JP3913503B2 - Pile head treatment method for cast-in-place concrete piles - Google Patents

Pile head treatment method for cast-in-place concrete piles Download PDF

Info

Publication number
JP3913503B2
JP3913503B2 JP2001259766A JP2001259766A JP3913503B2 JP 3913503 B2 JP3913503 B2 JP 3913503B2 JP 2001259766 A JP2001259766 A JP 2001259766A JP 2001259766 A JP2001259766 A JP 2001259766A JP 3913503 B2 JP3913503 B2 JP 3913503B2
Authority
JP
Japan
Prior art keywords
concrete
pile
colored
pile head
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001259766A
Other languages
Japanese (ja)
Other versions
JP2003064670A (en
Inventor
重則 川西
隆 上西
幸次 中瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP2001259766A priority Critical patent/JP3913503B2/en
Publication of JP2003064670A publication Critical patent/JP2003064670A/en
Application granted granted Critical
Publication of JP3913503B2 publication Critical patent/JP3913503B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、場所打ちコンクリート杭の造成時において、その杭頭の処理方法に関するものである。
【0002】
【従来の技術】
場所打ちコンクリート杭を造成するには、ベントナイト液等の安定液によって孔壁の崩壊を防止しながら地中に所定深さの杭孔を掘削したのち、この杭孔内に鉄筋籠を建て込み、次いで、トレミー管を杭孔内に挿入して該トレミー管を通じて生コンクリート(以下、単にコンクリートという)を打設することにより造成しているが、打設コンクリートの上端部には杭の強度を低下させるスライム等の不純物が混在しているため、予め、計画杭の天端面よりも上方部分までコンクリートを打設して杭頭にコンクリートの余盛り部分を形成しておき、この余盛り部分を除去することによって杭頭処理を行っている。
【0003】
このような杭頭処理方法としては、従来から、打設コンクリートの硬化後に、スライム等の不純物を含むコンクリートの余盛り部分を削り取って除去する方法や、コンクリート打設直後の未硬化の余盛り部分のコンクリートをバキュームホースによって吸引、除去する方法が採用されている。
【0004】
【発明が解決しようとする課題】
しかしながら、前者の杭頭処理方法では、大掛かりな装置や機器類を必要とするばかりでなく、削り取り作業時に振動や大きな騒音が発生して環境を悪化させるという問題点がある。そのため、コンクリート打設直後に杭頭の余盛り部分のコンクリートを吸引除去し、杭の天端を均すことによって杭頭の削り取り作業を省略することができる後者の杭頭処理方法を採用しているが、ベントナイト液やスライム等の不純物を含むコンクリート部分が完全に除去されたかどうかの確認を行うことができないので、コンクリートの硬化後、杭頭の一部から試片となるコアを抜き取ってこのコアに圧縮強度等の試験を行うことにより、品質の確認を行っているのが現状である。
【0005】
そのため、多数の場所打ちコンクリートにこのようなコアの抜き取りから圧縮強度等の試験までの作業を行うには多大な手間と費用がかかると共に、試験結果が出るまで次の作業工程に移れないという問題点があった。
【0006】
本発明は上記のような問題点に鑑みてなされたもので、その目的とするところは、コンクリート打設直後の杭頭の余盛り部分を吸引、除去する際に、目視することによって杭の天端部分が不純物を含まない正常な強度を有するコンクリート面であるかどうかを確認し得る場所打ちコンクリート杭の杭頭処理方法を提供するにある。
【0007】
【課題を解決するための手段】
上記目的を達成するために、本発明の場所打ちコンクリート杭の杭頭処理方法は、請求項1に記載したように、地盤に所定深さまで掘削した杭孔内にコンクリートを計画杭の天端面の下方近傍部にまで打設したのち、着色コンクリートを計画杭の天端面よりも上方部分にまで打設し、次いで、計画杭の天端面から上方におけるスライム等の不純分が混在する着色コンクリートの余盛り部分を、着色した色合いを確認しながら吸引除去したのち、天端を均すことを特徴とする。
【0008】
【作用】
ベントナイト液等の安定液中で杭孔を掘削すると、掘削土砂の一部が安定液中に拡散し、スライムとして孔底に沈澱する。このスライムは打設するコンクリートよりも比重が小さいので、杭孔にコンクリートを打設するに従って、該コンクリートの上端面上に堆積した状態で上昇すると共に、その一部が安定液と共に杭の強度を劣化させる不純物として打設コンクリートの上層部に混入する。
【0009】
一方、杭孔に打設する最終コンクリートとして、着色したコンクリートを使用し、この着色コンクリートを計画杭の天端面を越えて上方位置まで打設すると、計画杭の天端面から上方の着色コンクリートの余盛り部分上にはスライム等の不純物が堆積すると共にその一部が余盛り部分の上層部内に混在した状態となり、その混在によって着色コンクリートの色調、即ち、色合いが変化する。
【0010】
従って、この未硬化の着色コンクリートの余盛り部分をその上端側からバキュームホースによって吸引、除去していくと、余盛り部分が減少、降下するに従って、余盛り部分の着色コンクリートの色合いが不純分の混在による変化している色合いから打設前の着色コンクリートの色合いに変わっていき、これを目視することによって余盛り部分の上端面が打設前の着色コンクリートの色合いになった時に、バキュームホースによる吸引、除去を停止する。しかるのち、杭の天端ならしを行って所定の品質、強度を有する杭を造成するものである。
【0011】
【発明の実施の形態】
次に本発明の具体的な実施の形態を図面について説明する。まず、杭孔の掘削から本発明の杭頭処理前に至るまでの施工手順を図1に基づいて簡単に説明すると、この施工手順は公知のように、掘削機械10を使用して図1(イ)に示すように地盤に先行堀り1aを行ったのち図1(ロ)に示すように表層ケーシング2を建て込んで掘削孔上部の孔壁の崩壊を防止し、次いで、掘削される孔内にベントナイト液等の孔壁安定液を充満させた状態で上記掘削機械10によって図1(ハ)に示すように所定深さまで杭孔1を掘削する。この杭孔1の掘削後、孔底に沈澱しているスライムの一次処理を行い、しかるのち、図1(ニ)に示すように杭孔1内に鉄筋籠3を建て込む。
【0012】
次いで、図1(ホ)に示すように、トレミー管4を杭孔1内にその開口下端が杭孔1の底面に達するまで吊り込んで、2次スライム処理を行ったのち、このトレミー管4を通じて図1(ヘ)に示すように、地上から杭孔1内にコンクリート5を打設する。
【0013】
このコンクリート5の打設は、コンクリート5を杭孔1内に供給するトレミー管4の開口下端が常に打設したコンクリート5内に没入させて状態にし、打設コンクリート5の上昇に従ってコンクリート5の打設上端面5aからの没入深さを一定範囲(2〜6m)に保ちながら上方に引き上げる。コンクリート5の上端面5aからのトレミー管4の没入深さが浅すぎると、コンクリート5の材料分離の原因となり、深すぎるとトレミー管4からのコンクリート5の流出停止やトレミー管4の引き上げ不能の原因となるので、上記のように2〜6mの深さに保持しながらコンクリート5の打設に従って引き上げていく。
【0014】
こうして、杭孔1内に計画杭頭の天端面における下方側近傍部にまでコンクリート5を打設したのち、図1(ト)に示すように、バキューム装置(バキューム車)11によってバキュームホース12を通じて打設コンクリート上のスライム及び安定液を吸引、除去する。次いで、本発明の杭頭処理方法に移る。
【0015】
この杭頭処理方法は、まず、上記打設したコンクリート5と同じコンクリートを着色して着色コンクリート5Aを調製し、この着色コンクリート5Aを最終打設コンクリートとしてトレミー管4を通じて図2、図3に示すように、杭孔1内における計画杭頭の天端面近傍部にまで打設した上記コンクリート5から上方側の計画杭頭部分に打設する。この着色コンクリート5Aの打設は、計画杭頭の天端面6を越えて該天端面6から所定高さに達するまで行い、天端面6から上方に着色コンクリート5Aの余盛り部分5A' を設ける。
【0016】
なお、コンクリートの着色に使用した顔料はバイエル社製の赤色(色番130C)の顆粒タイプの無機顔料で、この顔料を杭造成現場において、生コンクリートミキサー車13にコンクリートと共に投入して約5分間、ドラムを高速で回転し、攪拌することによって上記着色コンクリート5Aを調製した。コンクリートに対する顔料の添加量は、コンクリートの着色具合と強度への影響範囲となるように、単位セメント量に対して3%とした。
【0017】
杭孔1内に打設した上記着色コンクリート5Aの余盛り部分5A' 上には、スライムや安定液、コンクリートが材料分離した成分等の不純物7が残存していると共にその一部が余盛り部分5A' 内に混入した状態となっており、次いで、この余盛り部分5A' における不純物が混入している部分を未硬化のうちにバキューム装置11のバキュームホース12によって吸引、除去する。
【0018】
まず、図4に示すように、表層ケーシング2をその下端が計画杭頭の天端面に達した位置まで引き上げると共にこの表層ケーシング2内に昇降タラップ及び作業足場(図示せず)を組立てたのち、図5、図6に示すように、バキュームホース12を杭孔1の上端部内に挿入して余盛り部分5A' 上に残存する不純物を吸引、除去すると共に、該バキュームホース12の吸引口を着色コンクリート5Aの余盛り部分5A' の上端面に接して或いは僅かに没入させた状態にして余盛り部分5A' を吸引、除去していく。
【0019】
この際、上記昇降タラップ及び足場を利用して作業員が表層ケーシング2内に入り、バキュームホース12によって吸引されて徐々に降下する着色コンクリート5Aの余盛り部分5A' の天端レベルの確認と共にその色合いの変化を目視によって観察し、その色合いが打設時の着色コンクリート5Aの色合いとなった時にバキュームホース12による着色コンクリート5Aの余盛り部分5A' の吸引、除去作業を停止する。しかるのち、図7、図8に示すように、杭頭1Aの天端面6のならし作業を行って杭頭部の仕上げ処理を行う。
【0020】
次いで、杭頭1Aから上方の杭孔1内に図9に示すように砕石8を鉄筋籠3の上端に達するまで投入すると共に表層ケーシング2を引き抜いて撤去し、地表面まで土砂等の埋め戻しを行って作業を終了するものである。
【0021】
【発明の効果】
以上のように本発明の場所打ちコンクリート杭の杭頭処理方法によれば、地盤に所定深さまで掘削した杭孔内にコンクリートを計画杭の天端面の下方近傍部にまで打設したのち、着色コンクリートを計画杭の天端面よりも上方部分にまで打設し、次いで、計画杭の天端面から上方におけるスライム等の不純分が混在する着色コンクリートの余盛り部分を、着色した色合いを確認しながら吸引除去したのち、天端を均すことを特徴とするものであるから、着色コンクリートの余盛り部分を上端側から吸引、除去していくと、該余盛り部分が減少、降下するに従って、余盛り部分の着色コンクリートの色合いが不純分の混在により変化している色合いから打設前の着色コンクリートの色合いに変わっていくので、これを観察することによって着色コンクリート上部のスライム等の不純物が除去されたかどうかを確実に確認することができる。
【0022】
従って、従来の杭頭処理方法のように、杭頭の一部をコア抜きして圧縮強度試験を実施しなくても、造成された杭頭が所定の品質や強度を備えていることを確認することができると共に、杭の造成作業が短期間で経済的に且つ能率よく行うことができる。
【図面の簡単な説明】
【図1】杭孔の掘削から杭頭処理前に至るまでの施工手順を示す簡略縦断面図、
【図2】着色コンクリートを打設している状態の簡略縦断面図、
【図3】その杭頭部分の縦断面図、
【図4】鉄筋籠を所定高さまで引き上げた状態の簡略縦断面図、
【図5】余盛り部分の上層部を吸引、除去している状態の簡略縦断面図、
【図6】その杭頭部分の縦断面図、
【図7】天端ならしを行っている状態の簡略縦断面図、
【図8】その杭頭部分の縦断面図、
【図9】砕石を投入している状態の簡略縦断面図。
【符号の説明】
1 杭孔
1A 杭頭
4 トレミー管
5 コンクリート
5A 着色コンクリート
5A' 余盛り部分
6 天端面
12 バキュームホース
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for treating a head of a cast-in-place concrete pile.
[0002]
[Prior art]
In order to build a cast-in-place concrete pile, after excavating a pile hole of a predetermined depth in the ground while preventing collapse of the hole wall with a stabilizing liquid such as bentonite liquid, a reinforcing bar is built in this pile hole, Next, the tremey pipe is inserted into the pile hole and the concrete is laid through the tremey pipe (hereinafter simply referred to as concrete), but the strength of the pile is reduced at the upper end of the cast concrete. Since impurities such as slime to be mixed are mixed, concrete is placed in advance up to the upper part of the top end of the planned pile to form a concrete pile on the pile head, and this pile is removed. The pile head is processed by doing.
[0003]
As such a pile head treatment method, conventionally, after hardening of the cast concrete, a method of scraping off and removing the extra portion of the concrete containing impurities such as slime, or an unhardened extra portion immediately after the concrete is placed The method of sucking and removing concrete with a vacuum hose is adopted.
[0004]
[Problems to be solved by the invention]
However, the former pile head processing method not only requires a large-scale apparatus and equipment, but also has a problem in that the environment is deteriorated by generating vibrations and large noises during the shaving operation. Therefore, the latter pile head treatment method that can eliminate the pile head scraping work by sucking and removing the concrete of the pile head extra portion immediately after placing the concrete and leveling the top of the pile is adopted. However, since it cannot be confirmed whether the concrete part containing impurities such as bentonite liquid and slime has been completely removed, after the concrete is hardened, the core as a specimen is removed from a part of the pile head. At present, quality is confirmed by performing tests such as compressive strength on the core.
[0005]
Therefore, it takes a lot of time and money to perform a lot of cast-in-place concrete from the extraction of the core to the test for compressive strength, etc., and it is impossible to move to the next work process until the test result is obtained. There was a point.
[0006]
The present invention has been made in view of the above-mentioned problems, and the object of the present invention is to visually check the pile top by sucking and removing the piled-up portion of the pile head immediately after placing the concrete. It is in providing the pile head processing method of the cast-in-place concrete pile which can confirm whether an edge part is a concrete surface which has the normal intensity | strength which does not contain an impurity.
[0007]
[Means for Solving the Problems]
In order to achieve the above object, the pile head processing method for a cast-in-place concrete pile according to the present invention, as described in claim 1, puts concrete into a pile hole excavated in the ground to a predetermined depth, After pouring up to the lower vicinity, colored concrete is cast up to the upper part of the top end of the planned pile, and then the remaining colored concrete containing impurities such as slime above the top end of the planned pile. The top portion is removed by suction while confirming the colored shade, and then the top is leveled.
[0008]
[Action]
When a pile hole is excavated in a stable liquid such as bentonite liquid, part of the excavated earth and sand diffuses into the stable liquid and settles as a slime at the bottom of the hole. Since this slime has a lower specific gravity than the concrete to be placed, as the concrete is placed in the pile hole, it rises in a state of being deposited on the upper end surface of the concrete, and a part of it increases the strength of the pile together with the stabilizing liquid. It is mixed into the upper layer of the cast concrete as an impurity that deteriorates.
[0009]
On the other hand, if colored concrete is used as the final concrete to be placed in the pile hole, and this colored concrete is placed to the upper position beyond the top end surface of the planned pile, the excess of the colored concrete above the top end surface of the planned pile is left. Impurities such as slime are deposited on the raised portion, and a part thereof is mixed in the upper layer portion of the excess portion, and the color tone of the colored concrete, that is, the color tone is changed by the mixture.
[0010]
Therefore, if the extra portion of the uncured colored concrete is sucked and removed from the upper end side by a vacuum hose, the extra portion of the colored concrete is impure as the extra portion decreases and descends. The color changed from the mixed color to the color of the colored concrete before placing. When the upper end surface of the surplus part becomes the color of the colored concrete before placing by observing this, the vacuum hose Stop aspiration and removal. After that, the top end of the pile is leveled to create a pile having a predetermined quality and strength.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Next, specific embodiments of the present invention will be described with reference to the drawings. First, the construction procedure from the excavation of the pile hole to before the pile head processing of the present invention will be briefly described with reference to FIG. 1. This construction procedure is shown in FIG. B) After conducting a pre-drilling 1a in the ground as shown in Fig. 1 (b), the surface casing 2 is installed to prevent the collapse of the hole wall above the excavation hole, and then the hole to be excavated The pile hole 1 is excavated to a predetermined depth as shown in FIG. 1 (c) by the excavating machine 10 with the hole wall stabilizing liquid such as bentonite liquid filled therein. After excavation of the pile hole 1, primary processing of the slime settled on the bottom of the hole is performed, and then a reinforcing bar 3 is built in the pile hole 1 as shown in FIG.
[0012]
Next, as shown in FIG. 1 (e), the tremy tube 4 is suspended in the pile hole 1 until the lower end of the opening reaches the bottom surface of the pile hole 1 and subjected to secondary slime treatment. As shown in FIG. 1 (f), concrete 5 is placed in the pile hole 1 from the ground.
[0013]
The concrete 5 is placed in such a state that the lower end of the opening of the tremmy pipe 4 that supplies the concrete 5 into the pile hole 1 is always immersed in the concrete 5 that has been placed, and the concrete 5 is placed as the concrete 5 is raised. The immersion depth from the upper end surface 5a is pulled upward while maintaining a certain range (2 to 6 m). If the immersion depth of the tremmy pipe 4 from the upper end surface 5a of the concrete 5 is too shallow, it will cause material separation of the concrete 5, and if it is too deep, the outflow of the concrete 5 from the tremy pipe 4 cannot be stopped or the tremmy pipe 4 cannot be pulled up. Therefore, the concrete 5 is pulled up according to the placement of the concrete 5 while maintaining the depth of 2 to 6 m as described above.
[0014]
After placing concrete 5 in the pile hole 1 up to the lower vicinity of the top end surface of the planned pile head, as shown in FIG. 1 (G), the vacuum device (vacuum wheel) 11 passes through the vacuum hose 12. Suction and removal of slime and stabilizer on the cast concrete. Subsequently, it moves to the pile head processing method of this invention.
[0015]
In this pile head processing method, first, colored concrete 5A is prepared by coloring the same concrete as the cast concrete 5 described above, and this colored concrete 5A is used as the final cast concrete as shown in FIGS. Thus, it casts in the plan pile head part on the upper side from the concrete 5 cast to the top end face vicinity part of the plan pile head in the pile hole 1. The colored concrete 5A is placed until it reaches a predetermined height from the top end face 6 beyond the top end face 6 of the planned pile head, and an extra portion 5A ′ of the colored concrete 5A is provided above the top end face 6.
[0016]
The pigment used to color the concrete is a red (color number 130C) granule type inorganic pigment manufactured by Bayer, and this pigment is put together with concrete into the ready-mixed concrete mixer 13 at the pile construction site for about 5 minutes. The colored concrete 5A was prepared by rotating the drum at high speed and stirring. The amount of the pigment added to the concrete was set to 3% with respect to the unit cement amount so as to be within the influence range on the coloration and strength of the concrete.
[0017]
Impurities 7 such as slime, stabilizer, and components separated from concrete remain on the surplus portion 5A 'of the colored concrete 5A placed in the pile hole 1, and a part of the surplus portion is a surplus portion. Then, the portion where the impurities are mixed in the extra portion 5A ′ is sucked and removed by the vacuum hose 12 of the vacuum device 11 while it is uncured.
[0018]
First, as shown in FIG. 4, after pulling up the surface casing 2 to a position where the lower end has reached the top end surface of the planned pile head, and assembling a lifting and lowering trap and a working scaffold (not shown) in the surface casing 2, As shown in FIGS. 5 and 6, the vacuum hose 12 is inserted into the upper end of the pile hole 1 to remove and remove impurities remaining on the excess portion 5A ′, and the suction port of the vacuum hose 12 is colored. The surplus portion 5A ′ is sucked and removed while contacting or slightly immersing the upper end surface of the surplus portion 5A ′ of the concrete 5A.
[0019]
At this time, the worker enters the surface casing 2 by using the lifting trap and the scaffold, and confirms the top end level of the extra portion 5A 'of the colored concrete 5A which is sucked by the vacuum hose 12 and gradually descends. The change in color is visually observed, and when the color becomes the color of the colored concrete 5A at the time of placing, the suction and removal work of the extra portion 5A 'of the colored concrete 5A by the vacuum hose 12 is stopped. Thereafter, as shown in FIGS. 7 and 8, the top end surface 6 of the pile head 1A is leveled to finish the pile head.
[0020]
Next, as shown in FIG. 9, the crushed stone 8 is thrown into the upper pile hole 1 from the pile head 1A until reaching the upper end of the reinforcing bar 3 and the surface casing 2 is pulled out and removed, and the earth and sand are backfilled to the ground surface. To complete the work.
[0021]
【The invention's effect】
As described above, according to the pile head processing method of the cast-in-place concrete pile of the present invention, the concrete is placed in the pile hole excavated to a predetermined depth in the ground to the lower vicinity of the top end face of the planned pile, and then colored. Place concrete up to the upper part of the top end of the planned pile, and then check the colored tint of the extra portion of colored concrete mixed with impurities such as slime above the top end of the planned pile. Since the top of the colored concrete is smoothed after suction removal, if the extra portion of colored concrete is sucked and removed from the upper end side, the extra portion decreases and descends as the extra portion decreases. The color of the colored concrete at the height changes from the color that changes due to the mixing of impure content to the color of the colored concrete before placing, so coloring by observing this Impurities slime etc. Nkurito upper can reliably confirm whether or been removed.
[0022]
Therefore, as in the conventional pile head treatment method, it is confirmed that the built pile head has the specified quality and strength without having to core the part of the pile head and carrying out the compressive strength test. In addition, the pile construction work can be performed economically and efficiently in a short period of time.
[Brief description of the drawings]
FIG. 1 is a simplified longitudinal sectional view showing a construction procedure from excavation of a pile hole to before pile head processing,
FIG. 2 is a simplified vertical cross-sectional view of colored concrete being cast,
FIG. 3 is a longitudinal sectional view of the pile head part,
FIG. 4 is a simplified longitudinal sectional view showing a state where the reinforcing bar is pulled up to a predetermined height,
FIG. 5 is a simplified vertical cross-sectional view showing a state in which the upper layer portion of the surplus portion is sucked and removed,
FIG. 6 is a longitudinal sectional view of the pile head part,
FIG. 7 is a simplified longitudinal sectional view showing a state where the top end is leveled,
FIG. 8 is a longitudinal sectional view of the pile head part,
FIG. 9 is a simplified vertical cross-sectional view showing a state in which crushed stone is introduced.
[Explanation of symbols]
1 Pile hole
1A Pile head 4 Tremy tube 5 Concrete
5A colored concrete
5A 'Extra portion 6 Top face
12 Vacuum hose

Claims (1)

地盤に所定深さまで掘削した杭孔内にコンクリートを計画杭の天端面の下方近傍部にまで打設したのち、着色コンクリートを計画杭の天端面よりも上方部分にまで打設し、次いで、計画杭の天端面から上方におけるスライム等の不純物が混在する着色コンクリートの余盛り部分を、未硬化のうちに着色した色合いを確認しながらバキューム装置によって吸引除去し、その色合いが打設時の着色コンクリートの色合いとなった時に吸引、除去作業を停止したのち天端を均すことを特徴とする場所打ちコンクリート杭の杭頭処理方法。After placing concrete into the pile hole drilled to the ground at a predetermined depth to the lower part of the top end face of the planned pile, colored concrete is placed to the upper part of the top end face of the planned pile, and then planned. The excess of colored concrete mixed with impurities such as slime above the top end of the pile is removed by suction with a vacuum device while checking the colored color while uncured, and the colored concrete is colored when placed. A pile head treatment method for cast-in-place concrete piles, wherein the suction and removal work is stopped when the color becomes the same, and then the top edge is leveled.
JP2001259766A 2001-08-29 2001-08-29 Pile head treatment method for cast-in-place concrete piles Expired - Fee Related JP3913503B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001259766A JP3913503B2 (en) 2001-08-29 2001-08-29 Pile head treatment method for cast-in-place concrete piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001259766A JP3913503B2 (en) 2001-08-29 2001-08-29 Pile head treatment method for cast-in-place concrete piles

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2004183310A Division JP2004263559A (en) 2004-06-22 2004-06-22 Method for treating pile head of cast-in-place concrete pile

Publications (2)

Publication Number Publication Date
JP2003064670A JP2003064670A (en) 2003-03-05
JP3913503B2 true JP3913503B2 (en) 2007-05-09

Family

ID=19087088

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001259766A Expired - Fee Related JP3913503B2 (en) 2001-08-29 2001-08-29 Pile head treatment method for cast-in-place concrete piles

Country Status (1)

Country Link
JP (1) JP3913503B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4705663B2 (en) * 2008-05-27 2011-06-22 株式会社サンエイ Attachment for vacuum hose and pile head processing method using this attachment for vacuum hose
CN113638408A (en) * 2021-08-24 2021-11-12 三峡大学 Construction method for small-size expansion cast-in-place pile body formed by suction in coral sand

Also Published As

Publication number Publication date
JP2003064670A (en) 2003-03-05

Similar Documents

Publication Publication Date Title
JP4327638B2 (en) Construction method of cast-in-place concrete pile
CN106545020A (en) A kind of construction method of deep foundation pit support
JP3913503B2 (en) Pile head treatment method for cast-in-place concrete piles
JP4327639B2 (en) Construction method of cast-in-place concrete pile
JPH05222729A (en) Execution method for cast-in-place concrete pile, etc.
JP6645098B2 (en) Removal method of existing pile
JP2004263559A (en) Method for treating pile head of cast-in-place concrete pile
EP0541812A1 (en) Construction method of improving or strengthening ground
KR100944284B1 (en) Pile construction methode for minimizing remaining volume of slime
CN109056740A (en) A kind of construction method whether novel judgement interlocking pile is engaged
JPS5918488B2 (en) Slime processing method in stable liquid drilling method
JP2576046B2 (en) Method of forming cured soil
JPH08284151A (en) Improvement work of ground and device by use thereof
JP3230113B2 (en) Method and apparatus for supplying mud solidified slurry into excavation trench
JP2004257065A (en) Pile head processing method for cast-in-place concrete pile and partition frame used therefor
JPS6010014A (en) On-site piling work
JPH02167922A (en) Head treatment of in-situ concrete pile
JP6116619B2 (en) Pile head processing equipment
JPS58210211A (en) Treatment of extra-banking concrete in head of on-site concrete pile
JPH1171751A (en) Execution method of soil-mortar diaphragm wall
JP2017089158A (en) Management method of secondary slime treatment
JP2014159691A (en) Soil improvement machine, soil improvement method and hole opening block
JP3581674B2 (en) Burying method of existing pile and its equipment
JPH04185814A (en) Construction of structural core column
JPH0868047A (en) Method for forming soil hardened body

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040825

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060822

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060829

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061027

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070109

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070131

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130209

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130209

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees