JP4300796B2 - Solidified state detector for continuous cast slabs - Google Patents

Solidified state detector for continuous cast slabs Download PDF

Info

Publication number
JP4300796B2
JP4300796B2 JP2002375704A JP2002375704A JP4300796B2 JP 4300796 B2 JP4300796 B2 JP 4300796B2 JP 2002375704 A JP2002375704 A JP 2002375704A JP 2002375704 A JP2002375704 A JP 2002375704A JP 4300796 B2 JP4300796 B2 JP 4300796B2
Authority
JP
Japan
Prior art keywords
slab
sensor
arm
cooling water
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002375704A
Other languages
Japanese (ja)
Other versions
JP2004205382A (en
Inventor
豪伸 渡邉
淳 久保田
等 藤原
幸理 飯塚
俊一 川波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2002375704A priority Critical patent/JP4300796B2/en
Publication of JP2004205382A publication Critical patent/JP2004205382A/en
Application granted granted Critical
Publication of JP4300796B2 publication Critical patent/JP4300796B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N29/00Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic waves; Visualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object
    • G01N29/04Analysing solids
    • G01N29/11Analysing solids by measuring attenuation of acoustic waves
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2291/00Indexing codes associated with group G01N29/00
    • G01N2291/02Indexing codes associated with the analysed material
    • G01N2291/028Material parameters
    • G01N2291/0289Internal structure, e.g. defects, grain size, texture
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2291/00Indexing codes associated with group G01N29/00
    • G01N2291/04Wave modes and trajectories
    • G01N2291/048Transmission, i.e. analysed material between transmitter and receiver

Landscapes

  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)
  • Investigating And Analyzing Materials By Characteristic Methods (AREA)
  • Continuous Casting (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、連続鋳造される鋳片に対して、その厚み方向に超音波を透入することにより、鋳片の凝固状態を検出する装置に関する。
【0002】
【従来の技術】
溶融金属の連続鋳造は、一般に、タンディッシュから所定の断面形状を有する鋳型へ溶融金属を注入し、溶融部と凝固部とが混在した鋳片を鋳型の下方から連続的に引き抜くことにより行われている。鋳片は、鋳型から引き抜かれた直後は、未凝固である溶融部が内側の大部分を占めているが、その後の冷却により凝固が進行するにつれて、凝固部が占める割合が高くなり、全体が凝固する。
【0003】
ここで、連続鋳造鋳片の完全凝固端(クレータエンド)が連続引抜過程にある鋳片のどの位置にあるかを判定することが極めて重要である。理由は以下の通りである。
すなわち、生産性を向上させるために鋳造速度を増やすと、クレータエンドは鋳片の下流側に移動する。クレータエンドの位置が鋳片切断機による切断位置を超えて下流側に移動してしまうと溶鋼漏れといった大事故になる可能性がある。
【0004】
また、凝固の中心偏析を減らし、高品質化を図るための軽圧下操業では、クレータエンドを軽圧下帯近傍に位置させるように鋳造速度や2次冷却量を制御する必要がある。これらの要求に応えるためには、鋳片の凝固状態を、連続的に計測する必要がある。
【0005】
このように、クレータエンドの位置検出や鋳片の凝固状態を検出することが鋳片の生産性や品質の向上に大きく貢献するため、従来から種々の装置が開発されている。
例えば、鋳片表面に接触転動するスペーサーローラと冷却水噴出穴を備えた水冷式電磁超音波トランスジューサを鋳片を中心として対向せしめ、前記トランスジューサに被測定体搬送ローラと接触転動する引込み防止支持ローラを設けた電磁超音波測定装置が提案されている(例えば、特許文献1参照)。
【0006】
【特許文献1】
特公平2−646号公報
【0007】
【発明が解決しようとする課題】
しかしながら、上記の従来技術には以下のような問題点がある。
冷式電磁超音波トランスジューサと鋳片間を所定間隔に保つために、冷式電磁超音波トランスジューサの先端部に鋳片上を接触転動するスペーサローラを設けている。しかし、鋳片表面が平滑面でないため、冷式電磁超音波トランスジューサがガイドローラに引き込まれることがある。もっとも、特許文献1ではこの引込み現象を回避するために、被測定体搬送ローラと接触転動する引込み防止支持ローラを設けているが、機械的な接触があるかぎり引き込みの危険や、振動等による検知誤作動が生ずる危険がある。
【0008】
本発明はかかる課題を解決するためになされたものであり、センサ及びその保持部を鋳片に対して完全に非接触にして、引き込みの危険や振動等による誤作動のない連続鋳造鋳片の凝固状態検出装置を得ることを目的としている。
【0009】
【課題を解決するための手段】
本発明に係る連続鋳造鋳片の凝固状態検出装置は、鋳型に注入された溶鋼を前記鋳型の下方に引き抜き、冷却ゾーンで冷却しながら連続鋳造される鋳片に対して、その厚み方向に、非接触状態の送信用センサから超音波を透入し、前記鋳片を透過した超音波を非接触状態の受信用センサで受信することにより、前記鋳片の凝固状態を検出する装置であって、
前記冷却ゾーンのチャンバー外側に前記鋳片の進行方向直交方向に設置されたリニアレールと、該リニアレールに走行可能に設置されたリニアガイドと、該リニアガイドに取り付けられて前記鋳片を挟んで上下に配置される一対のアームと、を備え、
前記アームの前側が前記リニアレールから大きく延出できるように、前記アームの後端側に前記リニアガイドが設けられ、且つ、前記アームの後端側にバランスウェイトが設けられ、
前記送信用センサが取り付けられ、該送信用センサに鋳片が接触して外力が作用した際、該送信用センサを鋳片から離れる方向に移動させる非常緩衝装置が、前記一対のアームの一方のアームの先端部に、設置され、
前記受信用センサが取り付けられ、該受信用センサに鋳片が接触して外力が作用した際、該受信用センサを鋳片から離れる方向に移動させる非常緩衝装置が、前記一対のアームの他方のアームの先端部に設置されることを特徴とするものです。
【0011】
また、前記非常緩衝装置は、前記アームの先端部に設置された支持棒と、
該支持棒の先端側に鋳片から離れる方向に移動可能に設置されたセンサ保持部と、該センサ保持部を鋳片側へ常時付勢する付勢手段とを備えてなることを特徴とするものである。
【0012】
また、鋳片に対して冷却水を噴射する冷却水ノズルを前記アームの先端部に設けたことを特徴とするものである。
また、前記送信用センサおよび前記受信用センサが水冷構造であることを特徴とするものである。
【0013】
また、鋳片のそれぞれの面に対して冷却水を噴射する送信側冷却水ノズルおよび受信側冷却水ノズルが前記アームの先端部に設けられ、該送信側冷却水ノズルおよび受信側冷却水ノズルにそれぞれに冷却水管が接続され、
前記送信用センサおよび前記受信用センサが水冷構造であって、該送信用センサおよび前記受信用センサにそれぞれに冷却水管が接続され、
前記冷却水管のそれぞれはヘッダに接続されると共に、水量調整弁が設けられ、各別に水量調整可能に構成されていることを特徴とするものである。
【0014】
また、一対のアームは、鋳片を挟む上下がそれぞれ独立に構成され、各アームが位置調整可能に構成されていることを特徴とする請求項1〜5のいずれかに記載の連続鋳造鋳片の凝固状態検出装置。
【0015】
また、一対のアームは、後端側が連結されたC形状からなると共に、リニアレールが平行に複数設けられてなることを特徴とするものである。
【0016】
【発明の実施の形態】
実施の形態1.
図1は連続鋳造機の全体を示した側面概略図、図2は図1の丸で囲んだア部を拡大して示すと共に本実施の形態の凝固状態検出装置の信号処理系の構成を示している。図3は本実施の形態の凝固状態検出装置の側面図、図4は平面図である。まず、図1、図2に基づいて、連続鋳造機の全体の説明、及び信号処理系の概要を説明し、その後で図3、図4に基づいて凝固状態検出装置の構成を詳細に説明する。
【0017】
連続鋳造機では、図1に示すように、取鍋1からタンディッシュ3、タンディッシュ3から鋳型5へと移送された溶鋼を、鋳型5の下方に設けられたガイドロールエプロン6に設置された複数組のサポートロール7間を移送して鋳片9を製造する。
鋳型5から引き出された直後の鋳片9は、未凝固である溶融部9aが内側の大部分を占めているが、その後の冷却により凝固が進行するにつれて、凝固部が占める割合が高くなり、全体が凝固する。
【0018】
鋳片9の完全凝固端(クレータエンド(図2参照))が鋳片9のどの位置にあるかを判定するために、凝固状態検出装置11が設置されている。
凝固状態検出装置11の信号処理系は、図2に示すように、送信用横波電磁超音波センサ13(以下単に、「送信用センサ13」という)及び受信用横波電磁超音波センサ15(以下単に、「受信用センサ15」という)からなるセンサ部17と、送信用センサ13に送信信号を出力する送信出力系(任意波形発生器19,送信アンプ21)と、受信用センサ15にて受信した受信信号を処理する受信処理系(受信アンプ23、フィルタ25、オシロスコープ27)、及び受信信号に基づいてクレータエンド及び鋳片凝固状態を算出するクレータエンド計算機29とを備えている。
【0019】
次に、図3、図4に基づいて凝固状態検出装置の構成を詳細に説明する。なお、図3においては実線が待機時の状態を示し、破線が検出実行時の状態を示している。
本実施形態に係る凝固状態検出装置11は、冷却ゾーンのチャンバー31の外側に設置された下部側装置架構31と、下部側装置架構31に鋳片9の進行方向直交方向に設置されたリニアレール33と、リニアレール33上を走行する複数のリニアガイド35と、リニアガイド35に取り付けられた幅狭のアーム37とを備えている。リニアレール33、リニアガイド35、アーム37の関係を後方から見た状態を図5に示す。
【0020】
アーム37を幅狭にしたのは、アーム37をガイドロール7間に挿入できるようにするためである。そして、アーム37をガイドロール7間に挿入するためにアーム37を支持するリニアガイド35をアーム37の後端側に設け、アーム37の前側がリニアレール33から大きく延出できるように構成されている。そして、アーム37を支えるリニアガイド35がアーム37の中央部に位置しないことから生ずるアンバランスを解消するためにアーム37の後端側にバランスウェイト39が設けられている。
アーム37の先端側には送信用センサ13が取り付けられている。
【0021】
下部側装置架構31上には昇降装置41を介して上部側装置架構43が取り付けられ、この上部側装置架構43は昇降装置41によって高さ調整が自在に行えるようになっている。上部側装置架構43には、上述した下部側装置架構31と同様に、リニアレール45と、リニアガイド47と、アーム49とが設置されている。また、アーム49の先端側には受信用センサ15が取り付けられ、後端側にはバランスウェイト51が取り付けられている。
【0022】
本実施の形態では、上下のアーム37、49をそれぞれ別個の構造としたことにより各アームごとの位置調整が可能となり、微調整ができる。
なお、各アーム37,49は、図4に示す駆動モータ53によってリニアガイド35,47がリニアレール33,45上を走行することで、その先端部が冷却チャンバー31に出入りできるようになっている。各アーム37,49の移動を、リニアガイド35,47によって行うようにしたことにより、スムーズな走行が実現され、これによってアーム37,49の先端部に取り付けた送受信センサ13、15を非接触状態で保持することができるのである。
【0023】
送信用センサ13は、送信信号を横波の電磁超音波として発信し、電磁超音波が鋳片9を透過した透過信号を受信用センサ15が受信する。このとき横波超音波は液相である残存溶融金属中を伝播できないことを利用して受信信号を前述の信号処理系で処理することによりクレータエンドの位置検出が行われる。
【0024】
図6は凝固状態検出装置11の先端部の拡大図であり、鋳片9を挟んでセンサ13,15を配置した状態(検出可能状態)の拡大図である。図6に基づいて、凝固状態検出装置11の先端部の構造を説明する。なお、上側と下側は同じ構造なので上側を例に挙げて説明するが、下側の構成であって上側の構成に相当する部分には同一の符号を付してある。
【0025】
まず、受信用センサ15の取り付け構造を説明する。
受信用センサ15は、受信用センサ15が外力を受けたときに鋳片9から離れる方向に移動可能な非常緩衝装置55に取り付けられている。この非常緩衝装置55は、アーム49の先端部に下向きに設置された4本の支持棒57,59,61,63と、該支持棒57,59,61,63の先端側に鋳片9から離れる方向に移動可能に設置された保持部材65と、保持部材65の鋳片9側に取り付けられた脚部67とを備え、この脚部67に受信用センサ15が取り付けられている。
【0026】
そして、4本の支持棒57,59,61,63のうちの外側の2本の支持棒57,63の外周には圧縮バネ69,71がそれぞれはめ込まれており、圧縮バネ69,71が保持部材65を鋳片9側に常時付勢している。このため、保持部材65が常時鋳片9側に押し付けられ所定位置に配置され、これによって受信用センサ15と鋳片9の隙間が所定の間隔に規定される。
そして、鋳片9表面の凸部等に受信用センサ15が接触して受信用センサ15に外力が作用すると、保持部材65が圧縮バネ69,71の付勢力に抗して鋳片9から離れる方向に移動する。このため、受信用センサ15に過大な力が作用せず、受信用センサ15が巻き込まれて破壊するようなことがない。
【0027】
次に、受信用センサ15及び鋳片9の冷却構造について説明する。
受信用センサ15は水冷構造であり、アーム49に沿って設けられた冷却水管73が受信用センサ15にも配管されている。また、アーム49の先端部には鋳片9に対して冷却水を噴射する冷却ノズル75が設けられており、この冷却ノズル75にもアーム49に沿って設けられた冷却配管77が接続されている。冷却ノズル75は、図6〜図8に示すように、鋳片9進行方向の後方、すなわち受信用センサ15検出部の直前部に冷却水を噴射できるようになっている。
【0028】
このように、アーム49の先端部に鋳片9冷却用の冷却ノズル75を設けたので、アーム49を移動しても、必要な箇所のみ冷却でき、冷却水量を節約できる。
【0029】
受信用センサ15を冷却するための冷却水及び冷却ノズル75に供給する冷却水は、図9に示すように、冷却水本管79からヘッダ81を介してそれぞれの冷却管73,75によって供給される。そして、各冷却管73,75にはそれぞれ別個に流量調整弁83,85が設けられている。
このように、流量調整弁83,85を各冷却管73,75ごとに別個に設けたことにより、冷却水本管79の冷却水量の変動に影響をうけることなく、常に所定の冷却水量を受信用センサ15及び冷却ノズル75に供給できる。
【0030】
ここで、受信用センサ15及び冷却ノズル75に常に所定の冷却水量を供給できることの効果について説明する。その前提として、受信用センサ15及び冷却ノズル75に供給される冷却水量が変動したときの問題点について述べる。
まず、受信用センサ15の冷却水量が減少すると受信用センサ15の加熱により感度が低下する。逆に受信用センサ15の冷却水量が増加すると、冷却水による振動がノイズとなり、感度の低下が生じる。
【0031】
また、冷却ノズル75への冷却水量が減少すると、鋳片9の冷却効率が悪くなり、超音波の透過率が悪くなる。加えてセンサへの熱負荷も高まり、センサの耐久性が低下する。逆に、冷却水量が多くなると、冷却ノズル75から噴射される水がジェット噴射状態になり、冷却ノズル75および受信用センサ15に振動が生じ感度に悪影響を生ずる。
【0032】
このように、受信用センサ15及び冷却ノズル75に供給される冷却水量が変動すると、種々の問題が生ずるが、本実施形態では受信用センサ15及び冷却ノズル75に常に所定の冷却水量を供給できるようにしているので、このような問題が生ずることがないのである。
【0033】
以上のように構成された凝固状態検出装置11によって鋳片9の凝固状態を検出するには、鋳造開始前に送受信用センサ13,15の位置合わせをし、鋳造開始後、アーム37,49をガイドロール間に挿入し(図3の破線の状態)、センサ感度が良好になるよう、リフトオフ量(センサ13,15と鋳片9の隙間量)を調整する。
リフトオフ量の調整ができると、アーム37,49を走行させることにより、センサ13,15で鋳片9の幅方向に走査する。
このとき、送信用センサ13は、送信信号を横波の電磁超音波として発信し、電磁超音波が鋳片9を透過した透過信号を受信用センサ15が受信する。この受信信号を前述の信号処理系で処理することによりクレータエンドの位置検出が行われる。
【0034】
なお、連続鋳造機の軽圧下量の変更、鋳片9の厚みの変更などがあったときにはそれに対応してリフトオフ量を変更する。
【0035】
本実施の形態においては、アーム37,49の先端部にセンサ13,15を設置して非接触にて鋳片9の凝固状態を検出できるようにしたので、鋳片9表面の凹凸に影響されることなく、正確に鋳片9の凝固状態を検出できる。
また、アーム37,49を上下2分割構造としたので、各アーム毎に位置調整ができ、リフトオフ量を正確に設定できる。
また、センサ13,15を非常緩衝装置55を介して取り付けたので、センサ13,15が外力を受けたときに、センサ13,15が鋳片9から離れる方向に移動でき、センサが巻き込まれたり、破壊したりするのを防止できる。
【0036】
また、アーム先端部に鋳片9冷却用の冷却ノズル75を設けたので、アーム49を移動しても、必要な箇所のみ冷却でき、冷却水量を節約できる。
また、センサ13,15と冷却ノズル75への流量を各別に調整可能としたので、センサ13,15及び冷却ノズル75への冷却水量を常に所定量に制御でき、センサ13,15の感度を良好に保つことができる。
【0037】
また、アーム37,49を後退させることで、アーム先端部がチャンバー31の外側に配置されるので、センサ13,15を含む装置全体のメンテナンスを容易にすることができる。
【0038】
実施の形態2.
図10は本発明の実施の形態2の説明図であり、図3に示した実施の形態1と同一部分には同一の符号を付してある。
本実施の形態は、上下アームを一体化してC型アーム87としたものである。このようにすることで、アームの構造を単純化できる。もっとも、レールを下部だけに配置することになり、C型アーム87の立端が高くなるため左右への倒れ込みが生ずる危険がある。そこで、この実施の形態では、図11に示すように、所定間隔離した位置にレールを2本平行に設置している。このようにすることで、アームの左右への倒れ込みを防止できる。
【0039】
【発明の効果】
以上説明したように、本発明においては、冷却ゾーンのチャンバー外側に鋳片の進行方向直交方向に設置されたリニアレールと、該リニアレールに走行可能に設置されたリニアガイドと、該リニアガイドに取り付けられて前記鋳片を挟んで上下に配置される一対のアームと、該一対のアームの一方の先端部に設置された送信用センサと、前記一対のアームの他方の先端部に設置された受信用センサとを備え、前記センサ及び前記アーム先端部は前記鋳片の上下面に非接触である構成としたので、鋳片表面の凹凸に影響されることなく、正確に鋳片9凝固状態を検出できる。
【図面の簡単な説明】
【図1】 本発明の一実施の形態の連続鋳造機の全体を示した側面概略図である。
【図2】 図1の丸で囲んだア部の拡大図である。
【図3】 本発明の一実施の形態の凝固状態検出装置の側面図である。
【図4】 本発明の一実施の形態の凝固状態検出装置の平面図である。
【図5】 本発明の一実施の形態の凝固状態検出装置の一部拡大図である。
【図6】 本発明の一実施の形態の凝固状態検出装置の一部拡大図である。
【図7】 本発明の一実施の形態の凝固状態検出装置の一部拡大図である。
【図8】 本発明の一実施の形態の凝固状態検出装置の一部拡大図である。
【図9】 本発明の一実施の形態の凝固状態検出装置の冷却水配管の系統図である。
【図10】 本発明の他の実施の形態の凝固状態検出装置の側面図である。
【図11】 本発明の他の実施の形態の凝固状態検出装置の一部拡大図である。
【符号の説明】
13 送信用センサ
15 受信用センサ
31 冷却ゾーンのチャンバー
33 リニアレール
35 リニアガイド
37 アーム
39 バランスウェイト
55 非常緩衝装置
75 冷却ノズル
83,85流量調整弁
87 C型アーム
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an apparatus for detecting a solidified state of a slab by continuously penetrating ultrasonic waves in the thickness direction of a continuously cast slab.
[0002]
[Prior art]
In general, continuous casting of molten metal is performed by injecting molten metal from a tundish into a mold having a predetermined cross-sectional shape, and continuously pulling out a slab mixed with a molten part and a solidified part from below the mold. ing. Immediately after being drawn out of the mold, the slab occupies most of the inner part of the melted portion which is not solidified, but as the solidification proceeds by subsequent cooling, the proportion of the solidified portion increases, and the whole Solidify.
[0003]
Here, it is very important to determine where the fully solidified end (crater end) of the continuous cast slab is located in the slab in the continuous drawing process. The reason is as follows.
That is, when the casting speed is increased in order to improve productivity, the crater end moves to the downstream side of the slab. If the position of the crater end moves downstream beyond the cutting position by the slab cutter, there is a possibility of a major accident such as molten steel leakage.
[0004]
Further, in the light reduction operation for reducing the center segregation of solidification and improving the quality, it is necessary to control the casting speed and the secondary cooling amount so that the crater end is positioned in the vicinity of the light reduction zone. In order to meet these requirements, it is necessary to continuously measure the solidification state of the slab.
[0005]
Thus, since detecting the position of the crater end and detecting the solidified state of the slab greatly contributes to the improvement in the productivity and quality of the slab, various devices have been developed.
For example, a spacer roller that rolls in contact with the slab surface and a water-cooled electromagnetic ultrasonic transducer with a cooling water jet hole face each other centering on the slab and prevents the pulling of the transducer in contact with the measured object transport roller An electromagnetic ultrasonic measurement apparatus provided with a support roller has been proposed (see, for example, Patent Document 1).
[0006]
[Patent Document 1]
Japanese Examined Patent Publication No. 2-646 [0007]
[Problems to be solved by the invention]
However, the above prior art has the following problems.
In order to maintain a predetermined distance between the cold electromagnetic ultrasonic transducer and the slab, a spacer roller is provided at the tip of the cold electromagnetic ultrasonic transducer so as to roll over the slab. However, since the slab surface is not a smooth surface, the cold electromagnetic ultrasonic transducer may be drawn into the guide roller. However, in Patent Document 1, in order to avoid this pull-in phenomenon, a pull-in prevention support roller that rolls in contact with the measured object transport roller is provided. However, as long as there is a mechanical contact, there is a risk of pull-in, vibration, or the like. There is a risk of erroneous detection.
[0008]
The present invention has been made to solve such a problem, and the sensor and its holding part are completely in non-contact with the slab, so that there is no risk of pull-in or malfunction due to vibration or the like. It aims at obtaining the coagulation state detection apparatus.
[0009]
[Means for Solving the Problems]
The solidification state detection device for a continuous cast slab according to the present invention draws the molten steel injected into the mold below the mold, and in the thickness direction of the slab continuously cast while cooling in the cooling zone, An apparatus that detects the solidification state of the slab by penetrating ultrasonic waves from a non-contact transmission sensor and receiving ultrasonic waves transmitted through the slab by a non-contact reception sensor. ,
A linear rail installed in the direction perpendicular to the direction of travel of the slab on the outside of the chamber of the cooling zone, a linear guide installed so as to be able to run on the linear rail, and sandwiched between the slab attached to the linear guide A pair of arms arranged vertically, and
The linear guide is provided on the rear end side of the arm so that the front side of the arm can extend greatly from the linear rail, and a balance weight is provided on the rear end side of the arm,
The transmission sensor is attached, and when the slab comes into contact with the transmission sensor and an external force is applied, an emergency shock absorber for moving the transmission sensor in a direction away from the slab is provided on one of the pair of arms. Installed at the tip of the arm,
When the receiving sensor is attached and an external force is applied to the receiving sensor due to the slab contacting the receiving sensor, an emergency shock absorber for moving the receiving sensor away from the slab is provided on the other side of the pair of arms. It is installed at the tip of the arm.
[0011]
In addition, the emergency shock absorber includes a support bar installed at the tip of the arm;
Wherein the sensor holding portion installed movably in a direction away from the slab to the distal end side of the support rod, and biasing means for normally urging the side cast the sensor holding portion, in that it comprises an Is.
[0012]
In addition, a cooling water nozzle for injecting cooling water to the slab is provided at the tip of the arm.
Further, the transmission sensor and the reception sensor have a water cooling structure.
[0013]
Further, a transmission-side cooling water nozzle and a reception-side cooling water nozzle for injecting cooling water to each surface of the slab are provided at the tip of the arm, and the transmission-side cooling water nozzle and the reception-side cooling water nozzle A cooling water pipe is connected to each,
The transmission sensor and the reception sensor have a water cooling structure, and a cooling water pipe is connected to each of the transmission sensor and the reception sensor,
Each of the cooling water pipes is connected to a header and provided with a water amount adjusting valve, and is configured to be able to adjust the water amount separately.
[0014]
6. The continuous cast slab according to claim 1, wherein the pair of arms are configured such that the upper and lower sides sandwiching the slab are independent of each other, and each arm is configured to be position-adjustable. Coagulation state detection device.
[0015]
Further, the pair of arms has a C shape in which the rear end sides are connected, and a plurality of linear rails are provided in parallel.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Embodiment 1 FIG.
FIG. 1 is a schematic side view showing the entire continuous casting machine. FIG. 2 is an enlarged view of the circled portion of FIG. 1 and shows the configuration of the signal processing system of the solidification state detection device of the present embodiment. ing. FIG. 3 is a side view of the solidification state detection device of the present embodiment, and FIG. 4 is a plan view. First, the overall description of the continuous casting machine and the outline of the signal processing system will be described based on FIGS. 1 and 2, and then the configuration of the solidification state detection device will be described in detail based on FIGS. 3 and 4. .
[0017]
In the continuous casting machine, as shown in FIG. 1, the molten steel transferred from the ladle 1 to the tundish 3 and from the tundish 3 to the mold 5 is installed in a guide roll apron 6 provided below the mold 5. The slab 9 is manufactured by transferring between a plurality of sets of support rolls 7.
The slab 9 immediately after being drawn out from the mold 5 occupies most of the inner side of the melted portion 9a that is not solidified, but as the solidification proceeds by subsequent cooling, the proportion of the solidified portion increases. The whole solidifies.
[0018]
In order to determine in which position of the slab 9 the fully solidified end (crater end (see FIG. 2)) of the slab 9 is located, a solidified state detection device 11 is installed.
As shown in FIG. 2, the signal processing system of the coagulation state detection device 11 includes a transmission transverse wave electromagnetic ultrasonic sensor 13 (hereinafter simply referred to as “transmission sensor 13”) and a reception transverse wave electromagnetic ultrasonic sensor 15 (hereinafter simply referred to as “transmission sensor 13”). , “Sensor 15 for reception”), a transmission output system (arbitrary waveform generator 19, transmission amplifier 21) that outputs a transmission signal to the transmission sensor 13, and the reception sensor 15. A reception processing system (reception amplifier 23, filter 25, oscilloscope 27) for processing the reception signal and a crater end calculator 29 for calculating a crater end and a slab solidification state based on the reception signal are provided.
[0019]
Next, the configuration of the coagulation state detection device will be described in detail with reference to FIGS. In FIG. 3, a solid line indicates a standby state, and a broken line indicates a detection execution state.
The solidification state detection device 11 according to the present embodiment includes a lower-side device frame 31 installed outside the chamber 31 in the cooling zone, and a linear rail installed on the lower-side device frame 31 in a direction orthogonal to the traveling direction of the slab 9. 33, a plurality of linear guides 35 traveling on the linear rail 33, and a narrow arm 37 attached to the linear guide 35. FIG. 5 shows a state in which the relationship between the linear rail 33, the linear guide 35, and the arm 37 is viewed from the rear.
[0020]
The reason why the arm 37 is made narrow is that the arm 37 can be inserted between the guide rolls 7. In order to insert the arm 37 between the guide rolls 7, a linear guide 35 that supports the arm 37 is provided on the rear end side of the arm 37, and the front side of the arm 37 can be extended from the linear rail 33. Yes. A balance weight 39 is provided on the rear end side of the arm 37 in order to eliminate the unbalance caused by the linear guide 35 that supports the arm 37 not being located at the center of the arm 37.
A transmission sensor 13 is attached to the distal end side of the arm 37.
[0021]
An upper apparatus frame 43 is mounted on the lower apparatus frame 31 via an elevating device 41, and the height of the upper apparatus frame 43 can be freely adjusted by the elevating device 41. Similar to the lower apparatus frame 31 described above, a linear rail 45, a linear guide 47, and an arm 49 are installed in the upper apparatus frame 43. A receiving sensor 15 is attached to the front end side of the arm 49, and a balance weight 51 is attached to the rear end side.
[0022]
In the present embodiment, since the upper and lower arms 37 and 49 have separate structures, the position of each arm can be adjusted and fine adjustment can be performed.
The arms 37 and 49 are configured so that the linear guides 35 and 47 run on the linear rails 33 and 45 by the drive motor 53 shown in FIG. . The movement of the arms 37 and 49 is performed by the linear guides 35 and 47, so that smooth running is realized. As a result, the transmission / reception sensors 13 and 15 attached to the tips of the arms 37 and 49 are in a non-contact state. Can be held.
[0023]
The transmission sensor 13 transmits a transmission signal as a transverse electromagnetic ultrasonic wave, and the reception sensor 15 receives a transmission signal obtained by transmitting the electromagnetic ultrasonic wave through the slab 9. At this time, the position of the crater end is detected by processing the received signal with the above-described signal processing system by utilizing the fact that the transverse ultrasonic wave cannot propagate in the residual molten metal that is in the liquid phase.
[0024]
FIG. 6 is an enlarged view of the distal end portion of the solidification state detection device 11, and is an enlarged view of a state (detectable state) in which the sensors 13 and 15 are arranged with the slab 9 interposed therebetween. Based on FIG. 6, the structure of the front-end | tip part of the coagulation | solidification state detection apparatus 11 is demonstrated. Since the upper side and the lower side have the same structure, description will be given by taking the upper side as an example. However, the same reference numerals are given to the parts corresponding to the upper side structure.
[0025]
First, the mounting structure of the receiving sensor 15 will be described.
The receiving sensor 15 is attached to an emergency shock absorber 55 that can move in a direction away from the slab 9 when the receiving sensor 15 receives an external force. The emergency shock absorber 55 includes four support rods 57, 59, 61, 63 installed downward at the tip of the arm 49, and the cast piece 9 on the tip side of the support rods 57, 59, 61, 63. A holding member 65 is provided so as to be movable in a direction away from it, and a leg portion 67 attached to the slab 9 side of the holding member 65, and the receiving sensor 15 is attached to the leg portion 67.
[0026]
The compression springs 69 and 71 are fitted on the outer circumferences of the two outer support rods 57 and 63 of the four support rods 57, 59, 61 and 63, and the compression springs 69 and 71 are held. The member 65 is constantly urged toward the slab 9 side. For this reason, the holding member 65 is always pressed against the slab 9 and disposed at a predetermined position, whereby the gap between the receiving sensor 15 and the slab 9 is defined at a predetermined interval.
When the receiving sensor 15 comes into contact with the convex portion on the surface of the slab 9 and an external force acts on the receiving sensor 15, the holding member 65 moves away from the slab 9 against the urging force of the compression springs 69 and 71. Move in the direction. For this reason, excessive force does not act on the receiving sensor 15, and the receiving sensor 15 is not caught and destroyed.
[0027]
Next, the cooling structure of the receiving sensor 15 and the cast piece 9 will be described.
The reception sensor 15 has a water cooling structure, and a cooling water pipe 73 provided along the arm 49 is also connected to the reception sensor 15. A cooling nozzle 75 for injecting cooling water to the slab 9 is provided at the tip of the arm 49, and a cooling pipe 77 provided along the arm 49 is connected to the cooling nozzle 75. Yes. As shown in FIGS. 6 to 8, the cooling nozzle 75 can inject cooling water to the rear of the slab 9 in the traveling direction, that is, immediately before the receiving sensor 15 detection unit.
[0028]
Thus, since the cooling nozzle 75 for cooling the slab 9 is provided at the tip of the arm 49, even if the arm 49 is moved, only a necessary portion can be cooled and the amount of cooling water can be saved.
[0029]
The cooling water for cooling the receiving sensor 15 and the cooling water supplied to the cooling nozzle 75 are supplied from the cooling water main pipe 79 by the respective cooling pipes 73 and 75 through the header 81 as shown in FIG. The The cooling pipes 73 and 75 are provided with flow rate adjusting valves 83 and 85, respectively.
Thus, by providing the flow rate adjusting valves 83 and 85 separately for the respective cooling pipes 73 and 75, a predetermined amount of cooling water is always received without being affected by the fluctuation of the cooling water quantity of the cooling water main pipe 79. The sensor 15 and the cooling nozzle 75 can be supplied.
[0030]
Here, an effect of being able to always supply a predetermined amount of cooling water to the receiving sensor 15 and the cooling nozzle 75 will be described. As a premise, a problem when the amount of cooling water supplied to the receiving sensor 15 and the cooling nozzle 75 fluctuates will be described.
First, when the amount of cooling water in the reception sensor 15 decreases, the sensitivity decreases due to heating of the reception sensor 15. Conversely, when the amount of cooling water in the receiving sensor 15 increases, vibration due to the cooling water becomes noise and the sensitivity decreases.
[0031]
Further, when the amount of cooling water to the cooling nozzle 75 is reduced, the cooling efficiency of the slab 9 is deteriorated, and the transmittance of ultrasonic waves is deteriorated. In addition, the heat load on the sensor increases, and the durability of the sensor decreases. Conversely, when the amount of cooling water increases, the water jetted from the cooling nozzle 75 enters a jet jet state, causing vibrations in the cooling nozzle 75 and the receiving sensor 15 and adversely affecting the sensitivity.
[0032]
As described above, when the amount of cooling water supplied to the receiving sensor 15 and the cooling nozzle 75 fluctuates, various problems occur. In the present embodiment, a predetermined amount of cooling water can always be supplied to the receiving sensor 15 and the cooling nozzle 75. Therefore, such a problem does not occur.
[0033]
In order to detect the solidification state of the slab 9 by the solidification state detection device 11 configured as described above, the transmission / reception sensors 13 and 15 are aligned before the casting starts, and the arms 37 and 49 are moved after the casting starts. It is inserted between the guide rolls (the state of the broken line in FIG. 3), and the lift-off amount (the gap amount between the sensors 13 and 15 and the slab 9) is adjusted so that the sensor sensitivity is good.
When the lift-off amount can be adjusted, the arms 37 and 49 are moved to scan the slab 9 in the width direction by the sensors 13 and 15.
At this time, the transmission sensor 13 transmits the transmission signal as a transverse electromagnetic ultrasonic wave, and the reception sensor 15 receives a transmission signal obtained by transmitting the electromagnetic ultrasonic wave through the slab 9. The position of the crater end is detected by processing this received signal with the signal processing system described above.
[0034]
When there is a change in the light reduction amount of the continuous casting machine or a change in the thickness of the cast piece 9, the lift-off amount is changed accordingly.
[0035]
In the present embodiment, the sensors 13 and 15 are installed at the distal ends of the arms 37 and 49 so that the solidified state of the slab 9 can be detected in a non-contact manner. The solidification state of the slab 9 can be accurately detected without any trouble.
Further, since the arms 37 and 49 have a vertically divided structure, the position can be adjusted for each arm, and the lift-off amount can be set accurately.
Further, since the sensors 13 and 15 are attached via the emergency shock absorber 55, when the sensors 13 and 15 receive an external force, the sensors 13 and 15 can move in a direction away from the slab 9, and the sensor is caught up. , And can prevent destruction.
[0036]
Further, since the cooling nozzle 75 for cooling the slab 9 is provided at the tip of the arm, even if the arm 49 is moved, only a necessary portion can be cooled, and the amount of cooling water can be saved.
In addition, since the flow rates to the sensors 13 and 15 and the cooling nozzle 75 can be adjusted separately, the amount of cooling water to the sensors 13 and 15 and the cooling nozzle 75 can always be controlled to a predetermined amount, and the sensitivity of the sensors 13 and 15 is good. Can be kept in.
[0037]
Further, by retracting the arms 37 and 49, the arm tip is disposed outside the chamber 31, so that maintenance of the entire apparatus including the sensors 13 and 15 can be facilitated.
[0038]
Embodiment 2. FIG.
FIG. 10 is an explanatory diagram of the second embodiment of the present invention. The same reference numerals are given to the same parts as those of the first embodiment shown in FIG.
In this embodiment, the upper and lower arms are integrated into a C-shaped arm 87. By doing so, the structure of the arm can be simplified. However, since the rail is arranged only in the lower part and the standing end of the C-shaped arm 87 becomes high, there is a risk of falling to the left and right. Therefore, in this embodiment, as shown in FIG. 11, two rails are installed in parallel at positions separated by a predetermined distance. By doing in this way, falling of the arm to the left and right can be prevented.
[0039]
【The invention's effect】
As described above, in the present invention, the linear rail installed in the direction perpendicular to the traveling direction of the slab on the outside of the chamber of the cooling zone, the linear guide installed to be able to run on the linear rail, and the linear guide A pair of arms that are attached and arranged above and below the slab, a transmission sensor installed at one tip of the pair of arms, and installed at the other tip of the pair of arms Since the sensor and the arm tip are not in contact with the upper and lower surfaces of the slab, the slab 9 is accurately solidified without being affected by irregularities on the surface of the slab. Can be detected.
[Brief description of the drawings]
FIG. 1 is a schematic side view showing an entire continuous casting machine according to an embodiment of the present invention.
FIG. 2 is an enlarged view of a portion surrounded by a circle in FIG. 1;
FIG. 3 is a side view of a coagulation state detection apparatus according to an embodiment of the present invention.
FIG. 4 is a plan view of a coagulation state detection apparatus according to an embodiment of the present invention.
FIG. 5 is a partially enlarged view of a coagulation state detection apparatus according to an embodiment of the present invention.
FIG. 6 is a partially enlarged view of the coagulation state detection apparatus according to the embodiment of the present invention.
FIG. 7 is a partially enlarged view of a coagulation state detection apparatus according to an embodiment of the present invention.
FIG. 8 is a partially enlarged view of a coagulation state detection apparatus according to an embodiment of the present invention.
FIG. 9 is a system diagram of cooling water piping of the solidification state detection device according to the embodiment of the present invention.
FIG. 10 is a side view of a coagulation state detection device according to another embodiment of the present invention.
FIG. 11 is a partially enlarged view of a coagulation state detection device according to another embodiment of the present invention.
[Explanation of symbols]
13 Transmission sensor 15 Reception sensor 31 Cooling zone chamber 33 Linear rail 35 Linear guide 37 Arm 39 Balance weight 55 Emergency buffer 75 Cooling nozzle 83, 85 Flow rate adjusting valve 87 C-type arm

Claims (7)

鋳型に注入された溶鋼を前記鋳型の下方に引き抜き、冷却ゾーンで冷却しながら連続鋳造される鋳片に対して、その厚み方向に、非接触状態の送信用センサから超音波を透入し、前記鋳片を透過した超音波を非接触状態の受信用センサで受信することにより、前記鋳片の凝固状態を検出する装置であって、
前記冷却ゾーンのチャンバー外側に前記鋳片の進行方向直交方向に設置されたリニアレールと、該リニアレールに走行可能に設置されたリニアガイドと、該リニアガイドに取り付けられて前記鋳片を挟んで上下に配置される一対のアームと、を備え、
前記アームの前側が前記リニアレールから大きく延出できるように、前記アームの後端側に前記リニアガイドが設けられ、且つ、前記アームの後端側にバランスウェイトが設けられ、
前記送信用センサが取り付けられ、該送信用センサに鋳片が接触して外力が作用した際、該送信用センサを鋳片から離れる方向に移動させる非常緩衝装置が、前記一対のアームの一方のアームの先端部に、設置され、
前記受信用センサが取り付けられ、該受信用センサに鋳片が接触して外力が作用した際、該受信用センサを鋳片から離れる方向に移動させる非常緩衝装置が、前記一対のアームの他方のアームの先端部に設置されることを特徴とする連続鋳造鋳片の凝固状態検出装置。
The molten steel injected into the mold is drawn below the mold, and the slab is continuously cast while being cooled in the cooling zone. An apparatus for detecting the solidification state of the slab by receiving ultrasonic waves transmitted through the slab with a receiving sensor in a non-contact state,
A linear rail installed in the direction perpendicular to the direction of travel of the slab on the outside of the chamber of the cooling zone, a linear guide installed so as to be able to run on the linear rail, and sandwiched between the slab attached to the linear guide A pair of arms arranged vertically, and
The linear guide is provided on the rear end side of the arm so that the front side of the arm can extend greatly from the linear rail, and a balance weight is provided on the rear end side of the arm,
The transmission sensor is attached, and when the slab comes into contact with the transmission sensor and an external force is applied, an emergency shock absorber for moving the transmission sensor in a direction away from the slab is provided on one of the pair of arms. Installed at the tip of the arm,
When the receiving sensor is attached and an external force is applied to the receiving sensor due to the slab contacting the receiving sensor, an emergency shock absorber for moving the receiving sensor away from the slab is provided on the other side of the pair of arms. An apparatus for detecting a solidification state of a continuous cast slab, wherein the solid state detection apparatus is installed at a tip of an arm.
前記非常緩衝装置は、前記アームの先端部に設置された支持棒と、
該支持棒の先端側に鋳片から離れる方向に移動可能に設置されたセンサ保持部と、該センサ保持部を鋳片側へ常時付勢する付勢手段と、を備えてなることを特徴とする請求項1記載の連続鋳造鋳片の凝固状態検出装置。
The emergency shock absorber includes a support bar installed at the tip of the arm;
A sensor holding portion installed on the front end side of the support bar so as to be movable away from the slab, and a biasing means for constantly urging the sensor holding portion toward the slab side. The solidification state detection apparatus of the continuous cast slab of Claim 1.
鋳片に対して冷却水を噴射する冷却水ノズルを前記アームの先端部に設けたことを特徴とする請求項1又は2記載の連続鋳造鋳片の凝固状態検出装置。  The solid state detection device for a continuous cast slab according to claim 1 or 2, wherein a cooling water nozzle for injecting cooling water to the slab is provided at a tip of the arm. 前記送信用センサおよび前記受信用センサが水冷構造であることを特徴とする請求項1〜3のいずれかに記載の連続鋳造鋳片の凝固状態検出装置。  The solidification state detection device for a continuous cast slab according to any one of claims 1 to 3, wherein the transmission sensor and the reception sensor have a water cooling structure. 鋳片のそれぞれの面に対して冷却水を噴射する送信側冷却水ノズルおよび受信側冷却水ノズルが前記アームの先端部に設けられ、該送信側冷却水ノズルおよび受信側冷却水ノズルにそれぞれに冷却水管が接続され、
前記送信用センサおよび前記受信用センサが水冷構造であって、該送信用センサおよび前記受信用センサにそれぞれに冷却水管が接続され、
前記冷却水管のそれぞれはヘッダに接続されると共に、水量調整弁が設けられ、各別に水量調整可能に構成されていることを特徴とする請求項1又は2記載の連続鋳造鋳片の凝固状態検出装置。
A transmitting-side cooling water nozzle and a receiving-side cooling water nozzle for injecting cooling water to each surface of the slab are provided at the tip of the arm, and the transmitting-side cooling water nozzle and the receiving-side cooling water nozzle are respectively provided to The cooling water pipe is connected,
The transmission sensor and the reception sensor have a water cooling structure, and a cooling water pipe is connected to each of the transmission sensor and the reception sensor,
The solidification state detection of the continuous cast slab according to claim 1 or 2, wherein each of the cooling water pipes is connected to a header and is provided with a water amount adjusting valve so that the water amount can be adjusted separately. apparatus.
一対のアームは、鋳片を挟む上下がそれぞれ独立に構成され、各アームが位置調整可能に構成されていることを特徴とする請求項1〜5のいずれかに記載の連続鋳造鋳片の凝固状態検出装置。  The solidification of the continuous cast slab according to any one of claims 1 to 5, wherein the pair of arms are configured so that the upper and lower sides sandwiching the slab are independent of each other and each arm is configured to be position-adjustable. State detection device. 一対のアームは、後端側が連結されたC形状からなると共に、リニアレールが平行に複数設けられてなることを特徴とする請求項1〜6のいずれかに記載の連続鋳造鋳片の凝固状態検出装置。  The pair of arms are formed in a C shape in which the rear end sides are connected, and a plurality of linear rails are provided in parallel. The solidified state of the continuous cast slab according to any one of claims 1 to 6 Detection device.
JP2002375704A 2002-12-26 2002-12-26 Solidified state detector for continuous cast slabs Expired - Lifetime JP4300796B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002375704A JP4300796B2 (en) 2002-12-26 2002-12-26 Solidified state detector for continuous cast slabs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002375704A JP4300796B2 (en) 2002-12-26 2002-12-26 Solidified state detector for continuous cast slabs

Publications (2)

Publication Number Publication Date
JP2004205382A JP2004205382A (en) 2004-07-22
JP4300796B2 true JP4300796B2 (en) 2009-07-22

Family

ID=32813347

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002375704A Expired - Lifetime JP4300796B2 (en) 2002-12-26 2002-12-26 Solidified state detector for continuous cast slabs

Country Status (1)

Country Link
JP (1) JP4300796B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013223083A1 (en) * 2013-11-13 2015-05-13 Sms Siemag Ag Method and device for contactless checking of the condition of a metallurgical cast product
JP7222365B2 (en) * 2020-01-16 2023-02-15 Jfeスチール株式会社 SUBJECT THICKNESS MEASURING DEVICE AND THICKNESS MEASURING METHOD
KR102297178B1 (en) * 2020-10-16 2021-09-01 한만걸 Cold rolled steel sheet sheets seam welding ultrasonic inspection device

Also Published As

Publication number Publication date
JP2004205382A (en) 2004-07-22

Similar Documents

Publication Publication Date Title
US20030141036A1 (en) Manufacturing method for continuously cast product of steel
JP5092642B2 (en) Steel continuous casting method and continuous casting machine
JP4300796B2 (en) Solidified state detector for continuous cast slabs
JP5522324B1 (en) Steel continuous casting method
KR100588429B1 (en) Strip steering
JP5098594B2 (en) Manufacturing method of continuous casting slab and continuous casting machine
JP5494350B2 (en) Continuous casting method for steel slabs
JP5417892B2 (en) Continuous casting method for steel slabs
JP5712575B2 (en) Method for detecting and controlling solidification completion position of continuous cast slab
JP2002066704A (en) Method for detecting and controlling fully solidified position of continuously cast slab
JP2018196893A (en) Crater end position detection method and detection device for continuously casting slab
JP5862595B2 (en) Method for determining solidification completion position of slab, solidification completion position determination device for slab, and method for manufacturing slab
JPH11183449A (en) Method and apparatus for measurement of center solid-phase rate of cast piece
JP2009195937A (en) Method for producing continuously cast slab, and continuous casting machine
CN101774000B (en) Molten steel casting device
JPS606260A (en) Device for measuring bulging of continuous casting billet
JP6961295B2 (en) Crater end position detection device for continuously cast slabs, roll segments incorporating it, and crater end position detection method for continuously cast slabs using them.
KR101353772B1 (en) Apparatus and method for preventing swerving of slab
JP2011245497A (en) Method for continuously casting metal piece
JP4708686B2 (en) Steel continuous casting method
JP5691912B2 (en) Method for continuous casting of metal pieces
KR20240148396A (en) Solidification position measuring device, solidification position measuring method, quality control method for metal materials, casting equipment, manufacturing equipment for metal materials and manufacturing method for metal materials
JP2012215413A (en) Internal coagulation detection apparatus and internal coagulation detection method
JPS6138763A (en) Method for predicting breakout in continuous casting
JP3297703B2 (en) Continuous casting method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050928

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080930

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081126

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090106

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090306

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090331

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120501

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4300796

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090413

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120501

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130501

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140501

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term