JP3883981B2 - Scaffolding equipment - Google Patents

Scaffolding equipment Download PDF

Info

Publication number
JP3883981B2
JP3883981B2 JP2003114790A JP2003114790A JP3883981B2 JP 3883981 B2 JP3883981 B2 JP 3883981B2 JP 2003114790 A JP2003114790 A JP 2003114790A JP 2003114790 A JP2003114790 A JP 2003114790A JP 3883981 B2 JP3883981 B2 JP 3883981B2
Authority
JP
Japan
Prior art keywords
scaffold
main frame
handrail
work
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003114790A
Other languages
Japanese (ja)
Other versions
JP2004316354A (en
Inventor
淳 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alinco Inc
Original Assignee
Alinco Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alinco Inc filed Critical Alinco Inc
Priority to JP2003114790A priority Critical patent/JP3883981B2/en
Publication of JP2004316354A publication Critical patent/JP2004316354A/en
Application granted granted Critical
Publication of JP3883981B2 publication Critical patent/JP3883981B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、マンション等の多階層建物の各階に設けられている玄関側の室外廊下、あるいはベランダ等に設置して、その手摺等の補修や改装作業等を行なう際の足場として使用される足場装置に関する。
【0002】
【従来の技術】
従来におけるこの種の足場装置は、上下に対向する室外側廊下やベランダの上面壁と下面壁との間に、上下に延びる突っ張りポストにより足場本体を突っ張り支持させ、この足場本体にベランダの室外側に張り出し可能な張り出し枠を設け、この張り出し枠に作業床を設けたものである(例えば、特許文献1参照)。
【0003】
【特許文献1】
特開平11−223012号公報(第2〜第6頁、図1〜図10)
【0004】
【発明が解決しようとする課題】
上記従来の足場装置では、張り出し枠を足場本体内の収納位置から室外側の張り出し位置へ張り出す操作がスムーズに行なえない上に、張り出し枠が張り出し位置において不安定な状態となるなど、未だ使用勝手が悪いといった問題があった。
【0005】
本発明は、上記の課題に鑑み、収納位置から室外側張り出し位置への作業ステージの張り出し操作及び室外側張り出し位置から収納位置への収納操作がスムーズに行なえると共に、張り出し位置において作業ステージを安定状態に支持できる足場装置を提供することを目的とする。
【0006】
【課題を解決するための手段】
請求項1に係る発明は、上下に対向する室外側廊下やベランダ等(以下、ベランダVという)の上面壁Vaと下面壁Vbとの間に、上下に延びる突っ張りポスト2によって足場用主枠1を突っ張り支持するようにした足場装置において、足場用主枠1は、夫々の下端部にキャスター4を備えた室内側左右突っ張りポスト2,2及び室外側左右支柱3,3を有し、この足場用主枠1には室内側左右突っ張りポスト2,2及び室外側左右支柱3,3の内側所要高さ位置に左右ガイドレール5を設け、両ガイドレール5,5に案内されて、足場用主枠1内に収納される収納位置と足場用主枠1の前面側から室外側へ張り出す作業位置との間でスライド自在な作業ステージ6を設け、この作業ステージ6の先端部と左右各支柱3の上端部との間に折り畳み自在な斜材7を介設してなり、更に作業ステージ6には、前面側幅木37及び左右側面側幅木38,38を設けると共に、左右各側面側幅木38を、前部固定幅木38aと、この固定幅木38aの後端部に枢着した後部折畳幅木38bとから構成し、後部折畳幅木38bを前部固定幅木38aの内側面側に折り畳み可能としてなることを特徴とする。
【0007】
請求項2は、請求項1に記載の足場装置において、作業ステージ6は、収納位置及び作業位置において夫々ノブ付きボルト25,26によってガイドレール5に固定されるようになっていることを特徴とする。
【0008】
請求項3は、請求項1又は2に記載の足場装置において、作業ステージ6には前面側手摺31及び左右側面側手摺32を設けてなることを特徴とする。
【0009】
請求項4は、請求項3に記載の足場装置において、前面側手摺31及び左右側面側手摺32の各手摺は、作業ステージ6の収納位置において足場用主枠1内に収納可能な高さを有する下部固定手摺31a,32aと、この固定手摺31a,32aの上部に枢着されて、起立時には足場用主枠1より高くなり、作業ステージ6の収納時には内側に折り畳まれる上部折り畳み手摺31b,32bと、からなることを特徴とする。
【0010】
請求項5は、請求項4に記載の足場装置において、各手摺31,32の上部折り畳み手摺31b,32bは、起立時にはノブ付きボルト33によって、互いに又は下部固定手摺31a,32aに固定されるようになっていることを特徴とする。
【0013】
請求項は、請求項1〜の何れかに記載の足場装置において、足場用主枠1には足場板66を取り付けてなることを特徴とする。
【0014】
請求項は、請求項1〜の何れかに記載の足場装置において、各突っ張りポスト2は、下端部にキャスター4を取り付けた基部ポスト10と、この基部ポスト10に伸縮可能に取り付けられた第1伸縮ポスト11と、この第1伸縮ポスト11に伸縮可能に取り付けられた第2伸縮ポスト12と、からなることを特徴とする。
【0015】
請求項は、請求項1〜の何れかに記載の足場装置において、足場用主枠1には昇降用の梯子H1,H2を設けてなることを特徴とする。
【0016】
【発明の詳細な説明】
図1は本発明に係る足場装置を示す斜視図で、作業ステージ6が収納位置にある状態を示し、図2は足場装置の使用状態を示す斜視図である。図3は足場装置をベランダVに設置した状態での側面図、図4はベランダVに設置した足場装置の作業ステージ6を作業位置に張り出した状態での側面図、図5は使用状態の足場装置をベランダVの室内側から見た正面図、図6は同足場装置をベランダVの室外側から見た正面図、図7は同足場装置の平面図である。また図8の▲1▼〜▲4▼は足場装置の作業ステージ6が収納位置から作業位置までスライドする状態を示す説明図である。
【0017】
これらの図面において、足場用主枠1は、室内側の左右に位置する突っ張りポスト2,2及び室外側の左右に位置する支柱3,3を有し、突っ張りポスト2及び支柱3の夫々下端部にはジャッキ付きキャスター4が装備されている。この足場用主枠1には、図6及び図7から分かるように、室内側左右突っ張りポスト2,2及び室外側左右支柱3,3の内側所要高さ位置に左右ガイドレール5,5が設けられ、左右両ガイドレール5,5に案内されて、足場用主枠1内に収納される収納位置と足場用主枠1の前面側から室外側へ張り出す作業位置との間でスライド自在な作業ステージ6が設けられ、そしてこの作業ステージ6の先端部と左右各支柱3の上端部との間には、作業ステージ6を安定状態に保持すると共にそのスライド動作を補助する折り畳み自在な斜材7が介設されている。
【0018】
突っ張りポスト2は、図10から分かるように、下端部にキャスター4を取り付けた基部ポスト10と、この基部ポスト10に嵌合される第1伸縮ポスト11と、この第1伸縮ポスト11に更に嵌合される第2伸縮ポスト12とからなり、基部ポスト10には上端部に支持孔13が設けられ、第1伸縮ポスト11にはその長手方向適当間隔に調整孔14が設けられ、そのその上端部に固定孔15が設けられている。また第1伸縮ポスト11の上端部には雄ねじ部16が一体に突設され、これに微調整用のジャッキハンドル17が回転可能に螺合されると共に、雄ねじ部16は、第2伸縮ポスト12の下端部の中空部18に嵌合され、第2伸縮ポスト12の下端面はジャッキハンドル17に当接するようになっている。
【0019】
第2伸縮ポスト12の上端部にはベランダVの上面壁Vaに当接する突っ張り板19が壁面に自在に沿うように揺動自在に枢着されている。また、基部ポスト10の下端部及び室外側左右各支柱3の下端部にはジャッキハンドル8を介してキャスター4が取り付けてあって、このジャッキハンドル8によりキャスター4の接地状態を微調整できるようになっている。
【0020】
室内側左右突っ張りポスト2,2の基部ポスト10,10は、図9の(a)に示すように、上下の横桟41,42によって一体的に連結され、上下両横桟41,42には一対の中縦桟43,43が架け渡され、両中縦桟43,43には中横桟44,44が架け渡され、各基部ポスト10と各中縦桟43とには補強桟45が架け渡されている。ここで、両中縦桟43,43と中横桟44,44とによって足場用主枠1の後面側昇降用梯子H1を形成する。また図5、図9の(a)、図10その他の図面において、46は第2伸縮ポスト12を挿通支持する支持管で、左右の両支持管46,46は、左右両基部ポスト10,10の夫々直上方の所定高さ位置で上下横材47,48によって連結され、その上横材48と前記横桟41とが縦材49,49によって連結されている。
【0021】
室外側左右支柱3,3は、図6及び図9の(b)に示すように、その下部側が上下横桟51,52によって一体的に連結され、上下両横桟51,52には一対の中縦桟53,53が架け渡され、両中縦桟53,53には中横桟54,54が架け渡され、左右各支柱3と各中縦桟53とに補強桟55が架け渡されている。ここで、両中縦桟53,53と中横桟54,54とによって足場用主枠1の前面側昇降用梯子H2を形成する。
【0022】
室内側突っ張りポスト2とこれに対向する室外側支柱3との連結構造については、図10から分かるように、突っ張りポスト2の基部ポスト10と室外側支柱3の下部側とに上中下の横桟56,57,58が架け渡され、突っ張りポスト2の支持管46と室外側支柱3の上部側とに上下横材59,60が架け渡され、その下横材60と上横桟56とが縦材61でつながれ、この縦材61と室外側支柱3との間には上部側に横桟62が架け渡され、その下部側には縦材61及び室外側支柱3の内側にガイドレール5が取付金具63により架け渡されている。64は横桟62とガイドレール5とをつなぐ連結材であり、65は上下横材59,60をつなぐ連結材である。
【0023】
図1〜図10に示すように、足場用主枠1を構成する各部材どうしの直角連結部分には、図12の(a)に示す略々V字形の補強金具40又は同図の(b)に示す略々三角形の補強金具50が例えばビスによって取り付けられ、それにより足場用主枠1の構成部材どうしがきわめて強固に連結された剛体構造となっている。
【0024】
作業ステージ6は、図14に示すように、ステージ本体6aと、ステージ本体6aの後端部に折畳用ヒンジ20,20によってステージ本体6aの上面側に折り畳み可能に枢着された後部ステージ6bと、からなる。この作業ステージ6を足場用主枠1内の収納位置と足場用主枠1の前面側から室外側へ張り出す作業位置との間で案内するガイドレール5,5は、室内側左右突っ張りポスト2,2及び室外側左右支柱3,3の内側所要高さ位置に取付金具63によって水平に取り付けられている(図9、図17参照)。このガイドレール5は、図13及び図17の(b) に示すように、内外側壁5a,5bと底壁5cとからなる断面コ字状に形成されると共に、内側壁5aの上端にはフランジ片21が内向きに突設され、またこのガイドレール5には複数個のゴム製ガイド輪22がレール上端から若干突出するように軸着されている。
【0025】
図17の(a) は、図4に示すような作業位置にある作業ステージ6及びこれを案内するガイドレール5の側面図、(b) は(a) のC−C拡大断面図である。この図面を参照して、作業ステージ6は、下面の左右両端側に夫々設けられたガイド溝23にガイドレール5のガイド輪22を嵌め込ませると共に、ガイドレール5のフランジ片21を、ガイド溝23に設けられた断面L字状係合片24に係合させた状態で、ガイドレール5にスライド自在に取り付けられている。この場合、図17の(b) から分かるように、作業ステージ6は、ゴム製のガイド輪22に載置されると共にフランジ片21とL字状係合片24との係合によって横方向の移動を規制されながら、水平方向に円滑に走行案内されるようになっている。
【0026】
作業ステージ6は、上記のようなガイドレール5だけでは、特に作業位置において安定状態に支持され得ない。この作業ステージ6を作業位置で安定状態に保持すると共にそのスライド動作を補助するものが折り畳み自在な斜材7である。この折り畳み自在な斜材7は、図1〜図7に示すように作業ステージ6の左右両側に配置されるもので、枢支ピンOによって互いに屈折自在に枢支連結された2つのリンク7a,7bからなり、一方のリンク7aの端部はピンPで室外側左右支柱3の上端部に枢着され、他方のリンク7bの端部はピンQで作業ステージ6の先端部に枢着されている(図4参照)。
【0027】
図14、図17〜図20に示すように、作業ステージ6のステージ本体6aには収納位置で作業ステージ6をガイドレール5に固定するためのノブ付きボルト25が、また後部ステージ6bには作業位置で作業ステージ6をガイドレール5に固定するためのノブ付きボルト26が夫々設けられ、そして各ボルト25に螺合するナット27がガイドレール5の所要部に取り付けてある。また、作業ステージ6の後部ステージ6bをステージ本体6aと平行延ばしたままロックするロックピン28がステージ本体6a側に設けてある。尚、ノブ付きボルト25,26は、後述する手摺用のノブ付きボルト33と同様な構造である(図16の(c)参照)。
【0028】
上記ロックピン28は、図18の(b) に示すような略L字状に形成されたもので、その基端部28aがステージ本体6a側に回転自在に挿入されると共にコイルバネ29でステージ本体6a側に引き込まれるように付勢されており、従って後部ステージ6bをステージ本体6aと平行に延ばしてロックする時には図18の(b) に示すようにロックピン28の先端係止部28bを後部ステージ6b側のピン穴30に係入すればよく、また後部ステージ6bを図20に示すようにステージ本体6a側に折り畳み時にはロックピン28をコイルバネ29に抗して外側へ引っ張って先端部28bをピン穴30から抜けば、ロック解除される。
【0029】
図18は、後部ステージ6bをステージ本体6aと平行に延ばしてロックピン28でロックした作業ステージ6を、作業位置においてノブ付きボルト26でガイドレール5に固定した状態を示す。図19は、同じく後部ステージ6bをステージ本体6aと平行に延ばしてロックピン28でロックした作業ステージ6を、ノブ付きボルト26による固定解除後に収納位置側へスライドさせた状態を示している。また図20は、図19に示す状態でロックピン28を抜いて後部ステージ6bをステージ本体6a側に反転して折り畳んだ状態を示す。そして、この図20に示す状態から、作業ステージ6を更に図面の左方へスライドして収納位置まで後退させ、その位置でノブ付きボルト25をガイドレール5側のナット27に螺合することによって作業ステージ6を収納位置に固定することができる。
【0030】
また、作業ステージ6には、前面側手摺31及び左右側面側手摺32,32が設けられている。前面側手摺31及び左右側面側手摺32,32の各々は、作業ステージ6の収納位置において足場用主枠1内に収納できる最大限の高さを有する下部固定手摺31a,32aと、この固定手摺31a,32aの上部にヒンジ34(図15参照)により枢着されていて、起立時には足場用主枠1より高くなるため収納できず、作業ステージ6の収納時には内側に折り畳まれる上部折り畳み手摺31b,32bと、から構成されている。従って、このような前面側手摺31及び左右側面側手摺32,32によれば、作業時には、作業ステージ6の周囲に十分な高さの手摺が確保されるから、作業ステージ6での作業をより安全に行うことができ、また作業が終われば、上部折り畳み手摺31b,32bを折り畳んで足場用主枠1内にコンパクトに収納することができる。
【0031】
図15の(a) は左右側面側手摺32を示す正面図、(b) は前面側手摺31を示す正面図である。また図16の(a) は手摺31,32の平面図であり、(b) は図15の(a) のE−E線拡大断面図である。これら図面から分かるように、各手摺31,32の上部折り畳み手摺31b,32bは、起立時にはノブ付きボルト33によって下部固定手摺31a,32aに固定され、また前面側手摺31の上部折り畳み手摺31bと側面側手摺32の上部折り畳み手摺32bとがノブ付きボルト33によって互いに固定されるようになっている。
【0032】
ノブ付きボルト33は、図16の(c) に示すように、ノブ33bを固着したボルト33aと、このボルト33aの基端側に嵌め込まれるコイルバネ33cと、上部折り畳み手摺31b,32bに形成したボルト挿通孔の途中に設けられたナット33dと、下部固定手摺31a,32a(あるいは上部折り畳み手摺32b,31b)の内部に設けられたナット33eと、からなるもので、ノブ33bを固着したボルト33aを、図示のように上部折り畳み手摺32b内のナット33eに螺合貫通させて、その先端部を上部折り畳み手摺31bに螺合して締めつけることによって、例えば前面側手摺31の上部折り畳み手摺31bと側面側手摺32の上部折り畳み手摺32bとを互いに連結固定することができる。
【0033】
尚、下部固定手摺31a,32aの手摺支柱34,35は、図14に概略示すように作業ステージ6の所要位置に設けられた手摺支柱取付管36に嵌合されることによって、作業ステージ6上に立設されるようになっている。
【0034】
また、作業ステージ6の周辺には、作業中に作業ステージ6からの作業道具等の落下を防止するための前面側幅木37及び左右側面側幅木38,38が設けられ、前面側幅木37は、図7及び図14から分かるように、作業ステージ6のステージ本体6aの前端部に固定的に立設されている。左右各側面側幅木38は、図15の(a) ,(b) 及び図16の(a) ,(b) に示すように、下部固定手摺31a,32aの手摺支柱34,35に取り付けられて起立姿勢にある前部固定幅木38aと、この前部固定幅木38aの後端部に折畳ヒンジ39で枢着された後部折畳幅木38bとから構成され、後部折畳幅木38bは前部固定幅木38aの内側面側に折り畳まれるようになっている。このように各側面側幅木38が折り畳み構造となっているから、作業ステージ6を足場用主枠1内にコンパクトに収納することができる。
【0035】
また、図1、図2、図5及び図7に示すように、足場用主枠1には足場板66が取り付けられているから、ベランダVから足場用主枠1に、また足場用主枠1から張り出された作業ステージ6に容易に乗り移ることができるようになっている。この足場板66は、図11の(a)に示すように、室内側左右突っ張りポスト2,2の基部ポスト10,10をつなぐ横桟41と、室外側左右支柱3,3をつなぐ横桟51とに亘って架け渡されている。
【0036】
上述のように構成される足場装置の使用においては、図3〜図5に示すように、足場用主枠1の突っ張りポスト2の第1伸縮ポスト11を基部ポスト10に対して、第1伸縮ポスト11に嵌合してある第2伸縮ポスト12の上端部の突っ張り板19がベランダVの上面壁Vaにほぼ当接する位置まで伸長させて、その位置で基部ポスト10の支持孔13と第1伸縮ポスト11の調整孔14とに亘って調整ピン67を挿入し、第1伸縮ポスト11を伸長状態に維持させる。次に、第1伸縮ポスト11の雄ねじ部16(図10参照)に螺合されているジャッキハンドル17を水平に伸ばして回転させることにより、このハンドル17に当接する第2伸縮ポスト12をジャッキ作用によって上動させ、第2伸縮ポスト12の上端部の突っ張り板19をベランダVの下面壁Vbに圧接させて、足場用主枠1をベランダVの上面壁Vaと下面壁Vbとの間に堅固に突っ張り支持させる。またこの時、キャスター4側のジャッキハンドル8を回転させてキャスター4の接地状態を調整することができる。
【0037】
こうして突っ張りポスト2によって足場用主枠1をベランダVの上面壁Vaと下面壁Vbとの間に突っ張り支持させた状態で、作業ステージ6をガイドレール5と斜材7とにより足場用主枠1内に収納された収納位置から図4に示すような室外側の収納位置まで水平にスライドさせて張り出させる。この作業ステージ6が収納位置から作業位置に張り出される一連のスライド張り出し動作状態を図8の▲1▼〜▲4▼に示す。
【0038】
図8の▲1▼は、作業ステージ6が足場用主枠1内に収納された収納位置を示す。▲2▼は作業ステージ6を収納位置から室外側へスライドさせて張り出す途中の状態を示す。この▲2▼と同じ状態が図20に示される。この張り出し途中の状態において、それまで折り畳んでいた前面側手摺31及び左右側面側手摺32の上部折り畳み手摺31b,32bを起立させると共に、左右各側面側幅木38の後部折畳幅木38bを展開させ、更にそれまで折り畳んでいた作業ステージ6の後部ステージ6bをステージ本体6aと面一状態に展開させ、▲3▼に示す状態とする。▲4▼は、作業ステージ6が作業位置までスライドして張り出しを完了した状態を示す。この▲4▼と同じ状態が図18の(a) に示される。
【0039】
上記のように作業ステージ6が図8の▲1▼に示す収納位置から▲4▼に示す作業位置までスライドする間に、足場用主枠1の左右支柱3上端部と作業ステージ6の先端部とに亘って架け渡された折り畳み自在な斜材7を構成する2つのリンク7a,7bは、収納位置でのくの字形態から、両リンク7a,7bの成す角度を次第に広げながら、最終的に作業位置で同一直線状に伸長することになり、これによって作業ステージ6の水平方向スライド動作を安定状態で円滑に行わせると共に、作業位置において作業ステージ6を安定状態に保持することができる。
【0040】
上記のようにして作業ステージ6が作業位置に固定された状態で、作業者は、足場用主枠1の後面側昇降用梯子H1によって上段側足場板66に上がり、この足場板66から作業ステージ6に乗り移り、しかして作業ステージ6上においては周囲に配設された前面側手摺31及び左右側面側手摺32,32に保護されながら建物の外壁やベランダVの修理作業等を容易に且つ安全に行うことができる。勿論、足場用主枠1に設けてある足場板66の位置からもベランダVの上面壁Va等の修理作業等を行うこともできる。また作業ステージ6に設けてある前面側幅木37及び左右側面側幅木38,38によって、作業中に作業ステージ6からの作業道具等が落下するのを防止できて、作業上の安全を確保できる。
【0041】
作業終了後には、作業ステージ6に設けてある左右側面側幅木38の後部折畳幅木38bを折り畳み(図7参照)、また前面側手摺31及び左右側面側手摺32の上部折り畳み手摺31b,32bを図1に示すように折り畳んだ後、作業ステージ6を作業位置から収納位置の途中までスライドさせ、その途中で作業ステージ6の後部ステージ6bをステージ本体6a側に折り畳み(図8の▲2▼参照)、この状態で作業ステージ6を足場用主枠1内の収納位置までスライドさせて、図3や図8の▲1▼に示す状態とする。
【0042】
しかる後、突っ張りポスト2を収縮させ、調整ピン67を基部ポスト10の支持孔13と調整孔14とに挿通させて第2伸縮ポスト12を基部ポスト10に固定することによって、足場用主枠1は、図1に示すような嵩低状態となるから、キャスター4によって移動させ、エレベーターに乗せて建物の階上、階下の次の作業現場へ容易に移動することができる。この場合、作業ステージ6の後部ステージ6bをステージ本体6a側に折り畳むことにより、その長さを短くできて、足場用主枠1の前後幅を極力短くできると共に、作業ステージ6の移動構造にガイドレール5によるスライド方式を採用していることによって、足場用主枠1の高さも極力低くできるから、エレベーターによる搬送を容易に可能とすることができる。
【0043】
【発明の効果】
請求項1に係る発明の足場装置によれば、足場用主枠が、下端部にキャスターを備えた室内側左右突っ張りポスト及び室外側左右支柱を有し、この足場用主枠には室内側左右突っ張りポスト及び室外側左右支柱の内側所要高さ位置に左右ガイドレールを設け、両ガイドレールに案内されて、足場用主枠内に収納される収納位置と室外側へ張り出す作業位置と間でスライド自在な作業ステージを設け、この作業ステージの先端部と左右各支柱の上端部との間に折り畳み自在な斜材を介設しているから、ガイドレールによって、収納位置から室外側張り出し位置への作業ステージの張り出し操作、及び室外側張り出し位置から収納位置への作業ステージの収納操作をスムーズに行わせることができ、また折り畳み自在な斜材によって、作業ステージの水平方向スライド動作を安定状態で円滑に行わせると共に、作業位置において作業ステージを安定状態に保持することができ、更には作業ステージの強度補強を図ることができる。また、作業ステージに設けてある前面側幅木及び左右側面側幅木によって、作業中に作業ステージからの作業道具等が落下するのを防止できて、作業上の安全を確保できると共に、左右各側面側幅木を、前部固定幅木と、固定幅木の後端部に枢着した後部折畳幅木とから構成し、後部折畳幅木を前部固定幅木の内側面側に折り畳み可能としているから、作業ステージを足場用主枠内にコンパクトに収納することができる。
【0044】
請求項2に係る発明の足場装置によれば、作業ステージは、収納位置及び作業位置で夫々ノブ付きボルトによってガイドレールに固定されるから、足場装置の搬送時及び使用時において作業ステージのガタツキや誤動作を防止ことができる。
【0045】
請求項3に係る発明の足場装置によれば、作業ステージに前面側手摺及び左右側面側手摺を設けているから、作業者は、作業ステージ上において、前面側手摺及び左右側面側手摺に保護されながら作業を安全に行うことができる。
【0046】
請求項4に係る発明の足場装置によれば、前面側手摺及び左右側面側手摺の各手摺は、足場用主枠内に収納可能な高さを有する下部固定手摺と、この固定手摺の上部に枢着されて、起立時には足場用主枠より高くなり、作業ステージの収納時には内側に折り畳まれる上部折り畳み手摺と、からなるため、作業時には作業ステージの周囲に十分な高さの手摺が確保されて、作業ステージでの作業をより安全に行うことができ、作業が終われば、上部折り畳み手摺を折り畳んで足場用主枠内にコンパクトに収納することができる。
【0047】
請求項5に係る発明の足場装置によれば、各手摺の上部折り畳み手摺は、起立時にノブ付きボルトによって、互いに又は下部固定手摺に固定されるから、作業時に手摺のガタツキを解消し、不安感を無くすることができる。
【0050】
請求項に係る発明の足場装置によれば、足場用主枠には足場板を取り付けているから、ベランダから足場用主枠に、また足場用主枠から張り出された作業ステージに容易に乗り移ることができる。
【0051】
請求項に係る発明の足場装置によれば、突っ張りポストは、下端部にキャスターを取り付けた基部ポストと、基部ポストに伸縮可能に取り付けられた第1伸縮ポストと、第1伸縮ポストに伸縮可能に取り付けられた第2伸縮ポストと、からなるため、長尺な突っ張りポストであっても、運搬や保管時にはコンパクトに収納することができる。
【0052】
請求項に係る発明の足場装置によれば、足場用主枠に昇降用の梯子を設けているから、足場用主枠に容易に上ることができる。
【図面の簡単な説明】
【図1】 本発明に係る足場装置を示す斜視図で、作業ステージが収納位置にある状態を示す。
【図2】 図1に示す足場装置の使用状態を示す斜視図である。
【図3】 足場装置をベランダに設置した状態での側面図である。
【図4】 ベランダに設置した足場装置の作業ステージを作業位置に張り出した状態での側面図である。
【図5】 使用状態の足場装置をベランダ室内側から見た正面図である。
【図6】 同足場装置をベランダの室外側から見た正面図である。
【図7】 同足場装置の平面図である。
【図8】 ▲1▼〜▲4▼は足場装置の作業ステージが収納位置から作業位置までスライドする状態を示す説明図である。
【図9】 (a) は足場用主枠の基本構造部分を示すベランダ室内側から見た正面図、(b) はベランダ室外側から見た正面図である。
【図10】 足場用主枠の基本構造部分に突っ張りポストの第1及び第2伸縮ポストを取り付ける状態を示す側面図である。
【図11】 (a) は図9の(a) のA−A線拡大断面図、(b) は図9の(b) の矢印Bから見た側面図である。
【図12】 (a) 及び(b) は補強金具を示す斜視図である。
【図13】 ガイドレールを示す斜視図である。
【図14】 (a) は作業ステージを示す平面図、(b) は側面図、(c) は正面図である。
【図15】 (a) は左右側面側手摺を示す正面図、(b) は前面側手摺を示す正面図である。
【図16】 (a) は左右側面側手摺及び前面側手摺の平面図、(c) は図15の(a) の矢印Dで示す部分の拡大図である。
【図17】 (a) は図4に示すような作業位置にある作業ステージ及びこれを案内するガイドレールの側面図、(b) は(a) のC−C拡大断面図である。
【図18】 (a) は作業ステージを作業位置においてノブ付きボルトでガイドレールに固定した状態を示す側面図、(b) は(a) におけるロックピン取付部の平面図である。
【図19】 作業ステージを収納位置側へスライドさせた状態を示す側面図である。
【図20】 後部ステージをステージ本体側に反転して折り畳んだ状態を示す側面図である。
【符号の説明】
V ベランダ
Va ベランダの上面壁
Vb ベランダの下面壁
1 足場用主枠
2 突っ張りポスト
3 支柱
4 キャスター
5 ガイドレール
6 作業ステージ
7 斜材
10 基部ポスト
11 第1伸縮ポスト
12 第2伸縮ポスト
31 前面側手摺
31a,32a 下部固定手摺
31b,32b 上部折り畳み手摺
32 左右側面側手摺
33 ノブ付きボルト
37 前面側幅木
38 左右側面側幅木
38a 固定幅木
38b 後部折畳幅木
[0001]
BACKGROUND OF THE INVENTION
The present invention is a scaffold used as a scaffold for repairing or renovation of handrails, etc., installed in an outdoor corridor on the entrance side provided on each floor of a multi-level building such as an apartment or a veranda. Relates to the device.
[0002]
[Prior art]
Conventionally, this type of scaffolding device has a scaffolding body supported by a stretching post extending vertically between the upper and lower walls of the outdoor corridor and the veranda facing vertically, and this scaffolding body supports the outdoor side of the veranda. An overhanging frame that can be overhanged is provided, and a work floor is provided on the overhanging frame (see, for example, Patent Document 1).
[0003]
[Patent Document 1]
Japanese Patent Application Laid-Open No. 11-2223012 (pages 2 to 6, FIGS. 1 to 10)
[0004]
[Problems to be solved by the invention]
In the above-mentioned conventional scaffold device, the operation of overhanging the overhang frame from the storage position in the scaffold main body to the overhang position of the outdoor side cannot be performed smoothly, and the overhang frame becomes unstable at the overhang position. There was a problem such as badness.
[0005]
In view of the above problems, the present invention makes it possible to smoothly perform the operation of projecting the work stage from the storage position to the outdoor projecting position and the operation of storing the work stage from the outdoor projecting position to the storage position, and to stabilize the work stage at the projecting position. An object of the present invention is to provide a scaffold device that can be supported in a state.
[0006]
[Means for Solving the Problems]
  According to the first aspect of the present invention, a scaffolding main frame 1 is provided by a vertically extending strut post 2 between an upper surface wall Va and a lower surface wall Vb of an outdoor corridor or a veranda (hereinafter referred to as a veranda V) facing vertically. The scaffold main frame 1 includes indoor side left and right tension posts 2 and 2 and outdoor left and right support columns 3 and 3 each having a caster 4 at the lower end of each scaffold. The main frame 1 is provided with left and right guide rails 5 at the required inner height positions of the indoor left and right stretching posts 2 and 2 and the outdoor left and right columns 3 and 3, and is guided by both guide rails 5 and 5, A work stage 6 is provided which is slidable between a storage position stored in the frame 1 and a work position projecting from the front side of the scaffolding main frame 1 to the outdoor side. Fold between the top of 3 It was interposed only freely swash material 7Further, the work stage 6 is provided with a front side skirting board 37 and left and right side skirting boards 38, 38, and the left and right side skirting boards 38 are respectively connected to the front fixed skirting board 38a, The rear folding skirting board 38b is pivotally attached to the rear end part, and the rear folding skirting board 38b can be folded to the inner side surface of the front fixed skirting board 38a.It is characterized by that.
[0007]
According to a second aspect of the present invention, in the scaffold device according to the first aspect, the work stage 6 is fixed to the guide rail 5 by bolts 25 and 26 with knobs in the storage position and the work position, respectively. To do.
[0008]
A third aspect of the present invention is the scaffold device according to the first or second aspect, wherein the work stage 6 is provided with a front handrail 31 and a left and right handrail 32.
[0009]
According to a fourth aspect of the present invention, in the scaffold device according to the third aspect, the handrails of the front-side handrail 31 and the left and right side-handrails 32 have heights that can be stored in the scaffold main frame 1 at the storage position of the work stage 6. Lower fixed handrails 31a and 32a, and upper folding handrails 31b and 32b which are pivotally attached to the upper portions of the fixed handrails 31a and 32a and which are higher than the main frame 1 for the scaffolding when standing and folded inward when the work stage 6 is stored. It is characterized by comprising.
[0010]
According to a fifth aspect of the present invention, in the scaffold device according to the fourth aspect, the upper folding handrails 31b and 32b of the handrails 31 and 32 are fixed to each other or the lower fixed handrails 31a and 32a by the bolt 33 with a knob when standing. It is characterized by becoming.
[0013]
  Claim6Are claims 1 to5In the scaffold device described in any one of the above, a scaffold plate 66 is attached to the scaffold main frame 1.
[0014]
  Claim7Are claims 1 to6In the scaffold device according to any one of the above, each tension post 2 includes a base post 10 having a caster 4 attached to a lower end portion thereof, a first telescopic post 11 attached to the base post 10 so as to be extendable, and the first post. And a second telescopic post 12 attached to the telescopic post 11 so as to be telescopic.
[0015]
  Claim8Are claims 1 to7In the scaffold device according to any one of the above, the scaffold main frame 1 is provided with ladders H1 and H2 for raising and lowering.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 is a perspective view showing a scaffold device according to the present invention, showing a state in which a work stage 6 is in a storage position, and FIG. 2 is a perspective view showing a use state of the scaffold device. 3 is a side view of the scaffold device installed on the veranda V, FIG. 4 is a side view of the scaffold device installed on the veranda V, with the work stage 6 protruding to the working position, and FIG. 5 is the scaffold in use. FIG. 6 is a front view of the scaffold device as viewed from the outside of the veranda V, and FIG. 7 is a plan view of the scaffold device. Further, (1) to (4) in FIG. 8 are explanatory views showing a state in which the work stage 6 of the scaffold device slides from the storage position to the work position.
[0017]
In these drawings, the scaffold main frame 1 has stretching posts 2 and 2 positioned on the left and right sides of the indoor side and support columns 3 and 3 positioned on the left and right sides of the outdoor side, and the lower ends of the stretching posts 2 and the columns 3 respectively. Is equipped with a caster 4 with a jack. As can be seen from FIGS. 6 and 7, the scaffold main frame 1 is provided with left and right guide rails 5 and 5 at the required inner height positions of the indoor left and right stretching posts 2 and 2 and the outdoor left and right columns 3 and 3. It is guided by the left and right guide rails 5 and 5 and is slidable between a storage position stored in the scaffold main frame 1 and a work position projecting from the front side of the scaffold main frame 1 to the outdoor side. A work stage 6 is provided, and a foldable diagonal material that holds the work stage 6 in a stable state and assists its sliding operation between the front end of the work stage 6 and the upper ends of the left and right support columns 3. 7 is interposed.
[0018]
As can be seen from FIG. 10, the tension post 2 is further fitted to the base post 10 with the caster 4 attached to the lower end, the first telescopic post 11 fitted to the base post 10, and the first telescopic post 11. The base post 10 is provided with a support hole 13 at the upper end, and the first extendable post 11 is provided with an adjustment hole 14 at an appropriate interval in the longitudinal direction. A fixing hole 15 is provided in the part. Further, a male screw portion 16 is integrally projected at the upper end portion of the first telescopic post 11, and a jack handle 17 for fine adjustment is rotatably screwed to this, and the male screw portion 16 is connected to the second telescopic post 12. The lower end surface of the second telescopic post 12 is in contact with the jack handle 17.
[0019]
At the upper end portion of the second telescopic post 12, a tension plate 19 that abuts on the upper surface wall Va of the veranda V is pivotally mounted so as to freely swing along the wall surface. Further, a caster 4 is attached to a lower end portion of the base post 10 and a lower end portion of each of the outdoor left and right supports 3 via a jack handle 8 so that the grounding state of the caster 4 can be finely adjusted by the jack handle 8. It has become.
[0020]
As shown in FIG. 9 (a), the base posts 10 and 10 of the indoor side left and right strut posts 2 and 2 are integrally connected by upper and lower horizontal bars 41 and 42. A pair of middle and vertical bars 43 and 43 are bridged, the middle and vertical bars 44 and 44 are bridged between the middle and vertical bars 43 and 43, and a reinforcing bar 45 is provided between each base post 10 and each of the middle and vertical bars 43. It is laid over. Here, the back side elevating ladder H1 of the scaffold main frame 1 is formed by the middle vertical bars 43, 43 and the middle horizontal bars 44, 44. In FIGS. 5 and 9A, FIG. 10 and other drawings, reference numeral 46 denotes a support tube for inserting and supporting the second telescopic post 12, and the left and right support tubes 46, 46 are the left and right base post 10,10. The upper cross member 48 and the cross rail 41 are connected by the vertical members 49 and 49 at the predetermined height positions directly above the upper cross member 47 and 48, respectively.
[0021]
As shown in FIG. 6B and FIG. 9B, the outdoor left and right support columns 3 and 3 are integrally connected at the lower side by upper and lower horizontal beams 51 and 52, and a pair of upper and lower horizontal beams 51 and 52 are paired with each other. Middle vertical rails 53, 53 are bridged, middle horizontal rails 54, 54 are bridged between the middle vertical rails 53, 53, and reinforcing bars 55 are bridged between the left and right columns 3 and each middle vertical rail 53. ing. Here, the front side elevating ladder H2 of the scaffolding main frame 1 is formed by the middle vertical bars 53, 53 and the middle horizontal bars 54, 54.
[0022]
As shown in FIG. 10, the connecting structure between the indoor side post 2 and the outdoor column 3 opposite to the indoor side post 2 is located between the base post 10 of the post 2 and the lower side of the outdoor column 3. The crosspieces 56, 57, 58 are bridged, and the upper and lower horizontal members 59, 60 are bridged between the support pipe 46 of the stretching post 2 and the upper side of the outdoor column 3. Are connected by a vertical member 61, a cross rail 62 is bridged between the vertical member 61 and the outdoor column 3 on the upper side, and a guide rail is provided on the inner side of the vertical member 61 and the outdoor column 3 on the lower side. 5 is bridged by a mounting bracket 63. Reference numeral 64 denotes a connecting member that connects the horizontal rail 62 and the guide rail 5, and reference numeral 65 denotes a connecting member that connects the upper and lower horizontal members 59 and 60.
[0023]
As shown in FIGS. 1 to 10, a substantially V-shaped reinforcing bracket 40 shown in FIG. 12 (a) or (b) of FIG. A substantially triangular reinforcing metal fitting 50 shown in FIG. 3 is attached by, for example, screws, thereby forming a rigid body structure in which the constituent members of the scaffold main frame 1 are connected extremely firmly.
[0024]
As shown in FIG. 14, the working stage 6 includes a stage main body 6a and a rear stage 6b pivotally attached to the upper end of the stage main body 6a by folding hinges 20 and 20 at the rear end of the stage main body 6a. And consist of The guide rails 5 and 5 for guiding the work stage 6 between the storage position in the scaffold main frame 1 and the work position projecting from the front side of the scaffold main frame 1 to the outdoor side are the indoor left and right stretching posts 2. , 2 and the outdoor left and right support columns 3, 3 are mounted horizontally by mounting brackets 63 at the required height positions inside (see FIGS. 9 and 17). As shown in FIG. 13 and FIG. 17 (b), the guide rail 5 is formed in a U-shaped cross section comprising inner and outer walls 5a, 5b and a bottom wall 5c, and a flange is formed at the upper end of the inner wall 5a. A piece 21 protrudes inward, and a plurality of rubber guide wheels 22 are attached to the guide rail 5 so as to slightly protrude from the upper end of the rail.
[0025]
17A is a side view of the work stage 6 and the guide rail 5 that guides the work stage 6 in the work position as shown in FIG. 4, and FIG. 17B is a CC cross-sectional view of FIG. 17A. Referring to this drawing, work stage 6 has guide wheels 22 of guide rails 5 fitted in guide grooves 23 provided on the left and right ends of the lower surface, and flange piece 21 of guide rails 5 is inserted into guide grooves 23. It is slidably attached to the guide rail 5 in a state of being engaged with an L-shaped engagement piece 24 provided on the guide rail 5. In this case, as can be seen from FIG. 17 (b), the work stage 6 is placed on the rubber guide wheel 22 and is moved in the lateral direction by the engagement of the flange piece 21 and the L-shaped engagement piece 24. Smooth travel guidance is provided in the horizontal direction while the movement is restricted.
[0026]
The work stage 6 cannot be supported in a stable state only by the guide rail 5 as described above, particularly at the work position. A foldable diagonal member 7 holds the work stage 6 in a stable state at the work position and assists the slide operation. The foldable diagonal member 7 is disposed on the left and right sides of the work stage 6 as shown in FIGS. 1 to 7, and is provided with two links 7a, 7b, and the end of one link 7a is pivotally attached to the upper end of the left and right outdoor column 3 by a pin P, and the end of the other link 7b is pivotally attached to the tip of the work stage 6 by a pin Q. (See FIG. 4).
[0027]
As shown in FIGS. 14 and 17 to 20, the stage body 6a of the work stage 6 has a bolt 25 with a knob for fixing the work stage 6 to the guide rail 5 in the retracted position, and the rear stage 6b has a work. A bolt 26 with a knob for fixing the work stage 6 to the guide rail 5 at each position is provided, and a nut 27 screwed to each bolt 25 is attached to a required portion of the guide rail 5. Further, a lock pin 28 for locking the rear stage 6b of the work stage 6 while extending in parallel with the stage main body 6a is provided on the stage main body 6a side. In addition, the bolts 25 and 26 with a knob are the structures similar to the bolt 33 with a knob for handrails mentioned later (refer FIG.16 (c)).
[0028]
The lock pin 28 is formed in a substantially L shape as shown in FIG. 18B. The base end portion 28a of the lock pin 28 is rotatably inserted into the stage main body 6a, and the stage main body is rotated by a coil spring 29. Therefore, when the rear stage 6b is extended in parallel with the stage body 6a and locked, the front end locking portion 28b of the lock pin 28 is moved to the rear portion as shown in FIG. 18 (b). What is necessary is just to engage with the pin hole 30 on the stage 6b side, and when the rear stage 6b is folded to the stage main body 6a side as shown in FIG. 20, the lock pin 28 is pulled outwardly against the coil spring 29 to pull the tip end 28b. If the pin hole 30 is removed, the lock is released.
[0029]
FIG. 18 shows a state in which the work stage 6 in which the rear stage 6b is extended in parallel with the stage main body 6a and locked by the lock pin 28 is fixed to the guide rail 5 by the bolt 26 with a knob at the work position. FIG. 19 shows a state where the work stage 6 in which the rear stage 6b is extended in parallel with the stage main body 6a and locked by the lock pin 28 is slid to the storage position side after being fixed by the bolt 26 with the knob. FIG. 20 shows a state in which the lock pin 28 is pulled out and the rear stage 6b is reversed and folded toward the stage body 6a in the state shown in FIG. Then, from the state shown in FIG. 20, the work stage 6 is further slid to the left in the drawing and retracted to the storage position, and the bolt 25 with the knob is screwed to the nut 27 on the guide rail 5 side at that position. The work stage 6 can be fixed in the storage position.
[0030]
The work stage 6 is provided with a front handrail 31 and left and right handrails 32 and 32. Each of the front handrail 31 and the left and right side handrails 32, 32 has a lower fixed handrail 31a, 32a having a maximum height that can be stored in the scaffold main frame 1 at the storage position of the work stage 6, and the fixed handrail. The upper folding handrail 31b, which is pivotally attached to the upper part of 31a, 32a by a hinge 34 (see FIG. 15) and cannot be stored because it is higher than the scaffolding main frame 1 when standing, and is folded inward when the work stage 6 is stored. 32b. Therefore, according to the front-side handrail 31 and the left and right side-side handrails 32 and 32, a sufficiently high handrail is secured around the work stage 6 at the time of work. When the work is completed, the upper folding handrails 31b and 32b can be folded and stored in the scaffold main frame 1 in a compact manner.
[0031]
FIG. 15A is a front view showing the left and right side handrails 32, and FIG. 15B is a front view showing the front handrail 31. 16A is a plan view of the handrails 31 and 32, and FIG. 16B is an enlarged sectional view taken along line EE of FIG. 15A. As can be seen from these drawings, the upper folding handrails 31b and 32b of the handrails 31 and 32 are fixed to the lower fixed handrails 31a and 32a by the bolts 33 with knobs when standing, and the side surfaces of the front folding handrail 31 and the upper folding handrail 31b are side surfaces. The upper folding handrail 32b of the side handrail 32 is fixed to each other by a bolt 33 with a knob.
[0032]
As shown in FIG. 16 (c), the knob-attached bolt 33 includes a bolt 33a to which the knob 33b is fixed, a coil spring 33c fitted to the base end side of the bolt 33a, and bolts formed on the upper folding handrails 31b and 32b. A nut 33d provided in the middle of the insertion hole and a nut 33e provided inside the lower fixed handrails 31a and 32a (or the upper folding handrails 32b and 31b), and a bolt 33a to which the knob 33b is fixed As shown in the figure, by screwing and penetrating a nut 33e in the upper folding handrail 32b and screwing and tightening the tip of the nut 33e to the upper folding handrail 31b, for example, the upper folding handrail 31b of the front handrail 31 and the side surface side The upper folding handrail 32b of the handrail 32 can be connected and fixed to each other.
[0033]
The handrail columns 34 and 35 of the lower fixed handrails 31a and 32a are fitted onto a handrail column attachment tube 36 provided at a required position of the work stage 6 as schematically shown in FIG. It is supposed to be erected.
[0034]
Also, around the work stage 6, a front side skirting board 37 and left and right side skirting boards 38, 38 for preventing a work tool or the like from dropping from the work stage 6 during work are provided. As can be seen from FIGS. 7 and 14, 37 is fixedly erected at the front end of the stage body 6 a of the work stage 6. As shown in FIGS. 15 (a) and 15 (b) and FIGS. 16 (a) and 16 (b), the left and right side skirting boards 38 are attached to the handrail columns 34 and 35 of the lower fixed handrails 31a and 32a. A front fixed skirting board 38a in a standing position and a rear folded skirting board 38b pivotally attached to the rear end of the front fixed skirting board 38a by a folding hinge 39. 38b is configured to be folded to the inner surface side of the front fixed skirting board 38a. Thus, since each side-side skirting board 38 has a folded structure, the work stage 6 can be housed in the scaffold main frame 1 in a compact manner.
[0035]
As shown in FIGS. 1, 2, 5, and 7, since the scaffolding plate 66 is attached to the scaffold main frame 1, the scaffold main frame 1 is transferred from the veranda V to the scaffold main frame 1. It is possible to easily transfer to the work stage 6 protruding from 1. As shown in FIG. 11A, the scaffold plate 66 includes a horizontal beam 41 that connects the base posts 10, 10 of the indoor left and right stretching posts 2, 2 and a horizontal beam 51 that connects the outdoor left and right columns 3, 3. It is stretched over.
[0036]
In the use of the scaffold device configured as described above, as shown in FIGS. 3 to 5, the first telescopic post 11 of the tension post 2 of the scaffold main frame 1 is made to be the first telescopic post with respect to the base post 10. The extension plate 19 at the upper end of the second telescopic post 12 fitted to the post 11 is extended to a position where it substantially contacts the upper surface wall Va of the veranda V, and the first support hole 13 of the base post 10 and the first hole An adjustment pin 67 is inserted across the adjustment hole 14 of the expansion / contraction post 11 to maintain the first expansion / contraction post 11 in an extended state. Next, the jack handle 17 screwed into the male threaded portion 16 (see FIG. 10) of the first extendable post 11 is horizontally extended and rotated, whereby the second extendable post 12 abutting on the handle 17 is jacked. The strut plate 19 at the upper end of the second telescopic post 12 is pressed against the lower wall Vb of the veranda V, and the scaffold main frame 1 is firmly fixed between the upper wall Va and the lower wall Vb of the veranda V. Protrude to support. At this time, the grounding state of the caster 4 can be adjusted by rotating the jack handle 8 on the caster 4 side.
[0037]
Thus, the scaffolding main frame 1 is supported by the guide rail 5 and the diagonal member 7 in a state where the scaffolding main frame 1 is stretched and supported between the upper wall Va and the lower wall Vb of the veranda V by the stretching posts 2. It slides horizontally from the storage position stored inside to the storage position outside the room as shown in FIG. A series of slide projecting operation states in which the work stage 6 projects from the storage position to the work position are shown in (1) to (4) in FIG.
[0038]
(1) in FIG. 8 indicates a storage position where the work stage 6 is stored in the main frame 1 for scaffolding. (2) indicates a state where the work stage 6 is slid from the storage position to the outdoor side and is extended. The same state as (2) is shown in FIG. In the middle of the overhang, the front folding handrails 31b and 32b of the front side handrail 31 and the left and right side handrails 32 that have been folded up are raised and the rear folding baseboard 38b of the left and right side side baseboards 38 are developed. Further, the rear stage 6b of the work stage 6 that has been folded up to that point is unfolded to be flush with the stage body 6a to obtain the state shown in (3). (4) indicates a state in which the work stage 6 has been slid to the work position and the overhang has been completed. The same state as (4) is shown in FIG.
[0039]
As described above, while the work stage 6 slides from the storage position shown in (1) in FIG. 8 to the work position shown in (4), the upper ends of the left and right columns 3 of the scaffold main frame 1 and the tip of the work stage 6 The two links 7a and 7b constituting the foldable diagonal member 7 spanned across the top and bottom of the link 7a, 7b are gradually expanded from the shape of the square shape at the storage position while gradually expanding the angle formed by the links 7a, 7b. Therefore, the horizontal movement of the work stage 6 can be smoothly performed in a stable state, and the work stage 6 can be held in a stable state at the work position.
[0040]
In a state where the work stage 6 is fixed at the work position as described above, the worker goes up to the upper stage side scaffold plate 66 by the rear raising / lowering ladder H1 of the main frame 1 for the scaffold, and the work stage is moved from the scaffold plate 66. Therefore, on the work stage 6, the repair work of the outer wall of the building and the veranda V is easily and safely performed while being protected by the front handrail 31 and the left and right handrails 32, 32 arranged around the work stage 6. It can be carried out. Of course, the repair work of the upper surface wall Va of the veranda V and the like can also be performed from the position of the scaffold plate 66 provided in the scaffold main frame 1. Further, the front side skirting board 37 and the left and right side side skirting boards 38, 38 provided on the work stage 6 can prevent work tools and the like from the work stage 6 from falling during the work, thereby ensuring work safety. it can.
[0041]
After completion of the work, the rear folding baseboard 38b of the left and right side skirting boards 38 provided on the work stage 6 is folded (see FIG. 7), and the upper folding handrail 31b of the front side handrail 31 and the left and right side handrails 32, After folding 32b as shown in FIG. 1, the work stage 6 is slid from the work position to the middle of the storage position, and the rear stage 6b of the work stage 6 is folded to the stage body 6a in the middle ((2 in FIG. 8). In this state, the work stage 6 is slid to the storage position in the scaffold main frame 1 to obtain the state shown in (1) of FIGS.
[0042]
Thereafter, the tension post 2 is contracted, the adjustment pin 67 is inserted into the support hole 13 and the adjustment hole 14 of the base post 10, and the second telescopic post 12 is fixed to the base post 10. 1 is in a low-profile state as shown in FIG. 1, and can be easily moved to the next work site upstairs or downstairs of the building by being moved by a caster 4 and placed on an elevator. In this case, by folding the rear stage 6b of the work stage 6 to the stage body 6a side, the length can be shortened, the front-rear width of the main frame 1 for the scaffold can be shortened as much as possible, and the moving structure of the work stage 6 can be guided. By adopting the slide method using the rails 5, the height of the scaffold main frame 1 can be made as low as possible, so that it can be easily transported by an elevator.
[0043]
【The invention's effect】
  According to the scaffold device of the first aspect of the present invention, the scaffold main frame includes the indoor side left and right strut posts and the outdoor left and right posts provided with casters at the lower end, and the scaffold main frame includes the indoor side left and right posts. Left and right guide rails are provided at the required height inside the post and outdoor left and right columns, and guided between both guide rails, between the storage position stored in the main frame for scaffolding and the work position protruding to the outdoor side. A slidable work stage is provided, and a foldable slanting material is interposed between the tip of this work stage and the upper ends of the left and right columns. From the storage position to the outdoor overhanging position by the guide rail The operation stage can be smoothly extended and the operation stage can be stored smoothly from the outdoor position to the storage position. Causes horizontal sliding motion smoothly performed in a stable state of the can to hold the work stage to a stable state in the working position, even it is possible to reinforcement of the work stage.In addition, the front side skirting board and the left and right side skirting boards provided on the work stage can prevent work tools from dropping from the work stage during work, ensuring work safety, The side skirting board is composed of a front fixed skirting board and a rear folding skirting board pivotally attached to the rear end of the fixed skirting board, and the rear folding skirting board is arranged on the inner side of the front fixed skirting board. Since it can be folded, the work stage can be stored compactly in the main frame for scaffolding.
[0044]
According to the scaffold device of the invention according to claim 2, since the work stage is fixed to the guide rail by the bolts with knobs in the storage position and the work position, the work stage is not loose when the scaffold device is transported and used. Malfunctions can be prevented.
[0045]
According to the scaffold device of the invention of claim 3, since the front handrail and the left and right side rails are provided on the work stage, the worker is protected by the front handrail and the left and right side handrails on the work stage. Work can be done safely.
[0046]
According to the scaffold device of the invention according to claim 4, each of the front side handrail and the left and right side side handrails has a lower fixed handrail having a height that can be stored in the scaffold main frame, and an upper portion of the fixed handrail. It is pivotally attached and consists of an upper folding handrail that is higher than the scaffolding main frame when standing and folded inward when the work stage is stored, so that a sufficiently high handrail is secured around the work stage during work. The work on the work stage can be performed more safely, and when the work is finished, the upper folding handrail can be folded and stored compactly in the main frame for scaffolding.
[0047]
According to the scaffold device of the invention according to claim 5, since the upper folding handrails of the handrails are fixed to each other or the lower fixed handrails by the bolts with knobs at the time of standing, the rattling of the handrails is eliminated at the time of work, and anxiety is felt. Can be eliminated.
[0050]
  Claim6According to the scaffold device of the present invention, since the scaffolding plate is attached to the scaffold main frame, it can be easily transferred from the veranda to the scaffold main frame and to the work stage protruding from the scaffold main frame. it can.
[0051]
  Claim7According to the scaffold device of the present invention, the strut post is attached to the base post with a caster attached to the lower end, the first telescopic post attached to the base post so as to be stretchable, and stretchable to the first stretch post. In addition, since the second telescopic post is formed, even a long post can be stored compactly during transportation and storage.
[0052]
  Claim8With the scaffold device according to the invention, the ladder for raising and lowering is provided on the main frame for scaffolding, so that it can easily climb to the main frame for scaffolding.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a scaffold device according to the present invention, showing a state where a work stage is in a storage position.
FIG. 2 is a perspective view showing a usage state of the scaffold device shown in FIG. 1;
FIG. 3 is a side view of the scaffold device installed on a veranda.
FIG. 4 is a side view of the scaffold device installed on the veranda in a state where the work stage is projected to the work position.
FIG. 5 is a front view of the scaffold device in use as seen from the inside of the veranda room.
FIG. 6 is a front view of the scaffold device as viewed from the outside of the veranda.
FIG. 7 is a plan view of the scaffold device.
FIGS. 8A to 8 are explanatory views showing a state in which the work stage of the scaffold device slides from the storage position to the work position.
FIG. 9A is a front view showing the basic structure portion of the scaffold main frame as seen from the inside of the veranda room, and FIG. 9B is a front view seen from the outside of the veranda room.
FIG. 10 is a side view showing a state in which the first and second extendable posts of the tension post are attached to the basic structure portion of the scaffold main frame.
11A is an enlarged cross-sectional view taken along line AA in FIG. 9A, and FIG. 11B is a side view as viewed from the arrow B in FIG. 9B.
FIGS. 12A and 12B are perspective views showing a reinforcing metal fitting. FIG.
FIG. 13 is a perspective view showing a guide rail.
14A is a plan view showing a work stage, FIG. 14B is a side view, and FIG. 14C is a front view.
15A is a front view showing a left and right side handrail, and FIG. 15B is a front view showing a front handrail.
16A is a plan view of the left and right side handrails and the front handrail, and FIG. 16C is an enlarged view of a portion indicated by an arrow D in FIG. 15A.
17A is a side view of a work stage and a guide rail that guides the work stage in the work position as shown in FIG. 4, and FIG. 17B is an enlarged cross-sectional view of FIG.
18A is a side view showing a state in which the work stage is fixed to the guide rail with a knob-attached bolt at the work position, and FIG. 18B is a plan view of the lock pin mounting portion in FIG.
FIG. 19 is a side view showing a state where the work stage is slid to the storage position side.
FIG. 20 is a side view showing a state where the rear stage is inverted and folded toward the stage main body side.
[Explanation of symbols]
V Veranda
Va top wall of veranda
Vb Veranda bottom wall
1 Main frame for scaffolding
2 Strut post
3 props
4 casters
5 Guide rail
6 Work stage
7 diagonal materials
10 Base post
11 First telescopic post
12 Second telescopic post
31 Front handrail
31a, 32a Lower fixed handrail
31b, 32b Upper folding handrail
32 Left and right handrails
33 Knobed bolt
37 Front skirting board
38 Left and right side skirting boards
38a Fixed skirting board
38b Rear folding skirting board

Claims (8)

上下に対向する室外側廊下やベランダ等(以下、ベランダという)の上面壁と下面壁との間に、上下に延びる突っ張りポストによって足場用主枠を突っ張り支持するようにした足場装置において、足場用主枠は、夫々の下端部にキャスターを備えた室内側左右突っ張りポスト及び室外側左右支柱を有し、この足場用主枠には室内側左右突っ張りポスト及び室外側左右支柱の内側所要高さ位置に左右ガイドレールを設け、両ガイドレールに案内されて、足場用主枠内に収納される収納位置と足場用主枠の前面側から室外側へ張り出す作業位置との間でスライド自在な作業ステージを設け、この作業ステージの先端部と左右各支柱の上端部との間に折り畳み自在な斜材を介設してなり、更に、作業ステージには、前面側幅木及び左右側面側幅木を設けると共に、左右各側面側幅木を、前部固定幅木と、この固定幅木の後端部に枢着した後部折畳幅木とから構成し、後部折畳幅木を前部固定幅木の内側面側に折り畳み可能としてなる足場装置。For scaffolding devices that support the main frame for the scaffolding by the stretching posts extending vertically between the upper and lower walls of the outdoor corridor and veranda (hereinafter referred to as the veranda) facing vertically The main frame has indoor left / right strut posts and outdoor left / right struts with casters at the lower end of each, and this scaffold main frame has the required height position inside the indoor left / right strut posts and outdoor left / right struts. The left and right guide rails are provided on the left and right, and are guided by both guide rails so that they can be slid between the storage position stored in the main frame for scaffolding and the work position protruding from the front side of the main frame for scaffolding to the outdoor side. the stage is provided, the a tip portion of the working stage right Ri name and interposed a freely diagonals fold between the upper end portion of each post, and further, the work stage, the front side skirting and the left and right side surface width The tree And the left and right side skirting boards are composed of a front fixed skirting board and a rear folding skirting board pivotally attached to the rear end of the fixed skirting board, and the rear folding skirting board is configured as a front fixed width. Scaffolding device that can be folded to the inner side of the tree . 作業ステージは、収納位置及び作業位置において夫々ノブ付きボルトによってガイドレールに固定されるようになっている請求項1に記載の足場装置。  The scaffold device according to claim 1, wherein the work stage is fixed to the guide rail by a bolt with a knob in the storage position and the work position, respectively. 作業ステージには前面側手摺及び左右側面側手摺を設けてなる請求項1又は2に記載の足場装置。  The scaffold apparatus according to claim 1 or 2, wherein the work stage is provided with a front handrail and a left and right handrail. 前面側手摺及び左右側面側手摺の各手摺は、作業ステージの収納位置において足場用主枠内に収納可能な高さを有する下部固定手摺と、この固定手摺の上部に枢着されて、起立時には足場用主枠より高くなり、作業ステージの収納時には内側に折り畳まれる上部折り畳み手摺と、からなる請求項3に記載の足場装置。  Each handrail of the front side rail and the left and right side side rails is pivotally attached to the lower fixed handrail having a height that can be stored in the scaffolding main frame at the storage position of the work stage, and the upper part of the fixed handrail. The scaffold apparatus according to claim 3, further comprising an upper folding handrail that is higher than the scaffold main frame and folded inward when the work stage is stored. 各手摺の上部折り畳み手摺は、起立時にはノブ付きボルトによって、互いに又は下部固定手摺に固定されるようになっている請求項4に記載の足場装置。  The scaffold apparatus according to claim 4, wherein the upper folding handrail of each handrail is fixed to each other or the lower fixed handrail by a bolt with a knob when standing. 足場用主枠には足場板を取り付けてなる請求項1〜5の何れかに記載の足場装置。  The scaffold apparatus according to any one of claims 1 to 5, wherein a scaffold plate is attached to the scaffold main frame. 各突っ張りポストは、下端部にキャスターを取り付けた基部ポストと、この基部ポストに伸縮可能に取り付けられた第1伸縮ポストと、この第1伸縮ポストに伸縮可能に取り付けられた第2伸縮ポストと、からなる請求項1〜6の何れかに記載の足場装置。  Each strut post includes a base post having a caster attached to the lower end thereof, a first telescopic post attached to the base post so as to be extendable, a second extendable post attached to the first extendable post to be extendable, The scaffold device according to any one of claims 1 to 6. 足場用主枠には昇降用の梯子を設けてなる請求項1〜7の何れかに記載の足場装置。  The scaffold device according to any one of claims 1 to 7, wherein a ladder for raising and lowering is provided on the scaffold main frame.
JP2003114790A 2003-04-18 2003-04-18 Scaffolding equipment Expired - Fee Related JP3883981B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003114790A JP3883981B2 (en) 2003-04-18 2003-04-18 Scaffolding equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003114790A JP3883981B2 (en) 2003-04-18 2003-04-18 Scaffolding equipment

Publications (2)

Publication Number Publication Date
JP2004316354A JP2004316354A (en) 2004-11-11
JP3883981B2 true JP3883981B2 (en) 2007-02-21

Family

ID=33474257

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003114790A Expired - Fee Related JP3883981B2 (en) 2003-04-18 2003-04-18 Scaffolding equipment

Country Status (1)

Country Link
JP (1) JP3883981B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4506562B2 (en) * 2005-05-26 2010-07-21 株式会社ダイフク Structure with display
JP5647772B2 (en) * 2009-06-08 2015-01-07 日鐵住金建材株式会社 Lifting movable overhang scaffold
KR101349930B1 (en) 2013-11-04 2014-01-13 박정일 Apparatus for maintaining and managing of road tunnel

Also Published As

Publication number Publication date
JP2004316354A (en) 2004-11-11

Similar Documents

Publication Publication Date Title
US3664458A (en) Ladder scaffold vehicle
US6053284A (en) Support frame for a ladder
US6827181B2 (en) Low level adjustable scaffold with workbench
KR20120078548A (en) Folding stairs table
JP3125537U (en) Portable worktable
JP3883981B2 (en) Scaffolding equipment
JP2008214983A (en) Elevating/lowering portable scaffold
KR20120057868A (en) A leg fastener of work table
JP4880026B2 (en) Work scaffolding and linking scaffolding using the same
JP5300551B2 (en) Folding workbench
US8702069B1 (en) Guard rail system
JP4476044B2 (en) Ladder scaffolding
DE19500705C2 (en) Ladder-based work platform
KR102381438B1 (en) A-shaped safety ladder combined with scaffolding
JP4639170B2 (en) Workbench
JP2728390B2 (en) Ladder device for veranda installation of temporary scaffold
JP3044376B2 (en) Scaffolding platform for telescopic work and telescopic top plate
JP3354471B2 (en) Scaffolding equipment
KR101672410B1 (en) Handrail safety device and stair type movable platform
KR20210015011A (en) Ladder
KR102634597B1 (en) Movable scaffolding structure
AU2004202246B2 (en) Plank Support Stand
KR200461587Y1 (en) safety bar assembly of work table
US11939782B2 (en) Wall-mountable perch
JP2005105553A (en) Working scaffold base for portable stair

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041130

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060823

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060825

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060913

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061020

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061115

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101124

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101124

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111124

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121124

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121124

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131124

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees