JP4416420B2 - Building profit simulation device - Google Patents

Building profit simulation device Download PDF

Info

Publication number
JP4416420B2
JP4416420B2 JP2003067258A JP2003067258A JP4416420B2 JP 4416420 B2 JP4416420 B2 JP 4416420B2 JP 2003067258 A JP2003067258 A JP 2003067258A JP 2003067258 A JP2003067258 A JP 2003067258A JP 4416420 B2 JP4416420 B2 JP 4416420B2
Authority
JP
Japan
Prior art keywords
maintenance
building
repair
replacement
profit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2003067258A
Other languages
Japanese (ja)
Other versions
JP2003308428A (en
Inventor
史年 白岩
勝洋 小田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Kasei Homes Corp
Original Assignee
Asahi Kasei Homes Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Kasei Homes Corp filed Critical Asahi Kasei Homes Corp
Priority to JP2003067258A priority Critical patent/JP4416420B2/en
Publication of JP2003308428A publication Critical patent/JP2003308428A/en
Application granted granted Critical
Publication of JP4416420B2 publication Critical patent/JP4416420B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、部屋あるいは建物そのもの賃貸を行う建物の採算の評価を行うための建物採算シミュレーション装置に関する。
【0002】
【従来の技術】
従来、建物を建設し、その建物あるいは部屋を賃貸しようとする場合、家主は、住宅建設会社から見積もりをとるとともに、現在の賃貸費用の相場まで考慮した上で、建設に着工する。したがって、その採算を検討する上でも精度が悪かった。
【0003】
【発明が解決しようとする課題】
住宅建設後の住宅のメンテナンスは場当たり的であり、通常は、住宅のどこかに異常が発生した時に、修繕を行っている。したがって、住宅建設時にはいつ修繕が必要か、費用がいくらかかるかという点については、家主は知ることができない。
【0004】
また、一般的な財務に関する採算シミュレーション装置は従来から知られているが、住宅建設後の修繕等のメンテナンス費用または改装費用が考慮されておらず、賃貸住宅など住宅関連の採算シミュレーションの精度が悪いという問題もある。
【0005】
そこで、本発明の目的は、建物を建てる前に、建物を賃貸した場合の長期的な採算、メンテナンスコスト、メンテナンス時期等を精度良くシミュレーションまたは評価することができる(建物メンテナンス費考慮型長期)採算シミュレーション装置を提供することにある。
【0006】
【課題を解決するための手段】
このような目的を達成するために、建物の建設年数に応じた採算のシミュレーションを行う建物採算シミュレーション装置は、基本躯体構造と定期的な補修または交換のメンテナンスの対象である複数の部材とを含んで構成される建物の建設年数に応じた採算のシミュレーションを行う建物採算シミュレーション装置において、前記メンテナンスの対象の複数の部材間で共通である耐用年数及び該部材間で異なるものの周期的に共通する関係となっている耐用年数を当該部材に関連付けて記憶したデータベースと、前記耐用年数に到達する時期における補修または交換のメンテナンスに要する費用を当該部材に関連付けて記憶したデータベースと、前記データベースに記憶された前記定期的な補修または交換のメンテナンスの対象の各部材の耐用年数から、その年度が耐用年数に到達する時期にあたるメンテナンス対象の部材を検出して、当該年度をメンテナンス時期とするメンテナンス時期検出手段と、前記メンテナンス時期が同一の部材についての補修または交換のメンテナンス費用を、前記データベースに記憶された各部材の補修または交換のメンテナンスに要する費用に基づいて、当該年度についての補修または交換のメンテナンスに要する総費用として積算する積算手段と、前記メンテナンス時期検出手段により検出された各部材の耐用年数に到達する時期である各メンテナンス時期と、前記積算手段により積算された当該各メンテナンス時期に要する補修または交換のメンテナンスの総費用とを、建物の想定耐用年数にわたるメンテナンスプログラムの当該部材及び当該年度に対応させて可視出力できる出力手段と、を具えたことを特徴とする
【0007】
また、前記補修または交換のメンテナンスの対象である各部材の耐用年数は、想定耐用年数にわたりメンテナンスフリーである基本躯体構造の耐用年数とは異なるものの周期的に共通する関係であることを特徴とする。また、定期的な補修または交換のメンテナンスの対象である複数の部材が外装部材または埋設設備部材であることを特徴とする
【0008】
また、建物の賃貸収入を含む収入条件、賃貸部計算条件を含む条件を入力する初期条件入力手段と、該初期条件入力手段から入力された前記初期条件および前記積算手段により計算された前記耐用年数に到達するまでの補修または交換のメンテナンスに要する費用をパラメータとする演算式を使用して、建物の想定耐用年数にわたる賃貸収入を含む累積収入、または前記建物に賃貸収入及び前記補修または交換のメンテナンスに要する費用を組み入れた総財産を計算する採算シミュレーション情報処理手段と、をさらに備えたことを特徴とする。
【0009】
また、前記初期条件入力手段は、さらに建物の仕様変更及び時期を入力できることを特徴とする。
【0010】
また、前記出力手段は、前記情報処理手段が前記初期条件入力手段で入力された初期条件で計算した採算シミュレーション結果である前記累積収入または前記総財産を比較可能に出力することを特徴とする。
【0011】
【発明の実施の形態】
以下、図面を参照して本発明の実施形態を詳細に説明する。
【0012】
図1は本発明を適用した建物メンテナンス費考慮型長期採算シミュレーション装置のシステム構成を示す。図1において、1は(建物メンテナンス費考慮型長期)採算シミュレーション装置であり、部屋を含む賃貸住宅を建設した場合の採算をシミュレーションすると共に、メンテナンスが必要な項目、時期、費用等をシミュレーションする。採算シミュレーション装置1には市販の汎用コンピュータ、たとえば、パーソナルコンピュータやワークステーションを使用することができる。
【0013】
2は入力装置であり、上記シミュレーションの実行に必要な初期条件を入力する。入力装置2にはキーボードおよびマウスを使用する。
【0014】
3は表示装置であり、採算に関する図5シミュレーション結果や入力装置2から入力された情報を表示する。4はデータベースであり、上記シミュレーションに必要な情報を記憶する。本実施形態では、たとえば、建物種類(たとえば,レイアウト等のプランニングのパターン等)ごとに建設に必要な建物の部材名および部位名に関連付けて、部位および部材の数、量、単価、耐用年数、修繕費用等各種の情報がデータベースに登録されている。本願発明者は、住宅の部材の耐用年数に到達する時期が修理を要する時期であることに気が付き、住宅の耐用年数が共通する部材名および/または部位名をまとめ、それら部位や部材に関する修繕費用を積算することにより、メンテナンスが必要な項目、費用、時期等をシミュレーションする採算シミュレーション装置を発明した。また、上記メンテナンスに関するシミュレーション機能を使用してメンテナンスに要する費用を算出し、長期にわたる賃貸住宅(建物)の採算をもシミュレーションする採算シミュレーション装置を発明した。
【0015】
5はプリンタであり、メンテナンスに関するシミュレーション結果を図4の形態で印刷出力する。なお、図4に示すシートは、予め建物の想定耐用年数にわたる目盛りが付されており、該目盛りと直行する方向にメンテナンス対象部位である外装部材および埋設設備部材に含まれる部材名称が予め印刷され、前記目盛り方向に沿って、前記外装部材および前記埋設設備部材に含まれる各部材のメンテナンス時期を示す図形10が予め印刷され、メンテナンス費用を記入するための記入欄(空白)11が予め印刷されている。この、シートのメンテナンス費用記入欄に対してシミュレーションで得られるメンテナンス費用をプリンタ5により印刷する。
【0016】
さらに上記シートにはメンテナンス対象の建物に関する情報を記入するための記入欄が設けられている。この記入欄は空白のままとしてもよく、プリンタ5により所定情報を印刷してもよい。
【0017】
このようなシステム構成で実行されるシミュレーション処理を図2および図3を参照して説明する。図2は採算シミュレーション装置1が実行するメンテナンスに関するプログラムの処理内容を示す。図3は長期的な採算をシミュレーションするプログラムの処理内容を示す。両プログラムとも採算シミュレーション装置内の記憶装置、たとえば、ハードディスクに保存され、採算シミュレーション装置1内のCPUにより上記プログラムが実行される。
【0018】
ユーザ、たとえば、住宅販売会社の営業マンや建築主が、メンテナンスコストおよびメンテナンス時期を知りたい場合には、図2のプログラムの起動を入力装置2から指示する。これにより図2のプログラムが実行される。なお、建築した建物に関する仕様情報(設計や施工に関する情報であり、使用されている部材、個数、耐用年数などがこれらの情報の中に含まれる。)は予めデータベース4に登録されているものとする。
【0019】
ユーザは名前、住所等を初期条件として入力すると、採算シミュレーション装置1のCPUは、名前、住所等をクエリーとしてデータベースを検索し、対応する建物の仕様情報を検索する。検索結果は装置内部のメモリに一時記憶される。
【0020】
CPUは次の分類ごとに部位のメンテナンス時期(修繕あるいは交換時期)を仕様情報の中から取り出す。本実施形態では、基本躯体構造、屋根・防水、外壁防水、開口部、外部付帯パーツ、埋設設備、露出設備に建築物の部材、部位あるいは修繕項目を分類する。
【0021】
基本躯体構造には主要鉄骨、鉄筋コンクリート基礎、床板、屋根板,外壁板等が含まれる。
【0022】
屋根・防水には屋根、各種シート防水が含まれる。
【0023】
外壁防水には外壁吹き付け塗装,シーリングが含まれる。
【0024】
開口部には、玄関扉、サッシ枠等が含まれる。
【0025】
外部付帯パーツには雨戸、シャッター、換気フード、外階段等が含まれる。
【0026】
埋設設備には給水、給湯管、排水管等が含まれる。
【0027】
露出設備にはキッチンセット、洗面化粧台等が含まれる。
【0028】
CPUは各分類の各項目を順にピックアップすると、データベース4に記憶されている部材単価や修繕費用、交換か補修の種別等のデータを取り出して、修繕あるいは交換の費用を積算する。本実施形態では建物の部材の耐用年数はたとえば15年、30年というようにまとまるように設計されているので、各年度ごとに耐用年数を持つ部材、部位をデータベース4上で検出し、検出した部位、部材についての修繕・交換のメンテナンス費用をCPUにより積算し、その積算結果を内部メモリに記憶する(ステップS20→S30)。
【0029】
最後にCPUは積算結果、すなわち、項目ごとのメンテナンス時期とその時期のメンテナンス費用、メンテナンスが交換、補修であるかの種類を図4に示す形態で印刷出力する(ステップS40)。
【0030】
この印刷シートによりユーザは、各部位部材の耐用年数の周期に当たる15年目、30年目、45年目にメンテナンスが必要であること、そのメンテナンスの項目、種類、総費用を知ることができる。
【0031】
ユーザ、たとえば、住宅販売会社の営業マンや建物建築希望者が建物建築に関する採算を知りたい場合には、図3のプログラムの起動を入力装置2から指示する。これにより図3のプログラムが実行される。ユーザは最初に初期条件を入力する。初期条件は、建築計画、建築工事費、資金計画、収入条件、賃貸計算条件および共通計算条件およびその他条件である。建築計画は、建築規模(戸数)や床面積、建築時期等、建築する建物の内容を示す情報である。建築工事費は建築に要する費用、資金計画はローンの有無、ローンの金利、年数等である。
【0032】
収入条件は部屋などを賃貸した場合に得られる月、あるいは年の収入金額である。賃貸部計算条件は契約年数、一般管理費およびそのアップ率、テナントの入れ替え年数等シミュレーションに関わる計算条件である。
【0033】
共通計算条件は、土地の租税公課、保険料、原価償却年数等建物全体に関連する計算条件である。その他条件は建築計画の変更の有無および変更時期である。
【0034】
このような計算条件を示すパラメータ項目画表示装置3に表示されるので、ユーザは入力装置2から該当項目について、条件を入力する(ステップS100)。本実施形態では、条件の内容を示すパラメータの値φ1,φ2....と、年数tとにより累積収入および総財産を算出する。このため、F(φ1,φ2...,t)で表される関数が用意されており、この関数に上記入力したパラメータの値を代入することで、年度ごとの支出、累積収入および総財産を計算する。上記年数tが予め定めた部材の耐用年数に応じて、たとえば、15年,30年,45年等に到達した場合には、部材の交換、修繕が必要となるので、その交換、修繕費用を計算するための計算式を、上記関数を定義する計算式の中で使用する。
【0035】
住宅に限らない一般的な採算シミュレーションでは、初期に投資した費用、原価償却、年度ごとの収入のみがパラメータとして使用されるのに対し、本実施形態では、建物という特殊性を考慮して、部材が耐用年数に到達する、たとえば、15、30、45...年目に発生する修繕費用(メンテナンスコスト)をCPUにより自動計算し、上記入力条件の中の1つのパラメータとして採算シミュレーションの中に組み入れる。したがって、実際により近い採算シミュレーションを行うことができる。
【0036】
なお、一義的に定まる上記修繕費用とは別に、建築主の希望で、建物の内部の改装や建替えを行うことを本実施形態では比較検討できるように考慮しており、建物の仕様変更および時期が初期条件の入力ステップにおいて、建築後の建物の仕様変更ありが指示された場合には(ステップS110がYES判定)は変更条件、すなわち、改装内容および費用などが入力される(ステップS115)。
【0037】
以上の条件入力が行われると、採算シミュレーション装置1のCPUは与えられた条件を示すパラメータの値と予め定められている関数(計算式)、さらにはデータベース4に記憶されている情報を使用して年度ごとの支出、累積総収入および総財産を計算し、採算シミュレーション装置1の内部メモリに記憶する(ステップS120)。
【0038】
シミュレーション結果は図5に示すような形態でプリンタ5から印刷出力される(ステップ130)。この形態は、累計収入と総財産を年度ごと曲線で印刷する例であり、30年目にリフォームを行う場合と、プラン変更を行う場合と、建替えを行う場合とを採算比較している。
【0039】
上述の実施形態の他に次の形態を実施できる。
【0040】
1)上述の実施形態では、データベース4は採算シミュレーション装置1に対して外付きとしたが図1のシステムをノートパソコンで実現することも可能である。また、入力装置2と採算シミュレーション装置1との間を電話回線で接続したり、インターネットで接続してもよい。この場合には、シミュレーション結果の表示や印刷は入力装置2側で行う。
【0041】
2)さらに、上記システムをLAN接続として、複数の入力装置をLANに接続してもよい。
【0042】
3)上述の実施形態では、メンテナンスの費用のシミュレーション処理で入力するデータと採算シミュレーション処理で入力するデータとは異なっていたが、建物の仕様情報を共通化することもできる。この場合には、建物のモデルを複数種類用意しておき、データベース4には各モデルの使用情報、メンテナンスを要する部位、部品に関わる諸情報を記憶させておく。したがって、ユーザは、建物のモデルの種類を指定するだけで、建物の仕様情報を設定することができる。
【0043】
上述の他にも種々の変形が可能であるが、これらの変形は、特許請求の範囲に記載された技術思想に沿うものであるかぎり、その変形は本発明の技術範囲内となる。
【0044】
【発明の効果】
以上、説明したように、本発明によれば、賃貸などを目的とした建物についてメンテナンスの時期や費用を知ることができると共に、メンテナンス費用を考慮した採算のシミュレーションを精度よく行うことができる。
【0045】
また、採算シミュレーション装置を携帯用のノートパソコン上で実現すれば、住宅販売会社が住宅建築希望者の前で、シミュレーションを行うことができ、住宅建築の検討をより詳細かつ速やかに行うことも可能である。
【図面の簡単な説明】
【図1】 本発明実施形態のシステム構成を示すブロック図である。
【図2】 採算シミュレーション装置1が実行する処理手順を示すフローチャートである。
【図3】 採算シミュレーション装置1が実行する処理手順を示すフローチャートである。
【図4】 採算シミュレーション装置1の出力結果を示す説明図である。
【図5】 採算シミュレーション装置1の出力結果を示す説明図である。
【符号の説明】
1 採算シミュレーション装置
2 入力装置
3 表示装置
4 データベース
5 プリンタ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a building profit simulation apparatus for evaluating the profitability of a building that rents a room or the building itself.
[0002]
[Prior art]
Conventionally, when a building is constructed and the building or room is to be rented, the landlord starts construction after taking an estimate from a housing construction company and considering the current rental cost. Therefore, the accuracy was poor in considering the profitability.
[0003]
[Problems to be solved by the invention]
Maintenance of a house after the construction of the house is ad hoc, and repair is usually performed when an abnormality occurs somewhere in the house. Therefore, the landlord cannot know when repairs are needed and how much it costs.
[0004]
In addition, general financial profit simulation devices have been known, but maintenance costs such as repairs after home construction or renovation costs are not considered, and the accuracy of profit simulations related to housing such as rental housing is poor. There is also a problem.
[0005]
Therefore, the object of the present invention is to accurately simulate or evaluate the long-term profit, maintenance cost, maintenance time, etc. when the building is rented before building the building (long-term considering building maintenance cost). The object is to provide a simulation apparatus.
[0006]
[Means for Solving the Problems]
In order to achieve such an object, a building profit simulation apparatus that performs a profit simulation according to the construction years of a building includes a basic chassis structure and a plurality of members that are subject to periodic repair or replacement maintenance. In a building profit simulation apparatus that performs a profit simulation according to the construction years of a building composed of: a service life that is common among a plurality of maintenance target members, and a periodically common relationship that differs between the members A database that stores the service life associated with the member, a database that stores the cost required for repair or replacement maintenance at the time of reaching the service life, and the database stored in the database. For each member subject to maintenance of the periodic repair or replacement From the service life, a maintenance target member that detects a maintenance target member corresponding to the time when the current year reaches the service life is detected, and maintenance for repair or replacement of a member having the same maintenance time is detected. Based on the cost required for maintenance or replacement maintenance of each member stored in the database, the integration means for integrating the total cost required for maintenance or replacement maintenance for the current year, and the maintenance time detection means The maintenance period, which is the period when the detected service life of each member is reached, and the total cost of repair or replacement maintenance required for each maintenance period, accumulated by the accumulating means, are maintained over the estimated useful life of the building. The relevant parts of the program and To correspond to the year, characterized in that comprises an output means for visual output and by.
[0007]
In addition, the service life of each member to be repaired or replaced is different from the service life of the basic chassis structure that is maintenance-free over the expected service life, but is in a periodically shared relationship. . In addition, the plurality of members that are targets of periodic repair or replacement maintenance are exterior members or embedded equipment members .
[0008]
In addition, an initial condition input means for inputting a revenue condition including rental income of a building, a condition including a rental section calculation condition, the initial condition input from the initial condition input means, and the useful life calculated by the integrating means Using the calculation formula whose parameter is the cost of repair or replacement maintenance to reach the building, accumulated revenue including rental income over the estimated useful life of the building, or rental income and maintenance of the repair or replacement of the building And a profit simulation information processing means for calculating the total property including the cost required for the above.
[0009]
The initial condition input means may further input a specification change and time of the building.
[0010]
The output means outputs the cumulative income or the total property, which is a profit simulation result calculated by the information processing means using the initial condition input by the initial condition input means, in a comparable manner.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0012]
FIG. 1 shows a system configuration of a building maintenance cost-considering long-term profit simulation apparatus to which the present invention is applied. In FIG. 1, reference numeral 1 denotes a (building maintenance cost-considered long-term) profit simulation device, which simulates profits when a rental house including a room is constructed, and also simulates items, time, costs, etc. that require maintenance. The profit simulation apparatus 1 can be a commercially available general-purpose computer such as a personal computer or a workstation.
[0013]
Reference numeral 2 denotes an input device which inputs initial conditions necessary for executing the simulation. The input device 2 uses a keyboard and a mouse.
[0014]
Reference numeral 3 denotes a display device, which displays the simulation results shown in FIG. 5 and information input from the input device 2. A database 4 stores information necessary for the simulation. In the present embodiment, for example, the number of parts and members, the unit price, the unit price, the service life, in association with the part name and part name of the building necessary for construction for each building type (for example, planning pattern such as layout) Various information such as repair costs is registered in the database. The inventor of the present application notices that the time to reach the service life of the members of the house is a time that requires repair, summarizes the names of parts and / or parts having the common service life of the house, and repair costs related to those parts and members We have invented a profit simulation device that simulates items, costs, time, etc. that require maintenance. In addition, the inventors have invented a profit simulation apparatus that uses the simulation function related to maintenance to calculate the cost required for maintenance and simulates the profitability of a rental house (building) over a long period of time.
[0015]
Reference numeral 5 denotes a printer, which prints out a simulation result related to maintenance in the form of FIG. In addition, the sheet | seat shown in FIG. 4 is previously attached with the scale over the estimated useful life of a building, and the member name contained in the exterior member and the embedded equipment member which is a maintenance object site | part is printed in the direction orthogonal to this scale. A graphic 10 indicating the maintenance time of each member included in the exterior member and the embedded equipment member is printed in advance along the scale direction, and an entry column (blank) 11 for entering a maintenance cost is printed in advance. ing. The maintenance cost obtained by the simulation is printed by the printer 5 in the maintenance cost entry column of the sheet.
[0016]
In addition, the sheet is provided with an entry field for entering information relating to the building to be maintained. This entry field may be left blank, or predetermined information may be printed by the printer 5.
[0017]
A simulation process executed in such a system configuration will be described with reference to FIGS. FIG. 2 shows the processing contents of a program related to maintenance executed by the profit simulation apparatus 1. FIG. 3 shows the processing contents of a program that simulates long-term profitability. Both programs are stored in a storage device in the profit simulation device, for example, a hard disk, and the program is executed by the CPU in the profit simulation device 1.
[0018]
When a user, for example, a salesman or a building owner of a home sales company wants to know the maintenance cost and the maintenance time, he / she instructs the input device 2 to start the program of FIG. Thereby, the program of FIG. 2 is executed. It should be noted that specification information relating to the building that has been built (information relating to design and construction, including the components used, the number of pieces, and the useful life included in these pieces of information) is registered in the database 4 in advance. To do.
[0019]
When the user inputs a name, address, etc. as initial conditions, the CPU of the profit simulation apparatus 1 searches the database using the name, address, etc. as a query, and searches for the corresponding building specification information. The search result is temporarily stored in a memory inside the apparatus.
[0020]
The CPU extracts the maintenance time (repair or replacement time) of the part from the specification information for each next classification. In this embodiment, building members, parts, or repair items are classified into basic frame structure, roof / waterproofing, outer wall waterproofing, openings, external accessory parts, buried equipment, and exposed equipment.
[0021]
The basic frame structure includes main steel frames, reinforced concrete foundations, floor boards, roof boards, and outer wall boards.
[0022]
Roof and waterproof include roof and various sheet waterproofing.
[0023]
Exterior wall waterproofing includes exterior wall spraying and sealing.
[0024]
The opening includes an entrance door, a sash frame, and the like.
[0025]
External accessory parts include shutters, shutters, ventilation hoods, and external stairs.
[0026]
Buried facilities include water supply, hot water supply pipes, drain pipes and the like.
[0027]
Exposed facilities include kitchen sets and vanities.
[0028]
When the CPU picks up each item of each category in turn, it extracts data such as the unit price, repair cost, type of replacement or repair stored in the database 4, and accumulates the cost of repair or replacement. In the present embodiment, the building members are designed so that the useful life of the building members is, for example, 15 years and 30 years. Therefore, the members and parts having the useful lives are detected on the database 4 for each year, and are detected. Maintenance costs for repair and replacement of parts and members are accumulated by the CPU, and the accumulated result is stored in the internal memory (steps S20 → S30).
[0029]
Finally, the CPU prints out the integration result, that is, the maintenance time for each item, the maintenance cost at that time, and the type of whether the maintenance is replacement or repair in the form shown in FIG. 4 (step S40).
[0030]
With this printed sheet, the user can know that maintenance is required in the 15th, 30th, and 45th years corresponding to the cycle of the service life of each part member, and the items, types, and total cost of the maintenance.
[0031]
When a user, for example, a salesperson of a house sales company or a person who wants to build a building wants to know the profit related to building construction, the input device 2 instructs to start the program in FIG. Thereby, the program of FIG. 3 is executed. The user first enters initial conditions. The initial conditions are a building plan, a construction cost, a funding plan, an income condition, a rental calculation condition, a common calculation condition, and other conditions. The architectural plan is information indicating the contents of the building to be constructed, such as the construction scale (number of units), floor area, construction period, and the like. The construction work cost is the cost required for construction, and the financial plan is whether there is a loan, the interest rate of the loan, the number of years, etc.
[0032]
The income condition is the monthly or yearly income amount obtained when renting a room or the like. The rental section calculation conditions are the calculation conditions related to the simulation, such as the contract years, general administrative expenses and their up-rate, and tenant replacement years.
[0033]
Common calculation conditions are calculation conditions related to the entire building, such as land taxes, insurance premiums, depreciation years. Other conditions are whether or not the architectural plan has been changed and when.
[0034]
Since it is displayed on the parameter item picture display device 3 indicating such calculation conditions, the user inputs conditions for the corresponding item from the input device 2 (step S100). In this embodiment, parameter values φ1, φ2,. . . . And cumulative income and total assets are calculated from the number of years t. For this reason, a function represented by F (φ1, φ2,..., T) is prepared. By substituting the values of the parameters input above into this function, expenditure for each year, cumulative income, and total assets Calculate When the above-mentioned years t reach the predetermined service life of the member, for example, when it reaches 15 years, 30 years, 45 years, etc., replacement and repair of the members are necessary. The calculation formula for calculating is used in the calculation formula defining the above function.
[0035]
In a general profit simulation not limited to a house, only the initial investment cost, cost amortization, and income for each year are used as parameters, whereas in this embodiment, members are considered in consideration of the special property of buildings. Reaches the end of its useful life, for example 15, 30, 45. . . The repair cost (maintenance cost) generated in the year is automatically calculated by the CPU, and is incorporated into the profit simulation as one parameter in the input conditions. Therefore, it is possible to perform a profit simulation that is closer to the actual situation.
[0036]
In addition to the above-mentioned repair costs that are uniquely determined, it is considered that the renovation and rebuilding of the interior of the building at the request of the building owner can be compared in this embodiment, and the specification change of the building and If it is instructed that there is a change in the specification of the building after construction in the input step of the initial condition (step S110 is YES), the change condition, that is, the content of the renovation and the cost are input (step S115). .
[0037]
When the above conditions are input, the CPU of the profit simulation apparatus 1 uses the value of the parameter indicating the given condition, a predetermined function (calculation formula), and information stored in the database 4. The annual expenditure, the accumulated total income and the total property are calculated and stored in the internal memory of the profit simulation apparatus 1 (step S120).
[0038]
The simulation result is printed out from the printer 5 in the form as shown in FIG. 5 (step 130). This form is an example in which the cumulative income and total assets are printed in a curve for each year, and the case where renovation is performed in the 30th year, the case where a plan is changed, and the case where reconstruction is performed are compared for profit.
[0039]
In addition to the above embodiment, the following embodiment can be implemented.
[0040]
1) In the above-described embodiment, the database 4 is external to the profit simulation apparatus 1, but the system shown in FIG. 1 can also be realized by a notebook computer. Further, the input device 2 and the profit simulation device 1 may be connected by a telephone line or connected by the Internet. In this case, the simulation result is displayed and printed on the input device 2 side.
[0041]
2) Furthermore, the above system may be connected to a LAN, and a plurality of input devices may be connected to the LAN.
[0042]
3) In the above-described embodiment, the data input in the maintenance cost simulation process and the data input in the profit simulation process are different, but the building specification information can be shared. In this case, a plurality of types of building models are prepared, and the database 4 stores usage information of each model, parts requiring maintenance, and various information related to parts. Therefore, the user can set the building specification information simply by specifying the type of the building model.
[0043]
Various modifications other than those described above are possible. However, these modifications are within the technical scope of the present invention as long as they are in accordance with the technical ideas described in the claims.
[0044]
【The invention's effect】
As described above, according to the present invention, it is possible to know the time and cost of maintenance for a building intended for renting and the like, and it is possible to accurately perform a profit simulation in consideration of the maintenance cost.
[0045]
In addition, if the profit simulation device is realized on a portable laptop computer, the home sales company can perform simulations in front of those who want to build homes, and it is possible to examine home buildings in more detail and quickly. It is.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a system configuration of an embodiment of the present invention.
FIG. 2 is a flowchart showing a processing procedure executed by the profit simulation apparatus 1;
FIG. 3 is a flowchart showing a processing procedure executed by the profit simulation apparatus 1;
FIG. 4 is an explanatory diagram showing an output result of the profit simulation apparatus 1. FIG.
FIG. 5 is an explanatory diagram showing an output result of the profit simulation apparatus 1.
[Explanation of symbols]
1 Profit simulation device 2 Input device 3 Display device 4 Database 5 Printer

Claims (6)

基本躯体構造と定期的な補修または交換のメンテナンスの対象である複数の部材とを含んで構成される建物の建設年数に応じた採算のシミュレーションを行う建物採算シミュレーション装置において、
前記メンテナンスの対象の複数の部材間で共通である耐用年数及び該部材間で異なるものの周期的に共通する関係となっている耐用年数を当該部材に関連付けて記憶したデータベースと、
前記耐用年数に到達する時期における補修または交換のメンテナンスに要する費用を当該部材に関連付けて記憶したデータベースと、
前記データベースに記憶された前記定期的な補修または交換のメンテナンスの対象の各部材の耐用年数から、その年度が耐用年数に到達する時期にあたるメンテナンス対象の部材を検出して、当該年度をメンテナンス時期とするメンテナンス時期検出手段と、
前記メンテナンス時期が同一の部材についての補修または交換のメンテナンス費用を、前記データベースに記憶された各部材の補修または交換のメンテナンスに要する費用に基づいて、当該年度についての補修または交換のメンテナンスに要する総費用として積算する積算手段と、
前記メンテナンス時期検出手段により検出された各部材の耐用年数に到達する時期である各メンテナンス時期と、前記積算手段により積算された当該各メンテナンス時期に要する補修または交換のメンテナンスの総費用とを、建物の想定耐用年数にわたるメンテナンスプログラムの当該部材及び当該年度に対応させて可視出力できる出力手段と、
を具えたことを特徴とする建物採算シミュレーション装置。
In a building profit simulation apparatus that performs a profit simulation according to the construction years of a building including a basic structure and a plurality of members that are subject to periodic repair or replacement maintenance ,
A database that stores the useful life that is common among the plurality of members to be maintained and the useful life that is periodically related to what is different among the members in association with the member;
A database that stores the cost required for maintenance of repair or replacement at the time of reaching the useful life in association with the member;
From the service life of each member subject to maintenance of the periodic repair or replacement stored in the database, the member to be maintained corresponding to the time when the year reaches the service life is detected, and the year is designated as the maintenance time. Maintenance time detection means to perform ,
Based on the cost required for repair or replacement maintenance of each member stored in the database, the maintenance cost for repair or replacement for the member with the same maintenance time is the total cost required for repair or replacement maintenance for the current year. An accumulating means for accumulating as an expense ;
Each maintenance time that is the time to reach the service life of each member detected by the maintenance time detection means , and the total cost of repair or replacement maintenance required for each maintenance time accumulated by the accumulation means, An output means capable of visual output corresponding to the relevant year of the maintenance program over the expected life of the
A building profit simulation device characterized by comprising:
請求項1に記載の建物採算シミュレーション装置において、
前記補修または交換のメンテナンスの対象である各部材の耐用年数は、想定耐用年数にわたりメンテナンスフリーである基本躯体構造の耐用年数とは異なるものの周期的に共通する関係であることを特徴とする建物採算シミュレーション装置
In the building profit simulation apparatus according to claim 1,
Useful lives of the members are subject to the maintenance of the repair or replacement, building profitability, characterized in that the useful life of the basic skeleton structure is maintenance-free over assumed useful life is periodically common relationship different Simulation device .
請求項1または2に記載の建物採算シミュレーション装置において、
定期的な補修または交換のメンテナンスの対象である複数の部材が外装部材または埋設設備部材であることを特徴とする建物採算シミュレーション装置
In the building profit simulation apparatus according to claim 1 or 2,
A building profitability simulation apparatus, wherein a plurality of members that are objects of periodic repair or replacement maintenance are exterior members or embedded equipment members .
請求項1ないし3いずれかに記載の建物採算シミュレーション装置において、
建物の賃貸収入を含む収入条件、賃貸部計算条件を含む条件を入力する初期条件入力手段と、
該初期条件入力手段から入力された前記初期条件、および前記積算手段により計算された前記耐用年数に到達するまでの補修または交換のメンテナンスに要する費用をパラメータとする演算式を使用して、建物の想定耐用年数にわたる賃貸収入を含む累積収入、または前記建物に賃貸料収入、及び前記補修または交換のメンテナンスに要する費用を組み入れた総財産を計算する採算シミュレーション情報処理手段と、をさらに備えたことを特徴とする建物採算シミュレーション装置。
In the building profit simulation apparatus according to any one of claims 1 to 3 ,
An initial condition input means for inputting a revenue condition including a rental income of a building and a condition including a rental section calculation condition;
Using the above-described initial condition input from the initial condition input means and an arithmetic expression using as a parameter the cost required for repair or replacement maintenance until reaching the useful life calculated by the accumulating means, Profitable simulation information processing means for calculating total income including accumulated income including rental income over the assumed useful life, or rental income in the building and expenses required for maintenance of the repair or replacement, Building profitability simulation equipment.
請求項4に記載の建物採算シミュレーション装置において、
前記初期条件入力手段は、さらに建物の仕様変更及び時期を入力できることを特徴とする建物採算シミュレーション装置。
In the building profit simulation apparatus according to claim 4 ,
The initial condition input means can further input a specification change and timing of the building.
請求項4または5に記載の建物採算シミュレーション装置において、
前記出力手段は、前記情報処理手段が前記初期条件入力手段で入力された初期条件で計算した採算シミュレーション結果である前記累積収入または前記総財産を比較可能に出力することを特徴とする建物採算シミュレーション装置。
In the building profit simulation apparatus according to claim 4 or 5 ,
The output means outputs the accumulated profit or the total property, which is the profit simulation result calculated by the information processing means under the initial condition input by the initial condition input means, in a comparable manner. apparatus.
JP2003067258A 2003-03-12 2003-03-12 Building profit simulation device Expired - Lifetime JP4416420B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003067258A JP4416420B2 (en) 2003-03-12 2003-03-12 Building profit simulation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003067258A JP4416420B2 (en) 2003-03-12 2003-03-12 Building profit simulation device

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP34509699A Division JP2001159238A (en) 1999-12-03 1999-12-03 Long-term payability simulation device in consideration of building maintenance cost

Publications (2)

Publication Number Publication Date
JP2003308428A JP2003308428A (en) 2003-10-31
JP4416420B2 true JP4416420B2 (en) 2010-02-17

Family

ID=29398152

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003067258A Expired - Lifetime JP4416420B2 (en) 2003-03-12 2003-03-12 Building profit simulation device

Country Status (1)

Country Link
JP (1) JP4416420B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107403051A (en) * 2017-08-01 2017-11-28 贺州学院 Curing time determines method and device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5512399B2 (en) * 2010-06-01 2014-06-04 旭化成ホームズ株式会社 Reform time calculation system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03242529A (en) * 1990-02-20 1991-10-29 Mitsubishi Electric Corp Maintenance aid evaluator
JPH05282278A (en) * 1992-04-02 1993-10-29 Tokai Ginkou:Kk Simulation system for income and outgo of long-team business
JP2813309B2 (en) * 1995-01-13 1998-10-22 株式会社建築修繕計画研究所 Repair plan creation device
JPH0934946A (en) * 1995-07-18 1997-02-07 Mitsubishi Jisho Kk Facility maintenance management system
JPH1046832A (en) * 1996-08-05 1998-02-17 Shimizu Corp Building life-cycle analysis system
JPH11142298A (en) * 1997-11-05 1999-05-28 Babcock Hitachi Kk Life-cycle management type system for plant maintenance-assistance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107403051A (en) * 2017-08-01 2017-11-28 贺州学院 Curing time determines method and device

Also Published As

Publication number Publication date
JP2003308428A (en) 2003-10-31

Similar Documents

Publication Publication Date Title
Dong et al. A modeling framework to evaluate sustainability of building construction based on LCSA
Reddy BIM for building owners and developers: making a business case for using BIM on projects
Häkkinen et al. Reducing embodied carbon during the design process of buildings
Towey Construction quantity surveying: a practical guide for the contractor's QS
Melzner et al. A case study on automated safety compliance checking to assist fall protection design and planning in building information models
US20110246381A1 (en) Systems and methods of modeling energy consumption of buildings
Stegnar et al. Information needs for progressive BIM methodology supporting the holistic energy renovation of office buildings
Li et al. A green home decision-making tool: Sustainability assessment for homeowners
Rathnasiri et al. Green building information modelling technology adoption for existing buildings in Sri Lanka. Facilities management perspective
Chen et al. A hybrid-model forecasting framework for reducing the building energy performance gap
Wong et al. Modeling and forecasting construction labor demand: Multivariate analysis
US8428994B2 (en) System and method for managing facilities
Choi et al. Techno-economic feasibility study for deep renovation of old apartment
JP4416420B2 (en) Building profit simulation device
REEDER Green building rating systems
Hu et al. Monte Carlo simulation approach to understand the cost variance for energy retrofit projects: comparative study of Finland and the United States
Lam Sustainability Performance Simulation Tools for Building Design
Chapman et al. Benefits and costs of research: A case study of cybernetic building systems
US20100138261A1 (en) Configurable System And Method For Managing Facilities
JP2001175763A (en) Construction system
JP2001159238A (en) Long-term payability simulation device in consideration of building maintenance cost
Hassanain et al. Remodeling as a circular approach in built facilities: an assessment of lifecycle factors towards successful delivery
JP2003182265A (en) Sheet for evaluating long-term profit of building
Senghore Production and material flow process model for manufactured housing
Ingvaldsen et al. Productivity studies in Nordic building and construction industry

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061117

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20061117

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20080131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090519

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090715

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090818

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091016

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091124

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091124

R150 Certificate of patent or registration of utility model

Ref document number: 4416420

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121204

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121204

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121204

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121204

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131204

Year of fee payment: 4

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term