JP4299847B2 - Work management apparatus, work management system, and work management method - Google Patents

Work management apparatus, work management system, and work management method Download PDF

Info

Publication number
JP4299847B2
JP4299847B2 JP2006211782A JP2006211782A JP4299847B2 JP 4299847 B2 JP4299847 B2 JP 4299847B2 JP 2006211782 A JP2006211782 A JP 2006211782A JP 2006211782 A JP2006211782 A JP 2006211782A JP 4299847 B2 JP4299847 B2 JP 4299847B2
Authority
JP
Japan
Prior art keywords
work
tag
information
instruction
progress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006211782A
Other languages
Japanese (ja)
Other versions
JP2008040640A (en
Inventor
聡 大石
米満 新村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2006211782A priority Critical patent/JP4299847B2/en
Priority to US11/757,489 priority patent/US8190282B2/en
Priority to CN2008100865190A priority patent/CN101320264B/en
Priority to KR1020070056307A priority patent/KR101392568B1/en
Priority to CN2008100865203A priority patent/CN101320265B/en
Priority to KR1020080010383A priority patent/KR101392536B1/en
Priority to KR1020080010385A priority patent/KR101392618B1/en
Publication of JP2008040640A publication Critical patent/JP2008040640A/en
Application granted granted Critical
Publication of JP4299847B2 publication Critical patent/JP4299847B2/en
Priority to US13/365,330 priority patent/US8744608B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)

Description

本発明は、作業の進捗状況を容易に把握することができる作業管理装置、作業管理システム、及び作業管理方法、並びにピッキング台車に関する。   The present invention relates to a work management apparatus, a work management system, a work management method, and a picking cart that can easily grasp the progress of work.

従来、作業管理を行なう場合、作業実績収集システムの端末又は無線ハンディターミナルから、作業開始及び作業終了を入力する方法が一般的である。   Conventionally, when performing work management, a method of inputting work start and work end from a terminal of a work record collection system or a wireless handy terminal is generally used.

また、作業管理のひとつの指標である作業時間を特定する方法として、作業者が携帯する作業者特定用ID(Identification)タグと、作業対象物品を特定する作業対象物特定用IDタグをIDタグ読取装置(IC(Integrated Circuit)タグ読取装置)で読み取り、その読み取った情報と、作業エリアを特定する情報及びその作業エリアの作業設備の稼動情報を実績管理CPU(Central Processing Unit)へ送信することで、作業時間を管理する技術について開示されている(例えば、特許文献1参照)。
特開2005-182656号公報(段落0023〜0034、図1)
In addition, as a method for specifying a work time which is one index of work management, an ID tag for identifying a worker and an ID tag for identifying a work target for identifying a work target item are ID tags. Reading with a reading device (IC (Integrated Circuit) tag reading device), and transmitting the read information, information for specifying a work area, and operation information of work equipment in the work area to a results management CPU (Central Processing Unit) Thus, a technique for managing work time is disclosed (for example, see Patent Document 1).
Japanese Patent Laying-Open No. 2005-182656 (paragraphs 0023 to 0034, FIG. 1)

作業実績収集システムの端末又は無線ハンディターミナルを用いる方法では、作業者が組立作業を中断して作業実績を入力する必要があり、組立効率低下や作業者への負担が増大する問題があった。   In the method using the terminal of the work record collection system or the wireless handy terminal, it is necessary for the worker to interrupt the assembly work and input the work record, and there is a problem that the assembly efficiency is reduced and the burden on the worker is increased.

特許文献1に記載された作業実績収集システムのICタグ読取装置は、作業エリアに設置され、作業対象物品が搬送された作業エリアの広範囲な領域をカバーする読取装置である。よって、ICタグ読取装置は、作業エリアにある全てのICタグを読み込むため、作業管理に必要な作業者特定用ICタグ、作業対象物特定用ICタグ以外の部材品のトレーサビリティ管理用のICタグなどの多くの情報を読み取ってしまい、誤動作を生じる問題がある。また、作業エリアの作業の進捗状況は、実績管理CPUで、作業設備の稼動情報を分析しなければわからないのが現状である。   The IC tag reader of the work record collection system described in Patent Document 1 is a reader that is installed in a work area and covers a wide area of the work area where work target articles are conveyed. Therefore, since the IC tag reader reads all the IC tags in the work area, the IC tag for managing the traceability of the components other than the worker identifying IC tag and the work target identifying IC tag necessary for work management. There is a problem that a lot of information is read and a malfunction occurs. In addition, at present, the progress of work in the work area cannot be known unless the performance management CPU analyzes the operation information of the work equipment.

本発明は、前記の課題を解決するための発明であって、作業の進捗状況を容易に把握することができる作業管理装置、作業管理システム、及び作業管理方法、並びにピッキング台車を提供することを目的とする。   The present invention is an invention for solving the above-described problems, and provides a work management device, a work management system, a work management method, and a picking cart that can easily grasp the progress of work. Objective.

前記目的を達成するため、作業管理装置は、作業内容を特定する情報が書き込まれたICタグを置く置き場所(例えば、作業管理ボックス21)に付設され、その置き場所に置かれたICタグを検出してその情報を読み取るICタグ読取手段(例えば、ICタグリーダライタ15)と、ICタグ読取手段の読取情報に基づいて作業の進捗を判定する作業進捗判定手段(例えば、制御部26)と、作業進捗判定手段の指令により前記作業の進捗を告知する告知手段(例えば、LEDランプ23)と、を有することを特徴とする。   In order to achieve the above object, the work management apparatus is attached to a placement place (for example, work management box 21) where an IC tag in which information for specifying work contents is written is placed, and the IC tag placed in the placement place is attached to the placement place. IC tag reading means (for example, IC tag reader / writer 15) that detects and reads the information, work progress determination means (for example, control unit 26) for determining work progress based on the read information of the IC tag reading means, It has a notification means (for example, LED lamp 23) which notifies the progress of the said work by the command of the work progress judging means.

このような構成によれば、作業者は、作業開始に際し、ICタグを置き場所に置くだけでよく、また、作業終了に際し、ICタグを置き場所から取るだけでよい。また、作業者の作業進捗状況を告知手段により、例えば、作業中、作業停滞、作業完了、あるいは、特急作業であるかが表示されるので、その作業エリアでの作業状況をひと目で判断することができる。   According to such a configuration, the worker only has to place the IC tag at the place at the start of work, and only needs to remove the IC tag from the place at the end of the work. Also, the work progress status of the worker is displayed by means of notification, for example, whether it is working, stagnation, work completion, or express work, so it is possible to judge the work status in the work area at a glance. Can do.

本発明によれば、作業の進捗状況を容易に把握することができる。   According to the present invention, it is possible to easily grasp the progress of work.

以下、本発明の実施形態について図面を参照して説明する。
《第1の実施形態》
図1は、作業管理システム及び作業管理装置を示す構成図である。作業管理システム100は、指図(さしず)発行装置10と、作業管理装置20と、サーバ30とを備えている。指図発行装置10と、作業管理装置20と、サーバ30とは、LAN(Local Area Network)などのネットワーク40で接続されている。
Embodiments of the present invention will be described below with reference to the drawings.
<< First Embodiment >>
FIG. 1 is a configuration diagram illustrating a work management system and a work management apparatus. The work management system 100 includes an instruction issuing device 10, a work management device 20, and a server 30. The instruction issuing device 10, the work management device 20, and the server 30 are connected by a network 40 such as a LAN (Local Area Network).

指図発行装置10は、作業が必要になった際に、指図を発行する端末であり、サーバ30の記憶部31に、指図内容及び組付指示情報を登録する。なお、組付指示情報とは、製品・半製品を組立てていく(組付けていく)上で必要な部品及び手順の情報をいう。ここでは、組付指示情報として、電子回路基板74(図3参照)に部品を取付ける組立工程を一例としている。   The instruction issuing device 10 is a terminal that issues an instruction when work is required, and registers instruction contents and assembly instruction information in the storage unit 31 of the server 30. The assembly instruction information is information on parts and procedures necessary for assembling (assembling) products and semi-finished products. Here, as an example of assembly instruction information, an assembly process for attaching components to the electronic circuit board 74 (see FIG. 3) is taken as an example.

指図発行装置10は、情報処理部11、キーボード13、表示装置14、ICタグリーダライタ15、及びプリンタ16を備える。情報処理部11は、指図を発行する指図発行部12を有し、指図発行部12の指示により、指図50をプリンタ16にて出力する。また、ICタグリーダライタ15は、指図発行部12の指示により、作業内容を特定する情報を作業特定用ICタグ51に書き込む。   The instruction issuing device 10 includes an information processing unit 11, a keyboard 13, a display device 14, an IC tag reader / writer 15, and a printer 16. The information processing unit 11 includes an instruction issuing unit 12 that issues instructions, and outputs an instruction 50 on the printer 16 in accordance with an instruction from the instruction issuing unit 12. Further, the IC tag reader / writer 15 writes information for specifying the work content in the work specifying IC tag 51 in accordance with an instruction from the instruction issuing unit 12.

作業内容を特定する情報とは、例えば、指図番号、製造する製品・半製品の品名または型番、製作員数である。また、作業対象物品の作業内容を特定する情報の詳細情報として、作業員が、電子回路基板74(図3参照)に部品75(図3参照)を取付ける際の組付情報が記載されている。具体的には、部品75の種別、員数、及び部品の取付け順序である。   The information specifying the work content is, for example, an instruction number, a product name / model number of a product / semi-finished product to be manufactured, and the number of production personnel. In addition, as detailed information of information specifying the work content of the work target article, assembly information when the worker attaches the component 75 (see FIG. 3) to the electronic circuit board 74 (see FIG. 3) is described. . Specifically, the type of the component 75, the number of components, and the mounting order of the components.

指図50は、製品の組立工程のルートが記載された書類である。具体的には、電子回路基板74に取り付ける部品75は各種のものがあり、その各種部品75を電子回路基板74に組付ける順序(工程のルート)が記載されている。例えば、CPU工程、CPU周辺部品工程、電源工程、I/Oインターフェース工程がある。作業者は、指図50より作業工程のルートを判断することができる。   The instruction 50 is a document in which the route of the product assembly process is described. Specifically, there are various types of parts 75 to be attached to the electronic circuit board 74, and the order (process route) for assembling the various parts 75 to the electronic circuit board 74 is described. For example, there are a CPU process, a CPU peripheral component process, a power supply process, and an I / O interface process. The operator can determine the route of the work process from the instruction 50.

作業特定用ICタグ51は、RFID(Radio frequency identification)などの非接触の無線用ICタグを使用し、指図50としての書類に添付される。なお、作業特定用ICタグ51は、例えば、電池未搭載型で受信電波から電力を得るものであれば、小型化や低コスト化などを実現しやすくて好ましいが、電池搭載型のものであってもよい。   The work identification IC tag 51 uses a non-contact wireless IC tag such as RFID (Radio frequency identification) and is attached to a document as an instruction 50. The work specifying IC tag 51 is preferably a battery-mounted type, for example, if it is a battery-unmounted type and obtains power from received radio waves, because it is easy to achieve downsizing and cost reduction. May be.

作業管理装置20は、LED(Light Emitting Diode)ランプ23及び投入口24を有する作業管理ボックス21と、作業管理ボックス21の側面に付設される作業管理装置本体22とを備えている。構成の詳細は、図2を参照して説明する。   The work management apparatus 20 includes a work management box 21 having an LED (Light Emitting Diode) lamp 23 and a slot 24, and a work management apparatus body 22 attached to the side of the work management box 21. Details of the configuration will be described with reference to FIG.

図2は、作業管理装置の構成を示すブロック図である。作業管理装置20は、ICタグを読み取り、読み取った作業の進捗状況をLEDランプ23により表示する機能と、その読み取った情報をサーバ30へ送信する機能とを備えている。作業管理装置本体22は、ICタグリーダライタ25、制御部26、通信部27、及び入力部28を有している。   FIG. 2 is a block diagram illustrating a configuration of the work management apparatus. The work management apparatus 20 has a function of reading an IC tag and displaying the progress status of the read work by the LED lamp 23 and a function of transmitting the read information to the server 30. The work management apparatus main body 22 includes an IC tag reader / writer 25, a control unit 26, a communication unit 27, and an input unit 28.

作業管理ボックス21は、指図50を、作業の開始時に投入するボックスである。また、作業者は、作業が終了すると、指図50を作業管理ボックス21から取り出し、電子回路基板74(図3参照)に取り出した指図50を添付して、次の工程に配送する。   The work management box 21 is a box into which the instruction 50 is input at the start of work. When the work is completed, the worker takes out the instruction 50 from the work management box 21, attaches the taken instruction 50 to the electronic circuit board 74 (see FIG. 3), and delivers it to the next step.

ICタグリーダライタ25は、作業管理ボックス21に指図50が投入された際、作業特定用ICタグ51との通信を確認すると、指図50に添付されている作業特定用ICタグ51の情報を読み取り、制御部26に通信開始情報を送信する。また、ICタグリーダライタ25は、作業管理ボックス21から、指図50が取り出された際、作業特定用ICタグ51との通信の断絶を確認すると、制御部26に通信終了情報を送信する。   When the IC tag reader / writer 25 confirms communication with the work identification IC tag 51 when the instruction 50 is inserted into the work management box 21, the IC tag reader / writer 25 reads the information of the work identification IC tag 51 attached to the instruction 50, Communication start information is transmitted to the control unit 26. When the IC tag reader / writer 25 confirms the disconnection of communication with the work specifying IC tag 51 when the instruction 50 is taken out from the work management box 21, the IC tag reader / writer 25 transmits communication end information to the control unit 26.

制御部26は、具体的には、プログラムに従って動作するCPUによって実現される。制御部26は、ICタグリーダライタ25からの通信開始情報を受信すると、通信部27を介して、サーバ30に、作業特定用ICタグ51との通信開始情報と、作業内容を特定する情報とを送信する。通信開始情報には、例えば、作業管理ボックス21のID、通信開始時刻がある。作業内容を特定する情報には、例えば、指図50の指図番号、製造する製品・半製品の品番、製作員数がある。また、制御部26は、ICタグリーダライタ25からの通信終了情報を受信すると、通信部27を介して、サーバ30に、作業特定用ICタグ51との通信終了情報と、作業内容を特定する情報とを送信する。通信終了情報には、例えば、作業管理ボックス21のID、通信終了時刻がある。作業内容を特定する情報には、例えば、指図50の指図番号、製造する製品・半製品の品番、製作員数がある。   Specifically, the control unit 26 is realized by a CPU that operates according to a program. When the control unit 26 receives the communication start information from the IC tag reader / writer 25, the control unit 26 sends, via the communication unit 27, communication start information with the work specifying IC tag 51 and information for specifying the work content. Send. The communication start information includes, for example, the ID of the work management box 21 and the communication start time. The information for specifying the work content includes, for example, the instruction number of the instruction 50, the product number of the manufactured product / semi-finished product, and the number of production personnel. Further, when receiving the communication end information from the IC tag reader / writer 25, the control unit 26 communicates with the server 30 the communication end information with the work specifying IC tag 51 and information for specifying the work content via the communication unit 27. And send. The communication end information includes, for example, the ID of the work management box 21 and the communication end time. The information for specifying the work content includes, for example, the instruction number of the instruction 50, the product number of the manufactured product / semi-finished product, and the number of production personnel.

なお、作業管理ボックス21には、複数のICタグを投入してもよい。他のICタグとしては、例えば、作業者を特定する情報が書き込まれた作業者特定用ICタグがある。ICタグリーダライタ25は、作業者特定用ICタグが投入された際、作業者特定用ICタグの情報を読み取り、サーバ30に、作業者特定用ICタグとの通信開始情報と、作業者を特定する情報(例えば、図5の作業者M0001)とを送信する。通信開始情報には、例えば、作業管理ボックス21のID、通信開始時刻がある。また、ICタグリーダライタ25は、作業管理ボックス21から、作業者特定用ICタグが取り出された際、作業者特定用ICタグとの通信の断絶を確認すると、サーバ30に、作業者特定用ICタグとの通信終了情報と、作業者を特定する情報とを送信する。通信終了情報には、例えば、作業管理ボックス21のID、通信終了時刻がある。   A plurality of IC tags may be inserted into the work management box 21. As another IC tag, for example, there is a worker identification IC tag in which information for identifying a worker is written. The IC tag reader / writer 25 reads the information of the worker specifying IC tag when the worker specifying IC tag is inserted, and specifies the start information of communication with the worker specifying IC tag and the worker. Information (for example, worker M0001 in FIG. 5) is transmitted. The communication start information includes, for example, the ID of the work management box 21 and the communication start time. When the IC tag reader / writer 25 confirms the disconnection of communication with the worker specifying IC tag when the worker specifying IC tag is taken out from the work management box 21, the IC tag reader / writer 25 causes the server 30 to contact the worker specifying IC. Information on the end of communication with the tag and information for identifying the worker are transmitted. The communication end information includes, for example, the ID of the work management box 21 and the communication end time.

さらに、制御部26は、ICタグリーダライタ25の読取情報に基づいて作業の進捗を判定し、その判定結果に基づいて、表示色をLEDランプ23に指令する。詳細な制御プログラムのフローチャートについては後記する(図6参照)。なお、入力部28は、制御部26の初期設定などの入力を行なう。   Further, the control unit 26 determines the progress of the work based on the reading information of the IC tag reader / writer 25, and instructs the LED lamp 23 on the display color based on the determination result. A detailed control program flowchart will be described later (see FIG. 6). The input unit 28 performs input such as initial setting of the control unit 26.

LEDランプ23は、例えば、光の3原色RGB(赤・緑・青)の発光ダイオードを有し、発光ダイオードの全面に長方形のレンズを有している。これにより、作業管理者が、作業エリアの作業進捗状況を、比較的遠方からも確認することができる。LEDランプ23の発光色は、作業の進捗状況に応じて異なることが好ましい。例えば、作業待ちの場合は白色、作業中の場合は青色、特急作業の場合は黄色、所定時間以上が経過して作業が停滞の場合は赤色とする。これにより、複数の作業エリアを管理する作業管理者は、LEDランプ23の発光色を確認することにより、どの作業エリアに、作業遅れなどの問題を有しているかを判断することができる。なお、LEDランプ23は、詳細な作業の進捗状況の情報を表示する必要がある場合には、LEDディスプレイ形として、文字などを表示してもよい。   The LED lamp 23 includes, for example, light emitting diodes of three primary colors RGB (red, green, blue) of light, and a rectangular lens on the entire surface of the light emitting diode. Thereby, the work manager can confirm the work progress status of the work area even from a relatively long distance. The emission color of the LED lamp 23 is preferably different depending on the progress of work. For example, the color is white when the work is waiting, blue when the work is in progress, yellow when the work is express, and red when the predetermined time has passed and the work is stagnant. Accordingly, a work manager who manages a plurality of work areas can determine which work area has a problem such as work delay by confirming the emission color of the LED lamp 23. Note that the LED lamp 23 may display characters or the like as an LED display type when it is necessary to display detailed information on the progress of work.

サーバ30(図1参照)は、複数の製造エリアからの作業実績情報を記憶し、作業実績情報を分析するサーバである。サーバ30は、指図発行装置10からの登録情報を、記憶部31に記憶する。また、サーバ30は、作業管理装置20からの情報、すなわち、通信開始情報、作業内容を特定する情報、通信終了情報を受信すると、記憶部31に記憶する。受信された情報には、年月日を含む時刻情報(タイムスタンプ)が付加されて記憶される。記憶部31に記憶される時刻情報には、通信開始情報に含まれる通信開始時刻、通信終了情報に含まれる通信終了時刻、及び受信された情報に付加される時刻情報(タイムスタンプ)がある。受信された情報に付加される時刻情報(タイムスタンプ)は、通信開始時刻及び通信終了時刻のバックアップとして利用してもよい。また、作業管理装置20から送付された情報に、時刻情報が含まれていない場合は、受信された情報に付加される時刻情報(タイムスタンプ)が、受信された情報の管理に利用される。サーバ30は、記憶部31の情報から、例えば、指図別の作業時間を演算し、演算結果を記憶部31に記憶する。   The server 30 (see FIG. 1) is a server that stores work performance information from a plurality of manufacturing areas and analyzes the work performance information. The server 30 stores the registration information from the instruction issuing device 10 in the storage unit 31. In addition, when the server 30 receives information from the work management device 20, that is, communication start information, information for specifying work contents, and communication end information, the server 30 stores the information in the storage unit 31. Time information (time stamp) including date is added to the received information and stored. The time information stored in the storage unit 31 includes a communication start time included in the communication start information, a communication end time included in the communication end information, and time information (time stamp) added to the received information. The time information (time stamp) added to the received information may be used as a backup of the communication start time and communication end time. When the time information is not included in the information sent from the work management apparatus 20, the time information (time stamp) added to the received information is used for managing the received information. For example, the server 30 calculates a work time for each instruction from the information in the storage unit 31 and stores the calculation result in the storage unit 31.

図3は、作業エリアの作業台の一例を示す外観斜視図である。作業台71の下部には、作業管理装置20が設置されている。作業管理ボックス21は、作業者が、指図50を作業開始時に投入、作業終了時に取出し容易なように、図面前方に傾斜している。これにより、作業者は、作業管理ボックス21内の指図50の有無も確認が容易になる。なお、作業管理ボックス21の投入口24は、略垂直で上方向にあることが好ましい。これにより、作業管理ボックス21の設置面積を最小化することができる。   FIG. 3 is an external perspective view showing an example of a work table in the work area. A work management device 20 is installed below the work table 71. The work management box 21 is inclined forward of the drawing so that the operator can easily input the instruction 50 at the start of the work and take it out at the end of the work. Thereby, the worker can easily confirm the presence / absence of the instruction 50 in the work management box 21. In addition, it is preferable that the insertion port 24 of the work management box 21 is substantially vertical and upward. Thereby, the installation area of the work management box 21 can be minimized.

作業台71の上部(上面)は、電子回路基板74の組立作業エリアであり、また、作業者の前方には、複数の部品箱72が設置されている。表示装置80は、作業補助台73の上部に設置されており、作業内容の情報が表示される。作業者は、表示装置80に表示された情報に従い、電子回路基板74の作業を行なう。   The upper part (upper surface) of the work table 71 is an assembly work area of the electronic circuit board 74, and a plurality of component boxes 72 are installed in front of the worker. The display device 80 is installed on the upper part of the work auxiliary stand 73 and displays work content information. The worker performs work on the electronic circuit board 74 according to the information displayed on the display device 80.

図4は、作業中に表示装置に表示される画面の例を示す説明図である。適宜図1〜図3を参照して説明する。表示装置80は、作業に関する情報を表示するものであり、スイッチ76の押下によって画面が切り替わり、また、ネットワーク40を経由してサーバ30と接続されている。サーバ30は、作業管理装置20から送信された作業を特定する情報を受信すると、表示装置80に、該当する作業内容を表示する。表示装置80には、指図番号81、指図内容82(組付けする製品・半製品の型番、品名及び員数(個数)を含む。)、組付指示情報83(手順及び作業内容)、工程ID84、作業者ID85、完成員数(完成個数)86、作業着手日時・作業終了日時87及び詳細作業時刻88が表示される。   FIG. 4 is an explanatory diagram illustrating an example of a screen displayed on the display device during work. This will be described with reference to FIGS. The display device 80 displays information related to work, and the screen is switched when the switch 76 is pressed, and is connected to the server 30 via the network 40. When the server 30 receives the information specifying the work transmitted from the work management apparatus 20, the server 30 displays the corresponding work content on the display device 80. The display device 80 includes an instruction number 81, instruction contents 82 (including the model number, product name, and number (number) of products and semi-finished products to be assembled), assembly instruction information 83 (procedure and work contents), process ID 84, A worker ID 85, the number of completed workers (completed number) 86, a work start date / time / work end date / time 87, and a detailed work time 88 are displayed.

指図番号81には、作業特定用ICタグ51に対応する作業内容を特定する情報(例えば、A0001)が表示される。また、指図内容82及び組付指示情報83には、指図番号81に関する詳細情報(手順、作業内容)が表示される。工程ID84には、工程を特定する情報(例えば、W0001)が表示される。作業者ID85には、作業者を特定する情報(例えば、M0001)が表示される。なお、作業者を特定する情報は、予めサーバ30の記憶部31に登録しておいてもよいし、あるいは、作業者を特定するためのICタグ(不図示)を作業者が作業管理ボックス21に投入することでサーバ30が認識し、作業者ID85に表示するようにしてもよい。   In the instruction number 81, information (for example, A0001) for specifying the work content corresponding to the work specifying IC tag 51 is displayed. Further, in the instruction content 82 and the assembly instruction information 83, detailed information (procedure, work content) regarding the instruction number 81 is displayed. In the process ID 84, information for specifying a process (for example, W0001) is displayed. In the worker ID 85, information for identifying the worker (for example, M0001) is displayed. The information for specifying the worker may be registered in advance in the storage unit 31 of the server 30, or the operator may provide an IC tag (not shown) for specifying the worker in the work management box 21. May be recognized by the server 30 and displayed on the worker ID 85.

作業着手日時・作業終了日時87には、指図50が作業管理ボックス21に投入された時刻、及び、作業管理ボックス21から取り出された時刻が表示される。完成員数86には、製作員数(ここでは8枚)のうち完成した数が表示される。詳細作業時刻88には、各手順の終了時刻が表示され、例えば、各手順の終了時にスイッチ76が押されると、その時刻を表示する。このようにして、作業者は、表示装置80の表示画面による作業内容の指示に従い、作業を確実に進めることができる。   In the work start date / time and the work end date / time 87, the time when the instruction 50 is input into the work management box 21 and the time when the instruction 50 is taken out from the work management box 21 are displayed. The number of completed members 86 indicates the number of completed members out of the number of production members (eight here). The detailed work time 88 displays the end time of each procedure. For example, when the switch 76 is pressed at the end of each procedure, the time is displayed. In this way, the worker can reliably proceed with the work in accordance with the work content instruction on the display screen of the display device 80.

図5は、サーバの記憶部に記憶される作業工程毎の作業実績を示す説明図である。指図毎の各リーダライタへの投入時刻や取出時刻などについて説明する。指図No毎に、指図50の作業管理ボックス21への投入時刻(作業開始)、作業管理ボックス21からの取出時刻(作業終了)、作業工程に関する情報、作業者に関する情報が記憶されている。図5によれば、例えば、全体の作業工程W0001のひとつである作業内容(指図No)A0001は、2006年5月10日に作業者M0001により、投入時刻9:00に作業を開始し、取出時刻9:35に終了していることがわかる。また、作業内容(指図No)A0002は、2006年5月10日に作業者M0002により、投入時刻9:50に作業を開始し、取出時刻10:40に作業を終了していることがわかる。   FIG. 5 is an explanatory diagram showing work results for each work process stored in the storage unit of the server. A description will be given of the insertion time and extraction time for each reader / writer for each instruction. For each instruction number, the time when the instruction 50 is put into the work management box 21 (work start), the time when the instruction 50 is taken out (work end), information regarding the work process, and information regarding the worker are stored. According to FIG. 5, for example, work content (instruction No.) A0001, which is one of the entire work processes W0001, is started by the worker M0001 on May 10, 2006 at the input time of 9:00 and taken out. It can be seen that the process ended at 9:35. Further, it can be seen that the work content (instruction No.) A0002 is started by the worker M0002 on May 10, 2006 at the input time 9:50 and finished at the take-off time 10:40.

次に、作業管理装置20の作業進捗状況の表示機能について説明する。
図6は、第1の実施形態における作業管理装置の作業進捗の表示手順を示すフローチャートである。作業管理装置20の電源が入ると、制御部26は、LEDランプ23に初期告知指令を出し、白色を点灯する(ステップS101)。なお、LEDランプ23は、点灯された発光色の保持回路(図示せず)により、次の告知指令が来るまで発光色を保持する。発光色の保持回路は、ここでは、LEDランプ23側にあるが、制御部26側にあってもよい。図3に示すように、作業エリアの作業者は、指図50が添付された電子回路基板74を受理すると、指図50を、作業台71下部に設置されている作業管理ボックス21の投入口24から投入する。ICタグリーダライタ25は、ICタグリーダライタ25内のアンテナ(図示せず)から制御信号を含む電波を所定時間毎に発信しており、指図の投入を検知したか否かを判定する(ステップS102)。なお、ステップS102において、制御信号を含む電波は、ICタグリーダライタ25内のアンテナ(図示せず)から連続的に発信しておいてもよい。
Next, the work progress display function of the work management apparatus 20 will be described.
FIG. 6 is a flowchart illustrating a procedure for displaying work progress of the work management apparatus according to the first embodiment. When the power of the work management apparatus 20 is turned on, the control unit 26 issues an initial notification command to the LED lamp 23 and turns on white (step S101). Note that the LED lamp 23 holds the emission color until a next notification command is received by a light emission color holding circuit (not shown). Here, the emission color holding circuit is on the LED lamp 23 side, but may be on the control unit 26 side. As shown in FIG. 3, when the worker in the work area receives the electronic circuit board 74 to which the instruction 50 is attached, the instruction 50 is transferred from the insertion port 24 of the work management box 21 installed at the lower part of the work table 71. throw into. The IC tag reader / writer 25 transmits a radio wave including a control signal from an antenna (not shown) in the IC tag reader / writer 25 every predetermined time, and determines whether or not the insertion of the instruction is detected (step S102). . In step S102, the radio wave including the control signal may be continuously transmitted from an antenna (not shown) in the IC tag reader / writer 25.

作業特定用ICタグ51内のアンテナがICタグリーダライタ25からの電波を受信すると、アンテナの共振作用により起電力を発生する。発生した電力により作業特定用ICタグ51内の回路が起動し、必要な処理を行なう。その処理結果を作業特定用ICタグ51側のアンテナから送信する。ICタグリーダライタ25は、ICタグリーダライタ25のアンテナで、送信された電波を受信し、指図50の投入を検知する(ステップS102,Yes)。ICタグリーダライタ25が、指図50の投入を検知できない場合(ステップS102,No)は、ステップS102を継続する。   When the antenna in the work identification IC tag 51 receives a radio wave from the IC tag reader / writer 25, an electromotive force is generated by the resonance action of the antenna. The generated electric power activates a circuit in the work identification IC tag 51 to perform necessary processing. The processing result is transmitted from the antenna on the work identification IC tag 51 side. The IC tag reader / writer 25 receives the transmitted radio wave with the antenna of the IC tag reader / writer 25 and detects the insertion of the instruction 50 (Yes in step S102). If the IC tag reader / writer 25 cannot detect the insertion of the instruction 50 (No at Step S102), Step S102 is continued.

ICタグリーダライタ25は、検知した作業特定用ICタグ51の情報を読み取り、制御部26は、通信部27及びネットワーク40を介してサーバ30に、ICタグ投入情報である作業特定用ICタグ51との通信開始情報と、作業内容を特定する情報とを送信する(ステップS103)。また、制御部26は、LEDランプ23に作業中告知指令を出し、青色を点灯する(ステップS104)。   The IC tag reader / writer 25 reads the detected information of the work specifying IC tag 51, and the control unit 26 sends the work specifying IC tag 51 as IC tag input information to the server 30 via the communication unit 27 and the network 40. Communication start information and information for specifying the work content are transmitted (step S103). In addition, the control unit 26 issues an in-operation notification command to the LED lamp 23 to light blue (step S104).

制御部26は、指図50の指図内容が他に優先して作業を行なうことが必要な特急作業の内容(特急指図)か否かを判定する(ステップS105)。ステップS105において、特急指図の場合(ステップS105,Yes)は、制御部26は、LEDランプ23に特急告知指令を出し、黄色を点灯する(ステップS106)。ステップS105において、特急指図でない場合(ステップS105,No)は、ステップS107へ進む。   The control unit 26 determines whether or not the instruction content of the instruction 50 is the content of the express work (express instruction) that needs to be performed with priority over others (step S105). In step S105, in the case of an express instruction (step S105, Yes), the control unit 26 issues an express notification instruction to the LED lamp 23 and turns on yellow (step S106). In step S105, when it is not an express instruction (step S105, No), it progresses to step S107.

制御部26は、作業時間(指図を投入した時刻からの経過時間)が所定時間以上であるか否かを判定する(ステップS107)。所定時間以上の場合(ステップS107,Yes)は、制御部26は、LEDランプ23に停滞告知指令を出し、赤色を点灯する(ステップS108)。所定時間以上でない場合(ステップS107,No)は、ステップS109へ進む。   The control unit 26 determines whether or not the work time (elapsed time from the time when the instruction is input) is equal to or longer than a predetermined time (step S107). If it is longer than the predetermined time (step S107, Yes), the control unit 26 issues a stagnation notification command to the LED lamp 23, and turns red (step S108). When it is not longer than the predetermined time (step S107, No), the process proceeds to step S109.

ステップS109において、ICタグリーダライタ25は、作業特定用ICタグ51との通信を所定時間毎に実施しており、通信が確認できている場合は、作業者が指図50を、作業管理ボックス21の投入口24から取り出したと検知せず(ステップS109,No)、ステップS107へ戻る。所定時間において通信が確認できない場合、作業者が指図50を、作業管理ボックス21の投入口24から取り出したと検知し(ステップS109,Yes)、ステップS110へ進む。   In step S109, the IC tag reader / writer 25 performs communication with the work specifying IC tag 51 every predetermined time, and when the communication is confirmed, the operator gives an instruction 50 to the work management box 21. It does not detect that it has been taken out from the insertion port 24 (No at Step S109) and returns to Step S107. When communication cannot be confirmed within a predetermined time, it is detected that the operator has taken the instruction 50 from the insertion port 24 of the work management box 21 (step S109, Yes), and the process proceeds to step S110.

制御部26は、ネットワーク40を介して、サーバ30にICタグ取出情報である作業特定用ICタグ51との通信終了情報と、作業内容を特定する情報とを送信する(ステップS110)。その後、制御部26は、ステップS101に戻り、LEDランプ23に初期告知指令を出し、白色を点灯する。   The control unit 26 transmits, to the server 30 via the network 40, communication end information with the work identification IC tag 51, which is IC tag extraction information, and information for identifying the work content (step S110). Thereafter, the control unit 26 returns to step S101, issues an initial notification command to the LED lamp 23, and lights up white.

本実施形態によれば、作業管理装置20は、作業内容を特定する情報が書き込まれた作業特定用ICタグ51を投入する作業管理ボックス21と、作業管理ボックス21に付設され、その作業管理ボックス21に投入されたICタグを検出してその情報を読み取るICタグリーダライタ25と、ICタグリーダライタ25の読取情報に基づいて作業の進捗を判定する制御部26と、制御部26の指令により作業の進捗を告知するLEDランプ23と、を有している。このため、作業者は、作業開始に際し、ICタグを作業管理ボックス21に投入するだけでよく、又、作業終了に際し、ICタグを、作業管理ボックス21から取り出すだけでよい。また、作業者は、ICタグを投入後の作業の進捗状況は、LEDランプ23で告知されるので、作業者及び作業の管理者などが、作業の状態を容易に把握することができる。さらに、ICタグの投入時刻と取出時刻が、サーバ30に記憶されるので、実質的な作業時間を収集することができる。   According to the present embodiment, the work management device 20 is attached to the work management box 21 into which the work identification IC tag 51 in which information for identifying the work content is written and the work management box 21 are provided. IC tag reader / writer 25 that detects the IC tag inserted into 21 and reads the information, control unit 26 that determines the progress of the operation based on the read information of IC tag reader / writer 25, And an LED lamp 23 for notifying the progress. For this reason, the worker only has to insert the IC tag into the work management box 21 at the start of the work, and only to take out the IC tag from the work management box 21 at the end of the work. Further, since the worker is notified of the progress of the work after the IC tag is inserted by the LED lamp 23, the worker and the manager of the work can easily grasp the state of the work. Furthermore, since the insertion time and removal time of the IC tag are stored in the server 30, substantial work time can be collected.

《第2の実施形態》
図7は、自立型作業管理装置を示す構成図である。図7に示される構成は、図1に示される構成に対して、作業管理装置20Aが、自立型のポールの上部に取り付けられており、作業エリアの近傍に設置される。また、作業管理装置20Aには、LEDランプが複数設置され、第1のLEDランプ23a、第2のLEDランプ23b、及び第3のLEDランプ23cを有している。これにより、複数の指図、例えば、指図50a及び指図50bに対して、夫々作業の進捗状況を、第1のLEDランプ23a及び第2のLEDランプ23bにより表示することができる。第3のLEDランプ23cは、過多の指図が、作業管理ボックス21に投入された場合に利用される。なお、指図50aには、作業特定用ICタグ51aが添付されており、指図50bには、作業特定用ICタグ51bが添付されている。図7において、図1に記載の同一構成品については同一番号を付しており、説明は省略する。
<< Second Embodiment >>
FIG. 7 is a configuration diagram showing a self-supporting work management apparatus. In the configuration shown in FIG. 7, the work management device 20 </ b> A is attached to the upper part of the self-supporting pole, and is installed in the vicinity of the work area, compared to the configuration shown in FIG. The work management apparatus 20A includes a plurality of LED lamps, and includes a first LED lamp 23a, a second LED lamp 23b, and a third LED lamp 23c. Thereby, the progress of work can be displayed on the plurality of instructions, for example, the instruction 50a and the instruction 50b, by the first LED lamp 23a and the second LED lamp 23b. The third LED lamp 23c is used when an excessive instruction is input to the work management box 21. Note that a work identification IC tag 51a is attached to the instruction 50a, and a work identification IC tag 51b is attached to the instruction 50b. In FIG. 7, the same components as those shown in FIG.

図8は、第2の実施形態における作業管理装置の作業進捗の表示手順を示すフローチャートである。図8(a)は、初期設定フローチャートであり、図8(b)は、指図の投入検知フローチャートであり、図8(c)は、指図の取出し検知フローチャートである。図8(b)と図8(c)は、所定時間経過毎及び外部からの指令などにより、随時切換えられる。ここでは、切換えの所定時間経過毎による切換えとして説明する。また、図8のフローチャートの説明においては、最初に、複数の指図と複数のLEDランプの一例として指図50とLEDランプ23として説明し、そののち具体的な動作例において、複数の指図(指図50a、指図50b)と、複数のLEDランプ(第1のLEDランプ23a、第2のLEDランプ23b、及び第3のLEDランプ23c)との関係を含めて動作例を説明する。   FIG. 8 is a flowchart showing a work progress display procedure of the work management apparatus according to the second embodiment. 8A is an initial setting flowchart, FIG. 8B is an instruction insertion detection flowchart, and FIG. 8C is an instruction extraction detection flowchart. FIG. 8B and FIG. 8C are switched at any time after elapse of a predetermined time and according to a command from the outside. Here, the switching will be described as switching every predetermined time. In the description of the flowchart of FIG. 8, first, an instruction 50 and an LED lamp 23 will be described as an example of a plurality of instructions and a plurality of LED lamps, and then a plurality of instructions (instructions 50a) in a specific operation example. The operation example including the relationship between the instruction 50b) and the plurality of LED lamps (the first LED lamp 23a, the second LED lamp 23b, and the third LED lamp 23c) will be described.

図8(a)において、作業管理装置20Aの電源が入ると、制御部26は、LEDランプ23に初期告知指令を出し、白色を点灯する(ステップS201)。その後、作業管理ボックス21への指図の投入数を「0」(零)に初期化し(ステップS202)、図8(b)の処理へ進む(ステップS203)。   In FIG. 8A, when the power of the work management apparatus 20A is turned on, the control unit 26 issues an initial notification command to the LED lamp 23 and turns on white (step S201). Thereafter, the number of instructions input to the work management box 21 is initialized to “0” (zero) (step S202), and the process proceeds to the process of FIG. 8B (step S203).

図8(b)において、制御部26は、作業管理ボックス21への指図の投入数を設定する(ステップS204)。最初、指図の投入数は、ステップS202の初期値の値が引継がれる。制御部26は、指図の投入検知を継続(検知継続)するか否かを判定する(ステップS205)。投入検知が切換えの所定時間未満であれば、投入検知を継続する(ステップS205,Yes)。ICタグリーダライタ25は、ICタグリーダライタ25内のアンテナ(図示せず)から制御信号を含む電波を所定時間毎に発信しており、指図の投入を検知したか否かを判定する(ステップS207)。一方、投入検知が切換えの所定時間以上であれば(ステップS205,No)、図8(c)の処理へ切換える(ステップS206)。   In FIG. 8B, the control unit 26 sets the number of instructions input to the work management box 21 (step S204). Initially, the initial value in step S202 is inherited as the number of orders input. The control unit 26 determines whether or not to continue the instruction insertion detection (continuation of detection) (step S205). If the input detection is less than the predetermined switching time, the input detection is continued (Yes in step S205). The IC tag reader / writer 25 transmits a radio wave including a control signal from an antenna (not shown) in the IC tag reader / writer 25 every predetermined time, and determines whether or not the insertion of an instruction is detected (step S207). . On the other hand, if the input detection is longer than the predetermined switching time (No at Step S205), the process is switched to the process of FIG. 8C (Step S206).

ICタグリーダライタ25は、ICタグリーダライタ25のアンテナで、作業特定用ICタグ51のアンテナから送信された電波を受信し、指図50の投入を検知した場合(ステップS207,Yes)、ステップS208へ進む。ICタグリーダライタ25が、指図50の投入を検知できない場合(ステップS207,No)は、ステップS205へ戻る。   When the IC tag reader / writer 25 receives the radio wave transmitted from the antenna of the IC tag reader 51 for work identification with the antenna of the IC tag reader / writer 25 and detects the insertion of the instruction 50 (Yes in step S207), the IC tag reader / writer 25 proceeds to step S208. . If the IC tag reader / writer 25 cannot detect the insertion of the instruction 50 (No at Step S207), the process returns to Step S205.

ステップS208において、ICタグリーダライタ25は、検知した作業特定用ICタグ51の情報を読み取る。制御部26は、通信部27及びネットワーク40を介して、サーバ30に、ICタグ投入情報である作業特定用ICタグ51との通信開始情報と、作業内容を特定する情報とを送信し(ステップS208)、ステップS209へ進む。さらに、制御部26は、LEDランプ23に作業中告知指令を出し、青色を点灯し(ステップS209)、ステップ210へ進む。   In step S208, the IC tag reader / writer 25 reads the detected information of the work specifying IC tag 51. The control unit 26 transmits, to the server 30 via the communication unit 27 and the network 40, communication start information with the work specifying IC tag 51, which is IC tag input information, and information for specifying the work content (step). S208), the process proceeds to step S209. Further, the control unit 26 issues an in-operation notification command to the LED lamp 23, turns on blue (step S209), and proceeds to step 210.

ステップS210において、制御部26は、指図50の指図内容が特急作業の内容か否かを判定する。特急作業の場合(ステップ210,Yes)、制御部26は、LEDランプ23に特急告知指令を出し、黄色を点灯し(ステップS211)、ステップS212へ進む。特急作業でない場合(ステップS210,No)、ステップS212へ進む。   In step S210, the control unit 26 determines whether or not the instruction content of the instruction 50 is the content of the express work. In the case of limited express work (step 210, Yes), the control unit 26 issues a special express notification command to the LED lamp 23, turns yellow (step S211), and proceeds to step S212. If it is not the express work (No at Step S210), the process proceeds to Step S212.

制御部26は、指図の投入数に「1」を加算し(ステップS212)、指図の投入数が、所定値(つまり適正指図許容数)「N」を超えているか否かを判定する(ステップS213)。指図の投入数が「N」を超えている場合(ステップS213,Yes)、制御部26は、LEDランプ23に過多告知指令を出し、赤色を点滅する(ステップS214)。そして、図8(c)の処理へ切換える(ステップS215)。指図の投入数が、所定値「N」を超えていない場合(ステップS213,No)、ステップS205へ戻る。   The control unit 26 adds “1” to the number of instructions inserted (step S212), and determines whether the number of instructions inserted exceeds a predetermined value (that is, the allowable number of appropriate instructions) “N” (step S212). S213). When the number of instructions input exceeds “N” (step S213, Yes), the control unit 26 issues an excessive notification command to the LED lamp 23 and blinks red (step S214). And it switches to the process of FIG.8 (c) (step S215). If the number of orders input does not exceed the predetermined value “N” (step S213, No), the process returns to step S205.

図8(c)の処理に切換えられると、制御部26は、作業管理ボックス21への指図の投入数を設定する(ステップS220)。指図の投入数は、図8(b)の処理での指図の投入数の値が引継がれる。制御部26は、指図の取出しの検知を継続するか否かを判定する(ステップS221)。取出しの検知が切換えの所定時間未満であれば、取出しの検知を継続し(ステップS221,Yes)、投入されたICタグ(各ID)に対して、作業時間(指図を投入した時刻からの経過時間)が所定時間以上であるか否かを判定する(ステップS223)。投入時間が所定時間以上である場合(ステップS223,Yes)、制御部26は、LEDランプ23に停滞告知指令を出し、赤色を点灯し(ステップS224)、ステップS225へ進む。投入時間が所定時間未満である場合(ステップS223,No)、ステップS225へ進む。一方、取出し検知が切換えの所定時間以上であれば(ステップS221,No)、図8(b)の処理へ切換える(ステップS222)。   When the process is switched to the process of FIG. 8C, the control unit 26 sets the number of instructions input to the work management box 21 (step S220). As the number of inputs of instructions, the value of the number of inputs of instructions in the process of FIG. 8B is taken over. The control unit 26 determines whether or not to continue detecting detection of an instruction (step S221). If the detection of the removal is less than the predetermined switching time, the detection of the removal is continued (step S221, Yes), and the working time (elapsed from the time when the instruction was input) is applied to the inserted IC tag (each ID). It is determined whether or not (time) is equal to or longer than a predetermined time (step S223). When the charging time is equal to or longer than the predetermined time (step S223, Yes), the control unit 26 issues a stagnation notification command to the LED lamp 23, lights up red (step S224), and proceeds to step S225. When the input time is less than the predetermined time (step S223, No), the process proceeds to step S225. On the other hand, if the removal detection is longer than the predetermined switching time (step S221, No), the process is switched to the process of FIG. 8B (step S222).

ステップS225において、ICタグリーダライタ25は、作業特定用ICタグ51との通信を所定時間毎に実施しており、通信が確認できている場合は、作業者が指図50を、作業管理ボックス21の投入口24から取り出したと検知せず(ステップS225,No)、ステップS221へ戻る。所定時間において通信が確認できない場合、作業者が指図50を、作業管理ボックス21の投入口24から取り出したと検知し(ステップS225,Yes)、ステップS226へ進む。   In step S225, the IC tag reader / writer 25 performs communication with the work specifying IC tag 51 every predetermined time, and when the communication is confirmed, the operator gives the instruction 50 to the work management box 21. It does not detect that it has been taken out from the insertion port 24 (step S225, No), and returns to step S221. If communication cannot be confirmed within a predetermined time, it is detected that the operator has taken the instruction 50 from the insertion port 24 of the work management box 21 (step S225, Yes), and the process proceeds to step S226.

制御部26は、サーバ30に、ICタグ取出情報である作業特定用ICタグ51との通信終了情報と、作業内容を特定する情報とを送信する(ステップS226)。その後、制御部26は、LEDランプ23に初期告知指令を出し、白色を点灯し(ステップS227)、指図の投入数から「1」を減算する(ステップS228)。   The control unit 26 transmits to the server 30 information on the end of communication with the work specifying IC tag 51, which is IC tag extraction information, and information specifying the work content (step S226). Thereafter, the control unit 26 issues an initial notification command to the LED lamp 23, turns on white (step S227), and subtracts “1” from the number of orders input (step S228).

ステップS229において、制御部26は、指図の投入数が「0」であるか否かを判定する。指図の投入数が「0」である場合(ステップS229,Yes)、図8(b)の処理へ切換える(ステップS230)。指図の投入数が「0」でない場合(ステップS229,No)、ステップS221へ戻る。   In step S229, the control unit 26 determines whether or not the number of orders input is “0”. If the number of instructions input is “0” (step S229, Yes), the processing is switched to the processing of FIG. 8B (step S230). If the number of orders input is not “0” (step S229, No), the process returns to step S221.

次に、フローチャートの具体的な動作例について説明する。詳細な手順は、すでに図8で説明した。ここでは、LEDランプの点灯の状態を中心に説明し、他の手順の説明は随時省略する。作業管理ボックス21に、指図50aが投入され、次に特急指図である指図50bが投入され、さらに指図50c(図示せず)が投入されたとして説明する。なお、所定値(適正指図許容数)「N」は「2」とし、制御部26は、投入数が「2」を超えている場合は過多告知指令を出すとする。   Next, a specific operation example of the flowchart will be described. The detailed procedure has already been described with reference to FIG. Here, it demonstrates centering on the lighting state of an LED lamp, and description of another procedure is abbreviate | omitted at any time. In the following description, it is assumed that an instruction 50a is input to the work management box 21, an instruction 50b that is an express instruction is input, and an instruction 50c (not shown) is input. It is assumed that the predetermined value (allowable instruction allowable number) “N” is “2”, and that the control unit 26 issues an excessive notification command when the number of inputs exceeds “2”.

ステップS202のとき、第1のLEDランプ23a、第2のLEDランプ23b及び第3のLEDランプ23cが、白色に点灯される。指図50aが投入されると、指図(ICタグ)の投入の検知が判定され(ステップS207,Yes)、第1のLEDランプ23aが青色に点灯される(ステップS209)。特急指図でないので、ステップ212へ進む。投入数に「1」が加算され(ステップS212)、投入数は「1」となる(ステップS213,No)ので、ステップS205へ戻る。   In step S202, the first LED lamp 23a, the second LED lamp 23b, and the third LED lamp 23c are lit white. When the instruction 50a is inserted, the detection of the insertion of the instruction (IC tag) is determined (step S207, Yes), and the first LED lamp 23a is lit in blue (step S209). Since it is not an express instruction, the process proceeds to step 212. “1” is added to the number of inputs (step S212), and the number of inputs becomes “1” (step S213, No), and the process returns to step S205.

続いて指図50bが投入されると、指図(ICタグ)の投入の検知が判定され(ステップS207,Yes)、第2のLEDランプ23bが青色に点灯される(ステップS209)。特急指図であると判定され(ステップS210,Yes)、第2のLEDランプ23bが黄色に点灯される(ステップS211)。投入数に「1」が加算され(ステップS212)、投入数は「2」となる(ステップS213,No)ので、ステップS205へ戻る。   Subsequently, when the instruction 50b is input, it is determined whether the instruction (IC tag) is input (step S207, Yes), and the second LED lamp 23b is lit in blue (step S209). It is determined that the instruction is an express instruction (step S210, Yes), and the second LED lamp 23b is lit in yellow (step S211). “1” is added to the number of inputs (step S212), and the number of inputs becomes “2” (No in step S213), so the process returns to step S205.

さらに、続いて指図50cが投入されると、指図(ICタグ)の投入の検知が判定され(ステップS207,Yes)、第3のLEDランプ23bが青色に点灯される(ステップS209)。特急指図でないので、ステップ212へ進む。投入数に「1」が加算され(ステップS212)、投入数は「3」となる(ステップS213,Yes)ので、第3のLEDランプ23bが赤色に点滅され、ステップS205へ戻る。この時点においては、第1のLEDランプ23aが青色に点灯され、第2のLEDランプ23bが黄色に点灯され、及び第3のLEDランプ23cが赤色に点滅されている。   Further, when the instruction 50c is subsequently input, it is determined whether the instruction (IC tag) has been input (step S207, Yes), and the third LED lamp 23b is lit in blue (step S209). Since it is not an express instruction, the process proceeds to step 212. Since “1” is added to the number of inputs (step S212) and the number of inputs becomes “3” (step S213, Yes), the third LED lamp 23b blinks red, and the process returns to step S205. At this time, the first LED lamp 23a is lit in blue, the second LED lamp 23b is lit in yellow, and the third LED lamp 23c is blinking in red.

その後、作業管理ボックス21から、指図50cが取出され、さらに指図50bが取出されたが、指図50aが所定時間以上放置されたとして説明する。   Thereafter, the instruction 50c is taken out from the work management box 21, and further, the instruction 50b is taken out. It is assumed that the instruction 50a is left for a predetermined time or more.

所定時間内に指図50cが取出されると、指図(ICタグ)の取出しの検知が判定され(ステップS225,Yes)、第3のLEDランプ23cが白色に点灯される(ステップS227)。投入数から「1」が減算され(ステップS228)、投入数は「2」となり、「0」でないので(ステップS229,No)ので、ステップS221へ戻る。   When the instruction 50c is taken out within a predetermined time, it is determined whether the instruction (IC tag) is taken out (step S225, Yes), and the third LED lamp 23c is lit in white (step S227). “1” is subtracted from the number of inputs (step S228), and the number of inputs becomes “2”, which is not “0” (No in step S229), so the process returns to step S221.

続いて、所定時間内に指図50bが取出されると、指図(ICタグ)の投入の検知が判定され(ステップS225,Yes)、第2のLEDランプ23bが白色に点灯される(ステップS227)。投入数から「1」が減算され(ステップS228)、投入数は「1」となり、「0」でないので(ステップS229,No)、ステップS221へ戻る。   Subsequently, when the instruction 50b is taken out within a predetermined time, it is determined that the instruction (IC tag) has been inserted (step S225, Yes), and the second LED lamp 23b is lit in white (step S227). . “1” is subtracted from the number of inputs (step S228), and the number of inputs becomes “1”, which is not “0” (No in step S229), and the process returns to step S221.

さらに続いて、指図50aが所定時間以上放置されると、各IDに対して所定時間以上だと判定され(ステップS223,Yes)、第1のLEDランプ23aが赤色に点灯される(ステップS224)。この時点においては、第1のLEDランプ23aが赤色に点灯され、第2のLEDランプ23bが白色に点灯され、及び第3のLEDランプ23cが白色に点灯されている。   Subsequently, when the instruction 50a is left for a predetermined time or longer, it is determined that the predetermined time or longer for each ID (step S223, Yes), and the first LED lamp 23a is lit red (step S224). . At this time, the first LED lamp 23a is lit red, the second LED lamp 23b is lit white, and the third LED lamp 23c is lit white.

本実施形態によれば、作業者又は作業管理者などは、図7の作業管理装置20AのLEDランプ23a,23b,23cの発光色により、何枚の指図が入っているか、作業中(青色点灯)、作業停滞(赤色点灯)、作業完了(白色点灯)、特急作業(黄色点灯)、作業過多(赤色点滅)のいずれかの作業進捗状況を、ひと目で確認することができる。   According to the present embodiment, an operator, a work manager, or the like determines how many instructions are entered or is working (blue lighted) by the light emission colors of the LED lamps 23a, 23b, and 23c of the work management apparatus 20A in FIG. ), Work stagnation (red lighting), work completion (white lighting), express work (yellow lighting), excessive work (red flashing), can be confirmed at a glance.

《第3の実施形態》
図9は、ピッキング台車に作業管理装置を設置した場合を示す構成図である。ピッキング台車60は、組立工程で必要な部品をピッキングするときに用いる台車である。図9には、電子回路基板74が入ったワークケース61がピッキングされている状態が示されている。ピッキング台車60の側面には、作業管理装置20Bが設置されている。図9の作業管理装置20Bは、図1の作業管理装置20と同様であるが、台車特定用ICタグ52が、作業管理ボックス21に設置されている。ピッキング台車60に作業管理装置20Bを設置することにより、ピッキング作業の作業進捗状況を、LEDランプ23に表示することができる。また、ピッキング指図の内容と、ピッキングした部品が一致しないなどのピッキング指図内容との不一致が生じた場合に、警告表示することができる。なお、図1に記載の同一構成品については、同一番号を付しており、説明は省略する。
<< Third Embodiment >>
FIG. 9 is a configuration diagram illustrating a case where a work management device is installed in the picking cart. The picking cart 60 is a cart used when picking parts necessary for the assembly process. FIG. 9 shows a state where the work case 61 containing the electronic circuit board 74 is picked. A work management device 20 </ b> B is installed on the side surface of the picking cart 60. The work management apparatus 20B of FIG. 9 is the same as the work management apparatus 20 of FIG. 1, but a cart identification IC tag 52 is installed in the work management box 21. By installing the work management device 20 </ b> B on the picking cart 60, the work progress status of the picking work can be displayed on the LED lamp 23. In addition, a warning can be displayed when there is a discrepancy between the picking instruction content and the picking instruction content such that the picked parts do not match. In addition, about the same component described in FIG. 1, the same number is attached | subjected and description is abbreviate | omitted.

図10は、第3の実施形態における作業管理装置の作業進捗の表示手順を示すフローチャートである。なお、図6のフローチャートと同一機能については、同一番号を付しており、説明を簡略化する。作業管理装置20Bの電源が入ると、制御部26は、LEDランプ23に初期告知指令を出し、白色を点灯する(ステップS101)。ピッキング作業者が、ピッキング指図を、作業管理ボックス21に投入すると、ICタグリーダライタ25がピッキング指図の投入を検知する(ステップS102,Yes)。ICタグリーダライタ25がピッキング指図の投入を検知しない場合(ステップS102,No)、ステップS102へ戻る。   FIG. 10 is a flowchart illustrating a procedure for displaying the work progress of the work management apparatus according to the third embodiment. The same functions as those in the flowchart of FIG. 6 are denoted by the same reference numerals, and the description will be simplified. When the power of the work management apparatus 20B is turned on, the control unit 26 issues an initial notification command to the LED lamp 23 and turns on white (step S101). When the picking operator inputs a picking instruction into the work management box 21, the IC tag reader / writer 25 detects the input of the picking instruction (Yes in step S102). When the IC tag reader / writer 25 does not detect the insertion of the picking instruction (No at Step S102), the process returns to Step S102.

ICタグリーダライタ25は、検知したピッキング指図の添付されているICタグの情報を読み取り、制御部26は、通信部27を介してサーバ30に、通信開始情報と、作業内容を特定する情報とを送信する(ステップS103)。制御部26は、LEDランプ23に作業中告知指令を出し、青色を点灯する(ステップS104)。   The IC tag reader / writer 25 reads the information of the IC tag to which the detected picking instruction is attached, and the control unit 26 sends the communication start information and information for specifying the work content to the server 30 via the communication unit 27. Transmit (step S103). The control unit 26 issues an in-work notification command to the LED lamp 23 to light blue (step S104).

制御部26は、ピッキング指図内容が特急作業の内容か否かを判定する(ステップS105)。ステップS105において、特急作業の場合(ステップS105,Yes)は、制御部26は、LEDランプ23に特急告知指令を出し、黄色を点灯する(ステップS106)。ステップS105において、特急作業でない場合(ステップS105,No)は、ステップS107へ進む。   The control unit 26 determines whether the picking instruction content is the content of the express work (step S105). In step S105, in the case of express work (step S105, Yes), the control unit 26 issues an express notification instruction to the LED lamp 23 and turns on yellow (step S106). In step S105, if it is not the express work (step S105, No), the process proceeds to step S107.

制御部26は、作業時間(指図を投入した時刻からの経過時間)が所定時間以上であるか否かを判定する(ステップS107)。所定時間以上の場合(ステップS107,Yes)は、制御部26は、LEDランプ23に停滞告知指令を出し、赤色を点灯する(ステップS108)。所定時間以上でない場合(ステップS107,No)は、ステップS301へ進む。   The control unit 26 determines whether or not the work time (elapsed time from the time when the instruction is input) is equal to or longer than a predetermined time (step S107). If it is longer than the predetermined time (step S107, Yes), the control unit 26 issues a stagnation notification command to the LED lamp 23, and turns red (step S108). When it is not longer than the predetermined time (step S107, No), the process proceeds to step S301.

ピッキング作業者は、ピッキングした部品のICタグを、作業管理ボックス21に投入する。ステップS301において、制御部26は、ピッキング指図の指定されたピッキング部品IDの一覧中に、ピッキングした部品のICタグから読み込まれた部品IDがあるか否かを判定する。作業内容が一致しない(部品IDが一致しない)場合(ステップS301,Yes)、制御部26は、LEDランプ23に警告告知指令を出し、赤色を点滅する(ステップS302)。作業内容が一致する(ピッキング指図のピッキング部品IDの一覧中に、ピッキングした部品IDがある)場合(ステップS301,No)、ステップS303へ進む。制御部26は、全てのピッキング作業が完了したか否かを判定する(ステップS303)。具体的には、作業完了の判定は、ピッキング指図で指示されているピッキング部品IDの一覧について全てのピッキングした部品IDがあるか否かで判定する。ピッキング作業が完了していない場合(ステップS303,No)は、ステップS107へ戻る。ピッキング作業が完了した場合(ステップS303,Yes)は、ステップS304へ進む。   The picking operator puts the IC tag of the picked part into the work management box 21. In step S301, the control unit 26 determines whether or not there is a part ID read from the IC tag of the picked part in the list of picking part IDs specified in the picking instruction. When the work contents do not match (part IDs do not match) (step S301, Yes), the control unit 26 issues a warning notification command to the LED lamp 23 and blinks red (step S302). When the work contents match (the picked component ID is in the picking component ID list of the picking instruction) (No in step S301), the process proceeds to step S303. The control unit 26 determines whether all picking operations have been completed (step S303). Specifically, the completion of the work is determined based on whether or not there is all picked component IDs in the list of picking component IDs designated by the picking instruction. If the picking operation has not been completed (No at Step S303), the process returns to Step S107. When the picking work is completed (step S303, Yes), the process proceeds to step S304.

制御部26は、LEDランプ23に作業完了告知指令を出し、緑色を点灯する(ステップS304)。制御部26は、サーバ30に、作業完了情報を送信する(ステップS305)。   The control unit 26 issues a work completion notification command to the LED lamp 23 and turns on green (step S304). The control unit 26 transmits work completion information to the server 30 (step S305).

本実施形態によれば、ピッキング作業者又は作業管理者などは、図9の作業管理装置20BのLEDランプ23の発光色により、作業中(青色点灯)、作業停滞(赤色点灯)、作業完了(緑色点灯)、特急作業(黄色点灯)、作業不一致(赤色点滅)のいずれかの作業進捗状況を、ひと目で確認することができる。   According to the present embodiment, a picking worker, a work manager, or the like is working (blue lighted), work stagnant (red lighted), and work completed (lighted red) by the light emission color of the LED lamp 23 of the work management apparatus 20B of FIG. It is possible to confirm at a glance the progress of any of the following operations: green lighting), express work (yellow lighting), or work disagreement (red blinking).

図11は、ピッキング台車がピッキング台車ストックエリアに配置された場合の手順を示す説明図である。ピッキング作業者は、ピッキング作業を完了すると、所定のピッキング台車ストックエリア90に移動する。この場合、ピッキング台車が所定のピッキング台車ストックエリア90に配置されたことを、サーバ30に通知する必要がある。   FIG. 11 is an explanatory diagram showing a procedure when the picking cart is arranged in the picking cart stock area. When completing the picking work, the picking worker moves to a predetermined picking cart stock area 90. In this case, it is necessary to notify the server 30 that the picking cart is arranged in the predetermined picking cart stock area 90.

図11(a)は、ピッキング台車ストックエリア90の近傍に、自立式のタグ管理ボックス91が設置されている場合である。タグ管理ボックス91には、ピッキング台車ストックエリア90のエリア位置を記憶したICタグが添付された作業エリア指図53が入れられている。ピッキング作業者は、ピッキング作業完了後、ピッキング台車ストックエリア90の所定位置に配置し、タグ管理ボックス91から、作業エリア指図53を取出し、作業管理ボックス21に投入する。すると、ICタグリーダライタ25は、作業エリア指図53に添付されたICタグの情報を読取り、制御部26は、サーバ30へ、エリア位置情報、台車番号情報、時刻情報を送信する。   FIG. 11A shows a case where a self-supporting tag management box 91 is installed in the vicinity of the picking cart stock area 90. The tag management box 91 stores a work area instruction 53 to which an IC tag storing the area position of the picking cart stock area 90 is attached. After completing the picking work, the picking worker places the picking cart at a predetermined position in the picking cart stock area 90, takes out the work area instruction 53 from the tag management box 91, and puts it in the work management box 21. Then, the IC tag reader / writer 25 reads the information of the IC tag attached to the work area instruction 53, and the control unit 26 transmits area position information, cart number information, and time information to the server 30.

図11(b)は、ピッキング台車ストックエリア90の近傍に、ピッキング台車60の台車特定用ICタグ52を読み取るICタグリーダライタ92が設置されている場合である。ピッキング作業者は、ピッキング作業完了後、ピッキング台車ストックエリア90の所定位置に配置する。すると、ICタグリーダライタ92は、台車特定用ICタグ52の情報を読取り、サーバ30へ、エリア位置情報、台車番号情報、時刻情報を送信する。本実施形態によれば、ピッキング台車60が、ピッキング台車ストックエリア90の所定位置に配置されたことを、サーバ30に自動的に送信することができる。   FIG. 11B shows a case where an IC tag reader / writer 92 that reads the cart identification IC tag 52 of the picking cart 60 is installed in the vicinity of the picking cart stock area 90. After completing the picking work, the picking worker places the picking work person at a predetermined position in the picking cart stock area 90. Then, the IC tag reader / writer 92 reads information on the cart identification IC tag 52 and transmits area position information, cart number information, and time information to the server 30. According to this embodiment, it can be automatically transmitted to the server 30 that the picking cart 60 is disposed at a predetermined position in the picking cart stock area 90.

作業管理システム及び作業管理装置を示す構成図である。It is a block diagram which shows a work management system and a work management apparatus. 作業管理装置の構成を示すブロック図である。It is a block diagram which shows the structure of a work management apparatus. 作業エリアの作業台の一例を示す外観斜視図である。It is an external appearance perspective view which shows an example of the work table of a work area. 作業中に表示装置に表示される画面の例を示す説明図である。It is explanatory drawing which shows the example of the screen displayed on a display apparatus during work. サーバの記憶部に記憶される作業工程毎の作業実績を示す説明図である。It is explanatory drawing which shows the work performance for every work process memorize | stored in the memory | storage part of a server. 第1の実施形態における作業管理装置の作業進捗の表示手順を示すフローチャートである。It is a flowchart which shows the display procedure of the work progress of the work management apparatus in 1st Embodiment. 自立型作業管理装置を示す構成図である。It is a block diagram which shows a self-supporting work management apparatus. 第2の実施形態における作業管理装置の作業進捗の表示手順を示すフローチャートである。It is a flowchart which shows the display procedure of the work progress of the work management apparatus in 2nd Embodiment. ピッキング台車に作業管理装置を設置した場合を示す構成図である。It is a block diagram which shows the case where the work management apparatus is installed in the picking cart. 第3の実施形態における作業管理装置の作業進捗の表示手順を示すフローチャートである。It is a flowchart which shows the display procedure of the work progress of the work management apparatus in 3rd Embodiment. ピッキング台車がピッキング台車ストックエリアに配置された場合の手順を示す説明図である。It is explanatory drawing which shows the procedure in case a picking cart is arrange | positioned in the picking cart stock area.

符号の説明Explanation of symbols

10 指図発行装置
12 指図発行部
20,20A,20B 作業管理装置
21 作業管理ボックス
22 作業管理装置本体
23 LEDランプ
23a 第1のLEDランプ
23b 第2のLEDランプ
23c 第3のLEDランプ
24 投入口
25 ICタグリーダライタ
26 制御部
27 通信部
28 入力部
30 サーバ
31 記憶部
40 ネットワーク
50 指図
51 作業特定用ICタグ
60 ピッキング台車
90 ピッキング台車ストックエリア
100 作業管理システム
DESCRIPTION OF SYMBOLS 10 Instruction issuing device 12 Instruction issuing part 20, 20A, 20B Work management apparatus 21 Work management box 22 Work management apparatus main body 23 LED lamp 23a 1st LED lamp 23b 2nd LED lamp 23c 3rd LED lamp 24 Slot 25 IC tag reader / writer 26 Control unit 27 Communication unit 28 Input unit 30 Server 31 Storage unit 40 Network 50 Instruction 51 Work identification IC tag 60 Picking cart 90 Picking cart stock area 100 Work management system

Claims (4)

作業の進捗を管理する作業管理装置であって、
作業内容を特定する情報が書き込まれたICタグを置く置き場所に付設され、その置き場所に置かれた前記ICタグを検出してその情報を読み取るICタグ読取手段と、
前記ICタグ読取手段の読取情報に基づいて作業の進捗を判定する作業進捗判定手段と、
前記作業進捗判定手段の指令により前記作業の進捗を告知する複数のランプで構成される告知手段と、を備え、
前記作業進捗判定手段は、
前記ICタグ読取手段によりICタグとの通信ができたときは作業中、前記ICタグとの通信開始時刻から所定時間以上経過したときは作業停滞、前記ICタグ読取手段により前記ICタグとの通信が断絶したときは作業完了、及び前記ICタグの読取情報に他に優先して作業が行なう情報があるときは特急作業であると作業進捗状況を判定し、
前記ICタグ読取手段により前記ICタグとの通信中の員数を検知し、前記通信中の員数が予め記憶されている所定員数以上の員数であるときは過多作業であると判定し、
前記告知手段に該当する判定結果を指令する際に、
前記複数のICタグのうち先に読み込んだ第1のICタグの判定結果を、前記複数のランプのうち第1のランプに指令し、
前記複数のICタグのうち次に読み込んだ第2のICタグの判定結果を、前記複数のランプのうち第2のランプに指令するとともに、
前記過多作業の判定結果を前記複数のランプのうち第3のランプに指令する
ことを特徴とする作業管理装置。
A work management device for managing the progress of work,
IC tag reading means attached to a place where an IC tag in which information specifying work content is written is placed, detecting the IC tag placed in the place and reading the information;
Work progress determination means for determining work progress based on the read information of the IC tag reading means;
Notification means composed of a plurality of lamps for notifying the progress of the work according to the command of the work progress determination means ,
The work progress determination means includes
When the IC tag reading means can communicate with the IC tag, the work is in progress. When a predetermined time or more has elapsed from the communication start time with the IC tag, the work is stagnant. The IC tag reading means communicates with the IC tag. When there is information that the work is completed when there is disconnection, and when there is information that the work is prioritized in the reading information of the IC tag, it is determined that the work progress is an express work,
Detecting the number of communicating with the IC tag by the IC tag reading means, and determining that the number of communicating is more than a predetermined number stored in advance is excessive work,
When commanding the determination result corresponding to the notification means,
The determination result of the first IC tag read first among the plurality of IC tags is instructed to the first lamp among the plurality of lamps,
Instructing the determination result of the second IC tag read next out of the plurality of IC tags to the second lamp among the plurality of lamps,
A work management device that commands a determination result of the excessive work to a third lamp among the plurality of lamps .
前記作業進捗判定手段は、前記告知手段に前記作業進捗状況の作業内容に応じて異なる色を指定して指令する
ことを特徴とする請求項に記載の作業管理装置。
The work management apparatus according to claim 1 , wherein the work progress determination unit instructs the notification unit by designating a different color according to the work content of the work progress status.
作業の実績を入力する入力手段を作業場所に備えるとともに、前記入力手段により入力された作業実績を記憶するサーバを任意の場所に備え、作業員の所定の動作に対応して、入力される情報に基づいて作業実績情報を収集する作業管理システムであって、
前記入力手段は、請求項1又は請求項に記載の作業管理装置である
ことを特徴とする作業管理システム。
Information to be input corresponding to a predetermined operation of a worker, provided with an input means for inputting a work result at a work place, and a server for storing the work result inputted by the input means at an arbitrary place. A work management system that collects work performance information based on
It said input means, work management system, which is a service management apparatus according to claim 1 or claim 2.
作業内容を特定する情報が書き込まれたICタグを置く置き場所に付設され、その置き場所に置かれた前記ICタグを検出してその情報を読み取るICタグ読取手段と、前記ICタグ読取手段の読取情報に基づいて作業の進捗を判定する作業進捗判定手段と、前記作業進捗判定手段の指令により前記作業の進捗を告知する複数のランプで構成される告知手段と、を備える、作業管理装置の作業管理方法であって、
前記作業進捗判定手段は、
前記ICタグ読取手段によりICタグとの通信ができたときは作業中、前記ICタグとの通信開始時刻から所定時間以上経過したときは作業停滞、前記ICタグ読取手段により前記ICタグとの通信が断絶したときは作業完了、及び前記ICタグの読取情報に他に優先して作業が行なう情報があるときは特急作業であると作業進捗状況を判定し、
前記ICタグ読取手段により前記ICタグとの通信中の員数を検知し、前記通信中の員数が予め記憶されている所定員数以上の員数であるときは過多作業であると判定し、
前記告知手段に該当する判定結果を指令する際に、
前記複数のICタグのうち先に読み込んだ第1のICタグの判定結果を、前記複数のランプのうち第1のランプに指令し、
前記複数のICタグのうち次に読み込んだ第2のICタグの判定結果を、前記複数のランプのうち第2のランプに指令するとともに、
前記過多作業の判定結果を前記複数のランプのうち第3のランプに指令する
ことを特徴とする作業管理方法。
An IC tag reading means attached to a place where an IC tag in which information specifying work content is written is placed, detecting the IC tag placed in the place and reading the information; and A work management device comprising: work progress determination means for determining work progress based on read information; and notification means comprising a plurality of lamps for notifying the progress of the work in response to a command from the work progress determination means . A work management method,
The work progress determination means includes
When the IC tag reading means can communicate with the IC tag, the work is in progress. When a predetermined time or more has elapsed from the communication start time with the IC tag, the work is stagnant. The IC tag reading means communicates with the IC tag. When there is information that the work is completed when there is disconnection, and when there is information that the work is prioritized in the reading information of the IC tag, it is determined that the work progress is an express work,
Detecting the number of communicating with the IC tag by the IC tag reading means, and determining that the number of communicating is more than a predetermined number stored in advance is excessive work,
When commanding the determination result corresponding to the notification means,
The determination result of the first IC tag read first among the plurality of IC tags is instructed to the first lamp among the plurality of lamps,
Instructing the determination result of the second IC tag read next out of the plurality of IC tags to the second lamp among the plurality of lamps,
The work management method , wherein the determination result of the excessive work is commanded to a third lamp among the plurality of lamps .
JP2006211782A 2006-06-09 2006-08-03 Work management apparatus, work management system, and work management method Expired - Fee Related JP4299847B2 (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
JP2006211782A JP4299847B2 (en) 2006-08-03 2006-08-03 Work management apparatus, work management system, and work management method
US11/757,489 US8190282B2 (en) 2006-06-09 2007-06-04 Work management apparatus, picking carriage, work performance collection system, rework measurement system, workability management system, rework measurement measuring method, work performance collection method, workability management method and workability management program
KR1020070056307A KR101392568B1 (en) 2006-06-09 2007-06-08 Work achievements collection system
CN2008100865203A CN101320265B (en) 2006-06-09 2007-06-08 Renewal determination system and method, and work actual performance gathering system and method
CN2008100865190A CN101320264B (en) 2006-06-09 2007-06-08 System and method of workability management
KR1020080010383A KR101392536B1 (en) 2006-06-09 2008-01-31 System and method of rework measurement, and system and method of work achievements collection
KR1020080010385A KR101392618B1 (en) 2006-06-09 2008-01-31 System and method of workability management, and recording medium for recording program of workability management, system, method and apparatus of work management, and picking truck
US13/365,330 US8744608B2 (en) 2006-06-09 2012-02-03 Work management apparatus, picking carriage, work performance collection system, rework measurement system, workability management system, rework measurement measuring method, work performance collection method, workability management method and workability management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006211782A JP4299847B2 (en) 2006-08-03 2006-08-03 Work management apparatus, work management system, and work management method

Publications (2)

Publication Number Publication Date
JP2008040640A JP2008040640A (en) 2008-02-21
JP4299847B2 true JP4299847B2 (en) 2009-07-22

Family

ID=39175591

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006211782A Expired - Fee Related JP4299847B2 (en) 2006-06-09 2006-08-03 Work management apparatus, work management system, and work management method

Country Status (1)

Country Link
JP (1) JP4299847B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5068684B2 (en) * 2008-03-31 2012-11-07 株式会社日立製作所 Work management system and work management method
JP5311992B2 (en) * 2008-12-02 2013-10-09 株式会社ブリヂストン Tire production management system
JP5149825B2 (en) * 2009-01-29 2013-02-20 株式会社日立製作所 Work management system and work management method
JP5155976B2 (en) * 2009-09-29 2013-03-06 株式会社日立製作所 Work support system and work support method
JP5608576B2 (en) * 2011-01-21 2014-10-15 株式会社日立製作所 Work order management system and work order management method
JP5608586B2 (en) * 2011-02-24 2014-10-15 株式会社日立製作所 Work order management method and work order management system
KR102482136B1 (en) * 2015-12-31 2022-12-27 한화정밀기계 주식회사 The System For Managing Docking Cart
JP6408065B1 (en) * 2017-05-10 2018-10-17 和多田印刷株式会社 Process information collection system and process information collection method
JP7107273B2 (en) * 2019-04-19 2022-07-27 オムロン株式会社 production line and controller

Also Published As

Publication number Publication date
JP2008040640A (en) 2008-02-21

Similar Documents

Publication Publication Date Title
JP4299847B2 (en) Work management apparatus, work management system, and work management method
JP4851855B2 (en) Work results collection system
US7783387B2 (en) Process for controlling industrial robots, and related robots, systems and computer programs
CN103492114B (en) Welding booth system, cable and the method for identifying welding cable
JP2006054118A (en) Wiring support system
US20060232236A1 (en) Process for controlling industrial robots, and related robots, systems and computer programs
US20080262642A1 (en) Component Mounting Order Deciding Method and Component Mounting Order Deciding Apparatus
JP2011092722A (en) Digital price displayer and esl system comprising the same
JP2004099278A (en) Load management system
JP4545488B2 (en) Mounting machine
JP2010201440A (en) Roll shop control system
JP5155976B2 (en) Work support system and work support method
JP4566999B2 (en) Device configuration recognition system, configuration recognition method, and configuration recognition program
JP4563308B2 (en) Parts removal work assist system
JP5139650B2 (en) Work results collection system and work results collection method
JPH0635526A (en) Operation controller for machining system
JP4566846B2 (en) Cable connection display device and cable connection display method
JP4593165B2 (en) Product identification device and product management system
JP2004326595A (en) Position information detection system, attribute information report system, and communications tag used for these systems
JP4891796B2 (en) Work management apparatus, work management system, and work management method
JP4680826B2 (en) Vehicle management system and vehicle management method
KR101044625B1 (en) Middleware system for managing rfid entrance/exit gate and management apparatus of rfid tag
KR102482136B1 (en) The System For Managing Docking Cart
JP2007066238A (en) Cable connection reader, control panel and cable connection display method
CN215267785U (en) White automobile body workshop consumer power distribution monitoring device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080529

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080826

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081024

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090414

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090417

R150 Certificate of patent or registration of utility model

Ref document number: 4299847

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120424

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120424

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130424

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130424

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140424

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees