JP3408629B2 - Precast concrete foundation structure - Google Patents

Precast concrete foundation structure

Info

Publication number
JP3408629B2
JP3408629B2 JP15051394A JP15051394A JP3408629B2 JP 3408629 B2 JP3408629 B2 JP 3408629B2 JP 15051394 A JP15051394 A JP 15051394A JP 15051394 A JP15051394 A JP 15051394A JP 3408629 B2 JP3408629 B2 JP 3408629B2
Authority
JP
Japan
Prior art keywords
foundation
floor
precast concrete
equipment
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP15051394A
Other languages
Japanese (ja)
Other versions
JPH084029A (en
Inventor
明 岸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP15051394A priority Critical patent/JP3408629B2/en
Publication of JPH084029A publication Critical patent/JPH084029A/en
Application granted granted Critical
Publication of JP3408629B2 publication Critical patent/JP3408629B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建築物の地盤に構築さ
れる基礎構造に関し、特に、建築現場での作業を大幅に
簡略化するプレキャストコンクリート(以下、PCとい
う)基礎構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a basic structure constructed on the ground of a building, and more particularly to a precast concrete (hereinafter referred to as PC) basic structure that greatly simplifies work at a construction site.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】建築物
を安定した状態で構築するためには、まず地盤に基礎部
を安定かつ的確に構築する必要がある。従来、住宅用の
基礎部は、まず建物構築部分の地盤を連続的に掘削して
根切り部を形成し、この根切り部に玉砂利を敷いて型枠
を組み、支持手段を介してこの型枠を立設支持させ、そ
して、この型枠内にコンクリートを打設し、養生して固
化させた後、型枠を取り外し表面をモルタル処理して構
築されていた。
2. Description of the Related Art In order to construct a building in a stable state, it is first necessary to construct a foundation on the ground in a stable and appropriate manner. Conventionally, the foundation part for a house first forms a root cutting part by continuously excavating the ground of the building construction part, laying gravel on this root cutting part to assemble a formwork, and form this mold through a supporting means. It was constructed by standing and supporting the frame, and then pouring concrete into this form, curing and solidifying it, and then removing the form and mortaring the surface.

【0003】しかし、上記従来の基礎構築作業におい
て、型枠を根切り部に沿って連続して立設する作業は、
手間のかかるもので工期の長期化につながり、コストを
上昇させるものであった。また、コンクリートを養生す
る作業も、数日を必要とするもので工期を長引かせる原
因となっており、さらに、型枠の取り外しやモルタル処
理も手間のかかる作業であった。
However, in the above-mentioned conventional foundation construction work, the work of continuously erecting the formwork along the root cutting part is
It was time consuming and led to a longer construction period and increased costs. Also, the work of curing the concrete requires several days, which is a cause of prolonging the construction period, and further, the removal of the formwork and the mortar treatment are labor-intensive works.

【0004】そこで、建築現場における基礎部構築作業
をより簡略化かつ迅速化するために、工場段階において
予め製造されたプレキャストコンクリート(以下PCと
いう)基礎を根切り部に設置する構築形式が考えられ
た。
Therefore, in order to further simplify and speed up the work for constructing the foundation at the construction site, a construction method is considered in which a precast concrete (hereinafter referred to as PC) foundation manufactured in advance at the factory stage is installed in the root cutting portion. It was

【0005】さらに、このPC基礎によって、建築現場
での作業を最大限に簡略化する形式が要望された。
Furthermore, there has been a demand for a form that maximizes the work at the construction site by this PC foundation.

【0006】本発明は、上記従来の問題点に鑑みてなさ
れたもので、その目的は、フーティング構築のための建
築現場での作業を最も簡略化できるPC基礎構造を提供
することにある。
The present invention has been made in view of the above conventional problems, and an object of the present invention is to provide a PC foundation structure that can most simplify the work at a construction site for building footing.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
に、請求項1記載の発明は、建物の躯体を連続して支持
する布基礎と、出入口内側の内基礎床と、出入口外側の
外基礎床とからなる基礎構造において、前記布基礎は、
根切り部に所定間隔で設置される複数のプレキャストコ
ンクリート底盤に、建物を支持する立上部とこの立上部
の下部から側方に突出するフーティング部とを一体的に
有するプレキャストコンクリート基礎を架設して構成さ
れ、前記プレキャストコンクリート基礎は、前記立上部
から支持部が突出するものを含み、前記内基礎床の形成
領域には、この支持部を有するプレキャストコンクリー
ト基礎が用いられ、前記内基礎床は、前記プレキャスト
コンクリート基礎の支持部にプレキャストコンクリート
内基礎床版を支持させて構成され、前記プレキャストコ
ンクリート基礎同士の接合部、及び前記プレキャストコ
ンクリート基礎の下端部と地盤との間にコンクリートを
打設して構築され、前記外基礎床は、前記フーティング
部とこのフーティング部に対向する位置で地盤上に設置
されるプレキャストコンクリート外基礎床底盤との間
に、プレキャストコンクリート支持部材を架設し、この
プレキャストコンクリート支持部材にプレキャストコン
クリート外基礎床版を支持させて構成されることを特徴
とする。
In order to achieve the above object, the invention according to claim 1 has a cloth foundation for continuously supporting a building body, an inner foundation floor on the inside of the entrance and exit, and an outside foundation on the outside of the entrance and exit.
In the foundation structure consisting of the outer foundation floor , the cloth foundation,
On a plurality of precast concrete bottom plates installed at predetermined intervals in the root cutting part, a precast concrete foundation having a rising part supporting the building and a footing part projecting laterally from the lower part of the rising part is erected. The precast concrete foundation includes a support portion protruding from the rising portion, the precast concrete foundation having the support portion is used in the formation region of the inner foundation floor, and the inner foundation floor is The precast concrete foundation is supported by the precast concrete inner foundation slab on the supporting portion of the precast concrete foundation, the joint between the precast concrete foundations, and the concrete is placed between the lower end of the precast concrete foundation and the ground. Built with the outer foundation floor, the footing
Installed on the ground at a position facing the foot and this footing
Between precast concrete outer foundation floor base
, Erected a precast concrete support member, and
Precast concrete support member for precast concrete
Characterized by being supported by a cleat outside foundation slab
And

【0008】[0008]

【0009】そして、請求項記載の発明は、請求項1
載のプレキャストコンクリート基礎構造と、床を支持
する床支持基礎と、からなる基礎構造において、前記床
支持基礎は、床梁を架け渡し可能なプレキャストコンク
リート支持台を、前記フーティング部の上に載置し又は
前記フーティング部の上に一体的に設けて構成されるこ
とを特徴とする。
The invention according to claim 2 is based on claim 1.
Serial and precast concrete foundation structure mounting, the floor supporting foundation for supporting the floor, in a basic structure composed of, the floor supporting foundation, a pass can be precast concrete support base over the floor beams, on the footing portion It is characterized in that it is placed or integrally provided on the footing portion.

【0010】さらに、請求項記載の発明は、請求項1
または請求項に記載されたプレキャストコンクリート
基礎構造と、柱の下に単一に設けられる独立基礎と、か
らなる基礎構造において、前記独立基礎は、プレキャス
トコンクリート独立基礎を所定位置に設置して構成され
ることを特徴とする。
Further, the invention according to claim 3 is the same as claim 1.
Or a precast concrete foundation structure according to claim 2, and independent foundation provided in a single under the pillars, the basic structure consisting of the independent foundation, established a precast concrete independent foundation into position configuration It is characterized by being done.

【0011】また、請求項記載の発明は、請求項1か
ら請求項のいずれかに記載されたプレキャストコンク
リート基礎構造と、設備を設置する設備基礎床、とから
なる基礎構造において、前記設備基礎床は、前記設備の
設置領域に設置されるプレキャストコンクリート設備基
礎床底盤上に、プレキャストコンクリート設備基礎床版
を設置してなることを特徴とする。
Further, the invention according to claim 4 is a foundation structure comprising the precast concrete foundation structure according to any one of claims 1 to 3 and an equipment foundation floor on which equipment is installed. The foundation floor is characterized in that the precast concrete equipment foundation floor slab is installed on the precast concrete equipment foundation floor base installed in the installation area of the equipment.

【0012】そして、請求項記載の発明は、請求項
記載のプレキャストコンクリート基礎構造において、前
記設備基礎床は、前記プレキャストコンクリート設備基
礎床底盤を省略して、前記フーティング部の上にプレキ
ャストコンクリート設備基礎床版を設置してなることを
特徴とする。
The invention according to claim 5 is the same as claim 4
In the described precast concrete foundation structure, the equipment foundation floor is characterized in that the precast concrete equipment foundation floor bottom plate is omitted and a precast concrete equipment foundation floor slab is installed on the footing portion.

【0013】[0013]

【作用】本発明によれば、基礎を構成する部材を全てP
C製として、建築現場ではPC基礎同士の接合部、及び
PC基礎の下端部と地盤との間にコンクリートを打設す
ることとなっている。したがって、建築現場でのコンク
リート打設作業が大幅に少なくなって、最大限に作業の
簡略化を図ることができる。
According to the present invention, all the members constituting the foundation are P
As a product made of C, concrete is to be placed at the joint between the PC foundations and between the lower end of the PC foundation and the ground at the construction site. Therefore, the concrete placing work at the construction site is significantly reduced, and the work can be simplified to the maximum extent.

【0014】ここで、布基礎は、PC底盤間にPC基礎
を架設して構築され、内基礎床は、PC基礎の立上部に
形成された支持部にPC内基礎床版を支持させて構成さ
れる。
Here, the cloth foundation is constructed by laying the PC foundation between the PC bottom boards, and the inner foundation floor is constituted by supporting the PC inner foundation floor slab on the support portion formed at the upper portion of the PC foundation. To be done.

【0015】また、外基礎床は、PC基礎のフーティン
グ部とPC外基礎床底盤との間に、PC支持部材を架設
し、このPC支持部材にPC外基礎床版を支持させて構
成される。
The outer foundation floor is constructed by installing a PC support member between the footing portion of the PC foundation and the PC outer foundation floor base plate, and supporting the PC outer foundation floor slab on this PC support member. It

【0016】また、床支持基礎は、床梁を架け渡し可能
なPC支持台によって構成されるので、このPC支持台
に床梁を架け渡せば床を支持できることとなる。そし
て、独立基礎も、PC製となって所定位置に設置するだ
けで構成される。
Further, since the floor support foundation is composed of the PC support base on which the floor beams can be bridged, the floor can be supported by mounting the floor beams on the PC support base. The independent foundation is also made of PC and is simply configured to be installed at a predetermined position.

【0017】さらに、設備基礎床は、PC設備基礎床底
盤上にPC設備基礎床版を設置して構成される。あるい
は、PC設備基礎床底盤を省略し、PC設備基礎床版を
PC基礎のフーティング部上に設置してもよい。
Further, the equipment foundation floor is constructed by installing a PC equipment foundation floor slab on a PC equipment foundation floor bottom plate. Alternatively, the PC equipment foundation floor base plate may be omitted and the PC equipment foundation floor slab may be installed on the footing portion of the PC foundation.

【0018】[0018]

【実施例】以下、本発明の実施例について図面を参照し
て説明する。本実施例は、建物の躯体を連続して支持す
る布基礎と、出入口外側の外基礎床と、出入口内側の内
基礎床と、床を支持する床支持基礎と、浴室ユニットな
どの設備を設置する設備基礎床と、からなる基礎構造に
本発明を適用したものである。そして、これらの基礎を
PC化して、建築現場でのコンクリート打設作業を大幅
に簡略化したものである。
Embodiments of the present invention will be described below with reference to the drawings. In this embodiment, a cloth foundation that continuously supports the building frame, an outer foundation floor outside the entrance, an inner foundation floor inside the entrance, a floor support foundation that supports the floor, and facilities such as a bathroom unit are installed. The present invention is applied to a basic structure consisting of an equipment foundation floor. Then, these foundations are made into PCs, and the concrete pouring work at the construction site is greatly simplified.

【0019】図1は、実施例における布基礎及び外基礎
床を示す斜視図である。同図において、PC布基礎10
が、根切り部20に設置されたPC底盤30間に架設さ
れて布基礎が構築されている。
FIG. 1 is a perspective view showing a cloth foundation and an outer foundation floor in the embodiment. In the figure, PC cloth foundation 10
However, the cloth foundation is constructed by being installed between the PC bottom plates 30 installed in the root cutting part 20.

【0020】根切り部20は、地盤100を布掘りして
形成されており、この根切り部20のコーナー部および
所定位置にPC底盤30が設置されている。
The root cutting portion 20 is formed by digging the ground 100, and the PC bottom board 30 is installed at a corner portion and a predetermined position of the root cutting portion 20.

【0021】このPC底盤30は、補強鉄筋(図示せ
ず)を内部に有して強化されたコンクリート板であるた
め、建築現場で補強鉄筋をこのPC底盤30上に配設す
る作業を省略できる。また、このPC底盤30は、上面
が滑らかな平面となっており、PC布基礎10を架設す
るときにこの上面に位置合わせのための墨出しを行える
ようになっている。
Since this PC bottom plate 30 is a reinforced concrete plate having reinforcing reinforcing bars (not shown) inside, the work of disposing the reinforcing reinforcing bars on this PC bottom plate 30 can be omitted at the construction site. . Further, the PC bottom plate 30 has a smooth upper surface, and when the PC cloth foundation 10 is erected, marking can be performed on the upper surface for alignment.

【0022】そして、このPC底盤30を根切り部20
に設置するときには、このPC底盤30の設置位置にモ
ルタル22を設置し、このモルタル22の上にPC底盤
30を載置する。そして、このPC底盤30を掛矢等で
叩いて所定の高さで上面がほぼ水平になるよう調整作業
を行う。なお、この作業は、水糸や水準器やレーザー光
線による水準装置等を用いて水平レベルおよび高さを確
認しながら行う。
Then, the PC bottom plate 30 is attached to the root cutting portion 20.
At the time of installation, the mortar 22 is installed at the installation position of the PC bottom plate 30, and the PC bottom plate 30 is placed on the mortar 22. Then, the PC bottom board 30 is hit with a hanging arrow or the like to perform an adjusting operation so that the upper surface is substantially horizontal at a predetermined height. This work is performed while checking the horizontal level and height using a water thread, a level, or a leveling device using a laser beam.

【0023】次に、こうして設置されたPC底盤30間
に架設されるPC布基礎10について説明すると、PC
布基礎10には二種類があり、両端部に凹部11が形成
されたPC布基礎12(図1中右側)と、一方の端部に
凹部11が形成され他方の端部に凸部13が形成された
PC布基礎14(図1中左側)とがある。そして、これ
らのPC布基礎12、14は、いずれも立上部16とフ
ーティング部18とを有する。
Next, the PC cloth foundation 10 installed between the PC bottom plates 30 thus installed will be described.
There are two types of cloth bases 10, a PC cloth base 12 (right side in FIG. 1) having recesses 11 formed at both ends, and a recess 11 formed at one end and a protrusion 13 at the other end. There is the formed PC cloth foundation 14 (left side in FIG. 1). Each of the PC cloth foundations 12 and 14 has a rising portion 16 and a footing portion 18.

【0024】PC布基礎12を例にとって説明すると、
立上部16は、鉛直方向に直立して上端面に建物を載置
して支持するもので、所定の厚さで直方体形状に形成さ
れ、内部に図示しない補強用の鉄筋が埋設されてコンク
リートにて構成され、両端部には、肉厚が厚くなって横
断面コ字状の凹部11が形成されている。そして、PC
布基礎12同士を直線状に接合するときには、それぞれ
の凹部11を対向させて設置し、この凹部11の内部に
鉄筋を配設してコンクリートを打設し、連結部の強化を
図れるようになっている。また、立上部16は、図1に
示すように、玄関を形成する位置に切り欠き16aが形
成されている。
Taking the PC cloth foundation 12 as an example,
The upright portion 16 stands upright in the vertical direction and supports the building by placing it on the upper end surface, and is formed in a rectangular parallelepiped shape with a predetermined thickness. And a recess 11 having a U-shaped cross section is formed at both ends. And PC
When the cloth foundations 12 are joined to each other in a straight line, the recesses 11 are installed so as to face each other, and the reinforcing bars are arranged inside the recesses 11 to pour concrete to strengthen the connecting portion. ing. Further, as shown in FIG. 1, the rising portion 16 has a notch 16a formed at a position forming a front door.

【0025】なお、内基礎床を設ける領域には、この立
上部16から支持部52が突出している(図2参照)
が、この説明は内基礎床に関する説明と併せて後述す
る。
A support portion 52 projects from the rising portion 16 in the area where the inner foundation floor is provided (see FIG. 2).
However, this explanation will be given later together with the explanation regarding the inner foundation floor.

【0026】フーティング部18は、立上部16を直立
させて支持するものであって、立上部16の両側面にお
いて、内部に図示しない鉄筋を有して下端から側方に直
角に突出して形成されて、設置時に上面が水平となる。
さらに、上面は滑らかな面となっている。また、このフ
ーティング部18は、立上部16の中央部に形成されて
おり、上記凹部11の側面にはこのフーティング部18
は形成されない構成となっている。したがって、図1に
示すように、このPC布基礎12は、凹部11の下端面
を架設部としてPC底盤に載置できる。そして、このフ
ーティング部18は、根切り部20の地盤との間に所定
間隔の隙間が形成されて、この隙間にコンクリートを打
設できるようになっている。
The footing portion 18 supports the rising portion 16 so as to stand upright, and is formed on both side surfaces of the rising portion 16 so as to have a reinforcing bar (not shown) inside and to project laterally at a right angle from the lower end. Then, the top surface becomes horizontal when installed.
Furthermore, the upper surface is a smooth surface. The footing portion 18 is formed at the center of the rising portion 16, and the footing portion 18 is formed on the side surface of the recess 11.
Is not formed. Therefore, as shown in FIG. 1, the PC cloth foundation 12 can be placed on the PC bottom plate with the lower end surface of the recess 11 as the erection portion. Then, the footing portion 18 is provided with a gap at a predetermined interval between itself and the ground of the root cutting portion 20, and concrete can be poured into this gap.

【0027】また、このフーティング部18にはコンク
リート充填口19が形成されている。このコンクリート
充填口19は、フーティング部18の上面から下面に貫
通する複数の矩形の穴であって、このコンクリート充填
口19からコンクリートを打設養生し固化させて、フー
ティング部18を地盤100に強固に固定できるように
なっている。
A concrete filling port 19 is formed in the footing portion 18. The concrete filling port 19 is a plurality of rectangular holes penetrating from the upper surface to the lower surface of the footing portion 18, and concrete is poured from the concrete filling port 19 to cure and solidify the footing portion 18 to the ground 100. It can be firmly fixed to.

【0028】次に、PC布基礎14は、一方の端部に凸
部13を有する点で上記PC布基礎12と異なる。
Next, the PC cloth foundation 14 is different from the PC cloth foundation 12 in that it has a projection 13 at one end.

【0029】凸部13は、基礎のコーナー部において、
上記PC布基礎12と直角に接合するため、立上部16
の一方の端部に軸に直角に突出して形成されるものであ
る。そして、この凸部13の前端面には図示しない鉄筋
が突出しており、この鉄筋を接合されるPC布基礎12
の凹部11に挿入し、この凹部11にコンクリートを打
設、養生し固化したときに、PC布基礎12とPC布基
礎14とをしっかりと結合することができる。
The convex portion 13 is a corner portion of the foundation.
Since it is joined at a right angle to the PC cloth foundation 12, the rising portion 16
It is formed so as to project at a right angle to the axis at one end of the. Then, a reinforcing bar (not shown) projects from the front end surface of the convex portion 13, and the PC cloth foundation 12 to which the reinforcing bar is joined is joined.
It is possible to firmly bond the PC cloth foundation 12 and the PC cloth foundation 14 when the PC cloth foundation 12 and the PC cloth foundation 14 are inserted into the concave section 11 of FIG.

【0030】また、この凸部13が形成された端部には
フーティング部18が形成されず、フーティング部18
は立上部16の中央部に形成された構成となっている。
その他の構成は上記PC布基礎12と同様である。
Further, the footing portion 18 is not formed at the end portion where the convex portion 13 is formed, and the footing portion 18 is formed.
Is formed in the central portion of the rising portion 16.
Other configurations are the same as those of the PC cloth foundation 12.

【0031】なお、PC布基礎12およびPC布基礎1
4は、いずれも予め工場で表面が処理された状態となっ
ている。
The PC cloth foundation 12 and the PC cloth foundation 1
In No. 4, the surface is preliminarily processed in the factory.

【0032】そして、これらのPC布基礎10は、PC
底盤30の上面に設置位置の墨出しを行い位置合わせを
して、PC底盤30間に架け渡して設置される。このP
C布基礎10にはフーティング部18が一体的に形成さ
れているので、建築現場でフーティングを構築する必要
がない。
These PC cloth foundations 10 are made of PC
The installation position is marked on the upper surface of the bottom plate 30 to align the positions, and the PC bottom plate 30 is bridged and installed. This P
Since the footing portion 18 is integrally formed on the C cloth foundation 10, it is not necessary to construct the footing at the construction site.

【0033】こうして、図1に示すようにPC布基礎1
0が設置固定されると、次に、建物の玄関ポーチに設け
られる外基礎床を、PC製の部材にて構築する。この外
基礎床は、図1に示すように、PC底盤32と、PC支
持板42、44と、PC床版46にて構成される。
Thus, as shown in FIG. 1, the PC cloth foundation 1
When 0 is installed and fixed, next, the outer foundation floor provided in the entrance porch of the building is constructed by the members made of PC. As shown in FIG. 1, this outer foundation floor is composed of a PC bottom plate 32, PC support plates 42 and 44, and a PC floor slab 46.

【0034】PC底盤32は、上面をフーティング部1
8の上面と同じ高さにして、PC支持板42、44を載
置支持するものである。そして、このPC底盤32は、
上記PC底盤30を小型化したようなものであるが、P
C底盤30ほどの重い荷重を支持するものではないた
め、内部に鉄筋などは設けられていなくてもよい。
The bottom surface of the PC bottom plate 32 has a footing portion 1
The PC support plates 42 and 44 are placed and supported at the same height as the upper surface of the PC 8. And this PC bottom board 32 is
Although it is like miniaturizing the above-mentioned PC bottom board 30,
Since it does not support a heavy load such as the C bottom plate 30, no reinforcing bar may be provided inside.

【0035】PC支持板42は、PC底盤32とフーテ
ィング部18との間に立てた状態で架け渡されるもので
ある。また、PC支持板44は、PC底盤32、32間
に立てた状態で架け渡して、PC支持板42、42の先
端部に接続されるものである。そして、接続されたPC
支持板42、44は、図示しないボルト及びインサート
にて固定できるようになっている。なお、PC支持板4
2、44は、予め一体的に製造されたものであってもよ
い。
The PC support plate 42 is bridged between the PC bottom plate 32 and the footing portion 18 in an upright state. In addition, the PC support plate 44 is bridged in a state of standing between the PC bottom plates 32, 32, and is connected to the tip ends of the PC support plates 42, 42. And the connected PC
The support plates 42 and 44 can be fixed by bolts and inserts (not shown). The PC support plate 4
2, 44 may be integrally manufactured in advance.

【0036】また、PC支持板42、44には、上端部
に切り溝42a、44aが設けられており、この切り溝
42a、44aに、PC床版46を載置できるようにな
っている。そして、公知のボルト及びインサート等の締
結治具にて、PC支持板42、44とPC床版46とは
固定できるようになっている(図示せず)。
The PC support plates 42 and 44 are provided with cut grooves 42a and 44a at their upper ends, and the PC floor slab 46 can be placed in the cut grooves 42a and 44a. Then, the PC support plates 42 and 44 and the PC floor slab 46 can be fixed to each other by a known fastening jig such as a bolt and an insert (not shown).

【0037】PC床版46は、PC製の板であって上面
が、外基礎床の床面を構成するものである。したがっ
て、例えば、この面にモルタルを塗ったり、タイルを貼
り付けたりして、予め表面処理を施しておけば、建築現
場での作業を簡略化することができる。
The PC floor slab 46 is a plate made of PC, the upper surface of which constitutes the floor surface of the outer foundation floor. Therefore, for example, if a surface treatment is performed in advance by applying mortar or affixing tiles to this surface, the work at the construction site can be simplified.

【0038】そして、外基礎床を構築するには、上述し
たようにして設置されたPC布基礎10のフーティング
部18と対向する位置に、PC底盤32を設置する。こ
こで、このPC底盤32は、上面がフーティング部18
の上面と同じ高さにする。そして、フーティング部18
とPC底盤32との間に架け渡して、PC支持板42を
載置し、PC底盤32、32間にPC支持盤44を架け
渡して載置し、これらPC支持板42、44を固定し、
さらにこれらの上にPC床版46を載置し固定すれば外
基礎床が完成する。なお、PC支持板42、44及びP
C床版46のそれぞれの接合部分に隙間があく場合に
は、コンクリートで隙間を埋めることが好ましい。
To construct the outer foundation floor, the PC bottom board 32 is installed at a position facing the footing portion 18 of the PC cloth foundation 10 installed as described above. Here, the top surface of the PC bottom plate 32 is the footing portion 18
The same height as the top surface of. And footing section 18
PC support plate 42 is placed between the PC bottom plate 32 and the PC bottom plate 32, and a PC support plate 44 is placed between the PC bottom plates 32 and 32 to fix the PC support plates 42 and 44. ,
Further, by placing and fixing the PC floor slab 46 on these, the outer foundation floor is completed. The PC support plates 42, 44 and P
When there is a gap at each joint of the C floor slab 46, it is preferable to fill the gap with concrete.

【0039】次に、内基礎床について説明する。図2
は、実施例における内基礎床の断面図である。また、こ
の内基礎床は玄関の土間床であって、図1における外基
礎床の建物内部側に構築されるものである。
Next, the inner foundation floor will be described. Figure 2
FIG. 3 is a cross-sectional view of an inner foundation floor in an example. The inner foundation floor is the entrance floor floor, and is constructed on the inner side of the building of the outer foundation floor in FIG.

【0040】図2において、この内基礎床は、PC布基
礎10の立上部16に突設された支持部52にPC床版
56を支持させて構築されるものである。
In FIG. 2, the inner foundation floor is constructed by supporting a PC floor slab 56 on a support portion 52 projecting from the rising portion 16 of the PC cloth foundation 10.

【0041】支持部52は、内部に配設された鉄筋にて
補強されて立上部16と一体的に形成されたブラケット
状の部位で、上面がPC床版56の載置面となってイン
サート(図示せず)が埋設されている。
The support portion 52 is a bracket-like portion that is integrally formed with the rising portion 16 by being reinforced by the reinforcing bars provided inside, and the upper surface serves as a mounting surface for the PC floor slab 56 and is inserted. (Not shown) is buried.

【0042】また、PC床版56は、内部に補強鉄筋を
有するPC板であって、端部にボルト挿通穴が形成され
ている。したがって、ボルト58を挿通して上記インサ
ートに螺合させることで、このPC床版56は、支持部
52に固定できるようになっている。また、このボルト
挿通穴の形成領域には、図2に示すように、切り溝が形
成されているので、挿通されたボルトの頭部が突出しな
いようになる。
The PC floor slab 56 is a PC plate having reinforcing reinforcing bars inside, and has bolt insertion holes formed at its ends. Therefore, the PC floor slab 56 can be fixed to the support portion 52 by inserting the bolt 58 and screwing the bolt 58 into the insert. In addition, as shown in FIG. 2, a cut groove is formed in the area where the bolt insertion hole is formed, so that the head of the inserted bolt does not project.

【0043】こうして、PC製の部材によって内基礎床
が構築され、コンクリートの打設が不用であることか
ら、建築現場での作業を大幅に簡略化することができ
る。
In this way, since the inner foundation floor is constructed by the members made of PC and concrete pouring is unnecessary, the work at the construction site can be greatly simplified.

【0044】次に、床支持基礎について説明する。建物
の躯体は、上述した布基礎によって支持されるが、1階
の床がたわまないようにするために、布基礎と布基礎と
の間に、例えば束基礎のような床支持基礎を設けること
がある。そこで、本実施例では、この床支持基礎もPC
製の基礎を用いることとしたものである。
Next, the floor support foundation will be described. The skeleton of the building is supported by the above-mentioned cloth foundation, but in order to prevent the floor on the first floor from bending, a floor support foundation such as a bundle foundation is provided between the cloth foundations. May be provided. Therefore, in this embodiment, the floor support foundation is also a PC.
It was decided to use the manufacturing base.

【0045】図3は、本実施例における床支持基礎を示
す斜視図である。同図に示すように、床支持基礎は、P
C布基礎10のフーティング部18にPC支持台60を
載置して構成される。
FIG. 3 is a perspective view showing the floor support foundation in this embodiment. As shown in the figure, the floor support foundation is P
A PC support base 60 is placed on the footing portion 18 of the C cloth foundation 10.

【0046】PC支持台60は、図示しない床を支持す
るための床梁64を架設するものである。詳しくは、対
向するPC布基礎10のフーティング部18に、対向す
る状態で一対が設置されて、床梁64を架け渡して設置
できるようにするものである。
The PC support base 60 is provided with a floor beam 64 for supporting a floor (not shown). Specifically, the pair of floor cloth beams 64 are installed so as to be opposed to each other on the footing portions 18 of the PC cloth foundations 10 that face each other.

【0047】このPC支持台60も、PC製で直方体の
ブロックをなし、厚みがフーティング部18の突出長さ
を超えない程度となっている。そして、PC支持台60
の下端面は、滑らかな面となっているので、フーティン
グ部18の上端面に安定して載置できるようになってい
る。
The PC support base 60 is also made of PC and forms a rectangular parallelepiped block, and the thickness thereof does not exceed the protruding length of the footing portion 18. And the PC support 60
Since the lower end surface of is a smooth surface, it can be stably placed on the upper end surface of the footing portion 18.

【0048】そして、PC支持台60の上端面には取付
ボルト62が設けられて、床梁64との取付固定が容易
に行えるようになっている。すなわち、床梁64には、
図3に示すように、端部に取付板66が設けられ、この
取付板66に形成された取付穴66aに取付ボルト62
を挿通して、ナット68にて固定することで、床梁64
をPC支持台60に取付固定することができる。
A mounting bolt 62 is provided on the upper end surface of the PC support base 60 so that it can be easily mounted and fixed to the floor beam 64. That is, in the floor beam 64,
As shown in FIG. 3, a mounting plate 66 is provided at the end, and the mounting bolts 62 are inserted into the mounting holes 66 a formed in the mounting plate 66.
The floor beam 64 by inserting it through and fixing it with the nut 68.
Can be attached and fixed to the PC support base 60.

【0049】なお、取付ボルト62の代わりに、めねじ
が形成されたインサートをPC支持台60の上端面に形
成しておき、ボルトを螺合させて床梁64を取付固定す
るようにしてもよい。
Instead of the mounting bolt 62, an insert having a female screw is formed on the upper end surface of the PC support base 60, and the floor beam 64 is mounted and fixed by screwing the bolt. Good.

【0050】また、支持台は、上部に切欠を形成し、こ
の切欠に床梁をはめ込んで取り付けられるようにしても
よい。このような構成とすれば、図3におけるPC支持
台60の取付ボルト42を省略できるので製造が容易に
なる。
Further, the support base may have a notch formed in the upper portion thereof, and the floor beam may be fitted in the notch to be attached. With such a configuration, the mounting bolts 42 of the PC support base 60 shown in FIG. 3 can be omitted, which facilitates manufacturing.

【0051】あるいは、PC支持台を予めPC基礎と一
体化させて製造しておいてもよい。または、PC基礎の
立上部の上端部に切り欠きを形成して、この切り欠きに
床梁をはめ込んで取り付けられるようにして、立上部自
体をPC支持台とした構成であってもよい。
Alternatively, the PC support base may be manufactured in advance by being integrated with the PC base. Alternatively, a notch may be formed in the upper end of the rising portion of the PC foundation, and the floor beam may be fitted into the notch to be attached, so that the rising portion itself serves as a PC support.

【0052】次に、床梁64は、木材であってもよい
が、近年の木材の価格高騰に鑑みて、H形鋼などの鋼材
を用いることが好ましい。また、鋼材は、防蟻処理が不
要であるという利点もある。
Next, although the floor beam 64 may be made of wood, it is preferable to use a steel material such as H-section steel in view of the recent price increase of wood. In addition, the steel material has an advantage that it does not require a termite-proof treatment.

【0053】こうして、フーティング部18上に設置さ
れたPC支持台60に、床梁64を取付固定すれば、こ
の床梁64にて床を支持できるので、束基礎や独立基礎
を省略することができる。
In this way, if the floor beam 64 is attached and fixed to the PC support base 60 installed on the footing portion 18, the floor beam 64 can support the floor, so that a bundle foundation or an independent foundation is omitted. You can

【0054】そして、フーティング部18のコンクリー
ト充填口19にコンクリートを打設するときに、PC支
持台60の下端部をもコンクリートにて固定する。
Then, when concrete is poured into the concrete filling port 19 of the footing portion 18, the lower end portion of the PC support base 60 is also fixed with concrete.

【0055】なお、PC底盤30にPC布基礎10を架
設すると、地盤100とフーテイング部18との間に隙
間が形成されるので、コンクリートを打設したときにこ
の隙間から侵入したコンクリートが前記コンクリート充
填口19に下から満たされて、上端部から溢れ出たこと
を確認してコンクリートの充填を確実に行うことができ
る。この作業は、フーティング全体を構築する作業と比
較すると、打設するコンクリートが少量なので養生期間
も短期間で足り、コンクリート打設、養生作業を簡略化
できる。そして、コンクリート充填口19内にコンクリ
ートを打設、養生し固化すると、このフーティング部1
8を地盤100にしっかりと固定することができる。
When the PC cloth foundation 10 is laid on the PC bottom board 30, a gap is formed between the ground 100 and the footing portion 18. Therefore, when concrete is poured, the concrete that has entered through this gap is the concrete. It is possible to reliably fill the concrete by confirming that the filling port 19 is filled from below and overflows from the upper end portion. Compared with the work of constructing the entire footing, this work requires a small amount of concrete to be placed, so that the curing period is short and the concrete placing and curing work can be simplified. Then, when concrete is poured into the concrete filling port 19, cured and solidified, the footing portion 1
8 can be firmly fixed to the ground 100.

【0056】次に、設備基礎床について説明する。この
設備基礎床は、例えば、浴室ユニットなどの設備を設置
するために構築される基礎床である。そして、図4は、
実施例に係る設備基礎床を示す縦断面図である。同図に
示すように、設備基礎床は、PC底盤34にPC床版7
0を設置して構成される。
Next, the equipment foundation floor will be described. This equipment foundation floor is a foundation floor constructed to install equipment such as a bathroom unit, for example. And in FIG.
It is a longitudinal section showing an equipment foundation floor concerning an example. As shown in the figure, the equipment foundation floor is the PC floor plate 34 and the PC floor plate 7
It is configured by setting 0.

【0057】PC床版70は、PC製の板であって、コ
ンクリート打設用又は配管用の開口部72が形成されて
なる。
The PC floor slab 70 is a plate made of PC and has an opening 72 for concrete pouring or piping.

【0058】詳しくは、PC床版70は、PC布基礎1
0で囲まれる形状に相応したほぼ方形状のものとされ、
その寸法はPC布基礎10で囲まれる領域より若干小さ
く形成されている。そして、図4に示すように、PC布
基礎10の立上部16の内側面とPC床版70の外端面
との間に若干の隙間74が形成されるようになってい
る。なお、このPC床版70も、予め内部に図示しない
鉄筋が配設され、十分な強度を有するものである。
Specifically, the PC floor slab 70 is a PC cloth foundation 1
It is assumed to be a substantially square shape corresponding to the shape surrounded by 0,
The dimension is formed to be slightly smaller than the area surrounded by the PC cloth foundation 10. Then, as shown in FIG. 4, a slight gap 74 is formed between the inner side surface of the rising portion 16 of the PC cloth foundation 10 and the outer end surface of the PC floor slab 70. The PC floor slab 70 also has a reinforcing bar (not shown) arranged therein and has sufficient strength.

【0059】開口部72は、PC底盤34の配設位置を
避けた位置に、例えば4箇所貫通形成されるものであ
る。また、この開口部72は、コンクリート打設用とし
て用いられる場合には、ポンプ車のホース口径を考慮し
た大きさに設定され、かつ打設したコンクリートが全体
に回り込むことができるような位置を考慮して設定され
ている。あるいは、この開口部72が配管用に用いられ
る場合には、配管(図示せず)の立上り部に相応した位
置に貫通形成されることとなる。なお、配管用の開口部
72は、1箇所のみ形成されてもよいが、複数の配管が
設けられる場合には、その複数の配管に対応した数ある
いは複数の配管を一括して挿通できる大きさに設定する
ことも可能である。
The openings 72 are formed at four positions, for example, at positions other than the positions where the PC bottom plate 34 is provided. In addition, when the opening 72 is used for placing concrete, the opening 72 is set to a size that takes into account the hose diameter of the pump car, and the position where the placed concrete can go around is considered. Has been set. Alternatively, when this opening 72 is used for piping, it will be formed at a position corresponding to the rising portion of the piping (not shown). The opening 72 for the pipe may be formed only at one place, but when a plurality of pipes are provided, a size corresponding to the plurality of pipes or a size that allows the plurality of pipes to be inserted all at once. It is also possible to set to.

【0060】そして、このようなPC床版70をPC布
基礎10で囲まれる地面上に配設したPC底盤34上の
載置して、コンクリート打設用の開口部72からコンク
リートを打設して、PC床版70とPC底盤34とを固
定させれば設備基礎床が構築される。このような構成と
することで、PC床版70をコンクリート打設時の捨て
型枠として使用することができ、打設コンクリートの養
生期間を待つことなく、PC床版70上で他の作業を継
続することも可能となる。
Then, such a PC floor slab 70 is placed on the PC bottom plate 34 arranged on the ground surrounded by the PC cloth foundation 10, and concrete is poured from the opening 72 for concrete pouring. Then, by fixing the PC floor slab 70 and the PC bottom plate 34, a facility foundation floor is constructed. With such a configuration, the PC floor slab 70 can be used as a discard formwork during concrete pouring, and other work can be performed on the PC floor slab 70 without waiting for the curing period of the pouring concrete. It is possible to continue.

【0061】また、PC床版70は、隙間74からPC
布基礎10のフーティング部18にコンクリートを打設
することで、PC布基礎10にも固定されることとな
る。
Further, the PC floor slab 70 is connected to the PC through the gap 74.
By placing concrete on the footing portion 18 of the cloth foundation 10, the concrete is fixed to the PC cloth foundation 10.

【0062】あるいは、図4の設備基礎床からPC底盤
34を省略した構成として、図5に示すようにしてもよ
い。同図において、PC床版80は、PC布基礎10の
フーティング部18の上に架け渡されている。こうする
ことで、フーティング部18にてPC床版80を支持さ
せることができて、PC底盤34を省略できることとな
り、PC床版80とPC底盤とのコンクリートによる固
定が不用であることから、PC床版80には、コンクリ
ート打設用の開口部を形成する必要がなくなる。そし
て、PC床版80の周端面とPC布基礎10との間に形
成される隙間84にコンクリートを打設すれば、PC床
版80は、PC布基礎10に固定されることとなる。
Alternatively, as shown in FIG. 5, the PC bottom board 34 may be omitted from the equipment foundation floor of FIG. In the figure, the PC floor slab 80 is laid over the footing portion 18 of the PC cloth foundation 10. By doing so, the PC floor slab 80 can be supported by the footing portion 18, the PC bottom plate 34 can be omitted, and since the PC floor slab 80 and the PC bottom plate are not fixed with concrete, It is not necessary to form an opening for placing concrete in the PC floor slab 80. Then, if concrete is placed in the gap 84 formed between the peripheral end surface of the PC floor slab 80 and the PC cloth foundation 10, the PC floor slab 80 will be fixed to the PC cloth foundation 10.

【0063】なお、本発明は、上記実施例に限定される
ものではなく、発明の要旨の範囲内で種々の変形が可能
である。
The present invention is not limited to the above embodiment, but various modifications can be made within the scope of the invention.

【0064】例えば、上記実施例は、布基礎、内基礎
床、外基礎床、床支持基礎、及び設備基礎床からなる基
礎構造に本発明を適用したものであるが、これに独立基
礎を加えた基礎構造にも本発明は適用できる。この場合
には、独立基礎をPC製とし、地盤に形成された根切り
部に設置して、地盤との間にのみコンクリートを打設し
て独立基礎を構築する。こうすることで、上記実施例と
同様に、建築現場でのコンクリート打設作業を大幅に簡
略化できる。
For example, in the above-mentioned embodiment, the present invention is applied to the foundation structure consisting of the cloth foundation, the inner foundation floor, the outer foundation floor, the floor support foundation, and the equipment foundation floor. The present invention can be applied to a basic structure. In this case, the independent foundation is made of PC, installed at the root cutting portion formed in the ground, and concrete is placed only between the ground and the ground to construct the independent foundation. By doing so, the concrete pouring work at the construction site can be greatly simplified, as in the above embodiment.

【0065】あるいは、上記実施例から、外基礎床、床
支持基礎又は設備基礎床のうち少なくとも一つを除いた
形式の基礎構造であっても、本発明を適用して基礎を構
成する部材を全てPCすることで、建築現場でのコンク
リート打設作業を大幅に簡略化することができる。
Alternatively, even if the foundation structure is of a type in which at least one of the outer foundation floor, the floor support foundation, or the equipment foundation floor is removed from the above-mentioned embodiment, the member constituting the foundation by applying the present invention is By using all PCs, it is possible to greatly simplify the concrete pouring work at the construction site.

【0066】また、上記実施例において、PC布基礎1
0同士の接合部、及び、このPC布基礎10の下端部と
地盤100との間にのみコンクリートを打設するように
すれば、建築現場での作業を最大限に簡略化できる。
In the above embodiment, the PC cloth foundation 1 is used.
If the concrete is placed only between the 0 joints and between the bottom end of the PC cloth foundation 10 and the ground 100, the work at the construction site can be simplified to the maximum extent.

【0067】あるいは図6に示すように支持台90上部
に凹型溝92を構成しておき、床梁94の端部にはアン
カー筋またはアンカーボルト96を設けておいて、上記
凹型溝92にこのアンカーボルト96を入れ込んだ状態
で配置し、コンクリートを打設して両者を固定するよう
にしてもよい。
Alternatively, as shown in FIG. 6, a concave groove 92 is formed in the upper portion of the support 90, and an anchor streak or anchor bolt 96 is provided at the end of the floor beam 94, and the concave groove 92 is formed in the concave groove 92. The anchor bolts 96 may be arranged in a state of being inserted, and concrete may be poured to fix them.

【0068】[0068]

【発明の効果】以上説明したように、本発明によれば、
基礎を構成する部材を全てPC製として、建築現場での
コンクリート打設作業を大幅に少なくして、作業の簡略
化を図ることができる。
As described above, according to the present invention,
Since all the members constituting the foundation are made of PC, it is possible to greatly reduce the concrete placing work at the construction site and simplify the work.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施例における布基礎及び外基礎床を示す斜視
図である。
FIG. 1 is a perspective view showing a cloth foundation and an outer foundation floor in an embodiment.

【図2】実施例における内基礎床を示す縦断面図であ
る。
FIG. 2 is a vertical cross-sectional view showing an inner foundation floor in the example.

【図3】実施例における床支持基礎を示す斜視図であ
る。
FIG. 3 is a perspective view showing a floor support foundation in the embodiment.

【図4】実施例における設備基礎床を示す縦断面図であ
る。
FIG. 4 is a vertical cross-sectional view showing an equipment foundation floor in the example.

【図5】図4の設備基礎床の変形例を示す縦断面図であ
る。
5 is a vertical cross-sectional view showing a modified example of the equipment foundation floor of FIG.

【図6】実施例の変形例を示す斜視図である。FIG. 6 is a perspective view showing a modified example of the embodiment.

【符号の説明】[Explanation of symbols]

10 PC布基礎(PC基礎) 16 立上部 18 フーティング部 20 根切り部 30 PC底盤 32 PC底盤(PC外基礎床底盤) 34 PC底盤(PC設備基礎床底盤) 42 PC支持板(PC支持部材) 44 PC支持板(PC支持部材) 46 PC床版(PC外基礎床版) 52 支持部 60 PC支持台 70 PC床版(PC設備床版) 100 地盤 10 PC cloth foundation (PC foundation) 16 Rise 18 footing section 20 Root cutting part 30 PC bottom board 32 PC floor (outside floor of PC floor) 34 PC floor (PC equipment basic floor floor) 42 PC support plate (PC support member) 44 PC support plate (PC support member) 46 PC floor slab (outside base slab for PC) 52 Support 60 PC support 70 PC floor slab (PC equipment floor slab) 100 ground

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 建物の躯体を連続して支持する布基礎
と、出入口内側の内基礎床と、出入口外側の外基礎床と
からなる基礎構造において、 前記布基礎は、根切り部に所定間隔で設置される複数の
プレキャストコンクリート底盤に、建物を支持する立上
部とこの立上部の下部から側方に突出するフーティング
部とを一体的に有するプレキャストコンクリート基礎を
架設して構成され、 前記プレキャストコンクリート基礎は、前記立上部から
支持部が突出するものを含み、前記内基礎床の形成領域
には、この支持部を有するプレキャストコンクリート基
礎が用いられ、 前記内基礎床は、前記プレキャストコンクリート基礎の
支持部にプレキャストコンクリート内基礎床版を支持さ
せて構成され、 前記プレキャストコンクリート基礎同士の接合部、及び
前記プレキャストコンクリート基礎の下端部と地盤との
間にコンクリートを打設して構築され 前記外基礎床は、前記フーティング部とこのフーティン
グ部に対向する位置で地盤上に設置されるプレキャスト
コンクリート外基礎床底盤との間に、プレキャストコン
クリート支持部材を架設し、このプレキャストコンクリ
ート支持部材にプレキャストコンクリート外基礎床版を
支持させて構成されることを特徴とするプレキャストコ
ンクリート基礎構造。
1. A foundation structure comprising a cloth foundation for continuously supporting a building frame, an inner foundation floor inside a doorway, and an outer foundation floor outside a doorway , wherein the cloth foundation is root cutting. Consists of a precast concrete foundation that has a rising part that supports the building and a footing part that projects laterally from the lower part of this rising part on a plurality of precast concrete bottom plates installed at predetermined intervals The precast concrete foundation includes a projecting support portion from the rising portion, in the formation region of the inner foundation floor, a precast concrete foundation having this support portion is used, the inner foundation floor, the The precast concrete foundation foundation slab is supported on the support portion of the precast concrete foundation, and the precast concrete foundations are joined together. Parts, and the built in Da設concrete between the lower end portion and the ground of the precast concrete foundation, the outer baseplate, the Phu Thinh said footing portion
Precast installed on the ground at a position facing the
Precast concrete is placed between the concrete outer foundation floor base and
Install the cleat support members and install the precast concrete
Precast concrete outer foundation floor slabs
A precast cast that is characterized by being supported
Ncrete foundation structure.
【請求項2】 請求項1載のプレキャストコンクリー
ト基礎構造と、床を支持する床支持基礎と、からなる基
礎構造において、 前記床支持基礎は、床梁を架け渡し可能なプレキャスト
コンクリート支持台を、前記フーティング部の上に載置
し又は前記フーティング部の上に一体的に設けて構成さ
れることを特徴とするプレキャストコンクリート基礎構
造。
2. A precast concrete foundation structure according to claim 1 Symbol mounting, the floor supporting foundation for supporting the floor, in a basic structure composed of, the floor supporting foundation, a pass can be precast concrete support base over the floor beams A precast concrete foundation structure, which is placed on the footing portion or integrally provided on the footing portion.
【請求項3】 請求項1または請求項に記載されたプ
レキャストコンクリート基礎構造と、柱の下に単一に設
けられる独立基礎と、からなる基礎構造において、 前記独立基礎は、プレキャストコンクリート独立基礎を
所定位置に設置して構成されることを特徴とするプレキ
ャストコンクリート基礎構造。
3. A precast concrete foundation structure according to claim 1 or 2 , and an independent foundation provided under a column, wherein the independent foundation is a precast concrete independent foundation. A precast concrete foundation structure characterized by being installed at a predetermined position.
【請求項4】 請求項1から請求項のいずれかに記載
されたプレキャストコンクリート基礎構造と、設備を設
置する設備基礎床、とからなる基礎構造において、 前記設備基礎床は、前記設備の設置領域に設置されるプ
レキャストコンクリート設備基礎床底盤上に、プレキャ
ストコンクリート設備基礎床版を設置してなることを特
徴とするプレキャストコンクリート基礎構造。
4. A foundation structure comprising a precast concrete foundation structure according to any one of claims 1 to 3 and an equipment foundation floor for installing equipment, wherein the equipment foundation floor is the installation of the equipment. A precast concrete foundation structure comprising a precast concrete equipment foundation floor slab installed on a precast concrete equipment foundation floor slab installed in an area.
【請求項5】 請求項記載のプレキャストコンクリー
ト基礎構造において、 前記設備基礎床は、前記プレキャストコンクリート設備
基礎床底盤を省略して、前記フーティング部の上にプレ
キャストコンクリート設備基礎床版を設置してなること
を特徴とするプレキャストコンクリート基礎構造。
5. The precast concrete foundation structure according to claim 4 , wherein the equipment foundation floor is constructed by omitting the precast concrete equipment foundation floor base and installing a precast concrete equipment foundation floor slab on the footing portion. Precast concrete foundation structure characterized by
JP15051394A 1994-06-08 1994-06-08 Precast concrete foundation structure Expired - Lifetime JP3408629B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15051394A JP3408629B2 (en) 1994-06-08 1994-06-08 Precast concrete foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15051394A JP3408629B2 (en) 1994-06-08 1994-06-08 Precast concrete foundation structure

Publications (2)

Publication Number Publication Date
JPH084029A JPH084029A (en) 1996-01-09
JP3408629B2 true JP3408629B2 (en) 2003-05-19

Family

ID=15498509

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15051394A Expired - Lifetime JP3408629B2 (en) 1994-06-08 1994-06-08 Precast concrete foundation structure

Country Status (1)

Country Link
JP (1) JP3408629B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015014136A (en) * 2013-07-05 2015-01-22 大和ハウス工業株式会社 Base-isolated building
JP6148633B2 (en) * 2014-03-11 2017-06-14 大和ハウス工業株式会社 Base-isolated building structure
JP2018035531A (en) * 2016-08-30 2018-03-08 積水化学工業株式会社 Building foundation structure

Also Published As

Publication number Publication date
JPH084029A (en) 1996-01-09

Similar Documents

Publication Publication Date Title
KR101131679B1 (en) Splicing Method of Embedded type Baseplate with Steel Column
KR20110128396A (en) Pre-embedded anchor frame equipped with coupler and anchoring method of steel column thereof
KR100775359B1 (en) Concrete-mold assembly and construction method using the same
JP3682588B2 (en) Building member connection structure of H-shaped steel continuous foundation beam
JP3408629B2 (en) Precast concrete foundation structure
JP3959517B2 (en) Steel frame mounting hardware and mounting method
JP2003328320A (en) Construction method of precast capital part and bridge pier capital part
JPS6157732A (en) Construction of multilayered building skeletal by precast reinforced concrete unit
JPH0371537B2 (en)
EP0072814A1 (en) A beam-like building component of curable material, a method of manufacturing such a building component, and a method for producing a frame or structure for a building or part of a building with the use of such building material.
JP3563128B2 (en) Precast concrete foundation structure, precast concrete foundation and foundation construction method
JPH05209433A (en) Method of constructing building using pillar structure integrally with large beam
JP3086384B2 (en) Foundation structure and foundation construction method
JP2905056B2 (en) Foundation structure
JP3143324B2 (en) Foundation structure and foundation construction method
JP3609451B2 (en) Precast concrete foundation structure
JPS6195136A (en) Construction of multistoried building skeletal by precast reinforced concrete unit
JP2724891B2 (en) Construction method of pillar half PCa formwork
JP3629684B2 (en) Sound insulation wall foundation block
JP3023266B2 (en) Precast concrete foundation and foundation structure
JP2578671B2 (en) Column and beam construction method
JPH0782755A (en) Foundation structure and constructing method for foundation
JPH1113141A (en) Constructing method of composite structure
KR20240145175A (en) Precast Concrete Method of House Using Fixing Unit
JPH084027A (en) Foundation structure

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20030225

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080314

Year of fee payment: 5

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080314

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090314

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090314

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100314

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100314

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110314

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110314

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120314

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120314

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130314

Year of fee payment: 10