Prior art keywords
job
net
job net
information
nets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002089547A
Other languages
Japanese (ja)
Other versions
JP2003288220A (en
Inventor
淳一 佐々尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Software Engineering Co Ltd
Original Assignee
Hitachi Software Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Software Engineering Co Ltd filed Critical Hitachi Software Engineering Co Ltd
Priority to JP2002089547A priority Critical patent/JP3908069B2/en
Publication of JP2003288220A publication Critical patent/JP2003288220A/en
Application granted granted Critical
Publication of JP3908069B2 publication Critical patent/JP3908069B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、基点となるジョブネットと日間隔を含めた先行後続関連にあるジョブネット、及びそのジョブネットの近傍ジョブネットの導出方法、及びその関連図をGUI(Graphical User Interface)で表示する方法に関するものである。
【0002】
【従来の技術】
従来、ジョブ・ジョブネットの先行後続関連をリンク線を用いて明確に表示する手法は、一般的に行なわれている。しかしながら、大量のジョブネットが複雑に関連し合った運用管理システムの場合、その全体図から1つのジョブネットに対する先行後続関連を拾い出すことは容易ではない。
【0003】
また、先行後続関連に時間軸の概念を加えて、日付をまたがった先行後続関連、即ち、日間隔を含む先行後続関連を考慮に入れた先行後続関連図を表示する手法は行なわれていない。
【0004】
最近になり、メインフレームジョブから業務に必要なジョブネットを抽出し、そのジョブネットの集合を1単位とするネットグループという概念を導入し、そのネットグループに所属するジョブネット間の先行後続関連を表示する手法が考案されたが、ネットグループに所属するジョブネットに対して、該当するネットグループに所属していないジョブネットから先行後続関連があった場合には、ジョブネットのアイコンに外部関連を示す印を設ける、また、日間隔及び外部関連にあるジョブネットに関しては、リスト形式でそのジョブネット名を表示するなどして、その表現を行なっていた。
【0005】
【発明が解決しようとする課題】
しかしながら、上記従来の手法による表示方法では、目的のジョブネットに対する先行後続関連情報の全てを一操作で取得することができず、また、先行後続関連先のジョブネットに対する関連情報を取得するためには、そのジョブネットに対しても一連の操作が必要となり、複雑なシステムの場合、目的のジョブネットに関わる関連情報を取得することはコストのかかる作業となる。
【0006】
本発明の目的は、かかる問題を解消し、基点となるジョブネットから辿ることができる全ての先行後続関連のジョブネットを指定した範囲内から抽出し、また、日付をまたがった、即ち、日間隔を有する先行・後続関連ジョブネットに対しても、指定した範囲内から抽出し、目的となるジョブネットの先行後続関連を明確に、かつ分かり易く表示することができるようにしたジョブネットの関連近傍ジョブネットの導出及びその表示方法を提供することにある。
【0007】
【課題を解決するための手段】
上記目的を達成するために、本発明によるジョブネットの関連近傍ジョブネットの導出方法は、基点となるジョブネットと、該基点となるジョブネットに対して日間隔を含めた先行・後続関連にある先行・後続ジョブネットのうちの指定した先行・後続数の範囲内の該先行・後続ジョブネットと、夫々の該ジョブネットから辿ることができる近傍ジョブネットとしての先行ジョブネット及び後続ジョブネットのうちの指定した近傍数の範囲内の該先行ジョブネット及び該後続ジョブネットとを導出することを特徴とするものである。
本発明によるジョブネットの関連近傍ジョブネットの表示方法は、GUIの表示単位となるジョブネットの集合からなるネットグループを作成し、該ネットグループを使用した上記ジョブネットの関連近傍ジョブネットの導出方法をもとに得られる基点となるジョブネットの近傍ジョブネットを表示することを特徴とするものである。
そして、日間隔を含むジョブネットが存在するときには、該日間隔の値を添字としてジョブネット間に表示することを特徴とするものである。
さらに、日間隔を含むジョブネットが存在するときには、該日間隔の座標軸を含む立体図で該ジョブネット間の関連を描写し、同一ジョブネット名で日間隔が異なる複数のジョブネットを該日間隔の座標軸方向の異なる位置に表示することを特徴とするものである。
【0008】
【発明の実施の形態】
以下、本発明の実施形態を図面を参照して具体的に説明する。
【0009】
図1は本発明によるジョブネットの関連近傍ジョブネットの導出及びその表示方法に係るシステムの概要を示すブロック図であって、1はメインフレーム、11はマスタファイル、12はモニタファイル、2はサーバ、21はメインフレーム管理下情報ファイル、22はサーバ管理下情報ファイル、3はクライアント、31は端末装置である。
【0010】
同図において、このシステムは、メインフレーム1とメインフレームと連携するサーバ2とクライアント3とで構成されている。
【0011】
メインフレーム1は、そこで運用されているジョブネットのマスタ情報及びスケジュール情報の元となるマスタファイル11とモニタファイル12を有している。サーバ2は、メインフレーム1上の情報を反映したメインフレーム管理下情報ファイル21とジョブネットと関連する情報を確保するサーバ管理下情報ファイル22とを有している。クライアント3は、サーバ2への要求を行なうための入力装置やサーバ2から取得した情報から基点ジョブネットの先行・後続関連図を表示するためのディスプレイ装置などを備えた端末装置31を有している。
【0012】
次に、メインフレーム1から取得されるジョブネット単位の詳細情報並びに先行・後続関連情報を格納する工程について説明する。
【0013】
サーバ2は、メインフレーム1からジョブネットに関連する情報、即ち、ジョブネットのマスタ情報及びその先行・後続関連情報、ジョブネットのスケジュール情報及びその先行・後続関連情報を取得し、メインフレーム管理下情報ファイル21に格納する。その取得方法としては、例えば、システム起動時の一括ダウンロード及び一定サイクルで変更された情報のみを取得するジャーナル処理などの方法がある。
【0014】
メインフレーム管理下情報ファイル21へ格納する情報は、図2(a),(b)に示すようなジョブネットマスタ情報110とジョブネット関連マスタ情報120と、図3(a),(b)に示すようなジョブネットスケジュール情報150とジョブネット関連スケジュール情報160とから構成されている。
【0015】
ジョブネットマスタ情報110は、メインフレーム1上のマスタファイル11に格納されているジョブネットの情報と関連付けられたものであって、図2(a)で示すように、ジョブネット名111とジョブネット詳細情報112とを有している。ジョブネット関連マスタ情報120はジョブネットマスタ情報110の先行・後続関連情報と関連付けられたもので、図2(b)で示すように、先行ジョブネット名121と後続ジョブネット名122と日間隔123とを有している。ジョブネットスケジュール情報150は、メインフレーム1上のモニタファイル12に格納されているジョブネットの情報と関連付けられたもので、図3(a)で示すように、当初予定日151とジョブネット名152とジョブネット詳細情報153とを有している。ジョブネット関連スケジュール情報160は、ジョブネットスケジュール情報150の先行・後続関連情報と関連付けられたものであって、図3(b)で示すように、当初予定日161と先行ジョブネット名162と後続ジョブネット名163と日間隔164を有している。
【0016】
次に、基点となるジョブネットの先行・後続関連情報と指定された表示範囲の情報から辿ることができるジョブネットを抽出し、これらのジョブネットを構成要素として持つネットグループ(即ち、ダミーネットグループ)を作成し、表示に必要な情報をクライアント3へ送信する工程について、図4〜図8を用いて説明する。
【0017】
図4は基点となるジョブネットの関連近傍ジョブネット表示処理を行なったときのクライアント3ーサーバ2間の通信手順を示すシーケンス図である。
【0018】
図4において、まず、クライアント3からサーバ2に対してダミーネットグループ作成要求200が行なわれる(ステップS101)。このダミーネットグループ作成要求200では、図5(a)に示すプロトコルにより、クライアント3からサーバ2への情報通信が行なわれるものであって、即ち、図5(a)に図示する基点ジョブネット名201、該当ジョブネットの当初予定日202、先行範囲として指定された指定先行数203、後続範囲として指定された指定後続数204、近傍範囲として指定された指定近傍数205、日間隔の範囲として指定された指定日間隔数206の計6項目の情報がクライアント3からサーバ2へ送信されるものである。ここで、当初予定日202は省略可能であって、マスタ情報に対する要求の際は省略される。サーバ2では、かかる情報からダミーネットグループが作成され、そのダミーネットグループを一意に示すダミーネットグループ名207(図5(a))の項目1つからなる情報がクライアント3へ送信される(ステップS102)。
【0019】
クライアント3は、受け取ったこのダミーネットグループ名を基に、ダミーネットグループ構成要素ジョブネット情報取得要求210を行なう(ステップS103)。このダミーネットグループ構成要素ジョブネット情報取得要求210では、図5(b)に示すプロトコルによりクライアント3ーサーバ2間の情報通信が行なわれるものであって、即ち、図5(b)に図示するネットグループ名211と当初予定日212との計2項目の情報がクライアント3からサーバ2へ送信される。ここで、当初予定日212は省略可能であって、マスタ情報に対する要求の際には省略される。サーバ2では、これらの情報をキーとして、図1に示すメインフレーム管理下情報ファイル21とサーバ管理下情報ファイル22とから該当するジョブネットの情報が抽出され、図5(b)に示すジョブネット名213,X座標214,Y座標215,ジョブネット詳細情報216の計4項目のジョブネットの情報が要求210に対する応答としてクライアント3へ送信される(ステップS104)。このとき、送信されるレコード数は、ダミーネットグループの構成要素となるジョブネット数分となる。
【0020】
クライアント3は、受け取ったこのジョブネットの情報から上記の該当ジョブネットに対する先行ジョブネット情報取得要求220を行なう(ステップS105)。この先行ジョブネット情報取得要求220では、図5(c)に示すプロトコルによりクライアント3ーサーバ2間の情報通信が行なわれるものであって、即ち、図5(c)に図示するジョブネット名221と当初予定日222の計2項目の情報がクライアント3からサーバ2へ送信される。ここで、当初予定日222は省略可能であって、マスタ情報に対する要求の際には省略される。サーバ2では、これらの情報をキーとして、メインフレーム管理下情報ファイル21から該当する先行ジョブネットの情報を抽出し、図5(c)に示す先行ジョブネット名223と日間隔224の計2項目の情報が要求220に対する応答としてクライアント3へ送信される(ステップS106)。このとき、送信されるレコード数は、指定されたジョブネットの先行数分となる。
【0021】
クライアント3は、受け取ったこのジョブネットの情報から上記の該当ジョブネットに対する後続ジョブネット情報取得要求230を行なう(ステップS107)。この後続ジョブネット情報取得要求230では、図5(d)に示すプロトコルによりクライアント3ーサーバ2間の情報通信が行なわれるものであって、即ち、図5(d)に図示するジョブネット名231と当初予定日232の計2項目のジョブネットの情報がクライアント2からサーバ2へ送信される。ここで、当初予定日232は省略可能であって、マスタ情報に対する要求の際には省略される。サーバ2では、これらジョブネットの情報をキーとして、メインフレーム管理下情報ファイル21から該当する後続ジョブネットの情報が抽出され、後続ジョブネット名233と日間隔234の計2項目の情報が要求230に対する応答としてクライアント3へ送信される(ステップS108)。このとき、送信されるレコード数は、指定されたジョブネットの後続数分となる。
【0022】
以上のステップS101〜S108を実行することにより、クライアント3は必要な情報の全てを取得することができ、基点となるジョブネットの関連近傍ジョブネットを表示することができる。
【0023】
図6はダミーネットグループ及びその構成要素の作成手順を示すフロ−チャ−トである。
【0024】
同図において、ダミーネットグループ及びその構成要素の作成手順としては、まず、サーバ2において、クライアント3からの要求200(図4)を受けてダミーネットグループが作成される(ステップS201)。
【0025】
次に、基点となるジョブネットから辿ることができる指定範囲内の先行ジョブネットの情報を取得する(ステップS202)。取得された先行ジョブネットの情報は一旦メモリ上に確保される。また、この処理で重複したジョブネットがあった場合には、それらが1つにまとめられる。同様にして、基点となるジョブネットから辿ることができる指定範囲内の後続ジョブネットの情報も取得する(ステップS203)。取得された後続ジョブネットの情報は、先行ジョブの情報と同様に、一旦メモリ上に確保される。また、この処理で重複したジョブネットがあった場合には、それらが1つにまとめられる。
【0026】
次に、このように取得した辿り先の先行ジョブネット及び後続ジョブネット全てに対して、辿ることができる指定近傍範囲内の先行ジョブネットの情報を取得する(ステップS204)。取得された先行ジョブネットの情報は一旦メモリ上に確保される。また、この処理で重複したジョブネットがあった場合には、それらを1つにまとめられる。同様にして、取得した辿り先の先行ジョブネット及び後続ジョブネット全てに対して、辿ることができる指定近傍範囲内の後続ジョブネットの情報も取得する(ステップS205)。取得した後続ジョブネットの情報は、一旦メモリ上に確保される。また、この処理で重複したジョブネットがあった場合には、それらが1つにまとめられる。
【0027】
最後に、メモリ上に格納されたジョブネットの情報をサーバ管理下情報ファイル22(図1)に格納する(ステップS206)。
【0028】
以上により、ダミーネットグループ及びその構成要素の作成が完了する。
【0029】
次に、図6における各ステップの具体例について説明する。
【0030】
まず、図6におけるステップS201での処理の詳細について説明する。
【0031】
ステップS201で作成されるダミーネットグループの情報は、図1におけるサーバ管理下情報ファイル22に格納される。この格納される情報は、図2(c)に示すネットグループマスタ情報130と、図3(c)に示すネットグループスケジュール情報170とから構成されており、ネットグループマスタ情報130は、図2(c)で示すように、ネットグループ名131を有し、ネットグループスケジュール情報170は、図3(c)で示すように、当初予定日171とネットグループ名172とを有している。
【0032】
図7は図6での先行ジョブネット情報の取得に関する手順(ステップS202)の一具体例を示すフロ−チャ−トである。
【0033】
同図において、まず、基点となるジョブネットに対する先行ジョブネットの候補を選び出す処理をステップS301〜S303で行なう。即ち、まず、判定の対象となるジョブネット(以下、対象ジョブネットという)が指定された基点となるジョブネットからの範囲を超えたか否かを判定する(ステップS301)。指定された範囲を超えたものと判定された場合には、その対象ジョブネットに対する処理を終了する。それ以外の場合には、この対象ジョブネットが既に判定処理がなされたものか否かを判定する(ステップS302)。かかる判定処理がなされたものと判定された場合には、この対象ジョブネットに対する先行ジョブネットか否かであることの判定処理を終了する。それ以外の場合には、この対象ジョブネットの情報をメモリに確保して処理済みにする(ステップS303)。このようにして、先行ジョブネットの候補が選ばれ、これと同時に、かかる先行ジョブネットの候補の個数(情報数)も検出されている。
【0034】
次に、メモリに確保された先行ジョブネットに対する情報(先行ジョブネットの情報)をメインフレーム管理下ファイル21(図1)から取得する(ステップS304)。取得した先行ジョブネットの候補の情報数分、該当する先行ジョブネットかどうかの判定を行なうために、かかるジョブネットの判定毎にその判定数をカウンタでカウントしていくが、まず、このカウンタのカウント値が取得した情報数(即ち、上記メモリに確保された対象ジョブネットの個数)に到達したか否かを判定する(ステップS305)。このカウント値が取得した情報数に到達した場合には、先行ジョブネットに対する処理が全て終了する。それ以外の場合には、調査中の先行範囲を1だけ進め、メモリに確保されている次の対象ジョブネットを判定対象とする(ステップS306)。ここで、この先行ジョブネットの情報取得がマスタ情報の取得か否かを判定し(ステップS307)、マスタ上であれば、そのままステップS309に進むが、マスタ情報の取得ではなくてスケジュール情報の取得であれば、取得した日間隔分、当初予定日を変更し、調査中の日間隔範囲についても変更し(ステップS308)、ステップS309に進む。
【0035】
ステップS309では、上記の前記処理を踏まえた上で、再帰的に次の先行ジョブネット情報の取得を行ない、先行ジョブネット情報の取得の再帰処理が終了した時点で上記カウンタのカウント値を1だけ進め(ステップS310)、カウンタが取得した情報数に到達したか否かを判定処理するステップS305へ戻り、新たな先行ジョブネットの情報について、上記の処理を繰り返す。
【0036】
以上により、基点となるジョブネットから辿ることができる先行ジョブネットの情報を取得することができる。
【0037】
なお、この図7に示すアルゴリズムは、図6のステップS203での後続ジョブネットの情報の取得についても、同様である。これにより、基点となるジョブネットから辿ることができる後続ジョブネットの情報も取得することができる。
【0038】
図8は図6における辿り先ジョブネットの先行ジョブネット情報の取得(先行近傍情報取得)に関する手順(ステップS204)の一具体例を示すフロ−チャ−トである。
【0039】
同図において、まず、辿り先の先行ジョブネットが指定された基点となるジョブネットの近傍の範囲を超えたか否かを判定する(ステップS401)。これにより、指定された範囲を超えたものと判定された場合には、その辿り先の先行ジョブネットに対する処理を終了する。それ以外の場合には、その辿り先の先行ジョブネットが既に図8に示す処理をなされたものか否かを判定する(ステップS402)。処理されたものと判定された場合には、その辿り先の先行ジョブネットに対する処理を終了する。それ以外の場合には、その辿り先の先行ジョブネットの調査している範囲が、処理済みの範囲より大きいか否かを判定する(ステップS403)。処理済みの範囲より大きいと判定された場合には、その辿り先の先行ジョブネットに対する処理を終了する。それ以外の場合には、その先行ジョブネットの情報をメモリに確保して処理済みにする(ステップS404)。このようにして、各辿り先の先行ジョブネットの上記の判定処理が順次行なわれて、処理済みの先行ジョブネットがメモリに確保されていき、また、この場合も、メモリに格納される情報数も確保される。
【0040】
次に、その辿り先の先行ジョブネットに対する先行ジョブネットの情報をメインフレーム管理下ファイル21から取得する(ステップS405)。取得した先行ジョブネットの情報数分、該当する辿り先の先行ジョブネットかどうかの判定を行なうために、かかる先行ジョブネットを判定処理する毎に判定処理数をカウンタでカウントしていくが、まず、カウンタのカウント値が取得した情報数に到達したか否かを判定する(ステップS406)。カウント値が取得した情報数に到達した場合には、その辿り先の先行ジョブネットに対する処理を終了する。それ以外の場合には、調査中の先行範囲を1だけ進め、次の先行ジョブネットを処理対象とする(ステップS407)。ここで、この辿り先の先行ジョブネットの情報取得がマスタ情報か否かを判定し(ステップS408)、マスク情報であれば、そのままステップS410へ進むが、マスタ情報の取得ではなくてスケジュール情報の取得であれば、取得した日間隔分、当初予定日を変更し、調査中の日間隔範囲についても変更し(ステップS409)、ステップS410へ進む。
【0041】
ステップS410では、上記の処理を踏まえた上で、再帰的に次の辿り先の先行ジョブネットの情報取得を行ない、辿り先の先行ジョブネット情報取得の再帰処理が終了した時点でカウンタのカウント値を1だけ進め(ステップS411)、取得した情報数にカウンタのカウント値が到達したか否かを判定処理するステップS406へ戻り、新たな辿り先の先行ジョブネット情報について、上記の処理を繰り替えす。
【0042】
以上により、辿り先の先行ジョブネットから辿ることができる先行ジョブネットの情報を取得することができる。
【0043】
なお、この図8に示すアルゴリズムは、図6のステップS205の辿り先の後続ジョブネットの情報取得についても同様である。これにより、辿り先のジョブネットから辿ることができる後続ジョブネットの情報も取得することができる。
【0044】
次に、図6のステップS206での処理の詳細について説明する。
【0045】
ステップS206では、ステップS201で作成したダミーネットグループとステップS202〜S205で得られた情報を基に、ネットグループと構成要素となるジョブネットとの関連情報をサーバ管理下情報ファイル22(図1)に格納する。この格納する情報は、ネットグループージョブネット選択マスタ情報140とネットグループージョブネット選択スケジュール情報180とから構成されている。
【0046】
ネットグループージョブネット選択マスタ情報140は、図2(d)で示すように、ネットグループ名141とジョブネット名142とX座標143とY座標144とを有しており、ネットグループの構成要素ジョブネットの位置情報として、横方向の位置をX座標143で表わし、縦方向の位置をY座標144で表わす。また、ネットグループージョブネット選択スケジュール情報180は、図3(d)で示すように、当初予定日181とネットグループ名182とジョブネット名183とX座標184とY座標185とを有している。
【0047】
次に、クライアント3において、送信された情報を基にGUIで表示する工程について図9〜図11を用いて説明する。
【0048】
この表示工程は、マップエリアの設定,ジョブネットの配置,リンク線の描写及び日間隔の表示からなる。
【0049】
まず、図9(a)に示すように、マップエリアの設定を行なう。これは、ジョブネットのアイコンやリンク線を表示するためのマップエリアMを設定するものであり、マップエリアMのサイズは、初期値として、固定の値を用いる。ここでは、一例として、縦寸法7に対し、横寸法を13としている。
【0050】
次に、図9(b)に示すように、ジョブネットの配置を行なう。これは、ダミーネットグループの構成要素ジョブネット情報取得要求210(図4)により得られたジョブネット名213及びその位置情報214,215(図5(b))に基づいて、各ジョブネットをマップエリアMに配置していくものである。ここでは、このマップエリアMにジョブネットA〜Fを配置した状態を示している。
【0051】
次に、図9(c)に示すように、リンク線の描写及び日間隔の表示を行なう。これは、ジョブネットの先行情報取得要求220及びジョブネットの後続情報取得要求230(図4)により得られた先行・後続関連情報223,224,233,234(図5(c),(d))に基づいて、リンク線を描写するものである。リンク線の矢印の向きは先行ジョブネットから後続ジョブネットへの向きである。また、上記の先行・後続関連情報からは、先行ジョブネットの日間隔も得られる。日間隔が0でない場合、その値を先行ジョブネットのアイコンに添える。図9(c)では、ジョブネットA,Eの日間隔を1としている。同一ジョブネット名で日間隔が異なるジョブネットが複数存在する場合には、添え字となる日間隔の値を「,」区切りで表示する。そのとき、日間隔が0のものも含まれる場合には、添え字に日間隔の値を追加する。例えば、ジョブネット名「A」のジョブネットが2つ存在し、一方の日間隔が0、他方の日間隔が1とすると、「A1,1」,「A2」となる。
【0052】
図10は基点となるジョブネットの関連近傍ジョブネットの具体的な表示例を示す図である。
【0053】
図10(a)は、ジョブネットCを基点となるジョブネットとし、指定先行数を2に、指定後続数を2に、指定近傍数を0に夫々設定した場合の基点となるジョブネットCの関連近傍ジョブネットを表示したものである。
【0054】
この場合、ジョブネットCから直接辿ることができる先行・後続ジョブネットのみが表示される。このため、ジョブネットCの先行ジョブネットA,Bに別の後続ジョブネットが存在する場合や、ジョブネットCの後続ジョブネットD,E,Fに別の先行ジョブネットが存在する場合には、そのジョブネットは表示されない(かかる表示されないジョブネットを破線で示している)。
【0055】
図10(b)は、ジョブネットCを基点となるジョブネットとし、指定先行数を2に、指定後続数を2に、指定近傍数を2に夫々設定した場合の基点となるジョブネットの関連近傍ジョブネットを表示したものである。
【0056】
図10(a)の場合の表示と異なり、ジョブネットCから直接辿ることができる先行・後続ジョブネットA,B,D,Fから辿ることができる近傍ジョブネットについても表示される(なお、後続ジョブネットEには、これから辿ることができるジョブネットがない)。このため、ジョブネットCの辿り先ジョブネット(例えば、ジョブネットB)から指定近傍数の2の数分先近傍ジョブネット(例えば、ジョブネットK,L,M)についても表示される。これにより、ジョブネットCと関連するジョブネットを画面から把握することが可能となる。
【0057】
図11は基点となるジョブネットの関連近傍ジョブネットに日間隔を含むジョブネットが存在する場合の具体的な表示例を示す図である。
【0058】
図11(a)は、ジョブネットCを基点となるジョブとし、ジョブネットA,BをこのジョブネットCから辿る先行ジョブネット、D,E,FをこのジョブネットCから辿る後続ジョブネットとし、G,Iを夫々ジョブネットA,Bから辿る後続ジョブネット、HをジョブネットDから辿る先行ジョブネットとしたときの基点となるジョブネットCの関連近傍ジョブネットを平面図で表示したものである。
【0059】
図11(a)において、基点となるジョブネットCの関連近傍ジョブネットのうち、日間隔を含むジョブネットA,D,Hには、日間隔の値が添え字として表示される。同じジョブネット名のジョブネットが複数存在する場合には、日間隔の値が「,」区切りで表示される。例えば、ジョブネットDの場合、「,」の後の添字「1」が日間隔を表わしている。
【0060】
図11(b)は基点となるジョブネットCの関連近傍ジョブネットを立体図で表示したものである。
【0061】
図11(b)において、紙面に垂直な軸(垂直軸)に沿う方向に日間隔を設定して垂直軸方向情報が先行する方向とし、基点となるジョブネットCの日間隔を含む関連近傍ジョブネットをより分かり易くなるように表示させている。この表示は、平面図による表示と比較して、ジョブネットの配置の方法が異なる。
【0062】
基点となるジョブネットCが存在する垂直軸に垂直な平面を平面POとし、日間隔に応じて、この平面POに平行な平面をこの平面POの上下に設定する。例えば、このジョブネットCから見て先行ジョブネットAに日間隔がある場合には、この平面POよりも上方に平面PPを描写し、その平面PPにジョブネットAを配置する。これら平面PO,PPにおけるジョブネットの位置は、図11(a)で表示した位置を投影したものを用いる。
【0063】
また、基点となるジョブネットCから見て、例えば、後続ジョブネットFに日間隔がある場合には、この平面POよりも下方に平面PSを描写し、この平面PSにジョブネットFを配置する。この場合も、平面PSにおけるジョブネットの位置は、図11(a)で表示した位置を投影したものを用いる。なお、基点となるジョブネットCが存在する平面POが水平方向の軸となる。
【0064】
【発明の効果】
以上説明したように、本発明によれば、クライアントからジョブネット名及びそのジョブネットの先行・後続数,近傍数及び日間隔数を指定することにより、大量かつ複雑に関連したジョブネットの中から目的となるジョブネットに関わる関連情報だけを取り出すことができる。かかる関連情報には、日間隔に対する情報も含まれており、時間軸を考慮に入れた関連情報を知ることもできる。また、GUI表示にすることにより、それらの関連情報が分かり易い形で表現することができる。
【図面の簡単な説明】
【図1】本発明によるジョブネットの関連近傍ジョブネットの導出及びその表示方法に係るシステムの概要を示すブロック図である。
【図2】図1におけるジョブネット及びネットグループのマスタ情報に関連する情報の一具体例を示す構成図である。
【図3】図1におけるジョブネット及びネットグループのスケジュール情報に関連する情報の一具体例を示す構成図である。
【図4】本発明によるジョブネットの関連近傍ジョブネットの導出及びその表示方法の一実施形態における基点となるジョブネットの関連近傍ジョブネット表示処理を行なったときのクライアント−サーバ間の通信手順を示すシーケンス図である。
【図5】図4に示した処理でのクライアント−サーバ間のプロトコルの一具体例を示す図である。
【図6】図4に示す処理におけるサーバでの動作の一具体例を示すフローチャートである。
【図7】図6におけるステップS202,S203の一具体例を示すフロ−チャ−トである。
【図8】図6におけるステップS204,S205の一具体例を示すフロ−チャ−トである。
【図9】図1におけるクライアントでの図4で示した処理で得られた情報を基になされるGUIによるジョブネットの表示のマップエリアの設定から各ジョブネット間のリンクセンの描画,日間隔の表示までの処理手中の説明図である。
【図10】図9に示す処理手順に続く基点となるジョブネットの関連近傍ジョブネットの表示の一具体例についての説明図である。
【図11】図9に示す処理手順に続く基点となるジョブネットの関連近傍ジョブネットの表示の他の具体例についての説明図である。
【符号の説明】
1 メインフレーム
2 サーバ
3 クライアント
11 マスタファイル
12 モニタファイル
21 メインフレーム管理下情報ファイル
22 サーバ管理下情報ファイル
31 端末装置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for deriving a job net having a preceding and succeeding relationship including a day-to-day job net and a job net that is a base point, a method for deriving a job net in the vicinity of the job net, and a method for displaying the related diagram using a graphical user interface (GUI) It is about.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, a method of clearly displaying a relationship between a preceding and succeeding job / job net using a link line is generally performed. However, in the case of an operation management system in which a large number of job nets are intricately related, it is not easy to pick out the preceding and succeeding relations for one job net from the overall view.
[0003]
Further, there is no technique for adding a concept of a time axis to a preceding / following relationship and displaying a preceding / following relationship diagram that takes into account a preceding / following relationship across dates, that is, a preceding / following relationship including a day interval.
[0004]
Recently, we extracted the job nets necessary for business from mainframe jobs, introduced the concept of net groups, where the set of job nets is a unit, and established the prior / following relationship between job nets belonging to the net group Although a display method has been devised, if a job net belonging to a net group has a predecessor-related relationship from a job net that does not belong to the corresponding net group, an external relationship is displayed on the job net icon. For job nets that are provided with a mark indicating that they are related to the day interval and externally, the job net names are displayed in a list format.
[0005]
[Problems to be solved by the invention]
However, in the display method according to the conventional method described above, it is not possible to acquire all of the preceding and succeeding related information for the target job net in one operation, and in order to acquire related information for the job net of the preceding and succeeding related destination A series of operations is also required for the job net, and in the case of a complex system, acquiring related information related to the target job net is a costly operation.
[0006]
An object of the present invention is to solve such a problem and extract all preceding and succeeding related job nets that can be traced from a job net that is a base point from a specified range, and also spans dates, that is, a day interval. The related neighborhood of job nets that are extracted from the specified range for the preceding and succeeding related job nets that have a clear and easy-to-understand display of the preceding and succeeding related relationships of the target job net To provide a method for deriving and displaying a job net.
[0007]
[Means for Solving the Problems]
  To achieve the above objective,A method for deriving a job net related to a job net according to the present invention includes: a job net serving as a base point; and a preceding / successful job net that is related to a preceding / following job net including a day interval with respect to the base job net. Within the specified number of neighbors of the preceding and succeeding job nets within the specified preceding and succeeding number range, and the preceding job net and the succeeding job net as the neighboring job nets that can be traced from each job net The preceding job net and the subsequent job net are derived.
  According to the present invention, a method for displaying related job nets of job nets is a method for creating a net group composed of a set of job nets as a GUI display unit and deriving related job nets of the job nets using the net group. A job net in the vicinity of a job net serving as a base point obtained based on the above is displayed.
  When a job net including a day interval exists, the value of the day interval is displayed as a subscript between job nets.
  Further, when there is a job net including a day interval, the relationship between the job nets is depicted in a three-dimensional view including the coordinate axis of the day interval, and a plurality of job nets having the same job net name and different day intervals are displayed. Are displayed at different positions in the coordinate axis direction.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be specifically described below with reference to the drawings.
[0009]
FIG. 1 is a block diagram showing an outline of a system related to a method for deriving and displaying a job net related to a job net according to the present invention, wherein 1 is a main frame, 11 is a master file, 12 is a monitor file, and 2 is a server. , 21 is an information file under mainframe management, 22 is an information file under server management, 3 is a client, and 31 is a terminal device.
[0010]
In this figure, this system is composed of a main frame 1, a server 2 and a client 3 that cooperate with the main frame.
[0011]
The main frame 1 has a master file 11 and a monitor file 12 that are the basis of the master information and schedule information of the job nets operated there. The server 2 has a mainframe-managed information file 21 reflecting information on the mainframe 1 and a server-managed information file 22 for securing information related to the job net. The client 3 includes a terminal device 31 including an input device for making a request to the server 2 and a display device for displaying a preceding / successor related diagram of the base job net from information acquired from the server 2. Yes.
[0012]
Next, a process of storing detailed information for each job net acquired from the main frame 1 and preceding / following related information will be described.
[0013]
The server 2 obtains information related to the job net from the main frame 1, that is, master information of the job net and its preceding / following related information, schedule information of the job net and its preceding / following related information, Store in the information file 21. As the acquisition method, for example, there are methods such as batch download at the time of system startup and journal processing for acquiring only information changed in a certain cycle.
[0014]
Information stored in the information file 21 under the management of the mainframe includes job net master information 110 and job net related master information 120 as shown in FIGS. 2 (a) and 2 (b), and FIGS. 3 (a) and 3 (b). The job net schedule information 150 and the job net related schedule information 160 shown in FIG.
[0015]
The job net master information 110 is associated with the job net information stored in the master file 11 on the main frame 1, and as shown in FIG. Detailed information 112. The job net related master information 120 is associated with the preceding / following related information of the job net master information 110, and as shown in FIG. 2B, the preceding job net name 121, the succeeding job net name 122, and the day interval 123. And have. The job net schedule information 150 is associated with the job net information stored in the monitor file 12 on the main frame 1, and as shown in FIG. And job net detailed information 153. The job net related schedule information 160 is associated with the preceding / following related information of the job net schedule information 150. As shown in FIG. 3B, the initial scheduled date 161, the preceding job net name 162, and the succeeding A job net name 163 and a day interval 164 are included.
[0016]
Next, job nets that can be traced from the preceding / following related information of the job net that is the base point and the information of the specified display range are extracted, and a net group having these job nets as constituent elements (that is, a dummy net group) ) And transmitting information necessary for display to the client 3 will be described with reference to FIGS.
[0017]
FIG. 4 is a sequence diagram showing a communication procedure between the client 3 and the server 2 when the related neighborhood job net display process of the job net as the base point is performed.
[0018]
In FIG. 4, first, a dummy net group creation request 200 is made from the client 3 to the server 2 (step S101). In this dummy net group creation request 200, information communication from the client 3 to the server 2 is performed by the protocol shown in FIG. 5A. That is, the base job net name shown in FIG. 201, initially scheduled date 202 of the job net, designated preceding number 203 designated as a preceding range, designated succeeding number 204 designated as a following range, designated neighborhood number 205 designated as a neighborhood range, designated as a range of day intervals A total of six items of information on the designated number of specified day intervals 206 are transmitted from the client 3 to the server 2. Here, the originally scheduled date 202 can be omitted, and is omitted when requesting for master information. In the server 2, a dummy net group is created from the information, and information including one item of the dummy net group name 207 (FIG. 5A) uniquely indicating the dummy net group is transmitted to the client 3 (step S102).
[0019]
The client 3 makes a dummy net group component job net information acquisition request 210 based on the received dummy net group name (step S103). In the dummy net group component job net information acquisition request 210, information communication between the client 3 and the server 2 is performed by the protocol shown in FIG. 5B. That is, the network shown in FIG. Information on a total of two items of the group name 211 and the initial scheduled date 212 is transmitted from the client 3 to the server 2. Here, the initial scheduled date 212 can be omitted, and is omitted when requesting the master information. The server 2 extracts information on the corresponding job net from the mainframe managed information file 21 and the server managed information file 22 shown in FIG. 1 using these pieces of information as keys, and the job net shown in FIG. A total of four items of job net information including name 213, X coordinate 214, Y coordinate 215, and job net detailed information 216 are transmitted to client 3 as a response to request 210 (step S104). At this time, the number of records to be transmitted is equal to the number of job nets that are constituent elements of the dummy net group.
[0020]
The client 3 performs a preceding job net information acquisition request 220 for the corresponding job net from the received information of the job net (step S105). In the preceding job net information acquisition request 220, information communication between the client 3 and the server 2 is performed according to the protocol shown in FIG. 5C. That is, the job net name 221 shown in FIG. Information on a total of two items of the originally scheduled date 222 is transmitted from the client 3 to the server 2. Here, the initial scheduled date 222 can be omitted, and is omitted when requesting the master information. The server 2 extracts the information of the corresponding preceding job net from the information file 21 under the management of the mainframe using these information as a key, and displays a total of two items, the preceding job net name 223 and the day interval 224 shown in FIG. Is sent to the client 3 as a response to the request 220 (step S106). At this time, the number of records to be transmitted is equal to the preceding number of the specified job net.
[0021]
The client 3 makes a subsequent job net information acquisition request 230 for the corresponding job net from the received information of the job net (step S107). In the subsequent job net information acquisition request 230, information communication between the client 3 and the server 2 is performed by the protocol shown in FIG. 5D. That is, the job net name 231 shown in FIG. Information on job nets of a total of two items on the originally scheduled date 232 is transmitted from the client 2 to the server 2. Here, the initial scheduled date 232 can be omitted, and is omitted when requesting the master information. The server 2 extracts the information of the corresponding subsequent job net from the information file 21 under the management of the mainframe using the information of the job net as a key, and the information of a total of two items of the subsequent job net name 233 and the day interval 234 is requested 230. Is transmitted to the client 3 as a response to (step S108). At this time, the number of records to be transmitted is the number of subsequent records of the specified job net.
[0022]
By executing the above steps S101 to S108, the client 3 can acquire all necessary information, and can display related neighboring job nets of the job net that is the base point.
[0023]
FIG. 6 is a flowchart showing a procedure for creating a dummy net group and its components.
[0024]
In the figure, as a procedure for creating a dummy net group and its constituent elements, first, the server 2 receives a request 200 (FIG. 4) from the client 3 and creates a dummy net group (step S201).
[0025]
Next, information on the preceding job net within the designated range that can be traced from the job net that is the base point is acquired (step S202). The acquired information on the preceding job net is once secured on the memory. If there are duplicate job nets in this process, they are combined into one. Similarly, information on subsequent job nets within a specified range that can be traced from the base job net is also acquired (step S203). The acquired information of the succeeding job net is once secured on the memory, similarly to the information of the preceding job. If there are duplicate job nets in this process, they are combined into one.
[0026]
Next, information on the preceding job nets within the designated neighborhood range that can be traced is obtained for all the preceding job nets and subsequent job nets that are obtained in this way (step S204). The acquired information on the preceding job net is once secured on the memory. If there are duplicate job nets in this process, they are combined into one. Similarly, information on subsequent job nets within a specified neighborhood range that can be traced is also obtained for all the preceding job nets and subsequent job nets that are obtained (step S205). The acquired subsequent job net information is once secured in the memory. If there are duplicate job nets in this process, they are combined into one.
[0027]
Finally, the job net information stored in the memory is stored in the server-managed information file 22 (FIG. 1) (step S206).
[0028]
Thus, the creation of the dummy net group and its constituent elements is completed.
[0029]
Next, a specific example of each step in FIG. 6 will be described.
[0030]
First, details of the processing in step S201 in FIG. 6 will be described.
[0031]
The information on the dummy net group created in step S201 is stored in the server-managed information file 22 in FIG. The stored information is composed of net group master information 130 shown in FIG. 2C and net group schedule information 170 shown in FIG. 3C. The net group master information 130 is shown in FIG. As shown in FIG. 3C, it has a net group name 131, and the net group schedule information 170 has an initial scheduled date 171 and a net group name 172 as shown in FIG.
[0032]
FIG. 7 is a flowchart showing a specific example of the procedure (step S202) regarding the acquisition of the preceding job net information in FIG.
[0033]
In the figure, first, processing for selecting a candidate for a preceding job net for a base job net is performed in steps S301 to S303. That is, first, it is determined whether or not the job net to be determined (hereinafter referred to as the target job net) exceeds the range from the designated base job net (step S301). If it is determined that the specified range is exceeded, the processing for the target job net is terminated. In other cases, it is determined whether or not the target job net has already been subjected to determination processing (step S302). If it is determined that such determination processing has been performed, the determination processing for determining whether or not the job net is a preceding job net is terminated. In other cases, the information on the target job net is secured in the memory to be processed (step S303). In this way, candidates for the preceding job net are selected, and at the same time, the number of candidates for the preceding job net (number of information) is also detected.
[0034]
Next, information on the preceding job net secured in the memory (information on the preceding job net) is acquired from the main frame management file 21 (FIG. 1) (step S304). In order to determine whether or not it is a corresponding preceding job net, the number of determinations is counted by the counter for each job net determination. It is determined whether or not the count value has reached the acquired number of information (that is, the number of target job nets secured in the memory) (step S305). When this count value reaches the number of acquired information, all processes for the preceding job net are completed. In other cases, the preceding range under investigation is advanced by 1, and the next target job net secured in the memory is set as the determination target (step S306). Here, it is determined whether or not the information acquisition of the preceding job net is acquisition of master information (step S307), and if it is on the master, the process proceeds to step S309 as it is, but acquisition of schedule information is acquired instead of acquisition of master information. If so, the originally scheduled date is changed by the acquired day interval, the day interval range under investigation is also changed (step S308), and the process proceeds to step S309.
[0035]
In step S309, the next preceding job net information is recursively acquired based on the above processing, and the count value of the counter is set to 1 when the recurring processing for acquiring the preceding job net information is completed. Proceeding (step S310), the process returns to step S305 for determining whether or not the counter has reached the number of pieces of information acquired, and the above processing is repeated for the information of the new preceding job net.
[0036]
As described above, it is possible to acquire the information of the preceding job net that can be traced from the job net that is the base point.
[0037]
Note that the algorithm shown in FIG. 7 is the same for the acquisition of the information of the subsequent job net in step S203 of FIG. As a result, it is also possible to acquire information on the succeeding job net that can be traced from the job net that is the base point.
[0038]
FIG. 8 is a flowchart showing a specific example of the procedure (step S204) relating to the acquisition of preceding job net information (acquisition of preceding neighbor information) of the destination job net in FIG.
[0039]
In the figure, first, it is determined whether or not the preceding job net to be traced has exceeded the range in the vicinity of the designated job net (step S401). As a result, when it is determined that the specified range is exceeded, the processing for the preceding job net to be traced is terminated. In other cases, it is determined whether or not the preceding preceding job net has already undergone the processing shown in FIG. 8 (step S402). If it is determined that it has been processed, the processing for the preceding job net to be traced is terminated. In other cases, it is determined whether the investigated range of the preceding preceding job net is larger than the processed range (step S403). If it is determined that the range is larger than the processed range, the process for the preceding job net to be traced is terminated. In other cases, the information of the preceding job net is secured in the memory to be processed (step S404). In this way, the above determination process for each preceding destination job net is sequentially performed, and the processed preceding job net is secured in the memory. Also in this case, the number of pieces of information stored in the memory Is also secured.
[0040]
Next, information on the preceding job net for the tracing destination preceding job net is acquired from the mainframe management file 21 (step S405). In order to determine whether or not there is a corresponding preceding job net for the number of acquired preceding job nets, each time the preceding job net is determined, the number of determination processes is counted by a counter. Then, it is determined whether or not the count value of the counter has reached the acquired number of information (step S406). When the count value reaches the acquired number of information, the process for the preceding preceding job net is terminated. In other cases, the preceding range under investigation is advanced by 1, and the next preceding job net is set as a processing target (step S407). Here, it is determined whether or not the information acquisition of the preceding destination job net is the master information (step S408). If it is the mask information, the process proceeds to step S410 as it is. If it is acquisition, the initial scheduled date is changed by the acquired day interval, the day interval range under investigation is also changed (step S409), and the process proceeds to step S410.
[0041]
In step S410, based on the above processing, information on the next preceding destination job net is acquired recursively, and when the recursive processing for acquiring the preceding destination job net information ends, the count value of the counter Is advanced by 1 (step S411), the process returns to step S406 for determining whether or not the count value of the counter has reached the number of acquired information, and the above-described processing is repeated for the preceding preceding job net information. .
[0042]
As described above, information on the preceding job net that can be traced from the preceding preceding job net can be acquired.
[0043]
Note that the algorithm shown in FIG. 8 is the same for the acquisition of information on the subsequent job net to be traced in step S205 in FIG. As a result, information on the succeeding job net that can be traced from the destination job net can also be acquired.
[0044]
Next, details of the processing in step S206 of FIG. 6 will be described.
[0045]
In step S206, based on the dummy net group created in step S201 and the information obtained in steps S202 to S205, information related to the net group and the job net that is a constituent element is obtained from the server-managed information file 22 (FIG. 1). To store. This stored information is composed of net group-job net selection master information 140 and net group-job net selection schedule information 180.
[0046]
The net group-job net selection master information 140 includes a net group name 141, a job net name 142, an X coordinate 143, and a Y coordinate 144 as shown in FIG. As job net position information, a horizontal position is represented by an X coordinate 143 and a vertical position is represented by a Y coordinate 144. Further, as shown in FIG. 3D, the net group-job net selection schedule information 180 has an initial scheduled date 181, a net group name 182, a job net name 183, an X coordinate 184, and a Y coordinate 185. Yes.
[0047]
Next, the process of displaying with GUI on the basis of the transmitted information in the client 3 will be described with reference to FIGS.
[0048]
This display step consists of setting a map area, arranging a job net, drawing a link line, and displaying a day interval.
[0049]
First, as shown in FIG. 9A, a map area is set. This is to set a map area M for displaying job net icons and link lines, and the map area M uses a fixed value as an initial value. Here, as an example, the horizontal dimension is 13 with respect to the vertical dimension 7.
[0050]
Next, as shown in FIG. 9B, job nets are arranged. This is because each job net is mapped on the basis of the job net name 213 obtained by the dummy net group component job net information acquisition request 210 (FIG. 4) and its position information 214 and 215 (FIG. 5B). It is arranged in the area M. Here, a state where job nets A to F are arranged in the map area M is shown.
[0051]
Next, as shown in FIG. 9C, the link line is drawn and the day interval is displayed. This is because the preceding / following related information 223, 224, 233, 234 (FIGS. 5C and 5D) obtained by the preceding information acquisition request 220 of the job net and the subsequent information acquisition request 230 of the job net (FIG. 4). ) To draw a link line. The direction of the arrow of the link line is the direction from the preceding job net to the subsequent job net. Further, the date interval of the preceding job net is also obtained from the preceding / following related information. If the day interval is not 0, the value is attached to the icon of the preceding job net. In FIG. 9C, the day interval between job nets A and E is 1. If there are multiple job nets with the same job net name and different day intervals, the subscript day interval values are displayed separated by “,”. At that time, if a day interval is also included, the value of the day interval is added to the subscript. For example, if there are two job nets with the job net name “A”, one day interval is 0 and the other day interval is 1, “A1,1"," A2"
[0052]
FIG. 10 is a diagram showing a specific display example of the job nets related to the job net that is the base point.
[0053]
FIG. 10A shows a job net C as a base point, the job net C as a base point when the designated preceding number is set to 2, the designated succeeding number is set to 2, and the designated neighborhood number is set to 0. This is a display of related neighborhood job nets.
[0054]
In this case, only the preceding and succeeding job nets that can be traced directly from the job net C are displayed. For this reason, if there are other subsequent job nets in the preceding job nets A and B of the job net C, or if there are other preceding job nets in the subsequent job nets D, E, and F of the job net C, The job net is not displayed (the job net that is not displayed is indicated by a broken line).
[0055]
FIG. 10B shows the relationship between the job net as a base point when the job net C is set as the base job net, the designated preceding number is set to 2, the specified succeeding number is set to 2, and the specified neighborhood number is set to 2. This is a display of nearby job nets.
[0056]
Unlike the display in the case of FIG. 10A, the neighboring job nets that can be traced from the preceding / successful job nets A, B, D, and F that can be traced directly from the job net C are also displayed. The job net E has no job net that can be traced from now on). For this reason, the number of neighboring job nets (for example, job nets K, L, and M) that are two times the designated number of neighbors from the destination job net (for example, job net B) of job net C are also displayed. As a result, the job net related to the job net C can be grasped from the screen.
[0057]
FIG. 11 is a diagram showing a specific display example in the case where a job net including a day interval exists in the related neighboring job net of the base job net.
[0058]
FIG. 11A shows a job net C as a base job, job nets A and B as preceding job nets traced from the job net C, and D, E, and F as succeeding job nets traced from the job net C. A plan view of related job nets of job net C, which is a base point when G and I are subsequent job nets traced from job nets A and B, and H is a preceding job net traced from job net D, respectively. .
[0059]
In FIG. 11A, among the job nets A, D, and H including the day interval among the related neighboring job nets of the job net C serving as the base point, the value of the day interval is displayed as a subscript. If there are multiple job nets with the same job net name, the day interval values are displayed separated by “,”. For example, in the case of the job net D, the subscript “1” after “,” represents the day interval.
[0060]
FIG. 11B shows a three-dimensional view of the related neighboring job net of job net C serving as the base point.
[0061]
In FIG. 11B, the related neighborhood job including the day interval of the job net C serving as the base point, with the day interval set in the direction along the axis perpendicular to the paper surface (vertical axis) and the vertical axis direction information leading. The net is displayed to make it easier to understand. This display differs from the plan view display in the method for arranging job nets.
[0062]
A plane perpendicular to the vertical axis on which the job net C serving as the base point exists is defined as plane POAnd depending on the day interval, this plane POA plane parallel to the plane POSet up and down. For example, when there is a day interval in the preceding job net A when viewed from the job net C, the plane POPlane P abovePAnd the plane PPJob net A is placed in These planes PO, PPThe position of the job net in FIG. 11 is a projection of the position displayed in FIG.
[0063]
Further, when viewed from the job net C as the base point, for example, when the succeeding job net F has a day interval, the plane POPlane P belowSAnd this plane PSThe job net F is arranged in Again, plane PSThe position of the job net in FIG. 11 is a projection of the position displayed in FIG. The plane P on which the job net C serving as the base point existsOIs the horizontal axis.
[0064]
【The invention's effect】
As described above, according to the present invention, by specifying a job net name and the number of preceding / succeeding of the job net, the number of neighbors, and the number of day intervals from the client, it is possible to select from a large number of complicated job nets. Only relevant information related to the target job net can be extracted. Such related information includes information about the day interval, and it is possible to know the related information taking the time axis into consideration. In addition, by displaying the GUI, the related information can be expressed in an easy-to-understand manner.
[Brief description of the drawings]
FIG. 1 is a block diagram showing an outline of a system related to a method for deriving and displaying a job net related to a job net according to the present invention.
2 is a configuration diagram showing a specific example of information related to master information of job nets and net groups in FIG. 1; FIG.
3 is a configuration diagram showing a specific example of information related to schedule information of job nets and net groups in FIG. 1. FIG.
FIG. 4 shows a communication procedure between a client and a server when a related job net display process of a job net that is a base point in an embodiment of a method for deriving and displaying a related job net of a job net according to the present invention. FIG.
5 is a diagram showing a specific example of a protocol between a client and a server in the processing shown in FIG.
6 is a flowchart showing a specific example of the operation of the server in the process shown in FIG.
FIG. 7 is a flowchart showing a specific example of steps S202 and S203 in FIG.
FIG. 8 is a flowchart showing a specific example of steps S204 and S205 in FIG.
9 is a link area drawing between job nets and a day interval from setting of a map area for displaying a job net by GUI based on information obtained by the processing shown in FIG. 4 at the client in FIG. It is explanatory drawing in the processing hand until it displays.
FIG. 10 is an explanatory diagram of a specific example of a display of related neighborhood job nets of a job net serving as a base point following the processing procedure shown in FIG. 9;
11 is an explanatory diagram illustrating another specific example of the display of related job nets related to a job net serving as a base point following the processing procedure illustrated in FIG. 9;
[Explanation of symbols]
1 Main frame
2 servers
3 Client
11 Master file
12 Monitor file
21 Mainframe managed information file
22 Information file under server management
31 Terminal device

Claims (4)

基点となるジョブネットと、該基点となるジョブネットに対して日間隔を含めた先行・後続関連にある先行・後続ジョブネットのうちの指定した先行・後続数の範囲内の該先行・後続ジョブネットと、夫々の該ジョブネットから辿ることができる近傍ジョブネットとしての先行ジョブネット及び後続ジョブネットのうちの指定した近傍数の範囲内の該先行ジョブネット及び該後続ジョブネットとを導出することを特徴とするジョブネットの関連近傍ジョブネットの導出方法。The predecessor / successor job within the range of the specified predecessor / successor number of the predecessor / successor jobnet that is related to the basepoint job net and the predecessor / successor jobnet including the day interval for the basepoint deriving a net, and said prior job net and the succeeding job net within the number of near the specified one of the preceding job net and succeeding job net as a neighboring job net that can be traced from the job net respective A method for deriving a related neighborhood job net of a job net. GUIの表示単位となるジョブネットの集合からなるネットグループを作成し、該ネットグループを使用した請求項1に記載のジョブネットの関連近傍ジョブネットの導出方法をもとに得られる基点となるジョブネットの近傍ジョブネットを表示することを特徴とするジョブネットの関連近傍ジョブネットの表示方法。  2. A job as a base point obtained based on the method for deriving a job net associated with a job net according to claim 1, wherein a net group is formed of a set of job nets which are GUI display units, and the net group is used. A method of displaying related job nets of job nets, characterized by displaying job nets near the net. 請求項2に記載のジョブネットの関連近傍ジョブネットの表示方法であって、
日間隔を含むジョブネットが存在するときには、該日間隔の値を添字としてジョブネット間に表示することを特徴とするジョブネットの関連近傍ジョブネットの表示方法。
A method for displaying related job nets related to a job net according to claim 2,
A method for displaying related job nets related to a job net, wherein when there is a job net including a day interval, the value of the day interval is displayed as a subscript between job nets.
請求項2に記載のジョブネットの関連近傍ジョブネットの表示方法であって、
日間隔を含むジョブネットが存在するときには、該日間隔の座標軸を含む立体図で該ジョブネット間の関連を描写し、同一ジョブネット名で日間隔が異なる複数のジョブネットを該日間隔の座標軸方向の異なる位置に表示することを特徴とするジョブネットの関連近傍ジョブネットの表示方法。
A method for displaying related job nets related to a job net according to claim 2,
When there is a job net including a day interval, the relationship between the job nets is depicted in a three-dimensional view including the coordinate axis of the day interval, and a plurality of job nets having the same job net name and different day intervals are represented by the coordinate axis of the day interval. A method of displaying related job nets related to a job net, wherein the display is performed at positions having different directions.
JP2002089547A 2002-03-27 2002-03-27 Derivation and display method of job nets related to job nets Expired - Fee Related JP3908069B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002089547A JP3908069B2 (en) 2002-03-27 2002-03-27 Derivation and display method of job nets related to job nets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002089547A JP3908069B2 (en) 2002-03-27 2002-03-27 Derivation and display method of job nets related to job nets

Publications (2)

Publication Number Publication Date
JP2003288220A JP2003288220A (en) 2003-10-10
JP3908069B2 true JP3908069B2 (en) 2007-04-25

Family

ID=29235102

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002089547A Expired - Fee Related JP3908069B2 (en) 2002-03-27 2002-03-27 Derivation and display method of job nets related to job nets

Country Status (1)

Country Link
JP (1) JP3908069B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007164532A (en) * 2005-12-14 2007-06-28 Toshiba Corp Task display device, task display method, and task display program
JP2011095874A (en) * 2009-10-28 2011-05-12 Hitachi Ltd Flow chart display device, flow chart display method and program
JP2013257803A (en) * 2012-06-14 2013-12-26 Hitachi Solutions Ltd Job operation management system
JP2014035654A (en) * 2012-08-09 2014-02-24 Hitachi Ltd Job order confirmation method

Also Published As

Publication number Publication date
JP2003288220A (en) 2003-10-10

Similar Documents

Publication Publication Date Title
US10083517B2 (en) Segmentation of an image based on color and color differences
JP4122297B2 (en) Message analysis apparatus and message display method
US20070073575A1 (en) Progress management system
US10091123B2 (en) System and user interface for coordinating distributed workflow between multiple computing systems
JP2008257475A (en) Information management system, individual management server, intensive management server, and information management method
JP3908069B2 (en) Derivation and display method of job nets related to job nets
JP6926032B2 (en) Manufacturing control system and method
JP5336675B1 (en) Service evaluation diagnosis system, service evaluation diagnosis method, and service evaluation diagnosis program
JP5563545B2 (en) Information processing apparatus and method
CN104950833A (en) Production plan creation support method and production plan creation support apparatus
CN111026895A (en) Data visualization processing method and device and storage medium
CN111030874B (en) Service arranging method, equipment, storage medium and device
JP2017102742A (en) Plant management system
JP2010182215A (en) Time series map data management system, terminal device, time series map data management method, and time series map data management program
JP2006190199A (en) Cad progress managing system and its method and program
JP2006190115A (en) Program and system for designing/managing conductor path of optical cable
CN110068351A (en) Information processing equipment, information processing method and computer readable storage medium
JP2019190062A (en) Evaluation system of working face, evaluation method of working face, and evaluation program of working face
JP4113106B2 (en) Performance measuring apparatus and performance measuring method
JP7401478B2 (en) Information processing device, information processing method, and program
CN112579228B (en) Data transfer method and device, storage medium and electronic device
CN109559087B (en) Building visualization system and method
KR100813940B1 (en) System and methodology for the management of spatial data using large scale DBMS
JP4129949B2 (en) Network configuration management system
CN114358396A (en) Routing inspection route evaluation method and device, storage medium and mobile terminal

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040705

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060803

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060822

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061020

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070109

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070117

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130126

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130126

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160126

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees