JP3797858B2 - Vertical slide device and jack device of slide type mountain retaining system - Google Patents

Vertical slide device and jack device of slide type mountain retaining system Download PDF

Info

Publication number
JP3797858B2
JP3797858B2 JP2000269238A JP2000269238A JP3797858B2 JP 3797858 B2 JP3797858 B2 JP 3797858B2 JP 2000269238 A JP2000269238 A JP 2000269238A JP 2000269238 A JP2000269238 A JP 2000269238A JP 3797858 B2 JP3797858 B2 JP 3797858B2
Authority
JP
Japan
Prior art keywords
jack
support
slide
preload
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000269238A
Other languages
Japanese (ja)
Other versions
JP2002081068A (en
Inventor
俊平 田中
敬 高橋
栄生 大内
建 伊佐野
憲彦 岩田
行男 宇田
淳一 本橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2000269238A priority Critical patent/JP3797858B2/en
Publication of JP2002081068A publication Critical patent/JP2002081068A/en
Application granted granted Critical
Publication of JP3797858B2 publication Critical patent/JP3797858B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、建物地下を安全に構築するために必要な山留め工法による地下躯体構築工法に用いられるスライド式山留め支保工システムの上下スライド装置およびジャッキ装置に関するものである。
【0002】
【従来の技術】
建物地下を地盤中で安全に構築するための技術には、大きく分けて、建物地下の周りに山留め壁を構築してこの山留め壁を仮設の水平支保工で順次支えながら地盤に地下構築用の空間を作り、地下を最下部から構築する順打ち工法と、地下躯体を水平支保工として使用すべく最小限の空間を作りながら地下を上部階から下部階へと順次構築していく逆打ち工法とがある。これらの技術は、工事の条件に応じて、組み合わせて、あるいは単独で採用されている。
【0003】
【発明が解決しようとする課題】
順打ち工法は、地下躯体を地上の工事と同様の工程で構築するため、止水性等の地下の品質は高いが、地下構築用の全空間の確保が一時的に必要なため、大量の仮設材が必要となる。逆打ち工法は、地下階の構築に必要となる階高より大きめの空間を確保すればよいが、この階高よりも大きめの空間を仮設材を使用しないで確保するためには、順打ち工法に比べて山留め壁の規模が大きくなる。
【0004】
さらに、従来工法で山留め支保工としての機能を確保するには、掘削終了後に、順打ち工法では仮設水平支保工を架設してプレロードを導入したり、逆打ち工法では本体水平構造体が強度を発現することが必要であり、このために掘削終了後から1〜3週間程度の時間がかかっている。山留め壁に発生する変形と応力は、この期間に大きく増加している。
【0005】
このような問題点を解消すべく、本出願人は、地下構築時の支保工に地下本体構造の本設梁と可動の切梁支保工を利用することにより、従来の順打ち工法における大量の仮設材を無くすことができ、また可動の切梁支保工を迅速にスライドダウンさせ掘削底面近くに設置して山留め壁に発生する変形と応力を抑止することにより、山留め壁の規模を小さくすることができ、さらに支保工となる地下躯体の構築と地盤掘削を同時に進行させることも可能で工期短縮効果も期待できる地下躯体の構築工法を出願している(特願平9−203013)。
【0006】
本発明は、この地下躯体構築工法の実施に最適なスライド式山留め支保工システムに使用される上下スライド装置およびジャッキ装置であり、可動の切梁支保工と可動の本設梁を比較的簡易な装置で迅速にかつ安全にスライドダウンさせることができる上下スライド装置と、可動支保工のスライドダウンとプレロードの導入を比較的簡単な装置で迅速に行うことができるジャッキ装置を提供することにある。
【0007】
【課題を解決するための手段】
本発明の請求項1のスライド式山留め支保工システムの上下スライド装置は、、例えば図9〜図12に示すように、山留め壁内の掘削空間内に水平に配設された可動(上下スライド式)の切梁支保工と可動(上下スライド式)の本設梁をスライドダウンさせる上下スライド装置であり、1階床の本設梁に取付けられる昇降装置(電動チェーンブロック等)と、この昇降装置により昇降し、可動切梁支保工または可動本設梁に着脱可能に接続される把持装置とを備え、前記把持装置は、昇降装置から吊り下げられ可動本設梁が着脱可能に載置される水平取付部材と、この水平取付部材に開閉可能に設けられる一対のアームからなるチャックと、可動切梁支保工の切梁に設けられ前記アームの下部が着脱可能に接続される固定部材から構成されていることを特徴とする。
【0008】
本発明の請求項2のスライド式山留め支保工システムの上下スライド装置は、請求項1に記載の上下スライド装置において、例えば図9,図10に示すように、水平方向に間隔をおいて配設された一対の固定部材を連結する連結材と、この連結材の上面と可動の切梁の間に設けられる滑り支承とからなる水平スライド装置を有することを特徴とする。即ち、ジャッキ装置を挟んで配置される一対の上下スライド装置のうち、可動切梁支保工の中央部側に位置して部材が移動しない方の上下スライド装置を固定式とし、腹起し側に位置して切梁が移動する方の上下スライド装置を水平スライド式とする。
【0009】
本発明の請求項3のスライド式山留め支保工シテステムのジャッキ装置は、山留め壁内の掘削空間内を水平にスライドダウンして山留め壁を支える可動切梁支保工に組み込まれるジャッキ装置であり、例えば図3に示すように、可動切梁支保工の腹起しを山留め壁に対して進退移動させるストロークジャッキ(油圧シリンダなど)と、山留め壁にプレロードを導入するプレロードジャッキ(油圧ジャッキなど)を直列に接続して構成され、前記ストロークジャッキは、外筒と、この外筒内に移動自在に収納される内筒と、これら外筒および内筒に内蔵され、両端部がそれぞれ外筒と内筒の端部プレートに接続される油圧シリンダと、前記内筒に螺合し外筒と内筒を固定するロックナットを備えていることを特徴とする。切梁支保工は、例えば、平面視で、中央部に位置する縦横の切梁からなる中央ブロックと、外周部における4辺位置に配置される腹起し火打ちブロック(腹起し・切梁・火打ち梁)から構成され、中央ブロックとX方向・Y方向の腹起し火打ちブロックとをX方向とY方向のジャッキ装置で連結する。
【0011】
本発明の請求項4のスライド式山留め支保工のジャッキ装置は、請求項3に記載のジャッキ装置において、プレロードジャッキは、例えば図3に示すように、そのロッドに螺合し、このロッドと本体を固定するロックナットを備えていることを特徴とする。
【0012】
以上のような構成において、山留め壁内の掘削空間の上部が地下本体構造の本設梁と床で支えられ、掘削空間の下部が切梁支保工で支えられている状態から、ジャッキ装置により切梁支保工のプレロードの解放と腹起しの引き込みを行い、上下スライド装置により切梁支保工をスライドダウンさせる。切梁支保工が掘削底面近くの所定の位置にスライドダウンすると、ジャッキ装置により腹起しの押し出しとプレロードの導入を行う。これにより、山留め壁の変形が小さい時に切梁支保工を迅速にスライドダウンさせて掘削底面近くに支保工を架けることができる。
【0013】
地下本体構造の本設梁と可動の切梁支保工を使用して掘削後の山留め壁を支えるため、従来の順打ち工法における大量の仮設材を無くし、仮設材料を最小限の量とすることができる。また、可動の切梁支保工を迅速にスライドダウンさせて掘削底面近くに設置し、掘削終了後の状態で放置する時間もわずかで直ちに山留め支保工の機能が確保できるため、掘削時の主働土圧に対する反力としての掘削側の地盤が負担していた受働土圧によるレオロジカルな変形挙動を抑えること、および土質工学的に確認されている支保工位置に主働土圧を集中させる再配分効果を早期に発揮させて掘削側の地盤が負担していた受働土圧を軽減して、山留め壁に発生する変形・応力を効果的に低減する効果を容易に利用でき、山留め壁の規模を小さくすることができる。さらに、掘削が終了すると、直ちに支保工としての本設梁をスライドダウンさせて床を構築することができるため、支保工となる地下躯体の構築と地盤掘削を同時に進行させることが可能となり、工期の短縮を図ることができる。
【0014】
上下スライド装置は、昇降装置と把持装置から構成されているため、比較的簡易な装置により、切梁支保工を迅速にかつ安全にスライドダウンさせることができる。
【0015】
切梁支保工の進退移動する腹起し火打ちブロック部分に配置される一対の上下スライド装置に水平スライド装置を設けて進退移動を吸収することにより、切梁支保工を進退移動する部分でも吊り下げることができ、切梁支保工を安全にスライドダウンさせることができる。
【0016】
切梁支保工の切梁と腹起しがジャッキ装置により一体的に組み立てられているため、また、ジャッキ装置は大きなストロークのストロークジャッキとプレロードジャッキからなるため、ジャッキ装置で腹起しを押し引きするだけの簡単で迅速な作業により、切梁支保工をスライドダウンさせ、切梁支保工を所定位置に設置してプレロードを導入することができ、山留め壁を掘削底面近くで早期に支えて山留め壁に発生する変形と応力を抑止することができ、山留め壁の規模をより小さくすることができ、さらに、支保工作業を迅速に行うことができ、工期の短縮を図ることができる。
【0017】
ストロークジャッキは、テレスコープ式の外筒と内筒の内部に油圧シリンダを収納し、内筒に螺合するロックナットで外筒と内筒を固定する構造としているため、油圧シリンダにより大きなストロークが得られると共に、ロックナットで固定することで、簡単にプレロードを導入することができる。また、プレロードジャッキもロックナットで簡単に固定することができる。
【0018】
【発明の実施の形態】
以下、本発明を図示する一実施形態に基づいて説明する。この実施形態は地下3階の建物の地下躯体構築に本発明の上下スライド装置およびジャッキ装置を備えたスライド式山留め支保工システムを適用した例である。図1〜図12は、本発明の上下スライド装置およびジャッキ装置を備えたスライド式山留め支保工システムの1例を示したものである。図13〜図16は、スライド式山留め支保工システムによる地下躯体構築工法の1例を工程順に示したものである。
【0019】
本発明の上下スライド装置およびジャッキ装置を備えたスライド式山留め支保工システムによる地下躯体構築工法においては、図1〜図12に示すように、主に、山留め壁Wの変形が小さい時に迅速にスライドダウンさせて山留め壁Wを掘削底面近くで早期に支える可動の切梁支保工1(図1)と、山留め壁Wの上部の支保工として利用する1Fの本設梁2およびB1F・B2Fの可動の本設梁3−1,3−2(図6)と、切梁支保工1と地下階の本設梁3−1,3−2をスライドダウンさせる本発明に係る上下スライド装置4(図9〜図12)と、地下階の本設梁3−1,3−2を吊り支持する吊り支持装置5(図7,図8)を使用する。
【0020】
切梁支保工1には、図1に示すように、本発明に係るジャッキシステム6と、コーナー火打ち切梁架設装置7が組み込まれており、このような切梁支保工1と上下スライド装置4等を組み合わせることで、スライド式山留め支保工システムが構成される。
【0021】
切梁支保工1は、例えば図1の平面図に示すものを使用することができる。この切梁支保工1は、地下躯体に対応した例えば平面視長方形状であり、縦横に組まれた切梁10と、長方形の4辺位置に配設される4つの腹起し11と、火打ち梁12と、切梁同士を接合する接合ブロック13などから構成されている。中央に位置する切梁10と接合ブロック13からなる長方形状のメインブロックの接合ブロック部分にX方向とY方向のジャッキシステム6を介して腹起し火打ちブロックを接続し、ジャッキシステム6(後述)を作動させることで、4辺の腹起し11がそれぞれ山留め壁Wに対して進退移動するように構成されている。
【0022】
このような切梁支保工1において、X方向とY方向の腹起し11,11の端部同士の間には空間が設けられ、4辺の腹起し11がそれぞれ進退移動できるように構成されているため、切梁支保工1の4つの隅角部には、後に詳述するコーナー火打ち切梁架設装置7とコーナー腹起し8が配設される。また、上下スライド装置4の下部が、図1のa部分(長円形で示す)に接続される。なお、この切梁支保工1の切梁10およびコーナー火打ち切梁架設装置7は、後述する図6の本設梁の大梁と小梁にそれぞれ対応させて配置している。
【0023】
接合ブロック13は、図2に示すように、上下2枚の接合プレート13a,13aを縦リブ13b等で一体化した構造であり、その4つの接合端部にそれぞれ切梁10あるいはジャッキシステム6の端部が接合される。また、接合プレート13aの中央部には、スライドガイド兼用仮支柱(以下、単に仮支柱と記載)Pが余裕をもって挿通可能な挿通孔13cが形成されており、切梁支保工1を多数の仮支柱Pに沿ってスライドダウンさせることができる。
【0024】
所定の位置にスライドダウンした切梁支保工1は、ジャッキシステム6による腹起しの押し出し・プレロード導入により山留め壁Wに固定されるが、仮支柱Pに対しても、例えば図2(b) に示すような楔部材14を接合ブロック13と仮支柱Pの隙間に上方から打ち込むことにより、固定する。この楔部材14を用いれば、切梁支保工1の中央部を仮支柱Pに簡単に固定することができると共に、切梁支保工1をスライドダウンさせる場合にも、簡単に固定を解除することができる。なお、接合ブロック13は、切梁等の組立を容易に行えるように、4分割し、各分割体を継手板を介してボルト接合できる構造としている。
【0025】
ジャッキシステム6は、例えば図3に示すものを用いることができる。このジャッキシステム6は、ストロークジャッキ20とプレロードジャッキ21を直列に接続して構成されている。ストロークジャッキ20の先端部プレート20bとプレロードジャッキ21の基端部プレート21aがライナー22を介してボルト接合され一体化する。ストロークジャッキ20の基端部プレート20aが接合ブロック13にボルトで着脱可能に接合され、プレロードジャッキ21の先端部プレート21bが腹起し火打ちブロックの切梁10にボルトで着脱可能に接合される(図1参照)。
【0026】
ストロークジャッキ20は、切梁支保工1をスライドダウンできるように、その4辺の腹起し11を大きく押し引きさせる装置であり、プレート20aに固定された外筒23aとプレート20bに固定された外筒23bからなるテレスコープ式伸縮装置23と、この伸縮装置23の内部に配設されシリンダ基端部・ピストンロッド先端部がそれぞれ端部プレート20a,20bに軸着された油圧シリンダ24から構成され、比較的大きなストロークS1 が得られるようにされている。また、内筒23aの外面に全長にわたって形成された雄ねじ25と、この雄ねじ25に螺合するロックナット26により、ストロークジャッキ20を固定できるようにされている。
【0027】
プレロードジャッキ21は山留め壁Wにプレロードを導入する比較的小さなストロークS2 の油圧ジャッキである。このジャッキ21も、プランジャロッド21cの外面に全長にわたって形成された雄ねじ25と、この雄ねじ25に螺合するロックナット26により、固定できるようにされている。
【0028】
切梁支保工1をスライドダウンさせる際には、ストロークジャッキ20を収縮させることで、各辺の腹起し11を大きく引き込み、切梁支保工1の平面形状を縮小させてスライドダウンさせる。所定位置に達すると、ストロークジャッキ20を伸出させ、ロックナット26を外筒23aに対して締め込むことで、ストロークジャッキ20を固定した後、プレロードジャッキ21を伸出させて山留め壁Wにプレロードを導入する。その後、ロックナット26によりプレロードジャッキ21を固定する。
【0029】
従来の切梁支保工(順打ち工法)の場合、掘削後に位置出しをし、保持金物を取付け、腹起しを組み立て、切梁を組み立て、プレロードを導入するという、面倒で時間のかかる作業となっていたが、本発明の切梁支保工1は、切梁10と腹起し11がジャッキ装置6を介して一体的に組み立てられているため、また、ジャッキ装置6は大きなストロークのストロークジャッキ20とプレロードジャッキ21からなるため、ジャッキ装置6で腹起し11を押し引きするだけの簡単で迅速な作業により、切梁支保工1をスライドダウンさせ、切梁支保工1を所定位置に設置してプレロードを導入することができ、支保工作業を迅速に行うことができ、工期の短縮を図ることができる。また、山留め壁Wを掘削底面近くで早期に支えて山留め壁に発生する変形と応力を抑止することができるため、山留め壁Wの規模をより小さくすることができる。
【0030】
コーナー火打ち切梁架設装置7は、例えば図4に示すものを用いることができる。このコーナー火打ち切梁架設装置7は、切梁支保工1の隅角部において、X方向とY方向の腹起し11の進退移動に追随できるようにこれら腹起し11,11同士を連結し、かつ、前述のジャッキシステム6と共にプレロードを導入できるように構成され、主に、テレスコープ式伸縮部材30と、プレロードジャッキ31からなる。
【0031】
テレスコープ式伸縮部材30は、ジャッキシステム6のテレスコープ式伸縮装置23から油圧シリンダを取り除いた構造であり、外筒30a内を内筒30bが進退移動することにより、自由に伸縮することができる。プレロードジャッキ31には、ジャッキシステム6のプレロードジャッキ21と同様のものを用いることができる。
【0032】
テレスコープ式伸縮部材30とプレロードジャッキ31は、端部プレート同士をボルトで接合して一体化する。テレスコープ式伸縮部材30の基端部プレートと腹起し11の側面とをピンヒンジ32・ライナー33を介して接続する。プレロードジャッキ31の先端部と腹起し11の側面もピンヒンジ32・ライナー33を介して接続する。ピンヒンジ32は、一対のヒンジ部材を垂直ピン32aで連結した構造であり、腹起し11の進退移動に伴うテレスコープ式伸縮部材30の水平方向の角度変化を吸収することができる。
【0033】
このようなコーナー火打ち切梁架設装置7は、切梁支保工1をスライドダウンさせるために切梁支保工1の平面形状を縮小させると、テレスコープ式伸縮部材30が収縮し、所定の位置にスライドダウンして切梁支保工1の平面形状が拡大すると、テレスコープ式伸縮部材30が伸出し、腹起し11の進退移動に追随しつつX方向とY方向の腹起し11,11同士を連結することができる。
【0034】
プレロードに際しては、テレスコープ式伸縮部材30の内筒30bの雄ねじ34に螺合したロックナット35を外筒30aに対して締め込むことで、テレスコープ式伸縮部材30を固定した後、プレロードジャッキ31を伸出させて山留め壁Wにプレロードを導入する。その後、プレロードジャッキ31の雄ねじ34に螺合したロックナット35によりプレロードジャッキ31を固定する。
【0035】
図5は、コーナー火打ち切梁架設装置7において、ピンヒンジ32の代わりに球面ヒンジ(ボールヒンジ)36を用いた例である。この場合には、球面ヒンジ36を傾斜取付面を有する取付ピース37を介して腹起し11に取付ける。取付ピース37は隅部ピース38で補強する。
【0036】
以上のようなコーナー火打ち切梁架設装置7を切梁支保工1の4つの隅角部に設けることにより、山留め壁Wの隅角部でX方向とY方向にそれぞれ進退移動する腹起し11,11同士を一体化することができ、さらに、プレロードジャッキ31により山留め壁Wの隅角部にもプレロードを導入することができる。また、テレスコープ式伸縮部材31およびヒンジ30,36により切梁支保工1の拡縮動作に追随できるため、コーナー火打ち切梁架設装置7を切梁支保工1から取り外す必要がなく、切梁支保工1をスライドダウンさせた後、直ちに腹起し11の押し出し・プレロードの導入を行うことができる。
【0037】
コーナー腹起し8は、例えば図4に示すものを用いることができる。このコーナー腹起し8は、腹起し11などと同じ厚みの版状の部材であり、コーナー用腹起しブロック8aと、一対の楔部材8bと、楔押え部材8cなどからなる。
【0038】
先ず、切梁支保工1をスライドダウンさせる前に、コーナー用腹起しブロック8aを切梁支保工1を設置する所定の位置までチェーンブロック等の上下移動装置で吊り下ろし、山留め壁Wの隅角部にボルトで固定する。次いで、平面形状を縮小した切梁支保工1が設置位置にスライドダウンし、腹起し11が押し出しとプレロード導入により山留め壁Wにセットされると、コーナー用腹起しブロック8aと腹起し11の端部との間の隙間に楔部材8bを内側から挿入し、次いで楔押え部材8cをボルト・ナット8dによりコーナー用腹起しブロック8aに固定し、楔部材8bが抜け出ないようにする。
【0039】
以上のようなコーナー腹起し8により切梁支保工1の4つの隅角部が一体的に連結され、完全な形の山留め支保工を形成することができる。
【0040】
以上のような構成の切梁支保工1・ジャッキシステム6・コーナー火打ち切梁架設装置7・コーナー腹起し8を用いて、次のような手順で切梁支保工1のスライドダウンを行う。
【0041】
(i) 後述の上下スライド装置6で支持されている切梁支保工1をスライドダウンさせるに当り、切梁支保工1の上方の山留め壁が本設梁と床で支えられていることを確認した後、ジャッキシステム6とコーナー火打ち切梁架設装置7のプレロードジャッキ21,31によりX方向・Y方向のプレロードを解放後、コーナー用腹起し楔部材8bを押え部材8cのボルト・ナット8dを弛めることで腹起し11から切り離し、ジャッキシステム6のストロークジャッキ20でX方向・Y方向の腹起し11を順次あるいは同時に引き込み、切梁支保工1の平面形状を縮小する。この際、コーナー火打ち切梁架設装置7と腹起し11のジョイント部分は回動可能な機構となっているため、切梁支保工1の縮小動作に追随することができる。
【0042】
(ii)コーナー用腹起しブロック8aを上下移動装置により下降させ、切梁支保工1の設置位置における山留め壁Wの隅角部に固定する。
【0043】
(iii) 平面形状が縮小した切梁支保工1を上下スライド装置4により設置位置までスライドダウンさせる。
【0044】
(iv)切梁支保工1の腹起し側の切梁10は、上下スライド装置4の下部に設けられた水平スライド装置(後述)により移動自在に支持されており、ジャッキシステム6のストロークジャッキ20でX方向・Y方向の腹起し11を押し出し、次いで、ストロークジャッキ20にロックを掛けた後、プレロードジャッキ21で一定のプレロードを導入しておく(最終的な所定のプレロード導入前のプレロード)。
【0045】
(v) コーナー火打ち切梁架設装置7は上下スライド装置4により吊り下げられており、また後述する水平スライド装置により移動自在に支持されており、腹起し11のX方向・Y方向の移動に追随してテレスコープ式伸縮部材30が伸長する。この状態から、テレスコープ式伸縮部材30にロックを掛けた後、プレロードジャッキ31を押し出し(最終的な所定のプレロード導入前のプレロード)、切梁支保工1の平面形状を整える。
【0046】
(vi)切梁支保工1におけるジャッキシステム6のプレロードジャッキ21により最終的なX方向・Y方向の所定のプレロードを導入する。その後、コーナー火打ち切梁架設装置7のプレロードジャッキ31により最終的なコーナー部の所定のプレロードを導入する。
【0047】
(vii) 最後に、楔部材8bを挿入し、コーナー用腹起しブロック8aに固定し、4辺の腹起し11をコーナー腹起し8を介して一体化する。以上により、所定の位置にスライドダウンした切梁支保工1が山留め壁Wに対して支保工として機能する。コーナー火打ち切梁架設装置7は切梁支保工1から取り外す必要がなく、切梁支保工1のスライドダウン後、直ちに切梁支保工を架ける作業に入ることができる。
【0048】
1F・B1F・B2Fの本設梁2,3−1,3−2は、例えば図6の平面図に示すものを用いることができる(図示例はB1F・B2F)。これら本設梁は、切梁支保工1と同様に例えば平面視長方形状であり、縦横に組まれた大梁40と、コーナー部に配設される斜めの小梁41と、中央部で大梁同士を接合する接合プレート42と、外周部の4辺で大梁同士を接合する接合プレート43などから構成されている。なお、大梁40および小梁41は、それぞれ図1の切梁11,コーナー火打ち切梁架設装置7と同じ位置に配置されている。
【0049】
地下階B1F・B2Fの本設梁3−1,3−2は、後述する上下スライド装置4により所定の設置位置へスライドダウンされる。上下スライド装置4は、図6の長円形で示すa部分(切梁支保工1との共用)とb部分(本設梁専用)に接続される。
【0050】
中央部の接合プレート42は、図7に示すように、大梁40の接合端部を上下から挟むように一対で配設され、大梁40の上下フランジが添接されてボルトで接合される。また、接合プレート42の中央部には、仮支柱Pが余裕をもって挿通可能な挿通孔42aが形成されており、地下階の本設梁3−1,3−1を多数の仮支柱Pに沿ってスライドダウンさせることができる。外周部の接合プレート43も、図6に示すように、中央部の接合プレート42と同様の構成である。但し、この接合プレート43部分には仮支柱Pはなく、柱用の貫通孔43aが形成されている。
【0051】
吊り支持装置5は、前述のような構成の地下階の本設梁3−1,3−2を所定位置に吊り下げ固定する装置であり、図7に示すように、柱のねじふし鉄筋50(吊りロッド)を用いることができる。このねじふし鉄筋50は、仮支柱Pを取り囲むように中央部の接合プレート42を貫通して配設され、カップラーで下方へ継ぎ足すことで、最終的には基礎スラブまで一体的に伸ばされ、RC柱またはSRC柱Cの鉄筋の一部として利用される。外周部の接合プレート43にも、同様にねじふし鉄筋50が配設される。
【0052】
このねじふし鉄筋50を利用した吊り支持装置5の上部は、図8に示すように、1Fの本設梁2に固定する。即ち、本設梁2の上部接合プレート42(43)の上に、一対のチャンネル材からなるかんざし部材51を配置し、このかんざし部材51の隙間にねじふし鉄筋50の上部を挿通し、ナット52で固定する。ナット52は、例えば図8(c) に示すように、横方向に二つ割りとし、分割体52a,52bをボルト52cで締結する構造とすれば、横方向から容易に固定を行うことができる。図7(b) に示すように、地下階B1F・B2Fの本設梁3−1,3−2も、上下に取付けたナット52でねじふし鉄筋50に固定する。図13の(2)に示すように、B2Fの本設梁3−2のみをねじふし鉄筋50に固定し、このB2Fの本設梁3−2の上に台を介して地下階B1Fの本設梁3−1を載せるようにしてもよい。
【0053】
なお、図7に示す柱C内に配筋されるねじふし鉄筋50のうちの何本かを吊り支持装置5の吊りロッドとして使用する。例えば、図8(a) に示すように、コーナー部における2本の一対として合計8本のねじふし鉄筋50を吊りロッドとして利用する。
【0054】
以上のような吊り支持装置5は、吊りロッド50とかんざし部材51とナット52で構成することができ、比較的簡易な装置により、地下階の本設梁3−1,3−2を吊り下げ支持しておくことができる。また、この吊りロッド50をねじふし鉄筋として地下階の柱の鉄筋の1部として利用することにより、装置コストの低減および作業の迅速化を図ることができる。
【0055】
上下スライド装置4は、切梁支保工1を把持してスライドダウンさせ、かつ地下階B1F・B2Fの本設梁3−1,3−2を積載してスライドダウンさせる装置であり、例えば図9〜図12に示すものを用いることができる。この上下スライド装置4は、図9に示すように、大きく分けて、昇降装置60と、把持装置61から構成されている。
【0056】
昇降装置60は、図9に示すように、電動チェーンブロック62と、チェーン63とからなる。電動チェーンブロック62は、1Fの本設梁2の大梁40(コーナー部では小梁41)の上に束部材64を介して設置された水平吊り材65の一端部にフック等により吊り下げ固定されている。この電動チェーンブロック62から繰り出されたチェーン63が把持装置61の滑車66に巻き掛けられた後、先端部が水平吊り材65の他端部に固定される。従って、電動チェーンブロック62によりチェーン63を巻き上げ、繰り出しすることで、把持装置61を昇降させることができる。
【0057】
把持装置61は、切梁支保工1の切梁10を把持し、かつ本設梁3−1,3−2を積載する部材であり、例えば図9,図10に示すように、水平方向に開閉可能な一対のアーム70aからなるチャック70と、切梁10の下部フランジに取り付けられる固定部材71と、チャック70の水平取付部材72の上に設置される載置板73などからなる。
【0058】
図10に示すように、チャック70の一対のアーム70aの上端部が水平取付部材72の両端部に軸74を介して水平方向に回転可能に取付けられている。前記軸74には、チェーン63の滑車66が回転自在に取付けられている。このようなチャック70の左右一対のアーム70a,70aの下端部がそれぞれ左右一対の固定部材71,71の下部に固定ピン75により着脱可能に取付けられる。なお、軸74にはチャック70のアームを外方に押圧する捩じりコイルバネ76が装着されており、チャック70は開状態を保持できるようにされている。
【0059】
ここで、図9に示すように、切梁支保工1の外周側における腹起し火打ちブロックはジャッキシステム6により進退移動し、その移動する切梁10に上下スライド装置4の固定部材71を固定しておくと、装置が損壊するため、この腹起し火打ちブロックに配設される一対の上下スライド装置4,4は、水平スライド装置80により連結し、切梁10を進退移動可能に案内支持する。
【0060】
この水平スライド装置80は、連結材81と滑り支承82から構成する。連結材81は、図9に示すように、ジャッキシステム6と切梁10の下に配設し、その仮支柱P側の端部を接合ブロック13の下部プレートに固定し、一対の上下スライド装置4,4の固定部材71,71をそれぞれ連結材81の両端部における側面に固定する。滑り支承82は、腹起し側の上下スライド装置4位置において連結材81の上面に固定し、この滑り支承82で腹起し側の切梁10を進退移動可能に支持する。
【0061】
図10(a) は、滑り支承82が位置する腹起し側の上下スライド装置4の詳細であり、連結材81の上にプレート83を固定し、このプレート83上に滑り支承82をねじ止めで固定する。固定部材71には、上部フック71aを有するものを用い、これを連結材81に左右両側から取付け、ボルト・ナット84で固定し、上部フック71aにより切梁10の下部フランジを移動自在に案内支持するようにしている。
【0062】
なお、図9に示すように、仮支柱側の上下スライド装置4の固定部材71には上部フックのないものを用い、これを連結材81の両側面に固定する。さらに、仮支柱Pの内側の本設梁専用b部分(図6参照)に配置される上下スライド装置4は本設梁を載置すればよいため、その固定部材71は切梁10の下面に固定されなくてもよい。
【0063】
図11は、コーナー部におけるコーナー火打ち切梁架設装置7(小梁41)接続される上下スライド装置4の例であり、この場合も、前述と同様の理由で、水平スライド装置90を用いる。この水平スライド装置90には、対向配置した一対のチャンネル材からなるガイドレールを兼ねる連結材91と、この連結材91内を転動するガイドローラ92を用いる。
【0064】
上下スライド装置4は、切梁10に配置されるものと同じであるが、固定部材71を連結材91に固定し、左右一対の上下スライド装置4,4を連結一体化する。ガイドローラ92は、テレスコープ式伸縮部材30とプレロードジャッキ31のライナー33の下部にそれぞれ設け、腹起し11の進退移動に伴いテレスコープ式伸縮部材30とプレロードジャッキ31がそれぞれ進退移動できるように案内支持する。
【0065】
以上のような構成の上下スライド装置4において、図12に示すように、次のような手順で切梁支保工1および本設梁3−1,3−2のスライドダウンを行う。
【0066】
(i) 図9に示す状態で下部空間が掘削されると、図12(i) に示すように、多数の上下スライド装置4の電動チェーンブロック62を同期して作動させ、切梁支保工1を掘削底面近くまでスライドダウンさせる。
【0067】
(ii)切梁支保工1がそのジャッキシステム6の作動で山留め支保工として機能していることを確認した後、図12(ii)に示すように、固定ピン75を抜き、チャック70を開いて固定部材71から離脱させる。次いで、電動チェーンブロック62でチャック70を上昇させ、チャック上面の載置板73に当接したB2Fの本設梁3−2を載置板73にボルトで固定する。本設梁3−2を吊り支持しているロッド(ねじふし鉄筋)を外しチャック70に預ける。B1Fの本設梁3−1は、B2Fの本設梁3−2の上に台を介して載せられている。
【0068】
(iii) 多数の上下スライド装置4の電動チェーンブロック62を同期して作動させ、図12(iii) に示すように、チャック70の背中に載せられた本設梁3−1,3−2をスライドダウンさせ、本設梁3−1が地下1階に位置するようにする。本設梁3−1,3−2をロッドにより吊り下げ固定する。チャック70は開いた状態で切梁支保工1の上方に位置している。
【0069】
(iv)本設梁3−1,3−2の吊り下げ固定されていることを確認後、チャック70と本設梁3−2の固定を外して分離し、図12(iv)に示すように、電動チェーンブロック62でチャック70を若干下降させ、チャック70を閉じ、そのアーム先端を固定ピン75で切梁支保工1の固定部材71に固定する。次いで、前記工程を繰り返し、切梁支保工1をスライドダウンさせ、本設梁3−2を地下2階にスライドダウンさせる。
【0070】
以上のような上下スライド装置4は、電動チェーンブロック等の昇降装置60と、チャックや載置板等を有する把持装置61から構成されているため、比較的簡易な装置により、切梁支保工1と地下階の本設梁3−1,3−2の両方を迅速にかつ安全にスライドダウンさせることができる。さらに、切梁支保工1の進退移動する腹起し火打ちブロック部分とコーナー火打ち部分に配置される一対の上下スライド装置4に水平スライド装置80,90を設けて進退移動を吸収することにより、切梁支保工1を進退移動する部分でも吊り下げることができ、切梁支保工1を安全にスライドダウンさせることができる。
【0071】
以上のような各種の装置を使用して、地下躯体の構築を行う1例について工程順に説明する(図13〜図16参照)。
[A]スライド施工開始まで
(a-1) 図13の(1)に示すように、建物を構築すべき地盤中に打設した基礎杭の上に仮支柱Pを建て込み、その周囲に山留め壁(ソイルモルタル柱列壁)Wを施工する。
【0072】
(a-2) 山留め壁施工後、図13の(1)に示すように、山留め壁W内を所定の深さまで1次掘削する。必要に応じて、掘削底面に土間コンクリートを打設する。
【0073】
(a-3) 図13の(2)に示すように、1次掘削空間内の掘削底面近くに切梁支保工1を組み立て、ジャッキシステム6とコーナー火打ち切梁架設装置7により腹起しの押し出し・プレロードの導入を行う。
【0074】
(a-4) 図13の(2)に示すように、切梁支保工1の上に、B2Fの本設梁3−2を配設し、デッキプレートを敷き、床の配筋を行い、B2Fの床構造を仮組しておく。次に、このB2Fの本設梁3−2の上に、B1Fの本設梁3−1を配設し、デッキプレートを敷き、床の配筋を行い、B1Fの床構造を仮組しておく。
【0075】
(a-5) 図13の(2)に示すように、1Fの本設梁2を配設し、デッキプレートを敷き、床の配筋を行い、コンクリートを打設して、1Fの床を構築する。なお、この1Fの床はプレキャスト部材を利用することも可能である。
【0076】
(a-6) 図13の(2)に示すように、1Fの本設梁2が架設された状態で、この本設梁2に上下スライド装置4および吊りロッド50の上部を取付け、上下スライド装置4の下部を切梁支保工1の切梁10に接続し、吊りロッド50でB2Fの本設梁3−2を1Fの本設梁2から吊り下げ固定しておく。B1Fの本設梁3−1はB2Fの本設梁3−2の上に台を介して載せ固定しておく。
【0077】
[B]スライド施工(逆打ち工法)
(b-1) 図13の(3)に示すように、山留め壁Wの上部が切梁支保工1および1Fの本設梁2で支持されている状態で、所定の深さまで2次掘削を行う。この2次掘削と1Fの床構築は同時に行うことができる。
【0078】
(b-2) 2次掘削が終了すると、図13の(3)に示すように、1Fの床が支保工として機能できることを確認後、ジャッキシステム6・7により切梁支保工1のプレロードの開放・腹起しの引き込みを行う。その後、上下スライド装置4により切梁支保工1を所定の位置までスライドダウンさせる。
【0079】
(b-3) 図13の(4)に示すように、切梁支保工1が掘削底面近くに位置すると、ジャッキシステム6・7により腹起しの押し出し・プレロードの導入を行う。
【0080】
(b-4) 図13の(4)に示すように、上下スライド装置4を切梁支保工1からB2Fの本設梁3−2へ盛替えた後、B2Fの本設梁3−2と吊りロッド50の固定を解除する。
【0081】
(b-5) 図14の(5)に示すように、上下スライド装置4によりB1F・B2Fの本設梁3−1,3−2をスライドダウンさせ、B1Fの本設梁3−1を地下1階位置に位置させる。
【0082】
(b-6) 図14の(5)に示すように、前述のAの工程で使用した吊りロッド50の下部にカプラーで吊りロッドを継ぎ足し、この吊りロッド50でB2Fの本設梁3−2を吊り下げ固定する。B1Fの本設梁3−1は新規に設けた吊りロッド50で吊り下げ固定する。
【0083】
(b-7) 図14の(5)に示すように、上下スライド装置4をB2Fの本設梁3−2から切梁支保工1に盛替える。
【0084】
(b-8) 図14の(5)に示すように、B1Fの外周梁部の配筋を行い、この外周梁部と床(デッキプレートと配筋がなされている)にコンクリートを打設し、B1Fの床を構築する。なお、上下スライド装置4によりB2Fの本設梁3−2を吊った状態でB1Fの床を構築する場合もある。
【0085】
(b-9) 図14の(5)に示すように、B1Fのコンクリートを打設すると共に、3次掘削を開始する。
【0086】
(b-10)図14の(5)に示すように、3次掘削が終了すると、B1Fの床が支保工として機能できることを確認後、ジャッキシステム6・7により切梁支保工1のプレロードの開放・腹起しの引き込みを行う。
【0087】
(b-11)その後、図14の(6)に示すように、上下スライド装置4により切梁支保工1を所定の位置までスライドダウンさせ、ジャッキシステム6・7により腹起しの押し出し・プレロードの導入を行う。
【0088】
(b-12)図14の(6)に示すように、上下スライド装置4を切梁支保工1からB2Fの本設梁3−2へ盛替えた後、B2Fの本設梁3−2と吊りロッド50の固定を解除する。
【0089】
(b-13)図15の(7)に示すように、上下スライド装置4によりB2Fの本設梁3−2をスライドダウンさせ、B2Fの本設梁3−2を地下2階位置に位置させる。
【0090】
(b-14)図15の(7)に示すように、前工程でB2Fの本設梁3−2を吊っていた吊りロッド50の下部にカプラーで吊りロッドを継ぎ足し、この吊りロッド50でB2Fの本設梁3−2を吊り下げ固定する。
【0091】
(b-15)図15の(7)に示すように、上下スライド装置4をB2Fの本設梁3−2から切梁支保工1に盛替える。
【0092】
(b-16)図15の(7)に示すように、B2Fの外周梁部の配筋を行い、この外周梁部と床(デッキプレートと配筋がなされている)にコンクリートを打設し、B2Fの床を構築する。なお、上下スライド装置4によりB2Fの本設梁3−2を吊った状態でB2Fの床を構築する場合もある。
【0093】
(b-17)図15の(7)に示すように、B2Fのコンクリートを打設すると共に、4次掘削を開始する。
【0094】
(b-18)4次掘削が終了すると、図15の(7)に示すように、B2Fの床が支保工として機能できることを確認後、ジャッキシステム6・7により切梁支保工1のプレロードの開放・腹起しの引き込みを行う。
【0095】
(b-19)その後、図15の(8)に示すように、上下スライド装置4により切梁支保工1を所定の位置までスライドダウンさせ、ジャッキシステム6・7により腹起しの押し出し・プレロードの導入を行う。
【0096】
(b-20)次に、図16の(9)に示すように、5次掘削を行う。
【0097】
[C]順打ち工法に準じた地下躯体構築
(c-1) 図16の(9)に示す状態から、基礎スラブとB3Fの床(RC造)を構築する。
【0098】
(c-2) 基礎スラブとB3Fの床(RC造)が支保工として機能できることを確認後、切梁支保工1を解体撤去する。
【0099】
(c-3) B3Fの立ち上がり壁・柱を構築する。
(c-4) B2Fの立ち上がり壁・柱を構築する。
【0100】
(c-5) B1Fの立ち上がり壁・柱を構築する。
前記柱には、吊りロッド(ねじふし鉄筋)50が鉄筋の一部として利用される。以上により、地下躯体の構築が終了する。
【0101】
なお、基礎スラブに関して、大きな土圧に抵抗させるために、切梁支保工を基礎スラブ位置に架けたり、基礎スラブ間近に架ける場合には、基礎スラブの構築が困難となるが、この場合には、基礎スラブの2段打ちで対処する。また、切梁支保工1は、ジャッキシステム6やコーナー火打ち切梁架設装置7等を梁部材に置き換え、B3Fの本設梁として利用することも可能である。
【0102】
また、図17は、コーナー腹起しの別の例であり、平面視四角形の補助ピース100と2台のジャッキ101を用い、一方の腹起し11の端部にジャッキ101を取付けておき、腹起し11の張出し後に補助ピース100とジャッキ101をセットする。
【0103】
【発明の効果】
本発明のスライド式山留め支保工システムの上下スライド装置およびジャッキ装置は、以上のような構成からなるので、次のような効果を得ることができる。
【0104】
(1) 上下スライド装置は、昇降装置と把持装置により構成されているため、比較的簡易な切梁支保工を迅速にかつ安全にスライドダウンさせることができる。
【0105】
(2) 切梁支保工の進退移動する腹起し火打ちブロック部分に配置される一対の上下スライド装置に水平スライド装置を設けて進退移動を吸収することにより、切梁支保工を進退移動する部分でも吊り下げることができ、切梁支保工を安全にスライドダウンさせることができる。
【0106】
(3) 切梁支保工の切梁と腹起しがジャッキ装置により一体的に組み立てられているため、また、ジャッキ装置は大きなストロークのストロークジャッキとプレロードジャッキからなるため、ジャッキ装置で腹起しを押し引きするだけの簡単で迅速な作業により、切梁支保工をスライドダウンさせ、切梁支保工を所定位置に設置してプレロードを導入することができ、山留め壁を掘削底面近くで早期に支えて山留め壁に発生する変形と応力を抑止することができ、山留め壁の規模をより小さくすることができ、さらに、支保工作業を迅速に行うことができ、工期の短縮を図ることができる。
【0107】
(4) ジャッキ装置のストロークジャッキは、テレスコープ式の外筒と内筒の内部に油圧シリンダを収納し、内筒に螺合するロックナットで外筒と内筒を固定する構造としているため、油圧シリンダにより大きなストロークが得られると共に、ロックナットで固定することで、簡単にプレロードを導入することができる。また、プレロードジャッキもロックナットで簡単に固定することができる。
【図面の簡単な説明】
【図1】本発明のスライド式山留め支保工システムに用いる切梁支保工の1例を示す平面図である。
【図2】図1の切梁支保工の接合ブロックの1例であり、(a) は平面図、(b) は斜視図である。
【図3】図1の切梁支保工のジャッキシステムの1例であり、(a) は収縮状態の側面図、(b) は左から見た図、(c) は右から見た図、(d) は伸長状態の側面図である。
【図4】図1の切梁支保工のコーナー火打ち切梁架設装置とコーナー腹起しの1例であり、(a) は全体の平面図、(b) ジョイント部分の側面図である。
【図5】図4のコーナー火打ち切梁架設装置のジョイント部分が異なる例を示す平面図である。
【図6】本発明の地下躯体の構築工法で用いる本設梁の1例を示す平面図である。
【図7】図6の本設梁の接合プレート(地下階)と吊り支持装置の1例であり、(a) は平面図、(b) は正面図である。
【図8】図6の本設梁の接合プレート(1階)と吊り支持装置の1例であり、(a) は平面図、(b) は正面図、(c) はナットの横断面図、(d) はナットの縦断面図である。
【図9】本発明の地下躯体の構築工法で用いる上下スライド装置の1例であり、(a) は側面図、(b) は正面図である。
【図10】図9の上下スライド装置の把持装置と水平スライド装置の1例であり、(a) は正面図、(b) は側面図である。
【図11】図4のコーナー火打ち切梁架設装置における上下スライド装置の把持装置と水平スライド装置の1例であり、(a) は正面図、(b) は側面図である。
【図12】図9の上下スライド装置による切梁支保工と本設梁(地下階)のスライドダウンを工程順に示す側面図である。
【図13】本発明の地下躯体の構築工法の工程(1)〜(4)を示す断面図である。
【図14】本発明の地下躯体の構築工法の工程(5),(6)を示す断面図である。
【図15】本発明の地下躯体の構築工法の工程(7),(8)を示す断面図である。
【図16】本発明の地下躯体の構築工法の工程(9)を示す断面図である。
【図17】本発明のコーナー腹起しの別の例を示す平面図である。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a vertical slide device and a jack device of a slide type mountain retaining system used in an underground frame construction method by a mountain retaining method necessary for safely building a building underground.
[0002]
[Prior art]
The technology for safely building the basement of the building in the ground can be broadly divided into a mountain retaining wall around the building basement, and this mountain retaining wall is supported by a temporary horizontal support in order to build the ground on the ground. Creating a space and constructing the basement from the bottom, a striking method, and constructing the basement from the upper floor to the lower floor in sequence while creating a minimum space to use the underground frame as a horizontal support. There is. These technologies are employed in combination or independently depending on the construction conditions.
[0003]
[Problems to be solved by the invention]
In the construction method, the underground structure is constructed in the same process as the construction on the ground, so the quality of the underground such as water-stopping is high, but it is temporarily necessary to secure the entire space for underground construction, so a large amount of temporary construction Material is required. The counter-striking method is sufficient to secure a space larger than the floor height required for the construction of the basement floor, but in order to secure a space larger than this floor height without using temporary materials, The scale of the retaining wall is larger than
[0004]
Furthermore, in order to secure the function as a mountain support in the conventional method, after the excavation is completed, a temporary horizontal support is installed and a preload is introduced in the forward casting method, or the main body horizontal structure is strengthened in the reverse driving method. For this reason, it takes about 1 to 3 weeks after the end of excavation. The deformation and stress generated in the retaining wall has increased greatly during this period.
[0005]
In order to solve such problems, the present applicant uses a main beam of the underground main body structure and a movable beam support for the support work at the time of underground construction. Temporary materials can be eliminated, and the size of the retaining wall can be reduced by quickly sliding down the movable beam support and installing it near the bottom of the excavation to suppress deformation and stress generated in the retaining wall. In addition, an application has been filed for a construction method of an underground structure that can be constructed simultaneously with groundwork excavation and ground excavation as a support work, and can also be expected to shorten the construction period (Japanese Patent Application No. 9-203003).
[0006]
The present invention is an up-and-down slide device and a jack device used in a slide-type mountain retaining support system that is most suitable for the implementation of this underground structure construction method. A movable beam support and a movable main beam are relatively simple. It is an object of the present invention to provide a vertical slide device that can be quickly and safely slid down by a device, and a jack device that can quickly perform a slide-down of a movable supporter and introduction of a preload with a relatively simple device.
[0007]
[Means for Solving the Problems]
As shown in FIGS. 9 to 12, for example, as shown in FIGS. 9 to 12, the vertical slide device of the slide type mountain retaining support system according to claim 1 of the present invention is movable horizontally (vertical slide type) disposed in the excavation space in the mountain retaining wall. ) Is a vertical slide device that slides down a movable (vertical slide type) permanent beam, a lifting device (such as an electric chain block) that is attached to the permanent beam on the first floor, and this lifting device And a gripping device that is detachably connected to the movable beam support or movable permanent beam, and the gripping device is suspended from the lifting device and the movable permanent beam is detachably mounted thereon. It is composed of a horizontal mounting member, a chuck composed of a pair of arms that can be opened and closed on the horizontal mounting member, and a fixing member that is provided on the cutting beam of the movable beam supporting work and is detachably connected to the lower part of the arm. The And wherein the Rukoto.
[0008]
The vertical slide device of the slide type mountain retaining support system according to claim 2 of the present invention is the vertical slide device according to claim 1, wherein the vertical slide device is disposed at intervals in the horizontal direction as shown in FIGS. 9 and 10, for example. It has a horizontal slide device comprising a connecting member for connecting a pair of fixed members, and a sliding bearing provided between the upper surface of the connecting member and the movable beam. That is, of the pair of vertical slide devices arranged with the jack device interposed therebetween, the vertical slide device that is located on the center side of the movable beam supporter and does not move is fixed, and The vertical slide device on which the beam is positioned and moved is a horizontal slide type.
[0009]
A jack device for a sliding mountain retaining support system according to claim 3 of the present invention is a jack device incorporated into a movable beam supporting structure that slides down horizontally in an excavation space in a retaining wall and supports the retaining wall. As shown in Fig. 3, a stroke jack (hydraulic cylinder, etc.) that moves the erection of the movable beam support forward and backward with respect to the retaining wall and a preload jack (hydraulic jack, etc.) that introduces a preload to the retaining wall are connected in series. The stroke jack is built in the outer cylinder, the inner cylinder movably accommodated in the outer cylinder, the outer cylinder and the inner cylinder, and both end portions thereof are respectively the outer cylinder and the inner cylinder. A hydraulic cylinder connected to the end plate, and a lock nut screwed into the inner cylinder to fix the outer cylinder and the inner cylinder . For example, in the plan view, the timber support works include a central block made up of vertical and horizontal slabs located in the center and a flaming fire block (4 The central block and the flared fire block in the X and Y directions are connected by a jack device in the X and Y directions.
[0011]
According to a fourth aspect of the present invention, there is provided a jack device for a slide type mountain retaining support according to the third aspect , wherein the preload jack is screwed into the rod as shown in FIG. 3, for example. It is characterized by having a lock nut for fixing.
[0012]
In the above configuration, the upper part of the excavation space in the retaining wall is supported by the main beam and floor of the underground main body structure, and the lower part of the excavation space is supported by the beam support work. Release the beam support preload and retract the erection, and slide down the beam support with the vertical slide device. When the beam supporter slides down to a predetermined position near the bottom of excavation, the jacking device pushes out the abdomen and introduces the preload. Thereby, when the deformation of the retaining wall is small, the beam support can be quickly slid down and the support can be built near the bottom of the excavation.
[0013]
To support the retaining wall after excavation using the main beam of the underground main body structure and the movable beam support, eliminate a large amount of temporary materials in the conventional forward construction method and minimize the amount of temporary materials Can do. In addition, the movable beam support can be quickly slid down and installed near the bottom of the excavation, and it can be left in the state after completion of excavation for a short time. Suppress the rheological deformation behavior due to the passive earth pressure that the excavation side ground bears as a reaction force against the pressure, and the redistribution effect that concentrates the main earth pressure on the support position confirmed by geotechnical engineering The effect of effectively reducing deformation and stress generated on the retaining wall by reducing the passive earth pressure that the ground on the excavation side has been burdened by making it appear early can be easily utilized, and the scale of the retaining wall can be reduced. can do. Furthermore, once the excavation is completed, it is possible to construct the floor by sliding down the main beam as a support work immediately, so it is possible to proceed with the construction of the underground structure that will be the support work and the ground excavation at the same time. Can be shortened.
[0014]
Since the vertical slide device is composed of a lifting device and a gripping device, the beam supporting work can be quickly and safely slid down with a relatively simple device.
[0015]
A horizontal slide device is installed on the pair of vertical slide devices placed in the uprising and burning block part where the beam support moves forward and backward to absorb the advance and retreat movement, so that the part where the beam support is moved forward and backward is suspended. It is possible to slide down the beam support work safely.
[0016]
Because the beam and erection of the beam support work are assembled integrally by the jack device, and the jack device consists of a stroke jack with a large stroke and a preload jack, the jack device pushes and pulls the erection. With just simple and quick work, you can slide down the beam support, install the beam support in place and introduce the preload, and support the retaining wall early near the bottom of the excavation Deformation and stress can be suppressed, the scale of the retaining wall can be made smaller, the support work can be performed quickly, and the construction period can be shortened.
[0017]
Stroke jacks have a structure in which a hydraulic cylinder is housed inside a telescopic outer cylinder and an inner cylinder, and the outer cylinder and the inner cylinder are fixed with a lock nut that is screwed into the inner cylinder. In addition to being obtained, the preload can be easily introduced by fixing with a lock nut. Also, the preload jack can be easily fixed with a lock nut.
[0018]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described based on an embodiment shown in the drawings. This embodiment is an example in which the slide type mountain retaining support system including the vertical slide device and the jack device of the present invention is applied to the construction of an underground frame of a building on the third basement floor. FIGS. 1-12 shows an example of the slide-type mountain retaining support system provided with the up-and-down slide apparatus and jack apparatus of this invention. FIG. 13 to FIG. 16 show an example of the underground building construction method by the slide type mountain retaining support system in the order of steps.
[0019]
As shown in FIGS. 1 to 12, in the underground building construction method by the slide type mountain retaining support system having the vertical sliding device and the jack device of the present invention, the slide is quickly performed mainly when the deformation of the mountain retaining wall W is small. The movable beam support 1 (FIG. 1) that supports the mountain retaining wall W near the bottom of the excavation at an early stage, and the 1F main beam 2 and B1F / B2F movable as the upper support for the mountain retaining wall W. The vertical beams 4-1, 3-2 (FIG. 6) and the up-and-down slide device 4 (FIG. 6) according to the present invention for sliding down the beam supports 1 and the permanent beams 3-1, 3-2 on the basement floor. 9 to 12) and the suspension support device 5 (FIGS. 7 and 8) for supporting the main beams 3-1 and 3-2 on the basement floor.
[0020]
As shown in FIG. 1, the beam support 1 includes a jack system 6 and a corner-fired beam construction device 7 according to the present invention. Such a beam support 1 and an up-and-down slide device 4. Etc. are combined to form a slide-type mountain retaining system.
[0021]
As the beam support 1, for example, the one shown in the plan view of FIG. 1 can be used. This beam support 1 has a rectangular shape, for example, in plan view, corresponding to the underground frame, and is formed of vertical and horizontal cut beams 10, four ridges 11 disposed at four sides of the rectangle, It is comprised from the joining block 13 etc. which join the beam 12 and a cut beam. A flaming fire block is connected to a joint block portion of a rectangular main block composed of a beam 10 and a joint block 13 located in the center via jack systems 6 in the X direction and the Y direction. By actuating, the four sides 11 are configured to move forward and backward with respect to the retaining wall W, respectively.
[0022]
In such a beam support 1, a space is provided between the ends of the bulges 11 and 11 in the X direction and the Y direction, and the four bulges 11 on the four sides can move forward and backward. Therefore, a corner-fired beam construction device 7 and a corner erection 8 which will be described in detail later are disposed at the four corners of the beam support 1. Further, the lower part of the vertical slide device 4 is connected to a part (shown by an oval shape) in FIG. The beam 10 and the corner-fired beam erection device 7 of the beam support 1 are disposed in correspondence with the main beam and the small beam of the main beam shown in FIG.
[0023]
As shown in FIG. 2, the joining block 13 has a structure in which two upper and lower joining plates 13 a and 13 a are integrated by vertical ribs 13 b and the like. The ends are joined. In addition, an insertion hole 13c through which a slide guide / temporary support column (hereinafter simply referred to as a temporary support column) P can be inserted with a margin is formed at the center of the joining plate 13a. It can be slid down along the column P.
[0024]
The beam support 1 that has been slid down to a predetermined position is fixed to the retaining wall W by the push-up and preload introduction by the jack system 6. The wedge member 14 as shown in FIG. 5 is fixed by driving it into the gap between the joining block 13 and the temporary support P from above. If this wedge member 14 is used, the center part of the beam support 1 can be easily fixed to the temporary support P, and also when the beam support 1 is slid down, the fixation can be easily released. Can do. In addition, the joining block 13 is divided into four so that the assembly of a cut beam or the like can be easily performed, and each divided body is configured to be bolted via a joint plate.
[0025]
For example, the jack system 6 shown in FIG. 3 can be used. The jack system 6 is configured by connecting a stroke jack 20 and a preload jack 21 in series. The distal end plate 20b of the stroke jack 20 and the proximal end plate 21a of the preload jack 21 are bolted and integrated through a liner 22. The base end plate 20a of the stroke jack 20 is detachably joined to the joining block 13 with a bolt, and the tip end plate 21b of the preload jack 21 is erected and detachably joined to the fire beam 10 of the fire-blocking block ( (See FIG. 1).
[0026]
The stroke jack 20 is a device that largely pushes and pulls the protuberances 11 of the four sides so that the beam supporting work 1 can be slid down, and is fixed to the outer cylinder 23a and the plate 20b fixed to the plate 20a. A telescopic telescopic device 23 comprising an outer cylinder 23b, and a hydraulic cylinder 24 disposed inside the telescopic device 23 and having a cylinder base end and a piston rod front end pivotally attached to the end plates 20a and 20b, respectively. Thus, a relatively large stroke S 1 is obtained. The stroke jack 20 can be fixed by a male screw 25 formed over the entire length of the outer surface of the inner cylinder 23a and a lock nut 26 screwed into the male screw 25.
[0027]
The preload jack 21 is a hydraulic jack having a relatively small stroke S 2 for introducing a preload to the retaining wall W. The jack 21 can also be fixed by a male screw 25 formed over the entire length of the outer surface of the plunger rod 21 c and a lock nut 26 screwed into the male screw 25.
[0028]
When the beam support 1 is slid down, the stroke jack 20 is contracted so that the bulge 11 on each side is largely retracted, and the planar shape of the beam support 1 is reduced and slid down. When the predetermined position is reached, the stroke jack 20 is extended and the lock nut 26 is tightened to the outer cylinder 23a to fix the stroke jack 20, and then the preload jack 21 is extended to preload on the retaining wall W. Is introduced. Thereafter, the preload jack 21 is fixed by the lock nut 26.
[0029]
In the case of conventional beam support work (sequential construction method), it is troublesome and time consuming to position after excavation, attach holding hardware, assemble upset, assemble cut beam, and introduce preload. However, in the beam support 1 of the present invention, the beam 10 and the bulge 11 are integrally assembled via the jack device 6, and the jack device 6 has a stroke jack 20 with a large stroke. And the preload jack 21, the beam support 1 is slid down by a simple and quick operation of pushing up and pulling the jack 11 with the jack device 6, and the beam support 1 is installed at a predetermined position. Preload can be introduced, support work can be performed quickly, and the construction period can be shortened. In addition, since the retaining wall W can be supported early near the bottom of the excavation and deformation and stress generated in the retaining wall can be suppressed, the scale of the retaining wall W can be further reduced.
[0030]
As the corner burning beam construction device 7, for example, the one shown in FIG. 4 can be used. This corner-fired beam erection device 7 connects the bulges 11 and 11 to each other so that the bulge 11 in the X and Y directions can follow the forward and backward movement at the corner of the beam support 1. And it is comprised so that a preload can be introduced with the above-mentioned jack system 6, and mainly consists of the telescope type expansion-contraction member 30 and the preload jack 31. FIG.
[0031]
The telescopic telescopic member 30 has a structure in which a hydraulic cylinder is removed from the telescopic telescopic device 23 of the jack system 6, and can be freely expanded and contracted by moving the inner cylinder 30b forward and backward in the outer cylinder 30a. . As the preload jack 31, the same one as the preload jack 21 of the jack system 6 can be used.
[0032]
The telescopic telescopic member 30 and the preload jack 31 are integrated by joining the end plates with bolts. The base end plate of the telescopic telescopic member 30 and the side surface of the flank 11 are connected via a pin hinge 32 and a liner 33. The front end portion of the preload jack 31 and the side surface of the flank 11 are also connected via the pin hinge 32 and the liner 33. The pin hinge 32 has a structure in which a pair of hinge members are connected by a vertical pin 32 a, and can absorb a change in the angle in the horizontal direction of the telescopic telescopic member 30 that accompanies the advancing and retreating movement of the abdomen 11.
[0033]
In such a corner fire-cutting beam erection device 7, when the planar shape of the beam support 1 is reduced in order to slide down the beam support 1, the telescopic telescopic member 30 contracts to a predetermined position. When the planar shape of the beam supporting work 1 is expanded by sliding down, the telescopic telescopic member 30 is extended, and the bulges 11 and 11 in the X direction and the Y direction are followed while following the forward and backward movement of the bulge 11. Can be connected.
[0034]
At the time of preloading, after fixing the telescopic telescopic member 30 by tightening the lock nut 35 screwed into the male thread 34 of the inner tube 30b of the telescopic telescopic member 30 to the outer tube 30a, the preload jack 31 is fixed. Is extended and a preload is introduced into the retaining wall W. Thereafter, the preload jack 31 is fixed by a lock nut 35 screwed into the male screw 34 of the preload jack 31.
[0035]
FIG. 5 is an example in which a spherical hinge (ball hinge) 36 is used in place of the pin hinge 32 in the corner-fired beam erection device 7. In this case, the spherical hinge 36 is attached to the abdomen 11 via an attachment piece 37 having an inclined attachment surface. The mounting piece 37 is reinforced by the corner piece 38.
[0036]
By providing the above-mentioned corner fire-cutting beam erection device 7 at the four corners of the beam support 1, the uplift 11 moves forward and backward in the X and Y directions at the corners of the retaining wall W, respectively. 11 can be integrated with each other, and the preload jack 31 can also introduce a preload into the corners of the retaining wall W. Moreover, since the telescopic telescopic member 31 and the hinges 30 and 36 can follow the expansion / contraction operation of the beam support 1, it is not necessary to remove the corner-fired beam construction device 7 from the beam support 1, and the beam support Immediately after 1 is slid down, the abdomen 11 can be pushed out and preloading can be introduced.
[0037]
For example, the corner upset 8 shown in FIG. 4 can be used. The corner uplift 8 is a plate-like member having the same thickness as the upset 11 and the like, and includes a corner upset block 8a, a pair of wedge members 8b, a wedge pressing member 8c, and the like.
[0038]
First, before the beam support 1 is slid down, the corner erection block 8a is suspended by a vertical movement device such as a chain block to a predetermined position where the beam support 1 is installed. Fix the corners with bolts. Next, when the cut beam support 1 having a reduced planar shape is slid down to the installation position and the bulge 11 is set on the retaining wall W by pushing out and introducing a preload, the bulge 11 for the corner is erected. The wedge member 8b is inserted from the inside into the gap between the two ends, and then the wedge pressing member 8c is fixed to the block 8a with the bolt and nut 8d, and the wedge member 8b is prevented from coming out.
[0039]
The four corners of the beam support 1 are integrally connected to each other by the corner protrusion 8 as described above, so that a complete shape of the mountain support can be formed.
[0040]
Using the beam support 1, the jack system 6, the corner-fired beam construction device 7, and the corner uplift 8 configured as described above, the beam support 1 is slid down in the following procedure.
[0041]
(i) When sliding down the beam support 1 supported by the vertical slide device 6 to be described later, confirm that the retaining wall above the beam support 1 is supported by the main beam and the floor. After releasing the preload in the X direction and the Y direction by the jack system 6 and the preload jacks 21 and 31 of the corner fire-cutting beam erection device 7, the corner erection is caused and the wedge member 8b is pressed against the bolt / nut 8d of the pressing member 8c. By loosening, it is separated from the flank 11, and with the stroke jack 20 of the jack system 6, the flank 11 in the X direction and the Y direction are pulled in sequentially or simultaneously to reduce the planar shape of the beam support 1. At this time, since the joint portion of the corner burning and cutting beam construction device 7 and the erection 11 is a rotatable mechanism, it can follow the reduction operation of the beam supporting work 1.
[0042]
(ii) The corner erection block 8a is lowered by the vertical movement device and fixed to the corner portion of the retaining wall W at the installation position of the beam support 1.
[0043]
(iii) Slide down the beam support 1 having a reduced planar shape to the installation position by the vertical slide device 4.
[0044]
(iv) The beam 10 on the erection side of the beam support 1 is movably supported by a horizontal slide device (described later) provided at the lower part of the vertical slide device 4, and is a stroke jack of the jack system 6. 20, the bulge 11 in the X direction / Y direction is pushed out, and then the stroke jack 20 is locked, and then a predetermined preload is introduced by the preload jack 21 (preloading before the final predetermined preload introduction) ).
[0045]
(v) The corner fire-cutting beam erection device 7 is suspended by a vertical slide device 4 and is movably supported by a horizontal slide device to be described later, so that the erection 11 can be moved in the X and Y directions. Following this, the telescopic telescopic member 30 extends. From this state, after locking the telescopic telescopic member 30, the preload jack 31 is pushed out (preload before the final predetermined preload is introduced), and the planar shape of the beam supporting work 1 is adjusted.
[0046]
(vi) Final preloads in the X direction and Y direction are introduced by the preload jack 21 of the jack system 6 in the beam supporting work 1. Thereafter, a predetermined preload at the final corner portion is introduced by the preload jack 31 of the corner-fired beam erection device 7.
[0047]
(vii) Finally, the wedge member 8 b is inserted and fixed to the corner upset block 8 a, and the four side upsets 11 are integrated through the corner upset 8. As described above, the beam support 1 slid down to a predetermined position functions as a support for the retaining wall W. It is not necessary to remove the corner fire-cutting beam erection device 7 from the beam support 1, and after the beam support 1 has been slid down, it is possible to immediately enter the work for installing the beam support.
[0048]
As the main beams 2, 3-1 and 3-2 of 1F, B1F, and B2F, for example, those shown in the plan view of FIG. 6 can be used (B1F and B2F in the illustrated example). These permanent beams are, for example, rectangular in plan view like the beam support 1, and the large beams 40 assembled vertically and horizontally, the oblique small beams 41 disposed in the corner portions, and the large beams in the center portion. Are composed of a joining plate 42 that joins the large beams, and a joining plate 43 that joins the large beams on the four sides of the outer periphery. The large beam 40 and the small beam 41 are disposed at the same positions as the beam 11 and the corner-fired beam construction device 7 in FIG.
[0049]
The main beams 3-1 and 3-2 of the basement floors B1F and B2F are slid down to a predetermined installation position by the vertical slide device 4 described later. The vertical slide device 4 is connected to a portion (shared with the beam support 1) and b portion (dedicated to the main beam) shown by an oval shape in FIG.
[0050]
As shown in FIG. 7, the center-part joining plate 42 is disposed in a pair so as to sandwich the joining end portion of the large beam 40 from above and below, and the upper and lower flanges of the large beam 40 are attached and joined by bolts. In addition, an insertion hole 42a through which the temporary support P can be inserted with a margin is formed at the center of the joining plate 42, and the main beams 3-1 and 3-1 on the basement floor extend along the numerous temporary supports P. And slide down. As shown in FIG. 6, the outer peripheral joining plate 43 has the same configuration as the central joining plate 42. However, there is no temporary support P in the joining plate 43 portion, and a through hole 43a for a pillar is formed.
[0051]
The suspension support device 5 is a device that suspends and fixes the main beams 3-1 and 3-2 on the basement floor configured as described above to a predetermined position. As shown in FIG. (Hanging rod) can be used. The threaded reinforcing bar 50 is disposed through the joint plate 42 at the center so as to surround the temporary support P, and is finally extended integrally to the foundation slab by adding downward with a coupler. It is used as a part of the reinforcing bar of RC column or SRC column C. Similarly, the screw-reinforcing bars 50 are disposed on the outer peripheral joint plate 43 as well.
[0052]
The upper part of the suspension support device 5 using the threaded reinforcing bar 50 is fixed to the main beam 2 of 1F as shown in FIG. That is, on the upper joint plate 42 (43) of the main beam 2, a hairpin member 51 made of a pair of channel members is disposed, and the upper portion of the screw rebar 50 is inserted into the gap between the hairpin members 51, and the nut 52. Secure with. For example, as shown in FIG. 8 (c), the nut 52 is divided into two in the lateral direction, and the divided bodies 52a and 52b are fastened with bolts 52c, so that the nut 52 can be easily fixed from the lateral direction. As shown in FIG. 7 (b), the main beams 3-1 and 3-2 of the basement floors B1F and B2F are also fixed to the threaded reinforcing bar 50 with nuts 52 attached vertically. As shown in FIG. 13 (2) , only the B2F main beam 3-2 is fixed to the threaded reinforcing bar 50, and the B2F main beam 3-2 is placed on the B2F main beam 3-2 via a stand. You may make it mount the installation beam 3-1.
[0053]
Note that some of the threaded reinforcing bars 50 arranged in the column C shown in FIG. 7 are used as the suspension rod of the suspension support device 5. For example, as shown in FIG. 8 (a), a total of eight threaded reinforcing bars 50 are used as suspension rods as two pairs in the corner portion.
[0054]
The suspension support device 5 as described above can be composed of the suspension rod 50, the handle member 51, and the nut 52, and the main beams 3-1 and 3-2 on the underground floor are suspended by a relatively simple device. It can be supported. Moreover, by using this suspension rod 50 as a threaded reinforcing bar as a part of the reinforcing bar of the basement column, it is possible to reduce the apparatus cost and speed up the work.
[0055]
The vertical slide device 4 is a device that grips and slides down the beam support 1 and loads and slides down the main beams 3-1 and 3-2 of the underground floors B1F and B2F. The thing shown in FIG. 12 can be used. As shown in FIG. 9, the vertical slide device 4 is roughly composed of a lifting device 60 and a gripping device 61.
[0056]
As shown in FIG. 9, the lifting device 60 includes an electric chain block 62 and a chain 63. The electric chain block 62 is suspended and fixed by a hook or the like to one end portion of a horizontal suspension member 65 installed via a bundle member 64 on the large beam 40 (small beam 41 in the corner portion) of the main beam 2 of 1F. ing. After the chain 63 drawn out from the electric chain block 62 is wound around the pulley 66 of the gripping device 61, the tip is fixed to the other end of the horizontal suspension member 65. Therefore, the gripping device 61 can be moved up and down by winding up and feeding out the chain 63 by the electric chain block 62.
[0057]
The gripping device 61 is a member that grips the beam 10 of the beam supporting work 1 and loads the permanent beams 3-1 and 3-2. For example, as shown in FIGS. The chuck 70 includes a pair of arms 70 a that can be opened and closed, a fixing member 71 that is attached to the lower flange of the beam 10, and a mounting plate 73 that is installed on a horizontal attachment member 72 of the chuck 70.
[0058]
As shown in FIG. 10, the upper ends of a pair of arms 70 a of the chuck 70 are attached to both ends of a horizontal attachment member 72 so as to be rotatable in the horizontal direction via shafts 74. A pulley 66 of a chain 63 is rotatably attached to the shaft 74. The lower ends of the pair of left and right arms 70a and 70a of the chuck 70 are detachably attached to the lower portions of the pair of left and right fixing members 71 and 71 by fixing pins 75, respectively. The shaft 74 is provided with a torsion coil spring 76 that presses the arm of the chuck 70 outward, so that the chuck 70 can be kept open.
[0059]
Here, as shown in FIG. 9, the flaming fire block on the outer peripheral side of the beam support 1 is moved forward and backward by the jack system 6, and the fixing member 71 of the vertical slide device 4 is fixed to the moving beam 10. Then, since the device is damaged, the pair of upper and lower slide devices 4, 4 arranged in the flaming fire block are connected by a horizontal slide device 80, and the beam 10 is guided and supported so as to move forward and backward. To do.
[0060]
The horizontal slide device 80 includes a connecting member 81 and a sliding bearing 82. As shown in FIG. 9, the connecting member 81 is disposed below the jack system 6 and the cutting beam 10, the end on the temporary support P side is fixed to the lower plate of the joining block 13, and a pair of vertical slide devices 4 and 4 fixing members 71 are fixed to the side surfaces at both ends of the connecting member 81, respectively. The sliding bearing 82 is fixed to the upper surface of the connecting member 81 at the position of the up-and-down sliding device 4 on the abdominal erection side, and the sliding bearing 82 supports the cut beam 10 on the abdominal erection side so as to be movable forward and backward.
[0061]
FIG. 10A shows the details of the up-and-down sliding device 4 on the side of the stomach where the sliding support 82 is located. A plate 83 is fixed on the connecting member 81 and the sliding support 82 is screwed onto the plate 83. Secure with. A fixing member 71 having an upper hook 71a is used. The fixing member 71 is attached to the connecting member 81 from both the left and right sides, fixed with bolts and nuts 84, and the lower hook of the beam 10 is guided and supported by the upper hook 71a. Like to do.
[0062]
As shown in FIG. 9, the fixing member 71 of the vertical sliding device 4 on the temporary support column side is a member without an upper hook and is fixed to both side surfaces of the connecting member 81. Furthermore, since the vertical slide device 4 disposed in the dedicated beam-dedicated b portion (see FIG. 6) inside the temporary support P needs only to place the permanent beam, the fixing member 71 is placed on the lower surface of the beam 10. It does not have to be fixed.
[0063]
FIG. 11 shows an example of the vertical slide device 4 connected to the corner burning beam construction device 7 (small beam 41) in the corner portion. In this case, the horizontal slide device 90 is used for the same reason as described above. The horizontal slide device 90 uses a connecting member 91 that also serves as a guide rail made of a pair of channel members arranged opposite to each other, and a guide roller 92 that rolls in the connecting member 91.
[0064]
The vertical slide device 4 is the same as that disposed on the beam 10, but the fixing member 71 is fixed to the connecting member 91, and the pair of left and right vertical slide devices 4, 4 are connected and integrated. The guide rollers 92 are provided below the telescope type telescopic member 30 and the liner 33 of the preload jack 31, respectively, so that the telescope type telescopic member 30 and the preload jack 31 can move forward and backward as the belly 11 is moved forward and backward. Support guide.
[0065]
In the vertical slide device 4 configured as described above, as shown in FIG. 12, the cut beam support 1 and the main beams 3-1 and 3-2 are slid down in the following procedure.
[0066]
(i) When the lower space is excavated in the state shown in FIG. 9, as shown in FIG. 12 (i), the electric chain blocks 62 of the large number of vertical slide devices 4 are operated synchronously, and the beam support work 1 Slide down to near the bottom of the excavation.
[0067]
(ii) After confirming that the beam support 1 is functioning as a retaining support by the operation of the jack system 6, the fixing pin 75 is pulled out and the chuck 70 is opened as shown in FIG. 12 (ii). To be detached from the fixing member 71. Next, the chuck 70 is raised by the electric chain block 62, and the B2F permanent beam 3-2 that is in contact with the mounting plate 73 on the upper surface of the chuck is fixed to the mounting plate 73 with a bolt. The rod (screw-reinforcing bar) that suspends and supports the main beam 3-2 is removed and left in the chuck 70. The B1F permanent beam 3-1 is placed on the B2F permanent beam 3-2 via a table.
[0068]
(iii) The electric chain blocks 62 of a large number of the vertical slide devices 4 are operated in synchronization, and as shown in FIG. 12 (iii), the permanent beams 3-1 and 3-2 placed on the back of the chuck 70 are Slide down so that the main beam 3-1 is located on the first basement floor. The main beams 3-1 and 3-2 are suspended and fixed by a rod. The chuck 70 is positioned above the beam supporting work 1 in an open state.
[0069]
(iv) After confirming that the permanent beams 3-1 and 3-2 are suspended and fixed, the chuck 70 and the permanent beam 3-2 are detached and separated, as shown in FIG. Then, the chuck 70 is slightly lowered by the electric chain block 62, the chuck 70 is closed, and the arm tip is fixed to the fixing member 71 of the beam supporting work 1 by the fixing pin 75. Subsequently, the said process is repeated, the beam support 1 is slid down, and the main beam 3-2 is slid down to the second floor underground.
[0070]
The vertical slide device 4 as described above is composed of a lifting device 60 such as an electric chain block and a gripping device 61 having a chuck, a mounting plate, and the like. And the main beams 3-1 and 3-2 on the basement floor can be quickly and safely slid down. Further, the horizontal slide devices 80 and 90 are provided on the pair of vertical slide devices 4 arranged in the uprising and burning block portion and the corner burning portion of the beam support 1 to move forward and backward to absorb the forward and backward movement. The beam support 1 can be hung even at the part where it moves forward and backward, and the beam support 1 can be safely slid down.
[0071]
An example of constructing an underground structure using various devices as described above will be described in the order of steps (see FIGS. 13 to 16).
[A] Until the start of slide construction
(a-1) As shown in ( 1) of FIG. 13, a temporary support P is built on the foundation pile placed in the ground where the building is to be constructed, and a retaining wall (soil mortar column wall) ) Install W.
[0072]
(a-2) After the retaining wall construction, as shown in (1) of FIG. 13, the inside of the retaining wall W is first excavated to a predetermined depth. If necessary, soil concrete will be placed on the bottom of the excavation.
[0073]
(a-3) As shown in (2 ) of FIG. 13, the beam support 1 is assembled near the bottom of the excavation space in the primary excavation space, and the jack system 6 and the corner-fired beam construction device 7 Extrude and preload are introduced.
[0074]
(a-4) As shown in (2 ) of FIG. 13, the B2F main beam 3-2 is arranged on the beam support 1 and the deck plate is laid, and the floor is arranged. Temporarily assemble the floor structure of B2F. Next, the B1F permanent beam 3-1 is disposed on the B2F permanent beam 3-2, the deck plate is laid, the floor is arranged, and the B1F floor structure is temporarily assembled. deep.
[0075]
(a-5) As shown in Fig. 13 (2) , the 1F main beam 2 is installed, the deck plate is laid, the floor is placed, concrete is placed, and the 1F floor is To construct. In addition, this 1F floor can also utilize a precast member.
[0076]
(a-6) As shown in (2 ) of FIG. 13, with the main beam 2 of 1F installed, the upper and lower slide devices 4 and the upper part of the suspension rod 50 are attached to the main beam 2, and the upper and lower slides are mounted. The lower part of the device 4 is connected to the beam 10 of the beam support 1 and the B2F permanent beam 3-2 is suspended and fixed from the permanent beam 2 of 1F by the suspension rod 50. The B1F permanent beam 3-1 is placed and fixed on the B2F permanent beam 3-2 via a table.
[0077]
[B] Slide construction (reversing method)
(b-1) As shown in (3 ) of FIG. 13, secondary excavation is performed to a predetermined depth with the upper part of the retaining wall W supported by the main beam 2 of the cut beam support 1 and 1F. Do. This secondary excavation and 1F floor construction can be performed simultaneously.
[0078]
(b-2) When the secondary excavation is completed, as shown in (3) of Fig. 13, after confirming that the floor of 1F can function as a support, the preloading of the beam support 1 is performed by the jack systems 6 and 7 Pull open / upset. Thereafter, the beam support 1 is slid down to a predetermined position by the vertical slide device 4.
[0079]
(b-3) As shown in (4 ) of FIG. 13, when the beam support 1 is located near the bottom of excavation, the jack systems 6 and 7 are used to push out the abdomen and introduce the preload.
[0080]
(b-4) As shown in FIG. 13 (4) , after the vertical slide device 4 is replaced from the beam support 1 to the B2F permanent beam 3-2, the B2F permanent beam 3-2 and Release the fixing of the suspension rod 50.
[0081]
(b-5) As shown in FIG. 14 (5) , the B1F / B2F main beams 3-1 and 3-2 are slid down by the vertical slide device 4, and the B1F main beam 3-1 is underground. Located on the first floor.
[0082]
(b-6) As shown in FIG. 14 (5) , a suspension rod is added by a coupler to the lower portion of the suspension rod 50 used in the step A, and the B2F main beam 3-2 is added by the suspension rod 50. Suspend and fix. The main beam 3-1 of B1F is suspended and fixed by a newly provided suspension rod 50.
[0083]
(b-7) As shown in FIG. 14 (5) , the vertical slide device 4 is replaced from the B2F main beam 3-2 to the cut beam support 1.
[0084]
(b-8) As shown in (5) of Fig. 14, the outer beam of B1F is laid and concrete is placed on the outer beam and the floor (the deck plate is laid). Build the floor of B1F. In some cases, the B1F floor is constructed in a state where the B2F main beam 3-2 is suspended by the vertical slide device 4.
[0085]
(b-9) As shown in FIG. 14 (5) , B1F concrete is cast and tertiary excavation is started.
[0086]
(b-10) As shown in (5 ) of FIG. 14, after the third excavation is completed, after confirming that the B1F floor can function as a support, the jack system 6 and 7 are used to preload the beam support 1 Pull open / upset.
[0087]
(b-11) Then, as shown in FIG. 14 (6) , the up-and-down sliding device 4 slides the beam support 1 to a predetermined position, and the jack systems 6 and 7 push out and preload the abdomen. To introduce.
[0088]
(b-12) As shown in FIG. 14 (6) , after the vertical slide device 4 is replaced from the cut beam support 1 to the B2F permanent beam 3-2, the B2F permanent beam 3-2 and Release the fixing of the suspension rod 50.
[0089]
(b-13) As shown in FIG. 15 (7) , the B2F main beam 3-2 is slid down by the vertical slide device 4, and the B2F main beam 3-2 is positioned at the second basement level. .
[0090]
(b-14) As shown in FIG. 15 (7) , a suspension rod is added to the lower part of the suspension rod 50 that suspended the B2F permanent beam 3-2 in the previous step with a coupler, and the suspension rod 50 is used to The main beam 3-2 is suspended and fixed.
[0091]
(b-15) As shown in (7 ) of FIG. 15, the vertical slide device 4 is replaced from the B2F main beam 3-2 to the beam support 1.
[0092]
(b-16) As shown in Fig. 15 (7) , the outer peripheral beam part of B2F is placed, and concrete is placed on this outer peripheral beam part and the floor (the deck plate and the reinforcing bar are placed). Build a B2F floor. In some cases, a B2F floor is constructed in a state where the B2F main beam 3-2 is suspended by the vertical slide device 4.
[0093]
(b-17) As shown in FIG. 15 (7) , B2F concrete is placed and quaternary excavation is started.
[0094]
(b-18) When the fourth excavation is completed, as shown in (7) of Fig. 15, after confirming that the floor of B2F can function as a support, the jack system 6 and 7 will preload the beam support 1 Pull open / upset.
[0095]
(b-19) Then, as shown in FIG. 15 (8) , the up-and-down sliding device 4 slides the beam support 1 to a predetermined position, and the jack systems 6 and 7 push out and preload the abdomen. To introduce.
[0096]
(b-20) Next, as shown in (9) of FIG. 16, fifth excavation is performed.
[0097]
[C] Construction of underground structure in accordance with the order construction method
(c-1) Build the foundation slab and B3F floor (RC structure) from the state shown in (9) of FIG.
[0098]
(c-2) After confirming that the foundation slab and B3F floor (RC structure) can function as a support, dismantle and remove the beam support 1.
[0099]
(c-3) Build B3F rising walls and pillars.
(c-4) Construct B2F rising walls and pillars.
[0100]
(c-5) Build the rising wall and pillar of B1F.
In the pillar, a suspension rod (screw-reinforcing bar) 50 is used as a part of the reinforcing bar. This completes the construction of the underground structure.
[0101]
Regarding the foundation slab, in order to resist large earth pressure, it is difficult to construct the foundation slab when the beam support work is installed at the foundation slab position or close to the foundation slab. To deal with two-step foundation slabs. In addition, the beam support 1 can replace the jack system 6, the corner-fired beam erection device 7 and the like with beam members, and can be used as a permanent beam of B3F.
[0102]
Moreover, FIG. 17 is another example of the corner erection, which uses an auxiliary piece 100 having a square shape in plan view and two jacks 101, and the jack 101 is attached to the end of one erection 11, The auxiliary piece 100 and the jack 101 are set after the upset 11 is overhanging.
[0103]
【The invention's effect】
Since the up-and-down slide device and the jack device of the slide type mountain retaining support system of the present invention are configured as described above, the following effects can be obtained.
[0104]
(1) Since the vertical slide device is composed of a lift device and a gripping device, it is possible to quickly and safely slide down a relatively simple beam support.
[0105]
(2) The part where the beam support is moved forward and backward by absorbing the forward and backward movement by installing a horizontal slide device on the pair of vertical slide devices arranged in the flank raising block part that moves forward and backward of the beam support However, it can be suspended and the beam support can be safely slid down.
[0106]
(3) Since the beam and erection of the beam support work are assembled integrally by the jack device, and the jack device consists of a stroke jack with a large stroke and a preload jack, By simply pushing and pulling, the beam support can be slid down, the beam support can be installed in place and a preload can be introduced, and the retaining wall can be quickly supported near the bottom of the excavation. Therefore, the deformation and stress generated in the retaining wall can be suppressed, the scale of the retaining wall can be further reduced, the support work can be quickly performed, and the construction period can be shortened.
[0107]
(4) The stroke jack of the jack device has a structure in which a hydraulic cylinder is housed inside the telescopic outer cylinder and the inner cylinder, and the outer cylinder and the inner cylinder are fixed by a lock nut that is screwed into the inner cylinder. A large stroke can be obtained by the hydraulic cylinder, and a preload can be easily introduced by fixing with a lock nut. Also, the preload jack can be easily fixed with a lock nut.
[Brief description of the drawings]
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is a plan view showing an example of a beam support construction used in a slide type mountain retaining support system of the present invention.
FIG. 2 is an example of a joining block of the beam supporting work of FIG. 1, (a) is a plan view, and (b) is a perspective view.
3 is an example of the beam support jack system of FIG. 1, (a) is a side view in a contracted state, (b) is a view from the left, (c) is a view from the right, (d) is a side view of the extended state.
4 is an example of a corner-fired-cutting beam erection device and a corner erection of the beam support in FIG. 1, (a) is an overall plan view, and (b) is a side view of the joint portion.
FIG. 5 is a plan view showing an example in which the joint portion of the corner-fired beam erection device in FIG. 4 is different.
FIG. 6 is a plan view showing an example of a main beam used in the underground building construction method of the present invention.
7 is an example of a main beam joining plate (basement floor) and a suspension support device of FIG. 6, in which (a) is a plan view and (b) is a front view. FIG.
8 is an example of a main beam joining plate (first floor) and a suspension support device in FIG. 6, where (a) is a plan view, (b) is a front view, and (c) is a cross-sectional view of a nut. (D) is a longitudinal sectional view of the nut.
FIG. 9 is an example of an up-and-down slide device used in the underground building construction method of the present invention, where (a) is a side view and (b) is a front view.
10 is an example of a gripping device and a horizontal slide device of the vertical slide device of FIG. 9, wherein (a) is a front view and (b) is a side view.
11 is an example of a gripping device and a horizontal slide device of a vertical slide device in the corner-fired beam erection device of FIG. 4, wherein (a) is a front view and (b) is a side view.
12 is a side view showing the beam support work and the slide-down of the main beam (basement floor) by the vertical slide device of FIG. 9 in the order of steps.
FIG. 13 is a cross-sectional view showing steps (1) to (4) of the construction method of the underground frame of the present invention.
FIG. 14 is a cross-sectional view showing steps (5) and (6) of the underground building construction method according to the present invention.
FIG. 15 is a cross-sectional view showing steps (7) and (8) of the construction method of the underground frame of the present invention.
FIG. 16 is a sectional view showing a step (9) of the construction method of the underground frame of the present invention.
FIG. 17 is a plan view showing another example of corner upset according to the present invention.

Claims (4)

山留め壁内の掘削空間内に水平に配設された可動の切梁支保工と可動の本設梁をスライドダウンさせる上下スライド装置であり、1階床の本設梁に取付けられる昇降装置と、この昇降装置により昇降し、可動切梁支保工または可動本設梁に着脱可能に接続される把持装置とを備え、前記把持装置は、昇降装置から吊り下げられ可動本設梁が着脱可能に載置される水平取付部材と、この水平取付部材に開閉可能に設けられる一対のアームからなるチャックと、可動切梁支保工の切梁に設けられ前記アームの下部が着脱可能に接続される固定部材から構成されていることを特徴とするスライド式山留め支保工システムの上下スライド装置。A vertical sliding device that slides down a movable beam support work and a movable main beam that are horizontally disposed in an excavation space in the retaining wall, and a lifting device that is attached to the main beam on the first floor; And a gripping device that is lifted and lowered by this lifting device and is detachably connected to the movable beam support or movable permanent beam, and the gripping device is suspended from the lifting device so that the movable permanent beam is detachably mounted thereon. A horizontal mounting member, a chuck composed of a pair of arms that can be opened and closed on the horizontal mounting member, and a fixing member that is detachably connected to a lower beam of the movable beam supporting work. An up-and-down slide device of a slide-type mountain retaining support system characterized by comprising: 請求項1に記載の上下スライド装置において、水平方向に間隔をおいて配設された一対の固定部材を連結する連結材と、この連結材の上面と可動の切梁の間に設けられる滑り支承とからなる水平スライド装置を有することを特徴とするスライド式山留め支保工システムの上下スライド装置。  2. The vertical slide device according to claim 1, wherein a connecting member for connecting a pair of fixing members arranged at intervals in the horizontal direction, and a sliding support provided between the upper surface of the connecting member and the movable beam. A vertical slide device for a slide-type mountain-clamping support system, characterized by comprising a horizontal slide device comprising: 山留め壁内の掘削空間内を水平状態でスライドダウンして山留め壁を支える可動切梁支保工に組み込まれるジャッキ装置であり、可動切梁支保工の腹起しを山留め壁に対して進退移動させるストロークジャッキと、山留め壁にプレロードを導入するプレロードジャッキを直列に接続して構成され、前記ストロークジャッキは、外筒と、この外筒内に移動自在に収納される内筒と、これら外筒および内筒に内蔵され、両端部がそれぞれ外筒と内筒の端部プレートに接続される油圧シリンダと、前記内筒に螺合し外筒と内筒を固定するロックナットを備えていることを特徴とするスライド式山留め支保工シテステムのジャッキ装置。  It is a jack device built into the movable beam support that slides down horizontally in the excavation space in the retaining wall and supports the retaining wall, and moves the erection of the movable beam support forward and backward relative to the retaining wall. A stroke jack and a preload jack that introduces a preload to the retaining wall are connected in series. The stroke jack includes an outer cylinder, an inner cylinder that is movably accommodated in the outer cylinder, the outer cylinder, A hydraulic cylinder built in the inner cylinder and having both ends connected to the outer cylinder and an end plate of the inner cylinder, and a lock nut screwed into the inner cylinder to fix the outer cylinder and the inner cylinder; The jacking device of the slide-type mountain retaining support system. 請求項3に記載のジャッキ装置において、プレロードジャッキは、そのロッドに螺合し、このロッドと本体を固定するロックナットを備えていることを特徴とするスライド式山留め支保工のジャッキ装置。  The jack apparatus according to claim 3, wherein the preload jack includes a lock nut that is screwed to the rod and fixes the rod and the main body.
JP2000269238A 2000-09-05 2000-09-05 Vertical slide device and jack device of slide type mountain retaining system Expired - Fee Related JP3797858B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000269238A JP3797858B2 (en) 2000-09-05 2000-09-05 Vertical slide device and jack device of slide type mountain retaining system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000269238A JP3797858B2 (en) 2000-09-05 2000-09-05 Vertical slide device and jack device of slide type mountain retaining system

Publications (2)

Publication Number Publication Date
JP2002081068A JP2002081068A (en) 2002-03-22
JP3797858B2 true JP3797858B2 (en) 2006-07-19

Family

ID=18755885

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000269238A Expired - Fee Related JP3797858B2 (en) 2000-09-05 2000-09-05 Vertical slide device and jack device of slide type mountain retaining system

Country Status (1)

Country Link
JP (1) JP3797858B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101296693B1 (en) * 2012-01-20 2013-08-19 정진덕 The Movable land-side protection of which the series structure transfer device is prepared
CN108560582B (en) * 2018-04-09 2023-08-29 成都利拓重工机械有限公司 Movable support shield for urban pipe bag construction and limiting hinge thereof
CN108425367B (en) * 2018-04-09 2023-08-29 成都利拓重工机械有限公司 Movable support shield for urban pipe bag construction and mounting seat thereof
CN110029675A (en) * 2019-05-24 2019-07-19 戴向胜 Assembled in foundation pit compensates bracing members
JP7344107B2 (en) * 2019-12-06 2023-09-13 五洋建設株式会社 Retractable shoring and how to use retractable shoring
CN113389204B (en) * 2021-06-29 2023-03-17 上海隧道工程有限公司 Construction method of deep foundation pit sliding type rapid pre-support system
CN113914329B (en) * 2021-11-23 2022-08-26 中山大学 Support firm ground tunnel underground structure
CN116335151B (en) * 2023-03-27 2023-09-08 兰州有色冶金设计研究院有限公司 Construction method for excavating falling slope of space support frame after pre-grouting solidification of anchor cable

Also Published As

Publication number Publication date
JP2002081068A (en) 2002-03-22

Similar Documents

Publication Publication Date Title
JP3772657B2 (en) Sliding mountain retaining system
JP3735522B2 (en) Corner-fired beam construction equipment for sliding beam support
JP3797858B2 (en) Vertical slide device and jack device of slide type mountain retaining system
KR101352146B1 (en) Wale and strut integrated and separated temporary earth retaining wall, and construction method
JP3780833B2 (en) Construction method of underground structure
KR20110003815A (en) Prestressed temporary construction structure and method for land-side protection wall using the same
JP2014240592A (en) Caisson press-fit device and caisson press-fit construction method
JP3218314B2 (en) Beam formwork equipment
CN114045840B (en) Soft soil deep foundation pit combined supporting structure and construction method
JP7005713B1 (en) Strut for open shield method
JPH09144050A (en) Upward pushing method of construction
JP2829363B2 (en) Formwork equipment for pillar construction
JP2001003674A (en) Inner form device for vertical shaft and method for constructing side wall of mortar or the like using the same
JP2008138486A (en) Reinforcing construction method of pier
JP7275793B2 (en) Position adjusting device and method for adjusting position of structural column
CN220565688U (en) Unilateral formwork structure of secondary butt joint
JP3741784B2 (en) Lifting platform
CN112709124B (en) Steel structure bridge and installation process thereof
US20230383558A1 (en) Formwork system and a method of forming a wall
JP3079329B2 (en) Push-up method with composite jack for push-pull
JPH0230509Y2 (en)
JP3543247B2 (en) Temporary living support bracket
JP2022049699A (en) Press bar for open shield method, and strut
JPH0751789B2 (en) Soil retaining method and retaining frame for excavation trench with cross pipe
JP3225455B2 (en) How to build a building

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050916

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051018

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060124

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060207

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060418

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060418

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120428

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120428

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120428

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150428

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees