JP4610762B2 - 電力伝送ネットワークの安定度を査定するための方法及び装置 - Google Patents
電力伝送ネットワークの安定度を査定するための方法及び装置 Download PDFInfo
- Publication number
- JP4610762B2 JP4610762B2 JP2001066070A JP2001066070A JP4610762B2 JP 4610762 B2 JP4610762 B2 JP 4610762B2 JP 2001066070 A JP2001066070 A JP 2001066070A JP 2001066070 A JP2001066070 A JP 2001066070A JP 4610762 B2 JP4610762 B2 JP 4610762B2
- Authority
- JP
- Japan
- Prior art keywords
- network
- data
- substation
- system protection
- protection center
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 30
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000005259 measurement Methods 0.000 claims description 20
- 238000010248 power generation Methods 0.000 claims description 5
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 230000035484 reaction time Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 238000004883 computer application Methods 0.000 description 2
- 230000002123 temporal effect Effects 0.000 description 2
- ADHFMENDOUEJRK-UHFFFAOYSA-N 9-[(4-fluorophenyl)methyl]-n-hydroxypyrido[3,4-b]indole-3-carboxamide Chemical compound C1=NC(C(=O)NO)=CC(C2=CC=CC=C22)=C1N2CC1=CC=C(F)C=C1 ADHFMENDOUEJRK-UHFFFAOYSA-N 0.000 description 1
- 241001482237 Pica Species 0.000 description 1
- 239000003990 capacitor Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000000593 degrading effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012806 monitoring device Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
- 230000003449 preventive effect Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/24—Arrangements for preventing or reducing oscillations of power in networks
- H02J3/242—Arrangements for preventing or reducing oscillations of power in networks using phasor measuring units [PMU]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/22—Flexible AC transmission systems [FACTS] or power factor or reactive power compensating or correcting units
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
- Measurement Of Resistance Or Impedance (AREA)
Description
【発明が属する技術分野】
本発明は大規模な電力伝送ネットワークに関し、より詳細には請求項1および請求項7の前文によるところの電力伝送ネットワークの安定度を査定するための方法および装置に関する。
【0002】
【従来の技術】
電力送配電システムあるいはネットワークは、地理的に離れた領域を結んでいる高圧タイラインと電圧を変換し送電線間の接続を切換える変電所とを含んでいる。電力発生といくつかの発電所を含む送電ネットワークにおける電力流量は、中央のエネルギー管理システムによって制御されている。ネットワークに流れる電圧、電流、有効電力および無効電力の平均RMS(2乗平均)値の測定が、ネットワークのいろいろなところで行われている。ネットワーク全体からの測定値はエネルギー管理システムに集められ、ネットワークの状態のスナップショットを提供している。そのようなスナップショットは大体30秒毎に更新されている。スナップショットはネットワーク状態、特に潮流の静的な様態を示している。
【0003】
電圧余裕度にもとづいて、ネットワーク安定度を査定する方法は、米国電気電子工業会(IEEE)の電力産業のコンピュータ応用(PICA),1997年5月12日〜16日,におけるK.Vu他による「電圧安定度マージンを推定するためのローカル測定値の使用」、および電力システムコンピューテーション会議(PSCC),1999年6月,におけるK.Vu他による「電圧不安定予測子(VIP)とその応用」の論文で述べられている。両方の論文は、参考として本明細書に組み込まれている。これらの論文は、電圧崩壊への接近を推論するためにローカルに電流および電圧を測定する「電圧不安定予測子」(VIP)について記述している。VIPのコンセプトは図1に示されている。電力システムのひとつの部分は電(力)源として取扱われ、他の部分は負荷として取扱われる。電源はテブナンインピーダンスZThevをもつテブナン等価回路21によって表わされる。負荷は見かけの負荷インピーダンスZAppで表わされている。テブナンインピーダンスのZThevおよび見かけの負荷インピーダンスZAppはVIP装置22によって電流および電圧の測定値から推定される。これらのインピーダンスの関係は電源が崩壊にどれ位近づいているかを示すものである。IEEEの 電力におけるコンピュータ応用,1997年10月,におけるK.Vu他による論文「格子(グリッド)によるコンピュータ化した保護および制御」は、崩壊への接近というような発見結果をエネルギー管理システムに通知するVIP装置を開示している。
【0004】
米国特許第5,734,586号は、星形構造の不平衡配電線ネットワークの定常状態を最適化するためのシステムを開示している。この最適化は、ネットワークの状態を表わすデータで始まり、そして配電線を再構成するための切替え指令と無効電力補償のための容量および電圧レギュレータへの制御指令を決定している。
すべての引用されたドキュメントでは、システムレベルの反応時間は、相対的に遅いシステム管理機能によって制約されている。
【0005】
【発明が解決しようとする課題】
それ故に、本発明の目的は、送電ネットワークの状態の改良された動的な見方を提供する、送電ネットワークの安定度を査定する方法および装置を提供することである。本発明のさらなる目的は、負荷条件の急変に対してネットワークレベルでの素早い応答を可能とすることである。
これらの目的は、請求項1および請求項7による電力伝送ネットワークの安定度を査定する方法および装置によって達成される。
【0006】
【課題を解決するための手段】
本発明の方法は、複数の変電所、母線および送電線、及びシステム保護センターを含む電力伝送ネットワークの安定度を査定するものである。本方法は、
1.ネットワークの複数の箇所における電圧および電流に対するフェーザデータを測定する段階と、
2.フェーザデータを前記システム保護センターへ送信する段階と、
3.少なくとも1つの変電所の開閉器の状態に関する情報をシステム保護センターへ送信する段階と、
4.システム保護センターが送電ネットワークに関する少なくとも1つの安定度余裕値を決定する段階と、
を含む。
【0007】
このようにして、ネットワークの状態についての詳細なリアルタイム情報がネットワークのシステムレベルで集められ、これにより情報の、相当する全域的な分析が可能となる。
本発明の好ましい実施形態においては、システム保護センターはフェーザデータ及び開閉器の状態にもとづいて、1つまたはそれ以上の制御指令を決定する。
制御指令は少なくとも1つの変電所へ送信されてそこで実行される。
本発明によるシステム保護センター及び方法は、システムレベルでの電力ネットワークの保護を提供するものであり、現在の保護システムが局所的に動作し単に個々の送電線のみとか変圧器のような変電所の構成要素のみとかまたは発電機のみを保護しているのと対称的である。
【0008】
本発明の他の好ましい実施形態では、システム保護センターは、ネットワークの状態についての情報、例えば電力流量および潜在的または推定される今後の限界値または隘路、すなわち特定の線路または変電所で予想される過負荷状態、を決定する。この情報は、そのネットワーク状態情報に従ってネットワーク内の電力発生及び電力流量を制御するエネルギー管理システムへ送られる。このような制御は、ネットワークの応動を予測するものであるから、ネットワークの構成要素がその動作限界を越えてシャットダウンを余儀なくされ、もしかするとネットワークの状態をさらに悪化させてしまう前に、ネットワーク構成要素の過負荷が予見されこれを回避する。
【0009】
本発明の方法と装置は、フェーザデータを利用するものであるから、高い時間分解能を有する、電流、電圧および電力についてのリアルタイムな情報に依存している。これは、少なくとも1つの期間にわたって計算された平均値に相当しまたリアルタイムな情報ではないRMS値のようなスカラ情報とは対称をなすものである。そのような非リアルタイム情報は、既存のエネルギー管理システムで使われているように、およそ30秒の更新間隔を有している。結果として、本発明の方法がネットワークの潜在的な動揺(不安定度)を検知して、対策を決め対応する制御指令を送出するために要する反応時間は、100ミリ秒より小さく典型的には50ミリ秒より小さい。そのような早い反応時間はさらに過負荷または不安定となったネットワークで引起される崩壊事故の危険を減少させる。
本発明のさらに好ましい実施形態においては、フェーザデータは共通時間分配システムから得られる時間情報と関連づけられている。
さらに好ましい実施形態は従属する請求項から明らかである。
本発明の主題内容を、添付図面で図示されている好ましい例示的な実施形態を参照して以下の本文においてより詳細に説明する。
図面に使用されている参照記号とその意味が符号の説明にまとめて記載してある。原則的には、同一の部分は図において同一の参照記号が与えられている。
【0010】
【発明の実施の形態】
図2は、本発明を実行するための装置を含んでいる電力伝送ネットワークの制御システムの構成を示している。制御システムは、階層的にベイレベル12、ステーションレベル13およびネットワークレベル14を含んでいる。ベイレベル12は、例えば故障記録、ベイ保護、ベイ制御、負荷タップ切替え、負荷制限及び監視装置を含むベイ装置1を含む。ステーションレベル13は、順に変電所保護システム3および変電所制御システム4含む変電所自動化システム2を含む。変電所自動化システム2は、専用の信号線および/またはローカル通信網によってベイ装置1と通信する。変電所自動化システム2は、ベイ装置1からデータを集めベイ装置1に対して切替えや他の制御指令を送出する。他の制御指令は、変圧器のタップ設定あるいはコンデンサバンクまたはFACTS装置のような無効電力補償装置の制御を含む。通常の状態では、変電所自動化システム2は変電所に居る人的な運転員のどのような介在も受けないで動作している。
【0011】
ネットワークレベル14では、エネルギー管理システム7が複数の変電所自動化システム2から変電所データ5を収集している。集められたデータは、ネットワークの状態の概観を提供する。この概観にもとづいて、エネルギー管理システム7が、複数の変電所自動化システム2および/または発電プラントに制御指令6を送出することによって、電力発生及びネットワークの潮流を制御している。通常、このエネルギー管理プロセスは人による意志決定とその介在を含んでいる。例えば10〜15箇所より多い変電所をもちネットワークの地理的な分散に依存している大規模ネットワークにおいては、ネットワークレベルはひとつの中央にあるエネルギー管理システム7と協調する多くの従属のエネルギー管理システム7を備えた、エネルギー管理システム7の階層を含んでいる。
【0012】
本発明による方法を実行するために、システムは、ネットワークレベル14で、発明の装置、つまりシステム保護センター8を含んでいる。システム保護センター8は、例えば複数の変電所のベイレベル12におけるフィーダに設けられているおよび/または送電線の分岐点に設けられているフェーザ測定ユニット10からのフェーザデータ9を受信する。システム保護センター8は、変電所自動化システム2から変電所データ5を受信し、変電所自動化システム2へ制御指令を送信する。
エネルギー管理システム7の階層がある場合では、複数のシステム保護センター8が存在して、各々のシステム保護センター8がひとつの従属するエネルギー管理システム7と関連するのが好ましい。
【0013】
フェーザデータ9はフェーザを表わしており、極形式の数とすることができ、その絶対値はある量の実際の大きさまたはRMS値のいづれかに相当し、また時間基点における位相角に対する位相パラメータに相当する。もしくは、フェーザは実数と虚数部をもつ複素数とすることができ、あるいはフェーザは直交あるいは指数記数法を使用することができる。フェーザを用いて、位相コンダクタまたは電子回路に関連する電圧、電流、電力または電力量などの量を表わすことができる。それと対比して、電力ネットワークで使われている従来の感知装置は、一般的に電圧、電流などのRMS値のようなスカラーの平均表現値のみを測定している。
【0014】
本発明の方法では、フェーザデータ9は大きな地理的範囲、すなわち10から100キロメートルわたって分散されているフェーザ測定ユニット10から集められる。これらの異なる送信源からのフェーザデータ9は一緒にして解析されるので、これらのデータは共通する位相規準によらなければならない。言い換えれば、異なるフェーザ測定ユニット10は、所定の精度内に同期しているローカル時計を持たねばならない。フェーザ測定ユニット10のそのような同期化は、既知の時間分配システム、例えば全地球測位システム(GPS)で行われるのが好ましい。代表的な実施においては、フェーザデータ9は、好ましくは1ミリ秒より小さい時間分解能をもって、少なくとも200ミリ秒毎に、あるいは100ミリ秒毎に、あるいは好ましくは40ミリ秒毎に測定される。各々の測定値は、同期しているローカル時計から引き出されたタイムスタンプと関連づけられる。それ故に、フェーザデータ9はタイムスタンプデータを含んでいる。
【0015】
本発明の方法は、ネットワーク内の特定の構成体および/またはこれら構成体の組合わせに関係する安定度余裕値を決定することによって電力伝送ネットワークの安定度を査定する。本発明の従来の技術のところで述べたVIPシステムにおいては、安定度の測定値はインピーダンスで、または電圧余裕度として電圧で表現される。本発明の好ましい実施形態においては、電力余裕度は安定度マージンとして使用されている。電力余裕度は、電圧またはインピーダンス余裕度よりもずっと直観的な表現である。ローカルな電力余裕度は、例えばネットワークの特定の送電線を通して送ることのできる電力量を表わしている。全体の電力余裕度は、複数のフェーザ測定ユニット10から集められたフェーザデータ9を結合している。
【0016】
図3は、VIP装置が設置されている電力ネットワークのある所定のポイントにおける電圧と電流のプロットを示している。これはタイラインまたは負荷へのフィーダのところとすることができる。負荷がより強大になると、電流が増加し電圧は低下する。実際の電圧対電流カーブ(V/Iカーブ)は実線23によって表わされている。実際の応動はネットワーク全体から影響を受けるが、しかしVIP装置によるローカルな測定値から推定されている。VIPが、破線24により示されているこのカーブの推定値を計算し提供する。特に、カーブの傾斜は、VIP装置によって計算されたテブナンインピーダンスZThevに合致している。この推定されたカーブがあれば、現在のネットワーク状態で前記フィーダを通して送ることのできる、メガボルトアンペア(MVA)での最大電力が計算される。最大電力は見積られたV/Iカーブ24上で電流と電圧の積が最大であるポイントと合致している。電力余裕度は、現在の動作ポイント25に対しては、最大電力と現在送られている電力との差である。現時点の電流および電圧を、それぞれIt、Vtとする。この時前記フィーダに対応するローカルの電力余裕度ΔSは、
ΔS=(Vt−ZThevIt)2 / 4ZThev
【0017】
要約すれば、電力余裕度を計算する方法は、オンラインによる電流と電圧のフェーザ測定にもとづいて、ネットワークが崩壊する前にどれ位より多くの電力をタイラインを通して送ることができるか、あるいはどれ位より多くの電力が変電所によって引き出され得るかと言ういつでも適応される予測値を与る。これは危機的な状況を示すことになるであろう自動警報の崩壊事故ではなく、ネットワークがゆっくりと不安定方向へ動くような状況では特に有利である。
本発明のさらに好ましい実施形態においては、全体的な電力余裕度は複数のフェーザ測定ユニット10から集められたフェーザデータ9を結合している。それ故に全体的な電力余裕度はひとつのVIP装置ではなく、フィーダや線路または変電所のようなネットワークの構成体の組合せと関連づけられている。全体的な電力余裕度は、システム保護センター8によって決定されることが好ましい。特定のネットワーク配列に対して、全体的な電力余裕度を決定するいくつかの好ましい方法を以下に述べる。
【0018】
各々のフィーダがフェーザ測定ユニット10と関連づけられ、同一の母線に接続されている複数のフィーダに対して、全体的な電力余裕度が複数のフィーダの負荷の合計をひとつのひとかたまりの負荷と見倣すことによって計算される。全体の電力余裕度は、上述のローカルな電力余裕度と同様の方法で計算されるが、さらなる計算のベースとなる電流の合計を提供するために個々のフェーザ測定ユニット10の電流のフェーザ測定値が追加される。
複数の発電機と複数の負荷が共通の送電線を経て接続されている場合、その時は電力余裕度は、ローカルに、例えば各線路や各負荷に対して計算される。全体的な電力余裕度は、最悪のケースに合致し、即ち電力余裕度が最も小さいローカルの電力余裕度に等しくなる。ローカルな情報を使用して、最も危機的な場所において最小の電力のみが遮断されるように、負荷制限を調整する。
【0019】
いくつかの変電所が同一の負荷に供給する時は、加重平均電圧が変電所に対して割り当てられる。変電所からの分枝電流は合算され、見かけの負荷インピーダンスが計算されてそしてネットワーク等価の値が推定される。
全体の安定余裕度を計算するために、ネットワークのトポロジーが分らなければならない。この理由のために、変電所自動化システム2が変電所データ5、特に変電所の開閉器の状態についての情報をシステム保護センター8へ送信する。
それ故に、本発明の方法は、
1.ネットワークの複数の箇所における電圧および電流に対するフェーザデータを測定する段階と、
2.前記フェーザデータ9を前記システム保護センター8へ送信する段階と、
3.少なくとも1つの変電所の開閉器の状態に関する情報をシステム保護センター8へ送信する段階と、
4.システム保護センター8が送電ネットワークの少なくとも1つの安定度余
裕値を決定する段階と、
を含む。
【0020】
好ましい実施形態においては、本発明の方法はさらに、
1.フェーザデータ9および開閉器の状態5にもとづいて、1つまたはそれ以上の制御指令6を決定する段階と、
2.その制御指令6を少なくとも1つの変電所へ送信する段階と、
3.その制御指令6を少なくとも1つの変電所で実行する段階と、
を含む。
変電所自動化システム2に対して意味ある制御指令6を生成するために、ネットワークトポロジーがシステム保護センター8に知らされている。変電所自動化システム2に対して直接の制御指令6をシステム保護センター8が送出することは、観測された事象やネットワークの状態、特に不安定となる危険に対して短時間による反応を可能とする。そのような短い反応時間は100ミリ秒より小さく、典型的には50ミリ秒より小さい。これはおよそ30秒の更新サイクルタイムによって制約されているエネルギー管理システム7を通してネットワークレベルの異常に反応している現行実施より優れている。
【0021】
変電所自動化システム2の運転においてシステム保護センター8がこのように直ちに介入する事例は、危機的な負荷の制限と無効電力補償装置の制御である。
さらに好ましい実施形態においては、本発明の方法はさらに、
1.システム保護センター8が、電力流量および潜在的または推定される今後の限界値のようなネットワーク状態情報11を決定する段階と、
2.システム保護センター8が、前記ネットワーク状態情報11をエネルギー管理システム7へ送信する段階と、
3.エネルギー管理システム7が、前記ネットワーク状態情報11に従って電力発生及びネットワーク内の電力流量を制御する段階と、
を含む。
エネルギー管理システム7を介してシステム保護センター8がこのように間接的に介入する事例は、電力発生及び負荷制限の制御である。
【0022】
本発明の好ましい実施形態では、ネットワークのある状態が変電所自動化システム2へ制御指令6を自動的に送出させるか、またはエネルギー管理システム7の運転員へ警報を出すかのどちらに決めるかは、システム保護センター8が自動モードまたは手動モードのどちらの状態にあるかに依っている。
本発明の他の好ましい実施形態においては、システム保護センター8は、詳細なネットワークの諸量のシステム的な幅広い収集にもとづいている他の機能を提供する。例えば、システム保護センター8は故障またはネットワーク不安定の近傍にしばしば関連する負荷または線路部分を特定する。そのような分析は予防保全あるいは設備のアップグレードに対する基礎である。
【0023】
本発明のさらに好ましい実施形態では、システム保護センター8または複数のシステム保護センター8が、エネルギー管理システム7から分離したシステムとして設置されている。このことは、本発明のシステム保護センター8の機能性を備えることによって、既存のエネルギー管理システム7をアップグレードすることを可能にする。完全に新しい設置においては、エネルギー管理システム7およびシステム保護センター8の並列配置や部分的に独立した運転によって依頼性が増大する。
本発明の装置またはシステム保護センター8は、データ集信装置ユニット、システム保護ユニット、自動化制御ユニット、資産管理ユニットおよび故障評価ユニットを含んでいる。
データ集信装置ユニットは、フェーザ測定ユニット10から受信したフェーザデータ9を収集し、前処理を行って蓄積する。データ集信装置ユニットはまた、関連する変電所データ5、特にネットワークのトポロジー情報も収集している。すべての収集データにはタイムスタンプがつけられている。データ集信装置ユニットが収集した情報を他のユニットへ提供する。
【0024】
システム保護ユニットは、データ集信装置ユニットによって提供されたデータからネットワーク状態情報11をダイナミックに生成する。このようなネットワーク状態情報は、局部および/または全体の電圧および/または電力余裕度、及び送電線の能力を含んでいる。このネットワーク状態情報11を運転員は監視することができる。
自動化制御ユニットは、それが自動モードであるかまたは手動モードであるかに従って、ネットワーク状態情報11、およびデータ集信装置ユニットによって提供されたデータから制御指令6を生成する。
資産管理ユニットは、個々の構成要素からの監視データを集め、構成要素の状態についての情報を提供する。本発明の好ましい実施形態では、この構成要素の状態情報は自動制御ユニットによって考慮される。
【0025】
要約すると、システム保護センター8は電力伝送ネットワーク上に分散されている複数のフェーザ測定ユニット10からのフェーザデータ9を蓄積し、また複数の変電所自動化システム2からの変電所データを蓄積するためのデータ集信装置ユニットを含んでいる。両方の種類のデータは刻時情報と関連づけられている。システム保護センター8はさらに、送電ネットワークの少なくとも1つの安定度余裕値と他のネットワーク状態情報11を生成するシステム保護ユニットを含んでいる。
好ましい実施形態においては、システム保護センター8はさらに、少なくとも1つの安定度余裕値と他のネットワーク状態情報11から、及びデータ集信装置ユニットによって提供されたデータから変電所自動化システム2に対する制御指令6を生成する自動化制御ユニットを含んでいる。
他の好ましい実施形態では、システム保護センター8は、ネットワーク状態情報11をエネルギー管理システム7へ送信する手段を含んでいる。
【図面の簡単な説明】
【図1】従来の技術によるネットワーク安定度を査定する概念構成を概略的に示す図である。
【図2】本発明を実行するための装置と情報の流れ構成を概略的に示す図である。
【図3】電力ネットワークのある選択された位置における電流と電圧を示す図である。
【符号の説明】
1 ベイ装置
2 変電所自動化システム
3 変電所保護システム(SSPS)
4 変電所制御システム(SSCS)
5 変電所データ
6 制御指令
7 エネルギー管理システム(EMS)
8 システム保護センター(SPC)
9 フェーザデータ
10 フェーザ測定ユニット(PMU)
11 ネットワーク状態情報
12 ベイレベル
13 ステーションレベル
14 ネットワークレベル
21 テブナン等価回路
22 電圧不安定予測子(VIP)
23 実際のV/Iカーブ
24 推定されたV/Iカーブ
25 動作ポイント
Claims (9)
- 複数の変電所、母線および線路、及びシステム保護センター(8)を含む電力伝送ネットワークの安定度を査定する方法であって、
(a)前記ネットワークの複数の箇所における電圧および電流に対するフェーザ(9)データを測定する段階と、
(b)前記フェーザデータ(9)を前記システム保護センター(8)へ送信する段階と、
(c)少なくとも1つの変電所の変電所データ(5)を前記システム保護センター(8)へ送信する段階と、
(d)前記システム保護センター(8)が、前記フェーザデータ(9)及び前記変電所データから、前記送電ネットワークの安定度の尺度として、電力、電圧又はインピーダンスの少なくとも1つの安定度余裕値を決定する段階と、
をことを特徴とする方法。 - (a)前記システム保護センター(8)が1つまたはそれ以上の制御指令(6)を決定する段階と、
(b)前記システム保護センター(8)が前記制御指令(6)を少なくとも1つの変電所へ送信する段階と、
(c)前記変電所が前記制御指令(6)を実行する段階と、
をさらに含むことを特徴とする請求項1に記載の方法。 - (a)前記システム保護センター(8)がネットワーク
の状態情報(11)を決定する段階と、
(b)前記システム保護センター(8)が前記ネットワーク状態情報(11)をエネルギー管理システム(7)へ送信する段階と、
(c)前記エネルギー管理システム(7)が、前記ネットワーク状態情報(11)に従って、前記ネットワーク内の電力発生及び電力流量を制御する段階と、をさらに含むことを特徴とする請求項1に記載の方法。 - 前記フェーザデータ(9)が、少なくとも100ミリ秒毎に測定されることを特徴とする請求項1に記載の方法。
- 前記フェーザデータ(9)が、1ミリ秒より小さい時間分解能をもつタイムスタンプと関連づけられていることを特徴とする請求項1に記載の方法。
- 前記フェーザデータ(9)の測定が全地球測位システムからの刻時情報によって同期化されていることを特徴とする請求項1に記載の方法。
- 電力伝送ネットワーク上に分散されている複数のフェーザ測定ユニット(10)からのフェーザデータ(9)を蓄積するため、および、複数の変電所自動化システム(2)からの変電所データ(5)を蓄積するためのデータ集信装置ユニットと、前記フェーザデータ(9)及び前記変電所データから、前記伝送ネットワークの安定度の尺度として、電力、電圧又はインピーダンスの少なくとも1つの安定度余裕値を決定するためのシステム保護ユニットと、を含むことを特徴とする電力伝送ネットワークのシステム保護センター(8)。
- 少なくとも1つの前記安定度余裕値および前記データ集信装置ユニットによって提供されるデータから前記変電所自動化システム(2)に対する制御指令(6)を生成するための自動化制御ユニットを含むことを特徴とする請求項7に記載のシステム保護センター(8)。
- ネットワーク状態情報(11)を前記送電ネットワークのエネルギー管理システム(7)へ送信する手段を含むことを特徴とする請求項7に記載のシステム保護センター(8)。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP00810204A EP1134867B1 (en) | 2000-03-10 | 2000-03-10 | Method and device for assessing the stability of an electric power transmission network |
EP00810204:8 | 2000-03-10 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2001268794A JP2001268794A (ja) | 2001-09-28 |
JP4610762B2 true JP4610762B2 (ja) | 2011-01-12 |
Family
ID=8174595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001066070A Expired - Fee Related JP4610762B2 (ja) | 2000-03-10 | 2001-03-09 | 電力伝送ネットワークの安定度を査定するための方法及び装置 |
Country Status (6)
Country | Link |
---|---|
US (1) | US6754597B2 (ja) |
EP (1) | EP1134867B1 (ja) |
JP (1) | JP4610762B2 (ja) |
AT (1) | ATE421178T1 (ja) |
DE (1) | DE60041385D1 (ja) |
ES (1) | ES2320310T3 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101387061B1 (ko) * | 2012-10-18 | 2014-04-18 | 한국전력공사 | Pmu를 이용한 facts 기기 운용 장치 및 방법 |
Families Citing this family (70)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
PL199780B1 (pl) | 2001-12-20 | 2008-10-31 | B Spo & Lstrok Ka Z Ograniczon | Sposób badania stabilności napięciowej systemu elektroenergetycznego |
DE60119555T2 (de) * | 2001-12-21 | 2007-03-08 | Abb Schweiz Ag | Ermittlung der Betriebsgrenzwerte in einem Energieverteilungsnetz |
DE60108966D1 (de) | 2001-12-21 | 2005-03-24 | Abb Research Ltd | Zustandsbestimmung für ein Energieverteilungsnetz |
PL199777B1 (pl) | 2001-12-24 | 2008-10-31 | B Spo & Lstrok Ka Z Ograniczon | Sposób badania stabilności napięciowej systemu elektroenergetycznego |
CN1293441C (zh) * | 2002-06-10 | 2007-01-03 | 联想(北京)有限公司 | 机群电源电流电压实时采集处理的系统和方法 |
CA2400580A1 (en) * | 2002-09-03 | 2004-03-03 | Sureshchandra B. Patel | Systems of advanced super decoupled load-flow computation for electrical power system |
EP1416603B1 (en) | 2002-11-01 | 2015-01-21 | ABB Research Ltd. | Protection of an electric power transmission network |
EP1418477A1 (en) * | 2002-11-06 | 2004-05-12 | Abb Research Ltd. | Method for controlling an electric power transmission network |
WO2005015366A2 (en) * | 2003-08-08 | 2005-02-17 | Electric Power Group, Llc | Real-time performance monitoring and management system |
US7490013B2 (en) * | 2003-12-09 | 2009-02-10 | Oslsoft, Inc. | Power grid failure detection system and method |
KR100576511B1 (ko) * | 2004-05-11 | 2006-05-03 | 한국전기연구원 | 시계열 데이터를 이용한 전력계통 실시간 전압안정도위험지수 계산 시스템 및 방법 |
US20060224336A1 (en) * | 2005-04-05 | 2006-10-05 | Charles Petras | System and method for transmitting power system data over a wide area network |
US20060259255A1 (en) * | 2005-04-05 | 2006-11-16 | Anderson James C | Method of visualizing power system quantities using a configurable software visualization tool |
US7444248B2 (en) * | 2005-04-29 | 2008-10-28 | General Electric Company | System and method for synchronized phasor measurement |
US7480580B2 (en) * | 2005-10-18 | 2009-01-20 | Schweitzer Engineering Laboratories, Inc. | Apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system |
CN100381830C (zh) * | 2005-11-16 | 2008-04-16 | 上海华东电力信息工程技术有限公司 | 相量测量装置(pmu)现场校验方法 |
EP1830447A1 (en) * | 2006-03-02 | 2007-09-05 | ABB Research Ltd | Converter control unit using time-stamped voltage or current phasors |
US7630863B2 (en) * | 2006-09-19 | 2009-12-08 | Schweitzer Engineering Laboratories, Inc. | Apparatus, method, and system for wide-area protection and control using power system data having a time component associated therewith |
EP1909370A1 (en) | 2006-10-05 | 2008-04-09 | Abb Research Ltd. | Determination and use of power system sensitivities for power flow control |
US7603203B2 (en) * | 2006-10-09 | 2009-10-13 | Electric Power Research Institute, Inc. | Method for voltage instability load shedding using local measurements |
US7672812B2 (en) * | 2006-11-01 | 2010-03-02 | Abb Research Ltd. | Cable fault detection |
US7725295B2 (en) * | 2006-11-01 | 2010-05-25 | Abb Research Ltd. | Cable fault detection |
GB0712749D0 (en) * | 2007-07-02 | 2007-08-08 | Areva T & D Uk Ltd | Method of determining voltage stability margin for load shedding within an electrical power system |
US8655608B2 (en) * | 2007-09-28 | 2014-02-18 | Schweitzer Engineering Laboratories Inc | Symmetrical component amplitude and phase comparators for line protection using time stamped data |
US7930117B2 (en) * | 2007-09-28 | 2011-04-19 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for power swing and out-of-step detection using time stamped data |
US20090088990A1 (en) * | 2007-09-30 | 2009-04-02 | Schweitzer Iii Edmund O | Synchronized phasor processor for a power system |
WO2009076769A1 (en) * | 2007-12-17 | 2009-06-25 | The University Of British Columbia | A method and system for protecting an electrical power transmission network |
DE102008011824A1 (de) * | 2008-02-29 | 2009-09-10 | Siemens Aktiengesellschaft | Verwendung von Phasor Measurement Units für differentielle Globale Satellitennavigationssysteme (GNSS) |
US8494795B2 (en) * | 2008-05-05 | 2013-07-23 | Schweitzer Engineering Laboratories Inc | Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system |
WO2009136975A2 (en) | 2008-05-09 | 2009-11-12 | Accenture Global Services Gmbh | Method and system for managing a power grid |
KR100987167B1 (ko) * | 2008-10-01 | 2010-10-11 | 한국전력공사 | 다기 facts 기기의 제어방법 및 장치 |
NZ593725A (en) * | 2009-01-14 | 2013-09-27 | Accenture Global Services Ltd | Distribution system analysis using meter data |
US8554385B2 (en) * | 2009-09-11 | 2013-10-08 | Schweitzer Engineering Laboratories Inc. | Systems and methods for monitoring and controlling electrical system stability |
US20130116844A1 (en) * | 2009-12-03 | 2013-05-09 | A123 Systems, Inc. | Grid load synchronization device and method |
NL2003960C2 (nl) * | 2009-12-16 | 2011-06-20 | Stichting Energie | Gedistribueerde statusberekeningen in een elektriciteitsnetwerk met behulp van agenten. |
JP5259663B2 (ja) * | 2010-09-15 | 2013-08-07 | 株式会社東芝 | 計測装置およびプログラム |
US8738191B2 (en) * | 2010-09-17 | 2014-05-27 | Sarantos K. Aivaliotis | System and method for power grid management |
EP2490031B1 (en) * | 2011-02-15 | 2013-04-24 | ABB Technology AG | Method and system for measuring an electrical quantity in an electrical network |
EP2503667B1 (en) * | 2011-03-24 | 2014-03-19 | Schneider Electric GmbH | Merging Unit and Method of Operating a Merging Unit |
US9684020B2 (en) | 2011-03-24 | 2017-06-20 | Schneider Electric Gmbh | Merging unit and method of operating a merging unit |
WO2012163979A2 (en) * | 2011-05-30 | 2012-12-06 | Danmarks Tekniske Universitet | Assessment of power systems |
CN102255308B (zh) * | 2011-07-15 | 2014-03-12 | 中国电力科学研究院 | 一种配电网正常状态辨识方法 |
CN102324743B (zh) * | 2011-09-21 | 2015-07-08 | 国电南瑞科技股份有限公司 | 电力系统在线暂态安全稳定评估预想故障筛选方法 |
US8908343B2 (en) | 2011-10-31 | 2014-12-09 | General Electric Company | System for electric distribution system protection and control and method of assembling the same |
US8942856B2 (en) * | 2011-12-22 | 2015-01-27 | General Electric Company | Power converter and methods of controlling the same |
CN102567645B (zh) * | 2012-01-10 | 2014-10-22 | 河北省电力公司 | 基于在线理论网损计算的电网设备统计及计算网损的方法 |
CN102590675B (zh) * | 2012-02-28 | 2014-07-23 | 江西省电力科学研究院 | 多节点同步仿真测试方法 |
US9507367B2 (en) * | 2012-04-09 | 2016-11-29 | Clemson University | Method and system for dynamic stochastic optimal electric power flow control |
DE102013202005A1 (de) * | 2013-02-07 | 2014-08-07 | Siemens Aktiengesellschaft | Verfahren und Vorrichtung zum Betreiben eines Stromnetzes |
CN103413044B (zh) * | 2013-08-13 | 2016-03-30 | 东北电网有限公司 | 一种基于变电站量测信息的电力系统局部拓扑估计方法 |
US9985860B2 (en) | 2013-09-23 | 2018-05-29 | Schweitzer Engineering Laboratories, Inc. | Selection and display of polled and streamed electric power system measurements |
CN103617493B (zh) * | 2013-11-27 | 2016-07-27 | 北京国电通网络技术有限公司 | 一种任务处理方法及装置 |
CN103618385B (zh) * | 2013-12-03 | 2015-09-02 | 国家电网公司 | 一种提高精度的状态估计数据校正系统及方法 |
CN103823998B (zh) * | 2014-03-19 | 2017-05-10 | 国家电网公司 | 考虑网络拓扑变化对输电能力影响的薄弱断面确定方法 |
CN105515014B (zh) * | 2014-09-22 | 2018-05-29 | 国家电网公司 | 基于保护动作信息的风电场综合无功控制系统及控制方法 |
US9568516B2 (en) | 2014-09-23 | 2017-02-14 | Schweitzer Engineering Laboratories, Inc. | Determining status of electric power transmission lines in an electric power transmission system |
CN105743071B (zh) * | 2014-12-12 | 2018-07-20 | 国家电网公司 | 一种继电保护在线安全裕度评估系统 |
EP3096428B1 (en) * | 2015-05-18 | 2018-08-08 | General Electric Technology GmbH | Dynamic line rating determination apparatus and associated method |
DE102016102593B4 (de) | 2016-02-15 | 2017-08-31 | Maschinenfabrik Reinhausen Gmbh | Verfahren zum Steuern eines Regeltransformators und elektrische Anlage zum Koppeln zweier Wechselstromnetze |
US10404067B2 (en) | 2016-05-09 | 2019-09-03 | Utopus Insights, Inc. | Congestion control in electric power system under load and uncertainty |
CN106099984B (zh) * | 2016-07-29 | 2018-10-19 | 清华大学 | 一种数据驱动的主动配电网分布式电源最大容量评估方法 |
US10305932B2 (en) * | 2016-12-21 | 2019-05-28 | Abb Inc. | System and method for detecting false data injection in electrical substations |
US20180269681A1 (en) * | 2017-03-14 | 2018-09-20 | V & R Energy Systems Research, Inc. | Power systems and related voltage stability methods |
CN107658881A (zh) * | 2017-09-27 | 2018-02-02 | 国网上海市电力公司 | 基于戴维南等值方法的电压稳定临界点判断方法 |
US10664553B2 (en) | 2017-10-06 | 2020-05-26 | Schweitzer Engineering Laboratories, Inc. | Generating a representation of high-frequency signal data from an electric power delivery system |
US10923915B2 (en) * | 2018-03-13 | 2021-02-16 | Utopus Insights, Inc. | System and method for congestion forecasting in electrical networks |
CN111327057B (zh) * | 2020-03-13 | 2023-07-04 | 国网山东省电力公司潍坊供电公司 | 一种基于阻抗模裕度的线路过负荷联切系统及方法 |
CN112803381B (zh) * | 2021-03-10 | 2022-04-08 | 清华大学 | 全贯通式柔性牵引供电系统的接触网差动保护方法及装置 |
US11899517B2 (en) | 2021-08-26 | 2024-02-13 | Schweitzer Engineering Laboratories, Inc. | Event analysis and display |
CN114167200A (zh) * | 2021-11-04 | 2022-03-11 | 合肥中能电力科技有限公司 | 一种应用于能源管理的智能研判算法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0993792A (ja) * | 1995-09-22 | 1997-04-04 | Toshiba Corp | 電力系統動揺検出装置 |
JPH10336883A (ja) * | 1997-04-02 | 1998-12-18 | Toshiba Corp | 電力系統の脱調検出方法および脱調検出装置 |
JPH1198718A (ja) * | 1997-09-17 | 1999-04-09 | Chugoku Electric Power Co Inc:The | 雷情報処理装置並びに送電線の事故情報伝送装置及び事故情報伝送方法 |
JPH11341706A (ja) * | 1998-03-05 | 1999-12-10 | Toshiba Corp | 制御システム、電力系統保護制御システムおよびプログラムを記憶した記憶媒体 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2677190B1 (fr) * | 1991-06-03 | 1993-09-03 | Merlin Gerin | Dispositif de teletransmission a courants porteurs en ligne destine au controle commande d'un reseau electrique, notamment a moyenne tension. |
US5428549A (en) * | 1993-05-28 | 1995-06-27 | Abb Power T&D Company | Transmission line fault location system |
US5455776A (en) * | 1993-09-08 | 1995-10-03 | Abb Power T & D Company Inc. | Automatic fault location system |
US5703791A (en) * | 1994-02-17 | 1997-12-30 | Hitachi, Ltd. | Electric power system stabilization control apparatus and method thereof |
US5796258A (en) * | 1997-01-30 | 1998-08-18 | Abb Power T&D Company, Inc. | Adaptive quadrilateral characteristic distance relay |
US5995911A (en) * | 1997-02-12 | 1999-11-30 | Power Measurement Ltd. | Digital sensor apparatus and system for protection, control, and management of electricity distribution systems |
US6415244B1 (en) * | 1998-03-31 | 2002-07-02 | Mehta Tech, Inc. | Power monitoring system and method |
US6249719B1 (en) * | 1998-05-15 | 2001-06-19 | Abb Power T&D Company, Inc. | Applications and methods for voltage instability predictor (VIP) |
US6313752B1 (en) * | 1998-05-21 | 2001-11-06 | Steven P. Corrigan | System for displaying dynamic on-line operating conditions of an interconnected power transmission network |
-
2000
- 2000-03-10 DE DE60041385T patent/DE60041385D1/de not_active Expired - Lifetime
- 2000-03-10 ES ES00810204T patent/ES2320310T3/es not_active Expired - Lifetime
- 2000-03-10 EP EP00810204A patent/EP1134867B1/en not_active Expired - Lifetime
- 2000-03-10 AT AT00810204T patent/ATE421178T1/de not_active IP Right Cessation
-
2001
- 2001-03-08 US US09/800,570 patent/US6754597B2/en not_active Expired - Lifetime
- 2001-03-09 JP JP2001066070A patent/JP4610762B2/ja not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0993792A (ja) * | 1995-09-22 | 1997-04-04 | Toshiba Corp | 電力系統動揺検出装置 |
JPH10336883A (ja) * | 1997-04-02 | 1998-12-18 | Toshiba Corp | 電力系統の脱調検出方法および脱調検出装置 |
JPH1198718A (ja) * | 1997-09-17 | 1999-04-09 | Chugoku Electric Power Co Inc:The | 雷情報処理装置並びに送電線の事故情報伝送装置及び事故情報伝送方法 |
JPH11341706A (ja) * | 1998-03-05 | 1999-12-10 | Toshiba Corp | 制御システム、電力系統保護制御システムおよびプログラムを記憶した記憶媒体 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101387061B1 (ko) * | 2012-10-18 | 2014-04-18 | 한국전력공사 | Pmu를 이용한 facts 기기 운용 장치 및 방법 |
WO2014061889A1 (ko) * | 2012-10-18 | 2014-04-24 | 한국전력공사 | Pmu를 이용한 facts 기기 운용 장치 및 방법 |
Also Published As
Publication number | Publication date |
---|---|
ES2320310T3 (es) | 2009-05-21 |
US6754597B2 (en) | 2004-06-22 |
DE60041385D1 (de) | 2009-03-05 |
ATE421178T1 (de) | 2009-01-15 |
EP1134867B1 (en) | 2009-01-14 |
US20010021896A1 (en) | 2001-09-13 |
EP1134867A1 (en) | 2001-09-19 |
JP2001268794A (ja) | 2001-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4610762B2 (ja) | 電力伝送ネットワークの安定度を査定するための方法及び装置 | |
Schweitzer et al. | Synchrophasor-based power system protection and control applications | |
US10833507B2 (en) | Island detection and control of a microgrid | |
EP2522065B1 (en) | A method and system for power management in substations | |
US7973427B2 (en) | Converter control unit | |
CN102882229B (zh) | 风电场动态电压自动控制系统 | |
CN101194404B (zh) | 电力系统中的阻尼机电振荡 | |
EP1780858A1 (en) | Arrangement and method for protecting an electric power system | |
US20130073108A1 (en) | System and method for real-time monitoring of power system | |
Novosel et al. | Benefits of synchronized-measurement technology for power-grid applications | |
Zima | Special protection schemes in electric power systems: literature survey | |
KR20100037317A (ko) | 다기 facts 기기의 제어방법 및 장치 | |
US20220239149A1 (en) | Method for monitoring an electricity supply grid | |
CN115378031A (zh) | 低压分布式光伏计量采集系统及控制方法 | |
KR20230092406A (ko) | 부하 예측 모델 기반의 전압 최적화 제어를 통한 보전 전압 강하를 위한 전압 제어 장치 | |
KR101734151B1 (ko) | 송전선 과부하 해소를 위한 전력 계통 관리 방법 | |
Skok et al. | Monitoring and control of smart transmission grid based on synchronized measurements | |
Brosinsky et al. | HVAC/HVDC Control Center-Test and Demonstrator System | |
CN117044060A (zh) | 抢占式功率转换切换 | |
Min | Phasor measurement applications in China | |
Bright et al. | Integrated monitoring, protection, and control systems for industrial and commercial power systems | |
KR101734148B1 (ko) | 송전선 과부하 해소를 위한 혼잡 관리 시스템 | |
KR101734149B1 (ko) | 에너지 저장 장치를 이용한 송전선 과부하 관리 방법 | |
Provči et al. | A New Protection System Design of Active MV Distribution Network | |
Uhlig et al. | Hybrid cascaded operation of distribution grids |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080201 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090713 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090820 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20091112 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20091117 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091217 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20101007 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20101013 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131022 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |