JP4034778B2 - Steel column re-installation jig - Google Patents

Steel column re-installation jig Download PDF

Info

Publication number
JP4034778B2
JP4034778B2 JP2004336527A JP2004336527A JP4034778B2 JP 4034778 B2 JP4034778 B2 JP 4034778B2 JP 2004336527 A JP2004336527 A JP 2004336527A JP 2004336527 A JP2004336527 A JP 2004336527A JP 4034778 B2 JP4034778 B2 JP 4034778B2
Authority
JP
Japan
Prior art keywords
steel column
bolt
base plate
support
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004336527A
Other languages
Japanese (ja)
Other versions
JP2006144401A (en
Inventor
義則 濱田
清和 泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyowa Co Ltd
Original Assignee
Kyowa Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyowa Co Ltd filed Critical Kyowa Co Ltd
Priority to JP2004336527A priority Critical patent/JP4034778B2/en
Publication of JP2006144401A publication Critical patent/JP2006144401A/en
Application granted granted Critical
Publication of JP4034778B2 publication Critical patent/JP4034778B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

この発明は、鉄骨柱建入れ直し治具に関し、特に、容易に鉄骨柱の鉛直を出すことができる、建入れ作業に使用される鉄骨柱建入れ直し治具に関する。 This invention relates to a jig cycle steel column construction, in particular, can be easily put lead straight of steel column, to steel columns denominated cycle jig used in construction put work.

従来の鉄骨柱の建入れ直し治具が、たとえば、特許第3499754号公報に記載されている。同公報によれば、建入れ直し治具は、上部及び下部を有するフレームと、該フレームの上部を貫通し、フレームの下部に伸びるボルトと、フレームの上部及び下部間に配置され、かつボルトに螺合され、ボルトの軸線方向にのみ移動可能であるナットとを含み、ナットの上方に鉄骨柱ベースプレートの縁部を配置可能である。
特許第3499754号公報(段落番号0007、図2等)
A conventional steel column repositioning jig is described in, for example, Japanese Patent No. 3499754. According to the publication, the re-installation jig includes a frame having an upper part and a lower part, a bolt that passes through the upper part of the frame and extends to the lower part of the frame, and is arranged between the upper part and the lower part of the frame and is screwed onto the bolt. And a nut that is movable only in the axial direction of the bolt, and the edge of the steel column base plate can be disposed above the nut.
Japanese Patent No. 3499754 (paragraph number 0007, FIG. 2 etc.)

従来の建入れ作業に使用される建入れ直し治具は、上記のように構成されていた。ナットで鉄骨柱ベースプレートを保持するため、押上ボルトを締めるときに雌ネジとの摩擦による回転モーメントが治具自体にかかり、そのモーメントにより、治具自体が回転や移動を生じ、ボルトを締めるのが困難である、という問題があった。   The rebuilding jig used for the conventional erection work has been configured as described above. In order to hold the steel column base plate with the nut, when the push-up bolt is tightened, a rotational moment due to friction with the female screw is applied to the jig itself, and this moment causes the jig itself to rotate and move, and tighten the bolt. There was a problem that it was difficult.

この発明は、上記のような課題に鑑みてなされたもので、簡単な構造で、かつ容易に鉄骨柱ベースプレートを調整できる鉄骨柱建入れ直し治具を提供することを目的とする。   This invention is made | formed in view of the above subjects, and it aims at providing the steel column rebuilding jig which can adjust a steel column baseplate easily with a simple structure.

この発明に係る、鉄骨柱建入れ直し治具は、上下方向に延在する押上ボルトと、押上ボルトに係合可能な第1雌ネジ部と、第1雌ネジ部に接続して設けられ、鉄骨柱ベースプレートを支持する支持部とを含み、支持部は、鉄骨柱ベースプレートをその上面で支持するための支持部材と、支持部材の上面に鉄骨柱ベースプレートが支持されたときに、鉄骨柱ベースプレートをその上側から押し付けるために、鉄骨柱ベースプレート上で上下方向に移動可能な、支持ボルトと、支持部材に対向して、支持ボルトに係合可能に設けられた第2雌ネジ部とを含む。   The steel column rebuilding jig according to the present invention is provided by being connected to a push-up bolt extending in the vertical direction, a first female screw portion engageable with the push-up bolt, and the first female screw portion. A support portion for supporting the column base plate, the support portion supporting the steel column base plate on its upper surface, and when the steel column base plate is supported on the upper surface of the support member, In order to press from above, a support bolt that is movable in the vertical direction on the steel column base plate, and a second female screw portion that is provided so as to be able to engage with the support bolt opposite to the support member are included.

鉄骨柱ベースプレートを支持する支持部を有する第1雌ネジ部は、上下方向に延在する押上ボルトに係合可能であり、鉄骨柱ベースプレートを支持部材と支持ボルトで固定した後で、第1雌ネジ部を押上ボルトで上下方向に移動可能であるため、鉄骨柱ベースプレートを容易に上下方向に移動できる。その結果、簡単な構造で、かつ容易に鉄骨柱ベースプレートを調整できる鉄骨柱建入れ直し治具を提供できる。   The first female screw portion having a support portion for supporting the steel column base plate is engageable with a push-up bolt extending in the vertical direction. After fixing the steel column base plate with the support member and the support bolt, the first female screw portion is engaged. Since the threaded portion can be moved in the vertical direction with a push-up bolt, the steel column base plate can be easily moved in the vertical direction. As a result, it is possible to provide a steel column re-installation jig having a simple structure and capable of easily adjusting the steel column base plate.

好ましくは、支持部材と、第2雌ネジ部とは上下方向に延在する長手部材で一体化されている。   Preferably, the support member and the second female screw portion are integrated by a longitudinal member extending in the vertical direction.

この発明の他の局面においては、上記した鉄骨柱建入れ直し治具を用いて、アンカーボルトを固定する建入れ作業を行なう。 In another aspect of the present invention, using a cycling upper noted were steel columns denominated jig performs denominated insertion operation of fixing the anchor bolt.

以下、この発明の実施の形態を、図面を参照して説明する。図1はこの発明の一実施の形態に係る鉄骨柱建入れ直し治具10の構成を示す側面図(図1(A))と、図1(A)においてB−Bで示す部分の平面図である(図1(B)鉄骨柱ベースプレートについては、図示を省略している)。   Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a side view (FIG. 1 (A)) showing a configuration of a steel column re-installation jig 10 according to an embodiment of the present invention, and a plan view of a portion indicated by BB in FIG. 1 (A). There is (the illustration of the steel column base plate in FIG. 1B is omitted).

図1を参照して、鉄骨柱建入れ直し治具10は、上下方向に延在する押上ボルト11と、押上ボルト11に係合可能な第1雌ネジ部12と、第1雌ネジ部12に接続された支持部13とを含む。支持部13は、第1雌ネジ部12の長さ方向に延びる長手部材13bと、長手部材13bの下部に設けられ、その上面で鉄骨柱ベースプレート17を受ける支持部材13aと、長手部材13bの上部に設けられた第2雌ネジ部14とを含む。第2雌ネジ部14には上下方向に延在する支持ボルト15が係合し、支持ボルト15を締めることによって、支持ボルト15の下端と支持部材13aとの間で鉄骨柱ベースプレート17を保持する。   Referring to FIG. 1, a steel column rebuilding jig 10 includes a push-up bolt 11 extending in the vertical direction, a first female screw portion 12 engageable with the push-up bolt 11, and a first female screw portion 12. And a connected support portion 13. The support portion 13 is provided with a longitudinal member 13b extending in the length direction of the first female screw portion 12, a lower portion of the longitudinal member 13b, a support member 13a that receives the steel column base plate 17 on the upper surface, and an upper portion of the longitudinal member 13b. And a second female screw portion 14 provided on the front side. A support bolt 15 extending in the vertical direction is engaged with the second female screw portion 14, and the steel bolt base plate 17 is held between the lower end of the support bolt 15 and the support member 13 a by tightening the support bolt 15. .

第1雌ネジ部12の下端部は、支持部材13aの下端部よりも高い位置となるように設けられており、それによって、図1(A)に示すように、支持部材13aの下面とコンクリート上面27の隙間が狭くても、ライナープレート26の取付けが容易になる。なお、第1雌ネジ部12の下端面は支持部材13aの下端面よりも上の任意の位置に設けてもよい。 The lower end portion of the first female screw portion 12 is provided at a position higher than the lower end portion of the support member 13a, whereby the lower surface of the support member 13a and the concrete are provided as shown in FIG. Even when the gap between the upper surfaces 27 is narrow, the liner plate 26 can be easily attached. Incidentally, the lower end surface of the first female screw portion 12 may be provided at any position above the lower end surface of the support member 13a.

図1(B)に示すように、支持部材13aは、鉄骨柱ベースプレートの一部を保持するために十分な幅を有している。   As shown in FIG. 1B, the support member 13a has a sufficient width to hold a part of the steel column base plate.

なお、第2雌ネジ部14として、一般のナットを用いてもよい。   Note that a general nut may be used as the second female screw portion 14.

次に、鉄骨柱建入れ直し治具10を用いて、鉄骨建入れ直しを行なう手順について説明する。図2は鉄骨柱建入れ直し治具10を用いて鉄骨建入れ直し作業を行なう様子を示す図である。図2(B)を参照して、予め基礎の基準となるマンジュウ20の頂部が、所定のGLレベル(図2(B)においてGLで示す)になるように、コンクリート上面27より隆起させてマンジュウ20を所定の高さに形成する。このマンジュウ20の頂部の高さは、具体的には、マンジュウ20の内部に上下方向に埋込まれた鉄筋21の先端部を切断して行なう。なお、マンジュウ20はモルタルで構成されていてもよいし、鉄マンジュウであっても、レベルモルタルでもよい。 Next, a procedure for performing steel frame rebuilding using the steel column rebuilding jig 10 will be described. FIG. 2 is a diagram showing a state in which the steel frame rebuilding work is performed using the steel column rebuilding jig 10. Referring to FIG. 2 (B) , the top of the manju 20 serving as a basic reference is raised from the concrete upper surface 27 so that the top of the manju 20 becomes a predetermined GL level (indicated by GL in FIG. 2 (B)). 20 is formed to a predetermined height. Specifically, the height of the top of the manju 20 is obtained by cutting the tip of the reinforcing bar 21 embedded in the manju 20 in the vertical direction. The manju 20 may be composed of mortar, iron manju, or level mortar.

この状態で鉄骨柱25付きの鉄骨柱ベースプレート17をマンジュウ20の上に載置して、柱を建て込む。次いで、鉄骨柱ベースプレート17を支持部材13aと支持ボルト15とによって挟んで、鉄骨柱ベースプレート17の4辺の各々に鉄骨柱建入れ直し治具10を固定する。このとき、鉄骨柱建入れ直し治具10の一辺(図1(B)において13cで示す)を、予め墨だしされた、センター墨28(図2(A)参照)に合わせるとともに、4つの鉄骨柱建入れ直し治具10が全てセンター墨28の一方方向(図2(A)では、反時計方向)に位置するように配置される。   In this state, the steel column base plate 17 with the steel column 25 is placed on the Manju 20 and the column is built. Next, the steel column base plate 17 is sandwiched between the support member 13 a and the support bolt 15, and the steel column rebuilding jig 10 is fixed to each of the four sides of the steel column base plate 17. At this time, one side (indicated by 13c in FIG. 1 (B)) of the steel column rebuilding jig 10 is aligned with the center sumi 28 (see FIG. 2 (A)), which has been inked in advance, and four steel columns. All the re-installation jigs 10 are arranged so as to be positioned in one direction of the center ink 28 (counterclockwise in FIG. 2A).

なお、図2(A)においては、鉄骨柱建入れ直し治具10のボルトの形状等については省略している。   In FIG. 2A, the bolt shape of the steel column re-installation jig 10 is omitted.

このように、鉄骨柱建入れ直し治具10の一辺をセンター墨28に合わせるようにしたため、墨合わせと建入れ直しを同時作業として進めることが可能になる。   As described above, since one side of the steel column rebuilding jig 10 is aligned with the center ink 28, it is possible to proceed with the ink alignment and rebuilding as simultaneous operations.

鉄骨柱ベースプレートの厚さが端部方向へ薄くなっている場合があるので、支持ボルト15としてボルトの先がくぼみ先のボルトを使用すると好適である。   Since the thickness of the steel column base plate may become thinner in the end direction, it is preferable to use a bolt with a recessed tip as the support bolt 15.

次にライナープレート26をコンクリート上面27と押上ボルト11との間に置く。   Next, the liner plate 26 is placed between the concrete upper surface 27 and the push-up bolt 11.

通り芯を合せ、鉄骨柱建入れ直し治具10とアンカーナット19によって柱の鉛直度を調整する。トランシットで建ちを確認し、締める側のアンカーボルトを緩め、所定の位置になったときに、反対側のアンカーナットを仮締めする(たとえば、図2(A)において、鉄骨柱建入れ直し治具10aの押上ボルト11を右に廻して締付けるときは、アンカーナット19b、19cを緩め、アンカーナット19aと19dとを締付ける)。   The cores are aligned, and the verticality of the column is adjusted by the steel column re-installation jig 10 and the anchor nut 19. Confirm the building with transit, loosen the anchor bolt on the tightening side, and temporarily tighten the anchor nut on the opposite side when it reaches the predetermined position (for example, in FIG. 2 (A), the steel column rebuilding jig 10a When the push-up bolt 11 is turned clockwise, the anchor nuts 19b and 19c are loosened and the anchor nuts 19a and 19d are tightened).

なお、鉄骨柱建入れ直し治具10の押上ボルト11を締付けると、鉄骨柱ベースプレート17は上昇する。   Note that, when the push-up bolt 11 of the steel column erection jig 10 is tightened, the steel column base plate 17 rises.

このようにして建ちを確認し、4個の鉄骨柱建入れ直し治具10a〜10dに荷重をかけて調整し、4本のアンカーナット19a〜19dの仮締めを確認し、クレーンの玉かけを解除する。このようにして、4本の柱を建入れて、各柱を接続する梁を取付けて、トランシットで正確な建入れを完了し、アンカーナット19a〜19dを締める。   In this way, the building is confirmed, the four steel column re-installing jigs 10a to 10d are adjusted by applying a load, the temporary fastening of the four anchor nuts 19a to 19d is confirmed, and the crane stake is released. To do. In this way, the four pillars are erected, the beams connecting the respective pillars are attached, the exact erection is completed by transit, and the anchor nuts 19a to 19d are tightened.

以上のように、この実施の形態による鉄骨柱建入れ直し治具10を用いれば、容易にアンカーナット19の締付けが可能になり、鉄骨柱の建て込み時間を削減できる。 As described above, by using the steel column rebuilding jig 10 according to this embodiment, the anchor nut 19 can be easily tightened, and the time for installing the steel column can be reduced.

また、従来のようにワイヤを用いることなく作業が可能であるため、作業現場において、高所作業車やその他の車両が動きやすくなり、全体的な工程の短縮も可能になる。   Further, since the work can be performed without using a wire as in the prior art, an aerial work vehicle and other vehicles can easily move at the work site, and the overall process can be shortened.

なお、上記実施の形態においては、鉄骨柱ベースプレートの高さの調整を押上ボルトによって行なう例について説明したが、これに限らず、押上ボルトの代わりに、油圧ジャッキを用いて行なってもよい。   In the above-described embodiment, the example in which the height of the steel column base plate is adjusted by the push-up bolt has been described. However, the present invention is not limited to this, and a hydraulic jack may be used instead of the push-up bolt.

また、鉄骨柱の鉛直方向を自動確認する鉛直方向自動確認装置と、油圧ジャッキを連動させて、自動的に建入れ直しを制御するようにしてもよい。   In addition, a vertical direction automatic confirmation device that automatically confirms the vertical direction of the steel column and a hydraulic jack may be interlocked to automatically control the rebuilding.

以上、図面を参照してこの発明の実施形態を説明したが、この発明は、図示した実施形態のものに限定されない。図示された実施形態に対して、この発明と同一の範囲内において、あるいは均等の範囲内において、種々の修正や変形を加えることが可能である。   As mentioned above, although embodiment of this invention was described with reference to drawings, this invention is not limited to the thing of embodiment shown in figure. Various modifications and variations can be made to the illustrated embodiment within the same range or equivalent range as the present invention.

この発明に係る鉄骨柱建入れ直し治具10は、簡単な構造で、かつ容易に鉄骨柱ベースプレートを上下方向に移動できるため、鉄骨柱建入れ直し治具として有利に使用される。 The steel column rebuilding jig 10 according to the present invention has a simple structure and can easily move the steel column base plate in the vertical direction, and is therefore advantageously used as a steel column rebuilding jig.

この発明の一実施の形態に係る鉄骨柱建入れ直し治具の構成を示す図である。It is a figure which shows the structure of the steel-column re-installation jig | tool which concerns on one embodiment of this invention. この発明の一実施の形態に係る鉄骨柱建入れ直し治具を用いた、アンカーボルトの取付け状態を説明するための図である。It is a figure for demonstrating the attachment state of an anchor bolt using the steel-frame pillar-reinstalling jig which concerns on one embodiment of this invention.

符号の説明Explanation of symbols

10 鉄骨柱建入れ直し治具、11 押上ボルト、12 第1雌ネジ部、13 支持部、14 第2雌ネジ部、15 支持ボルト、17 鉄骨柱ベースプレート、18 アンカーボルト、19 アンカーナット、20 マンジュウ、21 鉄筋、25 鉄骨柱、26 ライナープレート、28 センター墨。 DESCRIPTION OF SYMBOLS 10 Steel column rebuilding jig, 11 Push-up bolt, 12 1st female thread part, 13 Support part, 14 2nd female thread part, 15 Support bolt, 17 Steel column base plate, 18 Anchor bolt, 19 Anchor nut, 20 Manju, 21 rebar, 25 steel column, 26 liner plate, 28 center ink.

Claims (3)

上下方向に延在する押上ボルトと、
前記押上ボルトに係合可能な第1雌ネジ部と、
前記第1雌ネジ部に接続して設けられ、鉄骨柱ベースプレートを支持する支持部とを含み、
前記支持部は、
鉄骨柱ベースプレートをその上面で支持するための支持部材と、
前記支持部材の上面に鉄骨柱ベースプレートが支持されたときに、鉄骨柱ベースプレートをその上側から保持するために、鉄骨柱ベースプレート上で上下方向に移動可能な、支持ボルトと、
前記支持部材に対向して、前記支持ボルトに係合可能に設けられた第2雌ネジ部とを含む、鉄骨柱建入れ直し治具。
A push-up bolt extending in the vertical direction;
A first female thread portion engageable with the push-up bolt;
A support portion that is provided in connection with the first female screw portion and supports the steel column base plate;
The support part is
A support member for supporting the steel column base plate on its upper surface;
When the steel column base plate is supported on the upper surface of the support member, in order to hold the steel column base plate from the upper side, a support bolt that is movable in the vertical direction on the steel column base plate;
A steel column re-installation jig including a second female screw portion provided to be able to engage with the support bolt so as to face the support member.
前記支持部材と、第2雌ネジ部とは上下方向に延在する長手部材で一体化されている、請求項1に記載の鉄骨柱建入れ直し治具。 The steel column rebuilding jig according to claim 1, wherein the support member and the second female screw portion are integrated by a longitudinal member extending in the vertical direction. 請求項1または2に記載された鉄骨柱建入れ直し治具を用いて、アンカーボルトを固定する建入れ作業を行なう、鉄骨柱建入れ直し施工方法。
A method for re-installing a steel column in which a work for fixing an anchor bolt is performed using the steel column re-installation jig according to claim 1.
JP2004336527A 2004-11-19 2004-11-19 Steel column re-installation jig Expired - Fee Related JP4034778B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004336527A JP4034778B2 (en) 2004-11-19 2004-11-19 Steel column re-installation jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004336527A JP4034778B2 (en) 2004-11-19 2004-11-19 Steel column re-installation jig

Publications (2)

Publication Number Publication Date
JP2006144401A JP2006144401A (en) 2006-06-08
JP4034778B2 true JP4034778B2 (en) 2008-01-16

Family

ID=36624410

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004336527A Expired - Fee Related JP4034778B2 (en) 2004-11-19 2004-11-19 Steel column re-installation jig

Country Status (1)

Country Link
JP (1) JP4034778B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7018253B2 (en) * 2016-03-09 2022-02-10 センクシア株式会社 Column base hardware and how to build a column base structure using it
CN112282388A (en) * 2020-10-13 2021-01-29 中国建筑第八工程局有限公司 Overhanging type cup mouth foundation steel column mounting and positioning device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10121576A (en) * 1996-10-16 1998-05-12 Tomoe Corp Fixing structure of pedestal
JP3483522B2 (en) * 2000-06-05 2004-01-06 テクノス株式会社 Position adjustment device for steel columns

Also Published As

Publication number Publication date
JP2006144401A (en) 2006-06-08

Similar Documents

Publication Publication Date Title
JP4732915B2 (en) Foundation construction method and device, and anchor bolt support device for construction
US20190226206A1 (en) Beam-column connection structure and method of making the same
JP2010048054A (en) Placing method and joint structure
JP4160581B2 (en) Anchor bolt position retaining bracket and position fixing structure, and steel column construction method using the same
JP2015105552A (en) Form support tool and slab construction method using the same
JP4553978B1 (en) Support device for height adjustment
JP4034778B2 (en) Steel column re-installation jig
JP4413765B2 (en) Pre-tension hollow girder horizontal fastening PC steel temporary fixing device and fixing method
JP4203441B2 (en) Tower crane support device and construction method thereof
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
JP4669955B2 (en) Anchor frame
JP7018253B2 (en) Column base hardware and how to build a column base structure using it
US20230358044A1 (en) Anchorage device, anchorage comprising the anchorage device and method of producing the anchorage
WO2014083602A1 (en) Erection piece and mounting structure for same
JP3752310B2 (en) Anchor bolt positioning tool and method
JP7339865B2 (en) How to install wall panels
JP2001348952A (en) Position adjustment device for steel-frame column
JPH01146026A (en) Anchor bolt fixing device
JP2002332645A (en) Foundation structure of rail for ground-traveling crane and laying method for foundation
JP2005127064A (en) Hardware for column base
JP2566470Y2 (en) Anchor bolt fixing device for construction
JP4436149B2 (en) Steel frame exposed column base structure
JP7431673B2 (en) Position adjustment jig and building unit position adjustment method
JP7192153B1 (en) Anchor bolt construction method and level adjustment member
JP6646959B2 (en) Column and beam frame and its construction method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071018

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20071023

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071025

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101102

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4034778

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101102

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111102

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111102

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121102

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121102

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131102

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees