JP3721392B2 - Manufacturing method of high-temperature superconducting wire - Google Patents

Manufacturing method of high-temperature superconducting wire Download PDF

Info

Publication number
JP3721392B2
JP3721392B2 JP20047694A JP20047694A JP3721392B2 JP 3721392 B2 JP3721392 B2 JP 3721392B2 JP 20047694 A JP20047694 A JP 20047694A JP 20047694 A JP20047694 A JP 20047694A JP 3721392 B2 JP3721392 B2 JP 3721392B2
Authority
JP
Japan
Prior art keywords
wire
temperature
hour
phase
plastic working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP20047694A
Other languages
Japanese (ja)
Other versions
JPH0864044A (en
Inventor
慎一 小林
謙一 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Japan Science and Technology Agency
National Institute for Materials Science
Sumitomo Electric Industries Ltd
National Institute of Japan Science and Technology Agency
Original Assignee
Japan Science and Technology Agency
National Institute for Materials Science
Sumitomo Electric Industries Ltd
National Institute of Japan Science and Technology Agency
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Japan Science and Technology Agency, National Institute for Materials Science, Sumitomo Electric Industries Ltd, National Institute of Japan Science and Technology Agency filed Critical Japan Science and Technology Agency
Priority to JP20047694A priority Critical patent/JP3721392B2/en
Publication of JPH0864044A publication Critical patent/JPH0864044A/en
Application granted granted Critical
Publication of JP3721392B2 publication Critical patent/JP3721392B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/60Superconducting electric elements or equipment; Power systems integrating superconducting elements or equipment

Description

【0001】
【産業上の利用分野】
本発明は、ビスマス系酸化物超電導体からなるフィラメントを有する線材の製造方法に関し、特に、液体窒素温度でより高い臨界電流密度(Jc)を有する線材をより短時間で製造することができる方法に関する。
【0002】
【従来の技術】
Bi系酸化物超電導材料を用いた線材を製造する方法の1つとして、実用化に最も適した方法として考えられているパウダー・イン・チューブ法がある。この方法では、まず、超電導体またはその原料の粉末を金属(銀)シースに充填し、圧延加工を含む塑性加工を施してテープ形状の線材を得る。得られたテープ形状の線材は、酸化物超電導体の焼結のため熱処理される。熱処理の後、線材は再び圧延加工され、次いで再度熱処理される。このように圧延加工および熱処理を繰り返すことによって、比較的高い臨界電流密度(Jc)を有する線材を得ることができる。このプロセスにおいて、熱処理はそれぞれ数十時間行なわれる。
【0003】
パウダー・イン・チューブ法の改良法として、Appl. Phys. Lett. 60(23),8 June 1992,2929−2931は、次のような熱処理のスキームを報告している。超電導材料の粉末が充填された銀シースを塑性加工して得られたテープ線は、まず830〜839℃で70時間熱処理される(第1の熱処理)。次に線材は、1軸方向にプレスされた後、860℃±3℃で20〜30分間溶融プロセスに供され、続いて838℃で60時間アニールされる(第2の熱処理)。線材は、200℃/時間で室温まで冷却された後、1GPaで1軸方向にプレスされ、838℃で80〜100時間熱処理される(第3の熱処理)。同文献は、860℃±3℃での溶融プロセスをとることによって、最終的に得られる線材のJcを向上させることができると報告している。このスキームでは、最初の熱処理により2223相が形成され、第2の熱処理によってそれが2212相と不純物相に分解され、第3の熱処理によって2223相が再生されると見られている。このため、この方法は、 high-Tc phase formation- decomposition- recovery (PFDR)プロセスと呼ばれる。
【0004】
【発明が解決しようとする課題】
本発明の目的は、従来の方法よりも、より短時間で、高い臨界電流密度(Jc)を有するビスマス系酸化物超電導線を製造できる方法を提供することにある。
【0005】
【課題を解決するための手段】
本発明者は、830〜850℃における一定温度で長時間熱処理するだけでは、酸化物超電導体の焼結密度を上げることができず、さらに高いJcを得ることは困難であると考えた。一方、本発明者は、2223相の体積分率が95%以上の銀シースビスマス系酸化物超電導線を850〜870℃の温度で短時間(1〜30分)熱処理すれば、その後、所定の冷却工程をとることによって、より高いJcを有する線材が得られることを見出した。そして冷却工程の後、再度塑性加工および熱処理する必要がないことを見出し、本発明を完成するに至った。
【0006】
本発明は、ビスマス系酸化物超電導体の2223相を主成分とするフィラメントを有する高温超電導線の製造方法であって、焼結によりビスマス系酸化物超電導体の2223相を主成分として生成し得る材料の粉末が充填された金属シースに塑性加工および熱処理を施すことにより、ビスマス系酸化物超電導体の2223相の体積分率が95vol%以上であるフィラメントを有する線材を調製する工程と、調製された線材に塑性加工を施す工程と、塑性加工された線材を850〜870℃の温度で1〜30分間加熱した後、ひき続きそれより低い温度でアニールしながら冷却していく工程とを備え、さらに塑性加工および焼結処理を施すことなく、冷却された線材を最終製品として供することを特徴とする。
【0007】
本発明に従って、2223相の体積分率が95vol%以上の線材を用い、塑性加工の後、850〜870℃の温度での部分溶融工程に続いてそれより低い温度でのアニールを行えば、冷却の後、さらに塑性加工および焼結処理を施すことなく、高Jcを有する線材がすみやかに得られる。この部分溶融工程に続く好ましいアニール工程および冷却工程を備える本発明の好ましい方法は、たとえば次の通りである。
【0008】
本発明に従うより好ましい方法は、焼結によりビスマス系酸化物超電導体の2223相を主成分として生成し得る材料の粉末が充填された金属シースに塑性加工および熱処理を施すことにより、ビスマス系酸化物超電導体の2223相の体積分率が95vol%以上であるフィラメントを有する線材を調製する工程と、調製された線材に塑性加工を施す工程と、塑性加工された線材を850〜870℃の温度で1〜30分間加熱する工程と、加熱温度から820℃まで2℃/時間〜60℃/時間の範囲におけるほぼ一定の温度勾配で線材を冷却する工程と、820℃から800℃まで2℃/時間〜80℃/時間の範囲における温度勾配で線材を冷却する工程と、800℃から室温まで8℃/時間より大きい温度勾配で線材を冷却する工程とを備え、さらに塑性加工および焼結処理を施すことなく冷却された線材を最終製品として供することを特徴とする。
【0009】
さらに本発明に従うより好ましい方法は、焼結によりビスマス系酸化物超電導体の2223相を主成分として生成し得る材料の粉末が充填された金属シースに塑性加工および熱処理を施すことにより、ビスマス系酸化物超電導体の2223相の体積分率が95vol%以上であるフィラメントを有する線材を調製する工程と、調製された線材に塑性加工を施す工程と、塑性加工された線材を850〜870℃の温度で1〜30分間加熱する工程と、加熱温度から840〜800℃の温度まで60℃/時間以上の温度勾配で線材を冷却する工程と、前記840〜800℃の温度で、5〜60時間線材を保持する工程と、前記保持の後、8℃/時間より大きい温度勾配で線材を冷却する工程とを備え、さらに塑性加工および焼結処理を施すことなく冷却された線材を最終製品として供することを特徴とする。
【0010】
本発明において、金属シースに充填すべき粉末は、通常のパウダー・イン・チューブ法に従って調製できる。粉末は、Bi系酸化物超電導体またはその原料から構成される。粉末におけるBi、Pb、Sr、CaおよびCuの原子比は、たとえば次のとおりとすることができる。
【0011】
【数1】
Bi:Pb:Sr:Ca:Cu=a:b:c:d:e(原子比)
a=1.7〜2.1
b=0〜0.4
c=1.7〜2.1
d=1.7〜2.3
e=2.9〜3.1
このような組成比において、たとえば粉末は、主に2212相と非超電導相から好ましく構成することができる。このような粉末は、熱処理により2223相を主成分とする超電導体に変えることができる。一方、粉末は2223相を主成分としてもよい。たとえば上記組成において、2212相は(Bi,Pb)2 Sr2 CaCu2 8+z 、2223相は(Bi,Pb)2 Sr2 Ca2 Cu3 10+yである。
【0012】
原料粉末は、Bi系酸化物超電導体を構成する金属元素の酸化物または炭酸塩の粉末を所定の配合比で混合し、焼結した後、粉砕して調製することができる。粉末を充填するシースは、たとえば銀または銀合金等の安定化材からなる。銀合金を構成する元素として金およびプラチナ等を用いることができる。粉末が充填されたシースは、塑性加工に供される。塑性加工には、伸線加工および圧延加工もしくはプレス加工が用いられる。圧延加工またはプレス加工の後、テープ形状の線材は、酸化物超電導体を焼結するため熱処理される。多芯線を製造する場合、伸線加工の後得られた複数の線材が1本の金属チューブ内に合わされ、さらに塑性加工に供される。塑性加工の後得られた線材は、たとえば830〜850℃好ましくは840〜850℃の温度で30〜70時間、好ましくは40〜60時間熱処理される。この熱処理により、Bi系2223相を生成させることができる。本発明では、以上のプロセスによって、Bi系2223相のフィラメントに占める割合(体積分率)が95vol%以上である線材を作製する。95%以上の2223相を得るため、たとえば、シースに充填する粉末の粒径を1μm以下にすることが好ましい。
【0013】
以上のプロセスによって製造されたテープ状超電導線のフィラメントは、テープの長手方向にわたってほぼ均一な超電導相を有し、超電導相のc軸は、テープの厚み方向にほぼ平行に配向している。また、フィラメントにおける結晶粒は、テープの長手方向に延びるフレーク状であり、結晶粒同士は強く結合している。フレーク状の結晶粒は、テープ線の厚み方向に積層される。
【0014】
本発明において、重要な特徴の1つは、2223相の割合が95%以上である線材を850〜870℃における短時間の熱処理に供することである。本発明者は、この割合が95%未満であれば、高いJcを有する超電導線材を最終的に得られないことを見出した。体積分率は、X線回折により次のように求めることができる。線材におけるフィラメントをX線回折で分析し、Bi系2223相の(0010)ピーク強度(以下I2223とする)と、2212層の(008)ピーク強度(以下I2212とする)をそれぞれ求める。そして以下の式に従って体積分率が求められる。
【0015】
【数2】
Bi系2223相の体積分率={I2223/(I2223+I2212)}×100%
上述したプロセスにおいて、2223相が95%以上の線材を得ることができるが、本発明では、必要に応じて2223相の体積分率を測定し、2223相が95%以上であるかどうか確認してもよい。
【0016】
830〜850℃で数十時間熱処理された線材は、冷却され、塑性加工(圧延またはプレス加工)に供される。次いで線材は、850〜870℃、1〜30分間の部分溶融ステップに供される。部分溶融ステップは、酸化物超電導体の焼結密度を上げ高いJcを有するフィラメントを生成させるため用いられる。部分溶融ステップにおける温度が870℃を超えると、2223相の分解が進み、線材のJcは低下する。一方、温度が850℃より低いとき、焼結密度を上げることができず、Jcの上昇は望めない。また、保持時間は1〜30分であり、これより短くても長くてもより高いJcを得ることができなくなってくる。部分溶融工程は、大気圧に限らず、減圧下または加圧下においても行なうことができる。また部分溶融工程の雰囲気における酸素分圧は任意である。一方、830〜850℃での熱処理は、通常の方法に従い酸素を含む雰囲気(酸素および窒素を含む雰囲気)で行なうことが好ましい。
【0017】
本発明のもう1つの重要な特徴は、850〜870℃の加熱の後の降温過程である。この降温過程において、アニールを行ないながらの温度制御を行なうことで、従来必要であったさらなる塑性加工および熱処理を行なわなくとも、高いJcを有する線材を得ることができるようになった。本発明では、たとえば以下に示す2種類の降温過程を好ましく用いることができる。1つの過程では、850〜870℃の加熱温度から、820℃まで2℃/時間〜60℃/時間の範囲におけるほぼ一定の温度勾配で線材を冷却し、引続き820℃から800℃まで2℃/時間〜80℃/時間の範囲における温度勾配で冷却し、続いて800℃から室温まで8℃/時間より大きな温度勾配で、たとえば10〜200℃/時間、好ましくは50〜150℃/時間、より好ましくは60〜100℃/時間の温度勾配で冷却する。もう1つの過程では、850〜870℃の加熱温度から840℃〜800℃まで60℃/時間以上の温度勾配、たとえば60℃〜200℃/時間、好ましくは80℃/時間〜160℃/時間の温度勾配で冷却した後、800℃〜840℃の温度で5〜60時間保持し、引続き8℃/時間より大きい温度勾配、たとえば10〜200℃/時間、好ましくは50〜150℃/時間、より好ましくは60〜100℃/時間の温度勾配で冷却する。これらの降温過程により、従来よりも短時間で高Jcの線材を得られるようになった。
【0018】
【発明の作用効果】
超電導線材の製造において、焼結および塑性加工を繰り返す場合、初期の焼結は超電導相の形成に主に寄与し、後期の焼結は配向性が改善された結晶粒同士の結合の強化に主に寄与していると考えられる。一方、複数の焼結工程の間に行なわれる塑性加工は、結晶の配向性を機械的に改善する目的で行なわれる。したがって、初期の焼結で超電導相が十分に生成しておれば、後期の焼結では粒界の改善のみを効果的に行なえば、高いJcの線材が得られると考えられた。
【0019】
図1は、超電導線材におけるBi系2223相の体積分率と、77.3KにおけるJcとの関係を示している。図に示すとおり、95%の割合を境にして、Jcが急激に上昇することがわかる。一方、2223相が95%未満であると、線材のJcは低く抑えられる。
【0020】
本発明では、初期の焼結工程で2223相をフィラメントにおいて95%以上生成させ、高Jcの線材を得るのに十分な条件を整えている。そして、線材を塑性加工した後、850℃〜870℃の温度で短時間熱処理することにより、焼結密度を高めている。次に、適切な降温条件を設定することにより、2223相結晶粒界の均一性を向上させ、高Jcの線材をもたらしている。
【0021】
本発明によれば、降温過程の後、さらに塑性加工および焼結工程を行なう必要はない。したがって、本発明は従来より短時間で高Jcを有する線材を作製することができる。
【0022】
【実施例】
実施例1
Bi2 3 、PbO、CaCO3 、SrCO3 、CuOを用いてBi:Pb:Sr:Ca:Cu=1.82:0.31:1.89:1.99:3.02(原子比)の組成比の粉末を調製した。この粉末に熱処理を施し、粉砕を行なった後、主に2212相と非超電導相からなる粉末を得た。得られた粉末を、外径12.5mm、内径8.55mmの銀パイプに充填した。粉末を充填したパイプについて伸線加工を施し、直径1mmの単芯線材を得た。このようにして得られた線材61本を、外径12.0mm、内径9.0mmの銀パイプに詰め、伸線加工を施し、直径1mmの線材を得た後、さらに一次圧延を施して、厚さ0.2mm、幅3mmの多芯テープ線を作製した。
【0023】
得られた多芯テープ線材を4cmごとに複数に分割した。得られたセグメントに、最初の焼結として、845℃で50時間の熱処理を行なった。X線回折法によりフィラメントにおけるBi系2223相の体積分率が95%以上であることを確認した。室温まで冷却された線材に二次圧延を施して、厚さ0.18mmとした。圧延された線材を860℃において1〜60分の範囲で表1に示すように保持時間を変えて加熱した後、820℃まで5時間で降温し、さらに室温まで80℃/時間で降温した。熱処理の結果、860℃での保持時間1〜30分において、77.3KのJcが30,000〜36,000A/cm2 と、高いJc値を有する超電導線材が得られた。
【0024】
【表1】

Figure 0003721392
【0025】
実施例2
実施例1と同様にして得られた銀シース多芯線材に、845℃、50時間の一次焼結を施した。次に、室温まで冷却された線材に圧延加工を施した。圧延された線材を860℃で20分間保持した後、それぞれ以下の表2に示すような16通りのスキームで、すなわち840〜780℃まで1〜30時間で降温し、その後、室温まで80℃/時間で降温した。降温の後得られた線材のJcを表3に示す。1〜20時間で800〜830℃まで降温させることにより、77.3Kで30,000〜35,000A/cm2 の高いJcが得られた。
【0026】
【表2】
a:840℃まで1時間で降温(20℃/時間)
b:820℃まで1時間で降温(40℃/時間)
c:800℃まで1時間で降温(60℃/時間)
d:780℃まで1時間で降温(80℃/時間)
e:840℃まで10時間で降温(2℃/時間)
f:820℃まで10時間で降温(4℃/時間)
g:800℃まで10時間で降温(6℃/時間)
h:780℃まで10時間で降温(8℃/時間)
i:840℃まで20時間で降温(1℃/時間)
j:820℃まで20時間で降温(2℃/時間)
k:800℃まで20時間で降温(3℃/時間)
l:780℃まで20時間で降温(4℃/時間)
m:840℃まで30時間で降温(0.67℃/時間)
n:820℃まで30時間で降温(1.33℃/時間)
o:800℃まで30時間で降温(2℃/時間)
p:780℃まで30時間で降温(2.67℃/時間)
【0027】
【表3】
Figure 0003721392
【0028】
実施例1と実施例2における降温過程を図2に示す。図において線a〜pは実施例2の降温過程、線qは実施例1の降温過程である。実線は比較的高いJcが得られた過程、点線は相対的に低いJcが得られた過程を示している。図を参照して、まず、860℃から降温するにあたり、2℃/時間〜60℃/時間の温度勾配で降温させることが好ましい。たとえば、線i(1℃/時間)、m(0.67℃/時間)、n(1.33℃/時間)のように温度勾配が緩やかであると、高いJcが得られなくなる。一方、線d(80℃/時間)のように温度勾配が急になっても、高いJcが得られなくなる。また、860℃から820℃までは、ほぼ一定の温度勾配で降温することが好ましい。たとえば、840℃で温度勾配を変え急冷すると(線aおよびe参照)、高いJcが得られなくなる。したがって、860℃から820℃までは、2℃/時間〜60℃/時間の範囲においてほぼ一定の温度勾配で冷却することが望ましい。次に、820℃から800℃までは、2℃/時間(線o)〜80℃/時間(線b、f、j、q)の温度勾配で冷却することが望ましい。一方、800℃からは、急冷することが望ましい。たとえば、線h、l、pのように、800℃から8℃〜2.67℃/時間でゆっくり降温させると、高いJcが得られなくなる。したがって、800℃からは、8℃/時間を超える温度勾配、たとえば60〜200℃/時間で冷却することが好ましい。
【0029】
実施例3
実施例1と同様にして得られた銀シース多芯線材に、845℃、50時間の一次焼結を施した。次に、室温まで冷却された線材を圧延加工した。圧延した線材を860℃で20分間保持し、部分溶融工程を行なった後、10分間で840℃まで降温し、表4に示すように1〜70時間それぞれ保持した。保持の後、室温まで80℃/時間で降温した。その結果、保持時間5〜60時間において、77.3Kで高いJcが得られた。表4に、保持時間とJcの関係を示す。また、図3に、それぞれ用いられた冷却工程を示す。ただし、冷却速度は60〜200℃/時間であることが好ましい。
【0030】
【表4】
Figure 0003721392

【図面の簡単な説明】
【図1】Bi系2223相の体積分率と77.3KにおけるJcの関係を示す図である。
【図2】実施例1および2で行なった降温スキームを示す図である。
【図3】実施例3で行なった降温スキームを示す図である。[0001]
[Industrial application fields]
The present invention relates to a method of manufacturing a wire having a filament made of a bismuth-based oxide superconductor, and more particularly to a method of manufacturing a wire having a higher critical current density (Jc) at a liquid nitrogen temperature in a shorter time. .
[0002]
[Prior art]
As one of the methods for producing a wire using a Bi-based oxide superconducting material, there is a powder-in-tube method that is considered as the most suitable method for practical use. In this method, first, a superconductor or its raw material powder is filled in a metal (silver) sheath, and plastic processing including rolling is performed to obtain a tape-shaped wire. The obtained tape-shaped wire is heat-treated for sintering the oxide superconductor. After the heat treatment, the wire is rolled again and then heat treated again. By repeating rolling and heat treatment in this way, a wire having a relatively high critical current density (Jc) can be obtained. In this process, the heat treatment is performed for several tens of hours.
[0003]
As an improved method of the powder-in-tube method, Appl. Phys. Lett. 60 (23), 8 June 1992, 2929-2931 reports the following heat treatment scheme. A tape wire obtained by plastic working a silver sheath filled with a powder of a superconducting material is first heat-treated at 830 to 839 ° C. for 70 hours (first heat treatment). Next, after the wire is pressed in the uniaxial direction, it is subjected to a melting process at 860 ° C. ± 3 ° C. for 20 to 30 minutes, followed by annealing at 838 ° C. for 60 hours (second heat treatment). The wire is cooled to room temperature at 200 ° C./hour, pressed in 1 axis at 1 GPa, and heat-treated at 838 ° C. for 80 to 100 hours (third heat treatment). This document reports that the Jc of the wire finally obtained can be improved by taking a melting process at 860 ° C. ± 3 ° C. In this scheme, the 2223 phase is formed by the first heat treatment, it is decomposed into the 2212 phase and the impurity phase by the second heat treatment, and the 2223 phase is regenerated by the third heat treatment. For this reason, this method is called a high-Tc phase formation-decomposition-recovery (PFDR) process.
[0004]
[Problems to be solved by the invention]
An object of the present invention is to provide a method capable of producing a bismuth-based oxide superconducting wire having a high critical current density (Jc) in a shorter time than a conventional method.
[0005]
[Means for Solving the Problems]
The present inventor considered that it is difficult to obtain a higher Jc because the sintered density of the oxide superconductor cannot be increased only by heat treatment at a constant temperature of 830 to 850 ° C. for a long time. On the other hand, if the present inventors heat-treat a silver sheath bismuth-based oxide superconducting wire having a volume fraction of 2223 phase of 95% or more at a temperature of 850 to 870 ° C. for a short time (1 to 30 minutes), It has been found that a wire having a higher Jc can be obtained by taking the cooling step. And after the cooling process, it discovered that it was not necessary to perform plastic working and heat processing again, and came to complete this invention.
[0006]
The present invention is a method for manufacturing a high-temperature superconducting wire having a filament whose main component is a 2223 phase of a bismuth-based oxide superconductor, and can be formed by sintering the 2223 phase of a bismuth-based oxide superconductor as a main component. A step of preparing a wire having a filament in which the volume fraction of the 2223 phase of the bismuth-based oxide superconductor is 95 vol% or more by performing plastic working and heat treatment on the metal sheath filled with the material powder; A step of subjecting the wire to plastic processing, and a step of heating the plastic processed wire at a temperature of 850 to 870 ° C. for 1 to 30 minutes and then cooling it while annealing at a lower temperature, Further, the cooled wire is used as a final product without performing plastic working and sintering.
[0007]
According to the present invention, if a wire having a volume fraction of 2223 phase of 95 vol% or more is used, and after plastic working, a partial melting step at a temperature of 850 to 870 ° C. is followed by annealing at a lower temperature, cooling Thereafter, a wire having a high Jc can be quickly obtained without further plastic working and sintering. A preferable method of the present invention including a preferable annealing step and cooling step following the partial melting step is, for example, as follows.
[0008]
A more preferred method according to the present invention is to apply a plastic working and a heat treatment to a metal sheath filled with a powder of a material that can be generated mainly by the 2223 phase of a bismuth-based oxide superconductor by sintering. A step of preparing a wire having a filament in which the volume fraction of the 2223 phase of the superconductor is 95 vol% or more, a step of subjecting the prepared wire to plastic working, and the plastic processed wire at a temperature of 850 to 870 ° C. A step of heating for 1 to 30 minutes, a step of cooling the wire with a substantially constant temperature gradient in the range of 2 ° C./hour to 60 ° C./hour from the heating temperature to 820 ° C., and 2 ° C./hour from 820 ° C. to 800 ° C. Cooling the wire with a temperature gradient in the range of -80 ° C / hour, and cooling the wire with a temperature gradient greater than 8 ° C / hour from 800 ° C to room temperature. For example, wherein subjecting further the cooled wire without performing plastic working and sintering process as a final product.
[0009]
Furthermore, a more preferable method according to the present invention is to perform bismuth-based oxidation by performing plastic working and heat treatment on a metal sheath filled with a powder of a material that can be generated mainly by the 2223 phase of a bismuth-based oxide superconductor by sintering. A step of preparing a wire having a filament in which the volume fraction of the 2223 phase of the superconductor is 95 vol% or more, a step of subjecting the prepared wire to plastic working, and a temperature of 850 to 870 ° C. A step of heating at 1 to 30 minutes, a step of cooling the wire at a temperature gradient of 60 ° C./hour or more from the heating temperature to a temperature of 840 to 800 ° C., and a wire of 5 to 60 hours at the temperature of 840 to 800 ° C. And a step of cooling the wire with a temperature gradient greater than 8 ° C./hour after the holding, and further performing plastic working and sintering treatment. Wherein subjecting the cooled wire as a final product.
[0010]
In the present invention, the powder to be filled in the metal sheath can be prepared according to a normal powder-in-tube method. The powder is composed of a Bi-based oxide superconductor or a raw material thereof. The atomic ratio of Bi, Pb, Sr, Ca and Cu in the powder can be, for example, as follows.
[0011]
[Expression 1]
Bi: Pb: Sr: Ca: Cu = a: b: c: d: e (atomic ratio)
a = 1.7 to 2.1
b = 0-0.4
c = 1.7 to 2.1
d = 1.7 to 2.3
e = 2.9-3.1
In such a composition ratio, for example, the powder can be preferably composed mainly of a 2212 phase and a non-superconducting phase. Such a powder can be changed to a superconductor mainly composed of the 2223 phase by heat treatment. On the other hand, the powder may contain 2223 phase as a main component. For example, in the above composition, the 2212 phase is (Bi, Pb) 2 Sr 2 CaCu 2 O 8 + z and the 2223 phase is (Bi, Pb) 2 Sr 2 Ca 2 Cu 3 O 10 + y .
[0012]
The raw material powder can be prepared by mixing and sintering powders of metal element oxides or carbonates constituting the Bi-based oxide superconductor at a predetermined blending ratio and sintering. The sheath filled with the powder is made of a stabilizing material such as silver or a silver alloy. Gold, platinum, or the like can be used as an element constituting the silver alloy. The sheath filled with the powder is subjected to plastic working. For plastic working, wire drawing and rolling or pressing are used. After rolling or pressing, the tape-shaped wire is heat treated to sinter the oxide superconductor. When manufacturing a multi-core wire, a plurality of wire rods obtained after wire drawing are combined in one metal tube and further subjected to plastic working. The wire obtained after the plastic working is, for example, heat-treated at a temperature of 830 to 850 ° C., preferably 840 to 850 ° C. for 30 to 70 hours, preferably 40 to 60 hours. By this heat treatment, a Bi-based 2223 phase can be generated. In the present invention, a wire rod having a ratio (volume fraction) of Bi-based 2223 phase filaments of 95 vol% or more is manufactured by the above process. In order to obtain a 2223 phase of 95% or more, for example, it is preferable to set the particle size of the powder filling the sheath to 1 μm or less.
[0013]
The filament of the tape-shaped superconducting wire manufactured by the above process has a substantially uniform superconducting phase over the longitudinal direction of the tape, and the c-axis of the superconducting phase is oriented substantially parallel to the thickness direction of the tape. Further, the crystal grains in the filament are in the form of flakes extending in the longitudinal direction of the tape, and the crystal grains are strongly bonded to each other. The flaky crystal grains are laminated in the thickness direction of the tape wire.
[0014]
In the present invention, one of the important features is that a wire having a 2223 phase ratio of 95% or more is subjected to heat treatment at 850 to 870 ° C. for a short time. The inventor has found that if this ratio is less than 95%, a superconducting wire having a high Jc cannot be finally obtained. The volume fraction can be determined by X-ray diffraction as follows. The filament in the wire is analyzed by X-ray diffraction to determine the (0010) peak intensity (hereinafter referred to as I 2223 ) of the Bi-based 2223 phase and the (008) peak intensity (hereinafter referred to as I 2212 ) of the 2212 layer. And the volume fraction is calculated | required according to the following formula | equation.
[0015]
[Expression 2]
Volume fraction of Bi system 2223 phase = {I 2223 / (I 2223 + I 2212 )} × 100%
In the above-described process, a wire having a 2223 phase of 95% or more can be obtained. However, in the present invention, the volume fraction of the 2223 phase is measured as necessary to confirm whether the 2223 phase is 95% or more. May be.
[0016]
The wire that has been heat-treated at 830 to 850 ° C. for several tens of hours is cooled and subjected to plastic working (rolling or pressing). The wire is then subjected to a partial melting step at 850-870 ° C. for 1-30 minutes. The partial melting step is used to increase the sintered density of the oxide superconductor to produce filaments with high Jc. When the temperature in the partial melting step exceeds 870 ° C., the decomposition of the 2223 phase proceeds and the Jc of the wire decreases. On the other hand, when the temperature is lower than 850 ° C., the sintering density cannot be increased and Jc cannot be increased. Further, the holding time is 1 to 30 minutes, and it becomes impossible to obtain a higher Jc whether it is shorter or longer than this. The partial melting step is not limited to atmospheric pressure, and can be performed under reduced pressure or under pressure. Moreover, the oxygen partial pressure in the atmosphere of a partial melting process is arbitrary. On the other hand, the heat treatment at 830 to 850 ° C. is preferably performed in an atmosphere containing oxygen (an atmosphere containing oxygen and nitrogen) according to a normal method.
[0017]
Another important feature of the present invention is the cooling process after heating at 850-870 ° C. By controlling the temperature while performing the annealing in the temperature lowering process, it has become possible to obtain a wire having a high Jc even without performing further plastic working and heat treatment that have been necessary conventionally. In the present invention, for example, the following two temperature lowering processes can be preferably used. In one process, the wire is cooled from a heating temperature of 850 to 870 ° C. to a temperature of 820 ° C. with a substantially constant temperature gradient in the range of 2 ° C./hour to 60 ° C./hour and subsequently from 820 ° C. to 800 ° C. Cool with a temperature gradient in the range of time to 80 ° C./hour followed by a temperature gradient from 800 ° C. to room temperature greater than 8 ° C./hour, for example 10-200 ° C./hour, preferably 50-150 ° C./hour Preferably, cooling is performed at a temperature gradient of 60 to 100 ° C./hour. In another process, a temperature gradient of 60 ° C./hour or more from a heating temperature of 850 to 870 ° C. to 840 ° C. to 800 ° C., for example, 60 ° C. to 200 ° C./hour, preferably 80 ° C./hour to 160 ° C./hour After cooling with a temperature gradient, it is held at a temperature of 800 ° C. to 840 ° C. for 5 to 60 hours, and subsequently a temperature gradient greater than 8 ° C./hour, such as 10 to 200 ° C./hour, preferably 50 to 150 ° C./hour, Preferably, cooling is performed at a temperature gradient of 60 to 100 ° C./hour. Through these temperature lowering processes, high Jc wires can be obtained in a shorter time than before.
[0018]
[Effects of the invention]
In the production of superconducting wires, when sintering and plastic processing are repeated, the initial sintering mainly contributes to the formation of the superconducting phase, and the latter sintering mainly strengthens the bond between crystal grains with improved orientation. It is thought that it contributes to. On the other hand, plastic working performed between a plurality of sintering steps is performed for the purpose of mechanically improving crystal orientation. Therefore, if the superconducting phase was sufficiently generated in the initial sintering, it was considered that a wire having a high Jc could be obtained if only the grain boundary was improved effectively in the latter sintering.
[0019]
FIG. 1 shows the relationship between the volume fraction of the Bi-based 2223 phase in the superconducting wire and Jc at 77.3K. As shown in the figure, it can be seen that Jc rises sharply at a ratio of 95%. On the other hand, if the 2223 phase is less than 95%, the Jc of the wire can be kept low.
[0020]
In the present invention, in the initial sintering step, 2223 phases are generated in the filament by 95% or more, and conditions sufficient for obtaining a high Jc wire are prepared. And after carrying out plastic working of a wire, the sintered density is raised by heat-processing for a short time at the temperature of 850 to 870 degreeC. Next, by setting appropriate temperature lowering conditions, the uniformity of the 2223 phase grain boundary is improved, resulting in a high Jc wire.
[0021]
According to the present invention, it is not necessary to perform further plastic working and sintering after the temperature lowering process. Therefore, the present invention can produce a wire having a high Jc in a shorter time than before.
[0022]
【Example】
Example 1
Bi: Pb: Sr: Ca: Cu = 1.82: 0.31: 1.89: 1.99: 3.02 (atomic ratio) using Bi 2 O 3 , PbO, CaCO 3 , SrCO 3 , CuO A powder having the composition ratio was prepared. After heat-treating and pulverizing this powder, a powder mainly composed of 2212 phase and non-superconducting phase was obtained. The obtained powder was filled into a silver pipe having an outer diameter of 12.5 mm and an inner diameter of 8.55 mm. The pipe filled with powder was drawn to obtain a single core wire having a diameter of 1 mm. The 61 wires thus obtained were packed in a silver pipe with an outer diameter of 12.0 mm and an inner diameter of 9.0 mm, subjected to wire drawing, and after obtaining a wire with a diameter of 1 mm, further subjected to primary rolling, A multi-core tape wire having a thickness of 0.2 mm and a width of 3 mm was produced.
[0023]
The obtained multi-core tape wire was divided into plural pieces every 4 cm. The obtained segment was heat-treated at 845 ° C. for 50 hours as the first sintering. It was confirmed by X-ray diffraction that the volume fraction of the Bi-based 2223 phase in the filament was 95% or more. The wire rod cooled to room temperature was subjected to secondary rolling to a thickness of 0.18 mm. The rolled wire was heated at 860 ° C. in the range of 1 to 60 minutes while changing the holding time as shown in Table 1, and then the temperature was lowered to 820 ° C. in 5 hours, and further to room temperature at 80 ° C./hour. As a result of the heat treatment, a superconducting wire having a high Jc value of 77.3 K Jc of 30,000 to 36,000 A / cm 2 was obtained at a holding time at 860 ° C. of 1 to 30 minutes.
[0024]
[Table 1]
Figure 0003721392
[0025]
Example 2
The silver sheath multicore wire obtained in the same manner as in Example 1 was subjected to primary sintering at 845 ° C. for 50 hours. Next, the wire rod cooled to room temperature was rolled. After holding the rolled wire rod at 860 ° C. for 20 minutes, the temperature was lowered to 16 to 840 ° C. to 780 ° C. in 1 to 30 hours, respectively, as shown in Table 2 below. The temperature dropped in time. Table 3 shows Jc of the wire obtained after the temperature was lowered. By reducing the temperature to 800-830 ° C. in 1-20 hours, a high Jc of 30,000-35,000 A / cm 2 was obtained at 77.3K.
[0026]
[Table 2]
a: Temperature drop to 840 ° C in 1 hour (20 ° C / hour)
b: Decrease in temperature to 820 ° C. in 1 hour (40 ° C./hour)
c: Temperature drop to 800 ° C in 1 hour (60 ° C / hour)
d: Temperature drop to 780 ° C in 1 hour (80 ° C / hour)
e: Temperature drop to 840 ° C in 10 hours (2 ° C / hour)
f: Temperature drop to 820 ° C. in 10 hours (4 ° C./hour)
g: Temperature drop to 800 ° C in 10 hours (6 ° C / hour)
h: Temperature drop to 780 ° C. in 10 hours (8 ° C./hour)
i: Temperature drop to 840 ° C. in 20 hours (1 ° C./hour)
j: Temperature drop to 820 ° C in 20 hours (2 ° C / hour)
k: Temperature drop to 800 ° C in 20 hours (3 ° C / hour)
l: Decrease in temperature to 780 ° C in 20 hours (4 ° C / hour)
m: Temperature drop to 840 ° C in 30 hours (0.67 ° C / hour)
n: Decreasing temperature to 820 ° C in 30 hours (1.33 ° C / hour)
o: Temperature drop to 800 ° C in 30 hours (2 ° C / hour)
p: Decrease in temperature to 780 ° C. in 30 hours (2.67 ° C./hour)
[0027]
[Table 3]
Figure 0003721392
[0028]
The temperature lowering process in Example 1 and Example 2 is shown in FIG. In the figure, lines a to p are the temperature lowering process of Example 2, and line q is the temperature lowering process of Example 1. A solid line indicates a process in which a relatively high Jc is obtained, and a dotted line indicates a process in which a relatively low Jc is obtained. Referring to the figure, first, when the temperature is decreased from 860 ° C., it is preferable to decrease the temperature with a temperature gradient of 2 ° C./hour to 60 ° C./hour. For example, if the temperature gradient is gentle like lines i (1 ° C./hour), m (0.67 ° C./hour), and n (1.33 ° C./hour), high Jc cannot be obtained. On the other hand, even if the temperature gradient becomes steep as in the line d (80 ° C./hour), high Jc cannot be obtained. Further, it is preferable to lower the temperature from 860 ° C. to 820 ° C. with a substantially constant temperature gradient. For example, if the temperature gradient is changed at 840 ° C. and rapid cooling is performed (see lines a and e), high Jc cannot be obtained. Therefore, it is desirable to cool from 860 ° C. to 820 ° C. with a substantially constant temperature gradient in the range of 2 ° C./hour to 60 ° C./hour. Next, it is desirable to cool from 820 ° C. to 800 ° C. with a temperature gradient of 2 ° C./hour (line o) to 80 ° C./hour (lines b, f, j, q). On the other hand, it is desirable to cool rapidly from 800 ° C. For example, if the temperature is slowly decreased from 800 ° C. to 8 ° C. to 2.67 ° C./hour as indicated by lines h, l, and p, high Jc cannot be obtained. Therefore, it is preferable to cool from 800 ° C. at a temperature gradient exceeding 8 ° C./hour, for example, 60 to 200 ° C./hour.
[0029]
Example 3
The silver sheath multicore wire obtained in the same manner as in Example 1 was subjected to primary sintering at 845 ° C. for 50 hours. Next, the wire cooled to room temperature was rolled. The rolled wire rod was held at 860 ° C. for 20 minutes, and after performing the partial melting step, the temperature was lowered to 840 ° C. in 10 minutes and held for 1 to 70 hours as shown in Table 4. After the holding, the temperature was lowered to room temperature at 80 ° C./hour. As a result, high Jc was obtained at 77.3 K at a retention time of 5 to 60 hours. Table 4 shows the relationship between retention time and Jc. FIG. 3 shows the cooling process used. However, the cooling rate is preferably 60 to 200 ° C./hour.
[0030]
[Table 4]
Figure 0003721392

[Brief description of the drawings]
FIG. 1 is a graph showing the relationship between the volume fraction of Bi system 2223 phase and Jc at 77.3K.
FIG. 2 is a diagram showing a temperature lowering scheme performed in Examples 1 and 2. FIG.
3 is a diagram showing a temperature lowering scheme performed in Example 3. FIG.

Claims (2)

ビスマス系酸化物超電導体の2223相を主成分とするフィラメントを有する高温超電導線材の製造方法であって、
焼結によりビスマス系酸化物超電導体の2223相を主成分として生成し得る材料の粉末が充填された金属シースに塑性加工および熱処理を施すことにより、ビスマス系酸化物超電導体の2223相の体積分率が95vol%以上であるフィラメントを有する線材を調製する工程と、
調製された線材に塑性加工を施す工程と、
塑性加工された線材を850〜870℃の温度で1〜30分間加熱する工程と、
前記加熱温度から820℃まで、2℃/時間〜60℃/時間の範囲におけるほぼ一定の温度勾配で、線材を冷却する工程と、
前記820℃から800℃まで、2℃/時間〜80℃/時間の範囲における温度勾配で線材を冷却する工程と、
前記800℃から室温まで、8℃/時間より大きい温度勾配で、線材を冷却する工程とを備え、
さらに塑性加工および焼結処理を施すことなく、冷却された線材を最終製品として供することを特徴とする、高温超電導線材の製造方法。
A method for producing a high-temperature superconducting wire having a filament composed mainly of a 2223 phase of a bismuth-based oxide superconductor,
The volume of the 2223 phase of the bismuth-based oxide superconductor is subjected to plastic working and heat treatment on a metal sheath filled with a powder of a material that can be generated with the 2223 phase of the bismuth-based oxide superconductor as a main component by sintering. Preparing a wire having a filament with a rate of 95 vol% or more;
Applying plastic working to the prepared wire;
Heating the plastically processed wire at a temperature of 850 to 870 ° C. for 1 to 30 minutes;
Cooling the wire from the heating temperature to 820 ° C. with a substantially constant temperature gradient in the range of 2 ° C./hour to 60 ° C./hour;
Cooling the wire with a temperature gradient in the range of 2 ° C./hour to 80 ° C./hour from 820 ° C. to 800 ° C .;
Cooling the wire from 800 ° C. to room temperature with a temperature gradient greater than 8 ° C./hour,
Furthermore, the manufacturing method of the high-temperature superconducting wire characterized by using the cooled wire as a final product without performing plastic working and sintering.
ビスマス系酸化物超電導体の2223相を主成分とするフィラメントを有する高温超電導線材の製造方法であって、
焼結によりビスマス系酸化物超電導体の2223相を主成分として生成し得る材料の粉末が充填された金属シースに塑性加工および熱処理を施すことにより、ビスマス系酸化物超電導体の2223相の体積分率が95vol%以上であるフィラメントを有する線材を調製する工程と、
調製された線材に塑性加工を施す工程と、
塑性加工された線材を850〜870℃の温度で1〜30分間加熱する工程と、
前記加熱温度から840〜800℃の温度まで、60℃/時間以上の温度勾配で線材を冷却する工程と、
前記840〜800℃の温度で、5〜60時間線材を保持する工程と、
前記保持の後、8℃/時間より大きい温度勾配で線材を冷却する工程とを備え、
さらに塑性加工および焼結処理を施すことなく、冷却された線材を最終製品として供することを特徴とする、高温超電導線材の製造方法。
A method for producing a high-temperature superconducting wire having a filament composed mainly of a 2223 phase of a bismuth-based oxide superconductor,
The volume of the 2223 phase of the bismuth-based oxide superconductor is subjected to plastic working and heat treatment on a metal sheath filled with a powder of a material that can be generated with the 2223 phase of the bismuth-based oxide superconductor as a main component by sintering. Preparing a wire having a filament with a rate of 95 vol% or more;
Applying plastic working to the prepared wire;
Heating the plastically processed wire at a temperature of 850 to 870 ° C. for 1 to 30 minutes;
Cooling the wire with a temperature gradient of 60 ° C./hour or more from the heating temperature to a temperature of 840 to 800 ° C .;
Holding the wire at a temperature of 840 to 800 ° C. for 5 to 60 hours;
Cooling the wire with a temperature gradient greater than 8 ° C./hour after the holding,
Furthermore, the manufacturing method of the high-temperature superconducting wire characterized by using the cooled wire as a final product without performing plastic working and sintering.
JP20047694A 1994-08-25 1994-08-25 Manufacturing method of high-temperature superconducting wire Expired - Lifetime JP3721392B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20047694A JP3721392B2 (en) 1994-08-25 1994-08-25 Manufacturing method of high-temperature superconducting wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20047694A JP3721392B2 (en) 1994-08-25 1994-08-25 Manufacturing method of high-temperature superconducting wire

Publications (2)

Publication Number Publication Date
JPH0864044A JPH0864044A (en) 1996-03-08
JP3721392B2 true JP3721392B2 (en) 2005-11-30

Family

ID=16424957

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20047694A Expired - Lifetime JP3721392B2 (en) 1994-08-25 1994-08-25 Manufacturing method of high-temperature superconducting wire

Country Status (1)

Country Link
JP (1) JP3721392B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2316837C2 (en) * 2003-08-28 2008-02-10 Сумитомо Электрик Индастриз, Лтд. Method for producing superconducting wire, method for modifying oxide-coated superconducting wire, and oxide-coated superconducting wire
JP4496902B2 (en) * 2004-09-15 2010-07-07 住友電気工業株式会社 Superconducting wire manufacturing method
JP4696811B2 (en) * 2005-09-22 2011-06-08 住友電気工業株式会社 Manufacturing method of Bi-based superconductor

Also Published As

Publication number Publication date
JPH0864044A (en) 1996-03-08

Similar Documents

Publication Publication Date Title
JP3450328B2 (en) Improved processing of oxide superconductors
JPH04212215A (en) Manufacture of bismuthal oxide superconductor
JP2567505B2 (en) Method for producing bismuth oxide superconductor
JP3149441B2 (en) Method for producing bismuth-based oxide superconducting wire
US6074991A (en) Process for producing an elongated superconductor with a bismuth phase having a high transition temperature and a superconductor produced according to this process
EP1021842A1 (en) Improved method of forming superconducting composite article
JP3721392B2 (en) Manufacturing method of high-temperature superconducting wire
JP4038813B2 (en) Superconducting wire manufacturing method
JPH07282659A (en) Manufacture of high temperature superconducting wire rod
JP2569413B2 (en) Method for producing Bi-based oxide superconducting wire
JP3091350B2 (en) Method and apparatus for producing superconducting wire
JP2567891B2 (en) Method for producing oxide superconducting molded body
JP3053411B2 (en) Manufacturing method of oxide superconducting wire
JPH06223650A (en) Manufacture of bi oxide superconducting wire
JPH03122918A (en) Manufacture of ceramics superconductive conductor
JPH04292812A (en) Manufacture of bismuth-based oxide superconductive wire
JPH05101723A (en) Manufacture of oxide superconductive wire
Zhao et al. Effect of Liquid Nitrogen Quenching on Phase Formation in (Bi, Pb)‐/2223Ag Tapes
JPH07105765A (en) Manufacture of oxide superconducting wire raw material and oxide superconducting wire
JPH04292814A (en) Manufacture of bismuth-based oxide superconductive wire
JPH08306248A (en) Manufacture of oxide superconducting wire material
JP2004296253A (en) Manufacturing method of bismuth based oxide superconducting wire rod
WO2001007378A9 (en) A method for forming bismuth-based superconducting ceramics
JPH02278616A (en) Manufacture of multicore-type oxide superconductor
JPH01163913A (en) Manufacture of oxide superconductive wire

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040303

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20040715

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040715

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050125

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050304

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050719

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050818

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090922

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090922

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100922

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100922

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110922

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110922

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120922

Year of fee payment: 7