Prior art keywords
underground structure
existing underground
floor slab
lower floor
side walls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007076390A
Other languages
Japanese (ja)
Other versions
JP2008231863A (en
Inventor
仁 藤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP2007076390A priority Critical patent/JP4759532B2/en
Publication of JP2008231863A publication Critical patent/JP2008231863A/en
Application granted granted Critical
Publication of JP4759532B2 publication Critical patent/JP4759532B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、軌条下や道路下を横断している地下道等の既設地下構造物を幅方向に拡げて大断面の地下道等に改築する既設地下構造物の拡幅方法に関するものである。   The present invention relates to a method for widening an existing underground structure in which an existing underground structure such as an underground passage or the like crossing under a rail or a road is expanded in the width direction and reconstructed into an underground passage or the like having a large cross section.

軌条下や道路下を横断するように設けられている既設の地下道等の地下構造物の通路幅を拡げる場合には、従来から、該既設地下構造物をこの既設地下構造物よりも幅広い既製の構造物と置換する方法が行われている。例えば、特許文献1に記載されているように、既設地下構造物の上床の上面に複数の細長板を該既設地下構造物の長さ方向に並列に敷設すると共にこの上床の両側方における該上床と同じ高さ位置に細長板を載置した複数本のパイプを並列状態に打設したのち全ての細長板の端部を不動箇所に固定し、さらに、既設地下構造物の下床にレールを敷設してこのレール上に仮受台車を既設地下構造物の長さ方向に移動自在に載せて該既設地下構造物の両側壁から切り離された上床を支持させ、しかるのち、この既設地下構造物の後端面から上記パイプ列の後端面に亘って既製構造物の上床前端面を突き合わせ状に後続させてこの既製構造物を推進させることにより、既設地下構造物を既製構造物に置換する作業を行っている。   When expanding the width of an underground structure such as an existing underground passage that crosses under a rail or a road, the existing underground structure is conventionally made wider than the existing underground structure. A method of replacing the structure has been performed. For example, as described in Patent Document 1, a plurality of elongated plates are laid in parallel in the length direction of the existing underground structure on the upper surface of the upper floor of the existing underground structure, and the upper floor on both sides of the upper floor After placing a plurality of pipes on which elongated plates are placed in parallel at the same height position, the ends of all the elongated plates are fixed at a fixed location, and a rail is attached to the lower floor of the existing underground structure. Laying and placing a temporary carriage on this rail in a movable manner in the length direction of the existing underground structure to support the upper floor separated from both side walls of the existing underground structure, and then this existing underground structure By replacing the existing underground structure with the ready-made structure by propelling the ready-made structure by following the upper end front end face of the ready-made structure in abutting manner from the rear end face of the pipe row to the rear end face of the pipe row, Is going.

この際、既製構造物の推進に先行して該既製構造物側から既設地下構造物の両側壁と上記下床とを破壊等の適宜な手段により撤去しながら既製構造物を推進させることにより、既設地下構造物の上床を支持している仮受台車を下床に敷設したレール上で前進させながら上床を到達側に押し出している。
特公平06−105025号公報
At this time, prior to the promotion of the ready-made structure, by pushing the ready-made structure while removing both side walls of the existing underground structure and the lower floor from the ready-made structure side by appropriate means such as destruction, The temporary floor cart that supports the upper floor of the existing underground structure is pushed forward on the rail laid on the lower floor, and the upper floor is pushed to the arrival side.
Japanese Patent Publication No. 06-105025

上記のように、鉄道等の軌条下や道路下において既設地下構造物を既製構造物に置換する工事を行う際には、道路や鉄道等を供用させた状態でその直下を横断する方向に既製構造物を推進させることになるので、既設地下構造物の上床を到達側に向かって押し進める際に、軌条や道路等の地表面が沈下することは安全上許されない。   As described above, when replacing existing underground structures with ready-made structures under rails or roads such as railways, they are ready-made in the direction crossing directly under the road or railway. Since the structure is to be propelled, it is not allowed for safety that the ground surface such as a rail or a road sinks when the upper floor of the existing underground structure is pushed toward the arrival side.

このため、上記従来工法においては、既設地下構造物の下床上にレールを敷設して、このレール上を前進移動する仮受台車によって上記上床を一定高さ位置に支持させているが、レールの上面に僅かでも高低差が生じていると、上床が推進中に上下に変位して地表面が変動する虞れがあると共に、レールの長さ方向と上床を押し進める既製構造物の推進方向とが正確に一致していなければ、上床が仮受台車上を横振れ方向に変動して仮受台車と上床間に摺接摩擦力が発生し、この摩擦力に打ち勝って上床を押し進めるには大きな推進力を必要とするため、予め、レールを精度よく敷設しておかなければならないばかりでなく、推進中においても上床の移動状態を管理しなければならないといった問題点がある。さらに、このような問題点は下床の表面の不陸が大きい場合にはより生じやすくなり、レールを精度良く敷設作業に困難性が増すことになる。   For this reason, in the conventional method, a rail is laid on the lower floor of the existing underground structure, and the upper floor is supported at a certain height position by a temporary carriage that moves forward on the rail. If there is a slight height difference on the upper surface, the upper floor may move up and down during propulsion and the ground surface may fluctuate, and the length direction of the rail and the propulsion direction of the ready-made structure that pushes the upper floor may differ. If they do not match exactly, the upper floor will move in the horizontal direction on the temporary carriage and a sliding frictional force will be generated between the temporary carriage and the upper floor. Since force is required, there is a problem that not only the rail must be laid in advance in advance, but also the moving state of the upper floor must be managed during propulsion. Furthermore, such a problem is more likely to occur when the surface of the lower floor is uneven, and the difficulty in laying the rail with high accuracy increases.

また、既製構造物の推進に先行して該既製構造物側から上記既設地下構造物の両側壁と上記下床とを破壊等の適宜な手段により撤去しながら既製構造物を推進させるものであるから、この既製構造物を一定長、推進させる前に、既設地下構造物をその両側壁から下床に亘ってそれらの後端部を所定長さ部分だけ、先に破壊、撤去しておかなければならないため、既設地下構造物を既製構造物に置換する作業能率が低下するといった問題点があった。   Further, prior to the promotion of the ready-made structure, the ready-made structure is promoted while removing both side walls of the existing underground structure and the lower floor from the ready-made structure side by an appropriate means such as destruction. Therefore, before propelling this ready-made structure for a certain length, the existing underground structure must be destroyed and removed by a predetermined length from the both side walls to the lower floor. Therefore, there is a problem that the work efficiency of replacing the existing underground structure with the ready-made structure is lowered.

本発明はこのような問題点に鑑みてなされたもので、その目的とするところは、既設地下構造物を該既設地下構造物よりも広幅の既製横長函体と置換するに際して、既設地下構造物の上床版を上下に変動させることなく、正確に水平方向に押し進めながら円滑且つ確実に既設地下構造物と既製横長函体とを置換することができる既設地下構造物の拡幅方法を提供するにある。   The present invention has been made in view of such problems. The purpose of the present invention is to replace an existing underground structure with an existing horizontal box having a width wider than that of the existing underground structure. The present invention provides a widening method for an existing underground structure that can smoothly and surely replace an existing underground structure and an existing horizontally long box while pushing the upper floor slab up and down accurately in a horizontal direction. .

上記目的を達成するために本発明の既設地下構造物の拡幅方法は、請求項1に記載したように、地中に築造されている上床板と両側壁とからなる既設地下構造物の拡幅方法であって、既設地下構造物の上床版の上面に複数の細長板を該既設地下構造物の長さ方向に並列に敷設すると共にこの上床版の側方における該上床版と同じ高さ位置に細長板を載置した複数本のパイプを並列状態に打設することにより並列パイプを形成する工程と、この工程と前後又は並行して、上記既設地下構造物の両側壁下端部間に下床版をこの既設地下構造物の長さ方向に摺動自在に設け、且つこの下床版と上記上床版間に仮受体を設けてこの仮受体により上床版を支持した状態で既設地下構造物の上床版と両側壁とを切り離す工程と、この既設地下構造物に該既設地下構造物よりも広幅の既製横長函体を後続させてこの既製横長函体の上床部の前端を既設地下構造物の上床版の後端及び上記並列パイプの後端に突き合わせ状に接合させると共に該既製横長函体の下床部の前端を上記下床版の後端に突き合わせ状に接合させる工程と、この工程後に既設地下構造物の両側壁を後端側から破壊等の適宜な手段により適宜長さ除去すると共にこの両側壁の除去長さに応じて不動箇所に固定された上記並列細長板の下面をガイド面として既設地下構造物の上床版を上記仮受体により支持させた状態で下床版と一体的に推進させることにより、既製横長函体と上記並列パイプとの推進を行って既設地下構造物と既製横長函体とを置換する工程とからなることを特徴とする。 In order to achieve the above object, the method for widening an existing underground structure according to the present invention is the method for widening an existing underground structure comprising an upper floor board and both side walls built in the ground as described in claim 1. And a plurality of elongated plates are laid in parallel in the length direction of the existing underground structure on the upper surface of the upper floor slab of the existing underground structure and at the same height position as the upper floor slab on the side of the upper floor slab. A step of forming a parallel pipe by placing a plurality of pipes on which elongated plates are placed in a parallel state, and a lower floor between the lower ends of both side walls of the existing underground structure before and after or in parallel with this step An existing underground structure in which a plate is slidably provided in the length direction of the existing underground structure, and a temporary receiver is provided between the lower floor plate and the upper floor plate, and the upper floor plate is supported by the temporary receiver. A process of separating the upper floor slab of the object and both side walls, and the existing underground structure And subsequent to cause a wide shelf horizontally a box body than underground construction with joining the front end of the top floor of the ready-made oblong box-body shape butt to the rear end of the rear end and the parallel pipe top floor version of the existing underground structures A step of joining the front end of the lower floor portion of the ready-made horizontal box to the rear end of the lower floor slab, and after this step, by appropriate means such as breaking both side walls of the existing underground structure from the rear end side With the length removed as appropriate, the upper floor slab of the existing underground structure is supported by the temporary support body with the lower surface of the parallel elongated plate fixed to the immovable location according to the removal length of both side walls as a guide surface. It is characterized by comprising a step of replacing the existing underground structure and the ready-made horizontal box by propelling the ready-made horizontal box and the parallel pipe by propelling integrally with the lower floor slab.

このように構成した既設地下構造物の拡幅方法において、請求項2に係る発明には、既設地下構造物の両側壁下端部間に下床版を設置する前に、この下床版の設置部分の下方に摺動面材を敷設しておき、この摺動面材上に下床版を摺動自在に載置することを特徴とし、請求項3に係る発明は、複数本の矩形パイプを上記摺動面材上に並列状態に設置することにより上記下床版を形成していることを特徴とする。   In the widening method of the existing underground structure configured as described above, the invention according to claim 2 includes the installation portion of the lower floor slab before the lower floor slab is installed between the lower ends of both side walls of the existing underground structure. A sliding surface material is laid below the sliding surface material, and a lower floor slab is slidably mounted on the sliding surface material, and the invention according to claim 3 comprises a plurality of rectangular pipes. The lower floor slab is formed by installing in parallel on the sliding face material.

一方、請求項4に係る発明は、既設地下構造物がその両側壁の下端部間に下床版を一体に設けてなる場合には、この下床版の下面に摺動面材を敷設したのち、該下床版を両側壁から切り離すことにより摺動面材上に摺動可能に設けることを特徴とする。   On the other hand, in the invention according to claim 4, when the existing underground structure has a lower floor slab integrally provided between the lower end portions of both side walls, a sliding surface material is laid on the lower surface of the lower floor slab. After that, the lower floor slab is provided so as to be slidable on the sliding face material by separating it from both side walls.

本発明の既設構造物の拡幅方法によれば、地中に築造されている既設地下構造物の両側壁下端部間に下床版をこの既設地下構造物の長さ方向に摺動自在に設けたのち、この下床版既設地下構造物の上床版間に仮受体を設けて該仮受体により上床版を支持した状態で既設地下構造物の上床版と両側壁とを切り離し、この既設地下構造物に該既設地下構造物よりも広幅の既製横長函体を後続させると共に既設地下構造物の両側壁を破壊等によってその後端側から適宜長さずつ除去しながら細長板をガイドして既設地下構造物の上床版を下床版と一体的に推進させると共に既製横長函体と上記既設地下構造物の上床版の側方に打設している並列パイプとを推進させて既設地下構造物と既製横長函体とを置換させるものであるから、仮受体は下床版上を移動することなく上下床版と一体的に前進移動させられるので、上床版を下床版に対して仮受体により常に一定の高さ位置に保持した状態で押し進めることができ、従って、この上床版の上方の軌条や道路等の地表面が沈下したり、変動したりするのを防止しながら、円滑且つ確実に既設地下構造物を広幅の既製横長函体により置換して既設地下構造物の拡幅を行うことができる。 According to the method for widening an existing structure of the present invention, a lower floor slab is provided slidably in the length direction of the existing underground structure between the lower ends of both side walls of the existing underground structure built in the ground. After that, a temporary receiver is provided between the upper floor slabs of the existing lower floor slab and the upper floor slab is supported by the temporary receiver to separate the upper floor slab from the both side walls. Install an elongated plate following an existing underground structure, which is wider than the existing underground structure, and remove both side walls of the existing underground structure from the rear end by appropriate length by breaking or the like. The existing underground structure is constructed by propelling the upper floor slab of the underground structure integrally with the lower floor slab and propelling the prefabricated horizontal box and the parallel pipes placed on the side of the upper floor slab of the existing underground structure. And the ready-made horizontal box, the temporary holder is on the lower floor plate. Since the upper floor slab can be moved forward integrally with the upper and lower floor slabs without moving, the upper floor slab can be pushed to the lower floor slab while being held at a constant height by the temporary support body. Smoothly and reliably replace the existing underground structure with a wide, pre-existing horizontal box while preventing the ground surface such as rails and roads above the plate from sinking or changing. Widening can be performed.

さらに、既製横長函体の推進に先行して該既製横長函体側から既設地下構造物の両側壁の後端部を所定長さだけ破壊、撤去するが、下床版は破壊されることなく、上床版と一体的に到達側に押し出して到達側で破壊、撤去するので、既設地下構造物の両側壁の後端部を所定長さだけ破壊、撤去したのち、直ちに既製横長函体の推進による既設地下構造物の置換作業を行うことができ、既設地下構造物の拡幅作業が能率よく行うことができる。   Furthermore, prior to the promotion of the ready-made horizontal box, the rear ends of both side walls of the existing underground structure are destroyed and removed from the pre-made horizontal box side by a predetermined length, but the lower floor slab is not destroyed, Since it is pushed out to the arrival side integrally with the upper floor slab and destroyed and removed on the arrival side, the rear ends of both side walls of the existing underground structure are destroyed and removed by a predetermined length, and then immediately by the promotion of the ready-made horizontal box The replacement work of the existing underground structure can be performed, and the widening work of the existing underground structure can be performed efficiently.

また、請求項2に係る発明によれば、既設地下構造物の両側壁下端部間に上記下床版を設置する前に、この下床版の設置部分の下方に摺動面材を敷設しておき、この摺動面材上に下床版を前後方向に摺動自在に載置するので、摺動面材を、その上面が上床版の下面に平行となるように容易に敷設することができると共にこの摺動面材上で下床版を前進移動させるので、下床版上に設置した仮受体を介して上床版を一定の高さ位置に保持しながら該下床版を上床版と一体的に摺動面材上を円滑に到達側に向かって摺動移動させることができる。   Further, according to the invention of claim 2, before installing the lower floor slab between the lower ends of both side walls of the existing underground structure, a sliding surface material is laid below the installation part of the lower floor slab. In addition, since the lower floor slab is slidably mounted on the sliding surface material in the front-rear direction, the sliding surface material should be easily laid so that its upper surface is parallel to the lower surface of the upper floor slab. Since the lower floor slab is moved forward on the sliding surface material, the lower floor slab is held on the upper floor while holding the upper floor slab at a fixed height position via a temporary support placed on the lower floor slab. The sliding face material can be smoothly slid and moved toward the arrival side integrally with the plate.

上記下床版としては、請求項3に係る発明によれば、複数本の矩形パイプを上記摺動面材上に並列状態に設置することにより形成しているので、下床版を容易に形成することができると共に、仮受体を介して上床版を強固に支持することができる一定厚みの下床版を形成することができる。   According to the invention according to claim 3, the lower floor slab is formed by installing a plurality of rectangular pipes in parallel on the sliding surface material, so that the lower floor slab is easily formed. In addition, it is possible to form the lower floor slab with a certain thickness that can firmly support the upper floor slab via the temporary support.

一方、請求項4に係る発明によれば、両側壁の上端部間と下端部間とにそれぞれ上床版と下床版とを一体に設けてなる断面矩形状の既設地下構造物を既製横長函体と置換することにより拡幅する方法であって、この既設地下構造物の下床版の下面に摺動面材を敷設したのち、該下床版を両側壁から切り離すことにより摺動面材上で摺動可能な下床版とするものであるから、新たな下床版を設けることなく、この下床版上に仮受体を設置して、既設地下構造物の両側壁から切り離された上床版を該仮受体により支持させることができ、この状態で上記同様に該既設地下構造物の両側壁の後端部を所定長さだけ破壊、撤去しながら、この既設地下構造物の推進と後続する既製横長函体の推進とを一体に又は別々に行うことにより、上床版を下床版に対して仮受体により常に一定の高さ位置に保持した状態で押し進めて、既設地下構造物と既設地下構造物との置換による拡幅作業が能率よく行うことができる。   On the other hand, according to the fourth aspect of the present invention, an existing underground structure having a rectangular cross section in which an upper floor slab and a lower floor slab are integrally provided between the upper end portions and the lower end portions of both side walls is provided with a prefabricated oblong box. This is a method of widening by replacing the body with a sliding surface material on the lower surface of the lower floor slab of the existing underground structure, and then separating the lower floor slab from both side walls to Because it is a slidable lower floor slab, a temporary receiving body was installed on this lower floor slab without installing a new lower floor slab, and separated from both side walls of the existing underground structure. The upper floor slab can be supported by the temporary support body. In this state, the rear base of both sides of the existing underground structure is destroyed and removed by a predetermined length, and the existing underground structure is promoted. The upper floor slab is converted into the lower floor slab by performing the following and the subsequent promotion of the ready-made horizontal box integrally or separately. Constantly pushed while holding at a constant height position, the widening operation by replacement of the existing underground structures and the existing underground construction can be performed with good efficiency by by provisionally receptacle against.

本発明の具体的な実施の形態を図面について説明すると、図1は既設地下構造物1を、この既設地下構造物1と同じ高さを有し且つ横幅が該既設地下構造物1よりも広いRCコンクタート構造物からなる既製横長函体2と置換することによって既設地下構造物1を拡幅している状態の簡略縦断側面図であり、図2はその拡大縦断正面図であって、既設地下構造物1は全長に亘って一定幅と一定厚みを有する上床版1aと、この上床版1aの両側端の下面に上端面を一体に連設している一定高さの両側壁1b、1bとからなる断面門形状のコンクリート製構造物であり、この既設地下構造物1を軌条下又は通路下(以下、軌条3とする)を横断するようにこの軌条3の下方の地中に築造されていてその長さ方向の前後両端開口部を軌条3の両側方に開口させている。   A specific embodiment of the present invention will be described with reference to the drawings. FIG. 1 shows an existing underground structure 1 having the same height as the existing underground structure 1 and a wider width than the existing underground structure 1. FIG. 2 is a simplified longitudinal side view of a state in which the existing underground structure 1 is widened by replacing it with an existing horizontal box 2 made of an RC contact structure, and FIG. 2 is an enlarged longitudinal front view of the existing underground structure. The object 1 is composed of an upper floor slab 1a having a constant width and thickness over the entire length, and both side walls 1b and 1b having a constant height and having upper end surfaces integrally connected to the lower surfaces of both side ends of the upper floor slab 1a. It is a concrete structure with a cross-sectional gate shape, and is constructed in the ground below this rail 3 so as to cross this existing underground structure 1 under the rail or under the passage (hereinafter referred to as rail 3). Open both ends of the longitudinal direction on both sides of the rail 3 To have.

この既設地下構造物1を上記既製横長函体2と置換することによって拡幅するには、既設地下構造物1に既製横長函体2を後続させる側を発進側4とし、既設地下構造物1を押し出す側を到達側5として、まず、既設地下構造物1の上床版1aの上面に複数枚の鋼板製細長板6、6、6・・・6を互いにその長さ方向の両側端面同士が接した状態で並列に敷設する。この細長板6の敷設作業は、軌条3下の地盤を掘削して既設地下構造物1の上床版1aを露出させ、この上床版1a上に敷き並べたのち、地盤を埋め戻すことにより行ってもよく、又、地盤をそのままにして既設地下構造物1の上床版1a上に発進側4から到達側5に向かって貫通させるように細長板6を圧入、又は、到達側5からワイヤ等で牽引することにより行ってもよい。   In order to widen the existing underground structure 1 by replacing it with the above-mentioned prefabricated horizontal box 2, the side where the prefabricated horizontal box 2 follows the existing basement structure 1 is set as the start side 4, and the existing subsurface structure 1 is With the extrusion side as the arrival side 5, first, a plurality of steel plate strips 6, 6, 6... 6 are in contact with each other at both end surfaces in the length direction on the upper surface of the upper floor slab 1a of the existing underground structure 1. In parallel, lay in parallel. The long plate 6 is laid by excavating the ground below the rail 3 to expose the upper floor slab 1a of the existing underground structure 1 and placing it on the upper floor slab 1a, and then refilling the ground. Alternatively, the elongated plate 6 may be press-fitted on the upper floor slab 1a of the existing underground structure 1 with the ground as it is so as to penetrate from the starting side 4 toward the reaching side 5, or from the reaching side 5 with a wire or the like. It may be performed by towing.

さらに、この既設地下構造物1の上床版1aの両側方における該上床版1aと同じ高さ位置に、上面に上記細長板6と同大、同形の細長板6を載置した複数本の断面矩形状の鋼製パイプ7を並列状態に打設して横方向に連なった並列パイプを形成すると共に、この並列パイプの両側端から下方に向かって、上記パイプ7と同大、同形の複数本の鋼製のパイプ7を、このパイプ7に載置している細長板6を外側に向けた状態で縦方向に順次並列に打設することにより、一列状に積み重なった並列パイプを形成する。細長板6の前端はパイプ7の先端に切り離し可能に固着してあり、各パイプ7を地中に打設するにはパイプ7内にオーガー(図示せず)を挿入して前方の地盤を掘削しながら発進側4から到達側5に向かって推進させることにより行われる。なお、既設地下構造物1の上床版1aの両側方に並列したパイプ列における最外側のパイプ7、7間の幅を置換すべき既製横長函体2の横幅に等しくなるように打設されている。   Further, a plurality of cross-sections in which an elongated plate 6 of the same size and shape as the elongated plate 6 is placed on the upper surface at the same height as the upper floor plate 1a on both sides of the upper floor plate 1a of the existing underground structure 1. A rectangular steel pipe 7 is driven in parallel to form a parallel pipe that is continuous in the lateral direction, and a plurality of pipes of the same size and the same shape as the pipe 7 downward from both side ends of the parallel pipe. The steel pipes 7 are sequentially placed in parallel in the vertical direction with the elongated plates 6 placed on the pipes 7 facing outward to form parallel pipes stacked in a line. The front end of the elongated plate 6 is detachably fixed to the tip of the pipe 7, and in order to drive each pipe 7 into the ground, an auger (not shown) is inserted into the pipe 7 to excavate the front ground. However, it is performed by propelling from the start side 4 toward the arrival side 5. The existing underground structure 1 is placed so that the width between the outermost pipes 7 and 7 in the pipe row arranged in parallel on both sides of the upper floor slab 1a is equal to the width of the ready-made horizontal box 2 to be replaced. Yes.

これらの並列パイプの前端と上記上床版1aの上面に敷設している細長板6の前端とは到達側5に突出させてあり、並列パイプ上の全ての細長板6の前端をパイプ7から切り離したのち、これらの互いに横一列に並んでいる全ての細長板6の前端と縦方向に並んでいる全ての細長板6の前端とをこれらの細長板6が突出した地盤の側面に密着、支持させている定着枠12に溶接等によって一体に固着させる一方、発進側4においては後方に突出している全ての細長板6をこれらの細長板6上に直交して配設したH形鋼等よりなる連結部材13を全ての細長板6に溶接等によって固着することにより一体に連結する。なお、細長板6の前端をパイプ7から切り離す作業や端部の固定作業は、既設地下構造物1と既製横長函体2との置換を開始する前の任意の時期でよい。   The front ends of these parallel pipes and the front ends of the elongated plates 6 laid on the upper surface of the upper floor slab 1a are projected to the arrival side 5, and the front ends of all the elongated plates 6 on the parallel pipes are separated from the pipes 7. After that, the front ends of all of the elongated plates 6 aligned in a row and the front ends of all of the elongated plates 6 aligned in the vertical direction are in close contact with and supported by the side surface of the ground from which these elongated plates 6 protrude. On the starting side 4, all the elongated plates 6 projecting rearward are made of H-shaped steel or the like arranged orthogonally on these elongated plates 6, while being fixed integrally to the fixing frame 12 being welded. The connecting member 13 is integrally connected to all the elongated plates 6 by being fixed by welding or the like. The work of separating the front end of the elongated plate 6 from the pipe 7 and the work of fixing the end may be performed at any time before the replacement of the existing underground structure 1 and the ready-made horizontal box 2 is started.

また、上記既設地下構造物1の両側壁1b、1bの下端部間における床面に下床版11を既設地下構造物1の長さ方向に摺動移動自在に敷設する。この際、下床版11の摺動移動が円滑且つ上下方向に変動することなく正確に摺動可能にするために、この下床版11の設置部分の下方の地盤に上面が平滑面に形成された一定厚みを有する摺動面材9を下床版11の略全幅に亘って敷設、固定し、この摺動面材9上に下床版11を長さ方向に摺動自在に敷設している。なお、この摺動面材9は図1に示すように、発進側4の地表面上にまで連続的に水平面一状に敷設、固定している。   In addition, a lower floor slab 11 is slidably laid in the length direction of the existing underground structure 1 on the floor surface between the lower ends of both side walls 1b and 1b of the existing underground structure 1. At this time, in order to allow the sliding movement of the lower floor slab 11 to be smooth and accurately slid without fluctuation in the vertical direction, the upper surface is formed on a smooth surface below the installation portion of the lower floor slab 11 The sliding surface material 9 having a certain thickness is laid and fixed over substantially the entire width of the lower floor slab 11, and the lower floor slab 11 is laid on the sliding surface material 9 so as to be slidable in the length direction. ing. As shown in FIG. 1, the sliding surface material 9 is continuously laid and fixed in a horizontal plane up to the ground surface on the starting side 4.

上記下床版11としては、鋼板によって一定厚みを有する横長矩形枠状に形成してなる形状のものを使用してもよいが、図2に示すように上記パイプ7と同じ断面矩形状の鋼製パイプ11a を複数本、上記摺動面材9上に並列状態に設置し、これらのパイプ11a 、11a を順次互いに連結しながら打設することによって上面が一定高さの平滑な面に形成された下床版11を構成している。なお、このパイプ11a の打設作業も上記パイプ7と同様にその内部にオーガー(図示せず)を挿入して前方の地盤を掘削しながら発進側4から到達側5に向かって推進させることにより行われる。   As the lower floor slab 11, a steel plate having a shape that is formed in a horizontally long rectangular frame shape having a certain thickness with a steel plate may be used. However, as shown in FIG. A plurality of pipes 11a are installed in parallel on the sliding face material 9, and these pipes 11a, 11a are sequentially connected to each other to form a smooth surface with a constant height. The lower floor slab 11 is configured. As with the pipe 7, the auger (not shown) is inserted into the pipe 11a, and the pipe 11a is propelled from the start side 4 toward the arrival side 5 while excavating the front ground. Done.

既設地下構造物1の下端部間に上記下床版11を敷設したのち、この下床版11上に仮受体8を設置し、この仮受体8によって上床版1aを支持した状態で既設地下構造物1の上床版1aと両側壁1b、1bとを切り離す。仮受体8は下床版11の上面にその下側台板8a1 を支持させている固定基台8aと、この固定基台8aの上側台板8a2 上に長さ方向及び幅方向に所定間隔毎に立設、支持している複数本のジャッキ8bとこれらのジャッキ8b、8bの上端面間に架設、固定している複数本の支持桁8cとからなり、ジャッキ8bの伸長によって支持桁8cの上面を全長に亘って上床版1aの下面に押し付けてこの上床版1aを両側壁1b、1bから切り離される前の高さ位置に保持するように構成している。なお、上床版1aと両側壁1b、1bとの切り離しはワイヤソー(図示せず)によって行われる。   After laying the lower floor slab 11 between the lower ends of the existing underground structure 1, the temporary receiver 8 is installed on the lower floor slab 11 and the upper floor slab 1 a is supported by the temporary receiver 8. The upper floor slab 1a of the underground structure 1 is separated from both side walls 1b and 1b. The temporary support 8 has a fixed base 8a that supports the lower base plate 8a1 on the upper surface of the lower floor slab 11, and a predetermined interval in the length direction and the width direction on the upper base plate 8a2 of the fixed base 8a. It consists of a plurality of jacks 8b erected and supported each time and a plurality of support girders 8c installed and fixed between the upper end surfaces of these jacks 8b, 8b. The upper surface of the upper floor slab is pressed against the lower surface of the upper floor slab 1a over the entire length so that the upper floor slab 1a is held at a height position before being separated from the side walls 1b and 1b. The upper floor slab 1a and the side walls 1b and 1b are separated by a wire saw (not shown).

また、固定基台8aの上記上側台板8a2 はその幅をジャッキ8dによって拡縮可能に構成してあり、支持桁8cによって上床版1aを支持する前にこの上側台板8a2 の両側端面を、その側端面に塗布又は貼付したグリス等の滑材を介して、或いは、その側端面に装着したローラを介して上記両側壁1b、1bの内側面に摺動自在に押接させ、両側壁1b、1bが内側方に傾倒するのを防止している。なお、既設地下構造物1の下端部間に下床版11を敷設し、且つこの下床版11と上床版1a間に仮受体8を設けてこの仮受体8により上床版1aを支持した状態で上床版1aと両側壁1b、1bとを切り離す工程は、既設地下構造物1の上床版1aの上面に上記複数の細長板6を該既設地下構造物1の長さ方向に並列に敷設すると共にこの上床版1aの側方における該上床版1aと同じ高さ位置に細長板6を載置した複数本のパイプ7を並列状態に打設する工程の前後であってもよく、並行して行ってもよい。   Further, the upper base plate 8a2 of the fixed base 8a is configured such that its width can be expanded and contracted by a jack 8d, and before supporting the upper floor slab 1a by the support beam 8c, both side end surfaces of the upper base plate 8a2 are Via a sliding material such as grease applied or affixed to the side end face, or via a roller attached to the side end face, slidably pressed against the inner side face of the both side walls 1b, 1b, both side walls 1b, 1b is prevented from tilting inward. A lower floor slab 11 is laid between the lower ends of the existing underground structure 1, and a temporary receiver 8 is provided between the lower floor slab 11 and the upper floor slab 1a. The temporary receiver 8 supports the upper floor slab 1a. The process of separating the upper floor slab 1a and both side walls 1b, 1b in the state of being in the state is that the plurality of elongated plates 6 are arranged in parallel in the length direction of the existing underground structure 1 on the upper surface of the upper floor slab 1a of the existing underground structure 1. It may be before or after the step of laying and placing a plurality of pipes 7 in which the elongated plates 6 are placed at the same height as the upper floor slab 1a on the side of the upper floor slab 1a. You may do it.

このように、両側壁1b、1bの上端から切り離された上床版1aを仮受体8によって支持させたのち、この既設地下構造物1の後方の発進側4上に、該既設地下構造物1と同一高さで且つ横幅がこの既設地下構造物1よりも広い既製横長函体2を設置して既設地下構造物1に後続させ、既製横長函体2の上床部2aの前端面を既設地下構造物1の後端面とこの後端面から両側方に並設している並列パイプ7、7の後端面と亘って突き合わせ状に接合させると共にこの並列パイプ7、7の両側端から下方に向かって縦方向に並列しているパイプ7、7の後端面に該既製横長函体2の両側壁部2b、2bの前端面を突き合わせ状に接合させ、さらに、この既製横長函体2の下床部2cにおける幅方向の中央部前端面を上記下床版11の後端面に突き合わせ状に接合させる。   In this way, after the upper floor slab 1a separated from the upper ends of the side walls 1b, 1b is supported by the temporary support 8, the existing underground structure 1 is placed on the starting side 4 behind the existing underground structure 1. A prefabricated horizontal box 2 having the same height and width wider than the existing underground structure 1 is installed and followed by the existing underground structure 1, and the front end surface of the upper floor 2a of the prefabricated horizontal box 2 is installed in the existing basement. The rear end surface of the structure 1 and the rear end surfaces of the parallel pipes 7, 7 juxtaposed on both sides from the rear end surface are joined in a butting manner and downward from the both side ends of the parallel pipes 7, 7. The front end surfaces of both side walls 2b, 2b of the ready-made horizontal box 2 are joined to the rear end faces of the pipes 7, 7 arranged in parallel in the vertical direction, and the lower floor part of the ready-made horizontal box 2 is further joined. The front end surface in the center in the width direction in 2c is joined to the rear end surface of the lower floor slab 11 in a butted manner. The

なお、既設地下構造物1の後端面に既製横長函体2の前端面を直接、突き合わせた状態で後続させてもよいが、本実施例においては、図1に示すように、既製横長函体2の前端面にこの既製横長函体2の断面形状と同一形状の刃口枠14を装着し、さらに、この刃口枠14の前端面に既設地下構造物1の上床版1aと下床版11の後端面及び並列パイプ7、7の後端面を押圧する複数本の中押しジャッキ15を装着している。   Although the front end face of the ready-made horizontal box 2 may be directly brought into contact with the rear end face of the existing underground structure 1, in this embodiment, as shown in FIG. 2 is mounted on the front end face of the frame 2 with the same shape as the cross-sectional shape of the ready-made oblong box 2, and the upper floor slab 1a and the lower floor slab of the existing underground structure 1 are mounted on the front end face of the blade edge frame 14. A plurality of intermediate push jacks 15 for pressing the rear end face of 11 and the rear end faces of the parallel pipes 7 and 7 are mounted.

一方、既製横長函体2の後方の摺動面材9上に反力受止壁部材10を立設し、この反力受止壁部材10の上端に上記細長板6列の後端に固着している上記連結部材13をアンカー等の連結材16で連結すると共に、反力受止壁部材10の前面に複数本の推進ジャッキ17を装着し、この推進ジャッキ17と既製横長函体2の後端面間に押枠18を介在させる。反力受止壁部材10は摺動面材9上に固定してもよいし、前方に向かって移動自在に設置してもよい。   On the other hand, a reaction force receiving wall member 10 is erected on the sliding surface member 9 on the rear side of the prefabricated horizontally long box 2 and fixed to the upper end of the reaction force receiving wall member 10 at the rear end of the elongated plate 6 row. The connecting member 13 is connected by a connecting member 16 such as an anchor, and a plurality of propulsion jacks 17 are attached to the front surface of the reaction force receiving wall member 10. A push frame 18 is interposed between the rear end surfaces. The reaction force receiving wall member 10 may be fixed on the sliding face member 9, or may be installed so as to be movable forward.

このように既製横長函体2や反力受止壁部材10等を発進側4に配設したのち、上記中押しジャッキ15を伸長させると、既設地下構造物1の上床版1aと並列パイプ7、7は、定着枠12や連結部材13等によって不動状態に固定されている細長板6をガイドとしてその対向面雨に摺接しながら一定長、到達側5に向かって前進すると共にこの既設地下構造物1の下床版11も摺動面材9上を摺動して上記上床版1aと一体的に同時に一定長、前進する。この際、上床版1aを支持している仮受体8も上床版1aを一定の高さ位置に保持しながら上下床版1a、11と共に前進移動する。   After the ready-made horizontal box 2 and the reaction force receiving wall member 10 are arranged on the starting side 4 as described above, when the intermediate push jack 15 is extended, the upper floor slab 1a of the existing underground structure 1 and the parallel pipe 7, 7 is a fixed-length elongate plate 6 fixed in a stationary state by the fixing frame 12 and the connecting member 13 as a guide, and moves forward toward the arrival side 5 while sliding in contact with the rain on the opposite surface, and this existing underground structure. The lower floor slab 11 of 1 also slides on the sliding face material 9 and advances together with the upper floor slab 1a simultaneously by a certain length. At this time, the temporary support body 8 supporting the upper floor slab 1a also moves forward together with the upper and lower floor slabs 1a and 11 while holding the upper floor slab 1a at a certain height position.

このように、既設地下構造物1の上下床版1a、11と並列パイプ7、7とを一定長、到達側5に推進させると、既設地下構造物1の両側壁1b、1bの後端部が上下床版1a、11の後端から上下床版1a、11の推進長だけ露出することになり、この露出した両側壁1b、1bの後端部を既製横長函体2内からハンマーなどによる破壊等の適宜な手段によって撤去する。しかるのち、発進側4に配設している推進ジャッキ17を伸長させることにより、既製横長函体2を細長板6と摺動面材9をガイドとして上記既製横長函体2と略同じ推進長だけ推進させる。この際、その推進速度に応じて上記中押しジャッキ15を収縮させることにより、既設地下構造物1側に推進ジャッキ17による推進力が伝達しないようにする。   In this way, when the upper and lower floor slabs 1a and 11 of the existing underground structure 1 and the parallel pipes 7 and 7 are propelled to the arrival side 5 by a certain length, the rear ends of both side walls 1b and 1b of the existing underground structure 1 Will be exposed from the rear end of the upper and lower floor slabs 1a and 11 by the propulsion length of the upper and lower floor slabs 1a and 11, and the exposed rear ends of the side walls 1b and 1b are exposed from inside the prefabricated horizontal box 2 by a hammer or the like. Remove by appropriate means such as destruction. After that, by extending the propulsion jack 17 disposed on the starting side 4, the prefabricated oblong box 2 is used as a guide with the elongated plate 6 and the sliding face member 9 as a guide. Just promote. At this time, the intermediate push jack 15 is contracted according to the propulsion speed so that the propulsive force by the propulsion jack 17 is not transmitted to the existing underground structure 1 side.

次いで、再び、中押しジャッキ15を伸長させることにより、既設地下構造物1の上下床版1a、11と並列パイプ7、7とを一体に一定長、到達側5に推進させたのち、その推進によって露出した既設地下構造物2の後部を破壊、撤去し、しかるのち、推進ジャッキ17を伸長させることによって既設地下構造物1に後続して既製横長函体2を同一長さだけ推進させ、この作業を繰り返し行うことによって既設地下構造物1と既製横長函体2とを置換し、軌条下に既設地下構造物1を拡幅した既製横長函体2からなる通路を築造するものである。   Next, the middle push jack 15 is extended again, so that the upper and lower floor slabs 1a, 11 of the existing underground structure 1 and the parallel pipes 7, 7 are integrally propelled to the arrival side 5 and then propelled. The rear part of the exposed existing underground structure 2 is destroyed and removed, and then the propulsion jack 17 is extended to propel the ready-made horizontal box 2 by the same length following the existing underground structure 1. By repeating the above, the existing underground structure 1 and the existing horizontal box 2 are replaced, and a passage made of the existing horizontal box 2 in which the existing underground structure 1 is widened under the rail is constructed.

この拡幅作業において、到達側5に押し出される既設地下構造物1の上下床版1a、11とパイプ7は、一定長、到達側5に突出する毎に切除する。また、既設地下構造物1の両側壁1b、1bの外側面から外側方に突出する既製横長函体2の両側部の前方の地盤は、既製横長函体2内からシャベル等の適宜な掘削具によって掘削、排除する。なお、既製横長函体2は長さ方向に数分割しておき、この既製横長函体2を既設地下構造物1に後続して継ぎ足しながら順次、推進して既設地下構造物1と置換してもよい。   In this widening operation, the upper and lower floor slabs 1a, 11 and the pipe 7 of the existing underground structure 1 pushed out to the arrival side 5 are cut each time they protrude to the arrival side 5 by a certain length. The ground in front of both sides of the prefabricated horizontal box 2 projecting outward from the outer side surfaces of the both side walls 1b and 1b of the existing underground structure 1 is an appropriate excavator such as a shovel from the prefabricated horizontal box 2 Exclude and eliminate by. The ready-made horizontal box 2 is divided into several parts in the length direction, and the ready-made horizontal box 2 is sequentially replaced with the existing underground structure 1 while being connected to the existing underground structure 1. Also good.

また、中押しジャッキ15を設けることなく、既製横長函体2の推進力によって既設地下構造物1を一体的に推進させてもよく、この場合にも既設地下構造物1の両側壁1b、1bをその後端側から適宜長さ、破壊等により除去する作業を先行して行い、この作業後に既設地下構造物1を既製横長函体2と一体的に上記両側壁1b、1bの破壊した長さ分だけ推進させるものであり、いずれにしても既設地下構造物1に既製横長函体2を後続させたのち、既設地下構造物の両側壁を後端側から破壊等の適宜な手段により適宜長さ除去する工程と、この両側壁の除去長さに応じて上記並列細長板の下面をガイド面として既設地下構造物の上床版を上記仮受体により支持させた状態で下床版と一体的に推進させると共に既製横長函体と上記並列パイプとの推進を行って既設地下構造物1と既製横長函体2とを置換するものである。   In addition, the existing underground structure 1 may be integrally propelled by the propulsive force of the ready-made horizontal box 2 without providing the intermediate push jack 15, and in this case, both side walls 1b and 1b of the existing underground structure 1 are After that, the work to remove from the end side by appropriate length, destruction, etc. is performed in advance. After this work, the existing underground structure 1 is integrated with the prefabricated horizontal box 2 for the length of the broken side walls 1b, 1b. In any case, after the existing horizontally long box 2 follows the existing underground structure 1, the both sides of the existing underground structure are appropriately lengthened by appropriate means such as destruction from the rear end side. In accordance with the removal length of the side walls and the lower surface of the parallel elongated plate, the upper floor slab of the existing underground structure is supported by the temporary support body in accordance with the removal length of the side walls, and integrally with the lower floor slab. And propulsion of ready-made horizontal box and the above parallel pipe It goes and replaces the existing underground structure 1 and the existing horizontally long box 2.

図3は、軌条3下に築造されている既設地下構造物1’は、上床版1aと両側壁1b、1bと下床版1cとを一体に設けてなる断面矩形状のコンクリート製構造物からなり、この既設地下構造物1'を該既設地下構造物1’と同じ高さを有し、且つ、横幅がこの既設地下構造物1’よりも広いRCコンクタート構造物からなる既製横長函体2'と置換することによって拡幅する方法を説明するための縦断正面図であって、この既設地下構造物1’を上記既製横長函体2と置換することによって拡幅するに際して、既設地下構造物1’の上床版1aの上面に複数枚の鋼板製細長板6、6、6・・・6を敷設することや、既設地下構造物1’の上床版1aの両側方における該上床版1aと同じ高さ位置に、上面に細長板6を載置した複数本の断面矩形状の鋼製パイプ7を並列状態に打設すると共にこの並列パイプの両側端から下方に向かってパイプ7をその細長板6を外側に向けた状態で縦方向に順次並列に打設すること、全ての細長板6をの端部を不動箇所に固定すること、発進側に推進ジャッキ17等の推進手段を配設する点などは上記実施例と同様であるので、同一部分には同一符号を付して詳細な説明を省略する。   Fig. 3 shows an existing underground structure 1 'built under the rail 3 from a concrete structure having a rectangular cross section in which an upper floor slab 1a, side walls 1b, 1b and a lower floor slab 1c are integrally provided. Thus, this existing underground structure 1 ′ has the same height as the existing underground structure 1 ′ and has a horizontal width that is wider than the existing underground structure 1 ′. It is a longitudinal sectional front view for explaining a method of widening by substituting with, and when widening by replacing this existing underground structure 1 'with the above-mentioned prefabricated horizontal box 2, existing underground structure 1' A plurality of steel strips 6, 6, 6... 6 are laid on the upper surface of the upper floor slab 1a, or the same height as the upper floor slab 1a on both sides of the upper floor slab 1a of the existing underground structure 1 ′. In this position, a plurality of steel pipes 7 having a rectangular cross section with an elongated plate 6 placed on the upper surface are arranged side by side. In addition, the pipes 7 are sequentially placed in parallel in the vertical direction with the elongated plates 6 facing outward from the opposite ends of the parallel pipes, and the ends of all the elongated plates 6 are Since the part is fixed to a stationary part and the propulsion means such as the propulsion jack 17 is arranged on the start side, the same parts are denoted by the same reference numerals and detailed description is omitted. To do.

上記実施例と異なる構成は、この既設地下構造物1' には下床版1cが一体に設けられている点であり、この下床版1cの下面に接して摺動面材9を埋設すると共に該下床版1c上に上記実施例で説明した同一構造の仮受体8を設置し、この仮受体8によって上床版1aを支持した状態で既設地下構造物1の上床版1aと両側壁1b、1bとをワイヤソーによって切り離し、さらに、下床版1cを両側壁1b、1bの下端からワイヤソーによって切り離すことにより、この下床版1cを上記上床版1aと共に既設地下構造物1' の長さ方向に移動可能にする。なお、摺動面材9はこの既設地下構造物1' の築造時に下床版1cの下面側に敷設されている場合には新たに埋設する必要とない。
Configuration different from the above embodiment, the lower deck 1c in the existing underground structures 1 'is a point which is provided integrally embedding the sliding surface member 9 in contact with the lower surface of the lower deck 1c In addition, the temporary receiver 8 having the same structure as described in the above embodiment is installed on the lower floor slab 1c, and the upper floor slab 1a is supported on both sides of the upper floor slab 1a with the temporary receiver 8 supporting the upper floor slab 1a. The walls 1b and 1b are separated from each other by a wire saw, and the lower floor slab 1c is separated from the lower ends of both side walls 1b and 1b by a wire saw, so that the lower floor slab 1c together with the upper floor slab 1a is the length of the existing underground structure 1 '. Move in the vertical direction. In addition, the sliding face material 9 does not need to be newly buried when it is laid on the lower surface side of the lower floor slab 1c when the existing underground structure 1 ′ is constructed.

このように、既設地下構造物1’の下床版1cを両側壁1b、1bから切り離したのち、上記実施例と同様に既設地下構造物1’に既製横長函体2'を後続させ、既設地下構造物1’の両側壁1b、1bを後端側から一定長さ部分、破壊等によって除去しながら、この両側壁1b、1bの一定長さ部分の除去毎に、細長板6と摺動面材9とをガイドとして既設地下構造物1’の上下床版1a、1bを仮受体8と共に一体に一定長さ推進させると共に、並列パイプ7と既製横長函体2'も一定長さ推進させることにより既設地下構造物1’と既製横長函体2'とを置換するものである。   In this way, after separating the lower floor slab 1c of the existing underground structure 1 'from the side walls 1b and 1b, the existing underground structure 1' is followed by the existing horizontally long box 2 'in the same manner as in the above embodiment. While removing both side walls 1b and 1b of the underground structure 1 'from the rear end by a fixed length portion, destruction, etc., each time the fixed length portions of both side walls 1b and 1b are removed, they slide with the elongated plate 6 The upper and lower floor slabs 1a and 1b of the existing underground structure 1 'are propelled together with the temporary support 8 for a fixed length using the face material 9 as a guide, and the parallel pipe 7 and the prefabricated horizontal box 2' are also driven with a fixed length. By doing so, the existing underground structure 1 'and the existing horizontally long box 2' are replaced.

この際、上記実施例で述べたように、既設地下構造物1’と既製横長函体2'との間に中押しジャッキ15を介在させている場合には、既設地下構造物1’の上下床版1a、1cを両側壁1b、1bの除去長さに応じて一定長、推進させたのち、既製横長函体2'を推進ジャッキ17によって一定長、推進させるが、中押しジャッキ15を設けることなく既設地下構造物1’の後端に既製横長函体2'を直接、突き合わせ状に接合させて既製横長函体2'を推進ジャッキ17によって推進させることにより、既設地下構造物1’の上下床版1a、1cを同時に一定長、既製横長函体2'と一体に推進させてもよい。この場合には、並列パイプ7も既製横長函体2'の前端面によって到達側5に推進されて押し出される。   At this time, as described in the above embodiment, when the intermediate pushing jack 15 is interposed between the existing underground structure 1 ′ and the existing horizontally long box 2 ′, the upper and lower floors of the existing underground structure 1 ′. After the plates 1a and 1c are propelled for a certain length according to the removal length of the side walls 1b and 1b, the ready-made horizontal box 2 'is propelled for a certain length by the propulsion jack 17, but without the intermediate push jack 15 being provided. By connecting the ready-made horizontal box 2 'directly to the rear end of the existing underground structure 1' in a butted manner and propelling the ready-made horizontal box 2 'by the propulsion jack 17, the upper and lower floors of the existing underground structure 1' The plates 1a and 1c may be simultaneously propelled together with a fixed length, ready-made horizontal box 2 '. In this case, the parallel pipe 7 is also pushed to the arrival side 5 by the front end face of the ready-made horizontal box 2 'and pushed out.

既設地下構造物を拡幅している状態の簡略縦断側面図。The simplified vertical side view of the state which has expanded the existing underground structure. そのA−A線における拡大縦断正面図。The enlarged vertical front view in the AA line. 別な構造の既設地下構造物を拡幅している状態の簡略縦断側面図。The simplified vertical side view of the state which has expanded the existing underground structure of another structure.

符号の説明Explanation of symbols

1 既設地下構造物
1a 上床版
1b 側壁
2 既製横長函体
3 軌条
4 発進側
5 到達側
6 細長板
7 パイプ
8 仮受体
9 摺動面材
11 下床版
1 Existing underground structure
1a Upper floor
1b Side wall 2 Ready-made horizontal box 3 Rail 4 Starting side 5 Arrival side 6 Elongated plate 7 Pipe 8 Temporary body 9 Sliding face material
11 Lower floor version

Claims (4)

地中に築造されている上床板と両側壁とからなる既設地下構造物の拡幅方法であって、既設地下構造物の上床版の上面に複数の細長板を該既設地下構造物の長さ方向に並列に敷設すると共にこの上床版の側方における該上床版と同じ高さ位置に細長板を載置した複数本のパイプを並列状態に打設することによって並列パイプを形成する工程と、この工程と前後又は並行して、上記既設地下構造物の両側壁下端部間に下床版をこの既設地下構造物の長さ方向に摺動自在に設け、且つこの下床版と上記上床版間に仮受体を設けてこの仮受体により上床版を支持した状態で既設地下構造物の上床版と両側壁とを切り離す工程と、この既設地下構造物に該既設地下構造物よりも広幅の既製横長函体を後続させてこの既製横長函体の上床部の前端を既設地下構造物の上床版の後端及び上記並列パイプの後端に突き合わせ状に接合させると共に該既製横長函体の下床部の前端を上記下床版の後端に突き合わせ状に接合させる工程と、この工程後に既設地下構造物の両側壁を後端側から破壊等の適宜な手段により適宜長さ除去すると共にこの両側壁の除去長さに応じて不動箇所に固定された上記並列細長板の下面をガイド面として既設地下構造物の上床版を上記仮受体により支持させた状態で下床版と一体的に推進させることにより、既製横長函体と上記並列パイプとの推進を行って既設地下構造物と既製横長函体とを置換する工程とからなることを特徴とする既設地下構造物の拡幅方法。 A method of widening an existing underground structure composed of an upper floor board and both side walls built in the ground, wherein a plurality of elongated plates are arranged on the upper surface of the upper floor slab of the existing underground structure in the length direction of the existing underground structure forming a parallel pipe by Da設a plurality of pipes mounted with the elongated plate to the same height as the upper deck at the side of the upper deck in parallel state with laid in parallel, the Before and after or in parallel with the process, a lower floor slab is provided between the lower ends of both side walls of the existing underground structure so as to be slidable in the length direction of the existing underground structure, and between the lower floor slab and the upper floor slab. And a step of separating the upper floor slab and both side walls of the existing underground structure in a state where the upper floor slab is supported by the temporary receiver and the existing underground structure is wider than the existing underground structure. The front end of the upper floor of this prefabricated horizontal box is already installed by following the prefabricated oblong box A step of joining the front end of the lower floor of the該既made oblong box making body causes joined to form butt to the rear end of the rear end and the parallel pipe top floor plate of the lower structure to form abutting the rear end of the lower deck After the step, the side walls of the existing underground structure are appropriately removed from the rear end side by appropriate means such as destruction, and the parallel elongated plates fixed to the immovable portion according to the removal length of the both side walls. The existing floor box and the parallel pipe are propelled together with the lower floor slab while the upper floor slab of the existing underground structure is supported by the temporary support body with the lower surface as the guide surface. A method of widening an existing underground structure, comprising a step of replacing an underground structure with an existing horizontal box. 既設地下構造物の両側壁下端部間に下床版を設置する前に、この下床版の設置部分の下方に摺動面材を敷設しておき、この摺動面材上に下床版を摺動自在に載置することを特徴とする請求項1に記載の既設地下構造物の拡幅方法。   Before installing the lower floor slab between the lower ends of both side walls of the existing underground structure, a sliding surface material is laid below the lower floor slab installation part, and the lower floor slab is placed on this sliding surface material. The method of widening an existing underground structure according to claim 1, wherein the slidable is placed slidably. 下床版は、複数本の矩形パイプを摺動面材上に並列状態に設置することにより形成されていることを特徴とする請求項1又は請求項2に記載の既設地下構造物の拡幅方法。   The method for widening an existing underground structure according to claim 1 or 2, wherein the lower floor slab is formed by installing a plurality of rectangular pipes in parallel on a sliding face material. . 既設地下構造物は、上床版と両側壁と下床版とからなり、この下床版の下面に摺動面材を敷設したのち、該下床版を両側壁から切り離すことにより摺動面材上に摺動可能に設けることを特徴とする請求項1に記載の既設地下構造物の拡幅方法。   The existing underground structure consists of an upper floor slab, both side walls, and a lower floor slab. After laying a sliding surface material on the lower surface of this lower floor slab, the lower floor slab is separated from both side walls, thereby sliding the surface material. The method for widening an existing underground structure according to claim 1, wherein the method is provided so as to be slidable upward.
JP2007076390A 2007-03-23 2007-03-23 Widening method of existing underground structure Active JP4759532B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007076390A JP4759532B2 (en) 2007-03-23 2007-03-23 Widening method of existing underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007076390A JP4759532B2 (en) 2007-03-23 2007-03-23 Widening method of existing underground structure

Publications (2)

Publication Number Publication Date
JP2008231863A JP2008231863A (en) 2008-10-02
JP4759532B2 true JP4759532B2 (en) 2011-08-31

Family

ID=39904995

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007076390A Active JP4759532B2 (en) 2007-03-23 2007-03-23 Widening method of existing underground structure

Country Status (1)

Country Link
JP (1) JP4759532B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101142783B1 (en) 2010-12-03 2012-05-08 (주)나우이앤씨 A train railroad outline area tunnel extension work-method and that structure
KR101408667B1 (en) 2014-02-26 2014-06-17 김동수 Method of constructing new tunnel using pre-existing tunnel structure
JP6434372B2 (en) * 2015-06-04 2018-12-05 植村 誠 Removal method of existing structures
JP6737851B2 (en) * 2018-08-30 2020-08-12 植村 誠 Removal method of existing tunnel structure by box roof method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06105025B2 (en) * 1988-06-02 1994-12-21 株式会社奥村組 Reconstruction method for existing underground structures
JPH0332685U (en) * 1990-08-10 1991-03-29
JP4073428B2 (en) * 2004-10-04 2008-04-09 株式会社奥村組 Underground construction method
JP4134089B2 (en) * 2005-04-14 2008-08-13 植村技研工業株式会社 Construction method for underground structures

Also Published As

Publication number Publication date
JP2008231863A (en) 2008-10-02

Similar Documents

Publication Publication Date Title
JP4759532B2 (en) Widening method of existing underground structure
KR101408667B1 (en) Method of constructing new tunnel using pre-existing tunnel structure
JP4698458B2 (en) Construction method for underground structures
JP4350113B2 (en) Box roof used in the construction method of underground structures
JP2006104744A (en) Underground structure embedding method
JP4698459B2 (en) Construction method for underground structures
JP5976728B2 (en) Widening method for existing structures
JP6737851B2 (en) Removal method of existing tunnel structure by box roof method
JP6434372B2 (en) Removal method of existing structures
JP2835418B2 (en) Pipe roof propulsion method and apparatus
JPH01304297A (en) Reconstruction of existing underground structure
JPH073155B2 (en) How to build an underground structure
JP2007154571A (en) Pipe for pipe roof
JP2684352B2 (en) How to build underground structures
JP4557918B2 (en) Pipe roof construction equipment
JP2860752B2 (en) Construction method of underpass formation structure and underpass introduction section
KR102108936B1 (en) Construction method for slab of undergroud structure
JP3105744B2 (en) Pipe roof and construction method
JP2006183316A (en) Construction equipment for pipe roof
JPS6145034B2 (en)
JPH09170396A (en) Construction method for roof for underground structure
JPH0555679B2 (en)
JP3946720B2 (en) How to bury underground structures
JPH06294283A (en) Method for constructing underground structure
JPH02252890A (en) Method for constructing underground structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090722

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110329

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110406

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110517

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110606

R150 Certificate of patent or registration of utility model

Ref document number: 4759532

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140610

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250