JP4588207B2 - Steel column misalignment correction jig - Google Patents
Steel column misalignment correction jig Download PDFInfo
- Publication number
- JP4588207B2 JP4588207B2 JP2000394495A JP2000394495A JP4588207B2 JP 4588207 B2 JP4588207 B2 JP 4588207B2 JP 2000394495 A JP2000394495 A JP 2000394495A JP 2000394495 A JP2000394495 A JP 2000394495A JP 4588207 B2 JP4588207 B2 JP 4588207B2
- Authority
- JP
- Japan
- Prior art keywords
- steel frame
- jig
- erection piece
- erection
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、鉄骨柱の建方において、先に設置された柱用の下方の鉄骨と、該鉄骨に継ぎ足される上方の鉄骨との間に生じた目違いを修正するために用いられる治具に関する。
【0002】
【従来の技術】
従来、柱用の下方の鉄骨とその上方の鉄骨との水平方向に関する位置的関係を確定すべく、下方の鉄骨に対する上方の鉄骨のずれを解消するための治具が提案されている(特開平11−303404号および特開平11−303406号)。
【0003】
この治具は、上方の鉄骨の下端部および下方の鉄骨の上端部にそれぞれ設けられた2つのエレクションピースを受け入れ可能である一条のスリットを有する細長い本体と、該本体に設けられスリットの横断方向へ伸びる一対のねじ溝にそれぞれ螺合された一対のボルトとを備える。
【0004】
この治具によれば、下方のボルトのねじ込み操作により下方の鉄骨のエレクションピースに本体を固定した後、上方のボルトのねじ込み操作により、下方の鉄骨を反力受けとして上方の鉄骨のエレクションピースに水平外力を及ぼし、該鉄骨に水平方向変位を生じさせることができ、これにより、上下の両鉄骨間の目違いを修正する。
【0005】
前記目違いの修正後、治具は、上下の両鉄骨相互の本溶接までの間、新たな目違い発生の防止および上方の鉄骨の転倒防止のために使用状態を継続される。
【0006】
ところで、柱の建方においては、上下の両鉄骨の本溶接に先立ち、前記目違いが修正された2つの上方の鉄骨間に梁用鉄骨を配置し、その両端を上方の両鉄骨に連結する梁入れが行われる。
【0007】
しかし、梁用鉄骨に不可避的に存する製造誤差のため、梁入れの際に鉄骨に作用する水平力のために前記治具に変形が生じ、上下の両鉄骨間に再び目違いが生じることがある。
【0008】
この再発生に係る目違いの修正に当たり、各鉄骨のエレクションピースは前記治具の取り付けに供されているため、利用することができない。
【0009】
このため、従来においては、下方の鉄骨にブラケットを溶接し、該ブラケットに、上方の鉄骨に相対する液圧ジャッキを取り付けてなる治具を配置していた。この治具によれば、その液圧ジャッキを伸長動作させることにより、下方の鉄骨を反力受けとして、上方の鉄骨に水平力を及ぼし、新たに生じた目違いを修正することができる。
【0010】
しかし、これには、取り付けに多大の労力と時間とを要するだけでなく、その撤去にも同様に労力と時間とを要するという問題があった。
【0011】
【発明が解決しようとする課題】
したがって、本発明の目的は、梁入れによって柱用の上下の両鉄骨間に生じた目違いの修正に適し、かつ、取り付けおよび撤去の容易である目違い修正用治具を提供することにある。
【0012】
本発明は、先に設置された柱用の下方の鉄骨と、該鉄骨に継ぎ足される柱用の上方の鉄骨との間に生じた目違いを修正するために用いられる治具であって、本体とフック状の引き掛け部とを有する板体と、該板体の相対する上端面上及び下端面上に取り付けられた一対のナットと、両ナットにそれぞれ螺合された一対のボルトとを含み、前記引き掛け部は前記ナットとほぼ平行に前記本体から突出している。前記引き掛け部は両鉄骨の端部にそれぞれ設けられた2つのエレクションピース間を通して一方のエレクションピースにその一方の側で引き掛け可能であり、前記引き掛け部が前記一方のエレクションピースにその一方の側で引き掛けられるとき、両ナットの一方は、前記一方のエレクションピースにその反対の側で対向可能であり、両ナットの他方は、他方のエレクションピースに、前記一方のエレクションピースの前記反対の側と同じ側で対向可能である。
【0013】
両ナットの一方は、前記鉄骨と前記板体との間に手入れ空間を形成するための、前記鉄骨に当接可能の突出部を有する。
【0014】
【発明の作用および効果】
本発明によれば、目違いが生じた上下の両鉄骨のエレクションピースの一方、例えば下方の鉄骨のエレクションピースに板体の引き掛け部を引き掛け、次いで、このときに下方の鉄骨のエレクションピースに対向するナットに螺合したボルトを進めてその先端を前記エレクションピースに当接させ、その後、上方の鉄骨のエレクションピースに対向するナットに螺合したボルトを進めて該エレクションピースに水平外力を付与することにより、前記上方の鉄骨を下方の鉄骨上で水平移動させ、該下方の鉄骨に対する上方の鉄骨の水平方向に関するずれである目違いを修正することができる。
【0015】
本発明にあっては、板体と、これに取り付けられた2つのナットおよび該ナットに螺合されたボルトとからなる治具は全体的に平板状を呈する。また、前記板体の引き掛け部が上下の両鉄骨のエレクションピース間を通して一方のエレクションピースに引き掛け可能である。このことから、先に上下の両鉄骨の目違い修正のためにこれらのエレクションピースに他の治具が取り付けられていても、他の治具と両鉄骨との間に存する隙間に本発明の治具を差し入れて配置し、両エレクションピースを利用しての目違い修正が可能である。しかも、前記隙間への治具の差し入れによるその配置に困難はなく、容易に行うことができ、また、これと逆の操作による治具の撤去も容易に行うことができる。
【0016】
互いに相対するように配置された両ナットの一方に突出部を設けるときは、該突出部を一方の鉄骨に当接させることにより、治具を前記隙間に挿入することき、該鉄骨と治具の板体との間に該板体を握る作業員の指先の受け入れ空間を確保することができる。
【0017】
【発明の実施の形態】
図1および図2を参照すると、鉄骨柱の建方において、先に設置されかつ垂直に伸びるように調整された下方の鉄骨10と、該鉄骨に継ぎ足される上方の鉄骨12とが示されている。
【0018】
図示の鉄骨10,12はそれぞれ矩形の横断面形状を有する鋼管からなり、上方の鉄骨12は、下方の鉄骨10への継ぎ足しのため、例えばクレーン(図示せず)により下方の鉄骨10上に吊り下げられ、これに載置される。
【0019】
前記クレーンによる吊り下げのため、両鉄骨10,12の端部にそれぞれ複数の板状のエレクションピース14,16が取り付けられている。各エレクションピース14,16には、吊り下げに用いられるロープ(図示せず)やフックを通すための穴18(図2)が設けられている。より詳細には、4つのエレクションピース14,16が各鉄骨の4つの面にそれぞれこれと直交するように配置され上下方向へ伸びている。各エレクションピースは、通常、前記矩形の各辺の伸長方向に関する中央部にある。また、前記4つの面の各々における上下のエレクションピース14,16間には隙間が存する。
【0020】
図示の下方の鉄骨10とその上方の鉄骨12とは互いに整合した状態にある。すなわち、両鉄骨10,12は水平方向へのずれ(目違い)なしに、下方の鉄骨10の上端面と上方の鉄骨12の下端面とにおいて互いに接している。
【0021】
ところで、この整合状態は、従来の目違い修正用治具20(図2に想像線で示す。)の操作による目違いの修正を受けた後、さらに、本発明に係る後記治具22による目違い修正を受けた結果によるものである。
【0022】
すなわち、従来の治具20による目違い修正後に該治具の設置状態下で梁入れが行われ、該梁入れの際に再度生じた目違いを修正するために適用された本発明に係る治具22の操作により、想像線(図1)で示す位置にあった上方の鉄骨柱12が実線で示す位置まで矢印24の方向へ水平移動され、これにより、整合状態におかれている。
【0023】
従来の修正用治具20は、全体に細長い鋼製の本体26であって上下方向へ伸びる一条のスリット28が設けられた本体26を備える。
【0024】
治具20は、両鉄骨10,12のエレクションピース14,16が治具20のスリット28を経て伸びるように、上方の鉄骨12のエレクションピース16に吊持されている。
【0025】
治具の本体26の上下部にはそれぞれ2つのねじ溝(図示せず)が設けられ、両ねじ溝にそれぞれボルト30,32が螺合されている。両ボルト30,32は、それぞれ、本体26の外部からスリット28の内部へ、スリット28を横断する方向へ伸びている。
【0026】
前記鉄骨の互いに相対する各面のエレクションピース14,16に据えられた各治具の本体26は、下方のボルト30のねじ込み操作により、下方の鉄骨のエレクションピース14に固定される。上方のエレクションピース16は、下方の鉄骨10を反力受けまたは反力支持体として、上方のボルト32のねじ込み操作による該ボルトの押圧力を受けて、目違い状態にある上方の鉄骨12を水平方向へ移動させる。
【0027】
次に、本発明に係る目違い修正用治具22について説明する。
【0028】
本発明の治具22は、鋼製の板体34と、該板体に取り付けられた一対のナット36と、両ナット36にそれぞれ螺合された一対のボルト38とを備える。
【0029】
板体34は丸みを帯びた全体形状を有し、比較的大きい面積を有する本体40と、該本体から突出するフック状の引き掛け部42とからなる。両ナット36は、図1で見て、本体40の上端面上および下端面上にそれぞれ配置され、互いに相対している。
【0030】
引き掛け部42は、上下の鉄骨10,12のエレクションピース14,16相互間を挿通可能である長さ寸法(図1で見て上下方向に関する長さ)、より詳細には、板体34を鉄骨10,12の各面(前記4つの面のそれぞれ)と平行にした状態で上下の両エレクションピース間を挿通可能である寸法を有する。
【0031】
引き掛け部42は、また、本体40に向けて伸びる先細の先端部44と、該先端部および本体40とに連なる平坦面46とを有する。
【0032】
引き掛け部42は、これを一方向(図1で見て左方向)へ水平移動させて両エレクションピース14,16間に通した後、その先端部44と本体40との間の部分を規定する平坦面46が下方のエレクションピース14に当たるまで下降させ、次いで、先端部分44が下方のエレクションピース14に当たるまで反対方向(同右方向)へ水平移動させることにより該エレクションピースに引き掛けることができる。
【0033】
両ナット36が板体34の厚さ寸法よりわずかに大きい厚さ寸法を有し、板体34の表裏両と平行に伸びる軸線を有するため、従来の治具20が先に配置されかつ上下の両エレクションピース14,16に取り付けられているにも拘わらず、両鉄骨10,12と、従来の治具20との隙間48に本発明に係る治具22を配置することができる。
【0034】
両ナット36は、板体34の引き掛け部42をエレクションピース14に引き掛けかつ板体34を前記鉄骨の面と平行にするとき、それぞれ、下方のエレクションピース14および上方のエレクションピース16(より詳細には、これらの他方の面)に対向する。
【0035】
したがって、板体34は、下方のナット36に螺合されたボルト38を回してこれを進め、該ボルトの先端を下方のエレクションピース14に押し当てることにより、該エレクションピースしたがって鉄骨10に固定することができる。
【0036】
次いで、上方のナット36に螺合されたボルト38を回してこれを進め、上方のエレクションピース16に当接したのち、さらに進めると、上方の鉄骨12にそのエレクションピース16を介して、また、下方の鉄骨10に反力を担わせて、水平外力を付与することができる。これにより、下方の鉄骨10上にある上方の鉄骨12を平行移動させ、目違いを修正することができる。なお、図示の場合には、目違い修正に際し、もう1つの治具22が鉄骨10,12の裏側にも同様に配置され、これと図示の治具22とを同時またはほぼ同時に操作する。
【0037】
治具22は、これを上下に関して逆に配置し、その引き掛け部42を上方のエレクションピース16に引き掛けて配置することができ、その後、上方のボルト38を該エレクションピースに当接させ、次いで下方のボルト38のねじ込み操作を行うことによっても、目違いの修正が可能である。
【0038】
また、図2に示すように、一方(図示の例では上方)のナット36が突出した側面または突出部50を有するものとすることができる。これによれば、治具22の配置時、突出部50が鉄骨10または12に当接し、該鉄骨と板体34との間に、板体34を把持する作業員の手のための手入れ空間を確保することができる。図示の例に代えて、突出部50を他方のナット36にも同様に設けることができる。
【0039】
なお、本発明に係る治具22は、従来の治具20の代わりの治具としての使用も可能である。
【図面の簡単な説明】
【図1】上下の柱用鉄骨に適用された状態の本発明に係る治具の正面図である。
【図2】図1に示す状態の治具の右側面図である。
【符号の説明】
10,12 柱用の下方の鉄骨および上方の鉄骨
14,16 エレクションピース
20 従来の治具
22 本発明に係る治具
34,36,38 板体、ナットおよびボルト
42,44 板体の引き掛け部およびその先端部[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a jig used for correcting a misalignment generated between a lower steel frame for a previously installed column and an upper steel frame added to the steel frame in the construction of the steel column. .
[0002]
[Prior art]
Conventionally, in order to determine the positional relationship in the horizontal direction between the lower steel frame for the column and the upper steel frame, a jig for eliminating the displacement of the upper steel frame with respect to the lower steel frame has been proposed (Japanese Patent Laid-Open No. Hei. 11-303404 and JP-A-11-303406).
[0003]
The jig includes an elongated main body having a single slit that can receive two erection pieces provided at the lower end of the upper steel frame and the upper end of the lower steel frame, and a transverse direction of the slit provided in the main body. And a pair of bolts respectively screwed into a pair of thread grooves extending to.
[0004]
According to this jig, after fixing the main body to the lower steel erection piece by screwing the lower bolt, the lower steel frame is used as a reaction force receiver to the upper steel erection piece by screwing the upper bolt. A horizontal external force can be exerted to cause horizontal displacement of the steel frame, thereby correcting the misunderstanding between the upper and lower steel frames.
[0005]
After the correction of the misalignment, the jig is kept in use for preventing the occurrence of a new misalignment and preventing the upper steel frame from toppling until the main welding between the upper and lower steel frames.
[0006]
By the way, in the column construction, prior to the main welding of the upper and lower steel frames, the beam steel frame is arranged between the two upper steel frames whose misalignment is corrected, and both ends thereof are connected to the upper steel frames. Beam insertion is performed.
[0007]
However, due to the manufacturing error that inevitably exists in the steel for beams, the jig is deformed due to the horizontal force acting on the steel when inserting the beam, and there is a difference between the upper and lower steel frames. is there.
[0008]
In correcting the mistake related to the re-generation, the erection piece of each steel frame is used for mounting the jig and cannot be used.
[0009]
For this reason, in the prior art, a bracket is welded to a lower steel frame, and a jig is attached to the bracket with a hydraulic jack attached to the upper steel frame. According to this jig, by extending the hydraulic jack, a horizontal force is exerted on the upper steel frame using the lower steel frame as a reaction force receiver, and a newly generated misunderstanding can be corrected.
[0010]
However, this has a problem that not only a great deal of labor and time is required for installation, but also the effort and time are required for the removal thereof.
[0011]
[Problems to be solved by the invention]
SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a misalignment correcting jig that is suitable for correcting misalignments generated between upper and lower steel frames for columns by beam insertion and that is easy to attach and remove. .
[0012]
The present invention is a jig used to correct a misunderstanding between a lower steel frame for a column installed earlier and an upper steel frame for a column added to the steel frame, And a hook having a hook-like hook, a pair of nuts mounted on the upper and lower ends facing each other, and a pair of bolts respectively screwed to the two nuts. The hook portion protrudes from the main body substantially parallel to the nut. The hooking part can be hooked on one side of one erection piece through two erection pieces provided at the ends of both steel frames, and the hooking part can be hooked on the one erection piece. One of the nuts can be opposed to the one erection piece on the opposite side, and the other of the nuts can be opposite the other erection piece to the opposite of the one erection piece. Can be opposed to the same side.
[0013]
One of the nuts has a protrusion that can contact the steel frame to form a care space between the steel frame and the plate.
[0014]
Operation and effect of the invention
According to the present invention, one of the upper and lower steel erection pieces in which a misunderstanding has occurred, for example, the lower steel erection piece is hooked with the hook portion of the plate body, and then the lower steel erection piece at this time The bolt screwed to the nut facing the head is advanced to bring the tip into contact with the erection piece, and then the bolt screwed to the nut facing the erection piece of the upper steel frame is advanced to apply a horizontal external force to the erection piece. By applying, the upper steel frame can be moved horizontally on the lower steel frame, and a misalignment that is a shift in the horizontal direction of the upper steel frame with respect to the lower steel frame can be corrected.
[0015]
In this invention, the jig | tool which consists of a plate body, two nuts attached to this, and the volt | bolt screwed together by this nut exhibits a flat plate shape as a whole. Further, the hooking portion of the plate body can be hooked to one erection piece through the erection pieces of the upper and lower steel frames. Therefore, even if other jigs are attached to these erection pieces in order to correct the misalignment between the upper and lower steel frames, the gaps between the other jigs and both steel frames can be used. It is possible to correct the misplacement by inserting and arranging jigs and using both erection pieces. Moreover, there is no difficulty in arranging the jig by inserting the jig into the gap, and the jig can be easily removed, and the jig can be easily removed by the reverse operation.
[0016]
When providing a projecting portion on one of the nuts arranged to face each other, when the jig is inserted into the gap by bringing the projecting portion into contact with one steel frame, the steel frame and the jig It is possible to secure a receiving space for a fingertip of an operator who holds the plate between the two plates.
[0017]
DETAILED DESCRIPTION OF THE INVENTION
Referring to FIGS. 1 and 2, in the construction of a steel column, there is shown a
[0018]
The illustrated
[0019]
For suspension by the crane, a plurality of plate-
[0020]
The
[0021]
By the way, this alignment state is obtained by correcting the misunderstanding by the operation of the conventional misunderstanding correcting jig 20 (indicated by imaginary lines in FIG. 2), and then, by the
[0022]
That is, after correcting the misalignment by the
[0023]
The
[0024]
The
[0025]
Two screw grooves (not shown) are provided in the upper and lower portions of the jig
[0026]
The
[0027]
Next, the
[0028]
The
[0029]
The
[0030]
The
[0031]
The hooking
[0032]
The hooking
[0033]
Since both
[0034]
When the
[0035]
Therefore, the
[0036]
Next, the
[0037]
The
[0038]
Further, as shown in FIG. 2, one (upper in the illustrated example)
[0039]
The
[Brief description of the drawings]
FIG. 1 is a front view of a jig according to the present invention in a state where the jig is applied to upper and lower pillar steel frames.
FIG. 2 is a right side view of the jig in the state shown in FIG.
[Explanation of symbols]
10, 12 Lower steel frame for columns and upper steel frames 14, 16
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000394495A JP4588207B2 (en) | 2000-12-26 | 2000-12-26 | Steel column misalignment correction jig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000394495A JP4588207B2 (en) | 2000-12-26 | 2000-12-26 | Steel column misalignment correction jig |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2002194897A JP2002194897A (en) | 2002-07-10 |
JP4588207B2 true JP4588207B2 (en) | 2010-11-24 |
Family
ID=18860117
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000394495A Expired - Lifetime JP4588207B2 (en) | 2000-12-26 | 2000-12-26 | Steel column misalignment correction jig |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4588207B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106996197A (en) * | 2016-01-25 | 2017-08-01 | 上海十三冶建设有限公司 | The correcting device and its application method misplaced for steel construction vertical member counterpart |
TWI668354B (en) * | 2017-02-13 | 2019-08-11 | 日商特科能股份有限公司 | Auxiliary tool for correction of alignment difference of steel column |
JP7083969B1 (en) * | 2022-02-28 | 2022-06-13 | 株式会社巴コーポレーション | Jig for correcting misalignment of plate seams |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100487578B1 (en) * | 2002-08-02 | 2005-05-03 | 최종해 | Vertical scaffolding |
JP2007186922A (en) * | 2006-01-13 | 2007-07-26 | Kayaba System Machinery Kk | Misalignment correction device |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5935900A (en) * | 1982-08-20 | 1984-02-27 | Ishikawajima Harima Heavy Ind Co Ltd | Method for mating groove of plates to be welded and jig used for said method |
JP2669292B2 (en) * | 1993-03-17 | 1997-10-27 | 株式会社ダイフク | Connecting device between trucks |
JPH08199819A (en) * | 1995-01-24 | 1996-08-06 | Taisei Corp | Method and equipment for constructing steel pipe column |
JP2822012B2 (en) * | 1995-04-18 | 1998-11-05 | 川崎重工業株式会社 | Steel column construction adjustment jig |
JP3375886B2 (en) * | 1998-04-17 | 2003-02-10 | テクノス株式会社 | Steel column fall prevention method, slippage correction method and fixing jig |
-
2000
- 2000-12-26 JP JP2000394495A patent/JP4588207B2/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106996197A (en) * | 2016-01-25 | 2017-08-01 | 上海十三冶建设有限公司 | The correcting device and its application method misplaced for steel construction vertical member counterpart |
TWI668354B (en) * | 2017-02-13 | 2019-08-11 | 日商特科能股份有限公司 | Auxiliary tool for correction of alignment difference of steel column |
JP7083969B1 (en) * | 2022-02-28 | 2022-06-13 | 株式会社巴コーポレーション | Jig for correcting misalignment of plate seams |
Also Published As
Publication number | Publication date |
---|---|
JP2002194897A (en) | 2002-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4384640B2 (en) | A jig for assembling a splice plate for connecting a lower flange of an H-shaped steel frame and a method for assembling a splice plate using the jig. | |
JP4231053B2 (en) | Jig for assembling splice plate for connecting upper flange of H-shaped steel frame and assembling method using the same | |
JP4588207B2 (en) | Steel column misalignment correction jig | |
JP2001090347A (en) | Re-erection device for joining long member | |
JP2883262B2 (en) | Jig for adjusting joints of steel columns | |
JP4804274B2 (en) | Wall panel mounting device | |
JP3176510B2 (en) | Installation adjustment jig for building unit | |
JP7431673B2 (en) | Position adjustment jig and building unit position adjustment method | |
JPS6125477B2 (en) | ||
JPH0736963Y2 (en) | Connection structure between columns and beams | |
JP2002349070A (en) | Erection adjusting tool for pillar and pillar erecting method using the same | |
JP3861247B2 (en) | Clamping device for lining plate and method for manufacturing the same | |
JP4034778B2 (en) | Steel column re-installation jig | |
JPS61209728A (en) | Bar stock bending device | |
JP2532097Y2 (en) | Wall anchor | |
JP2500602Y2 (en) | Beam material | |
JP2784546B2 (en) | Connection metal fittings for shoring | |
JP3048255U (en) | Wall panel fixtures | |
JPS587851Y2 (en) | Joint structure of columns and horizontal members | |
JP2997347B2 (en) | Automobile repair body fixing device | |
JP2001152555A (en) | Connecting method and joint plate for building unit | |
JP3343242B2 (en) | Jig used to connect steel frames | |
JP2799679B2 (en) | Belly reinforcer | |
JP3020372U (en) | Attachment device for cosmetic louvers in construction | |
JP2015059412A (en) | Covering plate fitting instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20071026 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090925 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20091006 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091130 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100427 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100430 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100817 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100908 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4588207 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130917 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |