JP4588207B2 - Steel column misalignment correction jig - Google Patents

Steel column misalignment correction jig Download PDF

Info

Publication number
JP4588207B2
JP4588207B2 JP2000394495A JP2000394495A JP4588207B2 JP 4588207 B2 JP4588207 B2 JP 4588207B2 JP 2000394495 A JP2000394495 A JP 2000394495A JP 2000394495 A JP2000394495 A JP 2000394495A JP 4588207 B2 JP4588207 B2 JP 4588207B2
Authority
JP
Japan
Prior art keywords
steel frame
jig
erection piece
erection
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000394495A
Other languages
Japanese (ja)
Other versions
JP2002194897A (en
Inventor
信二 岡田
昌義 岩生
清和 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technos Co Ltd
Original Assignee
Technos Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Technos Co Ltd filed Critical Technos Co Ltd
Priority to JP2000394495A priority Critical patent/JP4588207B2/en
Publication of JP2002194897A publication Critical patent/JP2002194897A/en
Application granted granted Critical
Publication of JP4588207B2 publication Critical patent/JP4588207B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、鉄骨柱の建方において、先に設置された柱用の下方の鉄骨と、該鉄骨に継ぎ足される上方の鉄骨との間に生じた目違いを修正するために用いられる治具に関する。
【0002】
【従来の技術】
従来、柱用の下方の鉄骨とその上方の鉄骨との水平方向に関する位置的関係を確定すべく、下方の鉄骨に対する上方の鉄骨のずれを解消するための治具が提案されている(特開平11−303404号および特開平11−303406号)。
【0003】
この治具は、上方の鉄骨の下端部および下方の鉄骨の上端部にそれぞれ設けられた2つのエレクションピースを受け入れ可能である一条のスリットを有する細長い本体と、該本体に設けられスリットの横断方向へ伸びる一対のねじ溝にそれぞれ螺合された一対のボルトとを備える。
【0004】
この治具によれば、下方のボルトのねじ込み操作により下方の鉄骨のエレクションピースに本体を固定した後、上方のボルトのねじ込み操作により、下方の鉄骨を反力受けとして上方の鉄骨のエレクションピースに水平外力を及ぼし、該鉄骨に水平方向変位を生じさせることができ、これにより、上下の両鉄骨間の目違いを修正する。
【0005】
前記目違いの修正後、治具は、上下の両鉄骨相互の本溶接までの間、新たな目違い発生の防止および上方の鉄骨の転倒防止のために使用状態を継続される。
【0006】
ところで、柱の建方においては、上下の両鉄骨の本溶接に先立ち、前記目違いが修正された2つの上方の鉄骨間に梁用鉄骨を配置し、その両端を上方の両鉄骨に連結する梁入れが行われる。
【0007】
しかし、梁用鉄骨に不可避的に存する製造誤差のため、梁入れの際に鉄骨に作用する水平力のために前記治具に変形が生じ、上下の両鉄骨間に再び目違いが生じることがある。
【0008】
この再発生に係る目違いの修正に当たり、各鉄骨のエレクションピースは前記治具の取り付けに供されているため、利用することができない。
【0009】
このため、従来においては、下方の鉄骨にブラケットを溶接し、該ブラケットに、上方の鉄骨に相対する液圧ジャッキを取り付けてなる治具を配置していた。この治具によれば、その液圧ジャッキを伸長動作させることにより、下方の鉄骨を反力受けとして、上方の鉄骨に水平力を及ぼし、新たに生じた目違いを修正することができる。
【0010】
しかし、これには、取り付けに多大の労力と時間とを要するだけでなく、その撤去にも同様に労力と時間とを要するという問題があった。
【0011】
【発明が解決しようとする課題】
したがって、本発明の目的は、梁入れによって柱用の上下の両鉄骨間に生じた目違いの修正に適し、かつ、取り付けおよび撤去の容易である目違い修正用治具を提供することにある。
【0012】
本発明は、先に設置された柱用の下方の鉄骨と、該鉄骨に継ぎ足される柱用の上方の鉄骨との間に生じた目違いを修正するために用いられる治具であって、本体とフック状の引き掛け部とを有する板体と、該板体の相対する上端面上及び下端面上に取り付けられた一対のナットと、両ナットにそれぞれ螺合された一対のボルトとを含み、前記引き掛け部は前記ナットとほぼ平行に前記本体から突出している。前記引き掛け部は両鉄骨の端部にそれぞれ設けられた2つのエレクションピース間を通して一方のエレクションピースにその一方の側で引き掛け可能であり、前記引き掛け部が前記一方のエレクションピースにその一方の側で引き掛けられるとき、両ナットの一方は、前記一方のエレクションピースにその反対の側で対向可能であり、両ナットの他方は、他方のエレクションピースに、前記一方のエレクションピースの前記反対の側と同じ側で対向可能である。
【0013】
両ナットの一方は、前記鉄骨と前記板体との間に手入れ空間を形成するための、前記鉄骨に当接可能の突出部を有する。
【0014】
【発明の作用および効果】
本発明によれば、目違いが生じた上下の両鉄骨のエレクションピースの一方、例えば下方の鉄骨のエレクションピースに板体の引き掛け部を引き掛け、次いで、このときに下方の鉄骨のエレクションピースに対向するナットに螺合したボルトを進めてその先端を前記エレクションピースに当接させ、その後、上方の鉄骨のエレクションピースに対向するナットに螺合したボルトを進めて該エレクションピースに水平外力を付与することにより、前記上方の鉄骨を下方の鉄骨上で水平移動させ、該下方の鉄骨に対する上方の鉄骨の水平方向に関するずれである目違いを修正することができる。
【0015】
本発明にあっては、板体と、これに取り付けられた2つのナットおよび該ナットに螺合されたボルトとからなる治具は全体的に平板状を呈する。また、前記板体の引き掛け部が上下の両鉄骨のエレクションピース間を通して一方のエレクションピースに引き掛け可能である。このことから、先に上下の両鉄骨の目違い修正のためにこれらのエレクションピースに他の治具が取り付けられていても、他の治具と両鉄骨との間に存する隙間に本発明の治具を差し入れて配置し、両エレクションピースを利用しての目違い修正が可能である。しかも、前記隙間への治具の差し入れによるその配置に困難はなく、容易に行うことができ、また、これと逆の操作による治具の撤去も容易に行うことができる。
【0016】
互いに相対するように配置された両ナットの一方に突出部を設けるときは、該突出部を一方の鉄骨に当接させることにより、治具を前記隙間に挿入することき、該鉄骨と治具の板体との間に該板体を握る作業員の指先の受け入れ空間を確保することができる。
【0017】
【発明の実施の形態】
図1および図2を参照すると、鉄骨柱の建方において、先に設置されかつ垂直に伸びるように調整された下方の鉄骨10と、該鉄骨に継ぎ足される上方の鉄骨12とが示されている。
【0018】
図示の鉄骨10,12はそれぞれ矩形の横断面形状を有する鋼管からなり、上方の鉄骨12は、下方の鉄骨10への継ぎ足しのため、例えばクレーン(図示せず)により下方の鉄骨10上に吊り下げられ、これに載置される。
【0019】
前記クレーンによる吊り下げのため、両鉄骨10,12の端部にそれぞれ複数の板状のエレクションピース14,16が取り付けられている。各エレクションピース14,16には、吊り下げに用いられるロープ(図示せず)やフックを通すための穴18(図2)が設けられている。より詳細には、4つのエレクションピース14,16が各鉄骨の4つの面にそれぞれこれと直交するように配置され上下方向へ伸びている。各エレクションピースは、通常、前記矩形の各辺の伸長方向に関する中央部にある。また、前記4つの面の各々における上下のエレクションピース14,16間には隙間が存する。
【0020】
図示の下方の鉄骨10とその上方の鉄骨12とは互いに整合した状態にある。すなわち、両鉄骨10,12は水平方向へのずれ(目違い)なしに、下方の鉄骨10の上端面と上方の鉄骨12の下端面とにおいて互いに接している。
【0021】
ところで、この整合状態は、従来の目違い修正用治具20(図2に想像線で示す。)の操作による目違いの修正を受けた後、さらに、本発明に係る後記治具22による目違い修正を受けた結果によるものである。
【0022】
すなわち、従来の治具20による目違い修正後に該治具の設置状態下で梁入れが行われ、該梁入れの際に再度生じた目違いを修正するために適用された本発明に係る治具22の操作により、想像線(図1)で示す位置にあった上方の鉄骨柱12が実線で示す位置まで矢印24の方向へ水平移動され、これにより、整合状態におかれている。
【0023】
従来の修正用治具20は、全体に細長い鋼製の本体26であって上下方向へ伸びる一条のスリット28が設けられた本体26を備える。
【0024】
治具20は、両鉄骨10,12のエレクションピース14,16が治具20のスリット28を経て伸びるように、上方の鉄骨12のエレクションピース16に吊持されている。
【0025】
治具の本体26の上下部にはそれぞれ2つのねじ溝(図示せず)が設けられ、両ねじ溝にそれぞれボルト30,32が螺合されている。両ボルト30,32は、それぞれ、本体26の外部からスリット28の内部へ、スリット28を横断する方向へ伸びている。
【0026】
前記鉄骨の互いに相対する各面のエレクションピース14,16に据えられた各治具の本体26は、下方のボルト30のねじ込み操作により、下方の鉄骨のエレクションピース14に固定される。上方のエレクションピース16は、下方の鉄骨10を反力受けまたは反力支持体として、上方のボルト32のねじ込み操作による該ボルトの押圧力を受けて、目違い状態にある上方の鉄骨12を水平方向へ移動させる。
【0027】
次に、本発明に係る目違い修正用治具22について説明する。
【0028】
本発明の治具22は、鋼製の板体34と、該板体に取り付けられた一対のナット36と、両ナット36にそれぞれ螺合された一対のボルト38とを備える。
【0029】
板体34は丸みを帯びた全体形状を有し、比較的大きい面積を有する本体40と、該本体から突出するフック状の引き掛け部42とからなる。両ナット36は、図1で見て、本体40の上端面上および下端面上にそれぞれ配置され、互いに相対している。
【0030】
引き掛け部42は、上下の鉄骨10,12のエレクションピース14,16相互間を挿通可能である長さ寸法(図1で見て上下方向に関する長さ)、より詳細には、板体34を鉄骨10,12の各面(前記4つの面のそれぞれ)と平行にした状態で上下の両エレクションピース間を挿通可能である寸法を有する。
【0031】
引き掛け部42は、また、本体40に向けて伸びる先細の先端部44と、該先端部および本体40とに連なる平坦面46とを有する。
【0032】
引き掛け部42は、これを一方向(図1で見て左方向)へ水平移動させて両エレクションピース14,16間に通した後、その先端部44と本体40との間の部分を規定する平坦面46が下方のエレクションピース14に当たるまで下降させ、次いで、先端部分44が下方のエレクションピース14に当たるまで反対方向(同右方向)へ水平移動させることにより該エレクションピースに引き掛けることができる。
【0033】
両ナット36が板体34の厚さ寸法よりわずかに大きい厚さ寸法を有し、板体34の表裏両と平行に伸びる軸線を有するため、従来の治具20が先に配置されかつ上下の両エレクションピース14,16に取り付けられているにも拘わらず、両鉄骨10,12と、従来の治具20との隙間48に本発明に係る治具22を配置することができる。
【0034】
両ナット36は、板体34の引き掛け部42をエレクションピース14に引き掛けかつ板体34を前記鉄骨の面と平行にするとき、それぞれ、下方のエレクションピース14および上方のエレクションピース16(より詳細には、これらの他方の面)に対向する。
【0035】
したがって、板体34は、下方のナット36に螺合されたボルト38を回してこれを進め、該ボルトの先端を下方のエレクションピース14に押し当てることにより、該エレクションピースしたがって鉄骨10に固定することができる。
【0036】
次いで、上方のナット36に螺合されたボルト38を回してこれを進め、上方のエレクションピース16に当接したのち、さらに進めると、上方の鉄骨12にそのエレクションピース16を介して、また、下方の鉄骨10に反力を担わせて、水平外力を付与することができる。これにより、下方の鉄骨10上にある上方の鉄骨12を平行移動させ、目違いを修正することができる。なお、図示の場合には、目違い修正に際し、もう1つの治具22が鉄骨10,12の裏側にも同様に配置され、これと図示の治具22とを同時またはほぼ同時に操作する。
【0037】
治具22は、これを上下に関して逆に配置し、その引き掛け部42を上方のエレクションピース16に引き掛けて配置することができ、その後、上方のボルト38を該エレクションピースに当接させ、次いで下方のボルト38のねじ込み操作を行うことによっても、目違いの修正が可能である。
【0038】
また、図2に示すように、一方(図示の例では上方)のナット36が突出した側面または突出部50を有するものとすることができる。これによれば、治具22の配置時、突出部50が鉄骨10または12に当接し、該鉄骨と板体34との間に、板体34を把持する作業員の手のための手入れ空間を確保することができる。図示の例に代えて、突出部50を他方のナット36にも同様に設けることができる。
【0039】
なお、本発明に係る治具22は、従来の治具20の代わりの治具としての使用も可能である。
【図面の簡単な説明】
【図1】上下の柱用鉄骨に適用された状態の本発明に係る治具の正面図である。
【図2】図1に示す状態の治具の右側面図である。
【符号の説明】
10,12 柱用の下方の鉄骨および上方の鉄骨
14,16 エレクションピース
20 従来の治具
22 本発明に係る治具
34,36,38 板体、ナットおよびボルト
42,44 板体の引き掛け部およびその先端部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a jig used for correcting a misalignment generated between a lower steel frame for a previously installed column and an upper steel frame added to the steel frame in the construction of the steel column. .
[0002]
[Prior art]
Conventionally, in order to determine the positional relationship in the horizontal direction between the lower steel frame for the column and the upper steel frame, a jig for eliminating the displacement of the upper steel frame with respect to the lower steel frame has been proposed (Japanese Patent Laid-Open No. Hei. 11-303404 and JP-A-11-303406).
[0003]
The jig includes an elongated main body having a single slit that can receive two erection pieces provided at the lower end of the upper steel frame and the upper end of the lower steel frame, and a transverse direction of the slit provided in the main body. And a pair of bolts respectively screwed into a pair of thread grooves extending to.
[0004]
According to this jig, after fixing the main body to the lower steel erection piece by screwing the lower bolt, the lower steel frame is used as a reaction force receiver to the upper steel erection piece by screwing the upper bolt. A horizontal external force can be exerted to cause horizontal displacement of the steel frame, thereby correcting the misunderstanding between the upper and lower steel frames.
[0005]
After the correction of the misalignment, the jig is kept in use for preventing the occurrence of a new misalignment and preventing the upper steel frame from toppling until the main welding between the upper and lower steel frames.
[0006]
By the way, in the column construction, prior to the main welding of the upper and lower steel frames, the beam steel frame is arranged between the two upper steel frames whose misalignment is corrected, and both ends thereof are connected to the upper steel frames. Beam insertion is performed.
[0007]
However, due to the manufacturing error that inevitably exists in the steel for beams, the jig is deformed due to the horizontal force acting on the steel when inserting the beam, and there is a difference between the upper and lower steel frames. is there.
[0008]
In correcting the mistake related to the re-generation, the erection piece of each steel frame is used for mounting the jig and cannot be used.
[0009]
For this reason, in the prior art, a bracket is welded to a lower steel frame, and a jig is attached to the bracket with a hydraulic jack attached to the upper steel frame. According to this jig, by extending the hydraulic jack, a horizontal force is exerted on the upper steel frame using the lower steel frame as a reaction force receiver, and a newly generated misunderstanding can be corrected.
[0010]
However, this has a problem that not only a great deal of labor and time is required for installation, but also the effort and time are required for the removal thereof.
[0011]
[Problems to be solved by the invention]
SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a misalignment correcting jig that is suitable for correcting misalignments generated between upper and lower steel frames for columns by beam insertion and that is easy to attach and remove. .
[0012]
The present invention is a jig used to correct a misunderstanding between a lower steel frame for a column installed earlier and an upper steel frame for a column added to the steel frame, And a hook having a hook-like hook, a pair of nuts mounted on the upper and lower ends facing each other, and a pair of bolts respectively screwed to the two nuts. The hook portion protrudes from the main body substantially parallel to the nut. The hooking part can be hooked on one side of one erection piece through two erection pieces provided at the ends of both steel frames, and the hooking part can be hooked on the one erection piece. One of the nuts can be opposed to the one erection piece on the opposite side, and the other of the nuts can be opposite the other erection piece to the opposite of the one erection piece. Can be opposed to the same side.
[0013]
One of the nuts has a protrusion that can contact the steel frame to form a care space between the steel frame and the plate.
[0014]
Operation and effect of the invention
According to the present invention, one of the upper and lower steel erection pieces in which a misunderstanding has occurred, for example, the lower steel erection piece is hooked with the hook portion of the plate body, and then the lower steel erection piece at this time The bolt screwed to the nut facing the head is advanced to bring the tip into contact with the erection piece, and then the bolt screwed to the nut facing the erection piece of the upper steel frame is advanced to apply a horizontal external force to the erection piece. By applying, the upper steel frame can be moved horizontally on the lower steel frame, and a misalignment that is a shift in the horizontal direction of the upper steel frame with respect to the lower steel frame can be corrected.
[0015]
In this invention, the jig | tool which consists of a plate body, two nuts attached to this, and the volt | bolt screwed together by this nut exhibits a flat plate shape as a whole. Further, the hooking portion of the plate body can be hooked to one erection piece through the erection pieces of the upper and lower steel frames. Therefore, even if other jigs are attached to these erection pieces in order to correct the misalignment between the upper and lower steel frames, the gaps between the other jigs and both steel frames can be used. It is possible to correct the misplacement by inserting and arranging jigs and using both erection pieces. Moreover, there is no difficulty in arranging the jig by inserting the jig into the gap, and the jig can be easily removed, and the jig can be easily removed by the reverse operation.
[0016]
When providing a projecting portion on one of the nuts arranged to face each other, when the jig is inserted into the gap by bringing the projecting portion into contact with one steel frame, the steel frame and the jig It is possible to secure a receiving space for a fingertip of an operator who holds the plate between the two plates.
[0017]
DETAILED DESCRIPTION OF THE INVENTION
Referring to FIGS. 1 and 2, in the construction of a steel column, there is shown a lower steel frame 10 that has been installed and adjusted to extend vertically, and an upper steel frame 12 that is added to the steel frame. .
[0018]
The illustrated steel frames 10 and 12 are each made of a steel pipe having a rectangular cross-sectional shape, and the upper steel frame 12 is suspended on the lower steel frame 10 by, for example, a crane (not shown) for addition to the lower steel frame 10. Lowered and placed on it.
[0019]
For suspension by the crane, a plurality of plate-like erection pieces 14 and 16 are attached to the ends of both steel frames 10 and 12, respectively. Each erection piece 14, 16 is provided with a rope (not shown) used for hanging and a hole 18 (FIG. 2) for passing a hook. More specifically, four erection pieces 14 and 16 are arranged on four surfaces of each steel frame so as to be orthogonal to each other and extend in the vertical direction. Each erection piece is usually in a central portion with respect to the extending direction of each side of the rectangle. Further, there is a gap between the upper and lower erection pieces 14 and 16 on each of the four surfaces.
[0020]
The lower steel frame 10 shown in the figure and the upper steel frame 12 are aligned with each other. That is, both the steel frames 10 and 12 are in contact with each other at the upper end surface of the lower steel frame 10 and the lower end surface of the upper steel frame 12 without any horizontal displacement (mistake).
[0021]
By the way, this alignment state is obtained by correcting the misunderstanding by the operation of the conventional misunderstanding correcting jig 20 (indicated by imaginary lines in FIG. 2), and then, by the postscript jig 22 according to the present invention. This is due to the results of the difference correction.
[0022]
That is, after correcting the misalignment by the conventional jig 20, beam insertion is performed under the installation state of the jig, and the repair according to the present invention applied to correct the misalignment that occurs again during the beam insertion. By the operation of the tool 22, the upper steel column 12 located at the position indicated by the imaginary line (FIG. 1) is moved horizontally in the direction of the arrow 24 to the position indicated by the solid line, thereby being brought into alignment.
[0023]
The conventional correction jig 20 includes a main body 26 that is an elongated steel main body 26 provided with a single slit 28 extending in the vertical direction.
[0024]
The jig 20 is suspended by the erection piece 16 of the upper steel frame 12 so that the erection pieces 14 and 16 of both the steel frames 10 and 12 extend through the slits 28 of the jig 20.
[0025]
Two screw grooves (not shown) are provided in the upper and lower portions of the jig main body 26, and bolts 30 and 32 are screwed into both screw grooves, respectively. Both bolts 30 and 32 extend from the outside of the main body 26 to the inside of the slit 28 in a direction crossing the slit 28.
[0026]
The main body 26 of each jig placed on the erection pieces 14 and 16 on the opposite surfaces of the steel frame is fixed to the lower steel erection piece 14 by screwing the lower bolt 30. The upper erection piece 16 receives the pressing force of the upper bolt 32 by the screwing operation of the upper bolt 32 using the lower steel frame 10 as a reaction force support or reaction force support, and horizontally displaces the upper steel frame 12 in a misplaced state. Move in the direction.
[0027]
Next, the mistake correcting jig 22 according to the present invention will be described.
[0028]
The jig 22 of the present invention includes a steel plate 34, a pair of nuts 36 attached to the plate, and a pair of bolts 38 respectively screwed to the nuts 36.
[0029]
The plate body 34 has a rounded overall shape, and includes a main body 40 having a relatively large area and a hook-shaped hooking portion 42 protruding from the main body. As shown in FIG. 1, both nuts 36 are arranged on the upper end surface and the lower end surface of the main body 40 and are opposed to each other.
[0030]
The hook portion 42 has a length dimension (length in the vertical direction as viewed in FIG. 1) that can be inserted between the erection pieces 14 and 16 of the upper and lower steel frames 10 and 12, more specifically, the plate body 34. It has dimensions that allow it to be inserted between the upper and lower erection pieces in a state parallel to the surfaces of the steel frames 10 and 12 (each of the four surfaces).
[0031]
The hooking portion 42 also has a tapered tip end portion 44 extending toward the main body 40 and a flat surface 46 connected to the tip end portion and the main body 40.
[0032]
The hooking portion 42 horizontally moves in one direction (leftward as viewed in FIG. 1) and passes between the two erection pieces 14 and 16, and then defines a portion between the tip portion 44 and the main body 40. The flat surface 46 to be moved is lowered until it hits the lower erection piece 14, and is then hooked to the erection piece by horizontally moving in the opposite direction (rightward direction) until the tip portion 44 hits the lower erection piece 14.
[0033]
Since both nuts 36 have a thickness dimension slightly larger than the thickness dimension of the plate body 34 and have an axis extending in parallel with both the front and back surfaces of the plate body 34, the conventional jig 20 is arranged first and the upper and lower Despite being attached to both erection pieces 14, 16, the jig 22 according to the present invention can be disposed in the gap 48 between both the steel frames 10, 12 and the conventional jig 20.
[0034]
When the hooks 42 of the plate body 34 are hooked on the erection piece 14 and the plate body 34 is made parallel to the surface of the steel frame, the nuts 36 are respectively provided on the lower erection piece 14 and the upper erection piece 16 (more In detail, it opposes these other surfaces).
[0035]
Therefore, the plate body 34 is fixed to the erection piece, that is, the steel frame 10 by rotating the bolt 38 screwed into the lower nut 36 and advancing the bolt 38 and pressing the tip of the bolt against the lower erection piece 14. be able to.
[0036]
Next, the bolt 38 screwed to the upper nut 36 is turned to advance it, and after contacting the upper erection piece 16, further advancement, the upper steel frame 12 is passed through the erection piece 16 and again. A horizontal external force can be applied by applying a reaction force to the lower steel frame 10. Thereby, the upper steel frame 12 on the lower steel frame 10 can be translated, and the misunderstanding can be corrected. In the case shown in the figure, another jig 22 is similarly arranged on the back side of the steel frames 10 and 12 when correcting the misunderstanding, and this jig 22 and the illustrated jig 22 are operated simultaneously or substantially simultaneously.
[0037]
The jig 22 can be disposed upside down with respect to the upper and lower portions thereof, and the hooking portion 42 can be hooked on the upper erection piece 16, and then the upper bolt 38 is brought into contact with the erection piece, Next, it is possible to correct the mistake by screwing in the lower bolt 38.
[0038]
Further, as shown in FIG. 2, one (upper in the illustrated example) nut 36 may have a side surface or a protruding portion 50 protruding. According to this, when the jig 22 is arranged, the projecting portion 50 abuts against the steel frame 10 or 12, and a maintenance space for a worker's hand holding the plate body 34 between the steel frame and the plate body 34. Can be secured. Instead of the illustrated example, the protruding portion 50 can be similarly provided on the other nut 36.
[0039]
The jig 22 according to the present invention can be used as a jig instead of the conventional jig 20.
[Brief description of the drawings]
FIG. 1 is a front view of a jig according to the present invention in a state where the jig is applied to upper and lower pillar steel frames.
FIG. 2 is a right side view of the jig in the state shown in FIG.
[Explanation of symbols]
10, 12 Lower steel frame for columns and upper steel frames 14, 16 Erection piece 20 Conventional jig 22 Jigs 34, 36, 38 according to the present invention Plate, nut and bolt 42, 44 Hook of plate And its tip

Claims (2)

先に設置された柱用の下方の鉄骨と、該鉄骨に継ぎ足される柱用の上方の鉄骨との間に生じた目違いを修正するために用いられる治具であって、本体とフック状の引き掛け部とを有する板体と、該板体の相対する上端面上及び下端面上に取り付けられた一対のナットと、両ナットにそれぞれ螺合された一対のボルトとを含み、前記引き掛け部は前記ナットとほぼ平行に前記本体から突出しており、前記引き掛け部は両鉄骨の端部にそれぞれ設けられた2つのエレクションピース間を通して一方のエレクションピースにその一方の側で引き掛け可能であり、前記引き掛け部が前記一方のエレクションピースにその一方の側で引き掛けられるとき、両ナットの一方は、前記一方のエレクションピースにその反対の側で対向可能であり、両ナットの他方は、他方のエレクションピースに、前記一方のエレクションピースの前記反対の側と同じ側で対向可能である、鉄骨柱の目違い修正用治具。A jig used to correct a misalignment between a lower steel frame for a column installed earlier and an upper steel frame for a column added to the steel frame, A plate having a hook, a pair of nuts mounted on opposite upper and lower surfaces of the plate, and a pair of bolts respectively screwed to the nuts. The part protrudes from the main body substantially parallel to the nut, and the hooking part can be hooked on one erection piece on one side through two erection pieces provided at the ends of both steel frames, respectively. And when the hook is hooked on one side of the one erection piece, one of the nuts can face the one erection piece on the opposite side, Write is the other erection piece, the possible opposite on the same side as the opposite side of the one erection piece jig tongue and groove modification of steel columns. 両ナットの一方は、前記鉄骨と前記板体との間に手入れ空間を形成するための、前記鉄骨に当接可能の突出部を有する、請求項1に記載の治具。2. The jig according to claim 1, wherein one of the nuts has a protruding portion capable of contacting the steel frame for forming a care space between the steel frame and the plate body.
JP2000394495A 2000-12-26 2000-12-26 Steel column misalignment correction jig Expired - Lifetime JP4588207B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000394495A JP4588207B2 (en) 2000-12-26 2000-12-26 Steel column misalignment correction jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000394495A JP4588207B2 (en) 2000-12-26 2000-12-26 Steel column misalignment correction jig

Publications (2)

Publication Number Publication Date
JP2002194897A JP2002194897A (en) 2002-07-10
JP4588207B2 true JP4588207B2 (en) 2010-11-24

Family

ID=18860117

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000394495A Expired - Lifetime JP4588207B2 (en) 2000-12-26 2000-12-26 Steel column misalignment correction jig

Country Status (1)

Country Link
JP (1) JP4588207B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106996197A (en) * 2016-01-25 2017-08-01 上海十三冶建设有限公司 The correcting device and its application method misplaced for steel construction vertical member counterpart
TWI668354B (en) * 2017-02-13 2019-08-11 日商特科能股份有限公司 Auxiliary tool for correction of alignment difference of steel column
JP7083969B1 (en) * 2022-02-28 2022-06-13 株式会社巴コーポレーション Jig for correcting misalignment of plate seams

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100487578B1 (en) * 2002-08-02 2005-05-03 최종해 Vertical scaffolding
JP2007186922A (en) * 2006-01-13 2007-07-26 Kayaba System Machinery Kk Misalignment correction device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5935900A (en) * 1982-08-20 1984-02-27 Ishikawajima Harima Heavy Ind Co Ltd Method for mating groove of plates to be welded and jig used for said method
JP2669292B2 (en) * 1993-03-17 1997-10-27 株式会社ダイフク Connecting device between trucks
JPH08199819A (en) * 1995-01-24 1996-08-06 Taisei Corp Method and equipment for constructing steel pipe column
JP2822012B2 (en) * 1995-04-18 1998-11-05 川崎重工業株式会社 Steel column construction adjustment jig
JP3375886B2 (en) * 1998-04-17 2003-02-10 テクノス株式会社 Steel column fall prevention method, slippage correction method and fixing jig

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106996197A (en) * 2016-01-25 2017-08-01 上海十三冶建设有限公司 The correcting device and its application method misplaced for steel construction vertical member counterpart
TWI668354B (en) * 2017-02-13 2019-08-11 日商特科能股份有限公司 Auxiliary tool for correction of alignment difference of steel column
JP7083969B1 (en) * 2022-02-28 2022-06-13 株式会社巴コーポレーション Jig for correcting misalignment of plate seams

Also Published As

Publication number Publication date
JP2002194897A (en) 2002-07-10

Similar Documents

Publication Publication Date Title
JP4384640B2 (en) A jig for assembling a splice plate for connecting a lower flange of an H-shaped steel frame and a method for assembling a splice plate using the jig.
JP4231053B2 (en) Jig for assembling splice plate for connecting upper flange of H-shaped steel frame and assembling method using the same
JP4588207B2 (en) Steel column misalignment correction jig
JP2001090347A (en) Re-erection device for joining long member
JP2883262B2 (en) Jig for adjusting joints of steel columns
JP4804274B2 (en) Wall panel mounting device
JP3176510B2 (en) Installation adjustment jig for building unit
JP7431673B2 (en) Position adjustment jig and building unit position adjustment method
JPS6125477B2 (en)
JPH0736963Y2 (en) Connection structure between columns and beams
JP2002349070A (en) Erection adjusting tool for pillar and pillar erecting method using the same
JP3861247B2 (en) Clamping device for lining plate and method for manufacturing the same
JP4034778B2 (en) Steel column re-installation jig
JPS61209728A (en) Bar stock bending device
JP2532097Y2 (en) Wall anchor
JP2500602Y2 (en) Beam material
JP2784546B2 (en) Connection metal fittings for shoring
JP3048255U (en) Wall panel fixtures
JPS587851Y2 (en) Joint structure of columns and horizontal members
JP2997347B2 (en) Automobile repair body fixing device
JP2001152555A (en) Connecting method and joint plate for building unit
JP3343242B2 (en) Jig used to connect steel frames
JP2799679B2 (en) Belly reinforcer
JP3020372U (en) Attachment device for cosmetic louvers in construction
JP2015059412A (en) Covering plate fitting instrument

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071026

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090925

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091006

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100427

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100430

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100817

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100908

R150 Certificate of patent or registration of utility model

Ref document number: 4588207

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130917

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term