JP3961835B2 - Sewage treatment plant water quality controller - Google Patents

Sewage treatment plant water quality controller Download PDF

Info

Publication number
JP3961835B2
JP3961835B2 JP2002000810A JP2002000810A JP3961835B2 JP 3961835 B2 JP3961835 B2 JP 3961835B2 JP 2002000810 A JP2002000810 A JP 2002000810A JP 2002000810 A JP2002000810 A JP 2002000810A JP 3961835 B2 JP3961835 B2 JP 3961835B2
Authority
JP
Japan
Prior art keywords
ratio
sewage treatment
component concentration
treatment plant
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002000810A
Other languages
Japanese (ja)
Other versions
JP2003200190A (en
Inventor
卓巳 小原
正彦 堤
理 山中
唯夫 本木
吉広 柴本
行雄 初鹿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2002000810A priority Critical patent/JP3961835B2/en
Publication of JP2003200190A publication Critical patent/JP2003200190A/en
Application granted granted Critical
Publication of JP3961835B2 publication Critical patent/JP3961835B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Activated Sludge Processes (AREA)
  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)
  • Control Of Non-Electrical Variables (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、曝気槽を備えた下水処理場から放流される処理水の水質を制御する下水処理場水質制御装置に係り、特に下水処理場に流入する流入水の窒素成分と有機物成分との比(C/N比)、リン成分と有機物成分との比(C/P比)等の水質バランスが悪化したような場合においても、下水処理場から放流される処理水の窒素、リンの水質を常に良好に維持できるようにした下水処理場水質制御装置に関するものである。
【0002】
【従来の技術】
近年、湖沼、湾等の閉鎖性水域では、富栄養化が進行してきており、これらの原因物質である窒素、リンの下水処理場から閉鎖性水域への流出を抑制する必要がある。
【0003】
このため、従来の下水処理場においては、活性汚泥法と呼ばれるプロセスにより、有機物除去を行なうようにしてきているが、最近では、湖沼、湾等の閉鎖性水域における富栄養化の進行から、窒素、リンの除去も行なう高度処理の要求が増大してきている。
【0004】
そして、かかる要求に応えるための下水処理場として、生物学的硝化脱窒反応、生物学的脱リン反応、凝集剤添加による脱リン反応等を利用して、下水処理場に流入する流入水の窒素またはリンを除去する、曝気槽を備えた下水処理場が実現されてきている。
【0005】
図7は、上記各種水処理プロセスのうち、脱窒素・脱リンを行なう高度処理プロセスの一つである、凝集剤注入型嫌気−無酸素−好気法(凝集剤注入A2 O法)と呼ばれるプロセスから構成される曝気槽を備えた下水処理場の構成例を示すフロー図である。
【0006】
図7において、下水処理場に流入する流入水1は、一つは、水配管50、弁24を介して最初沈殿池2に流入し、水配管51を介して、嫌気槽10と無酸素槽11と曝気装置9を備えた好気槽12との組み合わせから構成される曝気槽の嫌気槽10に流入する。
【0007】
また、もう一つは、水配管50、水配管59、初沈バイパス弁23を介して嫌気槽10に流入し、曝気槽により処理した後に、水配管52、最終沈殿池13、水配管60を介して、処理水3として放流される。
【0008】
一方、炭素源貯留槽21からは、炭素源注入ポンプ19、水配管57を介して、嫌気槽10に炭素源が注入される。
【0009】
また、凝集剤貯留槽22からは、PAC注入ポンプ16、水配管56を介して、好気槽12に凝集剤が注入される。
【0010】
一方、好気槽12の非処理水は、水配管53、循環ポンプ14を介して、無酸素槽11に返流される。
【0011】
また、最終沈殿池13の沈殿水は、水配管54、返送ポンプ15を介して、嫌気槽10に返流される。
【0012】
さらに、最終沈殿池13の最終汚泥水は、水配管55、余剰ポンプ17を介して、汚泥貯留槽20に放流される。
【0013】
さらにまた、最初沈殿池2の初沈汚泥水は、初沈引抜ポンプ18、水配管58を介して、汚泥貯留槽20に放流される。
【0014】
以上のような曝気槽を備えた下水処理場において、まず、窒素除去は、次のようにして行なわれる。
【0015】
好気槽12において、アンモニア性窒素(NH4 −N)は硝化菌の働きにより、亜硝酸性窒素(NO2 −N)、硝酸性窒素(NO3 −N)に酸化される。
【0016】
循環ポンプ14により、無酸素槽11に送り込まれた亜硝酸性窒素(NO2 −N)、硝酸性窒素(NO3 −N)は、無酸素条件下で有機物を栄養源とする脱窒細菌による硝酸性呼吸あるいは亜硝酸性呼吸により、窒素ガス(N2 )へと還元され、系外に除去される。
【0017】
この際、脱窒反応に必要な有機物が十分でなければ良好な窒素除去は行われない。
【0018】
この有機物を補填するための手段として、初沈バイパス弁23を開き、弁24を閉じることによって、最初沈殿池2をバイパスして有機物を確保する方法、炭素源貯留槽21に蓄えられたメタノール、エタノール、酢酸、廃酢酸、グルコース等の炭素源を注入する方法、最初沈殿池2で発生した引抜汚泥を曝気槽に投入する方法等がある。
【0019】
次に、リン除去は、次のような機構で行なわれる。
【0020】
曝気槽の前段に配置された嫌気槽10で、活性汚泥中のリン蓄積細菌は、酢酸等の有機酸を体内に蓄積し、リン酸(PO4 )が放出される。
【0021】
この過剰放出したリン酸態のリンは、曝気槽の後段に配置された好気槽12において、リン蓄積細菌のリン過剰摂取作用を利用して、嫌気槽10で放出された以上のリン酸態のリンを活性汚泥に吸収させることにより、リン除去が行なわれる。
【0022】
すなわち、このような反応を進行させるためには、酢酸等の有機酸が水素供与体として必要となる。
【0023】
雨水流入時には、有機酸濃度が薄くなり、リン蓄積菌が利用できる有機物が減少することから、十分なリンの吐き出し反応が十分に行なわれなくなるため、後に続くリンの過剰摂取反応も不十分となる。
【0024】
そこで、これを補填するために、窒素除去の場合と同様な手段で、リン除去に必要な炭素源を確保するか、もしくは凝集剤貯留槽22に蓄えられたポリ塩化アルミニウム、硫酸アルミニウム、硫酸鉄等の凝集剤を注入して、リン酸アルミニウムやリン酸鉄の形でリン成分を沈殿させることによって、リンを除去するようにしている。
【0025】
図8は、従来の下水処理場水質制御装置の一構成例を示すブロック図である。
【0026】
図8において、下水処理場に流入する流入水1は、水配管120を介して、無酸素槽100と曝気装置103を備えた好気槽101との組み合わせから構成される曝気槽の無酸素槽100に流入し、曝気槽により処理した後に、水配管121、最終沈殿池102、水配管122を介して、処理水3として放流される。
【0027】
一方、好気槽101の非処理水は、循環ポンプ104を介して、無酸素槽100に返流される。
【0028】
また、最終沈殿池102の沈殿水は、水配管123、返送ポンプ105を介して、無酸素槽100に返流される。
【0029】
一方、好気槽101には、アンモニア性窒素濃度を計測するアンモニア性窒素濃度計106が設置され、その計測値106aが出力される。
【0030】
また、制御目標値設定器108では、制御目標値108aが設定される。
【0031】
さらに、制御部107では、アンモニア性窒素濃度計106からの計測値106aと、制御部107により設定された制御目標値108aとの偏差に基づいて、曝気装置103を調節するための操作量107aが得られ、曝気装置103に与えられる。
【0032】
これにより、曝気槽内のアンモニア濃度を一定に保つように、制御が行なわれる。
【0033】
【発明が解決しようとする課題】
(a)しかしながら、図8に示すような、好気槽101で硝化処理後のアンモニア性窒素濃度を基に、曝気装置103の曝気風量をフィードバック(FB)制御により調節を行なうような制御では、下水処理場に流入する流入水量の変動が大きいにもかかわらず、曝気槽における微生物による水質反応が比較的遅いことから、このようなフィードバック制御のみでは、操作量107aの変化に対する水質反応の応答が遅く、処理水の水質を良好に保つことが困難であるという問題がある。
【0034】
(b)また、硝化反応の制御のみでは、亜硝酸性窒素、硝酸性窒素が残存し、放流水のpHの低下および最終沈殿池において、脱窒反応に起因するN2 ガス発生に伴なう汚泥浮上の問題がある。
【0035】
脱窒は、循環ポンプ104を用いて、無酸素槽100に硝化液を循環させて脱窒を行なうが、従来では、この循環流量は、一定量もしくは流入流量に対する比率制御で運転されているケースがほとんどであり、より脱窒を良好に行なうための制御が必要とされている。
【0036】
一方、脱窒を良好に行なうためには、炭素源の確保が必要であり、流入水の窒素成分と有機物成分との比(C/N比)が減少したような場合には、脱窒能が低下するという問題がある。
【0037】
(c)さらに、下水処理場に設置されたアンモニア性窒素濃度計、硝酸性窒素濃度計、全窒素濃度計等の窒素成分濃度計、およびリン酸濃度計、全リン計等のリン成分濃度計は、下水中の浮遊成分によって汚れ等が付着し易く、異常値を示すことが多いため、制御用のセンサとしては不安定、低精度で、利用が困難である。
【0038】
また、上記濃度計がサンプリングしてろ過する方式であっても、サンプリング管が詰まる等のメンテナンス上の問題もある。
【0039】
(d)リン成分と有機物成分との比(C/P比)がある程度確保されている場合は、生物学的脱リンのみでもある程度のリン除去が可能であるが、C/P比が小さくリン蓄積性細菌の利用できる有機物量が流入のリンに対して小さくなると、炭素源の確保を何らかの手段で行なうか、ポリ塩化アルミニウム等の凝集剤の注入するかを行なわなければ、リン除去が難しくなっている。
【0040】
この際、炭素源をどの程度注入するのかは経験的に行なわれていること、また凝集剤の過注入によるコスト、および処理水へのポリ塩化アルミニウムの流出等が、問題となっている。
【0041】
本発明の目的は、下水処理場に流入する流入水の窒素成分と有機物成分との比(C/N比)、リン成分と有機物成分との比(C/P比)等の水質バランスが悪化したような場合においても、下水処理場から放流される処理水の窒素、リンの水質を常に良好に維持することが可能な下水処理場水質制御装置を提供することにある。
【0042】
【課題を解決するための手段】
上記の目的を達成するために、本発明は以下の手段を講じる。
【0044】
求項に対応する発明は嫌気槽と好気槽とを含む曝気槽を備えた下水処理場から放流される処理水の水質を制御する下水処理場水質制御装置において、下水処理場に流入する流入水のリン成分濃度を計測するリン成分濃度計測手段と、下水処理場に流入する流入水の有機物成分濃度を計測する有機物成分濃度計測手段と、リン成分濃度計測手段および有機物成分濃度計測手段により計測されたリン成分濃度および有機物成分濃度に基づいて、下水処理場に流入する流入水のリン成分と有機物成分との比(C/P比)を演算するC/P比演算手段と、基準となる基準C/P比を設定するC/P比設定手段と、C/P比設定手段により設定された基準C/P比とC/P比演算手段により演算されたC/P比との差分に基づいて、最終沈殿池から前記曝気槽へ返送される沈殿水の返送流量、汚泥貯留槽から前記曝気槽に返流される返流水の返流水流量、曝気風量、炭素源注入量、凝集剤注入量、余剰汚泥流量、初沈バイパス弁のうちの少なくとも一つを制御する操作量を出力する制御手段とを備えている。
【0045】
従って、請求項に対応する発明の下水処理場水質制御装置においては、下水処理場に流入する流入水のC/P比を演算し、基準C/P比との差分に基づいて、下水処理場における返送流量、曝気風量、炭素源注入量、凝集剤注入量、余剰汚泥流量、返流水流量、初沈バイパス弁のうちの少なくとも一つを制御することにより、下水処理場に流入する流入水のC/P比の水質バランスが悪化したような場合においても、下水処理場から放流される処理水のリンの水質を常に良好に維持して、リン除去を行なうことができる。
【0050】
また、請求項に対応する発明は、嫌気槽と好気槽、もしくは嫌気槽と無酸素槽と好気槽との組み合わせから構成される曝気槽を備えた下水処理場から放流される処理水の水質を制御する下水処理場水質制御装置において、嫌気槽中のリン成分濃度を計測するリン成分濃度計測手段と、嫌気槽に流入する流入水の有機物成分濃度と計測する有機物成分濃度計測手段と、リン成分濃度計測手段および有機物成分濃度計測手段により計測されたリン成分濃度および有機物成分濃度に基づいて、リン成分と有機物成分との比(C/P比)を演算するC/P比演算手段と、基準となる基準C/P比を設定するC/P比設定手段と、C/P比設定手段により設定された基準C/P比と前記C/P比演算手段により演算されたC/P比との差分に基づいて、最終沈殿池から前記曝気槽へ返送される沈殿水の返送流量、汚泥貯留槽から前記曝気槽に返流される返流水の返流水流量、曝気風量、炭素源注入量、余剰汚泥流量、初沈バイパス弁のうちの少なくとも一つを制御する操作量を出力する制御手段とを備えている。
【0051】
従って、請求項に対応する発明の下水処理場水質制御装置においては、嫌気槽中のリン成分濃度と嫌気槽に流入する流入水の有機物成分濃度とに基づいて、リン成分と有機物成分とのC/P比を演算し、基準C/P比との差分に基づいて、下水処理場における返送流量、曝気風量、炭素源注入量、余剰汚泥流量、返流水流量、初沈バイパス弁のうちの少なくとも一つを制御することにより、下水処理場に流入する流入水のC/P比の水質バランスが悪化したような場合においても、下水処理場から放流される処理水のリンの水質を常に良好に維持して、リン除去を行なうことができる。また、リン成分濃度計測手段および有機物成分濃度計測手段を下水処理場の流入部分に設置しないような場合にも適用することができ、さらに曝気槽部分での濃度を計測することにより、制御性をより一層良好とすることができる。
【0056】
また、請求項に対応する発明は、上記請求項1または請求項2のいずれか1項に対応する発明の下水処理場水質制御装置において、リン成分濃度計測手段として、リン酸性リン濃度、全リン濃度のいずれかを計測する濃度計を用い、また有機物成分濃度計測手段として、生物化学的酸素要求量(BOD)、化学的酸素要求量(CODMn、CODcr)、全有機炭素量(TOC)のいずれかを計測する濃度計を用いるようにしている。
【0057】
従って、請求項に対応する発明の下水処理場水質制御装置においては、リン成分濃度計測手段として、リン酸性リン濃度、全リン濃度を計測する濃度計を用い、また有機物成分濃度計測手段として、生物化学的酸素要求量(BOD)、化学的酸素要求量(CODMn、CODcr)、全有機炭素量(TOC)を計測する濃度計を用いることにより、正味のC/P比を演算することができる。
【0060】
一方、請求項に対応する発明では、上記請求項1乃至請求項のいずれか1項に対応する発明の下水処理場水質制御装置において、下水処理場に流入する流入水の流量、リン成分濃度計測手段および有機物成分濃度計測手段による水質成分の計測値、および手分析による水質試験結果の各時系列データを蓄える流入水質データベースと、流入水質データベースに蓄えられた時系列データに基づいて、下水処理場に流入する流入水のリン成分濃度、及び有機物成分濃度を予測する流入水質予測手段とを備え、流入水質予測手段により予測されたリン成分濃度、有機物成分濃度を使用して、C/P比を演算するようにしている。
【0061】
従って、請求項に対応する発明の下水処理場水質制御装置においては、下水処理場に流入する流入水の流量、水質成分の計測値、および手分析による水質試験結果の各時系列データに基づいて、下水処理場に流入する流入水のリン成分濃度、及び有機物成分濃度を予測し、当該予測値を使用して、C/P比を演算することにより、リン成分濃度計測手段、有機物成分濃度計測手段の設置が困難な場合、あるいはリン成分濃度計測手段、有機物成分濃度計測手段が故障したような場合においても、十分に制御を行なうことができる。
【0062】
また、請求項に対応する発明では、上記請求項1乃至請求項のいずれか1項に対応する発明の下水処理場水質制御装置において、下水処理場に流入する流入水の窒素成分濃度を計測する窒素成分濃度計測手段と、下水処理場に流入する流入水の有機物成分濃度を計測する有機物成分濃度計測手段と、窒素成分濃度計測手段および有機物成分濃度計測手段により計測された窒素成分濃度および有機物成分濃度に基づいて、下水処理場に流入する流入水の窒素成分と有機物成分との比(C/N比)を演算するC/N比演算手段と、基準となる基準C/N比を設定する基準C/N比設定手段と、下水処理場に流入する流入水の流量を計測する流量計測手段さらに備え、制御手段としては、流量計測手段により計測された流量値、基準C/N比設定手段により設定された基準C/N比とC/N比演算手段により演算されたC/N比との差分、およびC/P比設定手段により設定された基準C/P比とC/P比演算手段により演算されたC/P比との差分に基づいて、曝気槽内で循環される非処理水の循環流量、最終沈殿池から曝気槽へ返送される沈殿水の返送流量、汚泥貯留槽から曝気槽に返流される返流水の返流水流量、曝気風量、炭素源注入量、余剰汚泥流量、初沈バイパス弁のうちの少なくとも一つを制御する操作量を出力するようにしている。
【0063】
従って、請求項に対応する発明の下水処理場水質制御装置においては、下水処理場に流入する流入水の流量を計測する流量計測手段を用い、当該流量計測手段による流量計測値、基準C/N比とC/N比との差分、および基準C/P比とC/P比との差分に基づいて、下水処理場における循環流量、返送流量、曝気風量、炭素源注入量、余剰汚泥流量、返流水流量、初沈バイパス弁のうちの少なくとも一つを制御することにより、下水処理場に流入する流入水の流量の大小によって処理水の流量が水質が変化したような場合においても、制御性を常に良好に維持することができる。
【0066】
【発明の実施の形態】
以下、本発明の実施の形態について図面を参照して詳細に説明する。
【0067】
(第1の実施の形態)
図1は、本実施の形態による下水処理場水質制御装置の構成例を示すブロック図であり、図7と同一部分には同一符号を付してその説明を省略し、ここでは異なる部分についてのみ述べる。
【0068】
すなわち、本実施の形態による下水処理場水質制御装置は、図1に示すように、前記図7に、有機物成分濃度計測手段であるTOC計4と、窒素成分濃度計測手段であるアンモニア濃度計5と、C/N比演算部6と、基準C/N比設定器7と、制御部8とを付加した構成としている。
【0069】
なお、前記図7における弁24、水配管59、初沈バイパス弁23については、図1ではその図示を省略している。
【0070】
TOC計4は、前記水配管51に設置しており、下水処理場に流入する流入水1の有機物成分濃度である全有機炭素量(TOC)4aを計測する。
【0071】
アンモニア濃度計5は、同水配管51に設置しており、下水処理場に流入する流入水1の窒素成分濃度である全窒素濃度5aを計測する。
【0072】
C/N比演算部6は、TOC計4およびアンモニア濃度計5により計測された全有機炭素量4aおよび全窒素濃度5aに基づいて、下水処理場に流入する流入水1の窒素成分と有機物成分との比(C/N比)6aを演算する。
【0073】
基準C/N比設定器7は、基準となる基準C/N比7aを設定する。
【0074】
制御部8は、基準C/N比設定器7により設定された基準C/N比7aとC/N比演算部6により演算されたC/N比6aとの差分に基づいて、下水処理場における炭素注入ポンプ19の流量を調節する操作量8aを出力する。
【0075】
次に、以上のように構成した本実施の形態による下水処理場水質制御装置の作用について説明する。
【0076】
図1において、最初沈殿池2から曝気槽に流入する水配管51上に取り付られたTOC計4の計測値である全有機炭素量(TOC)4aと、全窒素計5の計測値である全窒素濃度5aは、信号線4a,5aを介して、C/N比演算部6に入力され、これらを基にC/N比が演算される。
【0077】
この場合の演算式としては、例えば下記のような式(1.1)で表わされる。
【0078】
【数1】

Figure 0003961835
【0079】
CN:時刻tにおけるC/N比
TOC:流入水TOC濃度、CTN:流入水全窒素濃度
上記式(1.1)により演算されたC/N比は、信号線6aを介して制御部8へ入力される。
【0080】
一方、基準C/N比設定器7によって、基準C/N比が設定される。
【0081】
制御部8では、C/N比演算部6により演算されたC/N比と基準C/N比との偏差に基づき、炭素源注入量目標値が、例えば下記の式(1.2)式に示すような式によって演算され、炭素源注入量目標値となるように、炭素源注入量が調整される。
【0082】
【数2】
Figure 0003961835
【0083】
SVQcarbon,t:時刻tにおける炭素源注入量目標値
CN,t:時刻tにおけるC/N比
Cnbase:効率的窒素除去を行なうための基準C/N比
in:下水処理場流入流量
carbonTOC:炭素源のTOC濃度
T-Nin,t:流入水のT−N濃度
一方、基準C/N比設定器7によって設定される基準C/N比PCnbaseの値は、対象となる下水処理場によって異なるが、効率的な窒素除去を行なうためには、BOD/t−N比として3〜4を確保することが必要であるということから、BOD/TOC比を加味して、4〜6程度の値を設定することが好ましい。
【0084】
炭素源のTOC濃度CcarbonTOCは、使用する炭素源(メタノール、エタノール、酢酸、廃酢酸、グルコースetc)と溶液の濃度が既知であれば、容易に求めることができる。
【0085】
上記式(1.2)式により演算された炭素源注入量目標値に応じて、炭素源注入量が調整される。
【0086】
本下水処理場水質制御装置によって、C/N比が低下した場合、すなわち効率的窒素除去に必要とされる有機物量が不足した時にのみ、必要量の炭素源を注入することができ、炭素源の過剰注入のない効率的な窒素除去を行なうことができる。
【0087】
上述したように、本実施の形態による下水処理場水質制御装置では、以下のような効果を得ることができる。
【0088】
(a)制御対象として、炭素源注入ポンプ19を使用するようにしているため、注入量に応じたC/N比を容易に演算することができ、過剰な炭素源の注入を行なうことなく、効率的窒素除去を行なうために必要とされるC/N比以上の値に保つことが可能となる。
【0089】
(b)有機物成分を計測するセンサとしてTOC計4を、窒素成分を計測するセンサとして全窒素計5を使用するようにしているため、正味の有機物、窒素比を演算することが可能となる。
【0090】
(c)基準C/N比設定器7により、基準C/N比PCnbaseを設定しさえすれば、全てのパラメータを演算することが可能であるため、パラメータ調整の必要がない。
【0091】
(d)全窒素計5、TOC計4を最初沈殿池2通過後の水配管51に配しているため、水配管50に配した場合に比べて、汚れによるセンサ値異常の可能性が少なくなり、また曝気槽に流入する正味のC/N比を演算することが可能となる。
【0092】
(変形例1)
図1の窒素成分濃度計5、および有機物成分濃度計4の取付位置としては、水配管50に取り付けるようにしてもよい。
【0093】
また、最初沈殿池2や流入渠、沈砂池、ポンプ井等、曝気槽の前段部であれば、いずれの位置でも使用することができる。
【0094】
(変形例2)
図1の有機物成分濃度計4としては、TOC計でなくても、BOD計、COD計のいずれを使用するようにしてもよい。
【0095】
また、窒素成分濃度計5としては、全窒素計でなくても、下水処理場に流入する流入水1の窒素成分のほとんどはアンモニア性窒素であることから、アンモニア性窒素濃度計を使用するようにしてもよい。
【0096】
(変形例3)
図1の窒素成分濃度計5としては、無酸素槽11内に取り付けられた硝酸性窒素計を使用するようにしてもよい。
【0097】
(変形例4)
炭素源としては、メタノール、エタノール、酢酸、廃酢酸、グルコース等がある。
【0098】
また、図1の最初沈殿池2の引抜汚泥、およびそれを発酵させたものを使用するようにしてもよい。
【0099】
(変形例5)
図1の制御部8によって演算される操作量8aとしては、炭素源注入量以外に、循環流量、返送流量、曝気風量、炭素源注入量、余剰汚泥流量、返流水流量、初沈バイパス弁のいずれであってもよい。
【0100】
例えば、制御部8によって演算される操作量8aが循環流量である場合には、例えば下記の式(1.3)に示されるような演算式によって、目標値が演算される。
【0101】
【数3】
Figure 0003961835
【0102】
SVQcir,t:時刻tにおける炭素源注入量目標値
CN,t:時刻tにおけるC/N比
Cnbase:効率的窒素除去を行なうためのC/N比
Q0:定数
K:比例定数
Q0の定数は、一定流量、もしくは流入流量に対する比率制御の目標値であってもよい。
【0103】
これにより、C/N比が不足している時には循環流量が増加する方向に、C/N比が十分な時には循環流量が減少する方向にそれぞれ制御され、窒素除去を効率的に行なうことができる。
【0104】
(変形例6)
図1の制御部8によって演算される操作量8aとしては、上記記載のもの一つだけを制御するものでなく、複数のものを制御するようにしてもよい。
【0105】
例えば、制御部8によって演算される操作量8aとして、上記炭素源注入量および返流水流量を選択した場合には、C/N比が基準C/N比設定器7によって設定された値よりも大きい場合には、下記の式(1.4)に示すような形で返流水流量が制御され、またC/N比が基準C/N比設定器7によって設定された値よりも小さい場合には、炭素源注入量が前記式(1.2)に示されるような形で制御される。
【0106】
このように組み合わせて、切り替え制御するようにしてもよい。
【0107】
すなわち、汚泥貯留槽20から返流される返流水は、下水管から流れてくる流入水に比べて、窒素負荷が高くC/N比が小さいため、返流水量を増加させると、C/N比を下げる方向に作用する。
【0108】
C/N比が大きい場合には、返流水量が多くなる方に制御目標値の演算が行なわれる。
【0109】
また、C/N比が小さくなってくると、返流水量が少なくなる方に制御目標値の演算を行なう。
【0110】
【数4】
Figure 0003961835
【0111】
SVQcir,t:時刻tにおける炭素源注入量目標値
CN:時刻tにおけるC/N比
Cnbase:基準C/N比
I :積分時間
Q0:定数
K:比例定数
C/N比が、基準C/N比設定器7によって設定された値よりも小さく、炭素源が不足した場合には、返流水量はゼロの方向に向かい、PCN,t<PCnbaseではゼロとなる。
【0112】
一方で、PCN,t<PCnbaseの時は、炭素源注入量は上記のように増加の方向に向かう。
【0113】
また、上記のような切り替え制御でなく、同時に二つ以上の操作量を制御するものでもよい。
【0114】
(変形例7)
対象プロセスとしては、以下に示すような水処理プロセスのいずれに適用するようにしてもよい。
【0115】
標準活性汚泥法
2 O法(嫌気−無酸素−好気法)
AO法(嫌気−好気法)
硝化内生脱窒法
循環式硝化脱窒法
OD法
ステップ注入法
回分式活性汚泥法
間欠曝気法
担体投入型活性汚泥法
担体投入A2 O法
担体投入AO法
担体投入硝化内生脱窒法
担体投入循環式硝化脱窒法
担体投入OD法
担体投入ステップ注入法
担体投入回分式活性汚泥法
担体投入間欠曝気法
凝集剤注入型活性汚泥法
凝集剤注入A2 O法
凝集剤注入AO法
凝集剤注入硝化内生脱窒法
凝集剤注入循環式硝化脱窒法
凝集剤注入OD法
凝集剤注入ステップ注入法
凝集剤注入回分式活性汚泥法
凝集剤注入間欠曝気法
膜分離型活性汚泥法
膜分離型A2 O法
膜分離型AO法
膜分離型硝化内生脱窒法
膜分離型循環式硝化脱窒法
膜分離型OD法
膜分離型ステップ注入法
膜分離型回分式活性汚泥法
膜分離型間欠曝気法
なお、上記の他に、担体投入、凝集剤併用型のプロセス、またはAOAO法等、各種A2 O法の変法のいずれに用いるようにしてもよい。
【0116】
(変形例8)
図1の制御部8によって演算される操作量8aとしては、下水処理場に流入する流入水1のC/N比が演算される時点と曝気槽に流入するまでのタイムラグを考慮した、下記の式(1.5)に示すようなものとしてもよい。
【0117】
【数5】
Figure 0003961835
【0118】
SVQcarbon,t:時刻tにおける炭素源注入量目標値
CN:時刻tにおけるC/N比
Cnbase:基準C/N比
in,t- Δ t:時刻t−Δtにおける下水処理場流入流量
carbonTOC:炭素源のTOC濃度
T-Nin,t:時刻t−Δtにおける流入水全窒素濃度
(変形例9)
下水処理場に流入する流入水1の有機物成分濃度を直接計測したものでなくても、紫外線(UV)強度を計測するUV計により計測された紫外線(UV)強度と有機物成分濃度との相関関係から、下水処理場に流入する流入水1の有機物成分濃度を求めた換算値を使用するようにしてもよい。
【0119】
例えば、化学的酸素要求量(COD)値は、UV値と一般に高い相関関係にあると言われており、下記の式(1.6)に示すような式によって、COD値を推定することができる。
【0120】
【数6】
Figure 0003961835
【0121】
COD:COD推定値
UV:UV計測値
a,b:定数
これにより、COD計等の有機物成分濃度計が設置されていないような下水処理場においても、処理対象水の汚れ等の影響を受け難い、より安定的なセンサであるUV計の計測値を利用して、制御を行なうことができる。
【0122】
(変形例10)
図1の制御部8によって演算される操作量8a出力としては、偏差(PCN,t−PCNbase)に一次比例するものでなくとも、偏差に基づいたものであればどのようなものでもよい。
【0123】
例えば、偏差の対数log(PCN,t−PCNbase)に比例したもの、指数関数exp(PCN,t−PCNbase)、べき乗(PCN,t−PCNbasen に比例したもの等や、それらを複合したものでもよい。
【0124】
(変形例11)
C/N比としては、有機物成分濃度計4および窒素成分濃度計5の各計測値から演算されたものでなくとも、過去の流入水質パターンを利用して予測された予測値を用いて演算されたものであってもよい。
【0125】
(変形例12)
下水処理場に流入する流入水1の流入流量に対する流量比率制御の比率を補正するものや、DO制御の制御目標値を補正するものであってもよい。
【0126】
(変形例13)
図1のC/N比演算部6に加えて、C/P比演算部を備え、これらによって演算されたC/N比、C/P比に基づいて、循環流量、返送流量、曝気風量、炭素源注入量、凝集剤注入量、余剰汚泥流量、返流水流量のうちの少なくとも一つのものを調節するようにしてもよい。
【0127】
(変形例14)
図1の好気槽12の後段部、水配管52、最終沈殿池13、水配管60等、生物学的水処理がほぼ完了している部分に取り付けられた水質センサを用いたフィードバック(FB)制御により、制御量を補正するようにしてもよい。
【0128】
(第2の実施の形態)
図2は、本実施の形態による下水処理場水質制御装置の構成例を示すブロック図であり、図7と同一部分には同一符号を付してその説明を省略し、ここでは異なる部分についてのみ述べる。
【0129】
すなわち、本実施の形態による下水処理場水質制御装置は、図2に示すように、前記図7に、有機物成分濃度計測手段であるTOC計4と、リン成分濃度計測手段である全リン濃度計25と、C/P比演算部6′と、基準C/P比設定器7′と、制御部8とを付加した構成としている。
【0130】
なお、前記図7における弁24、水配管59、初沈バイパス弁23については、図2ではその図示を省略している。
【0131】
TOC計4は、前記水配管51に設置しており、下水処理場に流入する流入水1の有機物成分濃度である全有機炭素量(TOC)4aを計測する。
【0132】
全リン濃度計25は、同水配管51に設置しており、下水処理場に流入する流入水1のリン成分濃度である全リン濃度25aを計測する。
【0133】
C/P比演算部6′は、TOC計4および全リン濃度計25により計測された全有機炭素量4aおよび全リン濃度25aに基づいて、下水処理場に流入する流入水1のリン成分と有機物成分との比(C/P比)6′aを演算する。
【0134】
基準C/P比設定器7′は、基準となる基準C/P比7′aを設定する。
【0135】
制御部8は、基準C/P比設定器7′により設定された基準C/P比7′aとC/P比演算部6′により演算されたC/P比6′aとの差分に基づいて、下水処理場におけるPAC注入ポンプ16の流量を調節する操作量8aを出力する。
【0136】
次に、以上のように構成した本実施の形態による下水処理場水質制御装置の作用について説明する。
【0137】
図2において、最初沈殿池2から曝気槽に流入する水配管51上に取り付けられたTOC計4の計測値である全有機炭素量(TOC)4aと、全リン計25の計測値である全リン濃度25aは、信号線4a,25aを介して、C/P比演算部6′に入力され、これらを基にC/P比が演算される。
【0138】
この場合の演算式としては、例えば下記のような式(2.1)で表わされる。
【0139】
【数7】
Figure 0003961835
【0140】
CP,t:時刻tにおけるC/P比
TOC:流入水TOC濃度、
TP:流入水全リン濃度
上記式(2.1)により演算されたC/P比は、信号線6a′を介して制御部8へ入力される。
【0141】
一方、基準C/P比設定器7′によって、基準C/P比が設定される。
【0142】
制御部8では、C/P比演算部6′により演算されたC/P比と基準C/P比との偏差に基づき、PAC注入量目標値が、例えば下記の式(2.2)式に示すような式によって演算され、PAC注入量目標値となるように、PAC流量が調整される。
【0143】
【数8】
Figure 0003961835
【0144】
SVQPAC,t:時刻tにおけるPAC注入量目標値
CP:時刻tにおけるC/P比
Cnbase:基準C/P比
Q0:定数
K:比例定数
なお、Q0の定数は、一定流量、もしくは流入流量に対する比率制御の目標値でもよい。
【0145】
基準C/P比設定器7′によって設定される基準C/P比PCPbaseの値は、対象となる下水処理場によって異なるが、効率的なリン窒素の同時除去を行なうためには、BOD/T−P比として25程度を確保することが必要であるということから、BOD/TOC比を加味して、30〜45程度の値を設定することが好ましい。
【0146】
本下水処理場水質制御装置によって、C/P比が小さい場合には、生物学的リン除去の効率が低下するため、PACの注入量が増大する方向に向かい、逆にC/P比が大きい場合には、PACの注入量が減少する方向に向かう。
【0147】
上述したように、本実施の形態による下水処理場水質制御装置では、以下のような効果を得ることができる。
【0148】
(a)制御対象として、PAC注入ポンプ16を使用するようにしているため、C/P比が低く生物学的リン除去が困難な場合でも、放流水質のリン濃度を悪化させることなくリン除去を行なうことが可能となる。
【0149】
(b)有機物成分を計測するセンサとしてTOC計4を、リン成分を計測するセンサとして全リン計25を使用するようにしているため、正味の有機物、リン比を演算することが可能となる。
【0150】
(c)基準C/P比設定器7′により基準C/P比PCPbaseを設定しさえすれば、パラメータはKとQ0の二つと少なく、パラメータ調整を比較的容易に行なうことが可能となる。
【0151】
(d)全リン計25、TOC計4を最初沈殿池2通過後の水配管51に配しているため、水配管50に配した場合に比べて、汚れによるセンサ値異常の可能性が少なくなり、また曝気槽に流入する正味のC/P比を演算することが可能となる。
【0152】
(変形例1)
図2のリン成分濃度計25、および有機物成分濃度計4の取付位置としては、水配管50に取り付けるようにしてもよい。
【0153】
また、最初沈殿池2や流入渠、沈砂池、ポンプ井等、曝気槽の前段部であれば、いずれの位置でも使用することができる。
【0154】
(変形例2)
図2の有機物成分濃度計4としては、TOC計でなくても、BOD計、COD計のいずれを使用するようにしてもよい。
【0155】
また、リン成分濃度計25としては、全リン計でなくても、下水処理場に流入する流入水1のリン成分のほとんどはリン酸性リンであることから、リン酸性リン濃度計を使用するようにしてもよい。
【0156】
(変形例3)
図2の全リン計25としては、嫌気槽10内に取り付けられたリン酸性リン計を使用するようにしてもよい。
【0157】
(変形例4)
図2の制御部8によって演算される操作量8aとしては、PAC(凝集剤)注入量以外に、返送流量、曝気風量、炭素源注入量、余剰汚泥流量、返流水流量のいずれであってもよい。
【0158】
(変形例5)
図2の制御部8によって演算される操作量8aとしては、上記記載のもの一つだけを制御するものでなく、複数のものを制御するようにしてもよい。
【0159】
(変形例6)
対象プロセスとしては、前述したような水処理プロセスのいずれに適用するようにしてもよい。
【0160】
また、担体投入、凝集剤併用型のプロセス、またはAOAO法等、各種A2 O法の変法のいずれに用いるようにしてもよい。
【0161】
(変形例7)
図2の制御部8によって演算される操作量8aとしては、下水処理場に流入する流入水1のC/P比が演算される時点と曝気槽に流入するまでのタイムラグを考慮したものとしてもよい。
【0162】
(変形例8)
下水処理場に流入する流入水1の有機物成分濃度を直接計測したものでなくても、紫外線(UV)強度を計測するUV計により計測された紫外線(UV)強度と有機物成分濃度との相関関係から、下水処理場に流入する流入水1の有機物成分濃度を求めた換算値を使用するようにしてもよい。
【0163】
(変形例9)
C/P比は、有機物成分濃度計と窒素成分濃度計の計測値から演算されたものでなくとも、後述するような手法で予測された予測値を用いたものであっても良い。(請求項10の発明)
(変形例10)
図2の制御部8によって演算される操作量8a出力としては、偏差(PCN,t−PCNbase))に一次比例するものでなくとも、偏差に基づいたものであればどのようなものでもよい。
【0164】
例えば、偏差の対数log(PCN,t−PCNbase)に比例したもの、指数関数exp(PCN,t−PCNbase)、べき乗(PCN,t−PCNbasen に比例したもの等や、それらを複合したものでもよい。
【0165】
(変形例11)
C/P比としては、有機物成分濃度計4およびリン成分濃度計25の各計測値から演算されたものでなくとも、過去の流入水質パターン等を利用して予測された予測値を用いて演算されたものであっても良い。
【0166】
(変形例12)
下水処理場に流入する流入水1の流入流量に対する流量比率制御の比率を補正するものや、DO制御の制御目標値を補正するものであってもよい。
【0167】
(変形例13)
図2のC/P比演算部6′に加えて、C/N比演算部を備え、これらによって演算されたC/N比、C/P比に基づいて、循環流量、返送流量、曝気風量、炭素源注入量、凝集剤注入量、余剰汚泥流量、返流水流量のうちの少なくとも一つのものを調節するようにしてもよい。
【0168】
(変形例14)
図2の好気槽12の後段部、水配管52、最終沈殿池13、水配管60等、生物学的水処理がほぼ完了している部分にとりつけられた水質センサを用いたフィードバック(FB)制御により、制御量を補正するようにしてもよい。
【0169】
(第3の実施の形態)
図3は、本実施の形態による下水処理場水質制御装置の構成例を示すブロック図であり、図4と同一部分には同一符号を付してその説明を省略し、ここでは異なる部分についてのみ述べる。
【0170】
すなわち、本実施の形態による下水処理場水質制御装置は、図3に示すように、前記図4に、紫外線計測手段であるUV計30と、流量計測手段である流量計31と、NH4 計32と、窒素成分濃度計測手段であるT−N計33と、リン成分濃度計測手段であるT−P計34と、流入水質データベース26と、気象情報予測部27と、流入水質パターンデータベース28と、流入水質予測部29と、基準C/N比C/P比設定器7″と、UV→BOD換算器37と、C/N比C/P比演算部6″と、流入比率設定器38と、制御部8と、処理水質判定部36と、制御補正部35とを付加した構成としている。
【0171】
なお、前記図7における弁24、水配管59、初沈バイパス弁23、炭素源貯留槽21、炭素源注入ポンプ19、水配管57については、図3ではその図示を省略している。
【0172】
UV計30は、前記水配管51に設置しており、下水処理場に流入する流入水1の紫外線(UV)強度を計測する。
【0173】
流量計31は、同水配管51に設置しており、下水処理場に流入する流入水1の流量を計測する。
【0174】
NH4 計32は、前記好気槽12に設置しており、好気槽12内のアンモニア濃度を計測する。
【0175】
T−N計33は、前記水配管61に設置しており、処理水3の全窒素濃度を計測する。
【0176】
T−P計34は、同水配管61に設置しており、処理水3の全リン濃度を計測する。
【0177】
流入水質データベース26は、UV計30により計測された紫外線(UV)強度、NH4 計32により計測されたアンモニア濃度、T−N計33により計測された全窒素濃度、T−P計34により計測された全リン濃度、流量計31により計測された流量、および日常の水質試験である手分析による水質試験結果の各時系列データを蓄える。
【0178】
気象情報予測部27は、気象情報を予測する。
【0179】
流入水質パターンデータベース28は、流入水質データベース26に蓄積されたデータに基づいて、流入水質パターンを作成し記憶する。
【0180】
流入水質予測部29は、流入水質パターンデータベース28に蓄えられたT−Nの水質パターンと、気象情報予測部27二より予測された気象情報とに基づいて、下水処理場に流入する流入水の窒素成分濃度、リン成分濃度、有機物成分濃度のうちの少なくとも一つを予測する。
【0181】
基準C/N比C/P比設定器7″は、基準C/N比、および基準C/P比を設定する。
【0182】
UV→BOD換算器37は、UV計30により計測された紫外線(UV)強度を、生物化学的酸素要求量(BOD)に換算する。
【0183】
C/N比C/P比演算部6″は、流入水質予測部29により予測された窒素成分濃度、リン成分濃度、有機物成分濃度と、N比C/P比基準設定器7″により設定された基準C/N比、基準C/P比と、UV→BOD換算器37により換算されたBODとに基づいて、C/N比、C/P比を演算する。
【0184】
流入比率設定器38は、下水処理場に流入する流入水1の流量に対する曝気風量、循環流量、PAC注入流量の比率を設定する。
【0185】
制御部8は、C/N比C/P比演算部6″により演算されたC/N比、C/P比とC/N比C/P比基準設定器7″により設定された基準C/N比、基準C/P比それぞれの偏差に基づいて、曝気装置9、循環ポンプ14、PAC注入ポンプ16を調節するの操作量を出力する。
【0186】
処理水質判定部36は、NH4 計32により計測されたアンモニア濃度と、T−N計33により計測された全窒素濃度と、T−P計34により計測された全リン濃度とに基づいて、処理水3の水質状態を判定する。
【0187】
制御補正部35は、処理水質判定部36により判定された処理水3の水質状態と、あらかじめ設定された水質成分の目標値との差分に基づいて、制御部8から出力される曝気装置9、循環ポンプ14、PAC注入ポンプ16に対する操作量を補正する。
【0188】
次に、以上のように構成した本実施の形態による下水処理場水質制御装置の作用について、図4乃至図6に示す関係図を用いて説明する。
【0189】
図3において、最初沈殿池2から嫌気槽10に接続される水配管51上に取り付けられたUV計30の計測値である紫外線強度が、UV→BOD換算器37によってBOD値に換算され、信号線を介して、C/N比C/P比演算部6″に入力される。
【0190】
下水処理場に流入する流入水1の流入水質である窒素成分濃度、およびリン成分濃度は、下記に示すような方法で予測される。
【0191】
流入水質データベース26には、日常の水質試験により測定された水質の時系列データと流量計31による流量計測値、およびUV計30によるUV計測値の時系列データが保持されている。
【0192】
【表1】
Figure 0003961835
【0193】
流入水質パターンデータベース28には、天候、降雨量、降雨継続時間、降雨強度、気温等の気象情報、季節、平日、日曜等、日イベント毎に流入水質パターンが記憶されている。
【0194】
これは、流入水質データベース26に蓄積されたデータより作成されるものであるが、この流入水質パターンは、下水処理場のオペレータが自由に変更することができる。
【0195】
例えば、図4は、平日、夏、晴れの日の流入T−N変動パターンを示す図である。
【0196】
T−Nの水質パターンは、図4に示すように午前中にピークがある。
【0197】
T−Pの水質パターンも、同様に午前中にピークがある。
【0198】
なお、図4中、○印は、流入水質データベース26に蓄えられたデータである。
【0199】
流入水質予測部29では、その日の日イベントと気象情報予測部27によって予測された気象情報を基に類似日を選び出し、その日のT−Nの水質パターンが水質パターンデータベース28から選び出される。
【0200】
この場合、もし、その日のある時刻にT−Nが測定され、その値が流入水質データベース26に入力されれば、そのデータを基に、例えば図5に示すように、異なるT−Nの水質パターンが選定され、日変動パターンが補正される。
【0201】
また、流量計31の計測値、UV計30による計測値等、流入水質データベース26に蓄積されてくるデータにより、類似日を再検索して、日変動パターンが随時更新される。
【0202】
この流入水質予測部29で予測されたT−N濃度、T−P濃度は、信号線を介してC/N比C/P比演算部6″に入力される。
【0203】
C/N比C/P比演算部6″では、下記の式(3.1)、式(3.2)に基づき、C/N比、C/P比が、それぞれ演算される。
【0204】
【数9】
Figure 0003961835
【0205】
CN,t:時刻tにおけるC/N比
BOD:流入水BOD濃度換算値、
TN:流入水全窒素濃度予測値
【数10】
Figure 0003961835
【0206】
CP,t:時刻tにおけるC/P比
BOD:流入水BOD濃度換算値、
TP:流入水全リン濃度予測値
一方、流入比率設定部38によって、流入流量に対する曝気風量、循環流量、PAC注入流量の比率Rblow,Rcir,Rpacが、それぞれ設定される。
【0207】
そして、このC/N比C/P比演算部6″により演算されたC/N比、C/P比と、基準C/N比C/P比設定器7″により設定された基準C/N比、基準C/P比とのそれぞれの偏差に基づいて、循環流量とPAC注入量の流入流量に対する比率が補正される。
【0208】
【数11】
Figure 0003961835
【0209】
SVQblow,t:曝気風量目標値
SVQcir,t:循環流量目標値
SVQpac,t:PAC流量目標値
in,t:時刻tにおける流入流量
CNbase:基準C/N比
CPbase:基準C/P比
Sblow,Scir,Spac:制御補正量
K1,K2:定数
【0210】
【数12】
Figure 0003961835
【0211】
NH4,t:時刻tにおけるアンモニア性窒素濃度
T-N,t:時刻tにおける全窒素濃度
T-P,t:時刻tにおける全リン濃度
K3,K4,K5:定数
上記式(3.3)〜式(3.5)により、C/N比が不足した場合には、循環流量が増加し、C/P比が不足した場合には、PAC注入量が増加する。
【0212】
制御補正量(Sblow,Scir,Spac)は、下記の式(3.6)〜式(3.8)によって、それぞれ演算される。
【0213】
最終沈殿池13通過後の配管60に取り付けられたT−N計33の計数値、T−P計34の計数値、およびNH4 計32の計数値を基に、処理水3の水質状態を判定する処理水質判定部36により、T−N,T−Pの処理が悪化傾向にあると判定された場合に、補正がかけられる。
【0214】
すなわち、例えば図6(a)〜(c)に示すように、(1)T−N計33,T−P計34の計測値が連続的に上昇している場合(図6(a))、(2)T−N計33,T−P計34の計測値が処理悪化判定値以上になり一定時間経った場合(図6(b))、(3)T−N計33,T−P計34の計測値がある一定の時間幅の中で急激な濃度上昇があった場合(図6(c))等に、処理水3の水質が悪化したと判定される。
【0215】
このようなことから、処理水質判定部36で処理水の悪化が判定された場合には、次のようなロジックによって制御量が補正される。
【0216】
(1)処理水T−Nが悪化し、好気槽12内のNH4 計32による計測値が、ある一定の基準値よりも高い場合には、例えば上記式(3.6)によって曝気風量に補正がかけられる。
【0217】
(2)処理水T−Nが悪化し、処理水T−N計33の計測値と好気槽12内のNH4 計32による計測値との差がある一定以上である場合には、脱窒処理が不良と判定し、例えば上記式(3.7)によって循環流量に補正がかけられる。
【0218】
(3)処理水T−Pが悪化した場合には、例えば上記式(3.8)によってPAC流量に補正がかけられる。
【0219】
上述したように、本実施の形態による下水処理場水質制御装置では、以下のような効果を得ることができる。
【0220】
(a)下水処理場に流入する流入水1の窒素成分濃度、リン成分濃度としては、予測値を用いるようにしているため、窒素成分濃度計、リン成分濃度計が取り付けられないような機場でも、適用することが可能となる。
【0221】
(b)有機物成分濃度計の代わりに、比較的高精度で連続測定が可能なUV計30を利用して、有機物成分濃度を測定するようにしているため、より一層効果的な制御を実施することが可能となる。
【0222】
(c)放流水質の全窒素、全リン計の計測値を用いて、フィードバック(FB)制御により操作量を補正するようにしているため、処理水3の水質を悪化させることがなく制御を行なうことが可能となる。
【0223】
(d)好気槽12に取り付けられたアンモニア計32によって、処理水3の全窒素の悪化が硝化不良によるものなのか脱窒不良によるものなのかを判定して、曝気風量、循環流量を制御するようにしているため、より一層効率的な窒素除去を行なうことが可能となる。
【0224】
(変形例1)
図3の流量計31、およびUV計30の取付位置としては、水配管50に取り付けるようにしてもよい。
【0225】
また、最初沈殿池2や流入渠、沈砂池、ポンプ井等、曝気槽の前段部であれば、いずれの位置でも使用することができる。
【0226】
さらに、流量計31の代わりに、ポンプ井に設置される水位計の計測値から、Q−Hカーブで流量を演算したものを使用することもできる。
【0227】
(変形例2)
紫外線(UV)強度ではなく、有機物成分を直接測定する濃度計の計測値を有機物成分濃度として用いるようにしてもよい。
【0228】
(変形例3)
下水処理場に流入する流入水1のリン成分濃度および窒素成分濃度としては、水配管50,51、最初沈殿池2や流入渠、沈砂池、ポンプ井等、曝気槽の前段部に取り付けられたT−P計、PO4 計およびT−N計、NH4 計の計測値を利用するようにしてもよい。
【0229】
(変形例4)
水配管50,51、最初沈殿池2や流入渠、沈砂池、ポンプ井等、曝気槽の前段部にT−P計、PO4 計およびT−N計、NH4 計が取り付けられているような下水処理場においても、流入水質パターン予測により予測された値を用いて、制御を行なうようにしてもよい。
【0230】
(変形例5)
図1の制御部8によって演算される操作量8aとしては、循環流量、返送流量、曝気風量、炭素源注入量、凝集剤注入量、余剰汚泥流量、返流水流量、初沈バイパス弁のうちの少なくともいずれか一つであってもよい。
【0231】
(変形例6)
図3の処理水3のT−N計33、およびT−P計34の取付位置としては、水配管60の位置でなくとも、好気槽12の後段部、水配管52、最終沈殿池13等、生物学的水処理がほぼ完了している部分であればいずれの位置であってもよい。
【0232】
(変形例7)
制御補正用に処理水3の窒素成分を計測する窒素成分濃度計5としては、T−N計33でなくとも、アンモニア性窒素濃度、硝酸性窒素濃度、亜硝酸性窒素濃度のうちいずれであってもよく、また一つでなく複数を用いて補正を行なうようにしてもよい。
【0233】
(変形例8)
制御補正用に処理水3のリン成分を計測するリン成分濃度計としては、T−P計34でなくとも、リン酸性リン濃度であってもよく、また一つでなく複数を用いて補正を行なうようにしてもよい。
【0234】
(変形例9)
制御補正は、好気槽12の後段部、水配管52、最終沈殿池13、水配管60等、生物学的水処理がほぼ完了している部分に取り付けられたDO計、ORP計、pH計、SS計、MLSS計、UV計等の水質センサ等、いずれを用いて行なうようにしてもよい。
【0235】
(変形例10)
図3の制御部8によって演算される操作量出力としては、上記に示すような偏差に一次比例するものでなくとも、偏差に基づいたものであればどのようなものでもよい。
【0236】
例えば、偏差の対数に比例したもの、指数関数、べき乗に比例したもの等や、それらを複合したものでもよい。
【0237】
(変形例11)
制御補正部35よる出力としては、偏差に一次比例するものでなくとも、偏差に基づいたものであればどのようなものでもよい。
【0238】
例えば、偏差の対数に比例したもの、指数関数、べき乗に比例したもの等や、それらを複合したものでもよい。
【0239】
(その他の実施の形態)
尚、本発明は、上記各実施の形態に限定されるものではなく、実施段階ではその要旨を逸脱しない範囲で、種々に変形して実施することが可能である。
例えば、上記各実施の形態では、嫌気槽と無酸素槽と好気槽との組み合わせから構成される曝気槽を備えた下水処理場に本発明を適用した場合について説明したが、これに限らず、無酸素槽と好気槽との組み合わせから構成される曝気槽を備えた下水処理場についても、本発明を前述と同様に適用して同様の作用効果を得ることができる。
【0240】
また、各実施の形態は可能な限り適宜組合わせて実施してもよく、その場合には組合わせた作用効果を得ることができる。
さらに、上記各実施の形態には種々の段階の発明が含まれており、開示される複数の構成要件における適宜な組合わせにより、種々の発明を抽出することができる。
例えば、実施の形態に示される全構成要件から幾つかの構成要件が削除されても、発明が解決しようとする課題の欄で述べた課題(の少なくとも一つ)が解決でき、発明の効果の欄で述べられている効果(の少なくとも一つ)が得られる場合には、この構成要件が削除された構成を発明として抽出することができる。
【0241】
【発明の効果】
以上説明したように、本発明の下水処理場水質制御装置によれば、流入水の窒素成分と有機物成分とのC/N比、または/およびリン成分と有機物成分とのC/P比を用いて、下水処理場における循環流量、返送流量、曝気風量、炭素源注入量、余剰汚泥流量、返流水流量、初沈バイパス弁のうちの少なくとも一つを制御するようにしているので、下水処理場に流入する流入水の窒素成分と有機物成分とのC/N比、リン成分と有機物成分とのC/P比等の水質バランスが悪化したような場合においても、下水処理場から放流される処理水の窒素、リンの水質を常に良好に維持して、窒素、リン除去を行なうことが可能となる。
【図面の簡単な説明】
【図1】本発明による下水処理場水質制御装置の第1の実施の形態を示すブロック図。
【図2】本発明による下水処理場水質制御装置の第2の実施の形態を示すブロック図。
【図3】本発明による下水処理場水質制御装置の第3の実施の形態を示すブロック図。
【図4】同第3の実施の形態による下水処理場水質制御装置における作用を説明するための関係図。
【図5】同第3の実施の形態による下水処理場水質制御装置における作用を説明するための関係図。
【図6】同第3の実施の形態による下水処理場水質制御装置における作用を説明するための関係図。
【図7】凝集剤注入型嫌気−無酸素−好気法(凝集剤注入A2 O法)のプロセスから構成される曝気槽を備えた下水処理場の構成例を示すフロー図。
【図8】従来の下水処理場水質制御装置の一構成例を示すブロック図。
【符号の説明】
1…流入水
2…最初沈殿池
3…処理水
4…TOC計
5…T−N計
6…C/N比演算部
6′…C/P比演算部
6″…C/N比、C/P比演算部
7…基準C/N比設定器
7′…基準C/P比設定器
7″…基準C/N比、C/P比設定器
8…制御部
9…曝気装置
10…嫌気槽
11…無酸素槽
12…好気槽
13…最終沈殿池
14…循環ポンプ
15…返送ポンプ
16…PAC注入ポンプ
17…余剰ポンプ
18…初沈引抜ポンプ
19…炭素源注入ポンプ
20…汚泥貯留槽
21…炭素源貯留槽
22…凝集剤貯留槽
23…初沈バイパス弁
24…弁
25…T−P計
26…流入水質データベース
27…気象情報予測部
28…水質パターンデータベース
29…流入水質予測部
30…UV計
31…流量計
32…NH4
33…T−N計
34…T−P計
35…制御補正部
36…処理水質判定部
37…UV→BOD換算器
38…流入比率設定器
50〜60…水配管。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a sewage treatment plant water quality control device for controlling the quality of treated water discharged from a sewage treatment plant equipped with an aeration tank, and in particular, a ratio of nitrogen components and organic components of influent water flowing into the sewage treatment plant. (C / N ratio), even if the water quality balance such as the ratio of phosphorus component to organic component (C / P ratio) deteriorates, the quality of nitrogen and phosphorus in the treated water discharged from the sewage treatment plant The present invention relates to a water quality control device for a sewage treatment plant that can always be maintained well.
[0002]
[Prior art]
In recent years, eutrophication has progressed in closed water areas such as lakes and bays, and it is necessary to suppress the outflow of these causative substances from nitrogen and phosphorus sewage treatment plants to closed water areas.
[0003]
For this reason, in conventional sewage treatment plants, organic substances have been removed by a process called activated sludge process, but recently, due to the progress of eutrophication in closed water areas such as lakes and bays, nitrogen has been removed. There is an increasing demand for advanced treatments that also remove phosphorus.
[0004]
And, as a sewage treatment plant to meet such demands, influent water flowing into the sewage treatment plant using biological nitrification denitrification reaction, biological dephosphorization reaction, dephosphorization reaction by adding flocculant, etc. Sewage treatment plants with aeration tanks that remove nitrogen or phosphorus have been realized.
[0005]
FIG. 7 shows a coagulant injection type anaerobic-anoxic-aerobic method (coagulant injection A) which is one of the advanced treatment processes for denitrification and dephosphorization among the various water treatment processes described above.2It is a flowchart which shows the structural example of the sewage treatment plant provided with the aeration tank comprised from the process called O method.
[0006]
In FIG. 7, one of the inflow water 1 flowing into the sewage treatment plant flows into the first sedimentation basin 2 through the water pipe 50 and the valve 24, and the anaerobic tank 10 and the anoxic tank through the water pipe 51. 11 and an aerobic tank 12 provided with an aeration device 9 flows into the anaerobic tank 10 of the aeration tank.
[0007]
The other is that after flowing into the anaerobic tank 10 through the water pipe 50, the water pipe 59, and the initial settling bypass valve 23, the water pipe 52, the final settling tank 13, and the water pipe 60 are connected after being processed by the aeration tank. Then, it is discharged as treated water 3.
[0008]
On the other hand, the carbon source is injected from the carbon source storage tank 21 into the anaerobic tank 10 via the carbon source injection pump 19 and the water pipe 57.
[0009]
Further, the flocculant is injected into the aerobic tank 12 from the flocculant storage tank 22 via the PAC injection pump 16 and the water pipe 56.
[0010]
On the other hand, the non-treated water in the aerobic tank 12 is returned to the anoxic tank 11 through the water pipe 53 and the circulation pump 14.
[0011]
Further, the precipitated water in the final settling tank 13 is returned to the anaerobic tank 10 via the water pipe 54 and the return pump 15.
[0012]
Furthermore, the final sludge water in the final sedimentation basin 13 is discharged into the sludge storage tank 20 via the water pipe 55 and the surplus pump 17.
[0013]
Furthermore, the first settling sludge water in the first settling basin 2 is discharged to the sludge storage tank 20 via the first settling / pumping pump 18 and the water pipe 58.
[0014]
In the sewage treatment plant equipped with the aeration tank as described above, first, nitrogen removal is performed as follows.
[0015]
In the aerobic tank 12, ammoniacal nitrogen (NHFour-N) is nitrite nitrogen (NO) by the action of nitrifying bacteria.2-N), nitrate nitrogen (NOThreeOxidized to -N).
[0016]
Nitrite nitrogen (NO) fed into the anoxic tank 11 by the circulation pump 142-N), nitrate nitrogen (NOThree-N) is nitrogen gas (N) due to nitrate respiration or nitrite respiration by denitrifying bacteria using organic matter as a nutrient source under anoxic conditions.2) To be removed from the system.
[0017]
At this time, good nitrogen removal is not performed unless the organic matter necessary for the denitrification reaction is sufficient.
[0018]
As means for replenishing this organic matter, by opening the primary sedimentation bypass valve 23 and closing the valve 24, by bypassing the primary sedimentation basin 2 and securing the organic matter, methanol stored in the carbon source storage tank 21, There are a method of injecting a carbon source such as ethanol, acetic acid, waste acetic acid, glucose and the like, and a method of introducing the extracted sludge generated in the first sedimentation tank 2 into an aeration tank.
[0019]
Next, phosphorus removal is performed by the following mechanism.
[0020]
In the anaerobic tank 10 arranged in the front stage of the aeration tank, phosphorus accumulating bacteria in the activated sludge accumulate organic acids such as acetic acid in the body, and phosphoric acid (POFour) Is released.
[0021]
This excessively released phosphorous phosphorus is in the aerobic tank 12 arranged at the rear stage of the aeration tank, using the phosphorus excessive intake action of the phosphorus accumulating bacteria, more than the phosphate state released in the anaerobic tank 10. Phosphorus removal is performed by absorbing activated phosphorus in activated sludge.
[0022]
That is, in order to proceed such a reaction, an organic acid such as acetic acid is required as a hydrogen donor.
[0023]
At the time of rainwater inflow, the organic acid concentration becomes thin and the organic matter that can be used by phosphorus accumulating bacteria decreases, so that sufficient phosphorus exhalation reaction will not be performed, and the subsequent excessive intake reaction of phosphorus will also be insufficient .
[0024]
Therefore, in order to make up for this, a carbon source necessary for phosphorus removal is secured by means similar to the case of nitrogen removal, or polyaluminum chloride, aluminum sulfate, iron sulfate stored in the flocculant storage tank 22 By injecting a flocculant such as aluminum phosphate and precipitating a phosphorus component in the form of aluminum phosphate or iron phosphate, phosphorus is removed.
[0025]
FIG. 8 is a block diagram showing a configuration example of a conventional sewage treatment plant water quality control device.
[0026]
In FIG. 8, the inflow water 1 flowing into the sewage treatment plant is an anaerobic tank of an aeration tank configured by a combination of an anaerobic tank 100 and an aerobic tank 101 provided with an aeration device 103 via a water pipe 120. After flowing into 100 and processing in the aeration tank, it is discharged as treated water 3 through the water pipe 121, the final sedimentation basin 102, and the water pipe 122.
[0027]
On the other hand, the untreated water in the aerobic tank 101 is returned to the anoxic tank 100 via the circulation pump 104.
[0028]
Further, the precipitated water in the final settling basin 102 is returned to the anoxic tank 100 via the water pipe 123 and the return pump 105.
[0029]
On the other hand, the aerobic tank 101 is provided with an ammonia nitrogen concentration meter 106 for measuring the ammonia nitrogen concentration, and the measured value 106a is output.
[0030]
Further, the control target value setter 108 sets a control target value 108a.
[0031]
Further, in the control unit 107, an operation amount 107 a for adjusting the aeration apparatus 103 based on a deviation between the measured value 106 a from the ammonia nitrogen concentration meter 106 and the control target value 108 a set by the control unit 107 is obtained. Obtained and given to the aeration apparatus 103.
[0032]
Thereby, control is performed so as to keep the ammonia concentration in the aeration tank constant.
[0033]
[Problems to be solved by the invention]
(A) However, as shown in FIG. 8, in the control in which the aeration air volume of the aeration apparatus 103 is adjusted by feedback (FB) control based on the ammonia nitrogen concentration after nitrification in the aerobic tank 101, In spite of large fluctuations in the amount of inflow water flowing into the sewage treatment plant, the water quality reaction by microorganisms in the aeration tank is relatively slow. Therefore, with such feedback control alone, the response of the water quality reaction to the change in the manipulated variable 107a is not achieved. There is a problem that it is slow and it is difficult to keep the quality of the treated water good.
[0034]
(B) Further, only by controlling the nitrification reaction, nitrite nitrogen and nitrate nitrogen remain, and a decrease in pH of discharged water and N resulting from denitrification reaction in the final sedimentation basin2There is a problem of sludge levitation associated with gas generation.
[0035]
In the denitrification, the nitrification liquid is circulated in the anoxic tank 100 using the circulation pump 104 to perform denitrification. Conventionally, the circulation flow rate is a constant amount or a ratio control with respect to the inflow flow rate. However, there is a need for control for better denitrification.
[0036]
On the other hand, in order to perform denitrification satisfactorily, it is necessary to secure a carbon source. There is a problem that decreases.
[0037]
(C) Furthermore, ammonia component concentration meters such as ammonia nitrogen concentration meters, nitrate nitrogen concentration meters and total nitrogen concentration meters installed in sewage treatment plants, and phosphorus component concentration meters such as phosphoric acid concentration meters and total phosphorus meters Are likely to be contaminated by suspended components in sewage and often show abnormal values, so they are unstable, low-precision and difficult to use as control sensors.
[0038]
Further, even if the densitometer samples and filters, there is a problem in maintenance such as clogging of the sampling tube.
[0039]
(D) When the ratio of phosphorus component to organic component (C / P ratio) is secured to some extent, it is possible to remove phosphorus to some extent by biological dephosphorization alone, but the C / P ratio is small and phosphorus If the amount of organic matter that can be used by accumulating bacteria becomes smaller than the inflowing phosphorus, it will be difficult to remove phosphorus unless the carbon source is secured by some means or a flocculant such as polyaluminum chloride is injected. ing.
[0040]
At this time, how much the carbon source is injected is empirically performed, the cost due to the excessive injection of the flocculant, the outflow of polyaluminum chloride into the treated water, and the like are problems.
[0041]
The object of the present invention is to deteriorate the water quality balance such as the ratio (C / N ratio) of the nitrogen component and the organic substance component of the inflow water flowing into the sewage treatment plant and the ratio (C / P ratio) of the phosphorus component and the organic substance component. In such a case, it is an object of the present invention to provide a sewage treatment plant water quality control apparatus capable of always maintaining good quality of nitrogen and phosphorus in treated water discharged from the sewage treatment plant.
[0042]
[Means for Solving the Problems]
  To achieve the above objective,The present invention takes the following means.
[0044]
  ContractClaim1Departure corresponding toTomorrow,In a sewage treatment plant water quality control device that controls the quality of treated water discharged from a sewage treatment plant equipped with an aeration tank including an anaerobic tank and an aerobic tank,Phosphorus component concentration measuring means for measuring the phosphorus component concentration of the inflow water flowing into the sewage treatment plant, organic substance concentration measuring means for measuring the organic component concentration of the inflow water flowing into the sewage treatment plant, phosphorus component concentration measuring means, and C / P ratio for calculating the ratio (C / P ratio) between the phosphorus component and the organic component of the inflow water flowing into the sewage treatment plant based on the phosphorus component concentration and the organic component concentration measured by the organic component concentration measuring means A calculation means, a C / P ratio setting means for setting a reference C / P ratio as a reference, a reference C / P ratio set by the C / P ratio setting means, and a C calculated by the C / P ratio calculation means Based on the difference with the / P ratio,Precipitation water returned from the final sedimentation tank to the aeration tankReturn flow rate,Return water flow rate of return water returned from the sludge storage tank to the aeration tank,Aeration air volume, carbon source injection volume, coagulant injection volume, excess sludge flow rateFirstControl means for outputting an operation amount for controlling at least one of the sinking bypass valves.
[0045]
  Therefore, the claims1In the sewage treatment plant water quality control apparatus according to the invention, the C / P ratio of the inflow water flowing into the sewage treatment plant is calculated, and the return flow rate in the sewage treatment plant is calculated based on the difference from the reference C / P ratio. C / P ratio of inflow water flowing into sewage treatment plant by controlling at least one of aeration air volume, carbon source injection volume, coagulant injection volume, surplus sludge flow rate, return water flow rate, and primary sedimentation bypass valve Even when the water quality balance is deteriorated, it is possible to remove phosphorus by always maintaining good quality of phosphorus in the treated water discharged from the sewage treatment plant.
[0050]
  Claims2Departure corresponding toTomorrowSewage treatment plant water quality control that controls the quality of treated water discharged from a sewage treatment plant equipped with an anaerobic tank and an aerobic tank, or an aeration tank comprising a combination of an anaerobic tank, an anaerobic tank and an aerobic tank In the apparatus, the phosphorus component concentration measuring means for measuring the phosphorus component concentration in the anaerobic tank, the organic component concentration measuring means for measuring the organic component concentration of the inflow water flowing into the anaerobic tank, the phosphorus component concentration measuring means, and the organic component concentration C / P ratio calculating means for calculating a ratio (C / P ratio) between the phosphorus component and the organic substance component based on the phosphorus component concentration and the organic substance component concentration measured by the measuring means, and a reference C / P ratio as a reference Based on the difference between the C / P ratio setting means for setting, the reference C / P ratio set by the C / P ratio setting means and the C / P ratio calculated by the C / P ratio calculation means,Return flow rate of sediment water returned from the final sedimentation tank to the aeration tank, return water flow rate of return water returned from the sludge storage tank to the aeration tank,Aeration air volume, carbon source injection volume, excess sludge flow rateFirstControl means for outputting an operation amount for controlling at least one of the sinking bypass valves.
[0051]
  Therefore, the claims2In the sewage treatment plant water quality control device according to the invention, the C / P ratio between the phosphorus component and the organic matter component is calculated based on the phosphorus component concentration in the anaerobic tank and the organic component concentration of the inflow water flowing into the anaerobic tank. Calculate and control at least one of the return flow rate, aeration air flow rate, carbon source injection rate, surplus sludge flow rate, return water flow rate, and primary sediment bypass valve at the sewage treatment plant based on the difference from the standard C / P ratio. By doing so, even when the water quality balance of the C / P ratio of the inflow water flowing into the sewage treatment plant is deteriorated, the quality of phosphorus in the treated water discharged from the sewage treatment plant is always maintained well, Phosphorus removal can be performed. It can also be applied to cases where phosphorus component concentration measuring means and organic component concentration measuring means are not installed in the inflow part of the sewage treatment plant, and by controlling the concentration in the aeration tank part, controllability can be improved. It can be made even better.
[0056]
  Claims3Departure corresponding toTomorrowThe above claims1 orClaim2In any one itemCorresponding inventionIn the sewage treatment plant water quality control device, a concentration meter that measures either phosphoric acid phosphorus concentration or total phosphorus concentration is used as the phosphorus component concentration measuring means, and biochemical oxygen demand ( BOD), chemical oxygen demand (CODMn, CODcr), and a total organic carbon content (TOC) are measured.
[0057]
  Therefore, the claims3In the sewage treatment plant water quality control device according to the invention, the phosphorous component concentration measuring means uses a concentration meter that measures phosphoric acid phosphorus concentration and total phosphorus concentration, and the organic component concentration measuring means uses biochemical oxygen demand. The net C / P ratio can be calculated by using a densitometer that measures quantity (BOD), chemical oxygen demand (CODMn, CODcr), and total organic carbon (TOC).
[0060]
  Meanwhile, claims4In the invention corresponding to the above, the above claims 1 to3In the sewage treatment plant water quality control device of the invention corresponding to any one of the above, the flow rate of the inflow water flowing into the sewage treatment plant,Component concentration measurement meansandHands measuring organic component concentrationIn stepsBased on the inflow water quality database that stores the time series data of the water quality component measurement values and the water quality test results by manual analysis, and the inflow water phosphorus flowing into the sewage treatment plant based on the time series data stored in the inflow water quality database. Component concentration,as well asOrganic component concentrationDegreeInflow water quality prediction means for predicting the inflow water quality.TariComponent concentration, organic component concentration, CThe / P ratio is calculated.
[0061]
  Therefore, the claims4In the sewage treatment plant water quality control device corresponding to the Inflow water flowing intoNoComponent concentration,as well asOrganic component concentrationDegreePredict and use the predicted value, CBy calculating the / P ratio,If it is difficult to install organic component concentration measuring means or organic component concentration measuring meansIsEven when the component concentration measuring means and the organic component concentration measuring means fail, the control can be sufficiently performed.
[0062]
  Claims5In the invention corresponding to the above, the above claims 1 to4In the sewage treatment plant water quality control device according to any one of the inventions,Nitrogen component concentration measuring means for measuring the nitrogen component concentration of inflow water flowing into the sewage treatment plant, organic substance concentration measuring means for measuring the organic component concentration of inflow water flowing into the sewage treatment plant, nitrogen component concentration measuring means, C / N ratio for calculating the ratio (C / N ratio) between the nitrogen component and the organic component of the inflow water flowing into the sewage treatment plant based on the nitrogen component concentration and the organic component concentration measured by the organic component concentration measuring means. Calculation means, reference C / N ratio setting means for setting a reference C / N ratio as a reference,Flow rate measuring means for measuring the flow rate of inflow water flowing into the sewage treatment plantWhenThefurtherThe control means includes a flow rate value measured by the flow rate measurement means, a reference C / N ratio set by the reference C / N ratio setting means, and a C / N ratio calculated by the C / N ratio calculation means. Based on the difference and the difference between the reference C / P ratio set by the C / P ratio setting means and the C / P ratio calculated by the C / P ratio calculation means,Circulation flow rate of non-treated water circulated in the aeration tank, return flow rate of sediment water returned from the final sedimentation tank to the aeration tank, return water flow rate of return water returned from the sludge storage tank to the aeration tank,Aeration air volume, carbon source injection volume, excess sludge flow rateFirstAn operation amount for controlling at least one of the sinking bypass valves is output.
[0063]
  Therefore, the claims5In the sewage treatment plant water quality control device according to the invention, the flow rate measuring means for measuring the flow rate of the inflow water flowing into the sewage treatment plant is used, and the flow rate measurement value by the flow rate measurement means, the reference C / N ratio and C / Based on the difference between the N ratio and the difference between the reference C / P ratio and the C / P ratio, the circulation flow rate, return flow rate, aeration air amount, carbon source injection amount, surplus sludge flow rate, return water flow rate in the sewage treatment plant, By controlling at least one of the primary sedimentation bypass valves, the controllability is always improved even when the quality of the treated water changes due to the size of the influent water flowing into the sewage treatment plant. Can be maintained.
[0066]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0067]
(First embodiment)
FIG. 1 is a block diagram showing a configuration example of a sewage treatment plant water quality control apparatus according to the present embodiment. The same parts as those in FIG. State.
[0068]
That is, as shown in FIG. 1, the sewage treatment plant water quality control device according to the present embodiment includes a TOC meter 4 as an organic component concentration measuring means and an ammonia concentration meter 5 as a nitrogen component concentration measuring means as shown in FIG. A C / N ratio calculation unit 6, a reference C / N ratio setting unit 7, and a control unit 8 are added.
[0069]
Note that the valve 24, the water pipe 59, and the initial settling bypass valve 23 in FIG. 7 are not shown in FIG.
[0070]
The TOC meter 4 is installed in the water pipe 51, and measures the total organic carbon amount (TOC) 4a that is the organic component concentration of the inflow water 1 flowing into the sewage treatment plant.
[0071]
The ammonia concentration meter 5 is installed in the same water pipe 51 and measures the total nitrogen concentration 5a which is the nitrogen component concentration of the inflow water 1 flowing into the sewage treatment plant.
[0072]
The C / N ratio calculation unit 6 is configured to calculate the nitrogen component and the organic component of the influent 1 flowing into the sewage treatment plant based on the total organic carbon amount 4a and the total nitrogen concentration 5a measured by the TOC meter 4 and the ammonia concentration meter 5. The ratio (C / N ratio) 6a is calculated.
[0073]
The reference C / N ratio setting unit 7 sets a reference C / N ratio 7a as a reference.
[0074]
Based on the difference between the reference C / N ratio 7a set by the reference C / N ratio setter 7 and the C / N ratio 6a calculated by the C / N ratio calculation unit 6, the control unit 8 The operation amount 8a for adjusting the flow rate of the carbon injection pump 19 is output.
[0075]
Next, the operation of the sewage treatment plant water quality control apparatus according to this embodiment configured as described above will be described.
[0076]
In FIG. 1, the total organic carbon amount (TOC) 4 a that is a measured value of the TOC meter 4 mounted on the water pipe 51 that flows into the aeration tank from the first sedimentation tank 2 and the measured value of the total nitrogen meter 5. The total nitrogen concentration 5a is input to the C / N ratio calculation unit 6 via the signal lines 4a and 5a, and the C / N ratio is calculated based on these.
[0077]
An arithmetic expression in this case is expressed by, for example, the following expression (1.1).
[0078]
[Expression 1]
Figure 0003961835
[0079]
PCN: C / N ratio at time t
CTOC: TOC concentration of influent water, CTN: Total nitrogen concentration of influent
The C / N ratio calculated by the above equation (1.1) is input to the control unit 8 through the signal line 6a.
[0080]
On the other hand, the reference C / N ratio setter 7 sets the reference C / N ratio.
[0081]
In the control unit 8, based on the deviation between the C / N ratio calculated by the C / N ratio calculation unit 6 and the reference C / N ratio, the carbon source injection amount target value is expressed by, for example, the following formula (1.2) The carbon source injection amount is adjusted so that the carbon source injection amount target value is obtained.
[0082]
[Expression 2]
Figure 0003961835
[0083]
SVQcarbon, t: Carbon source injection amount target value at time t
PCN, t: C / N ratio at time t
PCnbase: Standard C / N ratio for efficient nitrogen removal
Qin: Sewage treatment plant inflow rate
CcarbonTOC: TOC concentration of carbon source
CT-Nin, t: TN concentration of influent
On the other hand, the reference C / N ratio P set by the reference C / N ratio setter 7CnbaseThe value of varies depending on the target sewage treatment plant, but in order to efficiently remove nitrogen, it is necessary to secure 3 to 4 as the BOD / t-N ratio. It is preferable to set a value of about 4 to 6 in consideration of the ratio.
[0084]
Carbon source TOC concentration CcarbonTOCCan be easily determined if the carbon source used (methanol, ethanol, acetic acid, waste acetic acid, glucose etc) and the concentration of the solution are known.
[0085]
The carbon source injection amount is adjusted according to the carbon source injection amount target value calculated by the above equation (1.2).
[0086]
The present sewage treatment plant water quality control device can inject the required amount of carbon source only when the C / N ratio is lowered, that is, when the amount of organic matter required for efficient nitrogen removal is insufficient. Nitrogen removal without excessive injection of nitrogen can be performed.
[0087]
As described above, in the sewage treatment plant water quality control apparatus according to the present embodiment, the following effects can be obtained.
[0088]
(A) Since the carbon source injection pump 19 is used as a control target, the C / N ratio corresponding to the injection amount can be easily calculated, and without excessive carbon source injection, It becomes possible to maintain a value equal to or higher than the C / N ratio required for efficient nitrogen removal.
[0089]
(B) Since the TOC meter 4 is used as a sensor for measuring organic components and the total nitrogen meter 5 is used as a sensor for measuring nitrogen components, it is possible to calculate the net organic matter and nitrogen ratio.
[0090]
(C) The reference C / N ratio P is set by the reference C / N ratio setter 7.CnbaseSince all parameters can be calculated as long as is set, there is no need for parameter adjustment.
[0091]
(D) Since the total nitrogen meter 5 and the TOC meter 4 are arranged in the water pipe 51 after first passing through the settling basin 2, there is less possibility of sensor value abnormality due to dirt as compared with the case where it is arranged in the water pipe 50. In addition, the net C / N ratio flowing into the aeration tank can be calculated.
[0092]
(Modification 1)
The nitrogen component concentration meter 5 and the organic component concentration meter 4 in FIG. 1 may be attached to the water pipe 50 as attachment positions.
[0093]
Moreover, if it is a front | former stage part of an aeration tank, such as the first sedimentation tank 2, an inflow tank, a sand basin, a pump well, etc., it can be used in any position.
[0094]
(Modification 2)
As the organic component concentration meter 4 in FIG. 1, a BOD meter or a COD meter may be used instead of the TOC meter.
[0095]
Further, as the nitrogen concentration meter 5, even if it is not a total nitrogen meter, an ammonia nitrogen concentration meter is used because most of the nitrogen component of the influent 1 flowing into the sewage treatment plant is ammonia nitrogen. It may be.
[0096]
(Modification 3)
As the nitrogen component concentration meter 5 in FIG. 1, a nitrate nitrogen meter attached in the anoxic tank 11 may be used.
[0097]
(Modification 4)
Examples of the carbon source include methanol, ethanol, acetic acid, waste acetic acid, glucose and the like.
[0098]
Moreover, you may make it use the extraction sludge of the first sedimentation basin 2 of FIG. 1, and what fermented it.
[0099]
(Modification 5)
As the operation amount 8a calculated by the control unit 8 in FIG. 1, in addition to the carbon source injection amount, the circulation flow rate, the return flow rate, the aeration air amount, the carbon source injection amount, the surplus sludge flow rate, the return water flow rate, the initial sedimentation bypass valve Either may be sufficient.
[0100]
For example, when the operation amount 8a calculated by the control unit 8 is a circulation flow rate, the target value is calculated by an arithmetic expression as shown in the following expression (1.3), for example.
[0101]
[Equation 3]
Figure 0003961835
[0102]
SVQcir, t: Carbon source injection amount target value at time t
PCN, t: C / N ratio at time t
PCnbase: C / N ratio for efficient nitrogen removal
Q0: Constant
K: Proportional constant
The constant of Q0 may be a constant flow rate or a target value for ratio control with respect to the inflow flow rate.
[0103]
Thereby, when the C / N ratio is insufficient, the circulating flow rate is controlled to increase, and when the C / N ratio is sufficient, the circulating flow rate is controlled to decrease, so that nitrogen removal can be performed efficiently. .
[0104]
(Modification 6)
The operation amount 8a calculated by the control unit 8 of FIG. 1 is not limited to the one described above, but may be a plurality of operations.
[0105]
For example, when the carbon source injection amount and the return water flow rate are selected as the operation amount 8 a calculated by the control unit 8, the C / N ratio is higher than the value set by the reference C / N ratio setting unit 7. When it is large, the return water flow rate is controlled in the form as shown in the following formula (1.4), and when the C / N ratio is smaller than the value set by the reference C / N ratio setter 7 Is controlled such that the carbon source injection amount is as shown in the equation (1.2).
[0106]
In this way, switching control may be performed.
[0107]
That is, the return water returned from the sludge storage tank 20 has a higher nitrogen load and a lower C / N ratio than the inflow water flowing from the sewer pipe. Acts in the direction of decreasing the ratio.
[0108]
When the C / N ratio is large, the control target value is calculated so that the return water amount increases.
[0109]
Further, when the C / N ratio becomes smaller, the control target value is calculated so that the return water amount becomes smaller.
[0110]
[Expression 4]
Figure 0003961835
[0111]
SVQcir, t: Carbon source injection amount target value at time t
PCN: C / N ratio at time t
PCnbase: Standard C / N ratio
TI: Integration time
Q0: Constant
K: Proportional constant
When the C / N ratio is smaller than the value set by the reference C / N ratio setting unit 7 and the carbon source is insufficient, the return water amount is directed toward zero and PCN, t<PCnbaseThen it becomes zero.
[0112]
On the other hand, PCN, t<PCnbaseIn this case, the carbon source injection amount tends to increase as described above.
[0113]
Further, instead of the switching control as described above, two or more operation amounts may be controlled simultaneously.
[0114]
(Modification 7)
The target process may be applied to any of the following water treatment processes.
[0115]
Standard activated sludge method
A2O method (anaerobic-anoxic-aerobic method)
AO method (anaerobic-aerobic method)
Nitrification endogenous denitrification method
Circulating nitrification denitrification method
OD method
Step injection method
Batch activated sludge process
Intermittent aeration
Activated sludge method with carrier
Carrier input A2O method
Carrier input AO method
Nitrification endogenous denitrification method
Circulating nitrification denitrification method with carrier
Carrier loading OD method
Carrier injection step injection method
Batch loading activated sludge method
Intermittent aeration method with carrier
Coagulant injection type activated sludge method
Flocculant injection A2O method
Flocculant injection AO method
Flocculant injection nitrification endogenous denitrification method
Coagulant injection circulation nitrification denitrification method
Flocculant injection OD method
Flocculant injection step injection method
Coagulant injection batch activated sludge method
Flocculant injection intermittent aeration method
Membrane separation activated sludge method
Membrane separation type A2O method
Membrane separation type AO method
Membrane separation type nitrification endogenous denitrification method
Membrane separation type circulation nitrification denitrification method
Membrane separation OD method
Membrane separation type step injection method
Membrane separation type batch activated sludge method
Membrane separation type intermittent aeration method
In addition to the above, various types of A, such as carrier loading, coagulant combined process, or AOAO method, etc.2You may make it use for any modification of O method.
[0116]
(Modification 8)
The operation amount 8a calculated by the control unit 8 of FIG. 1 is as follows in consideration of the time lag until the C / N ratio of the influent water 1 flowing into the sewage treatment plant is calculated and the flow into the aeration tank. It is good also as what is shown to Formula (1.5).
[0117]
[Equation 5]
Figure 0003961835
[0118]
SVQcarbon, t: Carbon source injection amount target value at time t
PCN: C / N ratio at time t
PCnbase: Standard C / N ratio
Qin, t- Δ t: Sewage treatment plant inflow rate at time t-Δt
CcarbonTOC: TOC concentration of carbon source
CT-Nin, t: Total nitrogen concentration of influent at time t-Δt
(Modification 9)
Correlation between the ultraviolet ray (UV) intensity measured by a UV meter that measures the ultraviolet ray (UV) intensity and the organic substance component concentration, even if the organic substance component concentration of the influent 1 flowing into the sewage treatment plant is not directly measured. Therefore, a conversion value obtained by obtaining the organic component concentration of the influent water 1 flowing into the sewage treatment plant may be used.
[0119]
For example, it is said that the chemical oxygen demand (COD) value is generally highly correlated with the UV value, and the COD value can be estimated by the following equation (1.6). it can.
[0120]
[Formula 6]
Figure 0003961835
[0121]
CCOD: COD estimate
CUV: UV measurement value
a, b: constant
As a result, even in a sewage treatment plant where an organic component concentration meter such as a COD meter is not installed, the measurement value of the UV meter, which is a more stable sensor, is less affected by contamination of the water to be treated. Thus, control can be performed.
[0122]
(Modification 10)
The operation amount 8a output calculated by the control unit 8 in FIG.CN, t-PCNbase) As long as it is based on the deviation.
[0123]
For example, the logarithm log (PCN, t-PCNbase), An exponential function exp (PCN, t-PCNbase), Power (PCN, t-PCNbase)nIt is also possible to use something that is proportional to or a combination of these.
[0124]
(Modification 11)
The C / N ratio is not calculated from the measured values of the organic component concentration meter 4 and the nitrogen component concentration meter 5, but is calculated using predicted values predicted using past inflow water quality patterns. It may be.
[0125]
(Modification 12)
What correct | amends the ratio of the flow rate ratio control with respect to the inflow flow rate of the inflowing water 1 which flows in into a sewage treatment plant, and correct | amends the control target value of DO control.
[0126]
(Modification 13)
In addition to the C / N ratio calculation unit 6 of FIG. 1, a C / P ratio calculation unit is provided, and based on the C / N ratio and C / P ratio calculated by these, the circulation flow rate, the return flow rate, the aeration air volume, At least one of the carbon source injection amount, the flocculant injection amount, the excess sludge flow rate, and the return water flow rate may be adjusted.
[0127]
(Modification 14)
Feedback (FB) using a water quality sensor attached to a part where biological water treatment is almost completed, such as the rear part of the aerobic tank 12 in FIG. 1, the water pipe 52, the final sedimentation tank 13, the water pipe 60, etc. The control amount may be corrected by the control.
[0128]
(Second Embodiment)
FIG. 2 is a block diagram showing an example of the configuration of the sewage treatment plant water quality control apparatus according to the present embodiment. The same parts as those in FIG. State.
[0129]
That is, as shown in FIG. 2, the sewage treatment plant water quality control apparatus according to the present embodiment includes a TOC meter 4 as an organic component concentration measuring means and a total phosphorus concentration meter as a phosphorus component concentration measuring means in FIG. 25, a C / P ratio calculation unit 6 ', a reference C / P ratio setter 7', and a control unit 8 are added.
[0130]
Note that the valve 24, the water pipe 59, and the initial sediment bypass valve 23 in FIG. 7 are not shown in FIG.
[0131]
The TOC meter 4 is installed in the water pipe 51, and measures the total organic carbon amount (TOC) 4a that is the organic component concentration of the inflow water 1 flowing into the sewage treatment plant.
[0132]
The total phosphorus concentration meter 25 is installed in the same water pipe 51 and measures the total phosphorus concentration 25a which is the phosphorus component concentration of the inflow water 1 flowing into the sewage treatment plant.
[0133]
The C / P ratio calculation unit 6 'calculates the phosphorus component of the influent 1 flowing into the sewage treatment plant based on the total organic carbon amount 4a and the total phosphorus concentration 25a measured by the TOC meter 4 and the total phosphorus concentration meter 25. The ratio (C / P ratio) 6′a with the organic component is calculated.
[0134]
The reference C / P ratio setting unit 7 'sets a reference C / P ratio 7'a as a reference.
[0135]
The control unit 8 determines the difference between the reference C / P ratio 7'a set by the reference C / P ratio setter 7 'and the C / P ratio 6'a calculated by the C / P ratio calculation unit 6'. Based on this, an operation amount 8a for adjusting the flow rate of the PAC injection pump 16 in the sewage treatment plant is output.
[0136]
Next, the operation of the sewage treatment plant water quality control apparatus according to this embodiment configured as described above will be described.
[0137]
In FIG. 2, the total organic carbon amount (TOC) 4 a that is a measurement value of the TOC meter 4 mounted on the water pipe 51 that flows into the aeration tank from the first settling basin 2 and the total measurement value of the total phosphorus meter 25. The phosphorus concentration 25a is input to the C / P ratio calculation unit 6 'via the signal lines 4a and 25a, and the C / P ratio is calculated based on these.
[0138]
An arithmetic expression in this case is expressed by, for example, the following expression (2.1).
[0139]
[Expression 7]
Figure 0003961835
[0140]
PCP, t: C / P ratio at time t
CTOC: TOC concentration of influent water,
CTP: Total phosphorus concentration of influent
The C / P ratio calculated by the above equation (2.1) is input to the control unit 8 through the signal line 6a ′.
[0141]
On the other hand, the reference C / P ratio is set by the reference C / P ratio setter 7 '.
[0142]
In the control unit 8, based on the deviation between the C / P ratio calculated by the C / P ratio calculation unit 6 ′ and the reference C / P ratio, the PAC injection amount target value is expressed by, for example, the following formula (2.2) The PAC flow rate is adjusted so that the PAC injection amount target value is obtained by the calculation shown in FIG.
[0143]
[Equation 8]
Figure 0003961835
[0144]
SVQPAC, t: PAC injection target value at time t
PCP: C / P ratio at time t
PCnbase: Standard C / P ratio
Q0: Constant
K: Proportional constant
The constant of Q0 may be a constant flow rate or a target value for ratio control with respect to the inflow flow rate.
[0145]
Reference C / P ratio P set by reference C / P ratio setter 7 'CPbaseThe value of varies depending on the target sewage treatment plant, but in order to efficiently remove phosphorus nitrogen simultaneously, it is necessary to secure a BOD / TP ratio of about 25. Considering the / TOC ratio, it is preferable to set a value of about 30 to 45.
[0146]
When the C / P ratio is small by this sewage treatment plant water quality control device, the biological phosphorus removal efficiency decreases, so that the PAC injection amount increases and conversely the C / P ratio is large. In this case, the PAC injection amount is reduced.
[0147]
As described above, in the sewage treatment plant water quality control apparatus according to the present embodiment, the following effects can be obtained.
[0148]
(A) Since the PAC infusion pump 16 is used as a control target, even if the C / P ratio is low and biological phosphorus removal is difficult, phosphorus removal can be performed without deteriorating the phosphorus concentration of the discharged water quality. Can be performed.
[0149]
(B) Since the TOC meter 4 is used as the sensor for measuring the organic component and the total phosphorus meter 25 is used as the sensor for measuring the phosphorus component, the net organic matter and the phosphorus ratio can be calculated.
[0150]
(C) The reference C / P ratio P is set by the reference C / P ratio setter 7 '.CPbaseAs long as is set, there are only two parameters, K and Q0, and parameter adjustment can be performed relatively easily.
[0151]
(D) Since the total phosphorus meter 25 and the TOC meter 4 are arranged in the water pipe 51 after first passing through the settling basin 2, the possibility of abnormal sensor values due to dirt is less than in the case of arranging the water pipe 50. In addition, it is possible to calculate the net C / P ratio flowing into the aeration tank.
[0152]
(Modification 1)
The phosphorus component concentration meter 25 and the organic component concentration meter 4 in FIG. 2 may be attached to the water pipe 50 as attachment positions.
[0153]
Moreover, if it is a front | former stage part of an aeration tank, such as the first sedimentation tank 2, an inflow tank, a sand basin, a pump well, etc., it can be used in any position.
[0154]
(Modification 2)
As the organic component concentration meter 4 in FIG. 2, not only a TOC meter but also a BOD meter or a COD meter may be used.
[0155]
Further, even if the phosphorus component concentration meter 25 is not a total phosphorus meter, since most of the phosphorus component of the influent 1 flowing into the sewage treatment plant is phosphoric acid phosphorus, a phosphoric acid phosphorus concentration meter is used. It may be.
[0156]
(Modification 3)
As the total phosphorus meter 25 in FIG. 2, a phosphoric acid phosphorus meter attached in the anaerobic tank 10 may be used.
[0157]
(Modification 4)
The operation amount 8a calculated by the control unit 8 in FIG. 2 may be any one of a return flow rate, an aeration air amount, a carbon source injection amount, an excess sludge flow rate, and a return water flow rate in addition to the PAC (flocculant) injection amount. Good.
[0158]
(Modification 5)
The operation amount 8a calculated by the control unit 8 in FIG. 2 is not limited to controlling only one described above, but may be a plurality of operations.
[0159]
(Modification 6)
The target process may be applied to any of the water treatment processes as described above.
[0160]
Also, various types of A such as carrier loading, coagulant combined type process, AOAO method, etc.2You may make it use for any modification of O method.
[0161]
(Modification 7)
As the operation amount 8a calculated by the control unit 8 in FIG. 2, the time point until the C / P ratio of the influent water 1 flowing into the sewage treatment plant is calculated and the time lag until it flows into the aeration tank may be considered. Good.
[0162]
(Modification 8)
Correlation between the ultraviolet ray (UV) intensity measured by a UV meter that measures the ultraviolet ray (UV) intensity and the organic substance component concentration, even if the organic substance component concentration of the influent 1 flowing into the sewage treatment plant is not directly measured. Therefore, a conversion value obtained by obtaining the organic component concentration of the influent water 1 flowing into the sewage treatment plant may be used.
[0163]
(Modification 9)
The C / P ratio may not be calculated from the measured values of the organic substance concentration meter and the nitrogen component concentration meter, but may be a prediction value predicted by a method described later. (Invention of Claim 10)
(Modification 10)
The output of the operation amount 8a calculated by the control unit 8 in FIG.CN, t-PCNbaseEven if it is not linearly proportional to)), it may be anything based on deviation.
[0164]
For example, the logarithm log (PCN, t-PCNbase), An exponential function exp (PCN, t-PCNbase), Power (PCN, t-PCNbase)nIt is also possible to use something that is proportional to or a combination of these.
[0165]
(Modification 11)
The C / P ratio is not calculated from the measured values of the organic substance concentration meter 4 and the phosphorus component concentration meter 25, but is calculated using a predicted value predicted using a past influent water quality pattern or the like. It may be what was done.
[0166]
(Modification 12)
What correct | amends the ratio of the flow rate ratio control with respect to the inflow flow rate of the inflowing water 1 which flows in into a sewage treatment plant, and correct | amends the control target value of DO control.
[0167]
(Modification 13)
In addition to the C / P ratio calculation unit 6 'of FIG. 2, a C / N ratio calculation unit is provided, and based on the C / N ratio and C / P ratio calculated by these, the circulation flow rate, the return flow rate, and the aeration air volume The carbon source injection amount, the flocculant injection amount, the excess sludge flow rate, and the return water flow rate may be adjusted.
[0168]
(Modification 14)
Feedback (FB) using a water quality sensor attached to a portion where biological water treatment is almost completed, such as the rear stage of the aerobic tank 12, the water pipe 52, the final sedimentation tank 13, the water pipe 60, etc. The control amount may be corrected by the control.
[0169]
(Third embodiment)
FIG. 3 is a block diagram showing a configuration example of the sewage treatment plant water quality control apparatus according to the present embodiment. The same parts as those in FIG. State.
[0170]
That is, as shown in FIG. 3, the sewage treatment plant water quality control apparatus according to the present embodiment includes, in FIG. 4, a UV meter 30 that is an ultraviolet ray measuring means, a flow meter 31 that is a flow rate measuring means, and an NH.FourTotal meter 32, TN meter 33 as nitrogen component concentration measuring means, TP meter 34 as phosphorus component concentration measuring means, influent water quality database 26, weather information prediction unit 27, influent water quality pattern database 28 An inflow water quality prediction unit 29, a reference C / N ratio C / P ratio setter 7 ″, a UV → BOD converter 37, a C / N ratio C / P ratio calculation unit 6 ″, and an inflow ratio setter. 38, a control unit 8, a treated water quality determination unit 36, and a control correction unit 35 are added.
[0171]
Note that the illustration of the valve 24, the water pipe 59, the initial sediment bypass valve 23, the carbon source storage tank 21, the carbon source injection pump 19, and the water pipe 57 in FIG. 7 is omitted in FIG.
[0172]
The UV meter 30 is installed in the water pipe 51 and measures the ultraviolet (UV) intensity of the inflow water 1 flowing into the sewage treatment plant.
[0173]
The flow meter 31 is installed in the same water pipe 51 and measures the flow rate of the influent water 1 flowing into the sewage treatment plant.
[0174]
NHFourThe total 32 is installed in the aerobic tank 12 and measures the ammonia concentration in the aerobic tank 12.
[0175]
The TN meter 33 is installed in the water pipe 61 and measures the total nitrogen concentration of the treated water 3.
[0176]
The TP meter 34 is installed in the water pipe 61 and measures the total phosphorus concentration of the treated water 3.
[0177]
The influent water quality database 26 includes ultraviolet (UV) intensity measured by the UV meter 30, NHFourAmmonia concentration measured by meter 32, total nitrogen concentration measured by TN meter 33, total phosphorus concentration measured by TP meter 34, flow rate measured by flow meter 31, and daily water quality test Each time series data of the water quality test result by a certain manual analysis is stored.
[0178]
The weather information prediction unit 27 predicts weather information.
[0179]
The inflow water quality pattern database 28 creates and stores an inflow water quality pattern based on the data accumulated in the inflow water quality database 26.
[0180]
The inflow water quality prediction unit 29 is based on the TN water quality pattern stored in the inflow water quality pattern database 28 and the meteorological information predicted by the meteorological information prediction unit 272, and the inflow water flowing into the sewage treatment plant. Predict at least one of nitrogen component concentration, phosphorus component concentration, and organic component concentration.
[0181]
The reference C / N ratio C / P ratio setter 7 ″ sets a reference C / N ratio and a reference C / P ratio.
[0182]
The UV → BOD converter 37 converts the ultraviolet (UV) intensity measured by the UV meter 30 into a biochemical oxygen demand (BOD).
[0183]
The C / N ratio C / P ratio calculation unit 6 ″ is set by the nitrogen component concentration, the phosphorus component concentration, the organic component concentration predicted by the influent water quality prediction unit 29, and the N ratio C / P ratio reference setting unit 7 ″. Based on the reference C / N ratio, the reference C / P ratio, and the BOD converted by the UV → BOD converter 37, the C / N ratio and the C / P ratio are calculated.
[0184]
The inflow rate setting unit 38 sets the ratio of the aeration air volume, the circulation flow rate, and the PAC injection flow rate with respect to the flow rate of the influent water 1 flowing into the sewage treatment plant.
[0185]
The control unit 8 includes the C / N ratio calculated by the C / N ratio C / P ratio calculation unit 6 ″, the reference C set by the C / P ratio and the C / N ratio C / P ratio reference setting unit 7 ″. Based on the deviations of the / N ratio and the reference C / P ratio, the operation amounts for adjusting the aeration apparatus 9, the circulation pump 14, and the PAC injection pump 16 are output.
[0186]
The treated water quality determination unit 36 is NHFourBased on the ammonia concentration measured by the meter 32, the total nitrogen concentration measured by the TN meter 33, and the total phosphorus concentration measured by the TP meter 34, the water quality state of the treated water 3 is determined. .
[0187]
The control correction unit 35 is based on the difference between the water quality state of the treated water 3 determined by the treated water quality determination unit 36 and the preset target value of the water quality component, and the aeration apparatus 9 output from the control unit 8; The operation amounts for the circulation pump 14 and the PAC injection pump 16 are corrected.
[0188]
Next, the operation of the sewage treatment plant water quality control apparatus according to the present embodiment configured as described above will be described with reference to the relational diagrams shown in FIGS.
[0189]
In FIG. 3, the UV intensity, which is a measurement value of the UV meter 30 attached on the water pipe 51 connected to the anaerobic tank 10 from the first sedimentation basin 2, is converted into a BOD value by the UV → BOD converter 37, It is input to the C / N ratio C / P ratio calculation unit 6 ″ via a line.
[0190]
The nitrogen component concentration and the phosphorus component concentration, which are the influent quality of the influent 1 flowing into the sewage treatment plant, are predicted by the following method.
[0191]
The inflow water quality database 26 holds time-series data of water quality measured by daily water quality tests, flow rate measurement values by the flow meter 31, and time-series data of UV measurement values by the UV meter 30.
[0192]
[Table 1]
Figure 0003961835
[0193]
Inflow water quality pattern database 28 stores inflow water quality patterns for each day event such as weather, rainfall, rainfall duration, rainfall intensity, temperature, weather information, season, weekdays, Sundays, and the like.
[0194]
This is created from data stored in the influent water quality database 26, but this influent water quality pattern can be freely changed by the operator of the sewage treatment plant.
[0195]
For example, FIG. 4 is a diagram illustrating an inflow TN fluctuation pattern on weekdays, summer, and sunny days.
[0196]
The water quality pattern of TN has a peak in the morning as shown in FIG.
[0197]
Similarly, the TP water quality pattern has a peak in the morning.
[0198]
In FIG. 4, the circles indicate data stored in the influent water quality database 26.
[0199]
The inflow water quality prediction unit 29 selects a similar day based on the day event of the day and the weather information predicted by the weather information prediction unit 27, and selects the TN water quality pattern of the day from the water quality pattern database 28.
[0200]
In this case, if TN is measured at a certain time of the day and the value is input to the influent water quality database 26, the water quality of different TN is obtained based on the data, for example, as shown in FIG. A pattern is selected and the daily fluctuation pattern is corrected.
[0201]
In addition, the daily variation pattern is updated from time to time by searching again for similar days based on data accumulated in the influent water quality database 26 such as measurement values of the flow meter 31 and measurement values of the UV meter 30.
[0202]
The TN concentration and the TP concentration predicted by the inflow water quality prediction unit 29 are input to the C / N ratio C / P ratio calculation unit 6 ″ via a signal line.
[0203]
The C / N ratio C / P ratio calculation unit 6 ″ calculates a C / N ratio and a C / P ratio based on the following formulas (3.1) and (3.2), respectively.
[0204]
[Equation 9]
Figure 0003961835
[0205]
PCN, t: C / N ratio at time t
CBOD: Inflow water BOD concentration conversion value,
CTN: Inflow water total nitrogen concentration predicted value
[Expression 10]
Figure 0003961835
[0206]
PCP, t: C / P ratio at time t
CBOD: Inflow water BOD concentration conversion value,
CTP: Predicted total phosphorus concentration in influent
On the other hand, the ratios Rblow, Rcir, and Rpac of the aeration air amount, the circulation flow rate, and the PAC injection flow rate with respect to the inflow rate are set by the inflow rate setting unit 38, respectively.
[0207]
Then, the C / N ratio and C / P ratio calculated by the C / N ratio C / P ratio calculating unit 6 ″ and the reference C / N ratio C / P ratio setter 7 ″ are set as the reference C / N ratio. Based on the respective deviations between the N ratio and the reference C / P ratio, the ratio of the circulation flow rate and the PAC injection amount to the inflow rate is corrected.
[0208]
## EQU11 ##
Figure 0003961835
[0209]
SVQblow, t: Aeration air flow target value
SVQcir, t: Circulation flow target value
SVQpac, t: PAC flow rate target value
Qin, t: Inflow flow rate at time t
PCNbase: Standard C / N ratio
PCPbase: Standard C / P ratio
Sblow, Scir, Spac: Control correction amount
K1, K2: Constant
[0210]
[Expression 12]
Figure 0003961835
[0211]
CNH4, t: Ammonia nitrogen concentration at time t
CTN, t: Total nitrogen concentration at time t
CTP, t: Total phosphorus concentration at time t
K3, K4, K5: Constant
According to the above formulas (3.3) to (3.5), when the C / N ratio is insufficient, the circulation flow rate is increased, and when the C / P ratio is insufficient, the PAC injection amount is increased. .
[0212]
The control correction amounts (Sblow, Scir, Spac) are calculated by the following equations (3.6) to (3.8), respectively.
[0213]
Count value of TN meter 33 attached to pipe 60 after passing through final sedimentation tank 13, count value of TP meter 34, and NHFourWhen the treated water quality determination unit 36 that determines the water quality state of the treated water 3 based on the count value of the total 32 determines that the treatment of TN and TP tends to deteriorate, correction is applied. .
[0214]
That is, for example, as shown in FIGS. 6A to 6C, (1) when the measured values of the TN meter 33 and the TP meter 34 are continuously increasing (FIG. 6A). (2) When the measured values of the TN meter 33 and the TP meter 34 are equal to or greater than the processing deterioration judgment value and a predetermined time has elapsed (FIG. 6B), (3) the TN meter 33, T- It is determined that the water quality of the treated water 3 has deteriorated, for example, when there is a sudden increase in concentration within a certain time width measured by the P meter 34 (FIG. 6C).
[0215]
For this reason, when the treated water quality determination unit 36 determines that the treated water has deteriorated, the control amount is corrected by the following logic.
[0216]
(1) The treated water TN deteriorates and NH in the aerobic tank 12FourIf the measured value by the meter 32 is higher than a certain reference value, the aeration air volume is corrected by the above equation (3.6), for example.
[0217]
(2) The treated water TN deteriorates, the measured value of the treated water TN meter 33 and the NH in the aerobic tank 12FourWhen the difference from the measured value by the total 32 is a certain value or more, it is determined that the denitrification process is defective, and the circulation flow rate is corrected by, for example, the above equation (3.7).
[0218]
(3) When the treated water TP deteriorates, the PAC flow rate is corrected by, for example, the above equation (3.8).
[0219]
As described above, in the sewage treatment plant water quality control apparatus according to the present embodiment, the following effects can be obtained.
[0220]
(A) Predicted values are used for the nitrogen component concentration and the phosphorus component concentration of the influent water 1 flowing into the sewage treatment plant. Therefore, even in a field where a nitrogen component concentration meter and a phosphorus component concentration meter cannot be attached. Can be applied.
[0221]
(B) Instead of the organic substance concentration meter, the UV meter 30 capable of continuous measurement with relatively high accuracy is used to measure the organic component concentration, so that more effective control is performed. It becomes possible.
[0222]
(C) Since the manipulated variable is corrected by feedback (FB) control using the measured values of the total nitrogen and total phosphorus meter of the discharged water quality, the control is performed without deteriorating the water quality of the treated water 3. It becomes possible.
[0223]
(D) By using the ammonia meter 32 attached to the aerobic tank 12, it is determined whether the deterioration of the total nitrogen in the treated water 3 is due to defective nitrification or defective denitrification, and the aeration air volume and circulation flow rate are controlled. Therefore, more efficient nitrogen removal can be performed.
[0224]
(Modification 1)
The flow meter 31 and the UV meter 30 in FIG. 3 may be attached to the water pipe 50 as attachment positions.
[0225]
Moreover, if it is a front | former stage part of an aeration tank, such as the first sedimentation tank 2, an inflow tank, a sand basin, a pump well, etc., it can be used in any position.
[0226]
Further, instead of the flow meter 31, a flow rate calculated by a QH curve from a measured value of a water level meter installed in a pump well can be used.
[0227]
(Modification 2)
You may make it use not the ultraviolet-ray (UV) intensity | strength but the measured value of the densitometer which measures an organic substance component directly as an organic substance component density | concentration.
[0228]
(Modification 3)
The phosphorus component concentration and nitrogen component concentration of the influent water 1 flowing into the sewage treatment plant were attached to the upstream part of the aeration tank, such as the water pipes 50 and 51, the first sedimentation basin 2, the inflow basin, the sand basin, and the pump well. TP meter, POFourMeter and TN meter, NHFourYou may make it utilize the measured value of a meter.
[0229]
(Modification 4)
Water pipes 50 and 51, first sedimentation basin 2, inflow basin, sand basin, pump well, etc.FourMeter and TN meter, NHFourEven in a sewage treatment plant where a meter is attached, control may be performed using a value predicted by inflow water quality pattern prediction.
[0230]
(Modification 5)
The operation amount 8a calculated by the control unit 8 in FIG. 1 includes a circulation flow rate, a return flow rate, an aeration air amount, a carbon source injection amount, a flocculant injection amount, an excess sludge flow rate, a return water flow rate, and a primary sedimentation bypass valve. It may be at least one of them.
[0231]
(Modification 6)
As a mounting position of the TN meter 33 and the TP meter 34 of the treated water 3 in FIG. 3, the rear stage portion of the aerobic tank 12, the water pipe 52, and the final sedimentation tank 13 are not necessarily located at the water pipe 60. Any position may be used as long as the biological water treatment is almost completed.
[0232]
(Modification 7)
The nitrogen component concentration meter 5 that measures the nitrogen component of the treated water 3 for control correction may be any one of ammonia nitrogen concentration, nitrate nitrogen concentration, and nitrite nitrogen concentration instead of the TN meter 33. Alternatively, the correction may be performed using a plurality instead of one.
[0233]
(Modification 8)
As a phosphorus component concentration meter for measuring the phosphorus component of the treated water 3 for control correction, the phosphoric acid phosphorus concentration may be used instead of the TP meter 34, and the correction may be made using a plurality instead of one. You may make it perform.
[0234]
(Modification 9)
The control correction is performed by a DO meter, an ORP meter, a pH meter attached to a part where biological water treatment is almost completed, such as the rear stage of the aerobic tank 12, the water pipe 52, the final sedimentation basin 13, the water pipe 60, etc. , SS quality meter, MLSS meter, water quality sensor such as UV meter, etc. may be used.
[0235]
(Modification 10)
The manipulated variable output calculated by the control unit 8 in FIG. 3 may be any output as long as it is based on the deviation, as long as it is not linearly proportional to the deviation as described above.
[0236]
For example, a value proportional to the logarithm of the deviation, an exponential function, a value proportional to a power, or a combination of these may be used.
[0237]
(Modification 11)
The output from the control correction unit 35 may be any output as long as it is based on the deviation, without being linearly proportional to the deviation.
[0238]
For example, a value proportional to the logarithm of the deviation, an exponential function, a value proportional to a power, or a combination of these may be used.
[0239]
(Other embodiments)
The present invention is not limited to the above-described embodiments, and various modifications can be made without departing from the scope of the invention at the stage of implementation.
For example, in each of the above-described embodiments, the case where the present invention is applied to a sewage treatment plant including an aeration tank including a combination of an anaerobic tank, an oxygen-free tank, and an aerobic tank is described. The same effect can be obtained by applying the present invention in the same manner as described above to a sewage treatment plant including an aeration tank constituted by a combination of an anaerobic tank and an aerobic tank.
[0240]
In addition, the embodiments may be implemented in appropriate combinations as much as possible, and in that case, combined effects can be obtained.
Further, the above embodiments include inventions at various stages, and various inventions can be extracted by appropriately combining a plurality of disclosed constituent elements.
For example, even if some constituent requirements are deleted from all the constituent requirements shown in the embodiment, the problem (at least one) described in the column of the problem to be solved by the invention can be solved, and the effect of the invention can be solved. When (at least one of) the effects described in the column can be obtained, a configuration in which this configuration requirement is deleted can be extracted as an invention.
[0241]
【The invention's effect】
As described above, according to the sewage treatment plant water quality control apparatus of the present invention, the C / N ratio between the nitrogen component and the organic component of the influent water or / and the C / P ratio between the phosphorus component and the organic component are used. Therefore, at least one of the circulation flow rate, return flow rate, aeration air flow rate, carbon source injection rate, surplus sludge flow rate, return water flow rate, and primary sedimentation bypass valve in the sewage treatment plant is controlled. Even if the water quality balance such as the C / N ratio between the nitrogen component and the organic component and the C / P ratio between the phosphorus component and the organic component deteriorates, the water discharged from the sewage treatment plant is discharged. It is possible to remove nitrogen and phosphorus while always maintaining good quality of water nitrogen and phosphorus.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a first embodiment of a sewage treatment plant water quality control apparatus according to the present invention.
FIG. 2 is a block diagram showing a second embodiment of a sewage treatment plant water quality control apparatus according to the present invention.
FIG. 3 is a block diagram showing a third embodiment of a sewage treatment plant water quality control apparatus according to the present invention.
FIG. 4 is a relationship diagram for explaining the operation of the sewage treatment plant water quality control apparatus according to the third embodiment.
FIG. 5 is a relationship diagram for explaining the operation of the sewage treatment plant water quality control apparatus according to the third embodiment.
FIG. 6 is a relationship diagram for explaining the operation of the sewage treatment plant water quality control apparatus according to the third embodiment.
FIG. 7: Coagulant injection type anaerobic-anoxic-aerobic method (coagulant injection A2The flowchart which shows the structural example of the sewage treatment plant provided with the aeration tank comprised from the process of O method.
FIG. 8 is a block diagram showing a configuration example of a conventional sewage treatment plant water quality control apparatus.
[Explanation of symbols]
1 ... Influent water
2 ... First sedimentation pond
3 ... treated water
4 ... TOC meter
5 ... TN meter
6 ... C / N ratio calculation unit
6 '... C / P ratio calculation unit
6 ″… C / N ratio, C / P ratio calculation unit
7 ... Standard C / N ratio setting device
7 '... Standard C / P ratio setter
7 "... Standard C / N ratio, C / P ratio setter
8. Control unit
9 ... Aeration device
10 ... Anaerobic tank
11 ... Oxygen-free tank
12 ... Aerobic tank
13 ... Final sedimentation basin
14 ... circulation pump
15 ... Return pump
16 ... PAC infusion pump
17 ... Surplus pump
18 ... First withdrawal pump
19 ... Carbon source injection pump
20 ... Sludge storage tank
21 ... Carbon source storage tank
22 ... Flocculant storage tank
23 ... First-sink bypass valve
24 ... Valve
25 ... TP meter
26 ... Influent water quality database
27 ... Weather information prediction part
28 ... Water quality pattern database
29 ... Inflow water quality prediction section
30 ... UV meter
31 ... Flow meter
32 ... NHFourTotal
33 ... TN meter
34 ... TP meter
35 ... Control correction unit
36 ... treated water quality determination unit
37 ... UV → BOD converter
38 ... Inflow ratio setting device
50-60 ... Water piping.

Claims (5)

嫌気槽と好気槽とを含む曝気槽を備えた下水処理場から放流される処理水の水質を制御する下水処理場水質制御装置において、
前記下水処理場に流入する流入水のリン成分濃度を計測するリン成分濃度計測手段と、
前記下水処理場に流入する流入水の有機物成分濃度を計測する有機物成分濃度計測手段と、
前記リン成分濃度計測手段および有機物成分濃度計測手段により計測されたリン成分濃度および有機物成分濃度に基づいて、前記下水処理場に流入する流入水のリン成分と有機物成分との比(C/P比)を演算するC/P比演算手段と、
基準となる基準C/P比を設定するC/P比設定手段と、
前記C/P比設定手段により設定された基準C/P比と前記C/P比演算手段により演算されたC/P比との差分に基づいて、最終沈殿池から前記曝気槽へ返送される沈殿水の返送流量、汚泥貯留槽から前記曝気槽に返流される返流水の返流水流量、曝気風量、炭素源注入量、凝集剤注入量、余剰汚泥流量、初沈バイパス弁のうちの少なくとも一つを制御する操作量を出力する制御手段と、
を備えて成ることを特徴とする下水処理場水質制御装置。
In a sewage treatment plant water quality control device that controls the quality of treated water discharged from a sewage treatment plant equipped with an aeration tank including an anaerobic tank and an aerobic tank ,
Phosphorus component concentration measuring means for measuring the phosphorus component concentration of the inflow water flowing into the sewage treatment plant;
An organic component concentration measuring means for measuring an organic component concentration of the influent water flowing into the sewage treatment plant;
Based on the phosphorus component concentration and the organic substance component concentration measured by the phosphorus component concentration measuring means and the organic substance component concentration measuring means, the ratio of the phosphorus component and the organic substance component of the inflow water flowing into the sewage treatment plant (C / P ratio) C / P ratio calculating means for calculating
C / P ratio setting means for setting a reference C / P ratio as a reference;
Based on the difference between the reference C / P ratio set by the C / P ratio setting means and the C / P ratio calculated by the C / P ratio calculation means, it is returned from the final sedimentation tank to the aeration tank. return flow of precipitation water, flowing water flow return from the sludge storage tank of the flowing water return return flow Sareru the aeration tank, the aeration air quantity, the carbon source injection quantity, coagulant injection amount, excess sludge flow rate, at least one of the first precipitation bypass valve Control means for outputting an operation amount for controlling one;
A sewage treatment plant water quality control apparatus comprising:
嫌気槽と好気槽、もしくは嫌気槽と無酸素槽と好気槽との組み合わせから構成される曝気槽を備えた下水処理場から放流される処理水の水質を制御する下水処理場水質制御装置において、
前記嫌気槽中のリン成分濃度を計測するリン成分濃度計測手段と、
前記嫌気槽に流入する流入水の有機物成分濃度と計測する有機物成分濃度計測手段と、
前記リン成分濃度計測手段および有機物成分濃度計測手段により計測されたリン成分濃度および有機物成分濃度に基づいて、リン成分と有機物成分との比(C/P比)を演算するC/P比演算手段と、
基準となる基準C/P比を設定するC/P比設定手段と、
前記C/P比設定手段により設定された基準C/P比と前記C/P比演算手段により演算されたC/P比との差分に基づいて、最終沈殿池から前記曝気槽へ返送される沈殿水の返送流量、汚泥貯留槽から前記曝気槽に返流される返流水の返流水流量、曝気風量、炭素源注入量、余剰汚泥流量、初沈バイパス弁のうちの少なくとも一つを制御する操作量を出力する制御手段と、
を備えて成ることを特徴とする下水処理場水質制御装置。
Sewage treatment plant water quality control device for controlling the quality of treated water discharged from a sewage treatment plant equipped with an anaerobic tank and an aerobic tank, or an aeration tank comprising a combination of an anaerobic tank, an anaerobic tank and an aerobic tank In
Phosphorus component concentration measuring means for measuring the phosphorus component concentration in the anaerobic tank;
Organic substance component concentration measuring means for measuring the organic substance component concentration of the inflow water flowing into the anaerobic tank,
C / P ratio calculating means for calculating a ratio (C / P ratio) between the phosphorus component and the organic component based on the phosphorus component concentration and the organic component concentration measured by the phosphorus component concentration measuring means and the organic substance concentration measuring means. When,
C / P ratio setting means for setting a reference C / P ratio as a reference;
Based on the difference between the reference C / P ratio set by the C / P ratio setting means and the C / P ratio calculated by the C / P ratio calculation means, it is returned from the final sedimentation tank to the aeration tank. return flow of precipitation water, return flow Sareru return water flow of return water flow rate from the sludge storage tank to the aeration tank, the aeration air quantity, the carbon source injection amount, excess sludge flow, to control at least one of the first precipitation bypass valve Control means for outputting an operation amount;
A sewage treatment plant water quality control apparatus comprising:
前記請求項1または請求項2のいずれか1項に記載の下水処理場水質制御装置において、
前記リン成分濃度計測手段として、リン酸性リン濃度、全リン濃度のいずれかを計測する濃度計を用い、また、前記有機物成分濃度計測手段として、生物化学的酸素要求量(BOD)、化学的酸素要求量(CODMn、CODcr)、全有機炭素量(TOC)のいずれかを計測する濃度計を用いるようにした
ことを特徴とする下水処理場水質制御装置。
In sewage treatment plant water quality control apparatus according to any one of claims 1 or claim 2,
As the phosphorus component concentration measuring means, a concentration meter that measures either phosphoric acid phosphorus concentration or total phosphorus concentration is used. As the organic component concentration measuring means, biochemical oxygen demand (BOD), chemical oxygen is used. A sewage treatment plant water quality control apparatus characterized by using a densitometer that measures either the required amount (CODMn, CODcr) or the total organic carbon amount (TOC).
前記請求項1乃至請求項のいずれか1項に記載の下水処理場水質制御装置において、
前記下水処理場に流入する流入水の流量、リン成分濃度計測手段および有機物成分濃度計測手段よる水質成分の計測値、および手分析による水質試験結果の各時系列データを蓄える流入水質データベースと、
前記流入水質データベースに蓄えられた時系列データに基づいて、前記下水処理場に流入する流入水のリン成分濃度、及び有機物成分濃度を予測する流入水質予測手段と
を備え、
前記流入水質予測手段により予測されたリン成分濃度、有機物成分濃度を使用して、前記C/P比を演算するようにした
ことを特徴とする下水処理場水質制御装置。
In the sewage treatment plant water quality control device according to any one of claims 1 to 3 ,
The flow rate of the inflow water flowing into the sewage treatment plant, an inlet water quality database for storing the time-series data of the re-emission component concentration measuring means and the measured value of the water component by organic component concentration measuring means, and the water quality test results manual analysis ,
Based on the time-series data stored in the inflow water quality database, the inflow water quality prediction means for predicting the phosphorus component concentration of the inflow water flowing into the sewage treatment plant, and the organic matter component concentration,
It said inlet phosphorus component concentration predicted by quality prediction means, using the organic component concentration, pre Symbol sewage water control apparatus is characterized in that so as to calculate the C / P ratio.
前記請求項1乃至請求項のいずれか1項に記載の下水処理場水質制御装置において、
前記下水処理場に流入する流入水の窒素成分濃度を計測する窒素成分濃度計測手段と、
前記下水処理場に流入する流入水の有機物成分濃度を計測する有機物成分濃度計測手段と、
前記窒素成分濃度計測手段および有機物成分濃度計測手段により計測された窒素成分濃度および有機物成分濃度に基づいて、前記下水処理場に流入する流入水の窒素成分と有機物成分との比(C/N比)を演算するC/N比演算手段と、
基準となる基準C/N比を設定する基準C/N比設定手段と、
前記下水処理場に流入する流入水の流量を計測する流量計測手段
さらに備え、
前記制御手段としては、前記流量計測手段により計測された流量値、前記基準C/N比設定手段により設定された基準C/N比と前記C/N比演算手段により演算されたC/N比との差分、および前記C/P比設定手段により設定された基準C/P比と前記C/P比演算手段により演算されたC/P比との差分に基づいて、前記曝気槽内で循環される非処理水の循環流量、最終沈殿池から前記曝気槽へ返送される沈殿水の返送流量、汚泥貯留槽から前記曝気槽に返流される返流水の返流水流量、曝気風量、炭素源注入量、余剰汚泥流量、初沈バイパス弁のうちの少なくとも一つを制御する操作量を出力するようにした
ことを特徴とする下水処理場水質制御装置。
In the sewage treatment plant water quality control device according to any one of claims 1 to 4 ,
Nitrogen component concentration measuring means for measuring the nitrogen component concentration of the influent water flowing into the sewage treatment plant;
An organic component concentration measuring means for measuring an organic component concentration of the influent water flowing into the sewage treatment plant;
Based on the nitrogen component concentration and the organic substance component concentration measured by the nitrogen component concentration measuring means and the organic substance component concentration measuring means, the ratio of the nitrogen component and the organic substance component of the inflow water flowing into the sewage treatment plant (C / N ratio) C / N ratio calculating means for calculating
Reference C / N ratio setting means for setting a reference C / N ratio as a reference;
Further comprising a <br/> the flow rate measuring means for measuring the flow rate of the inflow water flowing into the sewage treatment plant,
The control means includes a flow rate value measured by the flow rate measurement means, a reference C / N ratio set by the reference C / N ratio setting means, and a C / N ratio calculated by the C / N ratio calculation means. And the difference between the reference C / P ratio set by the C / P ratio setting means and the C / P ratio calculated by the C / P ratio calculation means , and circulates in the aeration tank. Circulating flow rate of untreated water, return flow rate of precipitated water returned from the final settling tank to the aeration tank, return water flow rate of return water returned from the sludge storage tank to the aeration tank, aeration air volume, carbon source injection volume, excess sludge flow, the sewage treatment plant water quality control apparatus is characterized in that so as to output an operation amount for controlling at least one of the first precipitation bypass valve.
JP2002000810A 2002-01-07 2002-01-07 Sewage treatment plant water quality controller Expired - Fee Related JP3961835B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002000810A JP3961835B2 (en) 2002-01-07 2002-01-07 Sewage treatment plant water quality controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002000810A JP3961835B2 (en) 2002-01-07 2002-01-07 Sewage treatment plant water quality controller

Publications (2)

Publication Number Publication Date
JP2003200190A JP2003200190A (en) 2003-07-15
JP3961835B2 true JP3961835B2 (en) 2007-08-22

Family

ID=27641093

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002000810A Expired - Fee Related JP3961835B2 (en) 2002-01-07 2002-01-07 Sewage treatment plant water quality controller

Country Status (1)

Country Link
JP (1) JP3961835B2 (en)

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3782738B2 (en) * 2002-02-05 2006-06-07 住友重機械工業株式会社 Wastewater treatment method
JP2005087853A (en) * 2003-09-17 2005-04-07 Fuji Electric Systems Co Ltd Method and apparatus for treating methane fermentation waste liquid
JP4131955B2 (en) * 2004-01-13 2008-08-13 株式会社東芝 Aeration air volume control device of sewage treatment plant
CN100443422C (en) * 2005-05-24 2008-12-17 株式会社东芝 Dephosphorize apparatus of sewage treatment plant
JP2007000859A (en) * 2005-05-24 2007-01-11 Toshiba Corp Phosphorous removal device in sewage disposal plant
US7431840B2 (en) * 2005-08-24 2008-10-07 Parkson Corporation Denitrification process
JP5041698B2 (en) * 2005-11-24 2012-10-03 新日本製鐵株式会社 Sewage treatment method
BRPI0705361A2 (en) * 2007-12-28 2010-05-11 Mercosul Com Ltda process for increasing the concentration of microorganism colonies in an anaerobic digestion removal process
KR100917127B1 (en) * 2009-04-20 2009-09-11 주식회사 무한기술 Microorganism wastewater treatment device
JP5300898B2 (en) * 2011-03-15 2013-09-25 株式会社東芝 Organic wastewater treatment equipment
JP5685504B2 (en) * 2011-08-10 2015-03-18 川崎重工業株式会社 Water treatment system and aeration air volume control method thereof
JP2013039538A (en) * 2011-08-18 2013-02-28 Hitachi Plant Technologies Ltd Wastewater treatment apparatus
JP5606513B2 (en) * 2011-11-08 2014-10-15 株式会社東芝 Nitrogen / phosphorus removal treatment method and nitrogen / phosphorus removal treatment apparatus
JP5806094B2 (en) * 2011-11-29 2015-11-10 オルガノ株式会社 Water treatment method and water treatment apparatus
JP2013226508A (en) * 2012-04-25 2013-11-07 Jfe Steel Corp Treatment method of nitrogen-containing wastewater and device
JP2014018744A (en) * 2012-07-19 2014-02-03 Yachiyo Industry Co Ltd Wastewater treatment system
JP5951531B2 (en) * 2013-03-11 2016-07-13 株式会社東芝 Wastewater treatment equipment
JP5956372B2 (en) * 2013-03-22 2016-07-27 株式会社日立製作所 Water treatment apparatus and water treatment method
WO2016132510A1 (en) * 2015-02-19 2016-08-25 三菱重工業株式会社 Industrial effluent treatment system and treatment method
JP6396238B2 (en) * 2015-03-13 2018-09-26 株式会社東芝 Organic wastewater treatment system, organic wastewater treatment method, and organic wastewater treatment system control program
JP6404999B2 (en) * 2017-06-07 2018-10-17 株式会社東芝 Organic wastewater treatment equipment
KR102029976B1 (en) * 2019-03-15 2019-11-26 (주)서인지엔티 Power saving and peak reduction Power saving and peak reduction of wastewater treatment facility using automatic operation system responding to demand response Automated operation control method for demand response
CN116874067B (en) * 2023-07-27 2023-12-15 湖南菁卉节能科技有限公司 Method for improving capacity of sewage treatment plant in rainy days

Also Published As

Publication number Publication date
JP2003200190A (en) 2003-07-15

Similar Documents

Publication Publication Date Title
JP3961835B2 (en) Sewage treatment plant water quality controller
JP4334317B2 (en) Sewage treatment system
CN101654299B (en) Aeration air quantity controller for sewage treatment plant
KR100649417B1 (en) Apparatus for controlling aeration air volume used in the sewage treatment plant
JP5775296B2 (en) Operation support apparatus and operation support method for sewage treatment plant
JP2012187587A (en) Denitrification process and system
CN113044973B (en) Sewage treatment control system and effluent TN control method
JP2001252691A (en) Water quality controlling device for sewage treatment plant
CN112875859A (en) Sewage nitrogen and phosphorus removal control system based on AOA technology
KR20120000858A (en) A rule-based realtime control technology for wastewater treatment process and system
Jiang et al. Estimation of costs of phosphorus removal in wastewater treatment facilities: adaptation of existing facilities
JP4229999B2 (en) Biological nitrogen removal equipment
JP6974795B2 (en) Aeration air volume control method and equipment for aeration tanks in sewage treatment equipment
JP2004275826A (en) Sewage treatment plant water quality monitoring and controlling device
CN112794444A (en) A2Optimization method of reflux ratio of O biological nitrogen and phosphorus removal
JP4008694B2 (en) Sewage treatment plant water quality controller
JP3525006B2 (en) Sewage treatment plant water quality control equipment
JP2012030232A (en) Phosphorous removal device in sewage disposal plant
CN114684909A (en) Leachate aerobic treatment control method
JP2006315004A (en) Water quality control unit for sewage disposal plant
JP6375257B2 (en) Water treatment equipment
JP3707526B2 (en) Waste water nitrification method and apparatus
JP7158912B2 (en) Regulation compartment control device, regulation compartment control method, computer program and organic wastewater treatment system
Carrio et al. Practical considerations for design of a step-feed biological nutrient removal system
JP2007000859A (en) Phosphorous removal device in sewage disposal plant

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040312

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060516

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060627

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060825

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070515

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070517

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110525

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110525

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120525

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120525

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130525

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130525

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140525

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees