JP3835716B2 - Reinforced concrete pier construction method - Google Patents

Reinforced concrete pier construction method Download PDF

Info

Publication number
JP3835716B2
JP3835716B2 JP20859497A JP20859497A JP3835716B2 JP 3835716 B2 JP3835716 B2 JP 3835716B2 JP 20859497 A JP20859497 A JP 20859497A JP 20859497 A JP20859497 A JP 20859497A JP 3835716 B2 JP3835716 B2 JP 3835716B2
Authority
JP
Japan
Prior art keywords
concrete
formwork
mold
pier
mold body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP20859497A
Other languages
Japanese (ja)
Other versions
JPH1136229A (en
Inventor
輝勝 笹谷
勝識 平野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP20859497A priority Critical patent/JP3835716B2/en
Publication of JPH1136229A publication Critical patent/JPH1136229A/en
Application granted granted Critical
Publication of JP3835716B2 publication Critical patent/JP3835716B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、鉄筋コンクリート橋脚を構築する方法に関するものである。
【0002】
【従来の技術】
鉄筋コンクリート橋脚は、従来、次のように構築されている。
図14、図15の(A)および(B)は従来のコンクリート橋脚の構築方法を示す説明図である。
従来の構築方法では、まず、図14の(A)に示すように、基礎部102(フーチン部)を施工後、構築すべきコンクリート橋脚の外側の4面に作業足場104を組み立てる。
次に、作業員が作業足場104に乗り、曲げ主材、帯鉄筋などの鉄筋106を組み立て、その後、セパレータや支保工108を用いてコンクリート型枠110を組み立てる。
次に、コンクリート型枠110にコンクリートを打設し、コンクリートの硬化後、支保工108およびコンクリート型枠110を解体して取り外し、第1リフトの施工が完了する。
第2リフト以降も、図14の(B)および図15の(A)に示すように、第1リフトと同様の作業を揚重機112を用いて行い、順次橋脚を上方へと構築していき、図15の(B)に示すようにコンクリート橋脚114が構築される。
【0003】
【発明が解決しようとする課題】
しかしながら、このような従来の構築方法では、曲げ主材および帯鉄筋などの鉄筋組みを作業足場上において行うことから、鉄筋組みは非常に手間がかかる作業となり、さらに、作業足場上において行うことから鉄筋組みや型枠の組み立て解体すべてに揚重機が必要となり、多くの仮設材と人員を要し、工期を短縮できない不具合があった。
【0004】
本発明は前記事情に鑑み案出されたものであって、本発明の目的は、作業足場での鉄筋組み作業および揚重機作業を軽減化し、工期を短縮でき、コストダウンを図ることができる鉄筋コンクリート橋脚の構築方法を提供することにある。
【0005】
【課題を解決するための手段】
本発明は上記目的を達成するため、断面が矩形で中実状の鉄筋コンクリート橋脚を構築する方法であって、プレキャストコンクリートから成る長方形の板状の型枠本体と、前記型枠本体の内面から膨出し、前記長方形の長辺の延在方向に間隔をおき前記長方形の短辺に平行して対向する前記長辺の間にわたって延在形成された複数のリブと、前記長方形の短辺の延在方向に間隔をおき前記リブに中間部が埋設されて複数設けられ、それぞれ前記型枠本体の内面と距離をおき前記型枠本体の内面および前記長方形の長辺に平行して前記型枠本体の長辺方向の全長にわたって延在する帯鉄筋と、前記型枠本体の内面に埋め込み固定されたセパレータ取り付け用の金具とから成るコンクリート型枠体を設け、コンクリート構造物の構築箇所と離れた箇所において、前記コンクリート型枠体の複数を、前記型枠本体の長辺の延在方向に一列に配置し、隣接する前記コンクリート型枠体の前記型枠本体の端面どうしを当接させて、隣接する前記コンクリート型枠体の内面間にわたって取り付けた連結具により相互に固定して第1の型枠構成体を形成し、コンクリート構造物の構築箇所と離れた箇所において、2つの前記第1の型枠構成体を対向配置し、第1の型枠構成体を構成するコンクリート型枠体の前記帯鉄筋に両端を係止して中間帯筋を配設すると共に、互いに対向するコンクリート型枠体相互をセパレータ取り付け金具に結合したセパレータにより連結して第2の型枠構成体を形成し、コンクリート構造物の構築箇所に曲げ主材を立設し、前記コンクリート構造物の構築箇所に、2つの前記第1の型枠構成体および1つの前記第2の型枠構成体を、前記リブが上下方向に延在し、かつ、前記曲げ主材を含んで上下方向に延在するコンクリート打設空間が区画されるように平面視矩形枠状に配置し、前記2つの第1の型枠構成体を構成するコンクリート型枠体の前記帯鉄筋に両端を係止して中間帯筋を配設すると共に、コンクリート型枠体相互をセパレータ取り付け金具に結合したセパレータにより連結し、隣接するコンクリート型枠体をそれらの内面間にわたって取り付けた連結具により相互に固定することで、前記第1および第2の型枠構成体を連結して平面視矩形枠状のコンクリート型枠を形成し、次いで前記コンクリート型枠の内部にコンクリートを打設するようにしたことを特徴とする。
【0006】
また、本発明は、矩形枠状に配置される外側型枠と、前記外側型枠の内側で矩形枠状に配置される内側型枠とを用いて内部に中空部を有する断面が矩形枠状の鉄筋コンクリート橋脚を構築する方法であって、プレキャストコンクリートから成る長方形の板状の型枠本体と、前記型枠本体の内面から膨出し、前記長方形の長辺の延在方向に間隔をおき前記長方形の短辺に平行して対向する前記長辺の間にわたって延在形成された複数のリブと、前記長方形の短辺の延在方向に間隔をおき前記リブに中間部が埋設されて複数設けられ、それぞれ前記型枠本体の内面と距離をおき前記型枠本体の内面および前記長方形の長辺に平行して前記型枠本体の長辺方向の全長にわたって延在する帯鉄筋と、前記型枠本体の内面に埋め込み固定されたセパレータ取り付け用の金具とから成るコンクリート型枠体を設け、鉄筋コンクリート橋脚の構築箇所とは離れた箇所において、前記コンクリート型枠体の複数を、前記型枠本体の長辺の延在方向に一列に配置し、隣接する前記コンクリート型枠体の前記型枠本体の端面どうしを当接させて、隣接する前記コンクリート型枠体の内面間にわたって取り付けた連結具により相互に固定して第1の型枠構成体を形成し、鉄筋コンクリート橋脚の構築箇所とは離れた箇所において、前記外側型枠を形成するための少なくとも1つの前記第1の型枠構成体と前記内側型枠を形成するための少なくとも1つの前記第1の型枠構成体、または前記外側型枠を形成するための少なくとも1つの前記第1の型枠構成体と前記内側型枠を形成するための1つの前記コンクリート型枠体とを対向配置し、対向する前記コンクリート型枠体の前記帯鉄筋に両端を係止して中間帯筋を配設すると共に、対向する前記コンクリート型枠体どうしをセパレータ取り付け金具に結合したセパレータにより連結して第2の型枠構成体を4つ形成し、前記コンクリート構造物の構築箇所に曲げ主材を立設し、前記コンクリート構造物の構築箇所に、4つの前記第2の型枠構成体を、前記リブが上下方向に延在し、かつ、前記曲げ主材を前記外側型枠と前記内側型枠との間に含んで上下方向に延在するコンクリート打設空間が区画されるように配置し、前記外側型枠を形成する隣り合う前記コンクリート型枠体どうし、および前記内側型枠を形成する隣り合う前記コンクリート型枠体どうしをそれらの内面間にわたって取り付けた連結具により相互に固定することで、前記第2の型枠構成体を連結して平面視矩形枠状のコンクリート型枠を形成し、次いで前記コンクリート型枠の前記外側型枠と前記内側型枠との間にコンクリートを打設するようにしたことを特徴とする。
【0007】
また、本発明は、前記コンクリートの打設が、前記コンクリート型枠が複数積み重ねられた後になされることを特徴とする。
また、本発明は、前記曲げ主材が、コンクリートの打設に伴い鉄筋コンクリート橋脚の高さが大きくなるにつれて継ぎ足されることを特徴とする。
また、本発明は、前記型枠本体の内部には、複数のひび割れ分散筋が埋め込まれていることを特徴とする。
また、本発明は、前記型枠本体の内面と前記帯鉄筋との間の距離が、前記コンクリート型枠に打設するコンクリート中の最大骨材寸法以上に設定されていることを特徴とする。
【0008】
本発明の中実状の鉄筋コンクリート橋脚を構築する方法では、コンクリート橋脚の構築箇所とは離れた箇所において、コンクリート型枠体により第1の型枠構成体を組み立て、さらに第1の型枠構成体、中間帯筋、ならびにセパレータなどを用いて第2の型枠構成体を組み立てておく。そして、コンクリート橋脚の構築箇所では曲げ主材を立設した後、第1および第2の型枠構成体を単に組み合せて連結するのみで、コンクリート型枠を完成させることができる。
【0009】
本発明の中空状の鉄筋コンクリート橋脚を構築する方法では、コンクリート橋脚の構築箇所とは離れた箇所において、まず、コンクリート型枠体により第1の型枠構成体を組み立てた上で、第1の型枠構成体、中間帯筋、ならびにセパレータなどにより第2の型枠構成体を組み立てておく。そして、コンクリート橋脚の構築箇所では曲げ主材を立設した後、複数の第2の型枠構成体を単に組み合せて連結するのみで、コンクリート型枠を完成させることができる。
【0010】
【発明の実施の形態】
次に本発明の実施の形態を実施例にもとづき図面を参照して説明する。
以下では、まず図2ないし図5を参照して中実状の鉄筋コンクリート橋脚の構築方法において用いるコンクリート型枠について説明する。
図2はコンクリート型枠の分解平面図、図3はコンクリート型枠体の内側正面図、図4はコンクリート型枠体の斜視図、図5の(A)は連結金具の説明図、(B)はコンクリート型枠体の拡大断面図、(C)はリブ部の拡大断面図である。
【0011】
図2に示すように、本実施例では、8つのコンクリート型枠体によりコンクリート橋脚を構築するための平面視長方形の型枠を形成する。より詳しくは、型枠の長辺部はそれぞれ2つの第1のコンクリート型枠体6により構成し、短辺部はそれぞれ2つの第2のコンクリート型枠体8により構成する。
【0012】
第1および第2のコンクリート型枠体6,8は、プレキャストコンクリート板からなる型枠本体10を備え、型枠本体10は互いに平行して対向する上辺と下辺、これら上辺と下辺よりも短い左辺と右辺とにより長方形の板状に形成され、第2のコンクリート型枠体8の型枠本体10の左右方向における一方の辺部には屈曲部12が形成されている。
型枠本体10の厚さは約50mm〜100mm程度で、運搬および後打ちコンクリート打設時にひびわれが発生しないように、補強材として鉄筋、繊維またはファイバが用いられている。
また、型枠本体10の内面14には、後打コンクリートとの一体性が図られるように、はけ引き処理、洗い出し処理など粗面仕上げがなされている。
【0013】
型枠本体10の内面14には、後打コンクリートの側圧に対処するため、図5の(C)に詳しく示すように、断面が台形状のリブ16が、左右方向に間隔をおいた複数箇所に、型枠本体10の上辺と下辺とにわたり上下に延在形成され、型枠本体10の剛性が高められている。
リブ16の間隔は、後打ちコンクリートの打設高さ、スランプ、コンクリート温度、打設速度を勘案して適宜決定される。
型枠本体10の内部には、図5の(B)、(C)に示すように、複数のひび割れ分散筋18が、上下左右方向に格子状に埋め込まれている。
【0014】
帯鉄筋20はその中間部がリブ16に埋設され、型枠本体10の内面14との間に距離をおいて内面14および上下の辺と平行して延在形成され、図3、図4に示すように左右の辺の延在方向に間隔をおいて複数設けられている。
帯鉄筋20は、第1のコンクリート型枠体6では、図2、図4に示すように型枠本体10の左右の辺から突出する長さに形成されている。この帯鉄筋20の両端にはそれぞれ屈曲部13、15が設けられている。屈曲部13はコの字状に形成され、一方、屈曲部15はL字状に形成されている。これは、第1および第2のコンクリート型枠体6,8を連結してコンクリート型枠を組み立てたとき、型枠本体10の内面14から帯鉄筋20の端部が直角に突出するようにするためである。
また、第2のコンクリート型枠体8では、図2、図3に示したように、帯鉄筋20は一方の端部のみが型枠本体10の辺部より突出する長さに形成され、第1のコンクリート型枠体6の場合と同様の理由で、帯鉄筋の両端部にはそれぞれ屈曲部13、15が設けられている。
型枠本体10の内面14とこれら帯鉄筋20との間隔は、後打ちコンクリート打設時のコンクリートの充填性を考慮して最大粗骨材寸法以上とすることが望ましい。
【0015】
図5の(A)に示すように、各コンクリート型枠体の型枠本体10の上下左右辺の各縁部寄りの箇所には、コンクリート型枠体相互を連結するための連結金具取着用金具が縁部の全長にわたり所定の間隔をおいて複数埋設されている。実施例では連結金具取着用金具として埋め込みボルト22が用いられている。
また、図6に示すように、各型枠本体10の内面14にはセパレータ取り付け用のセパレータ取り付け金具が、各型枠本体10の上下左右に間隔をおいた複数箇所に埋設固定されている。実施例ではセパレータ取り付け金具として埋め込みボルト26が用いられ、埋め込みボルト26の先端はリブ16の先端面から突出している。
【0016】
本実施例のコンクリート橋脚の構築方法では、このような第1および第2のコンクリート型枠体6,8を用いて、以下の手順でコンクリート橋脚を構築する。
まず、橋脚の構築箇所とは離れた箇所で、上記第1および第2のコンクリート型枠体6,8をそれぞれ用いて、平面視長方形のコンクリート型枠を形成するための2種類の第1の型枠構成体Aおよび第1の型枠構成体Bを組み立てる。図1は、各型枠構成体を示す平面図である。
【0017】
第1の型枠構成体Aの組み立てには2つの第1のコンクリート型枠体6を用いる。すなわち、図1に示したように、2つの第1のコンクリート型枠体6を用意し、帯鉄筋20の屈曲部13が外側となる状態で、2つの第1のコンクリート型枠体6を型枠本体10の長辺延在方向に一列に配置する。そして、隣接する第1および第2のコンクリート型枠体6,8の型枠本体10の端面どうしを当接させて、隣接する型枠本体10の内面14間にわたって取り付けた連結具により相互に固定して第1の型枠構成体Aを形成する。この第1の型枠構成体Aは本実施例では2つ組み立てる。
なお、型枠本体10の連結は、図5の(A)に示したように、連結具40により行い、連結具40は埋め込みボルト22を挿通させ、埋め込みボルト22の先端にナット42を締め付けることで固定する。
【0018】
一方、第1の型枠構成体Bの組み立てには2つの第2のコンクリート型枠体8を用いる。すなわち、図1に示したように、2つの第2のコンクリート型枠体8を用意し、屈曲部13が外側となるようにした上で、2つの第2のコンクリート型枠体8を型枠本体10の長辺延在方向に一列に配置する。そして、隣接する第2のコンクリート型枠体8の型枠本体10の端面どうしを当接させて、第1の型枠構成体Aの場合と同様に、隣接する型枠本体10の内面14間にわたって取り付けた連結具により相互に固定して第1の型枠構成体Bを形成する。この第1の型枠構成体Bも本実施例では2つ組み立てる。
【0019】
次に、第1の型枠構成体A、中間帯筋44、ならびにセパレータ24により第2の型枠構成体28を組み立てる。すなわち、図1に示したように、2つの第1の型枠構成体Aを対向配置してそれらの間に中間帯筋44およびセパレータ24を取り付ける。
中間帯筋44は、型枠本体10にほぼ直交して延在させ、その両端を、第1のコンクリート型枠体6の帯鉄筋20に係止して、型枠本体10の長辺の延在方向に間隔をおいて本実施例では6本配設する。この場合、中間帯筋44の両端にフックなどの係止具を設けるなどは任意である。なお、中間帯筋44は、上下に並べられた帯鉄筋20ごとに配置する。
セパレータ24は、図6に示すように、埋め込みボルト26を介して、対向する型枠本体10間に取り付ける。
セパレータ24は例えば、一端にL字状の支辺46が取着され、他端に右ネジが形成された第1のロッド48と、一端にL字状の支辺46が取着され、他端に右ネジが形成された第2のロッド52と、第1のロッド48の右ネジに歯合しかつ第2のロッド52の左ネジに歯合するターンバックル54などから構成されている。なお、セパレータ24は、上下方向に間隔をおいた複数箇所において型枠本体10に直交させて複数配設する。
【0020】
その後、以上のようにして組み立てた第2の型枠構成体28および第1の型枠構成体Bを用いて橋脚構築箇所に型枠を形成し、コンクリートを打設して橋脚を構築する。
図7は、基礎部の構築および曲げ主材の立設を示す説明図、図8は、コンクリート橋脚の構築手順を示す工程図、図9は曲げ主材の説明図である。
まず、構築すべきコンクリート橋脚箇所に図7に示すように、基礎部30(フーチンク部)を施工後、構築すべきコンクリート橋脚の外側の4面に作業足場32を組み立て、基礎部30には複数の曲げ主材34を立設する。
曲げ主材34は図9の(A)および(B)に示すように、4本の鉄筋36が正方形の各角部に位置するように、4本の鉄筋36の延在方向に間隔をおいた複数箇所において、4本の鉄筋36の間に組み立て筋38や、あるいはプレートが介在され、4本の鉄筋36が正方形の各角部に保持されるように構成されている。
【0021】
このような曲げ主材34は、図8の(A)に示したように、平面視長方形の型枠設置箇所32の周辺部に配列するが、型枠設置箇所32の4つの角の箇所にはこの段階では曲げ主材34は設置しない。
次に、第2の型枠構成体28を揚重機で吊り上げ、図8の(B)に示したように、基礎部30上の型枠設置箇所32に配置する。その際、リブ16が上下方向に延在し、曲げ主材34が内側となり、かつ各型枠本体10が型枠設置箇所32の長辺に沿って延在するようにする。
【0022】
つづいて、2つの第1の型枠構成体Bを順次、揚重機で吊り上げ、図8の(C)に示したように、それぞれ第2の型枠構成体28の両端部に配置する。その際、リブ16が上下方向に延在し、曲げ主材34が内側となり、かつ各型枠本体10が型枠設置箇所32の短辺に沿って延在するようにする。
【0023】
そして、図8の(D)に示したように、各第1の型枠構成体Bを成す型枠本体10の屈曲部12の端面と、第2の型枠構成体28を成す型枠本体10の対応する左右の端面とを当接させた状態で、型枠本体10どうしを、図5の(A)に示したように、連結具40により連結する。なお、連結具40は埋め込みボルト22を挿通させ、埋め込みボルト22の先端にナット42を締め付けることで固定する。
その後、対向する2つの第1の型枠構成体Bの間に、第2の型枠構成体28の場合と同様にして中間帯筋44およびセパレータ24を取り付ける。
これにより、図8の(D)に示すように、基礎部30(図7)上にコンクリート型枠2が形成される。以上の工程を例えば4回程度繰り返すことで、図10に示すようにコンクリート型枠2を上下に4段積み重ね、その結果、コンクリート型枠2の内側に上下に延在するコンクリート打設空間が形成される。
そして、基礎部30の4角にも曲げ主材34をそれぞれ立設し、型枠内に、図8の(E)に示したように、コンクリート42を打設し、コンクリート42が所定の硬度となるまで養生させる。
これにより、コンクリート型枠2を表面部材とする1リフト分の橋脚が完成する。
以降、図10に示すように、継手3402を介して曲げ主材34を継ぎ足し、コンクリート型枠2を組み立てて積み重ね、コンクリート42を打設するという作業を繰り返すことで、コンクリート橋脚を必要な高さにまで構築する。
【0024】
このように本実施例の中実状の鉄筋コンクリート橋脚の構築方法では、コンクリート橋脚の構築箇所とは離れた場所において、帯鉄筋20などの鉄筋やセパレータ24を含む第1の型枠構成体Bおよび第2の型枠構成体28を組み立てておき、コンクリート橋脚の構築箇所では曲げ主材34を立設した上でそれらを単に組み合せて連結するのみで完全なコンクリート型枠2を形成できる。
したがって、作業足場上での作業および揚重機による作業は大幅に削減され、また、組み立てたコンクリート型枠2はそのまま橋脚の表面部材となるので、コンクリート型枠2の解体作業は不要となる。その結果、人員の削減および工期の短縮を実現できる。
【0025】
さらに、本実施例の鉄筋コンクリート橋脚の構築方法では、コンクリート型枠2を完全に組み上げた後、コンクリート橋脚の構築箇所に設置するのではなく、部分的に組み立てて第1の型枠構成体Bおよび第2の型枠構成体28とし、それらを揚重機で吊り上げ、コンクリート橋脚の構築箇所に設置して組み立て、完全なコンクリート型枠2を形成する。
したがってコンクリート型枠2が全体として大型な場合にも、比較的小型の揚重機を用いればよく、大型の揚重機は不要であるからコスト削減に有利である。
【0026】
なお本実施例では、第1の型枠構成体Aは2つの第1のコンクリート型枠体6を用いて構成したが、第1のコンクリート型枠体6の数は2に限らず、3以上とすることも無論可能である。また、第1の型枠構成体Bについても同様である。
さらに、本実施例では、1つの第2の型枠構成体28と、2つの第1の型枠構成体Bによりコンクリート型枠2を構成したが、必要なコンクリート型枠2の大きさなどによっては、2以上の第2の型枠構成体28、3以上の第1の型枠構成体Bを用いてコンクリート型枠を構成することも可能である。
また、本実施例では、曲げ主材34としては図9に示したように4本の鉄筋36を組みにして構成したものを用いたが、これはあくまでも一例であり、必要な曲げ対力を確保できる限り、この例に限らず種々の曲げ主材を用いることができる。
なお、本実施例では、コンクリート構造物としてコンクリート橋脚を構築する場合について説明したが、本発明はコンクリート橋脚以外のコンクリート構造物に広く応用することができる。
【0027】
次に、中空状のコンクリート橋脚を構築する場合について説明する。
図12は、本実施例で中空のコンクリート橋脚を構築するために用いるコンクリート型枠の分解平面図である。図中、図2などと同一の要素には同一の符号を付した。
図12に示すように、本実施例では、14のコンクリート型枠体によりコンクリート橋脚を構築するための平面視長方形の型枠を形成する。より詳しくは、型枠の各長辺部には、第1のコンクリート型枠体6と、第3のコンクリート型枠体50とをそれぞれ2つずつ用い、型枠の各短辺部には、2つの第2のコンクリート型枠体8と、1つの第4のコンクリート型枠体56とを用いる。
そして、第1および第2のコンクリート型枠体6,8により外側型枠を形成し、第3および第4のコンクリート型枠体50,56により内側型枠を形成する。
【0028】
第3および第4のコンクリート型枠体50,56も、上記実施例ですでに説明した第1および第2のコンクリート型枠体6,8と基本的に同じ構成となっている。
第3のコンクリート型枠体50は第1のコンクリート型枠体6と基本的に同じ構造となっているが、第3のコンクリート型枠体50では、内側型枠を構成するために型枠本体10の長辺の長さが短く、また、帯鉄筋20の屈曲部58、60の、型枠本体10内面14からの突出距離が短く、屈曲部58は型枠本体10の端面から大きく突出している。そしてリブ16は、コンクリート型枠を形成したときに、第1のコンクリート型枠体6のリブ16に対向する位置に形成されている。
【0029】
第4のコンクリート型枠体56も、第1のコンクリート型枠体6と基本的に同じ構造となっているが、第4のコンクリート型枠体56では、第2のコンクリート型枠体8と対向配置して内側型枠の一部を構成するために型枠本体10の長辺の長さが、2つの第2のコンクリート型枠体8を連結した長さより短く、また、帯鉄筋20は両端が共にコの字状に屈曲しており、型枠本体10の端面からの突出距離が長くなっている。そしてリブ16は、コンクリート型枠を形成したときに第2のコンクリート型枠体8のリブ16に対向する位置に形成されている。
【0030】
本実施例のコンクリート橋脚の構築方法では、このような第1ないし第4のコンクリート型枠体6,8,50,56を用いて、以下の手順で中空のコンクリート橋脚を構築する。
まず、橋脚の構築箇所とは離れた箇所で、上記第1ないし第3のコンクリート型枠体6,8,50をそれぞれ用いて、平面視長方形のコンクリート型枠を形成するための3種類の第1の型枠構成体A、第1の型枠構成体B、ならびに第1の型枠構成体Cを組み立てる。
図11は、各型枠構成体を示す平面図である。
第1の型枠構成体A、第1の型枠構成体Bの組み立ては、上記実施例の場合と同じ手順で行えばよく、したがって、ここでは詳しい説明は省略する。
第1の型枠構成体Cの組み立てには2つの第3のコンクリート型枠体50を用いる。すなわち、図11に示したように、2つの第3のコンクリート型枠体50を用意し、帯鉄筋20の屈曲部58が外側となる状態で、2つの第3のコンクリート型枠体56を型枠本体10の長辺延在方向に一列に配置する。そして、隣接する第3のコンクリート型枠体50の型枠本体10の端面どうしを当接させて、隣接する型枠本体10の内面14間にわたって取り付けた連結具により相互に固定して第1の型枠構成体Cを形成する。この第1の型枠構成体Cは本実施例では2つ組み立てる。
なお、型枠本体10の連結は、図5の(A)に示したように、連結具40により行い、連結具40は埋め込みボルト22を挿通させ、埋め込みボルト22の先端にナット42を締め付けることで固定する。
【0031】
次に、橋脚の構築箇所とは離れた箇所で、第1の型枠構成体Aおよび第1の型枠構成体Cにより第2の型枠構成体63を組み立てる。
すなわち、図11に示したように、第1の型枠構成体Aと第1の型枠構成体Cとを、それぞれの帯鉄筋20が水平でかつ延在方向での位置が一致した状態で、相互に間隔をおいて対向配置する。
そして、第1の型枠構成体Aと第1の型枠構成体Cと間に中間帯筋44およびセパレータ24を取り付ける。
中間帯筋44は、型枠本体10にほぼ直交して延在させ、その両端を、対向する第1および第3のコンクリート型枠体6,50の帯鉄筋20に係止して、型枠本体10の長辺の延在方向に間隔をおいて本実施例では6本配設する。この場合、中間帯筋44の両端にフックなどの係止具を設けるなどは任意である。なお、中間帯筋44は、上下に並べられた帯鉄筋20ごとに配置する。
セパレータ24は、図6に示したように、埋め込みボルト26を介して、対向する型枠本体10間に取り付け、そして、上下方向に間隔をおいた複数箇所において型枠本体10に直交させて複数配設する。
【0032】
つづいて、橋脚の構築箇所とは離れた箇所で、第1の型枠構成体Bおよび第4のコンクリート型枠体56により第2の型枠構成体65を組み立てる。すなわち、図11に示したように、第1の型枠構成体Bと第4のコンクリート型枠体56とを、それぞれの帯鉄筋20が水平でかつ延在方向での位置が一致した状態で、相互に間隔をおいて対向配置する。
そして、第1の型枠構成体Bと第4のコンクリート型枠体56と間に、第2の型枠構成体63の場合と同様にして、中間帯筋44およびセパレータ24を取り付ける。
【0033】
その後、以上のようにして組み立てた第2の型枠構成体63および第2の型枠構成体65を用いて橋脚構築箇所に型枠を形成し、コンクリートを打設して橋脚を構築する。
図13の(A)ないし(F)はコンクリート橋脚の構築工程を示す工程図である。
【0034】
まず、構築すべきコンクリート橋脚箇所に、この場合にも図7に示したように、基礎部30を施工後、構築すべきコンクリート橋脚の外側の4面に作業足場32を組み立て、基礎部30には複数の曲げ主材34を立設する。
曲げ主材34は、図13の(A)に示したように、平面視長方形の型枠設置箇所64の周辺部に配列するが、この段階では、型枠設置箇所64の長辺部にのみ配設し、かつ長辺部の両端近傍の箇所には配設しない。
【0035】
次に、2つの第2の型枠構成体63を揚重機で順次、吊り上げ、基礎部30上の型枠設置箇所64に配置する。その際、図13の(B)に示したように、リブ16が上下方向に延在し、曲げ主材34が内側となり、かつ各型枠本体10が型枠設置箇所64の長辺に沿って延在するようにする。
つづいて、2つの第2の型枠構成体65を順次、揚重機で吊り上げ、それぞれ第2の型枠構成体63の両端部に配置する。その際、図13の(C)に示したように、リブ16が上下方向に延在し、かつ各型枠本体10が型枠設置箇所64の短辺に沿って延在するようにする。
【0036】
そして、各第2の型枠構成体65を成す型枠本体10の屈曲部12の端面と、第2の型枠構成体Aを成す型枠本体10の対応する左右の端面とを当接させた状態で、型枠本体10どうしを、図5の(A)に示したように、連結具40により連結する。
これにより、図13の(C)に示したように、基礎部30上にコンクリート型枠70が形成される。以上の工程を例えば4回程度繰り返すことで、コンクリート型枠70を上下に4段積み重ね、その結果、外側型枠66と内側型枠68とから成るコンクリート型枠70の内側に上下に延在するコンクリート打設空間が形成される。
そして、図13の(D)に示したように、第2の型枠構成体65の内側にも曲げ主材34をそれぞれ立設し、図13の(E)に示したように、内側型枠68の内面72近傍に、内面72に沿って曲げ主材としての鉄筋74を相互に間隔をおいて多数立設し、また、外側型枠66の内側の4隅近傍の箇所にも、曲げ主材として複数の鉄筋74を立設する。
【0037】
その後、図13の(F)に示したように、コンクリート型枠70内にコンクリート42を打設し、コンクリート42が所定の硬度となるまで養生させる。これにより、コンクリート型枠70を表面部材とする1リフト分の橋脚が完成する。以降、曲げ主材34を継ぎ足し、コンクリート型枠70を組み立てて積み重ね、配筋を行ってコンクリート42を打設するという作業を繰り返すことで、コンクリート橋脚を必要な高さにまで構築する。
【0038】
このように本実施例の鉄筋コンクリート橋脚の構築方法では、コンクリート橋脚の構築箇所とは離れた場所において、帯鉄筋20などの鉄筋やセパレータ24を含む第2の型枠構成体63および第2の型枠構成体65を組み立てておき、コンクリート橋脚の構築箇所では曲げ主材34を立設した上で、第2の型枠構成体63および第2の型枠構成体65を単に組み合せて連結するのみで中空橋脚を構築するための完全なコンクリート型枠70を形成できる。
したがって、作業足場上での作業および揚重機による作業は大幅に削減され、また、組み立てたコンクリート型枠70はそのまま橋脚の表面部材となるので、コンクリート型枠70の解体作業は不要となる。その結果、人員の削減および工期の短縮を実現できる。
さらに、本実施例の鉄筋コンクリート橋脚の構築方法では、コンクリート型枠70を完全に組み上げた後、コンクリート橋脚の構築箇所に設置するのではなく、部分的に組み立てて第2の型枠構成体63および第2の型枠構成体65とし、それらを揚重機で吊り上げ、コンクリート橋脚の構築箇所に設置して組み立て、完全なコンクリート型枠70を形成する。したがって、コンクリート型枠70が全体として大型な場合にも、比較的小型の揚重機を用いればよく、大型の揚重機は不要であるからコスト削減に有利である。
【0039】
なお、本実施例では、第1の型枠構成体A、第1の型枠構成体B、第1の型枠構成体Cはそれぞれ2つのコンクリート型枠体を用いて構成したが、コンクリート型枠体の数は2に限らず、1あるいは3以上とすることも無論可能である。
さらに、本実施例では、2つの第2の型枠構成体63と、2つの第2の型枠構成体65とによりコンクリート型枠70を構成したが、必要なコンクリート型枠の大きさなどによっては、3以上の第2の型枠構成体63や第2の型枠構成体65によりコンクリート型枠を構成することも可能である。
そして、本実施例では、第2の型枠構成体65を2つの第2のコンクリート型枠体8と1つの第4のコンクリート型枠体56とにより形成したが、第4のコンクリート型枠体56は、第2の型枠構成体63の場合と同様、複数とすることも可能である。
また、本実施例では、曲げ主材34としては図7に示したように4本の鉄筋36を組みにして構成したものを主に用いたが、これはあくまでも一例であり、必要な曲げ対力を確保できる限り、この例に限らず種々の曲げ主材34を用いることができる。
【0040】
【発明の効果】
以上説明したように本発明の中実状の鉄筋コンクリート橋脚の構築方法では、コンクリート橋脚の構築箇所とは離れた箇所において、コンクリート型枠体により第1の型枠構成体を組み立て、さらに第1の型枠構成体、中間帯筋、ならびにセパレータなどを用いて第2の型枠構成体を組み立てておく。
そして、コンクリート橋脚の構築箇所では曲げ主材を立設した後、第1および第2の型枠構成体を単に組み合せて連結するのみで、コンクリート型枠を完成させることができる。
したがって、作業足場上での作業および揚重機による作業は大幅に削減され、また、組み立てたコンクリート型枠はそのまま橋脚の表面部材となるので、コンクリート型枠の解体作業は不要となる。その結果、人員の削減および工期の短縮を実現できる。
さらに、本発明の鉄筋コンクリート橋脚の構築方法では、コンクリート型枠を完全に組み上げた後、コンクリート橋脚の構築箇所に設置するのではなく、部分的に組み立てて第1の型枠構成体および第2の型枠構成体とし、それらを揚重機で吊り上げ、コンクリート橋脚の構築箇所に設置して組み立て、完全なコンクリート型枠を形成する。
したがって、コンクリート型枠が全体として大型な場合にも、比較的小型の揚重機を用いればよく、大型の揚重機は不要であるからコスト削減に有利である。
【0041】
また、本発明の中空状の鉄筋コンクリート橋脚の構築方法では、コンクリート橋脚の構築箇所とは離れた箇所において、まず、コンクリート型枠体により第1の型枠構成体を組み立てた上で、第1の型枠構成体、中間帯筋、ならびにセパレータなどにより第2の型枠構成体を組み立てておく。
そして、コンクリート橋脚の構築箇所では曲げ主材を立設した後、複数の第2の型枠構成体を単に組み合せて連結するのみで、中空状の鉄筋コンクリート橋脚を構築するためのコンクリート型枠を完成させることができる。
したがって、作業足場上での作業および揚重機による作業は大幅に削減され、また、組み立てたコンクリート型枠はそのまま橋脚の表面部材となるので、コンクリート型枠の解体作業は不要となる。その結果、人員の削減および工期の短縮を実現できる。
さらに、本発明の鉄筋コンクリート橋脚の構築方法では、コンクリート型枠を完全に組み上げた後、コンクリート橋脚の構築箇所に設置するのではなく、部分的に組み立てて第2の型枠構成体とし、それらを揚重機で吊り上げ、コンクリート橋脚の構築箇所に設置して組み立て、完全なコンクリート型枠を形成する。
したがって、コンクリート型枠が全体として大型な場合にも、比較的小型の揚重機を用いればよく、大型の揚重機は不要であるからコスト削減に有利である。
【図面の簡単な説明】
【図1】型枠構成体を示す平面図である。
【図2】コンクリート型枠の分解平面図である。
【図3】コンクリート型枠体の内側正面図である。
【図4】コンクリート型枠体の斜視図である。
【図5】(A)は連結金具の説明図、(B)はコンクリート型枠体の拡大断面図、(C)はリブ部の拡大断面図である。
【図6】セパレータ取り付けの説明図である。
【図7】基礎部の構築および曲げ主材の立設を示す説明図である。
【図8】コンクリート橋脚の構築手順を示す工程図である。
【図9】曲げ主材の説明図である。
【図10】コンクリート型枠の斜視図である。
【図11】型枠構成体を示す平面図である。
【図12】コンクリート型枠の分解平面図である。
【図13】(A)ないし(F)はコンクリート橋脚の構築工程を示す工程図である。
【図14】(A)および(B)は従来のコンクリート橋脚の構築方法を示す説明図である。
【図15】(A)および(B)は従来のコンクリート橋脚の構築方法を示す説明図である。
【符号の説明】
2,70 コンクリート型枠
A,B,C 第1の型枠構成体
6 第1のコンクリート型枠体
8 第2のコンクリート型枠体
10 型枠本体
24 セパレータ
28,63,65 第2の型枠構成体
34 曲げ主材
44 中間帯筋
50 第3のコンクリート型枠体
56 第4のコンクリート型枠体
64 型枠設置箇所
66 外側型枠
68 内側型枠
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for constructing a reinforced concrete pier.
[0002]
[Prior art]
Reinforced concrete piers are conventionally constructed as follows.
14A and 15B are explanatory views showing a conventional method for constructing a concrete pier.
In the conventional construction method, first, as shown in FIG. 14A, after the foundation portion 102 (footing portion) is constructed, the work scaffold 104 is assembled on the four outer surfaces of the concrete pier to be constructed.
Next, an operator gets on the work scaffold 104 and assembles a reinforcing bar 106 such as a bending main material and a strip reinforcing bar, and then assembles a concrete formwork 110 using a separator and a support 108.
Next, concrete is placed in the concrete formwork 110, and after the concrete is hardened, the support 108 and the concrete formwork 110 are disassembled and removed, and the construction of the first lift is completed.
After the second lift, as shown in FIG. 14 (B) and FIG. 15 (A), the same work as the first lift is performed using the lifting machine 112, and the piers are sequentially built upward. The concrete pier 114 is constructed as shown in FIG.
[0003]
[Problems to be solved by the invention]
However, in such a conventional construction method, since the reinforcing bar assembly such as the bending main material and the band reinforcing bar is performed on the work scaffold, the reinforcing bar assembly is a very laborious work, and further, it is performed on the work scaffold. A lifting machine is required for all the rebar assembly and formwork assembly and disassembly, requiring a lot of temporary materials and personnel, and there was a problem that the construction period could not be shortened.
[0004]
The present invention has been devised in view of the above circumstances, and the object of the present invention is to reinforce the rebar assembling work and the lifting machine work on the work scaffold, shorten the construction period, and reduce the cost. The purpose is to provide a method for constructing piers.
[0005]
[Means for Solving the Problems]
In order to achieve the above object, the present invention is a method for constructing a solid reinforced concrete pier having a rectangular cross section, which is a rectangular plate-shaped formwork body made of precast concrete, and bulges from the inner surface of the formwork body. A plurality of ribs extending between the long sides facing each other in parallel to the short sides of the rectangle and spaced in the extending direction of the long sides of the rectangle, and the extending direction of the short sides of the rectangle A plurality of intermediate portions are embedded in the rib and spaced apart from the inner surface of the mold body, and the length of the mold body is parallel to the inner surface of the mold body and the long side of the rectangle. Provided a concrete mold frame consisting of a strip reinforcing bar extending over the entire length in the side direction and a metal fitting for attaching the separator embedded and fixed to the inner surface of the mold body, away from the construction site of the concrete structure In place, a plurality of the concrete formwork bodies are arranged in a line in the extending direction of the long side of the formwork body, and the end faces of the formwork body of the adjacent concrete formwork bodies are brought into contact with each other, The first formwork component is formed by fixing together with a connector attached between the inner surfaces of the adjacent concrete formwork bodies, and at the place away from the construction place of the concrete structure, A concrete formwork which is disposed opposite to each other, and is arranged with intermediate strips by engaging both ends of the concrete rebar constituting the first formwork structure with both ends of the rebars. They are connected to each other by a separator coupled to a separator mounting bracket to form a second formwork structure, and a bending main material is erected at the construction site of the concrete structure, and two at the construction site of the concrete structure. A concrete placement space in which the rib extends in the vertical direction and includes the bending main material and extends in the vertical direction in the first formwork structure and the one second formwork structure. Are arranged in a rectangular frame shape in plan view so as to be partitioned, and both ends of the concrete formwork constituting the two first formwork constructs are engaged with the rebars to arrange the intermediate rebars. In addition, the concrete mold bodies are connected to each other by a separator coupled to a separator mounting bracket, and the adjacent concrete mold bodies are fixed to each other by a connector attached between their inner surfaces, whereby the first and second concrete mold bodies are fixed. The formwork structure is connected to form a rectangular form-like concrete formwork, and then the concrete is placed inside the concrete formwork.
[0006]
Further, the present invention provides a rectangular frame-shaped cross section having a hollow portion inside using an outer mold frame arranged in a rectangular frame shape and an inner mold frame arranged in a rectangular frame shape inside the outer mold frame. A rectangular plate-shaped formwork body made of precast concrete, and a bulge from the inner surface of the formwork body, with a gap in the extending direction of the long side of the rectangle. And a plurality of ribs formed extending between the long sides facing each other in parallel with the short side, and a plurality of intermediate portions embedded in the ribs at intervals in the extending direction of the short sides of the rectangle. A strip reinforcing bar that is spaced from the inner surface of the mold body and extends over the entire length of the long side of the mold body parallel to the inner surface of the mold body and the long side of the rectangle, and the mold body Separator embedded and fixed inside A concrete formwork composed of mounting brackets is provided, and a plurality of the concrete formwork bodies are arranged in a line in the extending direction of the long side of the formwork body at a place away from the construction part of the reinforced concrete pier. A first formwork structure in which the end faces of the formwork main bodies of the adjacent concrete formwork bodies are brought into contact with each other and fixed to each other by a connector attached between the inner surfaces of the adjacent concrete formwork bodies. Forming at least one first formwork construct for forming the outer formwork and at least one for forming the inner formwork at a location away from the construction location of the reinforced concrete pier The first formwork construct, or at least one of the first formwork construct for forming the outer formwork and one of the concrete for forming the inner formwork And an intermediate strip is disposed by engaging both ends of the concrete mold frame opposite to each other, and the opposing concrete mold frames are separated from each other by a separator mounting bracket. Are connected by a separator coupled to each other to form four second formwork constructs, a bending main material is erected at the construction location of the concrete structure, and the four second construction bodies are constructed at the construction location of the concrete structure. A concrete placement space in which the ribs extend in the vertical direction and the bending main material is included between the outer mold frame and the inner mold frame to extend in the vertical direction. Are arranged so as to be partitioned, and the adjacent concrete molds forming the outer mold and the adjacent concrete molds forming the inner mold are attached across their inner surfaces. The second formwork components are connected to each other by a tie to form a rectangular form concrete formwork in plan view, and then the outer formwork and the inner formwork of the concrete formwork It is characterized by placing concrete between the two.
[0007]
Further, the present invention is characterized in that the placing of the concrete is performed after a plurality of the concrete molds are stacked.
Further, the present invention is characterized in that the bending main material is added as the height of the reinforced concrete pier increases as the concrete is placed.
Further, the present invention is characterized in that a plurality of crack dispersion bars are embedded in the inside of the mold body.
Further, the present invention is characterized in that a distance between the inner surface of the formwork main body and the rebar is set to be equal to or greater than a maximum aggregate size in the concrete to be placed on the concrete formwork.
[0008]
In the method for constructing the solid reinforced concrete pier of the present invention, the first formwork construct is assembled with the concrete formwork at a place away from the construction place of the concrete pier, and further, the first formwork construct, A second formwork construct is assembled using an intermediate band, a separator, and the like. Then, after the bending main material is erected at the construction site of the concrete pier, the concrete formwork can be completed simply by combining and connecting the first and second formwork constructs.
[0009]
In the method for constructing the hollow reinforced concrete pier according to the present invention, the first mold is first assembled with the concrete mold body at a location apart from the construction location of the concrete pier, and then the first mold. A second formwork structure is assembled using the frame structure, the intermediate band, the separator, and the like. Then, after the bending main material is erected at the construction site of the concrete pier, the concrete formwork can be completed by simply combining and connecting the plurality of second formwork components.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described based on examples with reference to the drawings.
In the following, a concrete formwork used in a method for constructing a solid reinforced concrete pier will be described first with reference to FIGS.
2 is an exploded plan view of the concrete mold, FIG. 3 is a front view of the inside of the concrete mold, FIG. 4 is a perspective view of the concrete mold, FIG. Is an enlarged cross-sectional view of a concrete mold body, and (C) is an enlarged cross-sectional view of a rib portion.
[0011]
As shown in FIG. 2, in this embodiment, a rectangular form frame for constructing a concrete pier is formed by eight concrete form bodies. More specifically, the long sides of the mold are each constituted by two first concrete molds 6, and the short sides are respectively constituted by two second concrete molds 8.
[0012]
The first and second concrete mold bodies 6 and 8 include a mold body 10 made of a precast concrete plate, and the mold body 10 has an upper side and a lower side facing each other in parallel with each other, and a left side shorter than the upper side and the lower side. And a right side, and a bent portion 12 is formed on one side in the left-right direction of the mold body 10 of the second concrete mold body 8.
The thickness of the mold body 10 is about 50 mm to 100 mm, and reinforcing bars, fibers or fibers are used as reinforcing materials so that cracks do not occur during transportation and post-casting concrete placement.
Further, the inner surface 14 of the mold body 10 is subjected to a rough surface finish such as a brushing process or a washing process so as to be integrated with the post-cast concrete.
[0013]
On the inner surface 14 of the mold body 10, in order to cope with the lateral pressure of the post-cast concrete, as shown in detail in FIG. 5C, ribs 16 having a trapezoidal cross section are provided at a plurality of positions spaced in the left-right direction. Further, the mold body 10 is formed so as to extend up and down over the upper side and the lower side of the mold body 10, and the rigidity of the mold body 10 is enhanced.
The interval between the ribs 16 is appropriately determined in consideration of the placement height of the post-cast concrete, slump, concrete temperature, and placement speed.
As shown in FIGS. 5B and 5C, a plurality of crack dispersion bars 18 are embedded in the formwork body 10 in a lattice shape in the vertical and horizontal directions.
[0014]
The band rebar 20 has an intermediate portion embedded in the rib 16 and is formed to extend in parallel with the inner surface 14 and the upper and lower sides at a distance from the inner surface 14 of the mold body 10. As shown, a plurality are provided at intervals in the extending direction of the left and right sides.
In the first concrete formwork 6, the band reinforcing bar 20 is formed to have a length protruding from the left and right sides of the formwork body 10 as shown in FIGS. 2 and 4. Bending portions 13 and 15 are provided at both ends of the band reinforcing bar 20, respectively. The bent portion 13 is formed in a U shape, while the bent portion 15 is formed in an L shape. This is so that when the first and second concrete mold bodies 6 and 8 are connected to assemble the concrete mold frame, the end of the band rebar 20 protrudes from the inner surface 14 of the mold body 10 at a right angle. Because.
Further, in the second concrete mold body 8, as shown in FIGS. 2 and 3, the band reinforcing bar 20 is formed so that only one end protrudes from the side of the mold body 10, For the same reason as in the case of the first concrete mold 6, bent portions 13 and 15 are provided at both ends of the band reinforcing bar, respectively.
The distance between the inner surface 14 of the mold body 10 and the strip reinforcing bars 20 is preferably equal to or larger than the maximum coarse aggregate size in consideration of the filling property of the concrete when the post-cast concrete is placed.
[0015]
As shown in FIG. 5 (A), a connecting bracket mounting bracket for connecting the concrete mold bodies to each other at positions near the edges of the upper, lower, left and right sides of the mold body 10 of each concrete mold body. Are embedded at predetermined intervals over the entire length of the edge. In the embodiment, embedded bolts 22 are used as connecting metal fittings.
In addition, as shown in FIG. 6, separator mounting brackets for attaching a separator are embedded and fixed to the inner surface 14 of each mold body 10 at a plurality of positions spaced apart from each other in the vertical and horizontal directions of each mold body 10. In the embodiment, an embedded bolt 26 is used as a separator mounting bracket, and the tip of the embedded bolt 26 protrudes from the tip surface of the rib 16.
[0016]
In the concrete pier construction method of the present embodiment, the concrete pier is constructed in the following procedure using the first and second concrete mold bodies 6 and 8 as described above.
First, two types of first types for forming a rectangular concrete form in plan view using the first and second concrete form bodies 6 and 8 at places apart from the construction place of the pier. The formwork structure A and the first formwork structure B are assembled. FIG. 1 is a plan view showing each formwork structure.
[0017]
Two first concrete formwork bodies 6 are used for assembling the first formwork structure A. That is, as shown in FIG. 1, two first concrete mold bodies 6 are prepared, and the two first concrete mold bodies 6 are molded in a state in which the bent portion 13 of the band reinforcing bar 20 is on the outside. The frame main body 10 is arranged in a line in the extending direction of the long side. Then, the end surfaces of the mold body 10 of the first and second concrete mold bodies 6 and 8 adjacent to each other are brought into contact with each other and fixed to each other by a connector attached between the inner surfaces 14 of the adjacent mold bodies 10. Thus, the first formwork structure A is formed. In the present embodiment, two first formwork structures A are assembled.
As shown in FIG. 5A, the mold body 10 is connected by a connecting tool 40. The connecting tool 40 allows the embedded bolt 22 to pass therethrough, and a nut 42 is fastened to the tip of the embedded bolt 22. Secure with.
[0018]
On the other hand, two second concrete formwork bodies 8 are used for assembling the first formwork structure B. That is, as shown in FIG. 1, two second concrete mold bodies 8 are prepared and the bent portion 13 is on the outside, and then the two second concrete mold bodies 8 are formed into the mold frame. The main body 10 is arranged in a line in the extending direction of the long side. Then, the end surfaces of the mold body 10 of the adjacent second concrete mold body 8 are brought into contact with each other, and between the inner surfaces 14 of the adjacent mold body 10 as in the case of the first mold body A. The first formwork construct B is formed by being fixed to each other by a connecting tool attached over the first. In the present embodiment, two first formwork structures B are also assembled.
[0019]
Next, the second formwork construct 28 is assembled by the first formwork construct A, the intermediate strip 44, and the separator 24. That is, as shown in FIG. 1, the two first formwork constructs A are arranged to face each other, and the intermediate strip 44 and the separator 24 are attached between them.
The intermediate band 44 extends substantially orthogonally to the mold body 10, and both ends thereof are locked to the band reinforcing bars 20 of the first concrete mold frame 6 to extend the long side of the mold body 10. In the present embodiment, six are arranged at intervals in the present direction. In this case, it is optional to provide a locking tool such as a hook at both ends of the intermediate band 44. The intermediate rebar 44 is arranged for each of the rebars 20 arranged vertically.
As shown in FIG. 6, the separator 24 is attached between the opposing mold bodies 10 via embedded bolts 26.
For example, the separator 24 has an L-shaped support edge 46 attached to one end, a first rod 48 with a right-hand thread formed at the other end, and an L-shaped support edge 46 attached to one end. A second rod 52 having a right-hand thread at the end, a turnbuckle 54 that meshes with the right-hand thread of the first rod 48 and a left-hand thread of the second rod 52, and the like. A plurality of separators 24 are arranged orthogonal to the mold body 10 at a plurality of positions spaced in the vertical direction.
[0020]
Thereafter, a mold is formed at the pier construction site using the second mold frame assembly 28 and the first mold frame structure B assembled as described above, and concrete is cast to construct the pier.
FIG. 7 is an explanatory view showing the construction of the foundation and the bending main material, FIG. 8 is a process diagram showing the construction procedure of the concrete pier, and FIG. 9 is an explanatory view of the bending main material.
First, as shown in FIG. 7 at the concrete pier location to be constructed, after the foundation portion 30 (footing portion) is constructed, work scaffolds 32 are assembled on the four outer surfaces of the concrete pier to be constructed. The bending main material 34 is erected.
As shown in FIGS. 9A and 9B, the bending main member 34 is spaced in the extending direction of the four reinforcing bars 36 so that the four reinforcing bars 36 are positioned at the corners of the square. At a plurality of locations, an assembly bar 38 or a plate is interposed between the four reinforcing bars 36, and the four reinforcing bars 36 are held at each corner of the square.
[0021]
As shown in FIG. 8A, such a bending main material 34 is arranged in the periphery of the formwork installation place 32 having a rectangular shape in plan view, but at the four corners of the formwork installation place 32. At this stage, the bending main material 34 is not installed.
Next, the 2nd formwork structure 28 is lifted with a lifting machine, and it arrange | positions to the formwork installation location 32 on the base part 30, as shown to (B) of FIG. At that time, the ribs 16 extend in the vertical direction, the bending main material 34 becomes the inner side, and each mold body 10 extends along the long side of the mold installation location 32.
[0022]
Subsequently, the two first formwork constructs B are sequentially lifted by a lifting machine, and are respectively disposed at both ends of the second formwork construct 28 as shown in FIG. At that time, the ribs 16 extend in the vertical direction, the bending main material 34 becomes the inner side, and each mold body 10 extends along the short side of the mold installation location 32.
[0023]
Then, as shown in FIG. 8D, the end surface of the bent portion 12 of the mold body 10 that forms each first mold body B and the mold body that forms the second form body 28 In a state where the corresponding left and right end faces of 10 are in contact with each other, the mold body 10 is connected by the connecting tool 40 as shown in FIG. The connecting tool 40 is fixed by inserting the embedded bolt 22 and tightening the nut 42 at the tip of the embedded bolt 22.
Thereafter, the intermediate strip 44 and the separator 24 are attached between the two first formwork structures B facing each other in the same manner as in the case of the second formwork structure 28.
Thereby, as shown to (D) of FIG. 8, the concrete formwork 2 is formed on the foundation part 30 (FIG. 7). By repeating the above steps, for example, about four times, the concrete formwork 2 is stacked up and down in four stages as shown in FIG. 10, and as a result, a concrete placement space extending up and down is formed inside the concrete formwork 2. Is done.
Then, bending main members 34 are erected on the four corners of the base portion 30, and concrete 42 is placed in the formwork as shown in FIG. 8E, and the concrete 42 has a predetermined hardness. It is cured until it becomes.
Thereby, the pier for one lift which uses the concrete formwork 2 as a surface member is completed.
Thereafter, as shown in FIG. 10, by repeating the work of adding the bending main material 34 through the joint 3402, assembling and stacking the concrete formwork 2, and placing the concrete 42, the concrete pier has a required height. Build up to.
[0024]
As described above, in the solid reinforced concrete pier construction method of the present embodiment, the first formwork body B including the reinforcing bars such as the strip reinforcing bars 20 and the separator 24 and the separator 24 are provided at a location away from the construction location of the concrete pier. The complete concrete formwork 2 can be formed by assembling the two formwork structures 28 and simply connecting them by combining the bending main members 34 upright at the construction site of the concrete pier.
Therefore, the work on the work scaffold and the work by the lifting machine are greatly reduced, and the assembled concrete formwork 2 becomes the surface member of the pier as it is, so that the work of disassembling the concrete formwork 2 becomes unnecessary. As a result, it is possible to reduce the number of workers and shorten the construction period.
[0025]
Furthermore, in the construction method of the reinforced concrete pier of the present embodiment, after the concrete formwork 2 is completely assembled, it is not installed at the construction position of the concrete pier, but is partially assembled and the first formwork structure B and The second formwork constituting body 28 is used, and they are lifted by a lifting machine, and are installed and assembled at the construction site of the concrete pier to form a complete concrete formwork 2.
Therefore, even when the concrete formwork 2 is large as a whole, a relatively small lifting machine may be used, and a large lifting machine is unnecessary, which is advantageous for cost reduction.
[0026]
In the present embodiment, the first formwork structure A is configured by using the two first concrete formwork bodies 6. However, the number of the first concrete formwork bodies 6 is not limited to 2, and is 3 or more. Of course, it is possible. The same applies to the first formwork structure B.
Furthermore, in the present embodiment, the concrete mold 2 is configured by one second mold structure 28 and two first mold structures B. However, depending on the size of the concrete mold 2 required, etc. It is also possible to construct a concrete mold using two or more second formwork constructs 28 and three or more first formwork constructs B.
Further, in this embodiment, as the bending main material 34, as shown in FIG. 9, a structure in which four reinforcing bars 36 are assembled is used. However, this is only an example, and a necessary bending force is obtained. As long as it can be ensured, not only this example but various bending main materials can be used.
In addition, although the present Example demonstrated the case where a concrete pier was constructed | assembled as a concrete structure, this invention can be widely applied to concrete structures other than a concrete pier.
[0027]
Next, a case where a hollow concrete pier is constructed will be described.
FIG. 12 is an exploded plan view of a concrete mold used for constructing a hollow concrete pier in this embodiment. In the figure, the same elements as those in FIG.
As shown in FIG. 12, in this embodiment, a rectangular formwork for constructing a concrete pier is formed by 14 concrete formwork bodies. More specifically, each of the long sides of the formwork uses two each of the first concrete formwork body 6 and the third concrete formwork body 50, and each short side part of the formwork has Two second concrete mold bodies 8 and one fourth concrete mold body 56 are used.
Then, the first and second concrete mold bodies 6 and 8 form an outer mold form, and the third and fourth concrete mold bodies 50 and 56 form an inner mold form.
[0028]
The third and fourth concrete mold bodies 50 and 56 have basically the same configuration as the first and second concrete mold bodies 6 and 8 already described in the above embodiment.
The third concrete mold body 50 has basically the same structure as that of the first concrete mold body 6, but the third concrete mold body 50 has a mold body for forming an inner mold frame. The length of the long side 10 is short, the protruding distance of the bent portions 58 and 60 of the band reinforcing bar 20 from the inner surface 14 of the mold body 10 is short, and the bent portion 58 protrudes greatly from the end surface of the mold body 10. Yes. The ribs 16 are formed at positions facing the ribs 16 of the first concrete mold body 6 when the concrete mold is formed.
[0029]
The fourth concrete mold body 56 has basically the same structure as that of the first concrete mold body 6, but the fourth concrete mold body 56 is opposed to the second concrete mold body 8. The length of the long side of the mold body 10 is shorter than the length connecting the two second concrete mold bodies 8 in order to arrange and constitute a part of the inner mold frame, Are bent in a U-shape, and the protruding distance from the end surface of the mold body 10 is long. And the rib 16 is formed in the position facing the rib 16 of the 2nd concrete mold body 8 when a concrete mold is formed.
[0030]
In the concrete pier construction method of this embodiment, a hollow concrete pier is constructed by using the first to fourth concrete mold bodies 6, 8, 50, and 56 in the following procedure.
First, three types of the first and third concrete mold bodies 6, 8, and 50 for forming a concrete mold having a rectangular shape in plan view are provided at locations apart from the construction site of the pier. Assembling one formwork structure A, first formwork structure B, and first formwork structure C.
FIG. 11 is a plan view showing each formwork structure.
The assembly of the first formwork structure A and the first formwork structure B may be performed in the same procedure as in the above embodiment, and thus detailed description thereof is omitted here.
Two third concrete formwork bodies 50 are used for assembling the first formwork structure C. That is, as shown in FIG. 11, two third concrete mold bodies 50 are prepared, and the two third concrete mold bodies 56 are molded in a state where the bent portion 58 of the band reinforcing bar 20 is on the outside. The frame main body 10 is arranged in a line in the extending direction of the long side. Then, the end surfaces of the mold body 10 of the adjacent third concrete mold body 50 are brought into contact with each other, and are fixed to each other by a connector attached across the inner surface 14 of the adjacent mold body 10. Formwork structure C is formed. In the present embodiment, two first formwork structures C are assembled.
As shown in FIG. 5A, the mold body 10 is connected by a connecting tool 40. The connecting tool 40 allows the embedded bolt 22 to pass therethrough, and a nut 42 is fastened to the tip of the embedded bolt 22. Secure with.
[0031]
Next, the 2nd formwork structure 63 is assembled with the 1st formwork structure A and the 1st formwork structure C in the place away from the construction place of the pier.
That is, as shown in FIG. 11, the first formwork structure A and the first formwork structure C are arranged in a state where the respective rebars 20 are horizontal and the positions in the extending direction coincide with each other. These are arranged opposite to each other with a space therebetween.
Then, the intermediate strip 44 and the separator 24 are attached between the first formwork structure A and the first formwork structure C.
The intermediate band 44 extends substantially orthogonally to the mold body 10, and both ends thereof are locked to the band reinforcing bars 20 of the first and third concrete mold bodies 6, 50 facing each other. In the present embodiment, six are arranged at intervals in the extending direction of the long side of the main body 10. In this case, it is optional to provide a locking tool such as a hook at both ends of the intermediate band 44. The intermediate rebar 44 is arranged for each of the rebars 20 arranged vertically.
As shown in FIG. 6, the separator 24 is attached between the opposing mold body 10 via embedded bolts 26, and a plurality of separators 24 are orthogonal to the mold body 10 at a plurality of positions spaced in the vertical direction. Arrange.
[0032]
Subsequently, the second formwork construct 65 is assembled by the first formwork construct B and the fourth concrete formwork 56 at a place away from the construction site of the pier. That is, as shown in FIG. 11, the first formwork component B and the fourth concrete formwork 56 are placed in a state where the respective rebars 20 are horizontal and the positions in the extending direction coincide with each other. These are arranged opposite to each other with a space therebetween.
Then, the intermediate strip 44 and the separator 24 are attached between the first formwork construct B and the fourth concrete formwork 56 in the same manner as the second formwork construct 63.
[0033]
Thereafter, a mold form is formed at a pier construction site using the second mold structure member 63 and the second mold member structure 65 assembled as described above, and concrete is placed to construct a pier.
(A) thru | or (F) of FIG. 13 is process drawing which shows the construction process of a concrete pier.
[0034]
First, as shown in FIG. 7, in this case as well, as shown in FIG. 7, after the foundation portion 30 is constructed, work scaffolds 32 are assembled on the four outer surfaces of the concrete pier to be constructed. Erected a plurality of bending main members 34.
As shown in FIG. 13A, the bending main members 34 are arranged in the peripheral part of the mold installation place 64 having a rectangular shape in plan view. At this stage, only the long side part of the mold installation place 64 is arranged. It is disposed and not disposed in the vicinity of both ends of the long side portion.
[0035]
Next, the two second formwork constructs 63 are sequentially lifted by a lifting machine and placed at the formwork installation location 64 on the foundation 30. At that time, as shown in FIG. 13B, the ribs 16 extend in the vertical direction, the bending main material 34 becomes the inner side, and each mold body 10 extends along the long side of the mold installation place 64. To extend.
Subsequently, the two second formwork components 65 are sequentially lifted by a lifting machine, and are respectively disposed at both ends of the second formwork structure 63. At that time, as shown in FIG. 13C, the ribs 16 extend in the vertical direction, and each mold body 10 extends along the short side of the mold installation location 64.
[0036]
Then, the end surface of the bent portion 12 of the mold body 10 constituting each second formwork construct 65 is brought into contact with the corresponding left and right end surfaces of the mold body 10 constituting the second formwork construct A. In this state, the mold body 10 is connected by the connecting tool 40 as shown in FIG.
Thereby, as shown to (C) of FIG. 13, the concrete formwork 70 is formed on the base part 30. FIG. By repeating the above steps, for example, about four times, the concrete molds 70 are stacked up and down in four stages. As a result, the concrete molds 70 extend vertically inside the concrete mold 70 composed of the outer mold 66 and the inner mold 68. A concrete placement space is formed.
Then, as shown in (D) of FIG. 13, the bending main members 34 are respectively erected on the inner side of the second formwork structure 65, and as shown in (E) of FIG. 13, the inner mold In the vicinity of the inner surface 72 of the frame 68, a large number of reinforcing bars 74 as bending main members are provided along the inner surface 72 at intervals from each other. A plurality of reinforcing bars 74 are erected as a main material.
[0037]
Thereafter, as shown in FIG. 13F, concrete 42 is placed in the concrete mold 70 and cured until the concrete 42 has a predetermined hardness. Thereby, the pier for 1 lift which uses the concrete formwork 70 as a surface member is completed. Thereafter, the bending main material 34 is added, the concrete formwork 70 is assembled and stacked, and the concrete pier is constructed to a required height by repeating the work of placing and placing the concrete 42.
[0038]
Thus, in the construction method of the reinforced concrete bridge pier of the present embodiment, the second formwork structure 63 and the second mold including the reinforcing bars such as the band reinforcement 20 and the separator 24 in a place away from the construction place of the concrete pier. The frame structure 65 is assembled, the bending main material 34 is erected at the construction site of the concrete pier, and the second mold frame structure 63 and the second mold structure 65 are simply combined and connected. The complete concrete formwork 70 for building the hollow pier can be formed.
Therefore, the work on the work scaffold and the work by the lifting machine are greatly reduced, and the assembled concrete formwork 70 becomes the surface member of the pier as it is, so that the work of disassembling the concrete formwork 70 becomes unnecessary. As a result, it is possible to reduce the number of workers and shorten the construction period.
Furthermore, in the construction method of the reinforced concrete pier of the present embodiment, after the concrete formwork 70 is completely assembled, it is not installed at the construction place of the concrete pier, but is partially assembled and the second formwork structure 63 and The second formwork construct 65 is lifted by a lifting machine, and is installed and assembled at a construction site of a concrete pier to form a complete concrete formwork 70. Therefore, even when the concrete formwork 70 is large as a whole, a relatively small lifting machine may be used, and a large lifting machine is unnecessary, which is advantageous for cost reduction.
[0039]
In this embodiment, each of the first formwork structure A, the first formwork structure B, and the first formwork structure C is configured by using two concrete formwork bodies. Of course, the number of frames is not limited to two, but can be one or three or more.
Furthermore, in the present embodiment, the concrete mold 70 is configured by the two second formwork constructs 63 and the two second formwork constructs 65, but depending on the size of the required concrete formwork and the like. It is also possible to construct a concrete formwork with three or more second formwork constructs 63 and second formwork constructs 65.
In this embodiment, the second formwork component 65 is formed by the two second concrete formwork bodies 8 and one fourth concrete formwork body 56, but the fourth concrete formwork body As in the case of the second formwork structure 63, a plurality of 56 can be provided.
Further, in this embodiment, as the bending main material 34, as shown in FIG. 7, a main body composed of four reinforcing bars 36 is mainly used. However, this is merely an example, and a necessary bending pair 34 is used. As long as the force can be secured, not only this example but also various bending main materials 34 can be used.
[0040]
【The invention's effect】
As described above, in the solid reinforced concrete pier construction method of the present invention, the first formwork component is assembled by the concrete mold body at a location apart from the construction location of the concrete pier, and the first mold is further constructed. A second formwork construct is assembled using a frame construct, an intermediate band, a separator, and the like.
Then, after the bending main material is erected at the construction site of the concrete pier, the concrete formwork can be completed simply by combining and connecting the first and second formwork constructs.
Therefore, the work on the work scaffold and the work by the lifting machine are greatly reduced, and the assembled concrete formwork becomes the surface member of the pier as it is, so that the work of dismantling the concrete formwork becomes unnecessary. As a result, it is possible to reduce the number of workers and shorten the construction period.
Furthermore, in the method for constructing a reinforced concrete pier according to the present invention, after the concrete formwork is completely assembled, it is not installed at the construction site of the concrete pier, but is partially assembled to form the first formwork structure and the second formwork structure. Form the formwork, lift them with a lifting machine, and install and assemble them at the concrete pier construction site to form a complete concrete formwork.
Therefore, even when the concrete formwork is large as a whole, a relatively small lifting machine may be used, and a large lifting machine is unnecessary, which is advantageous for cost reduction.
[0041]
In the method for constructing a hollow reinforced concrete pier according to the present invention, the first formwork construct is first assembled with the concrete formwork at a place away from the construction place of the concrete pier, A second formwork construct is assembled with the formwork construct, the intermediate strip, the separator, and the like.
And at the construction site of the concrete pier, after the bending main material is erected, the concrete formwork for constructing the hollow reinforced concrete pier is completed simply by combining and connecting the second formwork components Can be made.
Therefore, the work on the work scaffold and the work by the lifting machine are greatly reduced, and the assembled concrete formwork becomes the surface member of the pier as it is, so that the work of dismantling the concrete formwork becomes unnecessary. As a result, it is possible to reduce the number of workers and shorten the construction period.
Furthermore, in the construction method of the reinforced concrete pier of the present invention, after the concrete formwork is completely assembled, it is not installed at the construction site of the concrete pier, but is partially assembled to form the second formwork structure. It is lifted by a lifting machine, installed at the construction site of a concrete pier and assembled to form a complete concrete formwork.
Therefore, even when the concrete formwork is large as a whole, a relatively small lifting machine may be used, and a large lifting machine is unnecessary, which is advantageous for cost reduction.
[Brief description of the drawings]
FIG. 1 is a plan view showing a formwork structure.
FIG. 2 is an exploded plan view of a concrete formwork.
FIG. 3 is an inner front view of a concrete mold body.
FIG. 4 is a perspective view of a concrete formwork body.
5A is an explanatory view of a connecting metal fitting, FIG. 5B is an enlarged sectional view of a concrete mold body, and FIG. 5C is an enlarged sectional view of a rib portion;
FIG. 6 is an explanatory view of separator attachment.
FIG. 7 is an explanatory diagram showing the construction of the foundation and the standing of the bending main material.
FIG. 8 is a process diagram showing a construction procedure of a concrete pier.
FIG. 9 is an explanatory diagram of a bending main material.
FIG. 10 is a perspective view of a concrete formwork.
FIG. 11 is a plan view showing a formwork structure.
FIG. 12 is an exploded plan view of a concrete formwork.
FIGS. 13A to 13F are process diagrams showing a construction process of a concrete pier.
FIGS. 14A and 14B are explanatory views showing a conventional method for constructing a concrete pier.
FIGS. 15A and 15B are explanatory views showing a conventional method for constructing a concrete pier.
[Explanation of symbols]
2,70 concrete formwork
A, B, C First formwork structure
6 First concrete formwork
8 Second concrete formwork
10 Formwork body
24 Separator
28, 63, 65 Second formwork structure
34 Bending main material
44 Midband muscle
50 Third concrete formwork
56 Fourth concrete formwork
64 Formwork installation location
66 Outside formwork
68 Inside formwork

Claims (6)

断面が矩形で中実状の鉄筋コンクリート橋脚を構築する方法であって、
プレキャストコンクリートから成る長方形の板状の型枠本体と、前記型枠本体の内面から膨出し、前記長方形の長辺の延在方向に間隔をおき前記長方形の短辺に平行して対向する前記長辺の間にわたって延在形成された複数のリブと、前記長方形の短辺の延在方向に間隔をおき前記リブに中間部が埋設されて複数設けられ、それぞれ前記型枠本体の内面と距離をおき前記型枠本体の内面および前記長方形の長辺に平行して前記型枠本体の長辺方向の全長にわたって延在する帯鉄筋と、前記型枠本体の内面に埋め込み固定されたセパレータ取り付け用の金具とから成るコンクリート型枠体を設け、
コンクリート構造物の構築箇所と離れた箇所において、前記コンクリート型枠体の複数を、前記型枠本体の長辺の延在方向に一列に配置し、隣接する前記コンクリート型枠体の前記型枠本体の端面どうしを当接させて、隣接する前記コンクリート型枠体の内面間にわたって取り付けた連結具により相互に固定して第1の型枠構成体を形成し、
コンクリート構造物の構築箇所と離れた箇所において、2つの前記第1の型枠構成体を対向配置し、第1の型枠構成体を構成するコンクリート型枠体の前記帯鉄筋に両端を係止して中間帯筋を配設すると共に、互いに対向するコンクリート型枠体相互をセパレータ取り付け金具に結合したセパレータにより連結して第2の型枠構成体を形成し、
コンクリート構造物の構築箇所に曲げ主材を立設し、
前記コンクリート構造物の構築箇所に、2つの前記第1の型枠構成体および1つの前記第2の型枠構成体を、前記リブが上下方向に延在し、かつ、前記曲げ主材を含んで上下方向に延在するコンクリート打設空間が区画されるように平面視矩形枠状に配置し、
前記2つの第1の型枠構成体を構成するコンクリート型枠体の前記帯鉄筋に両端を係止して中間帯筋を配設すると共に、コンクリート型枠体相互をセパレータ取り付け金具に結合したセパレータにより連結し、隣接するコンクリート型枠体をそれらの内面間にわたって取り付けた連結具により相互に固定することで、前記第1および第2の型枠構成体を連結して平面視矩形枠状のコンクリート型枠を形成し、
次いで前記コンクリート型枠の内部にコンクリートを打設するようにした、
ことを特徴とする鉄筋コンクリート橋脚の構築方法。
A method of constructing a solid reinforced concrete pier with a rectangular cross section,
A rectangular plate-shaped formwork body made of precast concrete, and the length that bulges from the inner surface of the formwork body and that is spaced in the extending direction of the long side of the rectangle and parallel to the short side of the rectangle A plurality of ribs extending between the sides, and a plurality of ribs are provided with intermediate portions embedded in the ribs at intervals in the extending direction of the short sides of the rectangle, respectively, A strip reinforcing bar extending over the entire length in the long side direction of the mold body in parallel with the inner surface of the mold body and the long side of the rectangle, and for attaching a separator embedded and fixed in the inner surface of the mold body Provide a concrete formwork consisting of metal fittings,
A plurality of the concrete mold bodies are arranged in a row in the extending direction of the long side of the mold body at a place away from the construction site of the concrete structure, and the mold body of the adjacent concrete mold body The end faces of each other, and fixed to each other by a connector attached between the inner surfaces of the adjacent concrete mold bodies to form a first formwork structure,
At the place away from the construction site of the concrete structure, the two first formwork components are arranged opposite to each other, and both ends are locked to the band reinforcement of the concrete formwork constituting the first formwork structure. The intermediate strips are disposed, and the concrete molds facing each other are connected to each other by a separator coupled to a separator mounting bracket to form a second formwork construct,
Bending main material is erected at the construction site of the concrete structure,
In the construction site of the concrete structure, the two first formwork constructs and one second formwork construct include the ribs extending in the vertical direction and the bending main material. With a rectangular frame shape in plan view so that the concrete placement space extending in the vertical direction is partitioned,
A separator in which both ends of the concrete formwork constituting the two first formwork constituting bodies are locked to both ends of the concrete reinforcement to dispose an intermediate rebar, and the concrete formwork is connected to a separator mounting bracket. The first and second formwork components are connected to each other by fixing the adjacent concrete molds to each other by a connector attached between the inner surfaces thereof, and the rectangular frame-shaped concrete in plan view Form the formwork,
Next, concrete was placed inside the concrete formwork,
The construction method of the reinforced concrete pier characterized by this.
矩形枠状に配置される外側型枠と、前記外側型枠の内側で矩形枠状に配置される内側型枠とを用いて内部に中空部を有する断面が矩形枠状の鉄筋コンクリート橋脚を構築する方法であって、
プレキャストコンクリートから成る長方形の板状の型枠本体と、前記型枠本体の内面から膨出し、前記長方形の長辺の延在方向に間隔をおき前記長方形の短辺に平行して対向する前記長辺の間にわたって延在形成された複数のリブと、前記長方形の短辺の延在方向に間隔をおき前記リブに中間部が埋設されて複数設けられ、それぞれ前記型枠本体の内面と距離をおき前記型枠本体の内面および前記長方形の長辺に平行して前記型枠本体の長辺方向の全長にわたって延在する帯鉄筋と、前記型枠本体の内面に埋め込み固定されたセパレータ取り付け用の金具とから成るコンクリート型枠体を設け、
鉄筋コンクリート橋脚の構築箇所とは離れた箇所において、前記コンクリート型枠体の複数を、前記型枠本体の長辺の延在方向に一列に配置し、隣接する前記コンクリート型枠体の前記型枠本体の端面どうしを当接させて、隣接する前記コンクリート型枠体の内面間にわたって取り付けた連結具により相互に固定して第1の型枠構成体を形成し、
鉄筋コンクリート橋脚の構築箇所とは離れた箇所において、前記外側型枠を形成するための少なくとも1つの前記第1の型枠構成体と前記内側型枠を形成するための少なくとも1つの前記第1の型枠構成体、または前記外側型枠を形成するための少なくとも1つの前記第1の型枠構成体と前記内側型枠を形成するための1つの前記コンクリート型枠体とを対向配置し、対向する前記コンクリート型枠体の前記帯鉄筋に両端を係止して中間帯筋を配設すると共に、対向する前記コンクリート型枠体どうしをセパレータ取り付け金具に結合したセパレータにより連結して第2の型枠構成体を4つ形成し、
前記コンクリート構造物の構築箇所に曲げ主材を立設し、
前記コンクリート構造物の構築箇所に、4つの前記第2の型枠構成体を、前記リブが上下方向に延在し、かつ、前記曲げ主材を前記外側型枠と前記内側型枠との間に含んで上下方向に延在するコンクリート打設空間が区画されるように配置し、前記外側型枠を形成する隣り合う前記コンクリート型枠体どうし、および前記内側型枠を形成する隣り合う前記コンクリート型枠体どうしをそれらの内面間にわたって取り付けた連結具により相互に固定することで、前記第2の型枠構成体を連結して平面視矩形枠状のコンクリート型枠を形成し、
次いで前記コンクリート型枠の前記外側型枠と前記内側型枠との間にコンクリートを打設するようにした、
ことを特徴とする鉄筋コンクリート橋脚の構築方法。
A reinforced concrete pier with a rectangular cross section having a hollow section inside is constructed using an outer mold frame arranged in a rectangular frame shape and an inner mold frame arranged in a rectangular frame shape inside the outer mold frame. A method,
A rectangular plate-shaped formwork body made of precast concrete, and the length that bulges from the inner surface of the formwork body and that is spaced in the extending direction of the long side of the rectangle and parallel to the short side of the rectangle A plurality of ribs extending between the sides, and a plurality of ribs are provided with intermediate portions embedded in the ribs at intervals in the extending direction of the short sides of the rectangle, respectively, A strip reinforcing bar extending over the entire length in the long side direction of the mold body in parallel with the inner surface of the mold body and the long side of the rectangle, and for attaching a separator embedded and fixed in the inner surface of the mold body Provide a concrete formwork consisting of metal fittings,
A plurality of the concrete formwork bodies are arranged in a line in the extending direction of the long side of the formwork body at a place away from the construction place of the reinforced concrete pier, and the formwork body of the adjacent concrete formwork body The end faces of each other are fixed to each other by a connector attached between the inner surfaces of the adjacent concrete mold bodies to form a first formwork structure,
At a location remote from the construction location of the reinforced concrete pier, at least one first mold structure for forming the outer mold and at least one first mold for forming the inner mold A frame structure or at least one first formwork structure for forming the outer formwork and one concrete formwork for forming the inner formwork are arranged to face each other. Both ends of the concrete formwork are locked to the rebar and an intermediate rebar is provided, and the opposing concrete formwork is connected by a separator coupled to a separator mounting bracket to form a second formwork. Forming four components,
Bending main material is erected at the construction site of the concrete structure,
At the construction site of the concrete structure, the four second formwork components, the ribs extend in the vertical direction, and the bending main material is placed between the outer formwork and the inner formwork. The concrete placement spaces that are arranged in such a manner that the concrete placement space extending in the vertical direction is partitioned, the adjacent concrete mold bodies that form the outer formwork, and the adjacent concrete that forms the inner formwork By fixing the formwork bodies to each other by a connector attached between their inner surfaces, the second formwork structure is connected to form a rectangular form-like concrete formwork in plan view,
Next, concrete was placed between the outer formwork and the inner formwork of the concrete formwork,
The construction method of the reinforced concrete pier characterized by this.
前記コンクリートの打設は、前記コンクリート型枠が複数積み重ねられた後になされる請求項1または2記載の鉄筋コンクリート橋脚の構築方法。The method for constructing a reinforced concrete pier according to claim 1 or 2, wherein the placing of the concrete is performed after a plurality of the concrete formwork are stacked. 前記曲げ主材は、コンクリートの打設に伴い鉄筋コンクリート橋脚の高さが大きくなるにつれて継ぎ足される請求項1、2または3記載の鉄筋コンクリート橋脚の構築方法。The method for constructing a reinforced concrete pier according to claim 1, 2 or 3, wherein the bending main material is added as the height of the reinforced concrete pier increases with the placement of concrete. 前記型枠本体の内部には、複数のひび割れ分散筋が埋め込まれている請求項1乃至4に何れか1項記載の鉄筋コンクリート橋脚の構築方法。The method for constructing a reinforced concrete pier according to any one of claims 1 to 4, wherein a plurality of crack dispersion bars are embedded in the inside of the mold body. 前記型枠本体の内面と前記帯鉄筋との間の距離は、前記コンクリート型枠に打設するコンクリート中の最大骨材寸法以上に設定されている請求項1乃至5に何れか1項記載の鉄筋コンクリート橋脚の構築方法。The distance between the inner surface of the said formwork main body and the said strip reinforcement is set to be more than the largest aggregate size in the concrete cast in the said concrete formwork, The any one of Claims 1 thru | or 5 How to build a reinforced concrete pier.
JP20859497A 1997-07-17 1997-07-17 Reinforced concrete pier construction method Expired - Fee Related JP3835716B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20859497A JP3835716B2 (en) 1997-07-17 1997-07-17 Reinforced concrete pier construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20859497A JP3835716B2 (en) 1997-07-17 1997-07-17 Reinforced concrete pier construction method

Publications (2)

Publication Number Publication Date
JPH1136229A JPH1136229A (en) 1999-02-09
JP3835716B2 true JP3835716B2 (en) 2006-10-18

Family

ID=16558795

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20859497A Expired - Fee Related JP3835716B2 (en) 1997-07-17 1997-07-17 Reinforced concrete pier construction method

Country Status (1)

Country Link
JP (1) JP3835716B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100472338B1 (en) * 2001-05-30 2005-03-08 한국건설기술연구원 Deck plate structure for construction of pier
JP4347846B2 (en) * 2005-12-27 2009-10-21 東日本旅客鉄道株式会社 Bridge pier reinforcement method
KR100957864B1 (en) 2009-08-26 2010-05-14 주식회사 일승에스티 A lattlce type girder for bridge
JP5620344B2 (en) * 2011-06-21 2014-11-05 三井住友建設株式会社 Construction method of pier
CN104120647B (en) * 2014-07-04 2016-09-14 上海应用技术学院 It is suitable for section assembling concrete frame bridge pier system and the construction method of rapid construction
CN113981830A (en) * 2021-11-11 2022-01-28 中交一公局集团有限公司 V-shaped pier construction method

Also Published As

Publication number Publication date
JPH1136229A (en) 1999-02-09

Similar Documents

Publication Publication Date Title
JPH1030212A (en) Reinforced concrete structure and its construction method
JP3835716B2 (en) Reinforced concrete pier construction method
KR200414349Y1 (en) Connection structure of precast concrete structure
JP3945668B2 (en) Construction method of concrete pier
JP2002089043A (en) Reinforced concrete structure and construction method for steel framed reinforced concrete, structure
JP3830055B2 (en) Concrete formwork and method for constructing concrete structure using the concrete formwork
JP3841498B2 (en) PCa formwork and pier construction method using this PCa formwork
JPH1129910A (en) Method for constructing concrete pier
JP3137448B2 (en) Construction method of concrete main tower
JP3973577B2 (en) Bridge, bridge structure and bridge construction method
CN109352795B (en) Prefabricated road plate template system and prefabricated road plate manufacturing method
CN112359965A (en) Precast concrete assembled structure with rib mold structure and construction method thereof
JP4872301B2 (en) Construction method of RC structure
JPH10196027A (en) Deck panel for concrete form
JP2002227408A (en) Method for executing stair in building and rise directly used for its method
CN219908711U (en) Integrated steel bar mould-free cast-in-place concrete mould shell road guardrail
JPH0665973A (en) Constructing method of reinforced concrete structure such as foundation, wall, etc., and structure thereof
JPH084196A (en) Panel for building
KR101055361B1 (en) Deck construction deck of bridge deck
JP2008150820A (en) Wall concrete, and manufacturing method and construction method therefor
JPH05239810A (en) Constructing method for reinforced concrete arch bridge
KR0137465Y1 (en) Deck Girder of Reinforced Concrete Slab
JPS6046219B2 (en) Construction method of concrete retaining wall
JPH0881918A (en) Pipe and construction method thereof
JP2000356000A (en) Formwork unit construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040601

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060713

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060720

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060721

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090804

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100804

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110804

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110804

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120804

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120804

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130804

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees