JP3693480B2 - Upper swing body of hydraulic excavator - Google Patents

Upper swing body of hydraulic excavator Download PDF

Info

Publication number
JP3693480B2
JP3693480B2 JP01494798A JP1494798A JP3693480B2 JP 3693480 B2 JP3693480 B2 JP 3693480B2 JP 01494798 A JP01494798 A JP 01494798A JP 1494798 A JP1494798 A JP 1494798A JP 3693480 B2 JP3693480 B2 JP 3693480B2
Authority
JP
Japan
Prior art keywords
work
mounting portion
work attachment
attachment
swing body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP01494798A
Other languages
Japanese (ja)
Other versions
JPH11200415A (en
Inventor
慎太郎 崎谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Kobe Steel Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd, Kobe Steel Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP01494798A priority Critical patent/JP3693480B2/en
Publication of JPH11200415A publication Critical patent/JPH11200415A/en
Application granted granted Critical
Publication of JP3693480B2 publication Critical patent/JP3693480B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/08Superstructures; Supports for superstructures
    • E02F9/0833Improving access, e.g. for maintenance, steps for improving driver's access, handrails

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Component Parts Of Construction Machinery (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、油圧ショベル等の建設機械の上部旋回体に関し、特に上部旋回体上の搭載物のメンテナンス用作業ステップに関する。
【0002】
【従来の技術】
図7は、特開平8−302739号公報に記載されている一実施例バックホー1の全体側面図である。図において、5はバックホー1の旋回台、7はキャビン、20はキャビン7後部のボンネット、3は旋回台5のフロント部に装着している掘削装置である。図8は、図7における旋回台5の平面図である。図において、18はエンジン、16は燃料タンク、17はオイルタンク(作動油タンク)である。図7及び図8に示す従来技術のバックホーでは、その旋回台5は、平面視で前部が切り欠かれた略円形状を呈しており、作業時に小旋回ができるようにしている。このバックホー1では旋回台5の上面側に作業ステップを設けていない。また掘削装置3を図7のように最大上げ状態に操作したときには、前記掘削装置3のブーム8(詳くは第1ブーム部材8a)の背面がボンネット20の固定フード20cの上面前端部(符号イで示す)付近まで近接するようにしている。
【0003】
図9は、実開平6−63659号公報に記載されている中・大型の油圧ショベルの一実施例上部旋回体42の要部斜視図である。図9における上部旋回体42では、前記上部旋回体42の上面に沿って複数個の板材である上部ガード43を配設し、かつ上部ガード43の上面が上部ガード43の前端部より後端部へ向けて下り勾配の傾斜になるように形成している。そして前記上部ガード43の上面部に、メンテナンス作業時用の工具,油缶等を置くための水平面部分44を形成している。なお図9において、45は上部旋回体42の後部に装着したカウンタウエイト、46は運転室用のキャブである。
【0004】
図9に示す上部旋回体42では、運転者が上部ガード43の上面に昇って上部ガード43の一部を開放し、たとえばエンジン(図示していない)の点検,調整,修理等を行うとき、傾斜していない前記水平面部分44を作業ステップにするとともに工具,油缶等小物を安定して置くことができるので、前記メンテナンス作業時に便利が良い。
【0005】
【発明が解決しようとする課題】
油圧ショベル等の建設機械の上部旋回体上には、エンジン,各種油圧機器その他の各種機器類が搭載されているが、これらの機器類はメンテナンスが必要な場合があり、従来からメンテナンスをより容易に行えるように、上部旋回体上にメンテナンス用の作業ステップを設けている。例えば上部旋回体後方の後部機器搭載部に搭載されたエンジン及びその周辺機器のメンテナンスを行うためには、エンジンカバーを開放して、作業アタッチメント取付部と後部機器搭載部との間に設けられた作業ステップ上から作業を行う。
【0006】
しかしながら、近年の都市部での工事の増加に伴い、小型の油圧ショベルが増加してきた。この小型油圧ショベルでは、後部機器搭載部内にスペース的な余裕が持てないばかりでなく、作業アタッチメントを上げた状態にすると後部機器搭載部に近接するため、図9に示す中・大型の油圧ショベルのように、ここに十分な作業ステップを設けることができなかった。特に上部旋回体の少なくとも後端が車幅内で旋回できるような小型油圧ショベルでは、この傾向がより顕著であり、狭凡な作業スペース上でのメンテナンス作業を余儀なくされ、作業効率を著しく損なっていた。
【0007】
なお図7及び図8に示す従来技術の一実施例バックホー1では、その旋回台5の上面側に作業ステップを設けていない。そのために、作業者が旋回台5の上面側から旋回台5内部の機器類のメンテナンス作業(旋回台5上面側付近の清掃作業等も含む)を行うことは困難である。本発明は、小型の油圧ショベルであっても、上部旋回体(前記旋回台と同様)に搭載されている動力源,油圧機器等の機器類のメンテナンス作業を上部旋回体の上面側から行うために、前記上面側に作業ステップを設けるようにした建設機械の上部旋回体を提供することを目的とする。
【0008】
【課題を解決するための手段】
上部旋回体の上部に設けられた作業アタッチメント取付部と、前記作業アタッチメント取付部に、後傾状態となるまで起こされるように起伏自在に取付けた基端部構成要素であるブームを有する起伏自在に取付けた作業アタッチメントと、前記作業アタッチメント取付部の後方に設けられた動力源が搭載された後部機器搭載部と、前記上部旋回体の前記作業アタッチメント取付部の左右両側方に設けられた側部機器搭載部と、前記後部機器搭載部と前記左右両側方の側部機器搭載部と前記作業アタッチメントに囲まれた位置に配置された旋回モータとを有し、前記後部機器搭載部より前方で、かつ左右の前記側部機器搭載部の間で、かつ前記作業アタッチメント取付部の後方で、かつ前記旋回モータの上方に取外し可能に設けられた作業ステップを有し、前記作業ステップは、左右の前記側部機器搭載部と略同一幅を有し、また前記後部機器搭載部の上面より下方位置に、前記作業アタッチメントの最大上げ状態時の前記作業アタッチメントの略背面付近まで延設して配置した。
【0009】
前記のような上部旋回体の構成により、作業アタッチメントが作業アタッチメント取付部を基点として起こされ作業アタッチメントの基端部付近が後傾状態になっても、作業ステップは他の機器、その他上部旋回体の構造物との関係を考慮した上で可能な限り下方に配置するほど、作業ステップの前後方向長さは長寸に設定できる。またメンテナンス作業時に作業者の前屈姿勢が緩和される。
【0010】
更に、前記作業ステップは、左右の側部機器搭載部間と略同一の幅を持たせた。これによれば、より作業ステップの踏み面を大きくでき、よりメンテナンス作業の作業性が向上できる。
【0011】
更に、前記作業アタッチメントの最大上げ状態時に、前記作業ステップを作業アタッチメントの略背面付近まで延設した。これによれば、作業アタッチメントの背面と後部機器搭載部との間隔が離れる下方において、作業アタッチメントと干渉しない範囲で最大限、作業ステップの踏み面を大きくでき、よりメンテナンス作業の作業性が向上できる。
【0012】
【発明の実施の形態】
以下、本発明の実施の形態を図面に基づいて詳細に説明する。図1は、本発明の一実施形態の上部旋回体を装備した油圧ショベル10の側面図である。図において、11は油圧ショベル10の下部走行体、12は下部走行体11の上部に連設した上部旋回体、13は上部旋回体12のメインフレームであるセンタフレーム、14はメインフレーム13の上部に設けられた作業アタッチメント取付部、15は作業アタッチメント取付部14に起伏自在に取付けられた作業アタッチメント、21は作業アタッチメント15の基部側構成要素であるブーム、22はブームシリンダ、23は上部旋回体12の前部左側に設けられている運転室用のキャブ、24は上部旋回体12の後部に装着されているカウンタウエイト、25は作業アタッチメント取付部14の後方に配設した作業ステップ、19は前記作業ステップ25の下方の位置にある旋回モータである。
【0013】
図2は、図1における上部旋回体12の要部平面図である。なお図において作業ステップ25の配設位置をわかりやすくするために、作業ステップ25にはハッチングを施して図示している。26は作業アタッチメント取付部14の後方に設けられた後部機器搭載部、27は後部機器搭載部26に搭載されている動力源である例えばエンジン(ラジエータ,オイルクーラ等も搭載されているが図示していない)、28は前記キャブ23を搭載している左側部機器搭載部、29は左側部機器搭載部28に搭載されている他の機器類のうち燃料タンク、30は右側部機器搭載部、31は右側部搭載部30に搭載されている油圧機器類のうち作動油タンク、32は油圧アクチュエータ(前記ブームシリンダ22など)制御用のコントロールバルブ、33は右側部機器搭載部30の内壁面部と前記作業ステップ25との間に設けられているサイドカバー、34はサイドカバー33の前側に設けられている前カバー、35は前記サイドカバー33を固定するためにボルト(図示していないが後述する)締付けするフレーム枠である。
【0014】
図3は、図2に示す上部旋回体12に前記作業アタッチメント15を取付けた状態にしてA−Aより見た要部側面図であるが、作業アタッチメント15はブーム21を最大上げ状態にしている。図において、36はサイドカバー33をフレーム枠35に対して締付固定しているボルト、37はサイドカバー33に固設した作業ステップ25取付用のブラケットである。図4は、図2のBより見た作業ステップ25付近を示す要部斜視図である。図において、38は作業ステップ25を上部旋回体12の固定部(例えばブラケット37など)に締付固定しているボルト、39は作業ステップ25に開穿している前記ボルト38挿通用のボルト穴、40は作業ステップ25の下面部に固設した補強用のリブ、41は後部カバーである。図5は、作業ステップ25の平面図である。図6は、図5のCより見た側面図である。
【0015】
次に、本発明の一実施形態の上部旋回体12の構成及び作用を図1〜図6について述べる。本実施形態では、上部旋回体12のセンタフレーム13の上部に設けられた作業アタッチメント取付部14と、前記作業アタッチメント取付部14に起伏自在に取付けた作業アタッチメント15と、前記作業アタッチメント取付部14の後方に設けられた後部機器搭載部26(図2に示す)と、前記上部旋回体12の作業アタッチメント取付部14の左右両側方に設けられた左側部機器搭載部28,右側部機器搭載部30とを有する油圧ショベル10において、平面視で前記後部機器搭載部26と前記作業アタッチメント取付部14との間に設けられた作業ステップ25を有し、前記作業ステップ25は、前記後部機器搭載部26の上面ロ(図3及び図4に示す)より寸法hだけ下方に位置させた。
【0016】
前記のような上部旋回体12の構成により、作業アタッチメント15が作業アタッチメント取付部14を基点として起こされ作業アタッチメント15のブーム21が図3に示すように後傾状態になっても、作業ステップ25は他の機器例えばエンジン27、その他上部旋回体12の構造物との関係を考慮した上で可能な限り下方に(すなわち寸法hを延長する方向に)配置するほど、作業ステップ25の前後方向長さl(図2〜図6に示す)は長寸に設定できる。前記作業ステップ25の配設により、メンテナンス作業時に作業者の前屈姿勢が緩和され、正常な姿勢で楽に作業を行うことができる。
【0017】
また作業ステップ25は、通常旋回モータ19、図示していないスイベルジョイント等の機器が配置される部分の上方に位置するため、これらの機器を雨雪,砂等から保護することができ、ボルト38の取外しにより取外すことができるので、これらの機器のメンテナンスも可能である。
【0018】
更に、前記作業ステップ25は図2に示すように左側部機器搭載部28と右側部機器搭載部30との間の間隔寸法と、略同一の幅(その幅寸法はWであるが、図2,図4,図5に示す)を持たせるようにした。これによれば、より作業ステップ25の踏み面を大きくでき、よりメンテナンス作業の作業性を向上させることができる。
【0019】
更に図3に示すように、前記作業アタッチメント15の最大上げ状態時に対応すべく、作業ステップ25を前記状態の作業アタッチメント15のブーム21の略背面付近まで延設した。これによれば、前記ブーム21の背面と後部機器搭載部26との間隔が離れる下方において、ブーム21と干渉しない範囲で最大限、作業ステップ25の踏み面を大きくでき、よりメンテナンス作業の作業性を向上させることができる。
【0020】
【発明の効果】
本発明の建設機械の上部旋回体では、平面視で後部機器搭載部と作業アタッチメント取付部との間に設けられた作業ステップを有し、前記作業ステップは、前記後部機器搭載部の上面より下方に位置させたので、前記作業アタッチメントの基端部付近が後傾状態になっても、作業ステップは他の機器、その他上部旋回体の構造物との関係を考慮した上で可能な限り下方に配置するほど、作業ステップの前後方向長さは長寸に設定できる。前記作業ステップの配設により、メンテナンス作業時に作業者の前屈姿勢が緩和され、正常な姿勢で楽に作業を行うことができる。
【0021】
また前記作業ステップは、通常旋回モータ、スイベルジョイント等の機器が配置される部分の上方に位置するため、これらの機器を雨雪,砂等から保護することができ、かつ取外すことができるので、これらの機器のメンテナンスも可能である。
【0022】
更に前記作業ステップは、左右の側部機器搭載部間の間隔寸法と、略同一の幅を持たせるようにしたので、より作業ステップの踏み面を大きくでき、よりメンテナンス作業の作業性を向上させることができる。
【0023】
更に前記作業アタッチメントの最大上げ状態時に対応すべく、前記作業ステップを作業アタッチメントの略背面付近まで延設したので、作業アタッチメントの背面と後部機器搭載部との間隔が離れる下方において、作業アタッチメントと干渉しない範囲で最大限、作業ステップの踏み面を大きくでき、よりメンテナンス作業の作業性を向上させることができる。
【0024】
したがって本発明の建設機械の上部旋回体では、その上部旋回体の上面側に十分な大きさの作業ステップを確保できたので、正常な姿勢で楽にメンテナンス作業を行うことができるとともに、その作業効率をたかめることができる。
【図面の簡単な説明】
【図1】本発明の一実施形態の上部旋回体を装備した油圧ショベルの側面図である。
【図2】図1における上部旋回体の要部平面図である。
【図3】図2に示す上部旋回体に前記作業アタッチメントを取付けた状態にしてA−Aより見た要部側面図である。
【図4】図2のBより見た作業ステップ付近を示す要部斜視図である。
【図5】図4に示す作業ステップの平面図である。
【図6】図5のCより見た側面図である。
【図7】従来技術の一実施例バックホーの全体側面図である。
【図8】図7における旋回台の平面図である。
【図9】従来技術の油圧ショベルの一実施例上部旋回体の要部斜視図である。
【符号の説明】
12,42,5 上部旋回体(旋回台)
14 作業アタッチメント取付部
15,3 作業アタッチメント(掘削装置)
19 旋回モータ
21,8 ブーム
22 ブームシリンダ
25 作業ステップ
26 後部機器搭載部
27,18 エンジン
28 左側部機器搭載部
29,16 燃料タンク
30 右側部機器搭載部
31,17 作動油タンク
32 コントロールバルブ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an upper swing body of a construction machine such as a hydraulic excavator, and more particularly to an operation step for maintenance of a load on the upper swing body.
[0002]
[Prior art]
FIG. 7 is an overall side view of an example backhoe 1 described in Japanese Patent Laid-Open No. 8-302739. In the figure, 5 is a swivel of the backhoe 1, 7 is a cabin, 20 is a bonnet at the rear of the cabin 7, and 3 is an excavator mounted on the front part of the swivel 5. FIG. 8 is a plan view of the swivel base 5 in FIG. In the figure, 18 is an engine, 16 is a fuel tank, and 17 is an oil tank (hydraulic oil tank). In the conventional backhoe shown in FIGS. 7 and 8, the swivel 5 has a substantially circular shape with a front portion cut out in a plan view so that a small turn can be made during work. In the backhoe 1, no work step is provided on the upper surface side of the swivel base 5. When the excavator 3 is operated to the maximum raised state as shown in FIG. 7, the rear surface of the boom 8 (specifically, the first boom member 8 a) of the excavator 3 is the upper front end portion of the fixed hood 20 c of the bonnet 20 (reference numeral It is made to approach to the vicinity.
[0003]
FIG. 9 is a perspective view of an essential part of an upper rotating body 42 of an embodiment of a medium / large hydraulic excavator described in Japanese Utility Model Laid-Open No. 6-63659. In the upper swing body 42 in FIG. 9, an upper guard 43 that is a plurality of plates is disposed along the upper surface of the upper swing body 42, and the upper surface of the upper guard 43 is a rear end portion from the front end portion of the upper guard 43. It is formed so as to have a downward slope toward the top. A horizontal plane portion 44 for placing tools, oil cans and the like for maintenance work is formed on the upper surface of the upper guard 43. In FIG. 9, 45 is a counterweight attached to the rear part of the upper swing body 42, and 46 is a cab for the cab.
[0004]
In the upper turning body 42 shown in FIG. 9, when the driver rises to the upper surface of the upper guard 43 and opens a part of the upper guard 43, for example, when checking, adjusting, repairing, etc. the engine (not shown), Since the non-inclined horizontal plane portion 44 is used as a work step and small items such as tools and oil cans can be placed stably, it is convenient during the maintenance work.
[0005]
[Problems to be solved by the invention]
On the upper swing body of construction machines such as hydraulic excavators, the engine, various hydraulic devices and other various devices are mounted, but these devices may require maintenance, making maintenance easier than before. Thus, a maintenance work step is provided on the upper swing body. For example, in order to perform maintenance of the engine and its peripheral devices mounted on the rear device mounting portion behind the upper swing body, the engine cover is opened and provided between the work attachment mounting portion and the rear device mounting portion. Work from the work step.
[0006]
However, with the recent increase in construction in urban areas, small hydraulic excavators have increased. In this small hydraulic excavator, not only does not have enough space in the rear equipment mounting portion, but also when the work attachment is raised, the small hydraulic excavator is close to the rear equipment mounting portion. As described above, sufficient work steps could not be provided here. This tendency is more pronounced especially in small hydraulic excavators in which at least the rear end of the upper swinging body can swivel within the vehicle width, which necessitates maintenance work in a narrow work space and significantly impairs work efficiency. It was.
[0007]
In the backhoe 1 of the prior art shown in FIGS. 7 and 8, no work step is provided on the upper surface side of the swivel base 5. Therefore, it is difficult for an operator to perform maintenance work (including cleaning work in the vicinity of the upper surface side of the swivel 5) of the devices inside the swivel 5 from the upper surface side of the swivel 5. The present invention performs maintenance work on equipment such as a power source and hydraulic equipment mounted on an upper swing body (similar to the swivel) from the upper surface side of the upper swing body even in a small hydraulic excavator. Another object of the present invention is to provide an upper turning body of a construction machine in which a work step is provided on the upper surface side.
[0008]
[Means for Solving the Problems]
A work attachment mounting portion provided on the upper part of the upper swing body, and a boom that is a base end component that is mounted on the work attachment mounting portion so as to be raised and lowered so as to be tilted rearward. The attached work attachment, the rear equipment mounting portion on which the power source provided behind the work attachment mounting portion is mounted, and the side devices provided on the left and right sides of the work attachment mounting portion of the upper swing body A swivel motor disposed at a position surrounded by the mounting portion, the rear device mounting portion, the left and right side device mounting portions, and the work attachment; and in front of the rear device mounting portion; and A work step detachably provided between the left and right side equipment mounting parts, behind the work attachment mounting part and above the swing motor. The work step has substantially the same width as the left and right side device mounting portions, and is positioned below the upper surface of the rear device mounting portion, and the work when the work attachment is in the maximum raised state. Arranged to extend almost to the back of the attachment.
[0009]
Even if the work attachment is raised with the work attachment mounting portion as the base point and the vicinity of the base end portion of the work attachment is tilted backward, the work step can be performed by another device or other upper swivel body. The length of the work step in the front-rear direction can be set to be longer as it is arranged as far as possible in consideration of the relationship with the structure. Also, the operator's forward bending posture is eased during maintenance work.
[0010]
Further, the work step has substantially the same width as that between the left and right side device mounting portions. According to this, the tread surface of the work step can be further increased, and the workability of the maintenance work can be further improved.
[0011]
Furthermore, when the work attachment is in the maximum raised state, the work step is extended to the vicinity of the substantially rear surface of the work attachment. According to this, in the lower part where the distance between the rear surface of the work attachment and the rear equipment mounting portion is separated, the tread surface of the work step can be enlarged as much as possible within a range not interfering with the work attachment, and the workability of the maintenance work can be further improved. .
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a side view of a hydraulic excavator 10 equipped with an upper rotating body according to an embodiment of the present invention. In the figure, 11 is a lower traveling body of the excavator 10, 12 is an upper revolving body connected to the upper portion of the lower traveling body 11, 13 is a center frame that is a main frame of the upper revolving body 12, and 14 is an upper portion of the main frame 13. 15 is a work attachment attached to the work attachment attachment 14 so that it can be raised and lowered, 21 is a boom as a base side component of the work attachment 15, 22 is a boom cylinder, and 23 is an upper swing body. The cab for the operator's cab provided on the left side of the front part of the vehicle 12, 24 is a counterweight attached to the rear part of the upper swing body 12, 25 is a work step disposed behind the work attachment mounting part 14, 19 is It is a turning motor at a position below the work step 25.
[0013]
FIG. 2 is a plan view of a main part of the upper swing body 12 in FIG. In the figure, the work step 25 is hatched for easy understanding of the position of the work step 25. 26 is a rear device mounting portion provided behind the work attachment mounting portion 14, 27 is a power source mounted on the rear device mounting portion 26, for example, an engine (a radiator, an oil cooler, etc. is also mounted. , 28 is a left side device mounting portion on which the cab 23 is mounted, 29 is a fuel tank among other devices mounted on the left side device mounting portion 28, 30 is a right side device mounting portion, Reference numeral 31 denotes a hydraulic oil tank among the hydraulic equipment mounted on the right side mounting portion 30; 32, a control valve for controlling a hydraulic actuator (such as the boom cylinder 22); 33, an inner wall surface portion of the right side device mounting portion 30; A side cover provided between the working step 25, 34 is a front cover provided on the front side of the side cover 33, and 35 is the side cover 3. A bolt (not shown below) framework for clamping to secure the.
[0014]
FIG. 3 is a side view of the main part viewed from AA with the work attachment 15 attached to the upper swing body 12 shown in FIG. 2, but the work attachment 15 brings the boom 21 to the maximum raised state. . In the figure, 36 is a bolt that fastens and fixes the side cover 33 to the frame frame 35, and 37 is a bracket for mounting the work step 25 fixed to the side cover 33. FIG. 4 is a perspective view of the main part showing the vicinity of the work step 25 as seen from B of FIG. In the figure, 38 is a bolt that fastens and fixes the work step 25 to a fixing portion (for example, the bracket 37) of the upper swing body 12, and 39 is a bolt hole for inserting the bolt 38 opened in the work step 25. , 40 is a reinforcing rib fixed on the lower surface of the work step 25, and 41 is a rear cover. FIG. 5 is a plan view of the work step 25. FIG. 6 is a side view seen from C in FIG.
[0015]
Next, the configuration and operation of the upper swing body 12 according to an embodiment of the present invention will be described with reference to FIGS. In the present embodiment, the work attachment mounting part 14 provided on the upper part of the center frame 13 of the upper swing body 12, the work attachment 15 attached to the work attachment mounting part 14 so as to be raised and lowered, and the work attachment mounting part 14. A rear device mounting portion 26 (shown in FIG. 2) provided at the rear, a left device mounting portion 28 and a right device mounting portion 30 provided on the left and right sides of the work attachment mounting portion 14 of the upper swing body 12. The hydraulic excavator 10 includes a work step 25 provided between the rear device mounting portion 26 and the work attachment mounting portion 14 in plan view, and the work step 25 includes the rear device mounting portion 26. It was positioned below the upper surface b (shown in FIGS. 3 and 4) by a dimension h.
[0016]
Even if the work attachment 15 is raised with the work attachment mounting portion 14 as a base point and the boom 21 of the work attachment 15 is tilted backward as shown in FIG. Takes the length of the work step 25 in the front-rear direction so that it is arranged as far downward as possible (that is, in the direction in which the dimension h is extended) in consideration of the relationship with other equipment such as the engine 27 and other structures of the upper revolving structure 12. The length l (shown in FIGS. 2 to 6) can be set to a long size. By arranging the work step 25, the forward bending posture of the worker is eased during the maintenance work, and the work can be easily performed in a normal posture.
[0017]
Further, since the work step 25 is located above the portion where the normal swing motor 19 and swivel joint (not shown) are disposed, these devices can be protected from rain, snow, sand, etc. Since it can be removed by detaching, maintenance of these devices is also possible.
[0018]
Further, as shown in FIG. 2, the work step 25 has substantially the same width as the distance between the left side device mounting portion 28 and the right side device mounting portion 30 (the width size is W, but FIG. 2). , Shown in FIGS. 4 and 5). According to this, the tread surface of the work step 25 can be made larger, and the workability of the maintenance work can be further improved.
[0019]
Further, as shown in FIG. 3, in order to cope with the maximum working state of the work attachment 15, the work step 25 is extended to the vicinity of the substantially rear surface of the boom 21 of the work attachment 15 in the state. According to this, in the lower part where the distance between the rear surface of the boom 21 and the rear equipment mounting portion 26 is separated, the tread surface of the work step 25 can be maximized as long as it does not interfere with the boom 21, and the workability of the maintenance work is further increased. Can be improved.
[0020]
【The invention's effect】
The upper rotating body of the construction machine of the present invention has a work step provided between the rear device mounting portion and the work attachment mounting portion in a plan view, and the work step is below the upper surface of the rear device mounting portion. Therefore, even if the vicinity of the base end of the work attachment is tilted backward, the work step should be as low as possible in consideration of the relationship with other equipment and other structures of the upper rotating body. The longer the arrangement, the longer the length of the work step in the front-rear direction. By arranging the work steps, the forward bending posture of the worker is eased during the maintenance work, and the work can be easily performed in a normal posture.
[0021]
In addition, since the operation step is usually located above the portion where the devices such as the swing motor and swivel joint are arranged, these devices can be protected from rain and snow, sand, etc., and can be removed. Maintenance of these devices is also possible.
[0022]
Furthermore, since the work step has substantially the same width as the distance between the left and right side equipment mounting parts, the step surface of the work step can be made larger, and the workability of the maintenance work can be further improved. be able to.
[0023]
Further, since the work step is extended to the vicinity of the substantially rear surface of the work attachment in order to cope with the maximum raising state of the work attachment, it interferes with the work attachment in the lower part where the distance between the rear surface of the work attachment and the rear device mounting portion is separated. The tread surface of the work step can be increased as much as possible within the range where the operation is not performed, and the workability of the maintenance work can be further improved.
[0024]
Therefore, in the upper swing body of the construction machine of the present invention, a sufficiently large work step can be secured on the upper surface side of the upper swing body, so that the maintenance work can be easily performed in a normal posture and the work efficiency can be improved. Can be raised.
[Brief description of the drawings]
FIG. 1 is a side view of a hydraulic excavator equipped with an upper swing body according to an embodiment of the present invention.
FIG. 2 is a plan view of a main part of the upper swing body in FIG. 1;
FIG. 3 is a side view of a main part viewed from AA with the work attachment attached to the upper swing body shown in FIG. 2;
4 is a perspective view of a main part showing the vicinity of a work step as seen from B in FIG. 2;
FIG. 5 is a plan view of the work step shown in FIG. 4;
6 is a side view as seen from C in FIG. 5;
FIG. 7 is an overall side view of a backhoe according to an embodiment of the prior art.
8 is a plan view of the swivel base in FIG. 7. FIG.
FIG. 9 is a perspective view of a main part of an upper swing body of an embodiment of a conventional hydraulic excavator.
[Explanation of symbols]
12, 42, 5 Upper swing body (swivel base)
14 Work attachment mounting parts 15, 3 Work attachment (excavator)
19 Rotating motors 21 and 8 Boom 22 Boom cylinder 25 Working step 26 Rear equipment mounting part 27 and 18 Engine 28 Left side equipment mounting part 29 and 16 Fuel tank 30 Right side equipment mounting part 31 and 17 Hydraulic oil tank 32 Control valve

Claims (1)

上部旋回体の上部に設けられた作業アタッチメント取付部と、
前記作業アタッチメント取付部に、後傾状態となるまで起こされるように起伏自在に取付けた基端部構成要素であるブームを有する作業アタッチメントと、
前記作業アタッチメント取付部の後方に設けられた動力源が搭載された後部機器搭載部と、
前記上部旋回体の前記作業アタッチメント取付部の左右両側方に設けられた側部機器搭載部と、前記後部機器搭載部と前記左右両側方の側部機器搭載部と前記作業アタッチメントに囲まれた位置に配置された旋回モータとを有し、
前記後部機器搭載部より前方で、かつ前記左右の側部機器搭載部の間で、かつ前記作業アタッチメント取付部の後方で、かつ前記旋回モータの上方に取外し可能に設けられた作業ステップを有し、
前記作業ステップは、左右の前記側部機器搭載部間と略同一幅を有し、また前記後部機器搭載部の上面より下方位置に、前記作業アタッチメントの最大上げ状態時の前記作業アタッチメントの略背面付近まで延設して配置したことを特徴とする油圧ショベルの上部旋回体。
A work attachment mounting portion provided on the upper part of the upper swing body;
A work attachment having a boom that is a base end component attached to the work attachment attachment portion so as to be raised and lowered so as to be raised up to a rearward tilt state ;
A rear device mounting portion on which a power source provided behind the work attachment mounting portion is mounted;
Side device mounting portions provided on both left and right sides of the work attachment mounting portion of the upper swing body, a position surrounded by the rear device mounting portion, the left and right side device mounting portions, and the work attachment A swivel motor arranged in the
It has a work step that is detachably provided in front of the rear equipment mounting section, between the left and right side equipment mounting sections, behind the work attachment mounting section, and above the turning motor. ,
The work step has substantially the same width as that between the left and right side device mounting portions, and is substantially below the rear surface of the work attachment when the work attachment is in the maximum raised position, below the upper surface of the rear device mounting portion. An upper swing body of a hydraulic excavator characterized by being extended to the vicinity.
JP01494798A 1998-01-09 1998-01-09 Upper swing body of hydraulic excavator Expired - Lifetime JP3693480B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP01494798A JP3693480B2 (en) 1998-01-09 1998-01-09 Upper swing body of hydraulic excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP01494798A JP3693480B2 (en) 1998-01-09 1998-01-09 Upper swing body of hydraulic excavator

Publications (2)

Publication Number Publication Date
JPH11200415A JPH11200415A (en) 1999-07-27
JP3693480B2 true JP3693480B2 (en) 2005-09-07

Family

ID=11875178

Family Applications (1)

Application Number Title Priority Date Filing Date
JP01494798A Expired - Lifetime JP3693480B2 (en) 1998-01-09 1998-01-09 Upper swing body of hydraulic excavator

Country Status (1)

Country Link
JP (1) JP3693480B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002256593A (en) * 2001-03-01 2002-09-11 Shin Caterpillar Mitsubishi Ltd Elevating step structure in construction machine
JP4619170B2 (en) * 2005-03-28 2011-01-26 株式会社クボタ Swivel work machine
JP4707566B2 (en) * 2006-01-13 2011-06-22 日立建機株式会社 Thermal insulation structure for construction machinery
JP4270239B2 (en) 2006-08-11 2009-05-27 コベルコ建機株式会社 Construction machinery
JP5118116B2 (en) * 2009-11-11 2013-01-16 コベルコ建機株式会社 Construction machinery
JP6122255B2 (en) * 2012-06-01 2017-04-26 キャタピラー エス エー アール エル Construction machinery

Also Published As

Publication number Publication date
JPH11200415A (en) 1999-07-27

Similar Documents

Publication Publication Date Title
JP3255576B2 (en) Construction machine boom mounting device
EP1770223B1 (en) Construction machine
JP4527074B2 (en) Excavator
EP1489234A1 (en) Small swing type shovel
KR20060043739A (en) Construction machine
JP5204911B1 (en) Bulldozer
JP3693480B2 (en) Upper swing body of hydraulic excavator
KR100675445B1 (en) Working vehicle
JP3695301B2 (en) Small swing excavator at the rear end
WO2005003468A1 (en) Construction machine and projecting object of the same
JP3530375B2 (en) Front loader
JP4109401B2 (en) Bonnet structure of a turning work vehicle
JPH10140613A (en) Construction equipment
JP2877717B2 (en) Superstructure of turning machine
JP3820113B2 (en) Excavator
JP7269903B2 (en) work machine
JP2001180412A (en) Working vehicle
JP3115791B2 (en) Superstructure of turning machine
JP7257990B2 (en) work vehicle
JP4484573B2 (en) Swivel work machine
JP4312116B2 (en) Front loader mounted tractor
JP4291212B2 (en) Swivel construction machine
JP4459027B2 (en) Swivel work machine
JP5153552B2 (en) Machine room of construction machinery
JP3955908B2 (en) Swivel work vehicle

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040528

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040618

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040817

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050310

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050509

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050621

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050621

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090701

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100701

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110701

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110701

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120701

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120701

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130701

Year of fee payment: 8

EXPY Cancellation because of completion of term