JP4034658B2 - Piping interference prevention structure for bathroom unit room - Google Patents
Piping interference prevention structure for bathroom unit room Download PDFInfo
- Publication number
- JP4034658B2 JP4034658B2 JP2003006169A JP2003006169A JP4034658B2 JP 4034658 B2 JP4034658 B2 JP 4034658B2 JP 2003006169 A JP2003006169 A JP 2003006169A JP 2003006169 A JP2003006169 A JP 2003006169A JP 4034658 B2 JP4034658 B2 JP 4034658B2
- Authority
- JP
- Japan
- Prior art keywords
- bathroom unit
- unit room
- piping
- ceiling
- elbow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bathtubs, Showers, And Their Attachments (AREA)
- Residential Or Office Buildings (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は浴室ユニットル−ムの側面構造に関するものであり、更に詳しくは、各種配管と天井や側面との間の干渉部の構造に係るものである。
【0002】
【従来の技術】
集合住宅等にあって、通常は天井部には排気ダクト、給水・給湯管等が配置されており、これは単に水平に配置されるだけでなく、梁等を避けるためにエルボ部が形成されている。一方、浴室ユニットル−ムはスぺ−ス上できるだけコンパクトに納めることが望ましいが、浴室ユニットル−ムは前記した配管若しくはエルボ部と干渉してしまい、所定の位置に設置できないことがしばしばあり、配管若しくはエルボ部との干渉を避けて目的の場所より移動して設置することがあった。場合によっては目的の場所に設置するために、配管若しくはエルボ部と干渉しない程度のスケ−ルの小さい浴室ユニットル−ムを設置することともなっていた。
【0003】
更に、近年においてはマンション等のリフォ−ムが広く行われているが、配管の位置を変えたために所望の浴室ユニットル−ムが設置できないとか、浴室ユニットル−ムを大きめのものにしようとしても配管との干渉によりそれができない等という問題が発生していた。
【0004】
【発明が解決しようとする課題】
本発明は浴室ユニットル−ムが配管若しくはエルボ部と干渉する際、この干渉を防止する構造を提案するものである。
【0005】
【課題を解決するための手段】
本発明の要旨は、底面を構成する防水パン、天井を構成する天井パネル、側壁を構成する側面パネルを組み合わせてなる浴室ユニットルームにおいて、天井パネルと2つの側面パネルとで構成される隅部に、前記天井パネル及び前記側面パネルの少なくとも一方と固着されるフランジ部を備えたボックス部材を配置して室内側に向かって凹陥する凹陥部を形成したこと、を特徴とする浴室ユニットルームの配管干渉防止構造である。
【0006】
【発明の実施の形態】
本発明の特徴は配管の経路に当たる浴槽ユニットの天井及び側面を構成する各パネルを切り欠き、ここにボックス部材を取り付けて配管若しくはエルボ部のスぺ−スを保証する配管ボックスを構成したものである。ボックス部材は浴室ユニットル−ムの外側より当接接合され、或いはその内側より当接接合されるものであり、材料としては、FRP、HIPS、ABS等の樹脂、若しくは化粧鋼板であるが、特に限定されるものではない。
【0007】
【実施例】
以下、本発明の浴室ユニットル−ムの配管干渉防止構造を図面をもって更に説明する。図1は集合住宅における建物と天井配管及び浴室ユニットル−ムとの関係を示したものである。浴室ユニットル−ムにあって、内部に装備される浴槽、側面に備えられるドア等は省略した。尚、この例ではエルボ部をもって説明するが、単に配管部位の干渉にあっても同様でありここでは説明を省略する。
【0008】
1は建物の壁、3は天井配管を示し、建物の壁1の通口2を通って管3が外部に伸びている例である。さて、10は浴室ユニットル−ムであり、11は天井パネル、12は側面パネル、13は床パンであり、床パン13の周囲のフランジ部に側面パネル12が立設され、その側面パネル12の頂部に天井パネル11が取り付けられる。尚、通常は各パネルの裏面に補強のためにリブが縦横に備えられているが、図示しない。
【0009】
さて、通常の浴室ユニットル−ム10にあっては、同一長さの側面パネル12をもって側壁が構成されているもので、全体的に見て直方体形状をなしている。しかるに、前述したように浴室ユニットル−ムはスぺ−スの有効利用の関係から、できるだけ壁1に近付けて設置(一点鎖線で示す)するのがよい。ただし、図に示すような場合、天井配管3のエルボ部3aがあり、これが浴室ユニットル−ムは天井・側面と干渉してしまい、これ以上壁1に近付けることはできず、余分なスぺ−ス(S)を開けた状態で浴室ユニットル−ム10を設置(二点鎖線で示す)しなくてはならなくなる。
【0010】
しかるに、本発明の浴室ユニットル−ム10は図2に示すように配管3のエルボ部3aと干渉する位置(この例では浴室ユニットル−ムのコ−ナ−部10a)に配管ボックス20を構成したものであり、これによってエルボ部3aがここに納まり、浴室ユニットル−ム10はスぺ−スを無駄にすることなく望ましい位置に設置できることとなったものである。
【0011】
図3はこのため、天井パネル11にエルボ部3aの太さ(D)を納める切断部(X)、側面パネル12、12にエルボ部3aの長さ(L)が納まる切断部(Y)を夫々設けたものであり、図4はこの切断部(X、Y)に当設固着されるボックス部材21の斜視図である。
【0012】
即ち、この例は配管3のエルボ部3aは浴室ユニットル−ム10の直方体のコ−ナ−部10aとが干渉するものであって、このため、天井パネル11をエルボ部3aの太さ(D)が納まる分だけ切断(X)し、一方、エルボ部3aの長さ(L)が納まる分だけコ−ナ−を構成する二枚の側面パネル12を切断(Y)して、かかる切断部位にエルボ部3aを納めるスぺ−スを確保する。次いで、この切断部位(X、Y)を塞ぐべくボックス部材21をこの切断部位(X、Y)に当接し、これを水密に固着してエルボ部3aを納める配管ボックス部20を浴室ユニットル−ム10のコ−ナ−部10aに構成したものである。尚、両者の固着手段は公知のの接着剤、ボルト及びナット等任意の手段をもって固着されるものである。
【0013】
この例ではボックス部材21はABS樹脂よりなり、エルボ部3aが納まるように太さ(D)及びその長さ(L)分を囲む垂直面21a、21bが直角をなして構成され、更にその下端が傾斜面21cとなした形状となっている。
【0014】
尚、ボックス部材21はかかる形状に限定されるわけではなく、エルボ部3aが納まるものであれば採用できることは言うまでもない。又、天井パネル11や側面パネル12との固着に供するために、図5に示すようにボックス部21にフランジ部21dを備えたものでもよい。この例ではフランジ部21dは天井パネル11との固着に供されるが、側面パネル12との固着用の図示しないフランジ部を備えたものであってもよい。
【0015】
配管ボックス部20は浴室ユニットル−ム10のコ−ナ−部10a以外にも設置可能であり、図6はボックス部材21の他の例を示すもので、垂直面21a、これと直角をなす一対の垂直面21b、その下端に傾斜面21cをもってボックス部材21が構成されたものである。
【0016】
そして、図7に示すように天井パネル11の中間部(エルボ部3aに対応する部位)にはエルボ部3aが納まるようにコ字状の切断部(X)がなされ、側面パネル12にはエルボ部3aの長さが納まるコ字状の切断(Y)がなされるもので、ボックス部材21はこの切断部(X、Y)に固着される。これによって、浴室ユニットル−ム10の中間部に配管ボックス部20を形成することができる。勿論、このボックス部材21に上記のフランジ部21d等を備えることができることは言うまでもない。
【0017】
上記の例におけるボックス部材21は、いずれも一体ものの構造であるが、場合によっては二つ以上の部材を組み合わせてボックス部材が構成されてもよいことは勿論である。
【0018】
【発明の効果】
本発明は以上の通りであり、天井配管若しくはエルボ部との干渉を避けることができたものである。このため、浴室ユニットを所定の場所に設置することができ、浴室ユニットのサイズダウンを必要としないものである。即ち、配管経路に影響されることなく浴室ユニットの設置場所を選ぶことができ、例えば内装リフォ−ム時において浴室ユニットを任意の位置にしかもスぺ−スを無駄にすることなく設置することができたものである。
【図面の簡単な説明】
【図1】図1は天井配管及び浴室ユニットとの関係を示した図である。
【図2】図2は本発明の配管ボックスを用いた浴室ユニットの図である。
【図3】図3は浴室ユニットル−ムの天井パネル及び側面パネルの図である。
【図4】図4は本発明のボックス部材の斜視図である。
【図5】図5は本発明のボックス部材の他の例を示す斜視図である。
【図6】図6は本発明のボックス部材の更に他の例を示す斜視図である。
【図7】図7は浴室ユニットル−ムの天井パネルと側面パネルの他の例の図である。
【符号の説明】
1‥建物の壁、
3‥天井配管、
3a‥天井配管のエルボ部、
10‥浴室ユニットル−ム、
10a‥浴室ユニットル−ムのコ−ナ−部、
11‥天井パネル、
12‥側面パネル、
13‥床パン、
20‥配管ボックス、
21‥ボックス部材、
21a、21b‥ボックス部材の垂直面、
21c‥ボックス部材の傾斜面、
21d‥フランジ、
D‥エルボ部の太さ、
L‥エルボ部の長さ、
S‥スペ−ス、
X、Y‥切断部。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a side structure of a bathroom unit room, and more particularly to a structure of an interference portion between various pipes and a ceiling or a side.
[0002]
[Prior art]
In an apartment house, etc., an exhaust duct, water supply / hot water supply pipe, etc. are usually arranged on the ceiling, which is not only arranged horizontally, but an elbow is formed to avoid beams etc. ing. On the other hand, it is desirable to keep the bathroom unit room as compact as possible on the space. However, the bathroom room room often interferes with the piping or elbow part and cannot be installed at a predetermined position. In some cases, it was moved from the target location to avoid interference with the piping or elbow. In some cases, a bathroom unit room having a small scale that does not interfere with the piping or elbow part is installed in order to install the target place.
[0003]
Furthermore, in recent years, remodeling of condominiums and the like has been widely performed. However, because the location of the piping has been changed, the desired bathroom unit room cannot be installed, or an attempt has been made to make the bathroom unit room larger. However, there was a problem that this could not be done due to interference with the piping.
[0004]
[Problems to be solved by the invention]
The present invention proposes a structure for preventing the bathroom unit room from interfering with the pipe or elbow.
[0005]
[Means for Solving the Problems]
The gist of the present invention is that in a bathroom unit room formed by combining a waterproof pan that constitutes the bottom surface, a ceiling panel that constitutes the ceiling, and a side panel that constitutes the side wall, in the corner portion constituted by the ceiling panel and the two side panels. A pipe unit interference in a bathroom unit room, wherein a box member having a flange portion fixed to at least one of the ceiling panel and the side panel is disposed to form a recessed portion recessed toward the indoor side. It is a prevention structure.
[0006]
DETAILED DESCRIPTION OF THE INVENTION
The feature of the present invention is that a panel is constructed by notching each panel constituting the ceiling and side surface of the bathtub unit that hits the piping path, and attaching a box member to guarantee the space of the piping or elbow part. is there. The box member is abutted and joined from the outside of the bathroom unit room, or abutted and joined from the inside, and the material is a resin such as FRP, HIPS, ABS, or a decorative steel plate. It is not limited.
[0007]
【Example】
Hereinafter, the pipe interference prevention structure of the bathroom unit room of the present invention will be further described with reference to the drawings. FIG. 1 shows the relationship between a building, a ceiling pipe, and a bathroom unit room in an apartment house. In the bathroom unit room, the bathtub provided inside, the door provided on the side, etc. were omitted. In this example, the elbow portion is used for explanation, but the same applies to the interference of the piping part, and the explanation is omitted here.
[0008]
Reference numeral 1 denotes a building wall, 3 denotes a ceiling pipe, and the
[0009]
Now, in the usual
[0010]
However, the
[0011]
For this reason, FIG. 3 shows a cutting part (X) in which the thickness (D) of the elbow part 3a is stored in the
[0012]
That is, in this example, the elbow part 3a of the
[0013]
In this example, the
[0014]
Needless to say, the
[0015]
The
[0016]
Then, as shown in FIG. 7, a U-shaped cut portion (X) is formed in the middle portion of the ceiling panel 11 (a portion corresponding to the elbow portion 3 a) so that the elbow portion 3 a is accommodated, and the
[0017]
The
[0018]
【The invention's effect】
The present invention is as described above, and interference with the ceiling pipe or the elbow portion can be avoided. For this reason, a bathroom unit can be installed in a predetermined place, and the size reduction of a bathroom unit is not required. That is, the installation location of the bathroom unit can be selected without being affected by the piping route. For example, it is possible to install the bathroom unit at an arbitrary position at the time of interior reform without wasting space. It was made.
[Brief description of the drawings]
FIG. 1 is a diagram showing a relationship between a ceiling pipe and a bathroom unit.
FIG. 2 is a view of a bathroom unit using the piping box of the present invention.
FIG. 3 is a view of a ceiling panel and a side panel of a bathroom unit room.
FIG. 4 is a perspective view of the box member of the present invention.
FIG. 5 is a perspective view showing another example of the box member of the present invention.
FIG. 6 is a perspective view showing still another example of the box member of the present invention.
FIG. 7 is a view of another example of a ceiling panel and a side panel of a bathroom unit room.
[Explanation of symbols]
1. Building walls,
3. Ceiling piping,
3a ... Elbow part of ceiling piping,
10. Bathroom unit room,
10a. Corner part of bathroom unit room,
11 ... ceiling panel,
12 ... side panel,
13 ... floor bread,
20 ... Piping box,
21. Box member
21a, 21b ... vertical surface of the box member,
21c ... inclined surface of the box member,
21d ... flange,
D. Elbow thickness,
L ... the length of the elbow
S. Space,
X, Y ... cutting part.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003006169A JP4034658B2 (en) | 2003-01-14 | 2003-01-14 | Piping interference prevention structure for bathroom unit room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003006169A JP4034658B2 (en) | 2003-01-14 | 2003-01-14 | Piping interference prevention structure for bathroom unit room |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004218253A JP2004218253A (en) | 2004-08-05 |
JP4034658B2 true JP4034658B2 (en) | 2008-01-16 |
Family
ID=32896632
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003006169A Expired - Lifetime JP4034658B2 (en) | 2003-01-14 | 2003-01-14 | Piping interference prevention structure for bathroom unit room |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4034658B2 (en) |
-
2003
- 2003-01-14 JP JP2003006169A patent/JP4034658B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP2004218253A (en) | 2004-08-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5996346A (en) | Fabricated core of building | |
JP2018087424A (en) | Panel unit and curtain wall equipped with the same | |
JP4034658B2 (en) | Piping interference prevention structure for bathroom unit room | |
JPS6055913A (en) | Tray booth | |
JP4730003B2 (en) | Wall structure of bathroom unit | |
JP6936533B1 (en) | Mobile simple housing | |
JP3947430B2 (en) | Unit room | |
JP2015137455A (en) | Installation structure for piping storage unit | |
JP2512689Y2 (en) | Fireproof structure of building | |
JPH08312171A (en) | Waterproof pan for bath room | |
JP2533989Y2 (en) | Heat insulation device for hull settlement | |
JP3575563B2 (en) | Ventilation fan mounting structure | |
JP5588215B2 (en) | Bathroom installation method | |
JP2008194351A (en) | Structure of kitchen | |
JP2007225269A (en) | Drain pipe attaching tool for air conditioner concealed pipe | |
JP2594390Y2 (en) | Building exterior wall structure | |
KR970007215Y1 (en) | Connecting pipe for hot water distributor of a boiler | |
JP3589150B2 (en) | Box structure for hot water supply equipment | |
JP4664083B2 (en) | Fire stop structure in the shaft construction method | |
JP3966980B2 (en) | Panel articulated wall structure | |
JP2004143676A (en) | Bathroom unit | |
JP2001303698A (en) | Partition device and kitchen device | |
JP2009052216A (en) | Water sealing structure between upper and lower external facing materials | |
CN110952803A (en) | Modularized integrated sanitary box | |
JP2004332467A (en) | Unit bath |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051222 |
|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20051222 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070104 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070313 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070511 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070703 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070831 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20071023 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20071025 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101102 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4034658 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111102 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121102 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121102 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131102 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |