JP2001254368A - Foundation reinforcing method and fixture for reinforcing pile for use therein - Google Patents

Foundation reinforcing method and fixture for reinforcing pile for use therein

Info

Publication number
JP2001254368A
JP2001254368A JP2000069897A JP2000069897A JP2001254368A JP 2001254368 A JP2001254368 A JP 2001254368A JP 2000069897 A JP2000069897 A JP 2000069897A JP 2000069897 A JP2000069897 A JP 2000069897A JP 2001254368 A JP2001254368 A JP 2001254368A
Authority
JP
Japan
Prior art keywords
pile
reinforcing
footing
foundation
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000069897A
Other languages
Japanese (ja)
Other versions
JP4448592B2 (en
Inventor
Takashi Eguchi
孝 江口
Toshihisa Hatano
俊久 畑野
Masahiro Nakamura
正博 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP2000069897A priority Critical patent/JP4448592B2/en
Publication of JP2001254368A publication Critical patent/JP2001254368A/en
Application granted granted Critical
Publication of JP4448592B2 publication Critical patent/JP4448592B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Electric Cable Installation (AREA)

Abstract

PROBLEM TO BE SOLVED: To achieve reinforcement of an existing foundation easily and at a low cost, in order to increase a supportable load applied thereto by a ground structure such as a steel tower, and in order to increase the strength of the foundation against an earthquake, etc. SOLUTION: A required number of reinforcing piles 5 are driven from a location in proximity to a side surface 2a of a footing 2 of the foundation 1B of the steel tower to the periphery of the existing pile 3 in the ground below the footing 2. Then, a fixture 4 formed of a steel product or the like is attached to a pile head of each reinforcing pile 5, and a substrate 41 of the fixture 4 is anchored to the side surface 2a of the footing 2 by means of an anchor 45.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、高圧の送電線を高
架支持する電力用鉄塔等建築構造物における基礎を、補
強するための施工技術に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction technique for reinforcing a foundation in a building such as an electric power tower for supporting a high-voltage transmission line on an elevated road.

【0002】[0002]

【従来の技術】図7に示されるように、電力用鉄塔10
0等の構造物の基礎100Bは、地盤Gに打設された場
所打ちコンクリート杭等からなる基礎杭101と、その
杭頭101aと接合一体化されたコンクリートからなる
フーチング102(図示のものは連続フーチング)で構
成され、鉄塔100の柱脚103が前記フーチング10
2の上に構築されている。前記基礎杭101は通常、一
つのフーチング102あたり、それぞれ1本乃至複数
本、鉛直に打設される。
2. Description of the Related Art As shown in FIG.
The foundation 100B of the structure such as 0 is a foundation pile 101 made of a cast-in-place concrete pile or the like cast on the ground G, and a footing 102 made of concrete joined and integrated with the pile head 101a (the illustrated one is a continuous The pedestal 103 of the steel tower 100 is connected to the footing 10.
It is built on two. Usually, one to a plurality of foundation piles 101 are vertically driven per footing 102.

【0003】ところで近年、電力用鉄塔100の場合、
近年の電力需要の増大に伴い、図示されていない送電線
の重量が増大し、このため送電線の弛み量が増大(垂れ
下がり)することになる。そして、このような垂れ下が
りを補償するには、送電線の架設高さを高くする必要が
あり、このため鉄塔100の高さが高くなる傾向にあ
る。その結果、鉄塔100の重量が増大し、これを支持
する基礎杭101の耐力を向上させることが要求されて
いる。
In recent years, in the case of a power tower 100,
With an increase in power demand in recent years, the weight of a transmission line (not shown) increases, and the amount of slack in the transmission line increases (drops). In order to compensate for such drooping, it is necessary to increase the erection height of the transmission line, and thus the height of the steel tower 100 tends to increase. As a result, the weight of the steel tower 100 increases, and it is required to improve the strength of the foundation pile 101 that supports the tower.

【0004】一方、大地震時において発生する鉄塔10
0の傾斜や倒壊といった被害は、基礎杭101の破損に
起因するものであり、したがって耐震性を向上させる観
点からも、基礎杭101の耐力を向上させることが要求
されている。
On the other hand, a steel tower 10 generated during a large earthquake
Damage such as zero inclination or collapse is caused by breakage of the foundation pile 101. Therefore, from the viewpoint of improving earthquake resistance, it is required to improve the strength of the foundation pile 101.

【0005】従来、既設の基礎杭(以下、既設杭とい
う)101を補強するための工法としては、図8に示さ
れるようなものが知られている。すなわち、従来工法に
おいては、まずフーチング102に、既設杭101の鉛
直方向投影位置に隣接して、所要数の鉛直貫通孔102
aを削孔し、この鉛直貫通孔102aを通じて、前記既
設杭101の隣接地盤を鉛直方向にボーリングして、補
強用の杭104を打ち込む。そして、各補強杭104の
杭頭に支圧部材105を取り付け、これらの支圧部材1
05を埋めるように、前記フーチング102の上面に、
所要の厚さで鉄筋コンクリート106を打ち継ぐ。
Conventionally, as a method for reinforcing an existing foundation pile (hereinafter referred to as an existing pile) 101, a construction method as shown in FIG. 8 is known. That is, in the conventional construction method, first, a required number of vertical through holes 102 are provided in the footing 102 adjacent to the vertical projection position of the existing pile 101.
Then, the ground adjacent to the existing pile 101 is bored in the vertical direction through the vertical through hole 102a, and the reinforcing pile 104 is driven. Then, bearing members 105 are attached to the pile heads of the reinforcing piles 104, and these bearing members 1
05, on the upper surface of the footing 102,
The reinforced concrete 106 is joined at the required thickness.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、上記従
来の既設基礎の補強技術によれば、鉄筋コンクリートか
らなるフーチング102に、いくつもの鉛直貫通孔10
2aを削孔したり、補強杭104の打設後に、支圧部材
105を固定するために、前記フーチング102上に型
枠を組み立てて配筋し、コンクリート106を増設する
といった工程が必要であるため、施工が煩雑でコストが
高くなるばかりか、工期も長くなるといった問題があっ
た。
However, according to the above-mentioned conventional reinforcing technique of the existing foundation, a number of vertical through holes 10 are formed in the footing 102 made of reinforced concrete.
In order to fix the bearing member 105 after drilling the hole 2a or driving the reinforcing pile 104, a process of assembling a formwork on the footing 102, arranging reinforcing bars, and adding concrete 106 is required. Therefore, there is a problem that not only the construction is complicated and the cost is increased, but also the construction period is lengthened.

【0007】本発明は、上述のような問題に鑑みてなさ
れたもので、その主な技術的課題とするところは、鉄塔
等の地上構造物からの支持荷重増大や地震等に対する基
礎の耐力の向上を図るため、既設の基礎を容易かつ低コ
ストで補強可能な工法を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and its main technical problems are to increase the supporting load from an overground structure such as a steel tower and the strength of the foundation to withstand an earthquake or the like. An object of the present invention is to provide a construction method that can easily and at low cost reinforce an existing foundation in order to improve the construction.

【0008】[0008]

【課題を解決するための手段】上述の技術的課題は、本
発明によって有効に解決することができる。すなわち本
発明に係る基礎の補強工法は、構造物におけるフーチン
グの側面に近接した位置から、前記フーチングの下方地
盤中の既設杭の周囲へ所要数の補強杭を打設し、前記補
強杭の杭頭に固定具を取り付けると共にこの固定具を前
記フーチングの側面に定着するものである。
The above technical problems can be effectively solved by the present invention. That is, the method of reinforcing the foundation according to the present invention comprises: placing a required number of reinforcing piles around existing piles in the ground below the footing from a position adjacent to the side surface of the footing in the structure; A fixture is attached to the head and the fixture is fixed to the side surface of the footing.

【0009】また、本発明に係る補強杭の固定具は、縁
部に沿って複数の結合孔が開設された所要の肉厚の鋼板
等からなる基板と、この基板に突設され杭頭挿入孔が開
設された結合板と、前記杭頭挿入孔に挿入した補強杭の
杭頭を前記結合板に結合する結合部材群と、前記結合孔
に挿通されてフーチングの側面に打ち込み又はねじ込ま
れることにより前記基板を定着する複数のアンカーとか
らなる。
[0009] A fixture for a reinforcing pile according to the present invention comprises a board made of a required thickness of steel plate or the like having a plurality of connecting holes formed along an edge thereof, and a pile head inserted into the board and projected therefrom. A coupling plate having a hole, a coupling member group for coupling a pile head of a reinforcing pile inserted into the pile head insertion hole to the coupling plate, and being inserted into the coupling hole and driven or screwed into a side surface of a footing. And a plurality of anchors for fixing the substrate.

【0010】[0010]

【発明の実施の形態】以下、本発明に係る基礎の補強工
法の好適な一実施形態を、図1乃至図6を参照しながら
説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A preferred embodiment of a foundation reinforcing method according to the present invention will be described below with reference to FIGS.

【0011】まず図1は、電力用鉄塔の基礎1Bを、本
発明の工法により補強した状態を概略的に示すものであ
る。すなわち、この図において、参照符号1は、鉄骨等
により構築された電力用の鉄塔であり、その基礎1B
は、前記鉄塔1の柱脚11の下端に接合され地盤Gの表
層部に鉄筋コンクリートにより構築されたフーチング2
と、杭頭3aが前記フーチング2に接合され地盤Gへ鉛
直に打設された場所打ちコンクリート杭等からなる既設
の基礎杭(以下、既設杭という)3からなる。
FIG. 1 schematically shows a state in which a foundation 1B of a power tower is reinforced by the method of the present invention. That is, in this figure, reference numeral 1 denotes a power tower constructed of a steel frame or the like, and its base 1B
Is a footing 2 which is joined to the lower end of the column base 11 of the steel tower 1 and is made of reinforced concrete on the surface layer of the ground G.
And an existing foundation pile (hereinafter, referred to as an existing pile) 3 such as a cast-in-place concrete pile or the like in which a pile head 3a is joined to the footing 2 and is vertically driven into the ground G.

【0012】基礎1Bにおけるフーチング2の側面2a
には、複数の固定具4が図示の断面と直交する方向へ適
当な間隔で配置されており、フーチング2の周囲から既
設杭3と平行(鉛直)に打設された複数の補強杭5の各
杭頭5aが、前記固定具4を介して前記フーチング2の
側面2aに固定されている。
Side surface 2a of footing 2 in foundation 1B
, A plurality of fixing tools 4 are arranged at appropriate intervals in a direction orthogonal to the cross section shown in the figure, and a plurality of reinforcing piles 5 driven from the periphery of the footing 2 in parallel with the existing pile 3 (vertically). Each pile head 5 a is fixed to the side surface 2 a of the footing 2 via the fixing tool 4.

【0013】固定具4は、図2の斜視図及び図3の断面
図に示されるように、外周部に複数の結合孔41aが開
設された所要の肉厚の鋼板等からなる基板41と、この
基板41の中央部にその面に対して垂直に突設された鋼
板等からなる結合板42と、この結合板42の幅方向両
側に位置して、前記基板41及び結合板42の双方に対
して垂直に設けられた鋼板等からなる一対の補強板43
と、前記結合板42と補強杭5とを接合する結合部材群
44と、前記基板41の結合孔41aに挿通されてフー
チング2の側面2aに打ち込み又はねじ込まれることに
より、この固定具4を強固に定着する複数のアンカー4
5とを備える。また、前記基板41、結合板42及び補
強板43は、溶接等により互いに一体化され、めっきあ
るいは施工後の塗装や吹き付け等によって防錆される。
As shown in the perspective view of FIG. 2 and the cross-sectional view of FIG. 3, the fixture 4 includes a substrate 41 made of a required thickness, such as a steel plate, having a plurality of coupling holes 41a formed in an outer peripheral portion thereof. A coupling plate 42 made of a steel plate or the like protruded perpendicularly to the surface of the substrate 41 at the center thereof, and both sides of the coupling plate 42 in the width direction are provided on both the substrates 41 and 42. A pair of reinforcing plates 43 made of a steel plate or the like provided perpendicular to the
The fixing member 4 is firmly fixed by being inserted into the coupling hole 41a of the board 41 and driven or screwed into the side surface 2a of the footing 2, and a coupling member group 44 for coupling the coupling plate 42 and the reinforcing pile 5 to each other. Anchors 4 to settle in
5 is provided. The substrate 41, the coupling plate 42, and the reinforcing plate 43 are integrated with each other by welding or the like, and are rust-proofed by plating or painting or spraying after construction.

【0014】補強杭5としては、公知の構造を有する比
較的小径(例えばφ300mm以下)の、かつ高耐力を
有するものが好適に採用される。すなわち、この補強杭
5は、図3に示されるように、地盤Gにおける軟弱層G
1の下端又はそれより深くまで挿入されると共に、頭部
を固定具4の結合板42にそれぞれ結合部材群44を介
して接合された鋼管51と、この鋼管51の内周に挿通
され、この鋼管51の下部開口から更に下側へ延びる下
端52aが、前記軟弱層G1より下層にある堅固な支持
層G2内へ達すると共に、頭部が前記結合板42にそれ
ぞれ前記結合部材群44を介して接合された金属芯材と
しての異形鉄筋52と、前記鋼管51及び地盤Gと異形
鉄筋52との間に充填された固結材としてのグラウト5
3とからなるものである。グラウト53は、鋼管51の
下側(支持層G2内)では拡径されたペデスタル状に形
成されており、また、このグラウト53の一部は鋼管5
1の外周側に回り込んで、地盤Gの削孔面に定着されて
いる。
As the reinforcing stake 5, a stake having a relatively small diameter (for example, φ300 mm or less) having a known structure and high proof strength is suitably adopted. That is, as shown in FIG.
1 is inserted to the lower end or deeper, and the head is inserted through the inner periphery of the steel pipe 51 whose head is joined to the connecting plate 42 of the fixture 4 via the connecting member group 44, respectively. A lower end 52a extending further downward from the lower opening of the steel pipe 51 reaches into a solid support layer G2 below the soft layer G1, and has a head connected to the connecting plate 42 via the connecting member group 44, respectively. A deformed reinforcing bar 52 as a joined metal core material, and a grout 5 as a consolidated material filled between the steel pipe 51 and the ground G and the deformed reinforcing bar 52
3). The grout 53 is formed in an enlarged pedestal shape below the steel pipe 51 (in the support layer G2), and a part of the grout 53 is formed of the steel pipe 5.
1 and is fixed to the drilled surface of the ground G.

【0015】図4乃至図6に、固定具4と補強杭5との
種々の接合構造が例示されるように、固定具4の結合板
42には、それぞれ補強杭5の鋼管51を、適当な遊び
をもって挿通可能な杭頭挿入孔42aが開設されてい
る。
As shown in FIGS. 4 to 6, various connecting structures of the fixing tool 4 and the reinforcing pile 5 are exemplified, and the steel pipe 51 of the reinforcing pile 5 is appropriately attached to the connecting plate 42 of the fixing tool 4. A pile head insertion hole 42a that can be inserted with ample play is provided.

【0016】図4に示される例においては、結合部材群
44は、結合板42の下側に位置するように、補強杭5
における鋼管51の頭部近傍の外周に溶接等により固定
される鋼製の下部フランジ441と、前記結合板42の
杭頭挿入孔42aから上側へ突出した前記鋼管51の頭
部外周に、溶接等により固定される鋼製の上部フランジ
442と、この上部フランジ442の上に配置され、複
数の螺子部材443の緊結によって、前記結合板42と
の間に上部フランジ442を挟着した状態で補強杭5の
杭頭を押さえる鋼製の支圧板444とで構成される。支
圧板444の中央には螺子孔444aが開設されてお
り、補強杭5における異形鉄筋52の頭部が、この螺子
孔444aに螺合されることによって、前記支圧板44
4に固定されるようになっている。
In the example shown in FIG. 4, the connecting member group 44 is arranged so that the reinforcing pile 5
And a lower flange 441 made of steel fixed to the outer periphery near the head of the steel pipe 51 by welding or the like, and the outer periphery of the head of the steel pipe 51 projecting upward from the pile head insertion hole 42a of the coupling plate 42 by welding or the like. A steel upper flange 442 fixed by the above-described method, and a reinforcing pile arranged in a state where the upper flange 442 is sandwiched between the upper plate 442 and the coupling plate 42 by being tightened by the plurality of screw members 443. 5 and a steel support plate 444 for holding the pile head. A screw hole 444a is formed at the center of the support plate 444, and the head of the deformed reinforcing bar 52 in the reinforcing pile 5 is screwed into the screw hole 444a, so that the support plate 44 is formed.
4 is fixed.

【0017】また、図5に示される例においては、結合
部材群44は、結合板42の下側に位置するように、補
強杭5における鋼管51の頭部近傍の外周に溶接等によ
り固定される鋼製の下部フランジ441と、前記結合板
42の杭頭挿入孔42aから上側へ突出した前記鋼管5
1の頭部を覆うと共に、外周下面が前記結合板42に当
接するように配置され、溶接又は螺合等により前記鋼管
51に固定される鋼製の支圧キャップ445と、前記支
圧キャップ445の上部中央に開設した鉄筋挿通孔44
5aに、補強杭5における異形鉄筋52の頭部を挿通状
態に固定する一対のナット446,446とで構成され
る。
In the example shown in FIG. 5, the connecting member group 44 is fixed to the outer periphery near the head of the steel pipe 51 in the reinforcing pile 5 by welding or the like so as to be located below the connecting plate 42. Steel lower flange 441 and the steel pipe 5 projecting upward from the pile head insertion hole 42a of the coupling plate 42.
1 and a bearing cap 445 made of steel, which is arranged so as to cover the head portion of the steel pipe 1 and the lower surface of the outer periphery thereof is in contact with the coupling plate 42 and is fixed to the steel pipe 51 by welding or screwing. Rebar insertion hole 44 opened in the upper center of the building
5a, a pair of nuts 446 and 446 for fixing the head of the deformed reinforcing bar 52 of the reinforcing pile 5 in an inserted state is provided.

【0018】また、図6に示される例においては、結合
部材群44は、結合板42の下側に位置するように、補
強杭5における鋼管51の頭部近傍の外周に溶接等によ
り固定される鋼製の下部フランジ441と、前記結合板
42の杭頭挿入孔42aから上側へ突出した前記鋼管5
1の頭部外周に、溶接等により固定される鋼製の上部フ
ランジ442と、この上部フランジ442の上に配置さ
れ、複数のボルト447によって、前記結合板42との
間に上部フランジ442を挟着した状態で補強杭5の杭
頭を押さえる鋼製の支圧板444と、この支圧板444
の中央に開設された鉄筋挿通孔444bに、補強杭5に
おける異形鉄筋52の頭部を挿通状態に固定する一対の
ナット446,446とで構成される。
In the example shown in FIG. 6, the connecting member group 44 is fixed to the outer periphery near the head of the steel pipe 51 in the reinforcing pile 5 by welding or the like so as to be located below the connecting plate 42. Steel lower flange 441 and the steel pipe 5 projecting upward from the pile head insertion hole 42a of the coupling plate 42.
An upper flange 442 made of steel fixed by welding or the like to the outer periphery of the head 1 and disposed on the upper flange 442, and the upper flange 442 is sandwiched between the coupling plate 42 by a plurality of bolts 447. A steel bearing plate 444 for holding the pile head of the reinforcing pile 5 in a worn state, and the bearing plate 444
And a pair of nuts 446 and 446 for fixing the head of the deformed reinforcing bar 52 in the reinforcing pile 5 in the inserted state in the reinforcing bar insertion hole 444b opened in the center of the reinforcing pile 5.

【0019】上述の補強工法によれば、鉄塔1及びこれ
に架設された送電線(図示省略)の重量による荷重は、
柱脚11からフーチング2を介して既成杭3に伝達され
ると共に、前記フーチング2から、固定具4を介して各
補強杭5にも伝達される。このため前記荷重に対する基
礎1Bの支持耐力が増大するので、例えば電力需要の増
大に対処して、図1に実線で示される既設の鉄塔1を、
一点鎖線で示されるような、サイズの大きな鉄塔1’に
建て替えることによる荷重の増大に対応することができ
る。
According to the above-mentioned reinforcing method, the load due to the weight of the tower 1 and the transmission line (not shown) installed on the tower 1 is:
The power is transmitted from the column base 11 to the existing pile 3 via the footing 2, and also transmitted from the footing 2 to each reinforcing pile 5 via the fixture 4. For this reason, since the supporting strength of the foundation 1B against the load increases, for example, in response to an increase in power demand, the existing steel tower 1 shown by a solid line in FIG.
It is possible to cope with an increase in the load caused by rebuilding the tower 1 ′ having a large size as indicated by a chain line.

【0020】また、補強杭5によって、地震による水平
加速度が鉄塔1に加えられた場合の水平慣性力に対する
耐力や、鉄塔1の揺れによるモーメント及び引き抜き力
に対する耐力が向上する。このため、杭全体としての剪
断強度が増強され、大地震発生時の既設杭3の破壊や、
あるいはフーチング2と既設杭3との接合部等の破壊に
起因する鉄塔1の傾斜や倒壊を防止するための、耐震補
強工法としても有用である。
In addition, the reinforcing pile 5 improves the proof strength against the horizontal inertia force when the horizontal acceleration due to the earthquake is applied to the pylon 1 and the proof strength against the moment and the pull-out force due to the shaking of the pylon 1. Therefore, the shear strength of the entire pile is increased, and the existing pile 3 is destroyed when a large earthquake occurs,
Alternatively, it is also useful as a seismic retrofitting method for preventing the steel tower 1 from tilting or collapsing due to the destruction of the joint between the footing 2 and the existing pile 3 or the like.

【0021】以下、この実施形態の補強工法による施工
手順を説明すると、図2に示されるように、まず、フー
チング2の周囲の地盤Gを所要の深さに掘削して、前記
フーチング2の側面2aを露出させる。
The construction procedure according to the reinforcing method of this embodiment will be described below. As shown in FIG. 2, first, the ground G around the footing 2 is excavated to a required depth, and the side surface of the footing 2 is excavated. Expose 2a.

【0022】次に、フーチング2の側面2aと近接した
位置から、補強杭5を鉛直に打設する。補強杭5の打設
位置は、前記側面2aに固定具4を固定した場合の結合
板42における杭頭挿入孔42aの位置を考慮して決定
し、また、補強杭5の打設本数や打設間隔は、目的とす
る強度を考慮して適切に決定する。
Next, the reinforcing pile 5 is driven vertically from a position adjacent to the side surface 2a of the footing 2. The placement position of the reinforcing pile 5 is determined in consideration of the position of the pile head insertion hole 42a in the coupling plate 42 when the fixing tool 4 is fixed to the side surface 2a. The setting interval is appropriately determined in consideration of the intended strength.

【0023】各補強杭5の打設作業は、よく知られてい
るように、まず、この補強杭5の鋼管51よりも適宜大
径の管状ケーシング(図示省略)を用いてボーリング
(ケーシング掘り)を行い、地盤Gにおける支持層G2
内に達する削孔を形成する。そのとき、前記鋼管51は
ボーリングに合わせてケーシングと共に地盤Gの支持層
G2まで一緒に挿入される。削孔が形成されたら、前記
鋼管51を地盤G内に残し、ケーシングだけを引き抜
く。次に、異形鉄筋52を鋼管51内に挿入するが、こ
の異形鉄筋52にはグラウト53を圧入する装置が取り
付けられていて、一緒に挿入される。挿入が完了した
ら、前記圧入装置を用い、前記削孔内にグラウト53を
圧入し、これに合わせて、鋼管51を所定の高さまで引
き上げる。グラウト53が十分に充填されたら、再度前
記鋼管51を挿入し、同時にグラウト53も再度圧入す
る。そしてこの時の加圧力によって、前記鋼管51の下
側でグラウト53がペデスタル状に拡散される。
As is well known, the operation of placing the reinforcing piles 5 first involves boring (casing excavation) using a tubular casing (not shown) having a diameter larger than the steel pipe 51 of the reinforcing piles 5. And the supporting layer G2 in the ground G
A hole is formed to reach inside. At this time, the steel pipe 51 is inserted together with the casing up to the support layer G2 of the ground G in accordance with the boring. After the hole is formed, the steel pipe 51 is left in the ground G, and only the casing is pulled out. Next, the deformed reinforcing bar 52 is inserted into the steel pipe 51. A device for press-fitting the grout 53 is attached to the deformed reinforcing bar 52 and is inserted together. When the insertion is completed, the grout 53 is press-fitted into the hole by using the press-fitting device, and the steel pipe 51 is pulled up to a predetermined height accordingly. When the grout 53 is sufficiently filled, the steel pipe 51 is inserted again, and at the same time, the grout 53 is press-fitted again. The pressing force at this time causes the grout 53 to diffuse in a pedestal shape below the steel pipe 51.

【0024】補強杭5としては、先に説明したようにφ
300mm以下の小径で高耐力を有するものが好適に採
用されるため、フーチング2の側面2aに近接した位置
からでも容易に打設することができ、しかも比較的小型
の重機による打設が可能である。また、補強杭5の打設
のためにフーチング2に図8のような鉛直貫通孔102
aを削孔する必要がないため、補強杭5の打設における
施工コストが低減される。
As described above, the reinforcing pile 5 has a diameter of φ
Since a material having a small diameter of 300 mm or less and having a high yield strength is suitably adopted, it can be easily driven from a position close to the side surface 2a of the footing 2, and can be driven by a relatively small heavy machine. is there. In addition, a vertical through hole 102 as shown in FIG.
Since it is not necessary to drill holes a, the construction cost for driving the reinforcing pile 5 is reduced.

【0025】打設された各補強杭5の鋼管51の頭部近
傍には、先に説明した図4乃至図6に示されるように、
結合部材群44の一部である下部フランジ441が予め
溶接等により接合される。そして、フーチング2の周囲
の掘削空間Sに突出した各補強杭5の杭頭に、それぞれ
固定具4を配置して、その結合板42の杭頭挿入孔42
aに前記杭頭(鋼管51の頭部)を通すと共に、この固
定具4の基板41を、複数のアンカー45によってフー
チング2の側面2aに固定する。このとき、フーチング
2には特にコンクリートを増設する必要はなく、しかも
固定具4は鋼板等によって安価に製作可能であるため、
ここでも施工コストが低減される。
In the vicinity of the head of the steel pipe 51 of each of the installed reinforcing piles 5, as shown in FIGS.
The lower flange 441 which is a part of the connecting member group 44 is previously joined by welding or the like. Then, the fixtures 4 are respectively arranged at the pile heads of the reinforcing piles 5 protruding into the excavation space S around the footing 2, and the pile head insertion holes 42 of the coupling plates 42 are provided.
The pile head (the head of the steel pipe 51) is passed through a, and the substrate 41 of the fixture 4 is fixed to the side surface 2a of the footing 2 by a plurality of anchors 45. At this time, it is not necessary to add concrete to the footing 2 and the fixture 4 can be manufactured at low cost by using a steel plate or the like.
Again, construction costs are reduced.

【0026】次に、前記結合板42と補強杭5の杭頭と
を、結合部材群44によって、図4乃至図6に示される
ような方法で結合する。その後は、必要に応じて、塗装
や吹き付け等によって、防錆加工を施してから、フーチ
ング2の周囲の掘削空間Sを掘削土により埋め戻し、施
工を完了する。
Next, the connecting plate 42 and the pile head of the reinforcing pile 5 are connected by a connecting member group 44 by a method as shown in FIGS. Thereafter, if necessary, rustproofing is performed by painting, spraying, or the like, and then the excavation space S around the footing 2 is backfilled with excavated soil to complete the construction.

【0027】なお、上記実施形態においては、補強杭5
に、いわゆるマイクロパイルを用いるものとして説明し
たが、本発明は、これには限定されず、固定具4により
固定可能で、所要の耐力を発揮するものであれば良い。
In the above embodiment, the reinforcing pile 5
Although a so-called micropile has been described above, the present invention is not limited to this, and any device can be used as long as it can be fixed by the fixture 4 and has a required strength.

【0028】[0028]

【発明の効果】以上詳述したように、本発明に係る基礎
の補強工法によれば次のような効果が実現される。まず
施工上においては、フーチングへの孔開けやコンクリー
トの増設等が不要であるため、大掛かりな工事になら
ず、フーチングの周囲の狭い空間でも施工可能であるた
め、容易にかつ低コストで実施可能である。
As described in detail above, the following effects are realized by the method for reinforcing a foundation according to the present invention. First of all, since there is no need to drill holes in the footing or add concrete to the construction, large-scale construction is not required, and construction can be performed in a narrow space around the footing, so it can be performed easily and at low cost. It is.

【0029】また、この工法による既設杭の補強を行う
ことによって、鉛直荷重に対する基礎の支持耐力や、地
震時における水平耐力が向上するので、鉄塔等の地上構
造物の建て替えによる支持荷重の増大に対処することが
でき、また、大地震時の基礎杭の破壊に起因して発生す
る前記構造物の傾斜や倒壊といった被害を防止するため
の有効な対策となる。
Further, by reinforcing the existing piles by this method, the bearing capacity of the foundation against vertical loads and the horizontal strength in the event of an earthquake are improved, so that the supporting loads due to the rebuilding of ground structures such as steel towers can be increased. This can be an effective measure for preventing damage such as tilting or collapse of the structure caused by destruction of the foundation pile during a large earthquake.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係る基礎の補強工法によ
り補強された、鉄塔の基礎を概略的に示す説明図であ
る。
FIG. 1 is an explanatory view schematically showing a foundation of a steel tower reinforced by a foundation reinforcement method according to an embodiment of the present invention.

【図2】上記実施形態において固定具によりフーチング
と補強杭を接合した状態を示す斜視図である。
FIG. 2 is a perspective view showing a state in which a footing and a reinforcing pile are joined by a fixture in the embodiment.

【図3】上記実施形態における補強杭及び固定具の構造
をフーチング及び既設杭の一部と共に示す断面図であ
る。
FIG. 3 is a cross-sectional view showing a structure of a reinforcing pile and a fixture in the embodiment, together with a footing and a part of an existing pile.

【図4】上記実施形態における固定具と補強杭との結合
構造の一例を示す要部断面図である。
FIG. 4 is a cross-sectional view of a main part showing an example of a connection structure between a fixture and a reinforcing pile in the embodiment.

【図5】上記実施形態における固定具と補強杭との結合
構造の他の例を示す要部断面図である。
FIG. 5 is a cross-sectional view of a main part showing another example of the connection structure between the fixture and the reinforcing pile in the embodiment.

【図6】上記実施形態における固定具と補強杭との結合
構造の他の例を示す要部断面図である。
FIG. 6 is a cross-sectional view of a main part showing another example of the connection structure between the fixture and the reinforcing pile in the embodiment.

【図7】電力用鉄塔の基礎の構造を示すもので、(A)
は縦断面図、(B)は部分的な平面図である。
FIG. 7 shows the basic structure of a power tower, and FIG.
Is a longitudinal sectional view, and (B) is a partial plan view.

【図8】電力用鉄塔の基礎を、従来の補強工法により補
強した状態を概略的に示す説明図である。
FIG. 8 is an explanatory view schematically showing a state in which a foundation of a power tower is reinforced by a conventional reinforcing method.

【符号の説明】[Explanation of symbols]

1 鉄塔(構造物) 1B 基礎 2 フーチング 3 既設杭 4 固定具 41 基板 41a 結合孔 42 結合板 42a 杭頭挿入孔 44 結合部材群 5 補強杭 DESCRIPTION OF SYMBOLS 1 Steel tower (structure) 1B Foundation 2 Footing 3 Existing pile 4 Fixture 41 Board 41a Connection hole 42 Connection plate 42a Pile head insertion hole 44 Connection member group 5 Reinforcement pile

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中村 正博 東京都渋谷区千駄ヶ谷四丁目6番15号 株 式会社フジタ内 Fターム(参考) 2D046 CA01 CA03 DA11  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Masahiro Nakamura 4-6-1 Sendagaya, Shibuya-ku, Tokyo F-term in Fujita Co., Ltd. F-term (reference) 2D046 CA01 CA03 DA11

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 構造物におけるフーチングの側面に近接
した位置から、前記フーチングの下方地盤中の既設杭の
周囲へ所要数の補強杭を打設する工程と、 前記補強杭の杭頭に固定具を取り付けると共にこの固定
具を前記フーチングの側面に定着する工程と、 からなることを特徴とする基礎の補強工法。
1. A step of placing a required number of reinforcing piles around existing piles in the ground below the footing from a position adjacent to a side surface of the footing in a structure, and a fixture attached to a pile head of the reinforcing pile. Attaching the fixing device to the side surface of the footing, and reinforcing the foundation.
【請求項2】 縁部に沿って複数の結合孔が開設された
所要の肉厚の鋼板等からなる基板と、 この基板に突設され杭頭挿入孔が開設された結合板と、 前記杭頭挿入孔に挿入した補強杭の杭頭を前記結合板に
結合する結合部材群と、 前記結合孔に挿通されてフーチングの側面に打ち込み又
はねじ込まれることにより前記基板を定着する複数のア
ンカーと、からなることを特徴とする補強杭の固定具。
2. A board made of a required thickness of a steel plate or the like having a plurality of connecting holes formed along an edge, a connecting plate projecting from the board and having a pile head insertion hole formed therein, and the pile A coupling member group that couples the pile head of the reinforcing pile inserted into the head insertion hole to the coupling plate, and a plurality of anchors that are inserted through the coupling hole and are fixed to the substrate by being driven or screwed into the side surface of the footing, A fixing device for a reinforcing pile, comprising:
JP2000069897A 2000-03-14 2000-03-14 Reinforcement pile fixture Expired - Fee Related JP4448592B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000069897A JP4448592B2 (en) 2000-03-14 2000-03-14 Reinforcement pile fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000069897A JP4448592B2 (en) 2000-03-14 2000-03-14 Reinforcement pile fixture

Publications (2)

Publication Number Publication Date
JP2001254368A true JP2001254368A (en) 2001-09-21
JP4448592B2 JP4448592B2 (en) 2010-04-14

Family

ID=18588697

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000069897A Expired - Fee Related JP4448592B2 (en) 2000-03-14 2000-03-14 Reinforcement pile fixture

Country Status (1)

Country Link
JP (1) JP4448592B2 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006328816A (en) * 2005-05-26 2006-12-07 Fumio Ikemura Earthquake resistant structure of wooden house
JP2008255615A (en) * 2007-04-03 2008-10-23 Ohbayashi Corp Head anchoring structure of anchor, head anchoring method of anchor and injection method of grout material
KR100976620B1 (en) 2008-06-03 2010-08-17 주식회사 가인이앤피 Construction method for basement extention
JP2012172295A (en) * 2011-02-17 2012-09-10 Tokyo Electric Power Co Inc:The Reinforcement method of steel tower for power transmission
JP5509374B1 (en) * 2013-07-16 2014-06-04 黒沢建設株式会社 Seismic strengthening structure and seismic strengthening method for existing buildings
JP2017122343A (en) * 2016-01-07 2017-07-13 隆幸 瓜生 Precast foundation structure and precast foundation construction method
CN108677988A (en) * 2018-06-20 2018-10-19 西南交通大学 A kind of upper stake being suitable for large-scale cyclic load is casted anchor novel foundation
KR102331398B1 (en) * 2021-06-01 2021-12-01 이삼종 Pipeline system in underground distribution line
KR102331399B1 (en) * 2021-06-01 2021-12-01 이삼종 Pipeline system in underground distribution line
IT202000016588A1 (en) * 2020-07-09 2022-01-09 Smart G S R L SYSTEM AND METHOD OF FOUNDATION WITH SEISMIC ISOLATION OF BUILDINGS
JP7457670B2 (en) 2021-05-06 2024-03-28 大成建設株式会社 Pile foundation structure, building

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101402042B1 (en) 2011-07-15 2014-06-02 (주)엑스휘나스기술연구소 Joining structure of offshore structure and construction method using the same

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006328816A (en) * 2005-05-26 2006-12-07 Fumio Ikemura Earthquake resistant structure of wooden house
JP4707177B2 (en) * 2005-05-26 2011-06-22 康夫 福田 Seismic structure of wooden house
JP2008255615A (en) * 2007-04-03 2008-10-23 Ohbayashi Corp Head anchoring structure of anchor, head anchoring method of anchor and injection method of grout material
KR100976620B1 (en) 2008-06-03 2010-08-17 주식회사 가인이앤피 Construction method for basement extention
JP2012172295A (en) * 2011-02-17 2012-09-10 Tokyo Electric Power Co Inc:The Reinforcement method of steel tower for power transmission
JP5509374B1 (en) * 2013-07-16 2014-06-04 黒沢建設株式会社 Seismic strengthening structure and seismic strengthening method for existing buildings
JP2017122343A (en) * 2016-01-07 2017-07-13 隆幸 瓜生 Precast foundation structure and precast foundation construction method
CN108677988A (en) * 2018-06-20 2018-10-19 西南交通大学 A kind of upper stake being suitable for large-scale cyclic load is casted anchor novel foundation
IT202000016588A1 (en) * 2020-07-09 2022-01-09 Smart G S R L SYSTEM AND METHOD OF FOUNDATION WITH SEISMIC ISOLATION OF BUILDINGS
WO2022008992A1 (en) * 2020-07-09 2022-01-13 Smart-G S.R.L. Seismic isolation foundation system and method for buildings
JP7457670B2 (en) 2021-05-06 2024-03-28 大成建設株式会社 Pile foundation structure, building
KR102331398B1 (en) * 2021-06-01 2021-12-01 이삼종 Pipeline system in underground distribution line
KR102331399B1 (en) * 2021-06-01 2021-12-01 이삼종 Pipeline system in underground distribution line

Also Published As

Publication number Publication date
JP4448592B2 (en) 2010-04-14

Similar Documents

Publication Publication Date Title
JP2001254368A (en) Foundation reinforcing method and fixture for reinforcing pile for use therein
JP4069509B2 (en) Construction method of reverse struts in the outer periphery of underground excavation space
JP4456257B2 (en) Semi-fixed direct foundation and pile foundation structure of steel column
JP3799036B2 (en) Building basic structure and construction method
JP4558145B2 (en) Seismic isolation method for existing buildings
JP2831909B2 (en) Connection structure of steel columns, piles and foundation beams
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
KR102595835B1 (en) Seismic retrofit system using foundation integrated PC panel
JP2002285564A (en) Bearing construction for the foundation of structure and construction method therefor
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JP4067688B2 (en) Construction method of seismic isolation structure
JP4111262B2 (en) Connection structure between foundation pile and superstructure, pile head joint, connection method between foundation pile and superstructure
JP2002129583A (en) Building construction method and stress transmission device
JP4612422B2 (en) Construction method of structure and foundation structure used for it
JPS61233131A (en) Foundation structure of pole
JP2001262592A (en) Foundation of structure and execution work method therefor
JP2002194748A (en) Foundation constructing method and building foundation structure
JP2966765B2 (en) Underground construction members burying method
JP3118207B2 (en) Construction method of pile column top level adjustment structure in building structure using pile as pillar
JPS63280153A (en) Underground inverted lining method
JP2003064882A (en) Method for installing base isolation device in existing building
JPH1150407A (en) Road and construction method thereof
JP4889414B2 (en) Foundation structure
JP2004143878A (en) Construction method for joining foundation pile and column together and metal joint for joining
JPH10292393A (en) Method for reinforcing foundation of existing structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061122

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081217

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090212

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091224

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100125

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130129

Year of fee payment: 3

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130129

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140129

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees