JP3367042B2 - Pile construction method - Google Patents

Pile construction method

Info

Publication number
JP3367042B2
JP3367042B2 JP14776898A JP14776898A JP3367042B2 JP 3367042 B2 JP3367042 B2 JP 3367042B2 JP 14776898 A JP14776898 A JP 14776898A JP 14776898 A JP14776898 A JP 14776898A JP 3367042 B2 JP3367042 B2 JP 3367042B2
Authority
JP
Japan
Prior art keywords
pile
ground
pile construction
construction area
replacement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP14776898A
Other languages
Japanese (ja)
Other versions
JPH11336060A (en
Inventor
研一 堀越
英俊 藪田
哲夫 長藤
徹 末岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP14776898A priority Critical patent/JP3367042B2/en
Publication of JPH11336060A publication Critical patent/JPH11336060A/en
Application granted granted Critical
Publication of JP3367042B2 publication Critical patent/JP3367042B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】 【0001】 【発明の属する技術分野】本発明は、不透水層地盤を挟
んで、その上下に透水層地盤が存在し、上部透水層地盤
が汚染地下水を含んでいる地盤において、杭を打設する
場合の杭施工方法に関するものである。 【0002】 【従来の技術】中間層に粘土層やシルト層からなる不透
水層地盤を含み、その上下に砂層や砂礫層を含む透水層
を有する透水層地盤においては、当該透水層は帯水層に
なっており、その内部に地下水を有していることが多
い。このような地下水は、産業用水や生活用水として重
要な用途を有している。しかし、近年の産業活動等によ
り、上記地下水中に有害な汚染物質が混入してしまう事
態が頻繁に発生している。このような状況の中、不透水
層地盤を挟んでその上下に透水層地盤が存在し、上部透
水層地盤が汚染地下水を含んでいる地盤において、不透
水層地盤を貫通して下部透水層地盤に達する杭を打設す
る場合には、施工時又は施工後に、杭周辺の間隙等を通
じて、上部透水層地盤中に含まれる汚染地下水が下部透
水層地盤に流入することになり、下部透水層地盤中に存
在する清浄な地下水についても汚染されてしまうことに
なっていた。 【0003】 【発明が解決しようとする課題】しかし、従来は、この
ような地盤において、下部透水層地盤中に含まれる地下
水の汚染を有効に防止することができるような杭の打設
方法は存在しなかったため、下部透水層地盤における地
下水汚染が進行することになり、地下水の有効な利用を
図ることができないばかりか、自然環境にも悪影響を及
ぼすことになっていた。特に、汚染地下水にカドミウム
化合物やシアン化合物等の有毒物質が混入している場合
には深刻な問題となっていた。本発明は、上記の欠点を
除くためになされたものであり、不透水層地盤を挟ん
で、その上下に透水層地盤が存在し、上部透水層地盤が
汚染地下水を含んでいる地盤において、不透水層地盤を
貫通して下部透水層地盤に達する杭を打設する場合にお
いて、杭打設時又は杭打設後に、上部透水層地盤中の汚
染地下水が下部透水層地盤中に流入することを防止する
ために有効な杭施工方法を提供することを目的とするも
のである。 【0004】 【課題を解決するための手段】要するに、本発明は、不
透水層地盤を挟んでその上下に透水層地盤が存在し、上
部透水層地盤が汚染物質を含む汚染地下水を有する地盤
に杭を打設する杭施工方法であって、(イ)杭施工領域
中心部への前記汚染物質の浸入を防止するための置換材
料を用いて、前記杭施工領域内部の上部透水層地盤を置
換する上部透水層地盤置換工程、(ロ)前記杭施工領域
を貫通して所定深さに至るまで杭を打設する杭打設工
程、の各工程を含むことを特徴とする杭施工方法を提供
するものである。 【0005】即ち、本発明は、置換材料を用いて杭施工
領域内部の上部透水層地盤を置換することにより、杭施
工領域中心部への汚染物質の浸入を防止することによ
り、杭周面の間隙部等を伝わって、汚染地下水中に含有
される汚染物質が下部透水層地盤に浸透することを防止
して、下部透水層地盤中に含まれる清浄な地下水の汚染
を防止するものである。 【0006】 【発明の実施の形態】本発明に係る杭施工方法の実施形
態の一例について添付図面により詳細に説明する。尚、
本方法を適用するための対象地盤は、図1、図2に示す
ように、中間層に粘土層やシルト層からなる不透水層地
盤2,2’を含み、その上下に砂層や砂礫層を含む透水
層地盤1,1’,3,3’を有する地盤であり、以下に
示す実施の形態においてもそのような地盤での施工方法
について示しているが、透水層地盤と不透水層地盤が交
互に存在する地盤等においても、同様の方法を適用する
ことにより対応することが可能である。 【0007】◎第1実施形態 最初に、最も基本的な実施形態である第1実施形態につ
いて説明する。本発明に係る杭施工方法は、図1に示す
ように、第1工程である上部透水層地盤置換工程と第2
工程である杭打設工程の各工程により構成されている。
まず、第1工程である上部透水層地盤置換工程について
説明する。本工程は、杭Kを打設するために、杭施工領
域中心部4aへの汚染物質の浸入を防止するための置換
材料、即ち、例えば上記汚染物質を遮断する材料、若し
くは、上記汚染物質に対して反応性、吸着性を有し杭施
工領域中心部4aへの上記汚染物質の浸入を防止する材
料等のうちのいずれか1の材料、又は上記任意の複数の
材料を組合わせた置換材料により、杭施工領域4内部の
上部透水層地盤1を置換する工程である。 【0008】具体的には、図1(a)に示すように、汚
染地下水を含む上部透水層地盤1を貫く形で、杭施工領
域4に対応する上部透水層地盤1を掘削し、当該掘削地
盤中に上記置換材料を充填することにより行われるもの
である。本工程は従来行われている方法と同様の方法に
より行われる。例えば、各種の掘削機等を用いて、杭施
工領域4内部の掘削を行い、その内部に置換材料を投入
し、締固め等することにより行うことができる。尚、上
記の置換は、上部透水層地盤1のみについて行うことと
してもいいが、その効果を更に高めるためには、不透水
層地盤2の所定深さに至る範囲についても同時に置換す
ることが望ましい。また、杭施工領域4の形状には特に
制限はなく、円筒形、柱形等、地盤条件に応じて、決定
することができる。また、上部透水層地盤1のうち、ど
の程度の領域を置換するかについて示す置換率等につい
ても同様に制限はなく、地盤条件に応じて決定すること
ができる。 【0009】但し、後述するモルタルやコンクリートの
不透水性材料Mにより、上部透水層地盤1の置換を行う
場合には、杭施工領域4の地盤が硬化してしまうため、
置換後の杭打設が困難になる。そのため、図2(a)に
示すように、上部透水層地盤1の杭施工領域4’に予め
外挿管10を設置しておき、置換後における杭打設のた
めの杭打設用空間11を確保し、当該部分に杭打設を行
うことが必要となる(詳細は第2実施形態参照)。 【0010】上記置換材料としては種々の材料を用いる
ことが可能であり、以下の材料に限定されるものではな
いが、汚染物質を遮断する材料としては不透水性材料M
が代表的な材料である。また、汚染物質に対して反応
性、吸着性を有し杭施工領域4内部への汚染物質の浸入
を防止する材料としては、安定化材料、分解材料、吸着
性材料等が代表的な材料である。以下に、それぞれの置
換材料の性質に関し説明する。 【0011】不透水性材料Mは、当該不透水性材料Mの
硬化後に、杭施工領域4内部に流入してくる汚染地下水
を遮断する効果を有する物質であり、モルタル、コンク
リート等が用いられる。つまり、不透水性材料Mを用い
る目的は、対象となる杭施工領域4を当該材料により置
換することにより、杭施工領域4全体を不透水性地盤と
して、外部からの汚染地下水を遮断し、杭施工領域中心
部4aへの汚染物質の浸入を防止するすることにある。 【0012】安定化材料は、上記汚染物質と直接反応し
て不溶性物質を形成する性質を有する物質である。つま
り、安定化材料を用いる目的は、汚染地下水中に溶解し
ている上記汚染物質を、杭施工領域4に存在する安定化
材料により不溶性物質に変化させることにより、当該汚
染地下水中から上記汚染物質を分離し、杭施工領域外側
部4bにおいて除去することで、杭施工領域外側部4b
に流入してくる汚染地下水を最終的に無害化して、杭施
工領域中心部4aへの汚染物質の浸入を防止することに
ある。但し、汚染地下水中に含まれている汚染物質の種
類により、当該汚染物質に反応する安定化材料は異なる
ため、以下に説明するように汚染地下水の状況に応じて
置換するための安定化材料を決定する必要がある。 【0013】例えば、汚染物質が六価クロム化合物の場
合には、安定化材料として硫酸第一鉄、亜硫酸ナトリウ
ム、メタ重亜硫酸などの還元剤が適当である。これは、
六価のクロム化合物は水に易溶であるが、3価のクロム
化合物は難溶であるという性質を利用するものであり、
六価クロム化合物を上記還元剤を用いて還元することに
より、Cr(OH)3 やC r2 (SO4 3 の不溶性物
質に変化させ、汚染地下水中から除去するものである。 【0014】 上記六価クロム化合物を除去する場合と同
様の考え方により、他の汚染物質が汚染地下水中に含ま
れている場合にも、各汚染物質に対応する以下に示す安
定化材料を用いることにより、当該汚染物質の除去をす
ることが可能となる。 汚染物質がカドミウム化合物、ナ
トリウム化合物、水銀化合物の場合には、安定化材料と
して、硫化ナトリウムを用いることが効果的である。
た、汚染物質がシアン化合物の場合には、安定化材料と
して次亜塩素酸ソーダを用いることが効果的である。
た、汚染物質がひ酸化合物の場合には、安定化材料とし
て塩化鉄を用いることが効果的である。 更に、その他の
安定化材料として、鉄粉等の金属粉末を用いることによ
り、六価クロム、カドミウム、鉛、セレン、ヒ素などの
重金属を除去することも可能である。 【0015】 分解材料は、上記汚染物質と反応すること
により当該汚染物質を分解して無害化する性質を有する
物質である。つまり、分解材料を用いる目的は、汚染地
下水中に溶解している上記汚染物質を、杭施工領域4に
存在する分解材料により分解して、杭施工領域外側部4
bに流入してくる汚染地下水を最終的に無害化すること
により、杭施工領域中心部4aへの汚染物質の浸入を防
止することにある。 但し、汚染地下水中に含まれている
汚染物質の種類により、当該汚染物質に反応する分解材
料は異なるため、汚染地下水の状況に応じて置換するた
めの分解材料を決定する必要がある。例えば、汚染物質
として有機塩素化合物が含まれている場合には、分解材
料として鉄粉を添加することにより、所定の効果を得る
ことができる。 【0016】 吸着性材料は、非常に大きな吸着能力によ
り上記汚染物質を吸着することができる多孔質の材料で
あり、活性炭、石炭灰、木炭、亜炭、ゼオライト、ベン
トナイト等が用いられる。つまり、吸着性材料を用いる
目的は、汚染地下水中に溶解している上記汚染物質を、
杭施工領域4に存在する吸着性材料により吸着すること
により直接的に除去し、杭施工領域外側部4bに流入し
てくる汚染地下水を最終的に無害化して、杭施工領域中
心部4aへの汚染物質の浸入を防止することにある。 【0017】次に、杭打設工程について説明する。本工
程は、図1(b)から(c)に示すように、第1工程に
より置換された杭施工領域4内を貫通し、下部透水層地
盤3中の所定の深さに至るように杭Kを打設する工程で
あり、従来行われているものと同様の方法により行うこ
とが可能である。本工程では杭Kの打設方法は問わず、
基本的にどのような方法でも施工することができる。従
って、地盤条件に応じて、打撃工法、埋込み杭工法、場
所打ち杭工法等の各種の工法を採用することが可能とな
る。また、杭Kの材質、形状等に関しても特に制限はな
い。従って、鋼杭、既製コンクリート杭、プレストレス
トコンクリート杭、鋼とコンクリートの合成杭等の各種
の杭を施工することができることはもちろん、この他の
特殊基礎として、場所打ち鋼管コンクリート杭、拡底
杭、壁杭、多柱基礎等をも施工することができる。更
に、杭Kに突起等を設けることにより、杭Kの付着性を
高めることも可能である。 【0018】◎第2実施形態 図2に示すように、上述したモルタルやコンクリート等
の不透水性材料Mにより、上部透水層地盤1’において
杭施工領域4’内の置換を行う場合における施工方法で
ある。かかる場合には、杭施工領域4’の地盤が硬化し
てしまうため、置換後の杭打設が困難になる。そのた
め、杭施工領域4’に予め外挿管10を設置しておき、
置換後における杭打設のための杭打設用空間11を確保
し、当該部分に杭打設を行うことが必要となる。 【0019】具体的に説明すると、まず、図2(a)に
示すように、杭施工領域4’内部における上部透水層地
盤1’をモルタル、コンクリート等の不透水性材料Mを
用いて置換する際に、杭施工領域4’の杭打設を行う領
域の近傍に、置換領域の深さに至るまで外挿管10を設
置し、杭施工領域4’における当該外挿管10の外側部
に形成される置換域4’cのみに置換を行うことにな
る。この場合、外挿管10内部の部分には置換を行わ
ず、その内部に杭打設用空間11を確保しておく。尚、
外挿管10の設置方法は従来行われている方法と同様の
方法により行うことができる。例えば打撃、振動による
方法を用いて、杭施工領域4’の地盤に外挿管10を貫
入させることにより行うものである。 【0020】次に、図2(b)から(c)に示すよう
に、杭打設用空間11内に、杭K’を、上部透水層地盤
1’及び不透水層地盤2’を貫通し、下部透水層地盤
3’中の所定の深さに至るように打設することになる。
その後、図2(d)に示すように、外挿管10と杭K’
の間に形成される間隙部12に、モルタルやコンクリー
ト等の不透水性材料Mを充填することにより本工程を完
了するものである。これは、外挿管10と杭K’とを一
体化させ、杭K’の耐力を高める目的で行うものであ
る。 【0021】尚、本実施の形態においても、杭K’の打
設方法は問わず、基本的にどのような方法でも施工する
ことができる。従って、地盤条件に応じて、打撃工法、
埋込み杭工法、場所打ち杭工法等の各種の工法を採用す
ることが可能となる。また、杭K’の材質、形状等に関
しても特に制限はない。従って、鋼杭、既製コンクリー
ト杭、プレストレストコンクリート杭、鋼とコンクリー
トの合成杭等の各種の杭を施工することができることは
もちろん、この他の特殊基礎として、場所打ち鋼管コン
クリート杭、拡底杭、多柱基礎等をも施工することがで
きる。更に、この場合、杭K’や外挿管10に突起を設
けることにより、コンクリート等と杭K’及び外挿管1
0の付着性を高め、両者を一体化させることにより、更
に杭K’の耐力を高めることも可能である。 【0022】上記方法により、モルタル、コンクリート
等の不透水性材料Mを用いて置換域4’cの地盤を置換
することによる汚染地下水の遮断効果と、外挿管10に
よる汚染地下水の遮断効果により、汚染物質が杭打設用
空間11内部へ浸入することを効果的に防止することが
可能となる。 【0023】尚、杭K,K’頭部については、上部透水
層地盤1,1’の地盤中に埋設されていても(図2の場
合)、その上部に突出していても(図1の場合)、何ら
問題はない。 【0024】 【発明の効果】本発明により、上記各種の置換材料を用
いて、上部透水層地盤を置換することにより、汚染地下
水中に含まれる汚染物質の下部透水層地盤への浸透の防
止、又は、汚染物質の無害化を図ることにより、下部透
水層地盤中に含まれる清浄な地下水の汚染を防止するこ
とが可能になるという効果を得ることができる。
DETAILED DESCRIPTION OF THE INVENTION [0001] [0001] The present invention relates to an impermeable layer ground.
The upper and lower permeable ground exist above and below
Piling in ground containing contaminated groundwater
It relates to the pile construction method in the case. [0002] 2. Description of the Related Art An opaque material comprising a clay layer and a silt layer in an intermediate layer.
Permeable layer that includes the water layer ground and the sand layer and gravel layer above and below it
In the aquifer ground having
Often have groundwater inside.
No. Such groundwater is used as industrial water and domestic water.
Has important applications. However, due to recent industrial activities, etc.
Harmful pollutants may enter the groundwater
Condition occurs frequently. Under these circumstances, impervious
The permeable layer ground exists above and below the layer ground,
When the aquifer contains contaminated groundwater,
Driving piles that penetrate the aquifer ground and reach the lower aquifer ground
In the case of construction or after construction,
Contaminated groundwater contained in the upper permeable ground
The water will flow into the aquifer ground and will
The existing clean groundwater will be polluted
Had become. [0003] However, conventionally,
Underground included in the lower permeable ground
Driving piles that can effectively prevent water contamination
Because there was no method,
Sewage pollution will progress, and effective use of groundwater
Not only can not do this, but also have a negative impact on the natural environment.
Was to be dropped. In particular, cadmium in contaminated groundwater
When toxic substances such as compounds and cyanide are mixed
Had become a serious problem. The present invention overcomes the above disadvantages.
This was done to remove the impervious ground.
The upper and lower permeable grounds exist above and below
In the ground containing contaminated groundwater, the impermeable layer ground
When placing a pile that penetrates and reaches the lower
During or after pile driving, the soil in the upper permeable
Prevents dyed groundwater from flowing into the lower permeable ground
To provide an effective pile construction method for
It is. [0004] SUMMARY OF THE INVENTION In short, the present invention provides
The permeable ground exists above and below the permeable ground,
Where the permeable ground has contaminated groundwater containing pollutants
A pile construction method for placing a pile in
Replacement material for preventing the contaminant from entering the center
The upper permeable ground inside the pile construction area using
(B) The pile construction area
Pile driving to penetrate piles to a specified depth through
Providing a pile construction method characterized by the following steps:
Is what you do. That is, the present invention relates to a pile construction method using a replacement material.
By replacing the upper permeable ground inside the area,
By preventing contaminants from entering the center of the construction area
Contaminated groundwater flowing down the gaps around the pile surface
Of contaminated pollutants into the lower permeable ground
And clean groundwater contamination in the lower permeable ground
It is to prevent. [0006] BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of a pile construction method according to the present invention
An example of the mode will be described in detail with reference to the accompanying drawings. still,
The target ground for applying this method is shown in Figs.
Impermeable layer consisting of clay layer and silt layer in the middle layer
Permeable water including sand layers and gravel layers above and below
A ground having a layered ground 1, 1 ', 3, 3'
Also in the embodiment shown, the construction method on such ground
However, the permeable ground and the impermeable ground intersect.
Apply the same method to the mutually existing ground, etc.
It is possible to cope with this. [0007] First embodiment First, the first embodiment, which is the most basic embodiment, will be described.
Will be described. The pile construction method according to the present invention is shown in FIG.
As described above, the first step, the upper permeable ground replacement step, and the second step
It is constituted by each step of the pile driving step which is the step.
First, the first step, the upper permeable ground replacement step
explain. In this process, the pile construction area is
To prevent contaminants from entering the central area 4a
Material, i.e., for example, a material that blocks the above contaminants,
In other words, it is reactive and adsorbent
A material for preventing the above contaminants from entering the work area center 4a
Any one of the materials, or any of the above
With the replacement material combining the materials, the inside of the pile construction area 4 is
In this step, the upper permeable ground 1 is replaced. [0008] Specifically, as shown in FIG.
The pile construction area penetrates the upper permeable ground 1 containing dyed groundwater.
Excavation of the upper permeable ground 1 corresponding to the area 4
Performed by filling the board with the above replacement material
It is. This step is performed in the same way as the conventional method.
Done by For example, using various excavators,
Excavates the inside of construction area 4 and puts replacement material inside
Then, it can be performed by compacting or the like. In addition, above
Replacement of the above shall be performed only for the upper permeable ground 1
You can, but to further improve the effect, impervious
At the same time, replace the area that reaches the predetermined depth of the layer ground 2
Is desirable. In particular, the shape of the pile construction area 4 is particularly
There are no restrictions, determined according to the ground conditions, such as cylindrical and columnar
can do. In the upper permeable ground 1,
About the replacement rate, etc.
There are no restrictions as well, and it should be decided according to the ground conditions
Can be. However, mortar and concrete described later
The upper permeable layer ground 1 is replaced with the impermeable material M.
In such a case, the ground of the pile construction area 4 is hardened,
Pile driving after replacement becomes difficult. Therefore, FIG.
As shown, the pile construction area 4 ′ of the upper permeable
The extracorporeal tube 10 is installed, and the pile driving after replacement is performed.
Space for pile driving 11 is secured, and pile driving is performed in this area.
(See the second embodiment for details). Various materials are used as the replacement material.
Are not limited to the following materials:
However, as a material for blocking contaminants, an impermeable material M
Are representative materials. Also reacts to pollutants
Infiltration of contaminants into pile construction area 4
The materials that prevent stabilization include stabilizing materials, decomposition materials, and adsorption
Materials are representative materials. Below,
The properties of the replacement material will be described. The impermeable material M is formed of the impermeable material M
Contaminated groundwater flowing into the pile construction area 4 after hardening
Is a substance that has the effect of blocking mortar,
A REIT or the like is used. That is, using the water-impermeable material M
The purpose is to place the target pile construction area 4 with the material.
In this way, the entire pile construction area 4 is made to be impermeable ground.
To block contaminated groundwater from the outside
The purpose is to prevent intrusion of contaminants into the portion 4a. [0012] The stabilizing material reacts directly with the contaminants.
It is a substance having the property of forming an insoluble substance. Toes
The purpose of using stabilizing materials is to dissolve in contaminated groundwater.
Of the above contaminants existing in the pile construction area 4
By converting the material to an insoluble substance depending on the material,
Separates the above pollutants from dyed underground water and outside the pile construction area
By removing at the part 4b, the outer part 4b
Contaminated groundwater flowing into the
To prevent intrusion of contaminants into the work area center 4a
is there. However, species of pollutants contained in contaminated groundwater
Different stabilizing materials react to the pollutant
Therefore, depending on the situation of the contaminated groundwater as explained below
It is necessary to determine a stabilizing material to replace. For example, when the pollutant is a hexavalent chromium compound,
Ferrous sulfate and sodium sulfite as stabilizing materials
And reducing agents such as metabisulfite. this is,
Hexavalent chromium compounds are readily soluble in water, but trivalent chromium
The compound utilizes the property of being hardly soluble,
To reduce the hexavalent chromium compound using the above reducing agent
More Cr (OH)ThreeAnd CrTwo(SOFour)ThreeInsoluble matter
Quality and remove it from contaminated groundwater. [0014] Same as when removing hexavalent chromium compounds above
Of other pollutants in contaminated groundwater
Safety measures for each contaminant are listed below.
The use of the stabilizing material helps to remove the pollutants.
It becomes possible. Pollutants are cadmium compounds,
In the case of thorium compounds and mercury compounds, stabilizing materials
Then, it is effective to use sodium sulfide. Ma
If the contaminant is a cyanide, the stabilizing material
It is effective to use sodium hypochlorite. Ma
If the contaminant is an arsenic compound, use it as a stabilizing material.
It is effective to use iron chloride. In addition, other
By using metal powder such as iron powder as a stabilizing material,
Of hexavalent chromium, cadmium, lead, selenium, arsenic, etc.
It is also possible to remove heavy metals. [0015] Decomposed materials should react with the above contaminants
Has the property of decomposing the contaminant and rendering it harmless
Substance. In other words, the purpose of using decomposed materials is
The above pollutants dissolved in the sewage are transferred to the pile construction area 4.
It is decomposed by the existing decomposition material, and the pile construction area outside 4
Detoxification of contaminated groundwater flowing into b
Prevents intrusion of contaminants into the center 4a of the pile construction area
To stop. However, contained in contaminated groundwater
Decomposition materials that react to the pollutant depending on the type of the pollutant
Due to different charges, replacement is required depending on the situation of contaminated groundwater.
It is necessary to determine the decomposition material for For example, pollutants
If organic chlorine compounds are contained as
The desired effect is obtained by adding iron powder as a raw material
be able to. [0016] Adsorbent materials have very large adsorption capacity
A porous material that can adsorb the above pollutants
Yes, activated carbon, coal ash, charcoal, lignite, zeolite, ben
Tonite or the like is used. That is, using an adsorptive material
The purpose is to remove the above pollutants dissolved in the contaminated groundwater,
Adsorption by the adsorptive material existing in the pile construction area 4
To remove directly and flow into the pile construction area outside 4b.
The incoming contaminated groundwater is finally rendered harmless,
The purpose is to prevent intrusion of contaminants into the core 4a. Next, the pile driving step will be described. Main construction
In the process, as shown in FIGS. 1B to 1C, the first step
Penetrated through the pile construction area 4 replaced by
In the process of driving the pile K to reach a predetermined depth in the board 3
Yes, it can be done in the same way as
And it is possible. In this process, regardless of the method of placing the pile K,
Basically, any method can be used. Obedience
Depending on the ground conditions, the impact method, embedded pile method,
It is possible to adopt various construction methods such as the cast-in-place pile method.
You. There is no particular limitation on the material and shape of the pile K.
No. Therefore, steel pile, ready-made concrete pile, prestress
Concrete piles, composite piles of steel and concrete, etc.
Of course can be constructed of other piles
Cast-in-place steel pipe concrete pile, expanded bottom as special foundation
Piles, wall piles, multi-column foundations, etc. can also be constructed. Change
In addition, by providing a projection or the like on the pile K, the adhesion of the pile K can be reduced.
It is also possible to increase. ◎ Second Embodiment As shown in FIG. 2, mortar, concrete, etc.
Of the upper permeable layer ground 1 '
In the construction method when replacing in the pile construction area 4 '
is there. In such a case, the ground of the pile construction area 4 'becomes hardened.
Therefore, it is difficult to drive the pile after replacement. That
In advance, the extracorporeal tube 10 is installed in the pile construction area 4 'in advance,
Secure space 11 for pile driving for pile driving after replacement
However, it is necessary to drive the pile into the relevant part. More specifically, first, FIG.
As shown, the upper permeable stratum inside the pile construction area 4 '
The board 1 'is made of a water-impermeable material M such as mortar or concrete.
Area for pile driving in the pile construction area 4 '
An extracorporeal tube 10 is installed near the area to the depth of the replacement area.
And the outer portion of the extracorporeal tube 10 in the pile construction area 4 '
Will be replaced only in the replacement region 4'c formed in
You. In this case, the inside of the extracorporeal tube 10 is replaced.
Instead, a space 11 for placing a pile is secured inside. still,
The method of installing the extracorporeal tube 10 is the same as the method conventionally used.
It can be done by a method. For example, by blow, vibration
Using the method, the extracorporeal tube 10 is penetrated into the ground of the pile construction area 4 '.
This is done by inserting Next, as shown in FIGS.
Then, the pile K 'is inserted into the pile driving space 11 in the upper permeable ground.
1 'and the impermeable layer ground 2'
It will be cast to reach a predetermined depth in 3 '.
After that, as shown in FIG.
Mortar or concrete
This step is completed by filling an impermeable material M such as
That's it. This means that the extracorporeal tube 10 and the pile K '
For the purpose of increasing the strength of the pile K '
You. In this embodiment, the driving of the pile K '
Regardless of the installation method, basically use any method
be able to. Therefore, depending on the ground conditions,
Adopt various methods such as embedded pile method and cast-in-place pile method
It becomes possible. Also, regarding the material and shape of the pile K ′,
There is no particular limitation. Therefore, steel piles, ready-made concrete
Pile, prestressed concrete pile, steel and concrete
That various types of piles such as composite piles can be constructed
Of course, as another special foundation,
It is possible to construct cleat piles, expanded piles, multi-column foundations, etc.
Wear. Further, in this case, projections are provided on the pile K 'and the extracorporeal tube 10.
Concrete, etc., pile K 'and extracorporeal tube 1
0 by improving the adhesion of
It is also possible to increase the strength of the pile K '. By the above method, mortar, concrete
Replace the ground in the replacement area 4'c using an impermeable material M such as
And the extracorporeal tube 10
Pollutant for pile driving due to the effect of blocking contaminated groundwater
It is possible to effectively prevent intrusion into the space 11.
It becomes possible. The heads of the stakes K and K 'have upper water permeability.
Even if it is buried in the ground of the layered ground 1, 1 '(see FIG.
), Even if it protrudes above it (in the case of Fig. 1),
No problem. [0024] According to the present invention, the above various substitution materials can be used.
By replacing the upper aquifer ground,
Prevention of contaminants contained in water from penetrating into the lower permeable ground
By stopping or detoxifying contaminants,
Prevent contamination of clean groundwater contained in aquifer ground
Can be obtained.

【図面の簡単な説明】 【図1】(a)は上部透水層地盤置換工程の第1実施形
態を示す側断面図であり、(b),(c)は杭打設工程
の第1実施形態を示す側断面図である。 【図2】(a)は上部透水層地盤置換工程の第2実施形
態を示す側断面図であり、(b),(c),(d)は杭
打設工程の第2実施形態を示す側断面図である。 【符号の説明】 1 上部透水層地盤 2 不透水層地盤 3 下部透水層地盤 4 杭施工領域 4a 杭施工領域中心部 4b 杭施工領域外側部 4’c 置換域 10 外挿管 11 杭打設用空間 12 間隙部 K 杭 M 不透水性材料
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 (a) is a side sectional view showing a first embodiment of an upper permeable layer ground replacement process, and FIGS. 1 (b) and (c) are first executions of a pile driving process. It is a sectional side view which shows a form. FIG. 2 (a) is a side sectional view showing a second embodiment of the upper permeable layer ground replacement step, and FIGS. 2 (b), (c) and (d) show the second embodiment of the pile driving step. It is a side sectional view. [Description of Signs] 1 Upper permeable layer ground 2 Impermeable layer ground 3 Lower permeable layer ground 4 Pile construction area 4a Pile construction area central part 4b Pile construction area outer part 4'c Replacement area 10 External intubation 11 Pile driving space 12 gap K pile M impervious material

───────────────────────────────────────────────────── フロントページの続き (72)発明者 末岡 徹 東京都新宿区西新宿一丁目25番1号 大 成建設株式会社内 (56)参考文献 特開 平5−9925(JP,A) 特開 平7−224440(JP,A) 特開 昭57−112513(JP,A) (58)調査した分野(Int.Cl.7,DB名) E02D 3/00 101 E02D 5/22 E02D 3/12 102 E02D 7/00 ──────────────────────────────────────────────────続 き Continuation of the front page (72) Inventor Toru Sueoka 1-25-1, Nishi-Shinjuku, Shinjuku-ku, Tokyo Inside Taisei Corporation (56) References JP 5-9925 (JP, A) JP Hei 7-224440 (JP, A) JP-A-57-112513 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E02D 3/00 101 E02D 5/22 E02D 3/12 102 E02D 7/00

Claims (1)

(57)【特許請求の範囲】 【請求項1】 不透水層地盤を挟んでその上下に透水層
地盤が存在し、上部透水層地盤が汚染物質を含む汚染地
下水を有する地盤に杭を打設する杭施工方法であって、 (イ)杭施工領域中心部への前記汚染物質の浸入を防止
するための置換材料を用いて、前記杭施工領域内部の上
部透水層地盤を置換する上部透水層地盤置換工程、 (ロ)前記杭施工領域を貫通して所定深さに至るまで杭
を打設する杭打設工程、の各工程を含むことを特徴とす
る杭施工方法。
(57) [Claims] [Claim 1] A permeable layer ground exists above and below an impermeable layer ground, and an upper permeable layer ground drives a pile into the ground having contaminated groundwater containing pollutants. (A) an upper permeable layer that replaces an upper permeable layer ground inside the pile construction area by using a replacement material for preventing intrusion of the contaminant into the center of the pile construction area. A pile construction method, comprising: a ground replacement step; and (b) a pile placing step of placing a pile to a predetermined depth through the pile construction area.
JP14776898A 1998-05-28 1998-05-28 Pile construction method Expired - Fee Related JP3367042B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14776898A JP3367042B2 (en) 1998-05-28 1998-05-28 Pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14776898A JP3367042B2 (en) 1998-05-28 1998-05-28 Pile construction method

Publications (2)

Publication Number Publication Date
JPH11336060A JPH11336060A (en) 1999-12-07
JP3367042B2 true JP3367042B2 (en) 2003-01-14

Family

ID=15437745

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14776898A Expired - Fee Related JP3367042B2 (en) 1998-05-28 1998-05-28 Pile construction method

Country Status (1)

Country Link
JP (1) JP3367042B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018025055A (en) * 2016-08-10 2018-02-15 株式会社長谷工コーポレーション Cast-in-place pace construction method

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5157814B2 (en) * 2008-10-17 2013-03-06 株式会社大林組 Installation method of ready-made piles
JP2014114600A (en) * 2012-12-10 2014-06-26 Kajima Corp Foundation pile construction method
JP6006138B2 (en) * 2013-02-18 2016-10-12 鹿島建設株式会社 Vertical hole drilling method and vertical hole drilling apparatus
JP6171420B2 (en) * 2013-03-08 2017-08-02 株式会社大林組 Method of construction of retaining wall
CN107687175A (en) * 2017-09-27 2018-02-13 浙江大学 The vertical antifouling isolation wall construction of both sides ground local stiffening type and method
KR101952134B1 (en) * 2018-06-27 2019-06-11 (재)에스지환경기술연구원 Method of preventing arsonic polution of the ground water and treating method of the same
CN109324557A (en) * 2018-11-13 2019-02-12 浙江智握领程科技股份有限公司 A kind of mixing pile on-line monitoring instrument and its method
CN113062300A (en) * 2021-03-12 2021-07-02 中国电建集团西北勘测设计研究院有限公司 Construction method of gravel soil compaction pile composite foundation of collapsible stratum

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018025055A (en) * 2016-08-10 2018-02-15 株式会社長谷工コーポレーション Cast-in-place pace construction method

Also Published As

Publication number Publication date
JPH11336060A (en) 1999-12-07

Similar Documents

Publication Publication Date Title
JP5971606B1 (en) Soil purification method
JP3367042B2 (en) Pile construction method
JP2002018413A (en) Ground improving method for confining heavy metal- contaminated soil in present position
JP3572567B2 (en) Pile construction method
JP5644875B2 (en) Contaminant fixing structure in soil
JP4227553B2 (en) Permeable groundwater purification wall
JP2001288739A (en) Impervious revetment structure having function for detecting seepage of stored water and method for repairing the same
JP3076825B2 (en) In-situ purification method of leachable contaminated water
KR20070111065A (en) Impermeable and semi-permeable reactive barrier and contaminant removal and cut-off by them
JP4859458B2 (en) On-site treatment system for improved residual soil
JP2940867B1 (en) Water seal type impermeable wall and its function management method
Kamon Remediation techniques by use of ground improvement
JP3160016B2 (en) Environmental protection method
JPH10245861A (en) Method of purifying contaminated ground
Polańska et al. Barriers of Low Permeability to Water–Technical Solutions
JP4067279B2 (en) Soil shielded water-filled disposal site
Palmer Permeable treatment barriers
JPH0631882B2 (en) Waste treatment facility
JP2012125668A (en) In situ insolubilization method for contaminated soil
JP3140279B2 (en) Construction method of pollutant barrier
Cross Slurry Walls 1
JP2007029904A (en) Environmental preservation construction method
Boscardin et al. Barrier Walls to Contain Contaminated Soils
Cross The application of geotechnical engineering techniques for the prevention and control of pollution
JP2004330177A (en) Simple purification technique for contaminated soil

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091108

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101108

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111108

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111108

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121108

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121108

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131108

Year of fee payment: 11

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees