JP3720989B2 - 下水道管の埋設工法 - Google Patents

下水道管の埋設工法 Download PDF

Info

Publication number
JP3720989B2
JP3720989B2 JP24691598A JP24691598A JP3720989B2 JP 3720989 B2 JP3720989 B2 JP 3720989B2 JP 24691598 A JP24691598 A JP 24691598A JP 24691598 A JP24691598 A JP 24691598A JP 3720989 B2 JP3720989 B2 JP 3720989B2
Authority
JP
Japan
Prior art keywords
pipe
branch
rib
laying
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24691598A
Other languages
English (en)
Other versions
JP2000073438A (ja
Inventor
真人 小川
満 草野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Plastics Inc
Original Assignee
Mitsubishi Plastics Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Plastics Inc filed Critical Mitsubishi Plastics Inc
Priority to JP24691598A priority Critical patent/JP3720989B2/ja
Publication of JP2000073438A publication Critical patent/JP2000073438A/ja
Application granted granted Critical
Publication of JP3720989B2 publication Critical patent/JP3720989B2/ja
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、管外周面に環状リブが管軸方向に対して所定間隔で設けられた合成樹脂製リブパイプによる下水道管の埋設工法に関する。
【0002】
【従来の技術】
従来から下水道管の埋設配管は次のようにして行われている。即ち、図3に断面図で示した如く、地面を掘り起こして形成した掘削溝Aの底部を地均しして採石,栗石,砂利等を敷き詰めて基礎を形成し、本管1を敷設する。そこで、図4に示した如く、この本管1の側壁に分岐サドル継手5を接続し、該分岐サドル継手5に曲がり管6aを介して枝管6を接続すると共に、枝管6を敷設する掘削溝Bの底部には砂を敷き詰めて基礎を形成していた。
【0003】
この埋設配管では、本管1には管外周面に環状リブ11が管軸方向に対して所定間隔で設けられた合成樹脂製リブパイプが使用され、曲がり管6aと枝管6には環状リブを有しない通常の合成樹脂管が使用されていた。
【0004】
【発明が解決しようとする課題】
ところが、近年海砂や川砂等の目の細かい砂が不足しており、枝管6を敷設する掘削溝Bの底部に目の細かい砂を敷き詰めることができなくなっている。そこで、この砂に代えて採石,栗石,砂利等が用いられているが、これらの比較的目の粗い石を敷き詰めた場合には、土圧や輪荷重が合成樹脂管の上面に作用したとき、石の角が管表面に当たって亀裂が発生したり、破損する危険性があった。
【0005】
本発明はかかる課題を解決したものであって、採石等の比較的目の粗い石を敷き詰めて埋設溝の基礎を形成できると共に、土圧や輪荷重が枝管の上面に作用しても枝管に亀裂が生じたり、破損することのない下水道管の埋設工法を提供するものである。
【0006】
【課題を解決するための手段】
本発明は、管外周面に環状リブが管軸方向に対して所定間隔で設けられた合成樹脂製リブパイプによる下水道管の埋設工法であって、掘削溝の底部を地均しして採石等の比較的目の粗い石を敷き詰めて基礎を形成してからリブパイプの本管を敷設し、次いで本管の側壁に分岐サドル継手を接続して該分岐サドル継手にリブパイプの枝管を接続するにあたり、枝管を敷設する掘削溝の底部に採石等の比較的目の粗い石を敷き詰めて基礎を形成してからリブパイプの枝管を敷設して土砂等を埋め戻しすることを特徴とする。
【0007】
【発明の実施の形態】
以下、本発明の実施の形態を図面に基づいて詳細に説明する。
図1は本発明による下水道管の埋設状態を示す一実施例の部分切断断面図、図2は本管と枝管との接続状態を示す部分切断断面図であって、図中A及びBは地面を掘り起こして形成した掘削溝、1は本管、2は分岐サドル継手、3は枝管である。
【0008】
本管1及び枝管3は塩化ビニル樹脂等からなる管の外周面に環状リブ11,31が管軸方向に対して所定間隔で設けられたリブパイプであって、本発明では本管1及び枝管3に合成樹脂製リブパイプを用いて埋設配管を行うものである。掘削溝Aに本管1を敷設する際、掘削溝Aの底部を地均しして採石,栗石,砂利等の比較的目の粗い石を敷き詰めて基礎を形成し、本管1を基礎の上に敷き並べて順次接続する。
【0009】
同様にして、枝管3を敷設する掘削溝Bの底部を地均しして採石,栗石,砂利等の比較的目の粗い石を敷き詰めて基礎を形成する。そこで、本管1の側壁に分岐サドル継手2を接続し、該分岐サドル継手2に曲がり管3aを介して枝管3を順次接続し、その他端をマンホール等に接続する。この様にして、本管1及び枝管3の敷設配管を行ってから掘り起こした土砂等を掘削溝A及びBに投入して埋め戻しする。
【0010】
本管1及び枝管3に用いられるリブパイプの管外周面には、環状リブが設けられているため、管の偏平化が効果的に防止される。このため、埋設配管後に土圧や輪荷重が管の上面に作用しても亀裂が生じたり、破損することもない。また、採石等を敷き詰めた基礎の上に本管1及び枝管3を載置したとき、管外周面に所定間隔で設けられた環状リブが採石等と接触して上方からの荷重を支持する。このため、埋設配管後に土圧や輪荷重が管の上面に作用しても、採石等の角が管表面に当たって亀裂が発生したり、破損することもない。
【0011】
【発明の効果】
以上詳述した如く、本発明では、管外周面に環状リブが管軸方向に対して所定間隔で設けられた合成樹脂製リブパイプを用いて埋設配管を行なうので、管外周面に所定間隔で設けられた環状リブによって管の偏平化が防止される。また、土圧や輪荷重の外力が環状リブによって支持されるため、採石等の角が管表面に当たって亀裂が発生したり、破損することもない。近年、海砂や川砂等の目の細かい砂が不足しているため、配管の埋設工事に支障を来しているが、本発明の埋設工法によれば、どこでも手軽に入手できる採石等が使用できるため、埋設工事の工期短縮を図ることもできる。
【図面の簡単な説明】
【図1】図1は下水道管の埋設状態を示す本発明の一実施例の部分切断断面図である。
【図2】図2は本管と曲がり管との接続状態を示す部分切断断面図である。
【図3】図3は下水道管の埋設状態を示す従来例の部分切断断面図である。
【図4】図4は本管と曲がり管との接続状態を示す従来例の部分切断断面図である。
【符号の説明】
A,B 掘削溝
1 本管
2 分岐サドル継手
3 枝管
4 マンホール

Claims (1)

  1. 管外周面に環状リブが管軸方向に対して所定間隔で設けられた合成樹脂製リブパイプによる下水道管の埋設工法であって、掘削溝の底部を地均しして採石等の比較的目の粗い石を敷き詰めて基礎を形成してからリブパイプの本管を敷設し、次いで本管の側壁に分岐サドル継手を接続して該分岐サドル継手にリブパイプの枝管を接続するにあたり、枝管を敷設する掘削溝の底部に採石等の比較的目の粗い石を敷き詰めて基礎を形成してからリブパイプの枝管を敷設して土砂等を埋め戻しすることを特徴とする下水道管の埋設工法。
JP24691598A 1998-09-01 1998-09-01 下水道管の埋設工法 Expired - Fee Related JP3720989B2 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24691598A JP3720989B2 (ja) 1998-09-01 1998-09-01 下水道管の埋設工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24691598A JP3720989B2 (ja) 1998-09-01 1998-09-01 下水道管の埋設工法

Publications (2)

Publication Number Publication Date
JP2000073438A JP2000073438A (ja) 2000-03-07
JP3720989B2 true JP3720989B2 (ja) 2005-11-30

Family

ID=17155653

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24691598A Expired - Fee Related JP3720989B2 (ja) 1998-09-01 1998-09-01 下水道管の埋設工法

Country Status (1)

Country Link
JP (1) JP3720989B2 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6495068B2 (ja) * 2015-03-30 2019-04-03 大成建設株式会社 管渠の構築方法および地下流路

Also Published As

Publication number Publication date
JP2000073438A (ja) 2000-03-07

Similar Documents

Publication Publication Date Title
CN110219359A (zh) 一种沉管式检查井及其施工方法
JP3720989B2 (ja) 下水道管の埋設工法
CN217603494U (zh) 一种便于施工的石化公用工程管网开槽埋管结构
JP2007169927A (ja) 耐震化マンホール構造及びその製造法
KR100538981B1 (ko) 연약지반 설치용 상수도관 보호구조
KR100654327B1 (ko) 지중매설 상하수도관로 보호용 행거구조
JP2007092293A (ja) マンホール管の埋設構造
KR100681843B1 (ko) 도로의 흄관매설구조
KR200406776Y1 (ko) 연약지반 상하수도관 침하방지용 방석매트 지지구조
JP4863311B2 (ja) 掘削工法
CN113404050A (zh) 一种一体化钢圆筒水下防护系统的安装方法
CN112663761A (zh) 一种排水沟与边坡相交的结构及施工方法
KR100524136B1 (ko) 트렌치와 배수재를 이용한 기초바닥 영구배수 구조체 및그의 구축방법
CN103982707A (zh) 临场现铺混凝土包围柔管导流系统
JPS6111339Y2 (ja)
KR100688617B1 (ko) 저면이 평탄한 하수관
JPH0663269B2 (ja) 配管の埋設方法
JP2008057188A (ja) 耐震化マンホール構造及びその製造法
KR200333115Y1 (ko) 폐타이어 박편을 이용한 하수관 보호 충진재
JP2985063B2 (ja) ケーソンプレハブ人孔およびその施工法
JPS6215343Y2 (ja)
RU111604U1 (ru) Конструкция напорного трубопровода из высокопрочных чугунных труб с шаровидным графитом, используемого в различных грунтах (варианты)
JP3611937B2 (ja) 掘削孔の仮埋構造
KR0167035B1 (ko) 흄관 매설공법
KR200336460Y1 (ko) 트렌치와 배수재를 이용한 기초바닥 영구배수 구조체

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050810

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050817

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050909

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080916

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090916

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100916

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110916

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120916

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120916

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130916

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130916

Year of fee payment: 8

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130916

Year of fee payment: 8

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130916

Year of fee payment: 8

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130916

Year of fee payment: 8

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees