JP4448592B2 - Reinforcement pile fixture - Google Patents
Reinforcement pile fixture Download PDFInfo
- Publication number
- JP4448592B2 JP4448592B2 JP2000069897A JP2000069897A JP4448592B2 JP 4448592 B2 JP4448592 B2 JP 4448592B2 JP 2000069897 A JP2000069897 A JP 2000069897A JP 2000069897 A JP2000069897 A JP 2000069897A JP 4448592 B2 JP4448592 B2 JP 4448592B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- reinforcing
- coupling
- steel pipe
- footing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
- Electric Cable Installation (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、高圧の送電線を高架支持する電力用鉄塔等建築構造物における基礎を、補強するための施工技術に関する。
【0002】
【従来の技術】
図7に示されるように、電力用鉄塔100等の構造物の基礎100Bは、地盤Gに打設された場所打ちコンクリート杭等からなる基礎杭101と、その杭頭101aと接合一体化されたコンクリートからなるフーチング102(図示のものは連続フーチング)で構成され、鉄塔100の柱脚103が前記フーチング102の上に構築されている。前記基礎杭101は通常、一つのフーチング102あたり、それぞれ1本乃至複数本、鉛直に打設される。
【0003】
ところで近年、電力用鉄塔100の場合、近年の電力需要の増大に伴い、図示されていない送電線の重量が増大し、このため送電線の弛み量が増大(垂れ下がり)することになる。そして、このような垂れ下がりを補償するには、送電線の架設高さを高くする必要があり、このため鉄塔100の高さが高くなる傾向にある。その結果、鉄塔100の重量が増大し、これを支持する基礎杭101の耐力を向上させることが要求されている。
【0004】
一方、大地震時において発生する鉄塔100の傾斜や倒壊といった被害は、基礎杭101の破損に起因するものであり、したがって耐震性を向上させる観点からも、基礎杭101の耐力を向上させることが要求されている。
【0005】
従来、既設の基礎杭(以下、既設杭という)101を補強するための工法としては、図8に示されるようなものが知られている。すなわち、従来工法においては、まずフーチング102に、既設杭101の鉛直方向投影位置に隣接して、所要数の鉛直貫通孔102aを削孔し、この鉛直貫通孔102aを通じて、前記既設杭101の隣接地盤を鉛直方向にボーリングして、補強用の杭104を打ち込む。そして、各補強杭104の杭頭に支圧部材105を取り付け、これらの支圧部材105を埋めるように、前記フーチング102の上面に、所要の厚さで鉄筋コンクリート106を打ち継ぐ。
【0006】
【発明が解決しようとする課題】
しかしながら、上記従来の既設基礎の補強技術によれば、鉄筋コンクリートからなるフーチング102に、いくつもの鉛直貫通孔102aを削孔したり、補強杭104の打設後に、支圧部材105を固定するために、前記フーチング102上に型枠を組み立てて配筋し、コンクリート106を増設するといった工程が必要であるため、施工が煩雑でコストが高くなるばかりか、工期も長くなるといった問題があった。
【0007】
本発明は、上述のような問題に鑑みてなされたもので、その主な技術的課題とするところは、鉄塔等の地上構造物からの支持荷重増大や地震等に対する基礎の耐力の向上を図るため、既設の基礎を容易かつ低コストで補強可能な工法を提供することにある。
【0008】
【課題を解決するための手段】
上述の技術的課題は、本発明によって有効に解決することができる。
【0009】
本発明に係る補強杭の固定具は、縁部に沿って複数の結合孔が開設された基板と、この基板に突設され、鋼管とその内周に挿通された金属芯材と前記鋼管及び金属芯材の間に充填された固結材とからなる補強杭の前記鋼管を、遊びをもって挿通可能な杭頭挿入孔が開設された結合板と、前記杭頭挿入孔に挿入した補強杭の杭頭を前記結合板に結合する結合部材群と、前記結合孔に挿通されてフーチングの側面に打ち込み又はねじ込まれることにより前記基板を定着する複数のアンカーとを備え、前記結合部材群が、前記杭頭挿入孔に挿通した前記鋼管を結合板に接合する部材と、前記金属芯材の頭部に螺合されると共にこの金属芯材を前記結合板に接合する部材とからなる。
【0010】
【発明の実施の形態】
以下、本発明に係る補強杭の固定具を用いた基礎の補強工法を、図1乃至図6を参照しながら説明する。
【0011】
まず図1は、電力用鉄塔の基礎1Bを、本発明の工法により補強した状態を概略的に示すものである。すなわち、この図において、参照符号1は、鉄骨等により構築された電力用の鉄塔であり、その基礎1Bは、前記鉄塔1の柱脚11の下端に接合され地盤Gの表層部に鉄筋コンクリートにより構築されたフーチング2と、杭頭3aが前記フーチング2に接合され地盤Gへ鉛直に打設された場所打ちコンクリート杭等からなる既設の基礎杭(以下、既設杭という)3からなる。
【0012】
基礎1Bにおけるフーチング2の側面2aには、複数の固定具4が図示の断面と直交する方向へ適当な間隔で配置されており、フーチング2の周囲から既設杭3と平行(鉛直)に打設された複数の補強杭5の各杭頭5aが、前記固定具4を介して前記フーチング2の側面2aに固定されている。
【0013】
固定具4は、図2の斜視図及び図3の断面図に示されるように、外周部に複数の結合孔41aが開設された所要の肉厚の鋼板等からなる基板41と、この基板41の中央部にその面に対して垂直に突設された鋼板等からなる結合板42と、この結合板42の幅方向両側に位置して、前記基板41及び結合板42の双方に対して垂直に設けられた鋼板等からなる一対の補強板43と、前記結合板42と補強杭5とを接合する結合部材群44と、前記基板41の結合孔41aに挿通されてフーチング2の側面2aに打ち込み又はねじ込まれることにより、この固定具4を強固に定着する複数のアンカー45とを備える。また、前記基板41、結合板42及び補強板43は、溶接等により互いに一体化され、めっきあるいは施工後の塗装や吹き付け等によって防錆される。
【0014】
補強杭5としては、公知の構造を有する比較的小径(例えばφ300mm以下)の、かつ高耐力を有するものが好適に採用される。すなわち、この補強杭5は、図3に示されるように、地盤Gにおける軟弱層G1の下端又はそれより深くまで挿入されると共に、頭部を固定具4の結合板42にそれぞれ結合部材群44を介して接合された鋼管51と、この鋼管51の内周に挿通され、この鋼管51の下部開口から更に下側へ延びる下端52aが、前記軟弱層G1より下層にある堅固な支持層G2内へ達すると共に、頭部が前記結合板42にそれぞれ前記結合部材群44を介して接合された金属芯材としての異形鉄筋52と、前記鋼管51及び地盤Gと異形鉄筋52との間に充填された固結材としてのグラウト53とからなるものである。グラウト53は、鋼管51の下側(支持層G2内)では拡径されたペデスタル状に形成されており、また、このグラウト53の一部は鋼管51の外周側に回り込んで、地盤Gの削孔面に定着されている。
【0015】
図4乃至図6に、固定具4と補強杭5との種々の接合構造が例示されるように、固定具4の結合板42には、それぞれ補強杭5の鋼管51を、適当な遊びをもって挿通可能な杭頭挿入孔42aが開設されている。
【0016】
図4に示される例においては、結合部材群44は、結合板42の下側に位置するように、補強杭5における鋼管51の頭部近傍の外周に溶接等により固定される鋼製の下部フランジ441と、前記結合板42の杭頭挿入孔42aから上側へ突出した前記鋼管51の頭部外周に、溶接等により固定される鋼製の上部フランジ442と、この上部フランジ442の上に配置され、複数の螺子部材443の緊結によって、前記結合板42との間に上部フランジ442を挟着した状態で補強杭5の杭頭を押さえる鋼製の支圧板444とで構成される。支圧板444の中央には螺子孔444aが開設されており、補強杭5における異形鉄筋52の頭部が、この螺子孔444aに螺合されることによって、前記支圧板444に固定されるようになっている。
【0017】
また、図5に示される例においては、結合部材群44は、結合板42の下側に位置するように、補強杭5における鋼管51の頭部近傍の外周に溶接等により固定される鋼製の下部フランジ441と、前記結合板42の杭頭挿入孔42aから上側へ突出した前記鋼管51の頭部を覆うと共に、外周下面が前記結合板42に当接するように配置され、溶接又は螺合等により前記鋼管51に固定される鋼製の支圧キャップ445と、前記支圧キャップ445の上部中央に開設した鉄筋挿通孔445aに、補強杭5における異形鉄筋52の頭部を挿通状態に固定する一対のナット446,446とで構成される。
【0018】
また、図6に示される例においては、結合部材群44は、結合板42の下側に位置するように、補強杭5における鋼管51の頭部近傍の外周に溶接等により固定される鋼製の下部フランジ441と、前記結合板42の杭頭挿入孔42aから上側へ突出した前記鋼管51の頭部外周に、溶接等により固定される鋼製の上部フランジ442と、この上部フランジ442の上に配置され、複数のボルト447によって、前記結合板42との間に上部フランジ442を挟着した状態で補強杭5の杭頭を押さえる鋼製の支圧板444と、この支圧板444の中央に開設された鉄筋挿通孔444bに、補強杭5における異形鉄筋52の頭部を挿通状態に固定する一対のナット446,446とで構成される。
【0019】
上述の補強工法によれば、鉄塔1及びこれに架設された送電線(図示省略)の重量による荷重は、柱脚11からフーチング2を介して既成杭3に伝達されると共に、前記フーチング2から、固定具4を介して各補強杭5にも伝達される。このため前記荷重に対する基礎1Bの支持耐力が増大するので、例えば電力需要の増大に対処して、図1に実線で示される既設の鉄塔1を、一点鎖線で示されるような、サイズの大きな鉄塔1’に建て替えることによる荷重の増大に対応することができる。
【0020】
また、補強杭5によって、地震による水平加速度が鉄塔1に加えられた場合の水平慣性力に対する耐力や、鉄塔1の揺れによるモーメント及び引き抜き力に対する耐力が向上する。このため、杭全体としての剪断強度が増強され、大地震発生時の既設杭3の破壊や、あるいはフーチング2と既設杭3との接合部等の破壊に起因する鉄塔1の傾斜や倒壊を防止するための、耐震補強工法としても有用である。
【0021】
以下、この補強工法による施工手順を説明すると、図2に示されるように、まず、フーチング2の周囲の地盤Gを所要の深さに掘削して、前記フーチング2の側面2aを露出させる。
【0022】
次に、フーチング2の側面2aと近接した位置から、補強杭5を鉛直に打設する。補強杭5の打設位置は、前記側面2aに固定具4を固定した場合の結合板42における杭頭挿入孔42aの位置を考慮して決定し、また、補強杭5の打設本数や打設間隔は、目的とする強度を考慮して適切に決定する。
【0023】
各補強杭5の打設作業は、よく知られているように、まず、この補強杭5の鋼管51よりも適宜大径の管状ケーシング(図示省略)を用いてボーリング(ケーシング掘り)を行い、地盤Gにおける支持層G2内に達する削孔を形成する。そのとき、前記鋼管51はボーリングに合わせてケーシングと共に地盤Gの支持層G2まで一緒に挿入される。削孔が形成されたら、前記鋼管51を地盤G内に残し、ケーシングだけを引き抜く。次に、異形鉄筋52を鋼管51内に挿入するが、この異形鉄筋52にはグラウト53を圧入する装置が取り付けられていて、一緒に挿入される。挿入が完了したら、前記圧入装置を用い、前記削孔内にグラウト53を圧入し、これに合わせて、鋼管51を所定の高さまで引き上げる。グラウト53が十分に充填されたら、再度前記鋼管51を挿入し、同時にグラウト53も再度圧入する。そしてこの時の加圧力によって、前記鋼管51の下側でグラウト53がペデスタル状に拡散される。
【0024】
補強杭5としては、先に説明したようにφ300mm以下の小径で高耐力を有するものが好適に採用されるため、フーチング2の側面2aに近接した位置からでも容易に打設することができ、しかも比較的小型の重機による打設が可能である。また、補強杭5の打設のためにフーチング2に図8のような鉛直貫通孔102aを削孔する必要がないため、補強杭5の打設における施工コストが低減される。
【0025】
打設された各補強杭5の鋼管51の頭部近傍には、先に説明した図4乃至図6に示されるように、結合部材群44の一部である下部フランジ441が予め溶接等により接合される。そして、フーチング2の周囲の掘削空間Sに突出した各補強杭5の杭頭に、それぞれ固定具4を配置して、その結合板42の杭頭挿入孔42aに前記杭頭(鋼管51の頭部)を通すと共に、この固定具4の基板41を、複数のアンカー45によってフーチング2の側面2aに固定する。このとき、フーチング2には特にコンクリートを増設する必要はなく、しかも固定具4は鋼板等によって安価に製作可能であるため、ここでも施工コストが低減される。
【0026】
次に、前記結合板42と補強杭5の杭頭とを、結合部材群44によって、図4乃至図6に示されるような方法で結合する。その後は、必要に応じて、塗装や吹き付け等によって、防錆加工を施してから、フーチング2の周囲の掘削空間Sを掘削土により埋め戻し、施工を完了する。
【0027】
なお、上記実施形態においては、補強杭5に、いわゆるマイクロパイルを用いるものとして説明したが、本発明は、これには限定されず、固定具4により固定可能で、所要の耐力を発揮するものであれば良い。
【0028】
【発明の効果】
以上詳述したように、本発明に係る補強杭の固定具によれば次のような効果が実現される。まず施工上においては、フーチングへの孔開けやコンクリートの増設等が不要であるため、大掛かりな工事にならず、フーチングの周囲の狭い空間でも施工可能であるため、容易にかつ低コストで実施可能である。
【0029】
また、この補強杭の固定具を用いた基礎の補強工法による既設杭の補強を行うことによって、鉛直荷重に対する基礎の支持耐力や、地震時における水平耐力が向上するので、鉄塔等の地上構造物の建て替えによる支持荷重の増大に対処することができ、また、大地震時の基礎杭の破壊に起因して発生する前記構造物の傾斜や倒壊といった被害を防止するための有効な対策となる。
【図面の簡単な説明】
【図1】 本発明の一実施形態に係る補強杭の固定具を用いた基礎の補強工法により補強された、鉄塔の基礎を概略的に示す説明図である。
【図2】 上記実施形態の固定具によりフーチングと補強杭を接合した状態を示す斜視図である。
【図3】 実施形態の固定具及び補強杭の構造をフーチング及び既設杭の一部と共に示す断面図である。
【図4】 実施形態の固定具と補強杭との結合構造の一例を示す要部断面図である。
【図5】 実施形態の固定具と補強杭との結合構造の他の例を示す要部断面図である。
【図6】 実施形態の固定具と補強杭との結合構造の他の例を示す要部断面図である。
【図7】 電力用鉄塔の基礎の構造を示すもので、(A)は縦断面図、(B)は部分的な平面図である。
【図8】 電力用鉄塔の基礎を、従来の補強工法により補強した状態を概略的に示す説明図である。
【符号の説明】
1 鉄塔(構造物)
1B 基礎
2 フーチング
3 既設杭
4 固定具
41 基板
41a 結合孔
42 結合板
42a 杭頭挿入孔
44 結合部材群
5 補強杭[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a construction technique for reinforcing a foundation in a building structure such as a power tower that supports an elevated voltage transmission line.
[0002]
[Prior art]
As shown in FIG. 7, the
[0003]
By the way, in the case of the
[0004]
On the other hand, the damage such as the inclination and collapse of the
[0005]
Conventionally, as a construction method for reinforcing an existing foundation pile (hereinafter referred to as an existing pile) 101, one shown in FIG. 8 is known. That is, in the conventional method, first, a necessary number of vertical through
[0006]
[Problems to be solved by the invention]
However, according to the conventional reinforcement technique for existing foundations, in order to fix the supporting
[0007]
The present invention has been made in view of the above-described problems, and the main technical problem is to increase the support load from ground structures such as steel towers and to improve the basic strength against earthquakes. Therefore, an object of the present invention is to provide a construction method that can reinforce an existing foundation easily and at low cost.
[0008]
[Means for Solving the Problems]
The above technical problem can be effectively solved by the present invention .
[0009]
A reinforcing pile fixing tool according to the present invention includes a substrate having a plurality of coupling holes formed along an edge , a steel pipe, a metal core member inserted through an inner periphery thereof, the steel tube, A steel plate of a reinforcing pile composed of a consolidated material filled between metal cores, a coupling plate in which a pile head insertion hole that can be inserted with play is opened, and a reinforcing pile inserted into the pile head insertion hole A coupling member group that couples a pile head to the coupling plate, and a plurality of anchors that are inserted through the coupling hole and are driven or screwed into a side surface of a footing to fix the substrate, and the coupling member group includes It consists of a member that joins the steel pipe inserted through the pile head insertion hole to the coupling plate, and a member that is screwed to the head of the metal core and joins the metal core to the coupling plate .
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the reinforcement method of the foundation using the fixture of the reinforcement pile which concerns on this invention is demonstrated, referring FIG. 1 thru | or FIG.
[0011]
First, FIG. 1 schematically shows a state where a
[0012]
On the
[0013]
As shown in the perspective view of FIG. 2 and the cross-sectional view of FIG. 3, the
[0014]
As the reinforcing
[0015]
4 to 6 exemplify various joining structures between the
[0016]
In the example shown in FIG. 4, the
[0017]
Further, in the example shown in FIG. 5, the
[0018]
Further, in the example shown in FIG. 6, the
[0019]
According to the above-described reinforcing method, the load due to the weight of the
[0020]
Further, the
[0021]
Hereinafter, the construction procedure by this reinforcing method will be described. As shown in FIG. 2, first, the ground G around the
[0022]
Next, the reinforcing
[0023]
As is well known, the placing work of each reinforcing
[0024]
As described above, the reinforcing
[0025]
In the vicinity of the head of the
[0026]
Next, the
[0027]
In addition, in the said embodiment, although demonstrated as what uses what is called a micropile for the
[0028]
【The invention's effect】
As described in detail above, according to the reinforcing pile fixing tool of the present invention, the following effects are realized. First of all, since construction does not require drilling holes or adding concrete to the footing, it is not a large-scale construction and can be performed in a narrow space around the footing, so it can be carried out easily and at low cost. It is.
[0029]
In addition, by reinforcing the existing piles by the foundation reinforcement method using the fixtures for reinforcing piles, the support strength of the foundation against vertical loads and the horizontal strength during earthquakes are improved. It is possible to cope with an increase in the supporting load due to the rebuilding of the building, and it is an effective measure for preventing damage such as inclination or collapse of the structure caused by the destruction of the foundation pile at the time of a large earthquake.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram schematically showing a foundation of a steel tower reinforced by a foundation reinforcing method using a reinforcing pile fixing tool according to an embodiment of the present invention.
FIG. 2 is a perspective view showing a state in which a footing and a reinforcing pile are joined by the fixture of the embodiment .
FIG. 3 is a sectional view showing the structure of the fixture and the reinforcing pile according to the embodiment together with the footing and a part of the existing pile.
FIG. 4 is a cross-sectional view of a main part showing an example of a coupling structure between the fixture and the reinforcing pile according to the embodiment .
FIG. 5 is a cross-sectional view of an essential part showing another example of a coupling structure between a fixture and a reinforcing pile according to the embodiment .
FIG. 6 is a cross-sectional view of a main part showing another example of a coupling structure between a fixture and a reinforcing pile according to the embodiment .
7A and 7B show a basic structure of a power tower, where FIG. 7A is a longitudinal sectional view and FIG. 7B is a partial plan view.
FIG. 8 is an explanatory view schematically showing a state in which the foundation of a power tower is reinforced by a conventional reinforcing method.
[Explanation of symbols]
1 Steel tower (structure)
Claims (1)
この基板に突設され、鋼管とその内周に挿通された金属芯材と前記鋼管及び金属芯材の間に充填された固結材とからなる補強杭の前記鋼管を、遊びをもって挿通可能な杭頭挿入孔が開設された結合板と、
前記杭頭挿入孔に挿入した補強杭の杭頭を前記結合板に結合する結合部材群と、
前記結合孔に挿通されてフーチングの側面に打ち込み又はねじ込まれることにより前記基板を定着する複数のアンカーと、
を備え、
前記結合部材群が、前記杭頭挿入孔に挿通した前記鋼管の頭部を前記結合板に接合する部材と、前記金属芯材の頭部に螺合されると共にこの金属芯材を前記結合板に接合する部材とからなることを特徴とする補強杭の固定具。 A substrate having a plurality of coupling holes along the edge; and
The steel pipe of the reinforcing pile made of a steel pipe and a metal core material inserted into the inner periphery of the steel pipe and a solidified material filled between the steel pipe and the metal core material can be inserted with play. A coupling plate with a pile head insertion hole;
A coupling member group for coupling the pile head of the reinforcing pile inserted into the pile head insertion hole to the coupling plate;
A plurality of anchors for fixing the substrate by being inserted into the coupling hole and driven or screwed into a side surface of the footing;
With
The coupling member group is screwed to the coupling plate and a member that joins the head of the steel pipe inserted through the pile head insertion hole to the coupling plate, and the metal core is connected to the coupling plate. A fixture for reinforcing piles, characterized by comprising a member to be joined to the joint .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000069897A JP4448592B2 (en) | 2000-03-14 | 2000-03-14 | Reinforcement pile fixture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000069897A JP4448592B2 (en) | 2000-03-14 | 2000-03-14 | Reinforcement pile fixture |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2001254368A JP2001254368A (en) | 2001-09-21 |
JP4448592B2 true JP4448592B2 (en) | 2010-04-14 |
Family
ID=18588697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000069897A Expired - Fee Related JP4448592B2 (en) | 2000-03-14 | 2000-03-14 | Reinforcement pile fixture |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4448592B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101402042B1 (en) | 2011-07-15 | 2014-06-02 | (주)엑스휘나스기술연구소 | Joining structure of offshore structure and construction method using the same |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4707177B2 (en) * | 2005-05-26 | 2011-06-22 | 康夫 福田 | Seismic structure of wooden house |
JP5217216B2 (en) * | 2007-04-03 | 2013-06-19 | 株式会社大林組 | Anchor head fixing structure, anchor head fixing method, and grout injection method |
KR100976620B1 (en) | 2008-06-03 | 2010-08-17 | 주식회사 가인이앤피 | Construction method for basement extention |
JP5679305B2 (en) * | 2011-02-17 | 2015-03-04 | 東京電力株式会社 | Reinforcement method for power transmission towers |
JP5509374B1 (en) * | 2013-07-16 | 2014-06-04 | 黒沢建設株式会社 | Seismic strengthening structure and seismic strengthening method for existing buildings |
JP6611615B2 (en) * | 2016-01-07 | 2019-11-27 | 隆幸 瓜生 | Precast foundation structure and precast foundation method |
CN108677988A (en) * | 2018-06-20 | 2018-10-19 | 西南交通大学 | A kind of upper stake being suitable for large-scale cyclic load is casted anchor novel foundation |
IT202000016588A1 (en) * | 2020-07-09 | 2022-01-09 | Smart G S R L | SYSTEM AND METHOD OF FOUNDATION WITH SEISMIC ISOLATION OF BUILDINGS |
JP7457670B2 (en) | 2021-05-06 | 2024-03-28 | 大成建設株式会社 | Pile foundation structure, building |
KR102331398B1 (en) * | 2021-06-01 | 2021-12-01 | 이삼종 | Pipeline system in underground distribution line |
KR102331399B1 (en) * | 2021-06-01 | 2021-12-01 | 이삼종 | Pipeline system in underground distribution line |
-
2000
- 2000-03-14 JP JP2000069897A patent/JP4448592B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101402042B1 (en) | 2011-07-15 | 2014-06-02 | (주)엑스휘나스기술연구소 | Joining structure of offshore structure and construction method using the same |
Also Published As
Publication number | Publication date |
---|---|
JP2001254368A (en) | 2001-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5955108B2 (en) | Pile reinforcement structure of existing building and its construction method | |
JP4448592B2 (en) | Reinforcement pile fixture | |
KR20060092552A (en) | The non-strut down framework construction method of having used cast in place concrete pile | |
JP5456626B2 (en) | Connection structure and method of connection between pile and steel column | |
JP4069509B2 (en) | Construction method of reverse struts in the outer periphery of underground excavation space | |
JP3689840B2 (en) | Seismic reinforcement method for existing structure foundation | |
JP3799036B2 (en) | Building basic structure and construction method | |
JP2831909B2 (en) | Connection structure of steel columns, piles and foundation beams | |
JP4456257B2 (en) | Semi-fixed direct foundation and pile foundation structure of steel column | |
JP5785476B2 (en) | Reinforcing method and structure of existing foundation | |
JP3690437B2 (en) | Seismic reinforcement structure for existing buildings | |
KR102595835B1 (en) | Seismic retrofit system using foundation integrated PC panel | |
JP3671344B2 (en) | Joint structure between foundation pile and column base and its construction method | |
JP4111262B2 (en) | Connection structure between foundation pile and superstructure, pile head joint, connection method between foundation pile and superstructure | |
JP2004263497A (en) | Semi-rigid connection structure for foundation of structure | |
JP2019218795A (en) | Joint structure of foundation pile and foundation slab | |
JP2002129583A (en) | Building construction method and stress transmission device | |
JP4612422B2 (en) | Construction method of structure and foundation structure used for it | |
JP2004027727A (en) | Foundation pile and construction method for foundation pile | |
JP4473400B2 (en) | Foundation of construction and construction method | |
JPH1077644A (en) | Earthquake resisting pile foundation construction method | |
JP2002194748A (en) | Foundation constructing method and building foundation structure | |
JP2000017644A (en) | Installation method of underwater structure | |
JPH1082057A (en) | Method of earthquake-resisting pile foundation construction | |
JPH1082056A (en) | Method of earthquake-resisting pile foundation construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20061122 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20081205 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20081217 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090212 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20091224 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100125 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130129 Year of fee payment: 3 |
|
R150 | Certificate of patent (=grant) or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130129 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140129 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |