JP3531721B2 - Article storage facility - Google Patents

Article storage facility

Info

Publication number
JP3531721B2
JP3531721B2 JP30509398A JP30509398A JP3531721B2 JP 3531721 B2 JP3531721 B2 JP 3531721B2 JP 30509398 A JP30509398 A JP 30509398A JP 30509398 A JP30509398 A JP 30509398A JP 3531721 B2 JP3531721 B2 JP 3531721B2
Authority
JP
Japan
Prior art keywords
article
carrying
carry
abnormality monitoring
article storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP30509398A
Other languages
Japanese (ja)
Other versions
JP2000128306A (en
Inventor
幹朗 石黒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daifuku Co Ltd
Original Assignee
Daifuku Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daifuku Co Ltd filed Critical Daifuku Co Ltd
Priority to JP30509398A priority Critical patent/JP3531721B2/en
Publication of JP2000128306A publication Critical patent/JP2000128306A/en
Application granted granted Critical
Publication of JP3531721B2 publication Critical patent/JP3531721B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、物品収納部を上下
方向及び横方向に複数並べて備えた物品保管棚と、この
物品保管棚に対する物品搬出入部及び前記各物品収納部
と自己との間で物品の移載を行う物品移載装置が備えら
れて、前記物品搬出入部と前記各物品収納部との間で、
物品を搬送する搬送装置と、前記物品搬出入部に対して
入庫する物品を外部から搬入する受入れ口から、前記物
品搬出入部への他物の進入を検出するための進入検出手
段と、前記搬送装置の作動を管理して、前記物品の入出
庫を管理すると共に、前記進入検出手段が他物の進入を
検出するに伴って、前記搬送装置の作動を停止させる異
常監視処理を実行する管理手段とが設けられた物品保管
設備に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an article storage rack provided with a plurality of article storage sections arranged side by side in a vertical direction and a horizontal direction, and an article loading / unloading section for the article storage rack and the respective article storage sections and the self. An article transfer device for transferring an article is provided, and between the article carry-in / out section and each of the article storage sections,
A transport device for transporting an article, an entry detection unit for detecting entry of another object into the article transport-in / out portion from an inlet for loading an article to be loaded into / from the article transport-in / out portion from the outside, and the transport device. Managing the operation of the storage of the article, and managing means for executing an abnormality monitoring process for stopping the operation of the transport device when the entry detection means detects the entry of another article. The present invention relates to an article storage facility provided with.

【0002】[0002]

【従来の技術】かかる物品保管設備は、搬送装置にて、
物品保管棚の各物品収納部と物品搬出入部との間で物品
を搬送して、物品保管棚への物品の入庫と物品保管棚か
らの物品の出庫とを行うものであるが、搬送装置に備え
られた物品移載装置の移載対象となる物品搬出入部に他
物が進入したり、その物品搬出入部から更に搬送装置の
移動空間にまで他物が進入することも考えられ、その進
入した他物と物品移載装置を含む搬送装置とが接触し
て、搬送装置を損傷するおそれもある。そのため、物品
搬出入部に対して入庫する物品を外部から搬入する受入
れ口から、物品搬出入部への他物の進入を検出するため
の進入検出手段が備えられ、搬送装置の作動並びに物品
の入出庫を管理する管理手段が、進入検出手段が他物の
進入を検出するに伴って、搬送装置の作動を停止させる
異常監視処理を実行する。
2. Description of the Related Art Such an article storage facility is equipped with a carrier device.
The article is conveyed between each article storage section and the article carry-in / out section of the article storage shelf to store the article in the article storage shelf and store the article in the article storage shelf. It is conceivable that another object may enter the article loading / unloading section that is the transfer target of the equipped article loading / unloading apparatus, or another object may further enter the moving space of the transport apparatus from the article loading / unloading section. There is also a possibility that another object may come into contact with the transport device including the article transfer device and damage the transport device. Therefore, there is provided an entrance detection means for detecting entry of another article into the article loading / unloading section from the receiving port for loading the article to / from the article loading / unloading section from the outside, the operation of the transport device, and the loading / unloading of the article. The management unit that manages the process executes an abnormality monitoring process that stops the operation of the transport device when the entrance detection unit detects the entrance of another object.

【0003】このような異常監視処理を行うについて
は、物品保管棚に入庫する物品を上記受入れ口から物品
搬出入部に搬入する作業が上記進入検出手段の検出にか
かることがあるため、その搬入作業の際には、上記異常
監視処理が実行されないようにその処理を停止する必要
がある。従来は、この異常監視処理の停止を、作業者が
上記管理手段に対して物品の搬入作業を開始する旨の情
報を入力操作した時点で行うものとしていた。
In carrying out such an abnormality monitoring process, since the work of carrying in the goods to be stored in the goods storage rack from the receiving port to the goods carrying-in / out section may be detected by the entrance detecting means, the carrying-in work is carried out. In this case, it is necessary to stop the abnormality monitoring process so that it will not be executed. Conventionally, the abnormality monitoring process is stopped at the time when the worker inputs information to the management means to start the work of loading articles.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記従
来構成では、作業者が搬入作業を開始する旨の情報を入
力操作しても、例えば、搬送装置が先に指示された入出
庫作業を行っている場合等、搬送装置の作動状況によっ
ては直ちに物品搬出入部への物品の搬入作業を開始する
ことができない場合もあり、異常監視処理を停止する期
間が必要以上に長くなってしまう場合があった。本発明
は、上記実情に鑑みてなされたものであって、その目的
は、異常監視処理の停止期間を短くする点にある。
However, in the above-mentioned conventional configuration, even if the operator inputs the information to start the carrying-in work, for example, the carrying device carries out the loading / unloading work instructed first. In some cases, depending on the operating status of the transport device, it may not be possible to immediately start loading the articles into the article loading / unloading section, and the period for stopping the abnormality monitoring process may be longer than necessary. . The present invention has been made in view of the above circumstances, and an object thereof is to shorten the suspension period of the abnormality monitoring processing.

【0005】[0005]

【課題を解決するための手段】上記請求項1記載の構成
を備えることにより、管理手段は、例えば作業者の入力
操作等により物品の入庫作業を指示されると、搬送装置
に対して物品搬出入部にある物品の入庫を指令する。こ
の入庫の指令において、搬送装置は、物品搬出入部への
移動が指示され、物品搬出入部へ移動すると共に、その
移動が完了して物品の移載が可能となったときに、管理
手段に対して移動完了信号を送信する。
With the configuration according to the above-mentioned claim 1, when the management means is instructed to store an article by an input operation of an operator or the like, the management means unloads the article from the conveying device. Instruct to store the goods in the store. In this warehousing command, the transport device is instructed to move to the article loading / unloading section, moves to the article loading / unloading section, and when the movement is completed and the article can be transferred, the management unit is instructed. To transmit a movement completion signal.

【0006】管理手段は、進入検出手段の検出情報に基
づいて、物品搬出入部にそれの受入れ口から他物が進入
すると搬送装置の作動を停止させる異常監視処理を実行
しているのであるが、上記の移動完了信号を受信するに
伴って異常監視処理を停止して物品搬出入部への物品の
搬入作業を許容する。そして、物品搬出入部への物品の
搬入作業が終了して、その搬入作業が終了したことを示
す作業完了信号を受信するに伴って、上記異常監視処理
を再開し、搬出入部の受入れ口から他物が進入した場合
は搬送装置の作動を停止させる。従って、搬送装置が作
動中に上記異常監視処理が停止されるようなことがな
く、搬送装置が物品搬出入部に対して移載作業の準備が
できた段階で上記異常監視処理を停止するので、異常監
視処理の停止期間を短くすることができる。
Based on the detection information of the entrance detecting means, the managing means executes an abnormality monitoring process for stopping the operation of the carrying device when another article enters the article loading / unloading section through its receiving port. Upon receiving the movement completion signal, the abnormality monitoring process is stopped to permit the loading / unloading operation of the article into / from the article loading / unloading section. Then, when the work of loading the article into the article loading / unloading unit is completed and a work completion signal indicating that the loading / unloading work is completed is received, the abnormality monitoring process is restarted, and another operation is performed from the receiving port of the loading / unloading unit. When an object enters, stop the operation of the transportation device. Therefore, the abnormality monitoring process is not stopped during the operation of the transport device, and the abnormality monitoring process is stopped when the transport device is ready for the transfer operation with respect to the article loading / unloading unit. The stop period of the abnormality monitoring process can be shortened.

【0007】又、上記請求項2記載の構成を備えること
により、管理手段は、異常監視処理を停止してからの経
過時間を計時する計時手段の検出情報に基づいて、計時
手段による計時時間が設定時間に達するまでに、作業完
了信号を受信しないときには、設定時間に達するに伴っ
て異常監視処理を再開する。従って、搬送装置から移動
完了信号を受信して、異常監視処理を停止した後、何ら
かの理由により作業完了信号が受信されない状態が設定
時間継続すると、異常監視処理を再開して、異常監視処
理を停止する期間が必要以上に長くなるのを防止するこ
とができる。
Further, by providing the configuration according to the above-mentioned claim 2, the management means can measure the time measured by the time measuring means on the basis of the detection information of the time measuring means for measuring the elapsed time after stopping the abnormality monitoring processing. When the work completion signal is not received before the set time is reached, the abnormality monitoring process is restarted as the set time is reached. Therefore, after receiving the movement completion signal from the transport device and stopping the abnormality monitoring processing, if the work completion signal is not received for the set time for some reason, the abnormality monitoring processing is restarted and the abnormality monitoring processing is stopped. It is possible to prevent the period for which the operation is performed from becoming longer than necessary.

【0008】[0008]

【発明の実施の形態】以下、本発明の物品保管設備の実
施の形態を図面に基づいて説明する。物品保管設備LS
は、図1(イ)に示すように、物品Lの出し入れ側が向
かい合う状態で配置された一対の物品保管棚1a,1b
と、その一対の物品保管棚1a,1bに対して物品Lの
入出庫を行うための搬送装置としてのスタッカクレーン
STと、スタッカクレーンSTの作動を管理して、物品
Lの入出庫を管理する管理手段としての棚管理装置SC
と、物品保管棚1a,1bの横幅方向の側部に位置する
物品搬出入部LTに配置される一対の固定荷受け台10
とが備えられて構成されている。尚、図1(イ)におい
ては、スタッカクレーンSTを図示するために、物品保
管棚1aの一部を切り欠いて示している。物品保管棚1
a,1bの夫々は、物品Lを載置支持するための支持杆
3aが左右一対に備えられた物品収納部3を上下方向及
び横方向に複数並べて構成されている。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the article storage facility of the present invention will be described below with reference to the drawings. Goods storage facility LS
1A, a pair of article storage shelves 1a and 1b arranged such that the loading and unloading sides of the article L face each other.
And a stacker crane ST as a transfer device for loading and unloading the article L to and from the pair of article storage shelves 1a and 1b and an operation of the stacker crane ST to manage the loading and unloading of the article L. Shelf management device SC as management means
And a pair of fixed load receiving trays 10 arranged in the article carry-in / out section LT located on the lateral sides of the article storage shelves 1a and 1b.
And are provided and configured. In addition, in FIG. 1A, a part of the article storage rack 1a is cut away to show the stacker crane ST. Article storage shelf 1
Each of a and 1b is configured by arranging a plurality of article storage units 3 provided with a pair of left and right support rods 3a for placing and supporting the article L in the vertical direction and the lateral direction.

【0009】スタッカクレーンSTは、一対の物品保管
棚1a,1bの間の空間を走行通路とするクレーン本体
部2と、走行通路の床面に敷設されてクレーン本体部2
を走行案内する走行レール7と、天井側においてクレー
ン本体部2を案内する案内レール8とが備えられて構成
されている。スタッカクレーンSTのクレーン本体部2
は、走行レール7上を走行する走行台車5に2本の昇降
マスト4aが立設され、その2本の昇降マスト4aの上
端を案内レール8に案内される上部梁4bにて連結して
構成され、更に、上記2本の昇降マスト4aに昇降案内
される昇降台6が備えられている。
The stacker crane ST has a crane main body 2 having a space between the pair of article storage shelves 1a and 1b as a traveling passage, and a crane main body 2 laid on the floor of the traveling passage.
And a guide rail 8 for guiding the crane body 2 on the ceiling side. Stacker crane ST crane main unit 2
Is configured such that two lifting masts 4a are erected on a traveling carriage 5 traveling on a traveling rail 7, and upper ends of the two lifting masts 4a are connected by an upper beam 4b guided by a guide rail 8. Further, an elevating table 6 is provided which is vertically guided by the two elevating masts 4a.

【0010】昇降台6には、物品保管棚1a,1bの各
物品収納部3及び固定荷受け台10と自己との間で物品
Lの移載を行う物品移載装置としてのスライドフォーク
装置9が備えられている。搬送装置であるスタッカクレ
ーンSTは、走行レール7等に案内された走行台車5の
走行移動、昇降マスト4aに案内された昇降台6の昇降
移動及びスライドフォーク装置9による移載動作によ
り、物品搬出入部LTの固定荷受け台10と各物品収納
部3との間で、物品Lを搬送する。
On the lift table 6, there is a slide fork device 9 as an article transfer device for transferring the article L between the article storage sections 3 of the article storage shelves 1a and 1b and the fixed load receiving table 10 and itself. It is equipped. The stacker crane ST, which is a transfer device, carries out articles by the traveling movement of the traveling carriage 5 guided by the traveling rails 7 and the like, the raising and lowering movement of the lifting platform 6 guided by the lifting mast 4a, and the transfer operation by the slide fork device 9. The article L is conveyed between the fixed load receiving table 10 of the entry section LT and each article storage section 3.

【0011】物品搬出入部LTの固定荷受け台10の側
脇及び棚管理装置SCの両側脇には柵11が設置される
と共に、固定荷受け台10の一側にはその柵11が設け
られずに開放されて物品搬出入部LTに対する物品Lの
搬出入口10aが形成されている。従って、この搬出入
口10aは、物品搬出入部LTに対して入庫する物品L
を外部から搬入する受入れ口INとして機能する。この
搬出入口10aには、物品搬出入部LTへの他物の進入
を検出する進入検出手段ISが設けられている。進入検
出手段ISは、図1(ロ)に示すように、搬出入口10
aの両脇に設置されたポール12に、上下2段に水平方
向に検出光を投射するものと、その2段の検出光に挟ま
れる上下範囲内において、互いに交差するように斜め方
向に検出光を投射するものの、計4組の光学式センサ1
3が取付けられて構成されている。進入検出手段ISの
検出情報は、図2のブロック図に示すように、棚管理装
置SCに入力される。
A fence 11 is installed on the side of the fixed load receiving base 10 of the article carrying-in / out section LT and on both sides of the shelf management device SC, and the fence 11 is not provided on one side of the fixed load receiving base 10. The loading / unloading port 10a of the article L with respect to the loading / unloading section LT is formed. Therefore, the carry-in / out port 10a is provided with the articles L to be stored in the article carry-in / out section LT.
Functions as a receiving port IN for carrying in from outside. The carry-in / out entrance 10a is provided with an entrance detecting means IS for detecting the entrance of another object into the article carry-in / out section LT. As shown in FIG. 1B, the entrance detecting means IS is a loading / unloading port 10
The detection light is projected horizontally on the upper and lower two stages on the poles 12 installed on both sides of a, and is detected diagonally so as to intersect with each other within the upper and lower range sandwiched by the detection light on the two stages. Despite projecting light, a total of 4 sets of optical sensors 1
3 is attached and configured. The detection information of the entry detection means IS is input to the shelf management device SC, as shown in the block diagram of FIG.

【0012】次に棚管理装置SCによる、上記進入検出
手段ISの検出情報に基づく制御を概略的に説明する。
棚管理装置SCは、何れかの検出光が他物によって遮ら
れたことを進入検出手段ISが検出すると、その検出情
報を割り込み入力として受け付け、直ちにスタッカクレ
ーンSTに作動の停止を指令する異常監視処理を割り込
み処理として実行する。但し、作業者が、フォークリフ
ト等により、搬出入口10aから入庫する物品Lを固定
荷受け台10に搬入する場合、及び、スタッカクレーン
STにて物品収納部3から固定荷受け台10に搬送され
た出庫する物品Lを搬出入口10aから搬出する場合
は、その搬出入作業により上述の異常監視処理が実行さ
れないように異常監視処理を停止する。この異常監視処
理の停止は、物品Lの搬入又は搬出を行う受入れ口IN
に対応する進入検出手段ISの検出情報の受け付けを禁
止することにより行うが、二つの進入検出手段ISの夫
々に対して別個に割り込み入力が設定され、且つ、夫々
別個に割り込み禁止をかけるように構成して、割り込み
禁止によって上記停止の処理を行っても良い。
Next, the control by the shelf management device SC based on the detection information of the entry detecting means IS will be schematically described.
When the entrance detecting means IS detects that one of the detection lights is blocked by another object, the shelf management device SC accepts the detection information as an interrupt input and immediately monitors the stacker crane ST for an abnormality. The process is executed as an interrupt process. However, when the worker carries in the articles L to be loaded from the loading / unloading port 10a to the fixed load receiving tray 10 by using a forklift or the like, and when the article is transported from the article storage unit 3 to the fixed load receiving tray 10 by the stacker crane ST. When carrying out the article L from the carry-in / out port 10a, the abnormality monitoring process is stopped so that the above-mentioned abnormality monitoring process is not executed by the carrying-in / out work. The stop of the abnormality monitoring process is performed by the receiving port IN for loading or unloading the article L.
Is performed by prohibiting the acceptance of the detection information of the intrusion detection means IS corresponding to the above. However, the interrupt input is set separately for each of the two intrusion detection means IS, and the interrupts are disabled individually. It may be configured to perform the above-mentioned stop processing by disabling interrupts.

【0013】以下、棚管理装置SCの制御作動の一部を
示す図3及び図4のフローチャートと、クレーン本体部
2に備えられて、それの作動を制御するクレーン制御装
置2aが実行する制御作動の一部を示す図5のフローチ
ャートとに基づいて説明する。棚管理装置SCは、図3
及び図4に示す処理を繰り返し実行し、その時点でスタ
ッカクレーンSTが入出庫作業中でなく(ステップ#
1)、入出庫要求が指示入力されていれば(ステップ#
2)、その指示に応じて、クレーン制御装置2aに対し
て入庫対象又は出庫対象の物品収納部3と二つの固定荷
受け台10のうちの何れを対象とするかとを指定して入
出庫の指示を出す(ステップ#3)。
3 and 4 showing a part of the control operation of the shelf management device SC, and the control operation executed by the crane control device 2a which is provided in the crane main body 2 and controls the operation thereof. Will be described based on the flowchart of FIG. The shelf management device SC is shown in FIG.
And the processing shown in FIG. 4 is repeatedly executed, and at that time, the stacker crane ST is not in the loading / unloading operation (step #
1) If a request for entering and exiting the goods has been input (step #
2) In response to the instruction, the crane control device 2a is instructed to enter or exit by specifying which of the article storage unit 3 to be entered or unloaded and the two fixed cargo trays 10 to be targeted. Is issued (step # 3).

【0014】尚、スタッカクレーンSTが入出庫作業中
か否かは、上記のようにクレーン制御装置2aに対して
入出庫の指示を出した後、クレーン制御装置2aから入
出庫作業の完了信号を受信するまでの期間であるか否か
によって判断する。又、棚管理装置SCに対する入出庫
要求の指示入力は、棚管理装置SCに備えられた操作卓
14から入力され、複数の入庫及び出庫の指示を記憶さ
せておくことができ、棚管理装置SCは、この指示が複
数あるときは、古い順から順次処理していく。入出庫要
求の指示入力には、単純な入庫及び出庫の指示の他に、
物品収納部3の物品Lを固定荷受け台10に搬送し、そ
の物品Lに対して作業者がピッキング作業や補充作業等
を行った後に、その物品Lを元の物品収納部3に戻す一
時出庫を指示することも可能であり、この一時出庫が指
示されたときは、指示された物品収納部3の物品Lにつ
いての出庫と入庫とを連続して記憶する。
Whether or not the stacker crane ST is in the loading / unloading work is determined by issuing a loading / unloading instruction to the crane controller 2a as described above, and then issuing a loading / unloading completion signal from the crane controller 2a. It is determined by whether or not it is the period until reception. Further, the input / output request instruction to the shelf management device SC is input from the operation console 14 provided in the shelf management device SC, and a plurality of storage / unloading instructions can be stored. When there are multiple instructions, will process in order from oldest to newest. In addition to simple instructions for warehousing and warehousing, you can enter instructions for entering and exiting requests.
Temporary unloading in which the article L in the article storage unit 3 is conveyed to the fixed load receiving table 10 and the worker carries out picking work or replenishment work on the article L and then returns the article L to the original article storage unit 3. It is also possible to instruct, and when the temporary unloading is instructed, the unloading and warehousing of the instructed article L of the article storage unit 3 are continuously stored.

【0015】クレーン制御装置2aは、棚管理装置SC
から上記の入出庫の指示を受けると、図5に示す処理を
実行する。先ず、入庫の場合について説明する。入庫の
場合は、昇降台6の位置が最初の目標位置すなわち固定
荷受け台10に対する移載用位置に到達するまで、走行
台車5に備えられる走行モータM1及び昇降モータM2
を作動させて、走行台車5を走行させ、昇降台6を昇降
させる(ステップ#30,#31)。最初の目標位置が
固定荷受け台10であるので、棚管理装置SCに対して
物品搬出入部LTへの移動が完了したことを示す移動完
了信号を送信し(ステップ#32,#33)、棚管理装
置SCから移載指令を受信するまで待機する(ステップ
#34)。移動完了信号は、図6(イ)の「移動完了信
号」に示すように、移動完了信号線を「OFF」出力か
ら「ON」出力に切り換えることにより送信する。
The crane controller 2a is a shelf management device SC.
When receiving the above-mentioned storage / unloading instruction from, the processing shown in FIG. 5 is executed. First, the case of warehousing will be described. In the case of warehousing, the traveling motor M1 and the elevating motor M2 provided in the traveling carriage 5 are provided until the position of the lifting platform 6 reaches the first target position, that is, the transfer position for the fixed load receiving platform 10.
Is operated to cause the traveling carriage 5 to travel and the lifting platform 6 to be raised and lowered (steps # 30, # 31). Since the first target position is the fixed load receiving tray 10, a movement completion signal indicating that the movement to the article loading / unloading unit LT is completed is transmitted to the rack management device SC (steps # 32, # 33), and the rack management is performed. It waits until it receives a transfer command from the device SC (step # 34). The movement completion signal is transmitted by switching the movement completion signal line from "OFF" output to "ON" output, as shown in "Movement completion signal" in FIG.

【0016】棚管理装置SCは、入庫作業中において
(ステップ#4)、この移動完了信号を受信すなわち移
動完了信号線の「OFF」から「ON」への切り換わり
を検知すると(ステップ#5)、内臓している計時手段
としてのタイマTMによる計時を開始すると共に、図6
(イ)において符号Aで示すタイミングで、入庫する物
品Lを搬入する受入れ口INについての進入検出手段I
Sの検出情報の基づく上記異常監視処理を停止する(ス
テップ#6,#7)。すなわち、棚管理装置SCは、物
品Lを入庫させるときに、スタッカクレーンSTに対し
て入庫を指令することにより物品搬出入部LTへの移動
を指示した後、スタッカクレーンSTから上記移動完了
信号を受信するに伴って、上記異常監視処理を停止して
物品搬出入部LTへの物品Lの搬入作業を許容する。そ
して、棚管理装置SCは、搬入作業を許容する状態とし
たことを、図示しないランプや音声等によって案内する
(ステップ#8)。
The shelf management device SC receives the movement completion signal during the warehousing operation (step # 4), that is, detects the switching of the movement completion signal line from "OFF" to "ON" (step # 5). The timer TM, which is a built-in time measuring means, starts time measurement, and FIG.
In (a), the entry detection means I for the receiving port IN that carries in the article L to be stored at the timing indicated by the symbol A.
The abnormality monitoring process based on the detection information of S is stopped (steps # 6 and # 7). That is, the shelf management device SC receives the above-mentioned movement completion signal from the stacker crane ST after instructing the stacker crane ST to move to the article carry-in / out section LT when storing the goods L, by instructing the stacker crane ST to store the goods. Along with this, the abnormality monitoring process is stopped and the work of loading the article L into the article loading / unloading unit LT is permitted. Then, the shelf management device SC informs that the carrying-in work is permitted by a lamp, voice, or the like (not shown) (step # 8).

【0017】作業者は、この案内に従ってフォークリフ
ト等によって、入庫する物品Lを固定荷受け台10上に
載置する搬入作業を行い、搬入作業を終了すると、図示
しない作業完了ボタンを押し操作する。この作業者によ
る搬入作業の間、進入検出手段ISの検出情報自体は、
図6(イ)において「進入検出」として示すように変動
するが、何ら影響を与えない。上記の作業完了ボタンの
押し操作は、棚管理装置SCに作業完了信号として入力
され(ステップ#9)、図6(イ)において符号Bで示
すタイミングで上記異常監視処理を再開すると共に(ス
テップ#10)、スタッカクレーンSTに対して移載指
令を送信する(ステップ#11)。クレーン制御装置2
aは、この移載指令を受信すると(ステップ#34)、
スライドフォーク装置9により移載動作を開始する前
に、移載動作を開始する旨の信号を送信(ステップ#3
5)した後、スライドフォーク装置9を出退作動させて
物品Lを受け取り(ステップ#36)、スライドフォー
ク装置9が引退して移載完了後に移載動作を終了した旨
の信号を送信する(ステップ#37)。
According to this guide, the worker carries out the carrying-in work of placing the goods L to be loaded on the fixed load receiving base 10 by a forklift or the like, and when the carrying-in work is completed, the work completion button (not shown) is pressed. During the carrying-in work by this worker, the detection information itself of the entry detection means IS is
Although it fluctuates as shown as “entry detection” in FIG. 6A, it has no effect. The pressing operation of the work completion button is input to the shelf management device SC as a work completion signal (step # 9), and the abnormality monitoring processing is restarted at the timing indicated by the symbol B in FIG. 6A (step # 9). 10), a transfer command is transmitted to the stacker crane ST (step # 11). Crane control device 2
When a receives this transfer command (step # 34),
Before the transfer operation is started by the slide fork device 9, a signal for starting the transfer operation is transmitted (step # 3
5) After that, the slide fork device 9 is operated to move in and out to receive the article L (step # 36), and after the slide fork device 9 is retired and the transfer is completed, a signal indicating that the transfer operation is completed is transmitted ( Step # 37).

【0018】この移載動作の開始と終了を示す信号は、
図6(イ)及び(ロ)において「移載信号」として示す
ように、クレーン制御装置2aから棚管理装置SCへの
移載信号線を、「OFF」出力から「ON」出力に切換
えることによって移載動作の開始を送信し、「ON」出
力から「OFF」出力に切換えることによって移載動作
の終了を送信する。
The signals indicating the start and end of this transfer operation are
By switching the transfer signal line from the crane control device 2a to the shelf management device SC from "OFF" output to "ON" output, as shown as "transfer signal" in FIGS. 6 (a) and 6 (b). The start of the transfer operation is transmitted, and the end of the transfer operation is transmitted by switching from the “ON” output to the “OFF” output.

【0019】固定荷受け台10の物品Lを受け取ると、
その物品Lを降ろす二番目の目標位置となる物品収納部
3に移動した後、スライドフォーク装置9を作動させて
物品Lを移載する(ステップ#38〜#42)。この場
合も、スライドフォーク装置9による移載の前後に上述
と同様の移載動作を開始する旨の信号と移載動作を終了
した旨の信号を送信する。指定された物品収納部3への
物品Lの移載作業を終了すると、入出庫作業の完了信号
を棚管理装置SCに送信する(ステップ#43)。
When the article L on the fixed cargo tray 10 is received,
After moving the article L to the article storage section 3 which is the second target position for unloading the article L, the slide fork device 9 is operated to transfer the article L (steps # 38 to # 42). In this case as well, before and after the transfer by the slide fork device 9, a signal indicating the start of the transfer operation similar to the above and a signal indicating the end of the transfer operation are transmitted. When the transfer operation of the articles L to the specified article storage unit 3 is completed, a completion signal of the loading / unloading operation is transmitted to the shelf management device SC (step # 43).

【0020】一方、棚管理装置SCは、図3のフローチ
ャートのステップ#7において異常監視処理を停止した
後、タイマTMの計時時間が設定時間に達するまでに、
作業者が作業完了ボタンを押し操作せず、作業完了信号
を受信しないときには(ステップ#9,#12)、その
時点の入庫処理の再設定を含む復帰処理要求を棚管理装
置SCのCRTに画面表示して、上記異常監視処理を再
開する(ステップ#13,#14)と共に、図3及び図
4に示す「入出庫処理」を停止する。
On the other hand, the shelf management device SC, after stopping the abnormality monitoring processing in step # 7 of the flowchart of FIG. 3, until the time measured by the timer TM reaches the set time,
When the worker does not press the work completion button and does not receive the work completion signal (steps # 9, # 12), a return processing request including resetting of the storage processing at that time is displayed on the CRT of the shelf management device SC. After displaying, the abnormality monitoring process is restarted (steps # 13 and # 14), and the "in / out process" shown in FIGS. 3 and 4 is stopped.

【0021】次に、出庫の場合について説明する。クレ
ーン制御装置2aは、出庫の場合においては、昇降台6
を最初の目標位置すなわち出庫対象として指定された物
品収納部3に対する移載用位置に移動させて、スライド
フォーク装置9にてその物品収納部3の物品Lを受取る
(ステップ#30〜#37)。この後、二番目の目標位
置である固定荷受け台10に対する移載用位置に移動し
(ステップ#38,#39)、スライドフォーク装置9
により移載動作を開始する前に、移載動作を開始する旨
の信号を送信(ステップ#40)した後、スライドフォ
ーク装置9を出退作動させて物品Lを固定荷受け台10
へ移載し(ステップ#41)、移載動作の完了後に移載
動作を終了した旨の信号を送信する(ステップ#4
2)。そして、この移載動作の終了によって出庫作業が
完了するので、棚管理装置SCに入出庫作業の完了信号
を送信する(ステップ#43)。
Next, the case of warehousing will be described. The crane control device 2a uses the lift table 6 when the goods are unloaded.
Is moved to the first target position, that is, the transfer position for the article storage unit 3 designated as the delivery target, and the slide fork device 9 receives the article L in the article storage unit 3 (steps # 30 to # 37). . After that, the slide fork device 9 is moved to the transfer position for the fixed load platform 10 which is the second target position (steps # 38, # 39).
Before the transfer operation is started, the signal for starting the transfer operation is transmitted (step # 40), and then the slide fork device 9 is operated to move in and out to load the article L onto the fixed load receiving base 10.
Transfer (step # 41), and after the transfer operation is completed, a signal indicating that the transfer operation is completed is transmitted (step # 4).
2). When the transfer operation is completed, the warehousing operation is completed, so a completion signal of the warehousing / leaving operation is transmitted to the shelf management device SC (step # 43).

【0022】棚管理装置SCは、出庫作業中において
(ステップ#4)、上記移載動作を終了した旨の信号を
受信すると、すなわち、移載信号線の「ON」から「O
FF」への切換わりを検知すると(ステップ#15)、
その移載動作が固定荷受け台10に対するものであれば
(ステップ#16)、タイマTMによる計時を開始する
と共に、図6(ロ)において符号Cで示すタイミング
で、出庫する物品Lを載置した固定荷受け台10につい
ての進入検出手段ISによる上記異常監視処理を停止す
る(ステップ#17,#18)。そして、棚管理装置S
Cは、固定荷受け台10から物品Lを搬出する作業を許
容する状態としたことを、図示しないランプや音声等に
よって案内する(ステップ#19)。
When the shelf management device SC receives a signal indicating that the transfer operation has been completed during the delivery operation (step # 4), that is, the transfer signal line changes from "ON" to "O".
When the switch to "FF" is detected (step # 15),
If the transfer operation is for the fixed load receiving base 10 (step # 16), the timer TM starts the time measurement, and at the same time, the article L to be delivered is placed at the timing indicated by the symbol C in FIG. The above-mentioned abnormality monitoring processing by the entry detection means IS for the fixed cargo platform 10 is stopped (steps # 17, # 18). And the shelf management device S
C guides by a lamp, voice, or the like (not shown) that the operation of carrying out the article L from the fixed load receiving table 10 is permitted (step # 19).

【0023】作業者は、この案内に従ってフォークリフ
ト等によって、固定荷受け台10に載置されている出庫
対象の物品Lを受取り、その搬出作業を終了すると、図
示しない作業完了ボタンを押し操作する。この作業完了
ボタンの押し操作は、棚管理装置SCに作業完了信号と
して入力され(ステップ#20)、図6(ロ)において
符号Dで示すタイミングで、上記異常監視処理を再開す
る(ステップ#21)。
According to this guide, the worker receives the article L to be delivered, which is placed on the fixed load receiving base 10 by a forklift or the like, and when the delivery operation is completed, the operator presses a work completion button (not shown). This pressing operation of the work completion button is input to the shelf management device SC as a work completion signal (step # 20), and the abnormality monitoring processing is restarted at the timing indicated by the symbol D in FIG. 6B (step # 21). ).

【0024】一方、棚管理装置SCは、図4のフローチ
ャートのステップ#18において異常監視処理を停止し
た後、タイマTMの計時時間が設定時間に達するまで
に、作業者が作業完了ボタンを押し操作せず、作業完了
信号を受信しないときには(ステップ#20,#2
2)、その時点の出庫処理の再設定を含む復帰処理要求
を棚管理装置SCのCRTに画面表示して、上記異常監
視処理を再開する(ステップ#21)と共に、図3及び
図4に示す「入出庫処理」を停止する。
On the other hand, in the shelf management device SC, after stopping the abnormality monitoring processing in step # 18 of the flowchart of FIG. 4, the worker presses the work completion button until the time measured by the timer TM reaches the set time. If no work completion signal is received (steps # 20, # 2)
2), a return processing request including resetting of the delivery processing at that time is displayed on the CRT of the shelf management device SC on the screen, and the abnormality monitoring processing is restarted (step # 21), and also shown in FIGS. 3 and 4. Stop the "in / out process".

【0025】〔別実施形態〕以下、本発明の別実施形態
を列記する。 上記実施の形態では、物品Lを搬送する搬送装置と
して、床面に敷設された走行レール7上を、昇降台6を
昇降自在に支持する走行台車5が走行する形式のスタッ
カクレーンSTを例示しているが、例えば、スライドフ
ォーク装置等の物品移載装置を備えた台車を、物品保管
棚1a,1bの横幅方向略全幅に亘って移動操作自在に
支持する案内レールを設けて、その案内レールを昇降駆
動する構成とする等、搬送装置の具体構成は種々変更可
能である。
[Other Embodiments] Other embodiments of the present invention will be listed below. In the above-described embodiment, the stacker crane ST of the type in which the traveling carriage 5 that supports the elevating platform 6 so as to be vertically movable travels on the traveling rail 7 laid on the floor is illustrated as a transportation device that transports the article L. However, for example, a guide rail is provided to support a trolley provided with an article transfer device such as a slide fork device so as to be movable over substantially the entire width of the article storage shelves 1a and 1b. The specific configuration of the transporting device can be variously changed, such as the configuration for vertically moving.

【0026】 上記実施の形態では、搬送装置に備え
られる物品移載装置としてスライドフォーク装置9を例
示しているが、例えば、物品Lの一部と係合するフック
を物品収納部3等に向けて出退自在に備えて、フックと
物品Lの一部とを係合させた状態で、物品収納部3と昇
降台6との間で移動させる構成とする等、物品移載装置
の具体構成は種々変更可能である。 上記実施の形態では、受入れ口INから物品搬出入
部LTへの他物の進入を検出する進入検出手段ISを、
検出光が他物により遮られることにより、他物の存在を
検出する光学式センサを用いて構成しているが、例え
ば、可倒式の検出片を備えた接触スイッチを複数並べて
配置する等、進入検出手段ISの具体構成は種々変更可
能である。
In the above-described embodiment, the slide fork device 9 is exemplified as the article transfer device provided in the carrying device, but for example, a hook that engages with a part of the article L is directed to the article storage unit 3 or the like. A specific configuration of the article transfer device, such as a configuration in which the hook and a part of the article L are engaged with each other to move the article L between the article storage unit 3 and the elevating table 6 so that the article can be retracted and retracted. Can be changed in various ways. In the above-described embodiment, the entry detecting means IS for detecting entry of another object from the receiving port IN into the article loading / unloading section LT is provided.
Although the detection light is blocked by another object, it is configured by using an optical sensor that detects the presence of another object.For example, a plurality of contact switches equipped with a retractable detection piece are arranged side by side. The specific configuration of the entry detecting means IS can be changed in various ways.

【0027】 上記実施の形態では、物品搬出入部L
Tに固定荷受け台10を設置する場合を例示している
が、可動式の荷受け台、コンベアを備えたもの、あるい
は、旋回台を備えたもの等、種々の形式のものを設置す
る場合に適用できる。 尚、物品搬出入部LTにコンベアを備えて、物品搬出入
部LTに搬入される物品Lが、コンベアに搬送されて受
け入れ口INを通過する場合においては、物品搬出入部
LTへの物品Lの搬入作業が終了したことを示す作業完
了信号は、そのコンベアの制御装置や上位の管理用コン
ピュータ等から棚管理装置SCに入力されるように構成
するほかに、受入れ口INの物品Lの通過を検出できる
進入検出手段ISの検出情報を利用して、作業完了信号
として棚管理装置SCに入力されるように構成しても良
い。
In the above-described embodiment, the article carry-in / out section L
The case of installing the fixed load receiving base 10 on the T is shown as an example, but it is applied to the case of installing various types such as a movable load receiving base, one equipped with a conveyor, or one equipped with a swivel base. it can. When the article carry-in / out section LT is provided with a conveyor and the article L carried into the article carry-in / out section LT is conveyed to the conveyor and passes through the receiving port IN, the work of carrying the article L into the article carry-in / out section LT is carried out. The work completion signal indicating that the process has been completed is configured to be input to the shelf management device SC from the control device of the conveyor, the superordinate management computer, or the like, and the passage of the article L at the receiving port IN can be detected. The detection information of the entry detection means IS may be used to input the work completion signal to the shelf management device SC.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施の形態にかかる物品保管設備の外
観斜視図
FIG. 1 is an external perspective view of an article storage facility according to an embodiment of the present invention.

【図2】本発明の実施の形態にかかるブロック構成図FIG. 2 is a block configuration diagram according to an embodiment of the present invention.

【図3】本発明の実施の形態にかかるフローチャートFIG. 3 is a flowchart according to the embodiment of the present invention.

【図4】本発明の実施の形態にかかるフローチャートFIG. 4 is a flowchart according to the embodiment of the present invention.

【図5】本発明の実施の形態にかかるフローチャートFIG. 5 is a flowchart according to the embodiment of the present invention.

【図6】本発明の実施の形態にかかる信号説明図FIG. 6 is an explanatory diagram of signals according to the embodiment of the present invention.

【符号の説明】[Explanation of symbols]

IS 進入検出手段 LT 物品搬出入部 SC 管理手段 ST 搬送装置 TM 計時手段 1a,1b 物品保管棚 3 物品収納部 9 物品移載装置 IS approach detection means LT article carrying in / out section SC management means ST transport device TM timekeeping means 1a, 1b article storage shelves 3 article storage 9 Article transfer device

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B65G 1/00 - 1/20 ─────────────────────────────────────────────────── ─── Continuation of the front page (58) Fields surveyed (Int.Cl. 7 , DB name) B65G 1/00-1/20

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 物品収納部を上下方向及び横方向に複数
並べて備えた物品保管棚と、 この物品保管棚に対する物品搬出入部及び前記各物品収
納部と自己との間で物品の移載を行う物品移載装置が備
えられて、前記物品搬出入部と前記各物品収納部との間
で、物品を搬送する搬送装置と、 前記物品搬出入部に対して入庫する物品を外部から搬入
する受入れ口から、前記物品搬出入部への他物の進入を
検出するための進入検出手段と、 前記搬送装置の作動を管理して、前記物品の入出庫を管
理すると共に、前記進入検出手段が他物の進入を検出す
るに伴って、前記搬送装置の作動を停止させる異常監視
処理を実行する管理手段とが設けられた物品保管設備で
あって、 前記管理手段は、前記物品を入庫させるときに、前記搬
送装置に対して前記物品搬出入部への移動を指示した
後、前記搬送装置から前記物品搬出入部への移動が完了
したことを示す移動完了信号を受け取るに伴って、前記
異常監視処理を停止して前記物品搬出入部への物品の搬
入作業を許容し、且つ、その搬入作業が終了したことを
示す作業完了信号を受信するに伴って、前記異常監視処
理を再開するように構成されている物品保管設備。
1. An article storage shelf provided with a plurality of article storage units arranged side by side in a vertical direction and a lateral direction, and an article loading / unloading section for the article storage rack, and transfer of articles between each of the article storage sections and the self. An article transfer device is provided, and between the article carry-in / out section and each of the article storage sections, a carrying apparatus for carrying articles, and a receiving port for carrying in articles to and from the article carry-in / out section from the outside An entry detecting means for detecting entry of another article into the article carrying-in / out section; and an operation of the transport device to manage loading / unloading of the article, and the entry detection means to enter another article. Is a goods storage facility provided with a management means for executing an abnormality monitoring process for stopping the operation of the carrying device in accordance with the detection of the The above items for the device After instructing the movement to the carry-in / carry-out section, the abnormality monitoring process is stopped and the article carry-in / carry-out section is stopped by receiving a movement completion signal indicating that the movement to the article carry-in / carry-out section is completed. An article storage facility configured to allow the carrying-in work of an article and to restart the abnormality monitoring process when a work completion signal indicating that the carrying-in work is finished is received.
【請求項2】 前記異常監視処理を停止してからの経過
時間を計時する計時手段が設けられ、 前記管理手段は、前記計時手段による計時時間が設定時
間に達するまでに、前記作業完了信号を受信しないとき
には、前記設定時間に達するに伴って前記異常監視処理
を再開するように構成されている請求項1記載の物品保
管設備。
2. A time measuring means for measuring the elapsed time after stopping the abnormality monitoring processing is provided, and the managing means transmits the work completion signal until the time measured by the time measuring means reaches a set time. The article storage facility according to claim 1, wherein when the set time is not received, the abnormality monitoring process is restarted when the set time is not reached.
JP30509398A 1998-10-27 1998-10-27 Article storage facility Expired - Fee Related JP3531721B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30509398A JP3531721B2 (en) 1998-10-27 1998-10-27 Article storage facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30509398A JP3531721B2 (en) 1998-10-27 1998-10-27 Article storage facility

Publications (2)

Publication Number Publication Date
JP2000128306A JP2000128306A (en) 2000-05-09
JP3531721B2 true JP3531721B2 (en) 2004-05-31

Family

ID=17941028

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30509398A Expired - Fee Related JP3531721B2 (en) 1998-10-27 1998-10-27 Article storage facility

Country Status (1)

Country Link
JP (1) JP3531721B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6800835B2 (en) * 2017-12-26 2020-12-16 台湾大福高科技設備股▲分▼有限公司 Goods transport equipment

Also Published As

Publication number Publication date
JP2000128306A (en) 2000-05-09

Similar Documents

Publication Publication Date Title
JP2009120317A (en) Automated warehouse
JP3531721B2 (en) Article storage facility
JP7306804B2 (en) Conveyor system
JP3797089B2 (en) Control method of shelf equipment
JP3531720B2 (en) Article storage facility
JP3568014B2 (en) Article storage facility
WO2022049972A1 (en) Automated warehouse
JP4029465B2 (en) Load transport control method and transport control device in distribution system
JP3797069B2 (en) Goods storage facility
TWI761646B (en) Article transport facility
JPH11292219A (en) Article storage facilities
JP3599165B2 (en) Article storage facility
JP3941216B2 (en) Entry / exit control method and entry / exit control device of distribution system
JP2000272719A (en) Commodity storage facility
JP4026440B2 (en) Goods storage facility
JP3483016B2 (en) Article storage device
JP4026462B2 (en) Goods storage facility
JP6795361B2 (en) Transport equipment
JP2002265022A (en) Shelf equipment
JPH07330119A (en) Vertically conveying facility having stock function
JP2004067307A (en) Article storage facility
JP3775209B2 (en) Receipt system for automatic warehouse equipment
JP2010180051A (en) Article storage installation
JP3797090B2 (en) Control method of shelf equipment
JP2004035150A (en) Article storage facility

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040212

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040225

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080312

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090312

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100312

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110312

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110312

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110312

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120312

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120312

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120312

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130312

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130312

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140312

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees