JP3315312B2 - Tower assembly and dismantling equipment for construction elevators - Google Patents

Tower assembly and dismantling equipment for construction elevators

Info

Publication number
JP3315312B2
JP3315312B2 JP12139596A JP12139596A JP3315312B2 JP 3315312 B2 JP3315312 B2 JP 3315312B2 JP 12139596 A JP12139596 A JP 12139596A JP 12139596 A JP12139596 A JP 12139596A JP 3315312 B2 JP3315312 B2 JP 3315312B2
Authority
JP
Japan
Prior art keywords
tower
segment
holding
steel
holding means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP12139596A
Other languages
Japanese (ja)
Other versions
JPH09301656A (en
Inventor
浩次 ▲吉▼田
晴康 箕輪
利哉 野路
義文 木村
和弘 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP12139596A priority Critical patent/JP3315312B2/en
Publication of JPH09301656A publication Critical patent/JPH09301656A/en
Application granted granted Critical
Publication of JP3315312B2 publication Critical patent/JP3315312B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、鉄塔に付設された
ラックと駆動歯車との噛み合い駆動によって昇降する搬
器を備えたラック式の工事用エレベータにかかるもので
あって、その鉄塔に沿って昇降駆動可能な頂部連台によ
って鉄塔の組立あるいは解体が容易にされた工事用エレ
ベータの鉄塔組立・解体装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a rack-type construction elevator equipped with a carrier which moves up and down by a meshing drive of a rack attached to a tower and a drive gear, and which moves up and down along the tower. BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tower assembling / disassembling apparatus for a construction elevator, in which assembling or disassembling a tower is facilitated by a drivable top stud.

【0002】[0002]

【従来の技術】従来、工事用エレベータにおける搬器の
案内支持用の鉄塔は、構築物の建設工程の進捗に伴いそ
の揚程を高めるために鉄塔を延長する必要が生じる。ま
た、搬器を高速で昇降させるために、その駆動力の軽減
を図る目的でカウンターウエイトを鉄塔頂部に設けられ
るガイドシーブを巡らせて搬器とロープで繋いでバラン
スさせる方式が併用されている。そのために鉄塔頂部に
は前記カウンターウエイトを案内支持する前記ガイドシ
ーブを支持するとともに、鉄塔の継ぎ足し作業時にその
鉄塔をガイドにして昇降移動を可能にされた頂部連台が
付設されている。
2. Description of the Related Art Conventionally, a steel tower for guiding and supporting a carriage in a construction elevator needs to be extended in order to increase its head with the progress of a construction process of a building. In addition, in order to reduce the driving force, the counterweight is circulated around a guide sheave provided at the top of a steel tower and connected to the transporter with a rope to balance the transporter in order to reduce the driving force. To this end, the guide sheave for guiding and supporting the counterweight is supported at the top of the tower, and a top end stand that is capable of ascending and descending by using the tower as a guide at the time of adding the tower is provided.

【0003】前記鉄塔の継ぎ足し作業は、次第に高い位
置に鉄塔のセグメントを運び上げて組み立てることにな
るので、一般に建築中の建物の躯体などに設置されてい
るクレーンを用いて鉄塔のセグメントを吊り上げ組み立
てる方式が採用されている。このほかに、搬器に鉄塔の
セグメントを積んで運び上げ、この搬器に付設の小型の
クレーンで既設の鉄塔上にその鉄塔のセグメントを吊り
込んで接続するような方式も採用されている。
[0003] Since the above-mentioned work of extending the towers is carried out by gradually bringing the segments of the towers up and assembling them, the segments of the towers are generally lifted and assembled by using a crane installed on the frame of a building under construction. The method is adopted. In addition, a method has been adopted in which a segment of a tower is carried on a carrier, and the segment of the tower is suspended on an existing tower by a small crane attached to the carrier and connected.

【0004】また、作業が完了して工事用エレベータを
解体する場合には、主に建築物の高所に設置されている
工事用のクレーンによって鉄塔セグメントを順次吊り降
ろして解体作業が行われている。
[0004] When the work elevator is dismantled after the work is completed, the steel tower segments are successively suspended and lowered mainly by a work crane installed at a high place in a building to perform the dismantlement work. I have.

【0005】[0005]

【発明が解決しようとする課題】前述のように鉄塔の継
ぎ足し作業を躯体などに設置のクレーンによって鉄塔の
セグメントを吊り込む場合は、比較的作業性はよいが、
エレベータの設置場所がクレーンの作業半径外になると
クレーンを使用できない。あるいは、作業の合理化でク
レーンは構築資材などの揚降作業に専用され、利用する
ことが工程上困難であることが多い。このようなことか
ら、この工事用エレベータ単体で揚程の延長に伴う鉄塔
の継ぎ足し作業を効率よく、かつ安全に実施できる手段
が要求されている。
As described above, when a tower segment is hung by a crane installed on a skeleton or the like to extend the tower, the workability is relatively good.
If the elevator is installed outside the working radius of the crane, the crane cannot be used. Alternatively, cranes are dedicated to lifting and lowering work such as construction materials due to streamlining of work, and it is often difficult to use them in the process. For this reason, there is a demand for a means capable of efficiently and safely performing the work of adding the steel tower with the extension of the lift in the construction elevator alone.

【0006】また、工事が終了して工事用エレベータが
不用になり解体作業を行うにあたっても、クレーンを使
用して解体できない場合には、自己の機能で鉄塔の解体
を行うことが要求される。この場合、従来の搬器に付設
の小型のクレーンを用いての作業では作業性が低く、鉄
塔が大型化すると短時間での解体が困難であり、しかも
安全性に乏しいので危険を伴うなど、多くの問題点があ
る。
[0006] In addition, when the construction elevator is no longer needed after the construction is completed and the dismantling work cannot be performed using a crane, it is required to dismantle the steel tower by its own function. In this case, workability is low when working with a small crane attached to a conventional carrier, and it is difficult to disassemble in a short time if the tower is large, and it is dangerous because it is poor in safety. There is a problem.

【0007】本発明は、このような問題点を解決して、
自走機能を備える頂部連台に直接鉄塔セグメントを保持
して既設鉄塔に組み付けあるいは取り外しができる鉄塔
保持装置を搭載し、安全かつ簡便に鉄塔の継ぎ足し・解
体ができる工事用エレベータの鉄塔組立・解体装置を提
供することを目的とする。
[0007] The present invention solves such problems,
Elevator tower assembly and disassembly for construction elevators that can safely and easily add and dismantle towers by installing a tower holding device that can hold the tower segment directly on the top gantry with self-propelling function and can be assembled or removed from the existing tower. It is intended to provide a device.

【0008】[0008]

【課題を解決するための手段】このような目的を達成す
るために、本発明による工事用エレベータの鉄塔組立・
解体装置は、第1に、噛み合い駆動式の工事用エレベー
タにおいて、鉄塔に沿って昇降移動可能に設けられる頂
部連台上に、前記鉄塔の前側とその鉄塔の据付位置との
間で進退可能に移動台が設けられ、この移動台上に当該
エレベータの鉄塔の幅寸法よりも広い間隔にて左右一対
のアームが配設され、これら両アームには、上部に前記
鉄塔の側部に対して進退可能な鉄塔保持手段がそれぞれ
設けられ、前記移動台が最前進した位置で操作しようと
する鉄塔セグメントが鉄塔設置位置に位置するようにさ
れ、前記頂部連台には、前記移動台が後退したときに前
記鉄塔保持手段が鉄塔設置位置から外れた位置まで移動
できる移動台のガイドが設けられていることを特徴とす
るものである。
SUMMARY OF THE INVENTION In order to achieve such an object, a tower assembly for a construction elevator according to the present invention is provided.
The dismantling device is firstly provided in a meshing drive type construction elevator so as to be able to move up and down along a steel tower.
On the unit stand, the front of the tower and the installation position of the tower
A moving platform is provided so as to be able to advance and retreat between
Left and right pair at an interval wider than the width of the elevator tower
Arms are provided, and both arms have the above-mentioned
Tower holding means that can move forward and backward with respect to the side of the tower
To be operated at the most advanced position of the carriage.
Tower segment to be located at the tower installation location.
When the moving platform retreats,
The pylon holding means moved to a position outside the pylon installation location
A movable platform guide is provided .

【0009】本発明において、前記塔保持手段は、前
記アームの上部で前記鉄塔の側面に直交する方向に設け
られる支持片挿通孔と、この支持片挿通孔を貫通して前
記鉄塔の側面から内部に差し込んでその鉄塔の構成横部
材の下面に係合させて鉄塔を保持する支持片とで構成さ
れているのが好ましい。
[0009] In the present invention, wherein the iron tower holding means includes a support piece insertion holes provided in a direction perpendicular to the side surface of the tower at the top of the arm, from the side of the tower through the support piece insertion holes It is preferable that it is constituted by a support piece which is inserted into the inside and is engaged with the lower surface of the horizontal member constituting the tower to hold the tower.

【0010】また、前記鉄塔保持手段は、前記アームの
上部にて前記鉄塔の側面に向かって配置されて進退可能
な鉄塔の構成部材を把持するクランプ機構であっても良
い。
Further, the tower holding means may be a clamping mechanism for gripping the components of retractable pylons disposed toward the side surfaces of the tower at the top of the arm.

【0011】また、本発明による工事用エレベータの鉄
塔組立・解体装置は、第2に、噛み合い駆動式の工事用
エレベータにおいて、鉄塔に沿って昇降移動可能に設け
られる頂部連台上に、前記鉄塔の前側とその鉄塔の据付
位置との間で進退可能に移動台が設けられ、この移動台
上に当該エレベータの鉄塔の幅寸法よりも広い間隔にて
左右一対の支柱が立設され、これら両支柱にはそれぞれ
直線作動機によって所要ストローク上下動されるアーム
が前記鉄塔の側方に突き出すように支持配設され、これ
ら各アームの中間部には前記鉄塔の側部に対して進退可
能な鉄塔保持機構が回転軸芯を合致させて軸受により支
持され、記移動台が最前進した位置で作しようとす
る鉄塔セグメントが鉄塔設置位置に位置するようにさ
、前記頂部連台には、前記移動台が後退したときに
塔保持機構によって保持される鉄塔セグメントが回
転できて方向変換可能な位置まで移動できる動台のガ
イドが設けられていることを特徴とするものである。
[0011] In addition, iron construction for an elevator in accordance with the present invention
Second, the tower assembling and dismantling equipment is for meshing drive type construction
Elevators are installed so that they can move up and down along the tower
The front of the tower and the installation of the tower on the top
A moving table is provided so as to be able to move back and forth between the moving table and the moving table.
A pair of right and left columns are erected at intervals wider than the width of the tower of the elevator, and arms that are moved up and down by a required stroke by a linear actuator are protruded to the sides of the tower. the supported disposed, an intermediate portion of each arm retractable pylons holding mechanism against the side of the tower is supported by a bearing made to match the rotation axis, the position before Symbol moving table has foremost in such tower segment to be operations are located in tower installation position
Is the top in the portion communication platform, the movable platform is retracted when the front <br/> Symbol pylon segment is held by the iron tower holding mechanism can be moved to a position capable direction conversion rotatable transfer Dodai guide Is provided.

【0012】本発明において、前記鉄塔保持機構は、回
転支持軸の先端部に保持する鉄塔セグメントの構成部材
の要所を掴んで固定保持できる固定手段を備えているの
が好ましい。なお、前記頂部連台には、設置された鉄塔
に対して前記鉄塔セグメントを継ぎ足し操作する位置も
しくは撤去操作する位置まで達したら上昇を停止させる
自動停止機構を備えていることが、鉄塔セグメントの既
設鉄塔に対する組み込みあるいは取り外しの作業を安全
に実施できることになり、より好ましい。
[0012] Oite the present invention, the tower holding mechanism preferably comprises a fastening means that can be fixed and held by grasping the key points of the components of the steel tower segment to hold the tip of the rotation shaft. In addition, the steel tower installed on the top
The position to add and operate the tower segment with respect to
Properly is that has an automatic stop mechanism for stopping the rise reaches to the position where the removal operation, will be safe to implement the operations of the embedded or removable with respect to existing towers pylon segments, more preferred.

【0013】[0013]

【発明の実施の形態】次に、本発明の工事用エレベータ
の鉄塔組立・解体装置について、その一実施例を図面を
参照しつつ説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of an apparatus for assembling and dismantling a steel tower of a construction elevator according to the present invention.

【0014】図1に示されるのは本発明に係る鉄塔組立
・解体装置が用いられる工事用エレベータの一具体例を
表す図であり、(a) は正面図であり、(b) は右側面図で
ある。図2は本発明に係る工事用エレベータの鉄塔組立
・解体装置の一具体例を表す正面図である。図3は図2
の右側面から見た側面図である。図4は図2の平面図で
ある。
FIG. 1 is a view showing a concrete example of a construction elevator using a tower assembling / disassembling apparatus according to the present invention, wherein (a) is a front view, and (b) is a right side view. FIG. FIG. 2 is a front view showing a specific example of the apparatus for assembling and dismantling a steel tower of a construction elevator according to the present invention. FIG. 3 is FIG.
It is the side view seen from the right side. FIG. 4 is a plan view of FIG.

【0015】これらの図において、建物の躯体に支持さ
れて立設される鉄塔1は、所要長さに分割された鉄塔セ
グメント1Aを多数積み重ねて所要高さに組み立てられ
ている。この鉄塔1には、両側に搬器2の案内をするガ
イドレール1aが取り付けられ、前面にそのガイドレー
ル1aに平行してラック1bが連続するように取り付け
られている。搬器2は、前記鉄塔1のガイドレール1a
に案内されて搭載する駆動機6により駆動されるピニオ
ンを前記鉄塔1に付設のラック1bと噛み合わせて昇降
するように装備された駆動フレーム3と、この駆動フレ
ーム3に連結される昇降フレーム4に取り付けられたケ
ージ5とからなっている。
In these figures, a tower 1 supported and supported by a building frame is assembled to a required height by stacking a number of tower segments 1A divided into required lengths. A guide rail 1a for guiding the transporter 2 is attached to both sides of the steel tower 1, and a rack 1b is attached to a front surface of the tower 1 in parallel with the guide rail 1a. The carrier 2 is a guide rail 1a of the tower 1.
And a lifting frame 4 connected to the driving frame 3 so that a pinion driven by a driving machine 6 mounted on the steel tower 1 is moved up and down by engaging with a rack 1b attached to the steel tower 1. And a cage 5 attached to the cage.

【0016】前記鉄塔1の頂部前面には、頂部連台10
が、搭載する駆動機12により駆動されるピニオンを前
記鉄塔1に付設のラック1bと噛み合わせて昇降移動可
能に取り付けられている。この頂部連台10には、鉄塔
1の両側に位置するようにしてカウンターウエイト用ワ
イヤーロープ8,8の吊り下げシーブ9,9が左右一対
付設されている。カウンターウエイト7,7は前記鉄塔
1の左右両側面部に沿って昇降できるように案内され、
前記各吊り下げシーブ9に吊り掛けられるワイヤーロー
プ8の先端を、それぞれ前記搬器2の昇降フレーム4に
繋がれて、余端を前記カウンターウエイト7に組み込ま
れている余巻ドラム7aに巻き付けて、搬器2とカウン
ターウエイト7とがバランスするようにされている。な
お、頂部連台10には搬器2を最上昇させて作業員がケ
ージの天井部から乗り移れるようになされている。
At the front of the top of the tower 1, a top connecting column 10
However, a pinion driven by a driving device 12 mounted thereon is fitted to a rack 1b attached to the steel tower 1 so as to be movable up and down. A pair of right and left hanging sheaves 9, 9 for counterweight wire ropes 8, are provided on the top end stand 10 so as to be located on both sides of the tower 1. The counterweights 7, 7 are guided so as to be able to move up and down along the left and right side surfaces of the steel tower 1,
The tip of the wire rope 8 hung on each of the hanging sheaves 9 is connected to the lifting frame 4 of the transporter 2, and the other end is wound around an extra winding drum 7 a incorporated in the counterweight 7, The carrier 2 and the counterweight 7 are balanced. In addition, the transporter 2 is moved up to the top end stand 10 so that the worker can transfer from the ceiling of the cage.

【0017】本実施例に係る鉄塔組立・解体装置20
は、前記頂部連台10と、この頂部連台10のフレーム
10’の前部位置で踊り場11の上面に鉄塔1の幅寸法
よりも広い間隔で、その鉄塔1に直交する方向に2本の
平行に敷設される断面コ字形のガイドレール13,13
の溝部に案内されて移動可能に設けられる移動台21
と、この移動台21から平行して鉄塔1の両側に突き出
すように配される2本のアーム24,24と、これらア
ーム24の各先端部にて着脱可能に取り付く鉄塔支持片
25aにてなる鉄塔保持手段25とで構成される。
The tower assembling / disassembling apparatus 20 according to this embodiment
Is located on the top of the landing 11 at the front position of the top connecting frame 10 and the frame 10 ′ of the top connecting frame 10, at an interval wider than the width of the tower 1, in a direction perpendicular to the tower 1. Guide rails 13, 13 laid in parallel and having a U-shaped cross section
Movable table 21 movably provided by being guided by the groove of
And two arms 24, 24 which are arranged so as to protrude from the movable table 21 in parallel on both sides of the tower 1, and a tower support piece 25 a which is detachably attached to each of the distal ends of these arms 24. And a tower holding means 25.

【0018】前記鉄塔組立・解体装置20における移動
台21は、図5で例示するように踊り場11上に敷設さ
れた2本のガイドレール13,13に車輪22をそれぞ
れ係合させて移動自在に配され、両側に起立するフレー
ム23の上部を前方(連台のフレーム10’側)に向け
て水平に所要長さ屈曲させて突き出すアーム24を備え
ている。これらアーム24には、それぞれ複数の(具体
例では4個)支持片挿通孔26が直交して所定の間隔で
設けられている。これら支持片挿通孔26にはいずれも
鉄塔支持片25aが着脱可能に挿入される。これら鉄塔
支持片25aとアーム24の支持片挿通孔26とによっ
て鉄塔保持手段25が構成される。なお、これら鉄塔支
持片25aと支持片挿通孔26とは断面角形に形成さ
れ、無負荷で手動操作によって鉄塔支持片25aが支持
片挿通孔26に抜き差し容易なようにされている。
The moving table 21 in the tower assembling / disassembling apparatus 20 is movable by engaging wheels 22 with two guide rails 13 laid on a landing 11 as shown in FIG. An arm 24 is provided, which is arranged so that the upper part of the frame 23 that stands on both sides is bent horizontally by a required length toward the front (toward the frame 10 ′ of the connecting frame) and protrudes. Each of the arms 24 is provided with a plurality of (four in the specific example) support piece insertion holes 26 at predetermined intervals at right angles. In each of these support piece insertion holes 26, a steel tower support piece 25a is removably inserted. The tower supporting piece 25a and the supporting piece insertion hole 26 of the arm 24 constitute the tower holding means 25. The tower support piece 25a and the support piece insertion hole 26 are formed in a square cross section so that the tower support piece 25a can be easily inserted into and removed from the support piece insertion hole 26 by no load and manual operation.

【0019】そして、この移動台21はガイドレール1
3,13に沿って最前進すると前記鉄塔保持手段25が
丁度鉄塔1の設置位置の真横に位置し、最後退するとそ
の鉄塔保持手段25によって保持される鉄塔セグメント
1Aが鉄塔設置位置から離れた位置となるように関係付
けられている。なお、この移動台21のガイドレール1
3,13は、溝型鋼で構成され、移動台21の車輪22
が浮き上がるのを防止し、最前進位置と最後退位置には
ストッパー13a,13bを設けて位置決め容易なよう
にされている。また、頂部連台10の踊り場11は、前
記移動台21の進退操作が容易なように前記ガイドレー
ル13の敷設範囲で設けられ、搬器2から乗り移りがで
きるようにタラップ15を備えている。(図3参照)
The movable table 21 is mounted on the guide rail 1.
The tower holding means 25 is located just beside the installation position of the tower 1 when the tower 1 is advanced most along the lines 3 and 13, and the tower segment 1A held by the tower holding means 25 is moved away from the installation position when the tower 1 is finally retracted. It is related to become. In addition, the guide rail 1 of this moving table 21
3 and 13 are made of channel steel,
Are prevented from floating, and stoppers 13a and 13b are provided at the most advanced position and the most retracted position to facilitate positioning. Further, the landing 11 of the top connecting stand 10 is provided in the area where the guide rail 13 is laid so that the moving table 21 can be easily moved forward and backward, and is provided with a ramp 15 so that it can be transferred from the carrier 2. (See Fig. 3)

【0020】頂部連台10のフレーム10’には、鉄塔
1のラック1bと噛み合うピニオン14を駆動する駆動
機12と、万一の事故に備える速度検出型のガバナー式
落下防止装置16とが付設され、かつ頂部連台10を上
昇させて鉄塔1の頂端から一定高さそのフレーム10’
が突き出されると、それ以上移動できないようにして逸
走を防止するため自動停止機構として光電式の抜け止め
防止リミットスイッチ40が取り付けられている。な
お、この抜け止め防止リミットスイッチ40は鉄塔1の
連続する部材(例えばラック1b)に対向させて検出で
きるように設けられる。したがって、この抜け止め防止
リミットスイッチ40には光電式以外のリミットスイッ
チを用いることもできる。
A drive unit 12 for driving a pinion 14 meshing with the rack 1b of the steel tower 1 and a speed detection type governor type fall prevention device 16 for emergency use are provided on the frame 10 'of the top connecting unit 10. The top 10 is raised and the frame 10 ′ is fixed at a certain height from the top end of the tower 1.
When the is protruded, a photoelectric locking stopper switch 40 is mounted as an automatic stop mechanism to prevent further movement and prevent runaway. The retaining switch 40 is provided so as to face a continuous member (for example, the rack 1b) of the steel tower 1 so as to be detectable. Therefore, a limit switch other than the photoelectric switch can be used as the retaining switch 40.

【0021】このようになされた本実施例に係る鉄塔組
立・解体装置20においては、その搭載される頂部連台
10を、搬器2とは別に単独で運転可能なように電源に
接続して、例えば鉄塔1を継ぎ足す組立作業を行うに
は、搬器2を最下位に降ろし、カウンターウエイト吊り
下げワイヤーロープ8を一時的に取り外しておく。その
後に、頂部連台10を下部に降ろして最後退させた移動
台21の前側に、レッカーなどにより継ぎ足すための鉄
塔セグメント1Aを吊り込み、この鉄塔セグメント1A
を踊り場11の床面から適宜量浮き上がらせた状態で、
移動台21のアーム24の支持片挿通孔26にそれぞれ
鉄塔支持片25aを挿入して、これら鉄塔支持片25a
を両アーム24,24の間に位置させた鉄塔セグメント
1Aの側面の対応する横部材1cの下側に差し込み、吊
り下げているその鉄塔セグメント1Aを降ろすことによ
り、これら鉄塔支持片25aにてその鉄塔セグメント1
Aを起立状態を保って受支させる。
In the tower assembling / disassembling apparatus 20 according to the present embodiment, the top end stand 10 is connected to a power source so that it can be operated independently of the transporter 2. For example, in order to perform an assembling operation to add the steel tower 1, the transporter 2 is lowered to the lowest position, and the wire rope 8 hanging from the counterweight is temporarily removed. Thereafter, a steel tower segment 1A to be added by a tow truck or the like is hung on the front side of the movable base 21 which has been moved down to the bottom by lowering the top series 10 and this steel tower segment 1A
Is raised from the floor of the landing 11 by an appropriate amount,
The tower support pieces 25a are inserted into the support piece insertion holes 26 of the arm 24 of the moving table 21, respectively, and these tower support pieces 25a are inserted.
Is inserted under the corresponding horizontal member 1c on the side surface of the tower segment 1A located between the arms 24, 24, and the suspended tower segment 1A is lowered, so that the tower support piece 25a Tower segment 1
A is supported while standing.

【0022】その後に図6で示されるように、頂部連台
10を駆動機12の運転によって鉄塔1の頂部まで上昇
させ、鉄塔保持手段25によって支持された鉄塔セグメ
ント1Aの下端が既設の鉄塔1の頂面よりもやや上にな
る位置に達すると運転を停止させる。なお、この頂部連
台10には作業者が搭乗して昇降運転操作される。ま
た、この頂部連台10が鉄塔1の最上部まで上昇して、
万一過上昇するようなことが生じても、頂部連台を構成
するフレーム10’には抜け止め防止リミットスイッチ
40が付設されているので、鉄塔1の頂端からフレーム
10’が抜け出すようなことがなく、安全が確保され
る。
After that, as shown in FIG. 6, the top connecting stand 10 is raised to the top of the tower 1 by the operation of the drive unit 12, and the lower end of the tower segment 1 A supported by the tower holding means 25 is attached to the existing tower 1. Operation is stopped when the vehicle reaches a position slightly above the top surface of the vehicle. It is to be noted that a worker rides on the top end stand 10 to perform a lifting operation. In addition, this top connecting stand 10 rises to the top of the tower 1,
Even in the event of an excessive rise, the frame 10 'constituting the top connecting frame is provided with the retaining switch 40 so that the frame 10' may come off from the top end of the tower 1. And safety is ensured.

【0023】こうして、移動台21をガイドレール1
3,13に沿って前進させることにより鉄塔保持手段2
5によって保持されている鉄塔セグメント1Aを既設の
鉄塔1上に移動させることができる。したがって、その
鉄塔保持手段25にて保持される鉄塔セグメント1Aと
既設の鉄塔1との接続位置合わせが行われると、この鉄
塔セグメント1Aが既設の鉄塔1の頂面に積み重ねられ
るまでその頂部連台10を下降させる。
In this manner, the movable base 21 is moved to the guide rail 1
Tower holding means 2 by moving forward along 3 and 13
The tower segment 1 </ b> A held by 5 can be moved onto the existing tower 1. Therefore, when the connection position between the tower segment 1A held by the tower holding means 25 and the existing tower 1 is adjusted, the top connecting column is stacked until the tower segment 1A is stacked on the top surface of the existing tower 1. Lower 10

【0024】このようにして頂部連台10が所要位置に
達した後は、この頂部連台10に予め設けられている連
台支持片18,18(昇降時には後退させて鉄塔1に接
触しないようになっている)を鉄塔1前面に突き出し
て、鉄塔1の前面に設けられている横部材上に係合させ
て受支させる。こうすることで、頂部連台10は、連台
支持片18,18によって鉄塔構成横部材に自重を支持
され、ガイドレール1a,1aに係合しているガイドロ
ーラ17,17によって前後方向のずれを保持されて、
安定的に固定される。したがって、この頂部連台10
は、鉄塔継ぎ足し作業中に落下するような事故を起こす
ことなく安全性が確保できる。
After the top gantry 10 reaches the required position in this way, the gantry support pieces 18, 18 provided in advance on the top gantry 10 (retreat when ascending and descending so as not to contact the steel tower 1). Is projected to the front of the tower 1 and is engaged with and supported on a horizontal member provided on the front of the tower 1. In this way, the top end stand 10 is supported by the tower supporting lateral members by the end stand supporting pieces 18, 18, and its longitudinal weight is shifted by the guide rollers 17, 17 engaged with the guide rails 1 a, 1 a. Is held
It is fixed stably. Therefore, this top series 10
As a result, safety can be secured without causing an accident such as dropping during the work of adding a steel tower.

【0025】鉄塔セグメント1Aが継ぎ足す鉄塔に積み
重ねられた時点では、鉄塔セグメント1Aを保持してい
た鉄塔支持片25aが当該鉄塔セグメント1Aの側面横
部材1cの下面から離されて支持状態を脱するので、鉄
塔保持手段25のすべての鉄塔支持片25aを支持片挿
通孔26から抜き取れば、鉄塔1との係わりが解除され
てフリーとなり、移動台21を後退させることができ
る。したがって、継ぎ足される鉄塔セグメント1Aを既
設鉄塔1とボルト締結させた後は、連台支持片18,1
8を後退させ、頂部連台21を次の鉄塔セグメント1A
を積み込む位置まで下降させ、以後前記要領を繰り返し
て鉄塔1の継ぎ足し作業を行うことができる。
When the tower segment 1A is stacked on the tower to be added, the tower supporting piece 25a holding the tower segment 1A is separated from the lower surface of the lateral side member 1c of the tower segment 1A and comes out of the supporting state. Therefore, if all the tower support pieces 25a of the tower holding means 25 are pulled out from the support piece insertion holes 26, the engagement with the tower 1 is released and the tower 1 is free, and the movable table 21 can be moved backward. Therefore, after the tower segment 1A to be replenished is bolted to the existing tower 1, the gantry supporting pieces 18, 1 are connected.
8 is retracted and the top staircase 21 is moved to the next tower segment 1A.
Can be lowered to the loading position, and thereafter, the above procedure can be repeated to perform the work of adding the steel tower 1.

【0026】以上は鉄塔1の継ぎ足し作業について説明
したが、鉄塔1を解体する場合は、まず搬器2を地上階
に降ろして撤去し、次いで頂部連台10の駆動部に電源
を接続(通常運転時は頂部連台10の駆動部への動力源
は接続されない)して連台支持片18,18を後退さ
せ、これら連台支持片18,18による鉄塔1への保持
を解く。その後にその頂部連台10を一旦下降させるな
どしてカウンターウエイト吊り下げワイヤーロープ8を
取り外す。
Although the work of adding the tower 1 has been described above, when disassembling the tower 1, the carrier 2 is first lowered to the ground floor and removed, and then the power source is connected to the drive unit of the top connecting unit 10 (normal operation). At this time, the power source to the drive unit of the top gantry 10 is not connected) to retreat the gantry support pieces 18, 18 and release the holding of the gantry support pieces 18, 18 to the steel tower 1. Thereafter, the counterweight suspension wire rope 8 is removed by, for example, temporarily lowering the top connecting stand 10.

【0027】次に、頂部連台10の駆動機12を作動さ
せて鉄塔1の頂部まで上昇させ、頂部の鉄塔セグメント
1本分が取り外せる位置で頂部連台10を停止させ、移
動台21を鉄塔保持位置まで前進させる。その後にこの
移動台21の両アーム24,24の各支持片挿通孔26
に鉄塔支持片25aを挿入して撤去しようとする鉄塔セ
グメント1Aの両側面の横部材1cの下に差し込む。な
お、この鉄塔支持片25aの差し込み操作時には、当該
鉄塔支持片25aが鉄塔セグメント1Aの横部材1cと
接触しないでやや下側に位置するように頂部連台10の
停止位置を決めるようにする。
Next, the drive unit 12 of the top gantry 10 is operated to ascend to the top of the tower 1, the top gantry 10 is stopped at a position where one tower segment at the top can be removed, and the movable table 21 is moved to the tower. Advance to the holding position. After that, each support piece insertion hole 26 of both arms 24
The tower support piece 25a is inserted into the lower part of the horizontal member 1c on both sides of the tower segment 1A to be removed. During the operation of inserting the tower support piece 25a, the stop position of the top end stand 10 is determined so that the tower support piece 25a is located slightly below without contacting the horizontal member 1c of the tower segment 1A.

【0028】鉄塔1の左右両側でそれぞれ鉄塔支持片2
5aが差し込まれたならば、鉄塔1の接続ボルトを取り
外し、その後に頂部連台10を少し上昇させて各鉄塔支
持片25aを鉄塔両側の横部材1cの下側に接触させて
そのまま既設鉄塔1から鉄塔セグメント1Aを持ち上げ
る。したがって、この状態で移動台21を後退させれ
ば、この移動台21に付属する鉄塔保持手段25によっ
て鉄塔セグメント1Aが持ち上げられたまま鉄塔設置位
置から手前側に移動して離されるので、駆動機12を駆
動してそのまま地上部まで下降させて、地上部において
運び降ろした鉄塔セグメント1Aをトラッククレーンな
どで吊って鉄塔保持手段25による保持を解き(鉄塔支
持片25aを抜き取る)、頂部連台10上からその鉄塔
セグメント1Aを撤去する。以後この操作を繰り返すこ
とで鉄塔1を順次解体して撤去することができる。
On both left and right sides of the tower 1, the tower support pieces 2
When 5a is inserted, the connecting bolt of the tower 1 is removed, and then the top connecting stand 10 is slightly raised so that each tower supporting piece 25a is brought into contact with the lower side of the horizontal member 1c on both sides of the tower, and the existing tower 1 is left as it is. Lifts the tower segment 1A. Therefore, if the moving table 21 is retracted in this state, the tower segment 1A is lifted up by the tower holding means 25 attached to the moving table 21 and is moved forward and away from the tower installation position while being lifted. Then, the steel tower segment 1A carried down on the ground part is lifted by a truck crane or the like to release the holding by the steel tower holding means 25 (withdrawing the steel tower supporting piece 25a), and the top end stand 10 is driven. The tower segment 1A is removed from above. Thereafter, by repeating this operation, the steel tower 1 can be sequentially dismantled and removed.

【0029】なお、既設の鉄塔に対する鉄塔セグメント
1Aの着脱操作は、前述のように頂部連台10上の鉄塔
組立・解体装置20における移動台21のアーム24に
複数の鉄塔支持片25aを介して直立したまま浮かせて
鉄塔セグメント1Aを保持するようにされるので、移動
台21の前進位置が既設鉄塔1の真上に合致するように
ストッパー13aによって設定しておけば、移動台21
の進退操作と頂部連台10の鉄塔頂部での上下微動によ
って簡単に位置決めして操作できる。しかも、頂部連台
10は鉄塔1の前部と両側とに面して踊り場11を設け
てあるので、鉄塔1のボルト締結・分解作業が容易に行
える。
As described above, the operation of attaching / detaching the tower segment 1A to / from the existing tower is performed through the plurality of tower support pieces 25a on the arm 24 of the moving table 21 in the tower assembling / disassembling apparatus 20 on the top connecting stand 10. Since the tower segment 1A is held by being lifted upright, if the forward position of the moving table 21 is set by the stopper 13a so as to coincide with the position immediately above the existing steel tower 1, the moving table 21
And the vertical movement at the top of the tower of the top connecting stand 10 allows easy positioning and operation. In addition, since the landing 11 is provided with the landing 11 facing the front part and both sides of the tower 1, bolting and disassembling work of the tower 1 can be easily performed.

【0030】次に、本発明に係る鉄塔組立・解体装置の
他の実施例について、その具体例を図7及び図8にて説
明する。
Next, another embodiment of the steel tower assembling / disassembling apparatus according to the present invention will be described with reference to FIGS. 7 and 8. FIG.

【0031】これらの図によって示されるように、この
具体例における鉄塔組立・解体装置20Aは、前述の頂
部連台10の上に搭載されて前述のように所要の区間鉄
塔とその前部との間を移動できる移動台21Aと、この
移動台21Aに直立する左右両フレーム(支柱)23
A,23Aの鉄塔に面する側に付設されて上下動可能な
アーム24Aに取り付く鉄塔保持手段30と、この鉄塔
保持手段30を回転可能に支持する機構を備えている。
なお、前述の実施例と同一の部分については同一の符号
を付して詳細な説明を省略する。
As shown in these figures, the tower assembling / disassembling apparatus 20A in this embodiment is mounted on the above-mentioned top end stand 10, and as described above, the required section of the tower and its front section are connected to each other. A movable platform 21A that can move between the movable platform, and both left and right frames (supports) 23 standing upright on the movable platform 21A.
A steel tower holding means 30 attached to a vertically movable arm 24A attached to the side of the towers A and 23A facing the steel tower, and a mechanism for rotatably supporting the steel tower holding means 30 is provided.
The same parts as those in the above-described embodiment are denoted by the same reference numerals, and detailed description will be omitted.

【0032】前記移動台21Aは、最前進した位置でア
ーム24Aに付属する鉄塔保持手段30にて支持される
鉄塔セグメント1Aが既設の鉄塔設置位置に合致するよ
うにストッパー(図示せず)によって位置決めされ、最
後退すると支持する鉄塔セグメント1Aを反転させるこ
とができる位置となるようにその全体寸法を形成されて
いる。
The movable table 21A is positioned by a stopper (not shown) so that the tower segment 1A supported by the tower holding means 30 attached to the arm 24A at the most advanced position matches the existing tower installation position. The overall size is formed such that when it retreats backward, the tower segment 1A to be supported can be turned over.

【0033】この移動台21Aのフレーム23Aに付設
されるアーム24Aは、その基端部をフレーム23Aの
鉄塔側の支持座27に上下摺動可能に係合して、その基
部と移動台21Aの上面との間に設けられる直動の駆動
装置28(例えば油圧シリンダ)によって上下に移動可
能に連結されている。そして、これらのアーム24Aの
上部中間には左右同一軸線上に軸心を合致させて軸受3
1がそれぞれ取り付けられている。これら軸受31には
先端に鉄塔1の横部材1cなどを掴んで固定するクラン
プ33が付された支持軸(鉄塔保持機構)32が軸線方
向に適宜量進退可能,回転自在で対称に設けられてい
る。なお、前記支持軸32の端部のクランプ33に替え
て図示省略するが、鉄塔横部材1cなどを挟んでボルト
締めにより支持軸32に固定できる面板と押さえ板とか
らなる支持部材を使用することもできる。
The arm 24A attached to the frame 23A of the moving base 21A has its base end slidably engaged with a support seat 27 on the steel tower side of the frame 23A so as to be vertically slidable. It is connected movably up and down by a linear drive device 28 (for example, a hydraulic cylinder) provided between itself and the upper surface. In the middle of the upper part of these arms 24A, the bearings 3 are aligned on the same left and right axes.
1 are respectively attached. These bearings 31 are provided with support shafts (tower holding mechanisms) 32 each having a clamp 33 for gripping and fixing the horizontal member 1c of the tower 1 at the tip thereof. I have. It should be noted that, although not shown in place of the clamp 33 at the end of the support shaft 32, a support member including a face plate and a holding plate that can be fixed to the support shaft 32 by bolting with the steel tower horizontal member 1c or the like being used is used. Can also.

【0034】また、前記アーム24Aに設けられた支持
軸32とクランプ33(もしくは面板と押さえ板との挟
持による固定保持)とからなる鉄塔保持手段30に加え
て、アーム24Aには移動台21Aの移動時に支持して
いる鉄塔セグメント1Aが回動しないように仮固定する
例えば当て金のような固定手段(図示省略)を付設して
おくのがよい。
In addition to the tower holding means 30 comprising a support shaft 32 provided on the arm 24A and a clamp 33 (or a fixed holding by clamping a face plate and a holding plate), the arm 24A has a moving table 21A. It is preferable to provide a fixing means (not shown) such as a pad for temporarily fixing the tower segment 1A supported during the movement so as not to rotate.

【0035】このようになされた鉄塔組立・解体装置2
0Aは、例えば鉄塔1を解体する場合、鉄塔頂部まで頂
部連台10を単独で運転させて上昇し、所定の位置で頂
部連台10に付属する連台支持片18,18によって鉄
塔1に固定させた後、移動台21Aを鉄塔側に最前進さ
せる。その後に両アーム24Aに付属する鉄塔保持手段
30の支持軸32を鉄塔側に前進させて先端のクランプ
33により鉄塔横部材1cなどを掴んで固定させる。な
お、前記クランプ33による鉄塔1の横部材1cなどを
掴む際の位置合わせには、駆動装置28によってアーム
24Aを上下動させて行われる。
The tower assembling / disassembling apparatus 2 thus constructed
For example, when the tower 1 is dismantled, the top tower 10 is operated independently to ascend the tower 1 and rises, and is fixed to the tower 1 at a predetermined position by the supporting pieces 18, 18 attached to the top tower 10. After that, the moving table 21A is moved forward to the steel tower side. Thereafter, the support shaft 32 of the tower holding means 30 attached to both arms 24A is advanced toward the tower, and the tower horizontal member 1c and the like are gripped and fixed by the clamp 33 at the tip. The positioning when the clamp 33 grips the horizontal member 1c of the steel tower 1 is performed by moving the arm 24A up and down by the driving device 28.

【0036】鉄塔保持手段30によって解体する鉄塔セ
グメント1Aを保持したならば、接続されているボルト
を取り外す。その後において駆動装置28を作動させて
鉄塔セグメント1Aを持ち上げ、既設の鉄塔1から切り
離した後に移動台21Aを後退させ、鉄塔1と接触しな
い位置まで後退させたならば、駆動装置28を作動させ
て保持している鉄塔セグメント1Aを下降させて安定す
る姿勢にしてそのまま地上部まで頂部連台10を下降さ
せる。地上部においては、移動台21Aを最後退位置ま
で移動させると、図7で示されるように、保持している
鉄塔セグメント1Aを支持軸32を支点として起立状態
から水平状態に回動変位させる。このようにすると、地
上部において、例えばフォークリフトのフォークを鉄塔
セグメント1Aの枠内に差し込むようにして支持させ、
鉄塔保持手段30のクランプ33による鉄塔横部材1c
などの保持を解けば、そのままフォークリフトによって
頂部連台10から外部に運び出すことができる。
When the tower segment 1A to be dismantled is held by the tower holding means 30, the connected bolts are removed. After that, the drive unit 28 is operated to lift the tower segment 1A, and after separating from the existing tower 1, the moving table 21A is retracted, and if it is retracted to a position where it does not come into contact with the tower 1, the drive unit 28 is activated. The holding tower segment 1A is lowered to a stable posture, and the top connecting column 10 is lowered as it is to the ground portion. On the ground portion, when the movable base 21A is moved to the last retreat position, as shown in FIG. 7, the held steel tower segment 1A is pivotally displaced from the standing state to the horizontal state with the support shaft 32 as a fulcrum. In this way, on the ground portion, for example, a fork of a forklift is supported by being inserted into the frame of the tower segment 1A,
Tower horizontal member 1c by clamp 33 of tower holding means 30
When the holding operation is released, the forklift can be carried out of the top connecting stand 10 to the outside.

【0037】以後、頂部連台10を鉄塔頂部に上昇させ
て前記要領により順次鉄塔セグメント1Aを解体して地
上部に運び出すことができる。なお、鉄塔1の組立につ
いては、前述の解体操作と逆の手順で鉄塔セグメント1
Aを運び上げて順次既設の鉄塔1に継ぎ足すことで組み
立てることができる。
Thereafter, the tower 10 can be raised to the top of the tower, and the tower segments 1A can be sequentially disassembled and transported to the ground in the manner described above. In addition, the assembling of the tower 1 is performed in the reverse order of the dismantling operation described above.
A can be assembled by carrying A and sequentially adding it to the existing tower 1.

【0038】この具体例によれば、頂部連台10上に搭
載される移動台21A付設のアーム24A並びに鉄塔保
持手段30が、直動の駆動装置28によって上下に移動
される機能を備えているので、鉄塔1の頂部において頂
部連台10を上下に微動させることなく鉄塔セグメント
1Aの組み付け・解体ができるので、高所での作業を安
全に行なえる利点を有する。
According to this specific example, the arm 24A attached to the movable base 21A mounted on the top connecting stand 10 and the tower holding means 30 are provided with a function of being moved up and down by the linear drive device 28. Therefore, the tower segment 1A can be assembled and dismantled without slightly moving the top connecting column 10 up and down at the top of the tower 1, so that there is an advantage that work at high places can be performed safely.

【0039】なお、前記各実施例における頂部連台に搭
載の鉄塔組立・解体装置は、通常のエレベータの運転時
には、搭載した状態で何ら支障はない。
Note that the tower assembling / disassembling apparatus mounted on the top staircase in each of the above-mentioned embodiments does not cause any trouble in the mounted state during normal elevator operation.

【0040】[0040]

【発明の効果】以上に説明したように本発明によれば、
自走できる機能を備えた頂部連台上で鉄塔セグメントを
両側にて保持して鉄塔設置位置に対して上下動させると
ともに前後水平方向に進退させて、組立あるいは解体操
作できる鉄塔セグメントの支持装置を設けて、安定状態
で鉄塔セグメントを保持して既設の鉄塔に対し接続・取
り外しができるので、鉄塔の接続組立あるいは解体作業
が安全に、かつ能率よく実施できることになり、自己の
機能でエレベータの鉄塔の組立・解体が実施容易となっ
た。
According to the present invention as described above,
A tower segment support device that can hold and assemble or disassemble by moving the tower segment up and down to the tower installation position while holding it on both sides on the top gantry equipped with a self-propelled function, and moving it back and forth in the horizontal direction It can be connected and detached from the existing tower while holding the tower segment in a stable state, so that the connection and disassembly or dismantling work of the tower can be performed safely and efficiently, and the tower of the elevator by its own function Assembly and disassembly became easier.

【0041】また、鉄塔セグメントを保持するアームを
直動の駆動装置によって上下動できる構成とすれば、既
設鉄塔の頂部に対する鉄塔セグメントの継ぎ足しあるい
は撤去時の操作にあたり、頂部連台を所定位置に保って
保持する鉄塔セグメントのみを上下調節しながら作業が
できて高所での重量物(鉄塔セグメント)の取扱操作が
より安全に行え、作業能率を向上させることができる。
Further, if the arm holding the tower segment can be moved up and down by a linear drive device, when the tower segment is added to or removed from the top of the existing tower, the top column is held at a predetermined position. The work can be performed while adjusting only the tower segment to be held up and down, and the handling operation of heavy objects (tower segments) at a high place can be performed more safely, and the work efficiency can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は、本発明に係る鉄塔組立・解体装置が用
いられる工事用エレベータの一具体例を表す図であり、
(a) は正面図であり、(b) は右側面図である。
FIG. 1 is a view showing a specific example of a construction elevator in which a tower assembling / disassembling apparatus according to the present invention is used;
(a) is a front view and (b) is a right side view.

【図2】図2は、本発明に係る工事用エレベータの鉄塔
組立・解体装置の一具体例を表す正面図である。
FIG. 2 is a front view showing a specific example of an apparatus for assembling and dismantling a steel tower of a construction elevator according to the present invention.

【図3】図3は、図2の右側面から見た側面図である。FIG. 3 is a side view as viewed from the right side of FIG. 2;

【図4】図4は、図2の平面図である。FIG. 4 is a plan view of FIG. 2;

【図5】図5は、鉄塔組立・解体装置の一具体例の全体
斜視図である。
FIG. 5 is an overall perspective view of a specific example of a steel tower assembling / disassembling apparatus.

【図6】図6は、鉄塔セグメントの組立要領を示す概要
図である。
FIG. 6 is a schematic diagram showing an assembling procedure of a tower segment.

【図7】図7は、本発明に係る鉄塔組立・解体装置の他
の実施例の側面図であって、鉄塔セグメントを操作する
態様を併記した図である。
FIG. 7 is a side view of another embodiment of the tower assembling / disassembling apparatus according to the present invention, which also illustrates a mode of operating the tower segment.

【図8】図8は、図7で表す鉄塔組立・解体装置の右側
から見た図である。
FIG. 8 is a view of the tower assembling / disassembling apparatus shown in FIG. 7 as viewed from the right side.

【符号の説明】[Explanation of symbols]

1 鉄 塔 1a 鉄塔のガイドレール 1b ラック 1c 鉄塔の横部材 1A 鉄塔セグメント 2 搬 器 6 駆動機 7 カウンターウエイト 8 カウンターウエイト用ワイヤーロープ 9 吊り下げシーブ 10 頂部連台 10’ 頂部連台のフレーム 11 踊り場 12 頂部連台の駆動機 13 移動台のガイドレール 13a,13b ストッパー 20 鉄塔組立・解体装置 21,21A 移動台 22 車輪 23,23A フレーム 24,24A アーム 25,30 鉄塔保持手段 25a 鉄塔支持片(支持片) 26 支持片挿通孔 28 駆動装置 31 軸受 32 支持軸 33 クランプ(クランプ機構) 40 抜け止め防止リミットスイッチ(自動
停止機構)
DESCRIPTION OF SYMBOLS 1 Tower 1a Tower guide rail of a tower 1b Rack 1c Lateral member of a tower 1A Tower segment 2 Carrier 6 Driver 7 Counterweight 8 Counterweight wire rope 9 Suspended sheave 10 Top connecting frame 10 'Frame of top connecting frame 11 Landing area Reference Signs List 12 Drive unit of top continuous unit 13 Guide rail of moving stand 13a, 13b Stopper 20 Tower assembling / disassembling device 21, 21A Moving stand 22 Wheel 23, 23A Frame 24, 24A Arm 25, 30 Tower holding means 25a Tower supporting piece (support) Piece) 26 support piece insertion hole 28 drive device 31 bearing 32 support shaft 33 clamp (clamp mechanism) 40 retaining switch limit switch (automatic stop mechanism)

フロントページの続き (72)発明者 野路 利哉 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 木村 義文 大阪市西成区花園南一丁目7番20号 株 式会社コシハラ内 (72)発明者 井上 和弘 大阪市西成区花園南一丁目7番20号 株 式会社コシハラ内 (56)参考文献 特開 平4−11162(JP,A) 特開 平2−70688(JP,A) 特開 平6−24673(JP,A) (58)調査した分野(Int.Cl.7,DB名) B66B 9/00 - 9/193 Continued on the front page (72) Inventor Toshiya Noji 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Yoshifumi Kimura 1-20-20 Hanazono Minami, Nishinari-ku, Osaka Co., Ltd. In Koshihara (72) Inventor Kazuhiro Inoue 1-7-20 Hanazono Minami, Nishinari-ku, Osaka City Koshihara Co., Ltd. (56) References JP-A-4-11162 (JP, A) JP-A-2-70688 (JP) , A) JP-A-6-24673 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) B66B 9/00-9/193

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 噛み合い駆動式の工事用エレベータにお
いて、鉄塔に沿って昇降移動可能に設けられる頂部連台
上に、前記鉄塔の前側とその鉄塔の据付位置との間で進
退可能に移動台が設けられ、この移動台上に当該エレベ
ータの鉄塔の幅寸法よりも広い間隔にて左右一対のアー
ムが配設され、これら両アームには、上部に前記鉄塔の
側部に対して進退可能な鉄塔保持手段がそれぞれ設けら
れ、前記移動台が最前進した位置で操作しようとする鉄
塔セグメントが鉄塔設置位置に位置するようにされ、前
記頂部連台には、前記移動台が後退したときに前記鉄塔
保持手段が鉄塔設置位置から外れた位置まで移動できる
移動台のガイドが設けられていることを特徴とする工事
用エレベータの鉄塔組立・解体装置。
1. An interlocking-type construction elevator in which a top gantry is provided movably up and down along a steel tower.
Upward between the front of the tower and the installation location of the tower
A movable platform is provided so as to be retractable.
The pair of left and right arcs is wider than the width of the
The two towers are equipped with
Tower holding means that can move back and forth with respect to the side
And the iron that is to be operated at the most advanced position of the carriage
The tower segment is now located at the tower installation location,
When the moving table retreats, the steel tower
The holding means can move to a position outside the tower installation position
A tower assembling / disassembling apparatus for a construction elevator, wherein a guide for a moving table is provided .
【請求項2】 前記塔保持手段は、前記アームの上部
で前記鉄塔の側面に直交する方向に設けられる支持片挿
通孔と、この支持片挿通孔を貫通して前記鉄塔の側面か
ら内部に差し込んでその鉄塔の構成横部材の下面に係合
させて鉄塔を保持する支持片とで構成されている請求項
記載の工事用エレベータの鉄塔組立・解体装置。
Wherein said iron tower holding means includes a support piece insertion holes provided in a direction perpendicular to the side surface of the tower at the top of the arm, inside through the support piece insertion hole from the side of the tower insert in the tower configuration transverse member to engage the underside of the pylon assembly and disassembly apparatus construction for elevator according to claim 1 and a support piece for holding the tower.
【請求項3】 前記塔保持手段は、前記アームの上部
にて前記鉄塔の側面に向かって配置されて進退可能な鉄
塔の構成部材を把持するクランプ機構である請求項1
記載の工事用エレベータの鉄塔組立・解体装置。
Wherein the iron tower holding means, <br/> to claim 1 is a clamping mechanism for gripping the components of retractable pylons disposed toward the side surfaces of the tower at the top of the arm The tower assembling and dismantling equipment for construction elevators as described.
【請求項4】 噛み合い駆動式の工事用エレベータにお
いて、鉄塔に沿って昇降移動可能に設けられる頂部連台
上に、前記鉄塔の前側とその鉄塔の据付位置との間で進
退可能に移動台が設けられ、この移動台上に当該エレベ
ータの鉄塔の幅寸法よりも広い間隔にて左右一対の支柱
が立設され、これら両支柱にはそれぞれ直線作動機によ
って所要ストローク上下動されるアームが前記鉄塔の側
方に突き出すように支持配設され、これら各アームの中
間部には前記鉄塔の側部に対して進退可能な鉄塔保持機
構が回転軸芯を合致させて軸受により支持され、記移
動台が最前進した位置で作しようとする鉄塔セグメン
トが鉄塔設置位置に位置するようにされ、前記頂部連台
には、前記移動台が後退したときに前記塔保持機構に
よって保持される鉄塔セグメントが回転できて方向変換
可能な位置まで移動できる動台のガイドが設けられて
いることを特徴とする事用エレベータの鉄塔組立・解
体装置。
4. A mesh drive type construction elevator.
And a top staircase that can be moved up and down along the tower
Upward between the front of the tower and the installation location of the tower
A movable platform is provided so as to be retractable, and a pair of right and left columns are erected on the movable platform at intervals wider than the width of the tower of the elevator. The arm to be supported is disposed so as to protrude to the side of the tower, and a tower holding mechanism that can advance and retreat with respect to the side of the tower at the intermediate portion of each arm aligns the rotation axis with the bearing. is supported, is as tower segments before Symbol movable carriage is to operation at a position most advanced is positioned at the tower installation position, wherein the top portion communication platform, the iron tower preserved when the moving table is retracted tower assembly and disassembly apparatus Engineering thing for an elevator, characterized in that it can rotate tower segment guide of the mobile can move Dodai up direction convertible positions are provided which are held by the mechanism.
【請求項5】 前記鉄塔保持機構は、回転支持軸の先端
部に保持する鉄塔セグメントの構成部材の要所を掴んで
固定保持できる固定手段を備えている請求項4に記載の
工事用エレベータの鉄塔組立・解体装置。
5. The construction elevator according to claim 4, wherein the tower holding mechanism includes fixing means for holding and fixing and holding a key point of a component of the tower segment held at a tip end of a rotary support shaft. Tower assembly and dismantling equipment.
【請求項6】 前記頂部連台には、設置された鉄塔に対
して前記鉄塔セグメントを継ぎ足し操作する位置もしく
撤去操作する位置まで達したら上昇を停止させる自動
停止機構を備えている請求項1〜5のいずれかに記載の
工事用エレベータの鉄塔組立・解体装置。
6. The top connecting column is provided with a steel tower installed therein.
To add and operate the tower segment
The tower assembling / disassembling apparatus for a construction elevator according to any one of claims 1 to 5, further comprising an automatic stop mechanism for stopping the ascending operation when reaching a position where the removing operation is performed .
JP12139596A 1996-05-16 1996-05-16 Tower assembly and dismantling equipment for construction elevators Expired - Fee Related JP3315312B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12139596A JP3315312B2 (en) 1996-05-16 1996-05-16 Tower assembly and dismantling equipment for construction elevators

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12139596A JP3315312B2 (en) 1996-05-16 1996-05-16 Tower assembly and dismantling equipment for construction elevators

Publications (2)

Publication Number Publication Date
JPH09301656A JPH09301656A (en) 1997-11-25
JP3315312B2 true JP3315312B2 (en) 2002-08-19

Family

ID=14810137

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12139596A Expired - Fee Related JP3315312B2 (en) 1996-05-16 1996-05-16 Tower assembly and dismantling equipment for construction elevators

Country Status (1)

Country Link
JP (1) JP3315312B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006143431A (en) * 2004-11-22 2006-06-08 Sanoyas Hishino Meisho Corp Elevator device for work
JP4804013B2 (en) * 2005-02-04 2011-10-26 三成研機株式会社 Climbing method of top sheave unit in construction elevators and top sheave unit used in the method
JP4804144B2 (en) * 2005-12-27 2011-11-02 三成研機株式会社 Top sheave device in climbing method for construction elevators

Also Published As

Publication number Publication date
JPH09301656A (en) 1997-11-25

Similar Documents

Publication Publication Date Title
US9032689B2 (en) Jacking tower
EP2969887B1 (en) Scissors lift assembly for jacking tower
WO2020142001A1 (en) A moveable platform
CN103274315A (en) Installing and hoisting device for side plate and upright of gas chamber
JP3315312B2 (en) Tower assembly and dismantling equipment for construction elevators
KR101757193B1 (en) Lift device for cargo tank of lng carrier ship
CN114751276B (en) Safe anti-falling device for building construction
JP3807775B2 (en) How to lift the construction elevator
CN211769900U (en) Anti-swing crane
JP2006028734A (en) Launching erection method for bridge girder, using traveling staging
CN209778101U (en) Lifting crane
CN111252683A (en) Bridge deck crane and application method thereof applied to bridge dismantling
JPH0328066Y2 (en)
JP3841242B2 (en) Elevator parking elevating work table and construction method using it
CN216737340U (en) Can alternate floor hoisting device of use
CN210558918U (en) Material lifting machine for building engineering construction
CN219526006U (en) Building board lifting equipment
CN218058279U (en) Air pipe installation elevator
CN216710659U (en) Lifting belt conveyor support assembly for tobacco bale disassembly
CN216477183U (en) Expansion bracket and drilling derrick
CN220565730U (en) Guide rail type discharging device
CN210528336U (en) Large-scale bearing ring is with hoisting accessory
CN214240903U (en) Light-duty portable fairlead installation adjusting device
JP4279389B2 (en) Elevator tower assembly and dismantling equipment for construction
CN109809296B (en) Metallurgical hangs with main hoisting mechanism dual drive system

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20020521

LAPS Cancellation because of no payment of annual fees