JP3302148B2 - Assembling work time prediction apparatus and method - Google Patents

Assembling work time prediction apparatus and method

Info

Publication number
JP3302148B2
JP3302148B2 JP34251393A JP34251393A JP3302148B2 JP 3302148 B2 JP3302148 B2 JP 3302148B2 JP 34251393 A JP34251393 A JP 34251393A JP 34251393 A JP34251393 A JP 34251393A JP 3302148 B2 JP3302148 B2 JP 3302148B2
Authority
JP
Japan
Prior art keywords
mounting
work time
assembly work
data
actual data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP34251393A
Other languages
Japanese (ja)
Other versions
JPH07164267A (en
Inventor
昭司 山崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Canon Inc
Original Assignee
Canon Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Canon Inc filed Critical Canon Inc
Priority to JP34251393A priority Critical patent/JP3302148B2/en
Publication of JPH07164267A publication Critical patent/JPH07164267A/en
Application granted granted Critical
Publication of JP3302148B2 publication Critical patent/JP3302148B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、種々の生産計画作成業
務において、その基本となる新製品の組立作業時間を予
測する組立作業時間予測装置及び方法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an assembling work time estimating apparatus and method for estimating the assembling work time of a new product which is the basis of various production planning work.

【0002】[0002]

【従来の技術】従来、新製品の組立作業時間の予測は、
部品点数と組立を行う人または機械の標準作業時間との
積を予測値として求めるか、過去に部品点数が同じ位の
製品を組立ていてそのときの組立作業時間が分かる場合
は、その組立作業時間を使用している。しかし、このよ
うな予測方法では誤差が大きいため、実際には人または
機械の能力不足が発生しないように前記予測値に1より
大きな係数をかけて最終的な組立作業時間予測値として
いる。
2. Description of the Related Art Conventionally, the prediction of the assembly work time of a new product is as follows.
Estimate the product of the number of parts and the standard working time of the assembling person or machine, or, if you have assembled a product with the same number of parts in the past and know the working time at that time, the working time You are using However, since such a prediction method has a large error, the predicted value is multiplied by a coefficient larger than 1 to obtain a final predicted value of the assembly work time so that the capability of a person or a machine does not actually occur.

【0003】また、組立機械の場合は、組立機械の動作
時間計算モデルを有するロボットのオフラインティーチ
ングシステムのようなプログラム作成支援システムを使
用し、製品の部品データを入力して部品組立順序、動作
プログラム、及び組立作業時間を求めている。
In the case of an assembly machine, a program creation support system such as an offline teaching system of a robot having an operation time calculation model of the assembly machine is used to input part data of a product, and to assemble a part assembly sequence and an operation program. , And assembling work time.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記従
来例では次のような問題点があった。
However, the above conventional example has the following problems.

【0005】(1)部品点数と組立作業者または組立機
械の標準動作時間との積による組立作業時間予測値で
は、組立作業者または組立機械の各種部品組立動作の違
いが考慮されておらず、実際の組立作業時間との誤差が
大きい。このため、能力不足が発生しないように、得ら
れた組立作業時間に単に1より大きな係数をかけて最終
的な組立作業時間予測値としていた。従って、高精度な
組立作業時間の予測ができない。
(1) The estimated value of the assembly operation time based on the product of the number of parts and the standard operation time of the assembly operator or the assembly machine does not take into account the differences in the various assembly operations of the assembly operator or the assembly machine. The error from the actual assembly work time is large. For this reason, the obtained assembly work time is simply multiplied by a coefficient larger than 1 to obtain a final estimated value of the assembly work time so that the capacity shortage does not occur. Therefore, it is not possible to accurately predict the assembly operation time.

【0006】(2)新製品と全く同一の部品点数、同一
の作業条件で過去に組立られた製品は存在せず、できる
だけ新製品に近い類似製品の組立作業時間が得られても
そのままでは実際の組立時間との差が大きい。このた
め、能力不足が発生しないように、得られた組立作業時
間に単に1より大きな係数をかけて最終的な組立作業時
間予測値としていた。従って、高精度な組立作業時間の
予測ができない。
(2) There is no product assembled in the past with exactly the same number of parts and the same working conditions as a new product, and even if assembling work time for a similar product as close to the new product as possible is obtained, Large difference from the assembly time. For this reason, the obtained assembly work time is simply multiplied by a coefficient larger than 1 to obtain a final estimated value of the assembly work time so that the capacity shortage does not occur. Therefore, it is not possible to accurately predict the assembly operation time.

【0007】(3)組立機械の動作時間計算モデルを有
するロボットのオフラインティーチングシステムのよう
なプログラム作成支援システムは、通常1種類の組立機
械に対して1つの動作時間計算モデルしか用いることが
できず、同一機種の組立機械が複数存在し、それら組立
機械間に無視できぬ機差があってもその機差を考慮して
計算することができない。また同一機械に対して機差を
含めたモデルを構築するためには、全ての機械に対して
実際にいろいろな条件下での動特性を測る必要があり、
このため多大な時間を必要とし不可能であった。
(3) A program creation support system such as an off-line teaching system for a robot having an operation time calculation model of an assembly machine can usually use only one operation time calculation model for one type of assembly machine. Even if there are a plurality of assembling machines of the same model, and there are machine differences that cannot be ignored between these assembling machines, calculation cannot be performed in consideration of the machine differences. Also, in order to build a model including machine differences for the same machine, it is necessary to actually measure the dynamic characteristics of all machines under various conditions,
For this reason, a great amount of time was required and it was impossible.

【0008】本発明は上記従来の問題点に鑑み、多大な
時間を費やすことなく高精度な組立作業時間の予測を行
い、かつこの予測値の計算を迅速に行うことができる組
立作業時間予測装置を提供することを目的とする。
The present invention has been made in view of the above-described conventional problems, and has an assembling work time estimating apparatus capable of accurately estimating an assembling work time without spending a great deal of time and calculating the estimated value quickly. The purpose is to provide.

【0009】[0009]

【課題を解決するための手段】上記目的を達成するため
に、本発明に係る組立作業時間予測装置は、組立作業時
間予測対象の製品に関するデータを入力する予測対象デ
ータ入力手段と、過去における製品の部品の種類、部品
の種類別点数及び組立作業時間を含む実績データを、複
数の実装ラインの各実装ラインごとに格納する実績デー
タ格納手段と、前記複数の実装ラインの中から1つを選
択する選択手段と、前記対象の製品に関するデータを参
照して、前記実績データ格納手段に格納されている前記
選択された実装ラインの実績データの中から、所定の類
似度を満足する実績データを選択する選択手段と、前記
選択した実績データに基づき、前記対象製品の前記選択
された実装ラインにおける組立作業時間を予測する予測
処理部とを備えたものである。好ましくは、前記予測処
理部は、前記選択した実績データに基づき、組立作業予
測モデルを作製し、この組立作業予測モデルを参照して
組立作業時間を予測するようにする。好ましくは、前記
予測処理部は、前記実績データ格納部に、前記所の類
似度を満足する実績データが格納されていない場合、前
選択された実装ライン中の実装機の標準時間を利用し
て、前記対象製品の組立作業時間予測を行うようにす
る。
In order to achieve the above object, an assembling work time estimating apparatus according to the present invention comprises a predicting object data inputting means for inputting data relating to an assembling work time estimating target product; types of parts, the performance data, including the type-specific points and assembly work time of the parts, double
Means for storing performance data for each of the number of mounting lines, and selecting one of the plurality of mounting lines.
Selecting means for-option, with reference to the data regarding the product of the object, the stored in the actual data storage means
From the actual data of the selected mounting line, selecting means for selecting a track record data which satisfies a predetermined similarity, based on actual data wherein the selected, the selection of the products
And a prediction processing unit for predicting the assembly work time in the completed mounting line . Preferably, the prediction processing unit creates an assembly work prediction model based on the selected actual data, and predicts the assembly work time with reference to the assembly work prediction model. Preferably, the prediction processing section, the actual data storage unit, if the actual data that satisfies the similarity of the plant constant is not stored, using the standard time of the mounting apparatus in the selected mounting line Thus, the assembly work time of the target product is predicted.

【0010】本発明に係る組立作業時間予測方法は、
去における製品の部品の種類、部品の種類別点数及び組
立作業時間を含む実装データを複数の実装ラインの各実
装ラインごとに実績データ格納手段に格納し、組立作業
時間予測対象製品に関するデータを入力し、前記複数の
実装ラインの中から1つの実装ラインを選択し、前記
績データ格納手段に格納された前記選択された実装ライ
ンの実績データから、前記対象の製品に関するデータと
所定の類似度を満足する実績データを選択し、前記選択
した実績データに基づき、前記対象の製品の組立作業時
間を予測するようにする。また、前記実績データ格納手
段に、前記所の類似度を満足する実績データが格納さ
れていない場合、前記選択された実装ラインの実装機
標準作業時間を利用して、前記対象の製品の組立作業時
間予測を行うようにする。
[0010] The assembly work time prediction method according to the present invention, the over
The type of parts of the product in the past, the number of parts by type and the set
The mounting data, including the stand-by time, is
The data is stored in the actual data storage means for each mounting line ,
One mounting line is selected from the mounting lines, and the selected mounting line stored in the performance data storage means is selected.
The actual data satisfying a predetermined similarity with the data on the target product is selected from the actual result data of the target, and the assembly work time of the target product is predicted based on the selected actual data. Also, the actual data storage means, if the actual data that satisfies the similarity of the plant constant is not stored, using standard work time of mounting apparatus of the selected mounting line, of the product of the target Perform assembly work time prediction.

【0011】[0011]

【0012】[0012]

【0013】[0013]

【実施例】以下、図面を参照して本発明の実施例を説明
する。
Embodiments of the present invention will be described below with reference to the drawings.

【0014】図1は、本発明に係る組立作業時間予測装
置の実施例の概略構成を示すブロック図であり、本実施
例の組立作業時間予測装置はプリント基板の電子部品機
械実装時間の予測を行うものである。
FIG. 1 is a block diagram showing a schematic configuration of an embodiment of an assembling work time estimating apparatus according to the present invention. The assembling work time estimating apparatus according to this embodiment estimates the mounting time of electronic components on a printed circuit board. Is what you do.

【0015】この組立作業時間予測装置は、後述する構
成の組立作業時間予測装置1と、ディスプレイやキーボ
ードにより実現される端末2とで構成されている。実績
データ3は、電子部品実装ライン(以下、実装ラインと
いう)の管理システムにある実績データを示し、この実
績データ3が本実施例ではネットワークを介して組立作
業時間予測装置1に入力される。また、図中4はプリン
ト基板設計CADであり、電子部品に組み込まれる各種
プリント基板の回路設計と電子部品のプリント基板上の
実装レイアウトを設計する。このプリント基板設計CA
D4よりネットワークあるいは磁気記録媒体を介して組
立作業時間予測装置1に実装する各プリント基板の部品
データが入力される。
The assembling work time estimating apparatus comprises an assembling work time estimating apparatus 1 having a configuration to be described later, and a terminal 2 realized by a display and a keyboard. The performance data 3 indicates performance data in a management system of an electronic component mounting line (hereinafter, referred to as a mounting line). In the present embodiment, the performance data 3 is input to the assembly work time prediction device 1 via a network. Reference numeral 4 in the drawing denotes a printed circuit board design CAD, which designs the circuit design of various printed circuit boards incorporated in the electronic component and the mounting layout of the electronic component on the printed circuit board. This printed circuit board design CA
From D4, component data of each printed circuit board mounted on the assembling work time estimation device 1 is input via a network or a magnetic recording medium.

【0016】組立作業時間予測装置1は、実績データ編
集処理部101、実績データ格納部102、実装ライン
データ編集処理部103、実装ラインデータ格納部10
4、実装機データ編集処理部105及び実装機データ格
納部106を有している。
The assembling work time predicting apparatus 1 includes a performance data editing processing unit 101, a performance data storage unit 102, a mounting line data editing processing unit 103, and a mounting line data storage unit 10.
4. It has a mounting machine data edit processing unit 105 and a mounting machine data storage unit 106.

【0017】実績データ編集処理部101は、端末2か
らの処理要求に応じて実績データ3を取り込み実績デー
タ格納部102に格納する。実績データ3は、例えば実
装ラインの管理システムの中に格納されている個々の実
装機の各製品別実装部品の種類、その実装点数、及び各
製品別実装作業時間データであり、実績データ編集処理
部101によりネットワークまたは磁気記録媒体を介し
て入力され、実績データ格納部102に格納される。
The result data edit processing unit 101 fetches result data 3 in response to a processing request from the terminal 2 and stores it in the result data storage unit 102. The performance data 3 is, for example, the type of mounting parts for each product of each mounting machine stored in the mounting line management system, the number of mounting points, and the mounting work time data for each product. The data is input by the unit 101 via a network or a magnetic recording medium, and is stored in the performance data storage unit 102.

【0018】さらに、実績データ編集処理部101は、
端末2からの処理要求に応じて実績データ格納部102
に格納されていたデータの内容を表示、変更する。実績
データ格納部102の内容を図2に示す。なお、この図
2のデータ内容は、実装機が複数台結合されてラインを
構成している場合を示している。実績ラインデータ編集
処理部103は、端末2からの処理要求に応じて実装ラ
イン名とラインを構成する実装機の名前を追加、修正
し、実装ラインデータ格納部104にデータを格納する
と共に、実装ラインデータ格納部104に格納されたデ
ータを表示、修正する。実装ラインデータ格納部104
の内容を図3に示す。
Further, the performance data editing processing unit 101
Result data storage unit 102 in response to a processing request from terminal 2
Display and change the contents of the data stored in. FIG. 2 shows the contents of the performance data storage unit 102. The data contents in FIG. 2 show a case where a plurality of mounting machines are connected to form a line. The actual line data edit processing unit 103 adds and corrects the mounting line name and the name of the mounting machine constituting the line in response to the processing request from the terminal 2, stores the data in the mounting line data storage unit 104, and The data stored in the line data storage unit 104 is displayed and corrected. Mounting line data storage unit 104
3 is shown in FIG.

【0019】実装機データ編集処理部105は、端末2
からの処理要求に応じて実装機データ格納部106に格
納されている各実装機の実装可能部品、実装標準時間等
のデータを表示、修正、追加するものである。実装機デ
ータ格納部106の内容を図4に示す。ここで、図4中
の実装可能部品タイプ401は当該実装機で実装できる
部品のタイプを記述したものであり、実装標準時間区分
402は同一実装時間で実装可能である部品タイプをグ
ループ化したものである。実装標準時間403は各実装
標準時間区分402の識別記号に対して実装標準時間を
対応させたものである。
The mounting machine data editing processing unit 105
The display, correction, and addition of the data such as the mountable components and the mounting standard time of each mounting machine stored in the mounting machine data storage unit 106 in response to a processing request from. FIG. 4 shows the contents of the mounter data storage unit 106. Here, the mountable component type 401 in FIG. 4 describes the types of components that can be mounted by the mounting machine, and the mounting standard time section 402 groups component types that can be mounted in the same mounting time. It is. The mounting standard time 403 corresponds to the mounting standard time for the identification symbol of each mounting standard time section 402.

【0020】さらに、組立作業時間予測装置1は、基板
工程データ編集処理部107、基板工程データ格納部1
08、部品データ編集処理部109、部品データ格納部
110、部品優先度データ編集処理部111、及び部品
優先度データ格納部112を有している。
Further, the assembling work time estimating apparatus 1 includes a board process data editing unit 107, a board process data storage unit 1
08, a component data edit processing unit 109, a component data storage unit 110, a component priority data edit processing unit 111, and a component priority data storage unit 112.

【0021】基板工程データ編集処理部107は、端末
2からの処理要求に応じて基板工程データ格納部108
に格納されている各種計算対象基板の実装可能ラインを
表示、修正、追加するものである。基板工程データ格納
部108の内容を図5に示す。
The board process data edit processing section 107 is provided with a board process data storage section 108 in response to a processing request from the terminal 2.
The display, correction, and addition of the mountable lines of the various calculation target boards stored in. FIG. 5 shows the contents of the substrate process data storage unit 108.

【0022】部品データ編集処理部109は、端末2か
らの処理要求に応じてプリント基板設計CAD4から計
算対象基板の実装に用いる部品データをネットワークを
介して入力し、部品データ格納部110に格納する。プ
リント基板設計CAD4がネットワークにより結合され
ていないときには、プリント基板設計CAD4より磁気
記録媒体に部品データを出力し、その磁気記録媒体のデ
ータを部品データ編集処理部109より入力するものと
する。
In response to a processing request from the terminal 2, the component data edit processing unit 109 inputs, via a network, component data used for mounting a calculation target board from the printed circuit board design CAD 4 and stores it in the component data storage unit 110. . When the printed circuit board design CAD 4 is not connected by a network, the component data is output from the printed circuit board design CAD 4 to the magnetic recording medium, and the data of the magnetic recording medium is input from the component data editing processing unit 109.

【0023】部品データ編集処理部109は、端末2か
らの処理要求に応じて部品データ格納部110に格納さ
れている計算対象基板の部品データを表示、修正、追加
する。部品データ格納部110の内容を図6に示す。部
品データ格納部110に格納されているデータは図6に
示すように、各計算対象基板の面別に実装する部品の部
番、部品タイプ、及び実装数より構成される。
The component data edit processing unit 109 displays, corrects, and adds component data of a board to be calculated stored in the component data storage unit 110 in response to a processing request from the terminal 2. FIG. 6 shows the contents of the component data storage unit 110. As shown in FIG. 6, the data stored in the component data storage unit 110 includes a part number, a component type, and the number of components to be mounted for each surface of each board to be calculated.

【0024】部品優先度データ編集処理部111は、端
末2からの処理要求に応じて部品優先度データ格納部1
12に格納されている部品タイプと実装優先度に関する
データの表示、修正、追加を行う。部品優先度データ格
納部112の内容を図7に示す。図7において実装優先
度とは、値の小さいものほど優先度が高く、優先度の高
い部品タイプが低い部品タイプよりも先に実装されなけ
ればならないことを示すものである。この優先度は、X
−Yテーブル移動型の実装機を複数台使用して一つの基
板の片面を実装するとき、大きな部品は実装後高速でX
−Yテーブを移動すると、部品の慣性力が部品を基板に
保持しているクリーム半田の粘着力よりも大きくなり、
部品が基板上で位置ずれを起こしたり脱落したりするこ
とを防止するために設けられている。すなわち、優先度
の高い部品をX−Yテーブルを高速駆動して実装し、そ
の次の優先度の低い部品をX−Yテーブルを前よりも低
速で駆動して実装するという制約を表したものである。
The component priority data editing unit 111 responds to a processing request from the terminal 2 and
The display, correction, and addition of data relating to the component type and the mounting priority stored in the storage unit 12 are performed. FIG. 7 shows the contents of the component priority data storage unit 112. In FIG. 7, the mounting priority indicates that the smaller the value is, the higher the priority is, and that a component type with a higher priority must be mounted before a component type with a lower priority. This priority is X
-When mounting one surface of one board using multiple Y-table moving mounters, large
-When the Y-tape is moved, the inertia of the component becomes larger than the adhesive force of the cream solder holding the component to the board,
The components are provided to prevent the components from being displaced or falling off on the substrate. That is, the constraint that the high-priority component is mounted by driving the XY table at a high speed, and the next low-priority component is mounted by driving the XY table at a lower speed than before. It is.

【0025】さらに、組立作業時間予測装置1には、組
立作業時間予測処理部113、及び組立作業時間予測結
果格納部114が設けられている。組立作業時間予測処
理部113は、端末2からの処理要求により、実績デー
タ格納部102、実装ラインデータ格納部104、実装
機データ格納部106、基板工程データ格納部108、
部品データ格納部110、及び部品優先度データ格納部
112の各データをそれぞれ入力し、指定された計算対
象基板の実装時間予測値を求め、その結果を組立作業時
間予測結果格納部114に格納したり、端末2に表示す
るものである。この組立作業時間予測処理部113の処
理フローの概要を図8に示す。
Further, the assembling work time prediction device 1 is provided with an assembling work time prediction processing unit 113 and an assembling work time prediction result storage unit 114. The assembling work time prediction processing unit 113 responds to a processing request from the terminal 2 to store the actual data storage unit 102, the mounting line data storage unit 104, the mounting machine data storage unit 106, the board process data storage unit 108,
The respective data of the component data storage unit 110 and the component priority data storage unit 112 are input, a mounting time prediction value of the designated calculation target board is obtained, and the result is stored in the assembly work time prediction result storage unit 114. Or displayed on the terminal 2. FIG. 8 shows an outline of a processing flow of the assembly work time prediction processing unit 113.

【0026】同図において、まず、指定された計算対象
基板の中からまだ作業時間予測をしていない基板を選択
し(ステップS801)、次に、選択された計算対象基
板の実装可能ラインが複数指定されているときは、未検
討のラインを選択する(ステップS802)。その後、
指定された基板の部品実装データを部品データ格納部1
10から入力し、実績データ格納部102から同じライ
ンで実装した実績データを入力する。
In the figure, first, a board whose work time has not been predicted is selected from the designated boards to be calculated (step S801), and then a plurality of mountable lines of the selected board are calculated. If so, a line that has not been examined is selected (step S802). afterwards,
The component mounting data of the specified board is stored in the component data storage unit 1.
10 and the result data mounted on the same line from the result data storage unit 102.

【0027】そして、計算基板と実績データとの部品構
成の類似度を類似度関数を用いて評価し(ステップS8
03)、類似度関数としては、ピアソン相関係数、ユー
クリッド平方距離、標準化ユークリッド距離、あるいは
マハラノビスの凡距離等があるが、ここではユークリッ
ド平方距離を用いて類似度dijを計算する。ユークリ
ッド平方距離をここでは次のように定義する。
Then, the similarity of the component configuration between the calculation board and the actual data is evaluated using a similarity function (step S8).
03), similarity functions include a Pearson correlation coefficient, a Euclidean square distance, a standardized Euclidean distance, and a Mahalanobis general distance. Here, the similarity dij is calculated using the Euclidean square distance. Here, the Euclidean square distance is defined as follows.

【0028】[0028]

【数1】 ここで、Xkiとは計算対象基板iの実装標準時間区分
Xkの部品点数、Xkjとは実績基板jの実装標準時間
区分Xkの部品点数であり、この部品点数の差の2乗和
がユークリッド平方距離となる。そして、ユークリッド
平方距離が小さいほど計算対象基板と実績基板との類似
性が高いといえる。
(Equation 1) Here, Xki is the number of components in the mounting standard time section Xk of the calculation target board i, and Xkj is the number of components in the mounting standard time section Xk of the actual board j. The sum of squares of the difference in the number of components is the Euclidean square. Distance. The smaller the Euclidean square distance is, the higher the similarity between the calculation target substrate and the actual substrate is.

【0029】次に、計算対象基板と実績基板の得られた
類似度は、規定された値以下の実績データが重回帰分析
を行うのに十分な数だけ得られたかを判定する(ステッ
プS804)。重回帰分析を行うのに十分な実績データ
数は一般に、 n≧p+11 といわれている。ここで、nはデータ数、pは説明変数
の数であり、ここでは実装機の実装標準時間区分数に相
当する。
Next, as for the similarity obtained between the calculation target substrate and the actual substrate, it is determined whether or not the actual data having a value equal to or less than a prescribed value is obtained by a sufficient number for performing multiple regression analysis (step S804). . It is generally said that the number of pieces of actual data sufficient to perform the multiple regression analysis is n ≧ p + 11. Here, n is the number of data, and p is the number of explanatory variables, and here corresponds to the number of mounting standard time segments of the mounting machine.

【0030】条件が満足されない時は、実装ラインの実
装機の標準作業時間を使って計算し、これらの条件が満
足された場合は次に重回帰分析による実装時間予測モデ
ルの作製を行う(ステップS805)。重回帰分析は選
択された実装ラインの各実装機の実装標準時間区分を説
明変数とし、実装時間を目的変数とする重回帰モデルを
対象として行う。このため、まず初めに実績データを加
工して図9のような重回帰分析入力データを各実装機に
対して作成する。
If the conditions are not satisfied, calculation is performed using the standard working time of the mounting machine on the mounting line. If these conditions are satisfied, a mounting time prediction model is created by a multiple regression analysis (step). S805). The multiple regression analysis is performed on a multiple regression model using the mounting standard time section of each mounting machine of the selected mounting line as an explanatory variable and the mounting time as an objective variable. For this reason, first, the actual data is processed, and multiple regression analysis input data as shown in FIG. 9 is created for each mounting machine.

【0031】図9において、時間901とは実装に要し
た組立作業時間の実績値のことであり、速度区分902
とは実装機のある実装標準時間区分に該当する部品タイ
プの実装点数のことである。
In FIG. 9, the time 901 is the actual value of the assembly work time required for mounting,
Is the number of mounting points of a component type corresponding to a certain mounting standard time division of the mounting machine.

【0032】続いて各実装機について次のような組立作
業時間計算のための重回帰モデルを仮定し、重回帰分析
によりA0、A1、A2、A3を推定する。次式は組立作業
時間計算用重回帰モデルの一例である。
Subsequently, a multiple regression model for the following assembly work time calculation is assumed for each mounting machine, and A0, A1, A2, and A3 are estimated by multiple regression analysis. The following equation is an example of a multiple regression model for assembling work time calculation.

【0033】Y=A0+A1*X1+A2*X2+A3*X3 ここで、Yは目的変数と呼ばれ、組立作業時間を表す。
X1、X2、X3は説明変数と呼ばれ、この場合は各実装
標準時間区分の実装点数を表す。A0は、切片と呼ば
れ、この場合は作業時間のバイアス項を表す。A1,A
2,A3は偏回帰係数と呼ばれ、この場合は各実装標準時
間区分の部品1点当たりの組立時間を表すことになる。
Y = A0 + A1 * X1 + A2 * X2 + A3 * X3 Here, Y is called an objective variable and represents an assembly work time.
X1, X2, and X3 are called explanatory variables, and in this case, represent the mounting points of each mounting standard time section. A0 is called the intercept and in this case represents the bias term of the working time. A1, A
2, A3 is called a partial regression coefficient, and in this case, represents an assembling time per part in each mounting standard time section.

【0034】次に、各実装機に対して重回帰分析により
得られた組立作業時間計算モデルが有効であるか否かを
重回帰モデルの係数の符号チェックと統計的優位性判定
とにより行う(ステップS806)。重回帰モデルの係
数の符号チェックとは、得られた重回帰モデルの偏回帰
モデルの偏回帰係数の符号が正であるか否かをチェック
するものであり、符号が正でないときは組立作業時間が
減少することになるので、得られた組立作業時間モデル
は無効となる。
Next, whether or not the assembly operation time calculation model obtained by the multiple regression analysis is valid for each mounting machine is determined by checking the sign of the coefficient of the multiple regression model and determining the statistical superiority ( Step S806). Checking the sign of the coefficient of the multiple regression model is to check whether the sign of the partial regression coefficient of the obtained partial regression model of the multiple regression model is positive. Therefore, the obtained assembly work time model becomes invalid.

【0035】重回帰モデルの統計的優位性判定方法とし
ては一般に用いられている分散分析により行う。これら
のチェックの結果指定された実装ラインの実装機の1台
でもその重回帰モデルが無効となったときは、その指定
された実装ラインの実装機は全て重回帰モデルを使わず
に実装標準時間を使った組立作業モデルにより計算され
る。よって、ここで重回帰モデルが無効となったときに
はステップS810にジャンプすることになる。
As a method of judging the statistical superiority of the multiple regression model, a generally used analysis of variance is used. As a result of these checks, if the multiple regression model is invalid even for one of the mounting machines on the specified mounting line, all the mounting machines on the specified mounting line do not use the multiple regression model Calculated by the assembly work model using. Therefore, when the multiple regression model becomes invalid, the process jumps to step S810.

【0036】指定されたラインの全ての実装機に対して
得られた組立作業時間計算用重回帰モデルが有効である
ときには、実装機の標準作業時間モデルを得られた組立
作業時間計算モデルに置き換える(ステップS80
9)。
When the multiple regression model for assembling time calculation obtained for all the mounting machines on the designated line is valid, the standard working time model of the mounting machine is replaced with the obtained assembling time calculation model. (Step S80
9).

【0037】次に指定されたラインの実装機に計算対象
基板の部品を割り付けて組立作業時間を求める(ステッ
プS810)。部品の割り付けにおいては、部品優先度
データ格納部112から部品優先度データを入力し、部
品優先度を満足し、かつ指定されたラインの中の実装機
の負荷ができるだけ均一になるように行う。部品割り付
けにより得られた計算対象基板の組立作業時間予測値を
組立手作業時間予測結果処理部114に格納する。
Next, the components of the board to be calculated are allocated to the mounting machine of the designated line to determine the assembly work time ( step
S810 ). In allocating components, component priority data is input from the component priority data storage unit 112 so as to satisfy component priorities and to make the load of the mounting machine in the designated line as uniform as possible. The assembly work time prediction value of the calculation target board obtained by the component allocation is stored in the assembly manual work time prediction result processing unit 114.

【0038】さらに、計算対象基板の全ての実装可能ラ
インについて検討したか否かをチェックし(ステップS
811)、未検討ラインがあるときはステップS802
から行う。
Further, it is checked whether or not all the mountable lines of the calculation target board have been examined (step S).
811) If there is an unexamined line, step S802
Do from.

【0039】ある計算対象基板の全ての実装可能ライン
について組立作業時間予測が完了したら、未検討の計算
対象基板がないかチェックし(ステップS812)、未
検討計算対象基板があるときはステップS801へ戻
り、次の計算対象基板を選択して組立作業時間予測を行
う。
When the estimation of the assembly work time is completed for all the mountable lines of a certain board to be calculated, it is checked whether there is a board to be calculated that has not been studied (step S812). Returning, the next calculation target board is selected and the assembly work time is estimated.

【0040】指定された計算対象基板の指定された実装
可能ラインにおける組立作業時間予測値は、組立作業時
間予測結果格納部114に格納される。図10に組立作
業時間予測結果格納部114のデータ内容を示す。
The predicted assembly work time for the specified mountable line of the specified board to be calculated is stored in the assembly work time prediction result storage unit 114. FIG. 10 shows data contents of the assembly work time prediction result storage unit 114.

【0041】図10において、ラインタクト1001は
実装ラインの中の複数台の実装機の中の組立作業時間
(タクト)の最大値のことであり、この値が計算対象基
板の生産能力を決定することになる。回帰1002は組
立作業時間の予測値が重回帰モデルで計算されたのか、
それとも実装機の実装標準時間を使って計算されたのか
を表しており、この欄の記号が○のときは重回帰モデ
ル、×のときは実装機の実装標準時間を使ったことを表
す。
In FIG. 10, a line tact 1001 is a maximum value of an assembly operation time (tact) in a plurality of mounting machines in a mounting line, and this value determines a production capacity of a substrate to be calculated. Will be. Regression 1002 indicates whether the predicted value of the assembly work time was calculated by the multiple regression model,
It indicates whether the calculation was performed using the mounting standard time of the mounting machine. When the symbol in this column is ○, the multiple regression model is used, and when the symbol is ×, the mounting standard time of the mounting machine is used.

【0042】組立作業時間予測結果格納部114に格納
された組立作業時間予測結果は端末2からの指示により
端末2に表示したり、印刷機が接続されている場合は印
刷機にて紙に印刷されるものとする。
The assembly work time prediction result stored in the assembly work time prediction result storage unit 114 is displayed on the terminal 2 according to an instruction from the terminal 2 or printed on paper by a printing machine when a printing machine is connected. Shall be performed.

【0043】本実施例によれば、新しく実装する基板が
過去に実装されたプリント基板と部品構成の類似性が高
いならば、過去に実装されたプリント基板の各実装機の
部品配分とそのときの実装時間のみを収集するだけで、
非常に高精度に新しく実装する基板の実装時間を予測す
ることができる。
According to the present embodiment, if the newly mounted board has a high similarity in component configuration to the previously mounted printed circuit board, the component distribution of each mounting machine of the previously mounted printed circuit board and the Just collect the implementation time of
The mounting time of a newly mounted board can be predicted with very high accuracy.

【0044】これにより、高精度な設備負荷予測が可能
になり、実装機の稼働率が向上し生産性向上と生産コス
トの低減に大きな効果を発揮することが可能である。し
かも、従来のように担当者が長時間かけて部品点数と実
装機の標準実装時間とから実装時間を計算する必要がな
く、またプログラム作成支援システムに各実装機の動特
性データを入れるため、膨大な数の実装機に対して多大
の費用と時間をかけて動特性データを収集することな
く、高精度の実装時間モデルを作製し、実装時間を高精
度に予測することが可能である。
Thus, the equipment load can be predicted with high accuracy, the operating rate of the mounting machine can be improved, and a great effect can be exerted on improving the productivity and reducing the production cost. In addition, since the person in charge does not need to spend a long time calculating the mounting time from the number of components and the standard mounting time of the mounting machine, and because the dynamic characteristic data of each mounting machine is included in the program creation support system, A high-accuracy mounting time model can be created and mounting time can be predicted with high accuracy without collecting dynamic characteristic data for a huge number of mounting machines at a great cost and time.

【0045】次に、本発明の他の実施例を説明する。Next, another embodiment of the present invention will be described.

【0046】上記実施例では計算対象基板と類似の基板
とを実績データ格納部102から求めるのに計算対象基
板の実装部品全体と実装機データの中のある基板の部品
全体とを対象としたが、実装する実装機の割り付け部品
データを使って各実装機ごとに類似割り付け状態を実績
データ格納部102から求めて重回帰分析により組立作
業時間予測モデルを作成し、実装時間を予測することも
できる。以下この実施例について詳しく述べる。
In the above embodiment, the board to be calculated and the board similar to the board are obtained from the actual data storage unit 102, but the whole mounted parts of the board to be calculated and the whole parts of a certain board in the mounting machine data are targeted. It is also possible to obtain a similar allocation state for each mounting machine from the performance data storage unit 102 using the allocation component data of the mounting machine to be mounted, create an assembly work time prediction model by multiple regression analysis, and predict the mounting time. . Hereinafter, this embodiment will be described in detail.

【0047】まず初めに、計算対象基板の実装可能ライ
ンから任意の1つを選択し、実装機データ格納部106
からそのラインの実装機のデータを求める。この実装機
データの工数は実装標準工数であり、実装標準工数を使
って各実装機に計算対象基板の部品を割り付ける。この
割り付け方法は図8のステップS810と同じである。
First, any one of the mountable lines of the board to be calculated is selected, and the mounting machine data storage unit 106 is selected.
From the mounting machine data of the line. The man-hour of the mounting machine data is a mounting standard man-hour, and the components of the board to be calculated are allocated to each mounting machine using the mounting standard man-hour. This allocation method is the same as step S810 in FIG.

【0048】次に、各実装機単位に計算対象基板の実装
機と類似の部品割り付けを持つ実績データを実績データ
格納部102からユークリッド平方距離を使って求め
る。この処理は図8のステップS803と同じである。
類似実装割り付け状態が基準値以上得られたならば、各
実装機単位に重回帰分析を行い、得られた実装時間予測
モデルの有効性判定を図8のステップS806と同じよ
うに行う。
Next, performance data having a component assignment similar to that of the mounting machine of the board to be calculated for each mounting machine is obtained from the performance data storage unit 102 using the Euclidean square distance. This process is the same as step S803 in FIG.
If the similar mounting allocation state is obtained equal to or more than the reference value, multiple regression analysis is performed for each mounting machine, and the validity of the obtained mounting time prediction model is determined in the same manner as in step S806 in FIG.

【0049】有効であれば、実装機の標準作業時間を実
装時間予測モデルに置き換え、続いて再度、計算対象基
板の部品を選択されたラインの実装機に割り付けて実装
時間を計算する。類似の実装機割り付け状態が十分得ら
れなかった場合や、重回帰分析により得られた実装時間
予測モデルが有効でないときは、初めに計算した実装機
標準工数による実装時間を当該計算対象基板の実装時間
とする。
If valid, the standard work time of the mounting machine is replaced with a mounting time prediction model, and then the components of the board to be calculated are again allocated to the mounting machine of the selected line to calculate the mounting time. If a similar mounting machine allocation state is not sufficiently obtained, or if the mounting time prediction model obtained by multiple regression analysis is not valid, the mounting time based on the mounting machine standard man-hour calculated first is used for mounting the target board. Time.

【0050】こうして得られた実装時間予測値は、図1
0と同じ内容で格納され、端末2からの指示により、表
示・印刷可能である。本実施例によっても、上記実施例
と同様の効果を得ることができる。すなわち、従来のよ
うな部品点数と標準動作時間の積による組立作業時間の
予測や、過去の類似製品の組立作業時間を検索してその
ままの値を用いるといった誤差の大きくなる手法を用い
ずに、高精度に短時間で組立作業時間を予測することが
できる。これにより、設備や人員の稼働率が向上して生
産性を向上させることができる。さらに、将来の設備負
荷予測が正確に行われることから設備台数を正確に把握
でき、無駄のない効率的な設備投資計画を作成すること
が可能になる。また、組立機械間の機差を含めた組立作
業時間計算モデルを構築するため全ての組立機械の動特
性の測定と集計に多大の時間を費やすことをせずに、各
機械で組立られた部品の種類とそのときの組立作業時間
のみを採集するという非常に簡単な作業のみで高精度の
組立作業時間の予測を行うことが可能となる。
The estimated mounting time thus obtained is shown in FIG.
It is stored with the same contents as 0, and can be displayed and printed according to an instruction from the terminal 2. According to this embodiment, the same effects as those of the above embodiment can be obtained. That is,
Of the assembly work time by the product of the number of parts and the standard operation time
Search for predictions and past assembly times for similar products
Using a method that increases the error, such as using
Can accurately predict the assembly work time in a short time
it can. As a result, the operating rates of equipment and
Productivity can be improved. In addition, future facilities
Accurate grasp of the number of equipment by accurate load forecast
Create efficient and efficient capital investment plans
Becomes possible. In addition, assembly work including machine differences between assembly machines
Dynamic characteristics of all assembly machines to build a working time calculation model
Without spending a lot of time measuring and counting
Types of parts assembled by machine and assembly work time at that time
Only the very simple task of collecting
It is possible to predict the assembly work time.

【0051】[0051]

【発明の効果】以上詳細に説明したように、本願発明に
よれば、精度の高い組立時間を予測することができる。
これにより、設備や人員の稼動率が向上して生産性を向
上させることができる。また、将来の設備負荷予測が正
確に行われることから設備台数を正確に把握でき、無駄
のない効率的な設備投資計画を作成することができる。
As described in detail above, according to the present invention, a highly accurate assembly time can be predicted.
As a result, the operation rates of facilities and personnel are improved, and productivity can be improved. Further, since the future facility load is accurately predicted, the number of facilities can be accurately grasped, and a lean and efficient facility investment plan can be created.

【0052】すなわち、従来のような部品点数と標準動
作時間の積による組立作業時間の予測や、過去の類似製
品の組立作業時間を検索してそのままの値を用いるとい
った誤差の大きくなる手法を用いずに、高精度に短時間
で組立作業時間を予測することができる。これにより、
設備や人員の稼働率が向上して生産性を向上させること
ができる。さらに、将来の設備負荷予測が正確に行われ
ることから設備台数を正確に把握でき、無駄のない効率
的な設備投資計画を作成することが可能になる。
In other words, the conventional technique of estimating the assembly work time based on the product of the number of parts and the standard operation time, and the method of increasing the error such as retrieving the past assembly work time of similar products and using the same value are used. , It is possible to accurately predict the assembly work time in a short time. This allows
The operation rate of equipment and personnel is improved, and productivity can be improved. Further, since the future facility load is accurately predicted, the number of facilities can be accurately grasped, and a lean and efficient facility investment plan can be created.

【0053】また、組立機械間の機差を含めた組立作業
時間計算モデルを構築するため全ての組立機械の動特性
の測定と集計に多大の時間を費やすことをせずに、各機
械で組立られた部品の種類とそのときの組立作業時間の
みを採集するという非常に簡単な作業のみで高精度の組
立作業時間の予測を行うことが可能となる。
In order to construct an assembly work time calculation model including machine differences between assembling machines, a large amount of time is not required for measuring and totaling dynamic characteristics of all the assembling machines. It is possible to predict the assembly work time with high accuracy only by a very simple work of collecting only the type of the component and the assembly work time at that time.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る組立作業時間予測装置の実施例の
概略構成を示すブロック図である。
FIG. 1 is a block diagram showing a schematic configuration of an embodiment of an assembly work time prediction device according to the present invention.

【図2】実績データ格納部102の内容を示す図であ
る。
FIG. 2 is a diagram showing the contents of a performance data storage unit 102;

【図3】実装ラインデータ格納部104の内容を示す図
である。
FIG. 3 is a diagram showing the contents of a mounting line data storage unit 104;

【図4】実装機データ格納部106の内容を示す図であ
る。
FIG. 4 is a diagram showing the contents of a mounting machine data storage unit 106;

【図5】基板工程データ格納部108の内容を示す図で
ある。
FIG. 5 is a diagram showing the contents of a substrate process data storage unit 108;

【図6】部品データ格納部110の内容を示す図であ
る。
FIG. 6 is a diagram showing contents of a component data storage unit 110;

【図7】部品優先度データ格納部112の内容を示す図
である。
FIG. 7 is a diagram showing the contents of a component priority data storage unit 112;

【図8】組立作業時間予測処理部113の処理フローの
概要を示す図である。
FIG. 8 is a diagram showing an outline of a processing flow of an assembly work time prediction processing unit 113;

【図9】重回帰分析入力データを示す図である。FIG. 9 is a diagram showing multiple regression analysis input data.

【図10】組立作業時間予測結果格納部114のデータ
内容を示す図である。
FIG. 10 is a diagram showing data contents of an assembly work time prediction result storage unit 114;

【符号の説明】[Explanation of symbols]

1 組立作業時間予測装置 2 端末 3 実績データ 101 実績データ編集処理部 102 実績データ格納部 103 実装ラインデータ編集処理部 104 実装ラインデータ格納部 105 実装機データ編集処理部 106 実装機データ格納部 107 基板工程データ編集処理部 108 基板工程データ格納部 109 部品データ編集処理部 110 部品データ格納部 111 部品優先度データ編集処理部 112 部品優先度データ格納部 113 組立作業時間予測処理部 114 組立作業時間予測結果格納部 REFERENCE SIGNS LIST 1 Assembly work time prediction device 2 Terminal 3 Actual data 101 Actual data editing processing unit 102 Actual data storage unit 103 Mounting line data editing processing unit 104 Mounting line data storage unit 105 Mounting machine data editing processing unit 106 Mounting machine data storage unit 107 Substrate Process data edit processing unit 108 Board process data storage unit 109 Component data edit processing unit 110 Component data storage unit 111 Component priority data edit processing unit 112 Component priority data storage unit 113 Assembly work time prediction processing unit 114 Assembly work time prediction result Storage

フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B23P 21/00 G05B 19/418 G06F 17/60 Continuation of the front page (58) Field surveyed (Int. Cl. 7 , DB name) B23P 21/00 G05B 19/418 G06F 17/60

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 組立作業時間予測対象の製品に関するデ
ータを入力する予測対象データ入力手段と、 過去における製品の部品の種類、部品の種類別点数及び
組立作業時間を含む実績データを、複数の実装ラインの
各実装ラインごとに格納する実績データ格納手段と、前記複数の実装ラインの中から1つを選択する選択手段
と、 前記対象の製品に関するデータを参照して、前記実績デ
ータ格納手段に格納されている前記選択された実装ライ
ンの実績データの中から、所定の類似度を満足する実績
データを選択する選択手段と、 前記選択した実績データに基づき、前記対象製品の前記
選択された実装ラインにおける組立作業時間を予測する
予測処理部とを備えたことを特徴とする組立作業時間予
測装置。
1. A prediction target data input means for inputting data on a product whose assembly work time is to be predicted, and a plurality of actual data including past types of parts of the product, points of each type of parts, and assembly work times. Of the line
Result data storage means for storing each mounting line, and selecting means for selecting one from the plurality of mounting lines
And referring to the data related to the target product , and selecting the selected mounting line stored in the performance data storage unit.
From the emission actual data, selecting means for selecting a track record data which satisfies a predetermined similarity, based on actual data wherein the selection, the said products
A prediction processing unit for predicting an assembly operation time in a selected mounting line .
【請求項2】 前記予測処理部は、前記選択した実績デ
ータに基づき、組立作業予測モデルを作製し、この組立
作業予測モデルを参照して組立作業時間を予測すること
を特徴とする請求項1に記載の組立作業時間予測装置。
2. The method according to claim 1, wherein the prediction processing unit creates an assembly work prediction model based on the selected actual data, and predicts an assembly work time with reference to the assembly work prediction model. An assembling work time prediction device according to Claim 1.
【請求項3】 前記予測処理部は、前記実績データ格納
部に、前記所の類似度を満足する実績データが格納さ
れていない場合、前記選択された実装ライン中の実装機
の標準時間を利用して、前記対象製品の組立作業時間予
測を行うことを特徴とする請求項1又は2に記載の組立
作業時間予測装置。
Wherein the prediction processing section, the actual data storage unit, if the actual data that satisfies the similarity of the plant constant is not stored, mounting apparatus in the selected mounting line <br/> The assembly work time prediction apparatus according to claim 1, wherein the assembly work time prediction of the target product is performed using the standard time.
【請求項4】 過去における製品の部品の種類、部品の
種類別点数及び組立作業時間を含む実装データを複数の
実装ラインの各実装ラインごとに実績データ格納手段に
格納し、 組立作業時間予測対象製品に関するデータを入力し、前記複数の実装ラインの中から1つの実装ラインを選択
し、 前記 実績データ格納手段に格納された前記選択された実
装ラインの実績データから、前記対象の製品に関するデ
ータと所定の類似度を満足する実績データを選択し、 前記選択した実績データに基づき、前記対象の製品の組
立作業時間を予測することを特徴とする組立作業時間予
測方法。
4. The type of parts in a past product,
More than one type of mounting data, including points by type and assembly
In the actual data storage means for each mounting line of the mounting line
Storing, inputting data on the assembly work time prediction target product, and selecting one mounting line from the plurality of mounting lines
And the actual data storage means stored in the said selected real
From the actual data of the mounting line, selecting actual data that satisfies a predetermined similarity with the data on the target product, and predicting an assembly work time of the target product based on the selected actual data. Assembly work time prediction method.
【請求項5】 前記実績データ格納手段に、前記所
類似度を満足する実績データが格納されていない場合、
前記選択された実装ラインの実装機の標準作業時間を利
用して、前記対象の製品の組立作業時間予測を行うこと
を特徴とする請求項4に記載の組立作業時間予測方法。
If the method according to claim 5, wherein the actual data storage means, actual data that satisfies the similarity of the plant constant is not stored,
The assembly work time prediction method according to claim 4, wherein the assembly work time of the target product is predicted using a standard work time of a mounting machine of the selected mounting line .
JP34251393A 1993-12-14 1993-12-14 Assembling work time prediction apparatus and method Expired - Fee Related JP3302148B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34251393A JP3302148B2 (en) 1993-12-14 1993-12-14 Assembling work time prediction apparatus and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34251393A JP3302148B2 (en) 1993-12-14 1993-12-14 Assembling work time prediction apparatus and method

Publications (2)

Publication Number Publication Date
JPH07164267A JPH07164267A (en) 1995-06-27
JP3302148B2 true JP3302148B2 (en) 2002-07-15

Family

ID=18354328

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34251393A Expired - Fee Related JP3302148B2 (en) 1993-12-14 1993-12-14 Assembling work time prediction apparatus and method

Country Status (1)

Country Link
JP (1) JP3302148B2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7805328B2 (en) 2003-02-10 2010-09-28 Hoya Corporation Method and system of managing production quantity
JP2004265389A (en) * 2003-02-10 2004-09-24 Pentax Corp Production number management system and method
JP4644533B2 (en) * 2005-06-15 2011-03-02 株式会社日立メディコ Medical management simulation system
JP4924380B2 (en) * 2007-11-21 2012-04-25 パナソニック株式会社 Simulation method and simulation apparatus
EP2375297A1 (en) * 2008-12-05 2011-10-12 Hitachi, Ltd. Manufacturing plan drawing-up system and method
WO2014188524A1 (en) * 2013-05-22 2014-11-27 株式会社日立製作所 Task time estimation device
JP6076272B2 (en) * 2014-02-06 2017-02-08 三菱電機ビルテクノサービス株式会社 Standard work time estimation device and program
EP3451092B1 (en) 2016-04-26 2022-08-03 Fujitsu Limited Work assistance device, work assistance method, and work assistance program
JP6853764B2 (en) * 2017-10-02 2021-03-31 株式会社日立製作所 Work man-hour estimation device and work instruction system
JP7080199B2 (en) * 2019-04-08 2022-06-03 株式会社日立製作所 Production planning support system equipped with work man-hour prediction system and work man-hour prediction system
JP7140073B2 (en) * 2019-08-23 2022-09-21 Jfeスチール株式会社 LEARNING MODEL GENERATION METHOD, DATABASE CONSTRUCTION METHOD, MILL SETUP SETTING METHOD, ROLLED MATERIAL MANUFACTURING METHOD, PROCESSING TARGET MANUFACTURING METHOD, AND LEARNING MODEL GENERATING DEVICE

Also Published As

Publication number Publication date
JPH07164267A (en) 1995-06-27

Similar Documents

Publication Publication Date Title
US5544348A (en) Simulation method and apparatus
JP3302148B2 (en) Assembling work time prediction apparatus and method
Tempelmeier et al. Flexible manufacturing systems: decision support for design and operation
Inman Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
CN101910962B (en) Bottleneck device extracting method and bottleneck device extracting assistance device
JPH1063714A (en) Capability predicting device
EP0660210A2 (en) Methods and apparatus for the testing, monitoring and improvement of manufacturing process effectiveness
CA2344769A1 (en) System and method for on-line adaptive prediction using dynamic management of multiple sub-models
Don Taylor et al. Designing New Products: Compatibility with Existing ProductionFacilities and Anticipated Product Mix
JPH07251356A (en) Actual operation result display analyzing system
EP0819996A2 (en) Automatic manufacturability evaluation method and system
Lee et al. An integrated design support method for flexible assembly systems
EP1028307B1 (en) Apparatus and method for maintenance of instrument for measuring coordinates and surface properties
JPH09326589A (en) System operating method
JPH10228463A (en) Demand prediction model evaluating method
CN110689177A (en) Method and device for predicting order preparation time, electronic equipment and storage medium
Ellis et al. Development of a placement time estimator function for a turret style surface mount placement machine
Cochran et al. Optimization of multivariate simulation output models using a group screening method
JPH06195402A (en) Optimal design supporting system for product development
Johri A heuristic algorithm for loading new work on circuit pack assembly lines
Saboo et al. Recursion models for describing and managing the transient flow of materials in generalized flowlines
US7415388B2 (en) Method for the automatically determining the indirect and direct extent of damages resulting from a failure of technical components in objects integrated in a production cycle
JPH0561507A (en) Job shop production control system
Anderson A method for planning analysis and design simulation of CIM systems
Alexander et al. Cost based surface mount PCB design evaluation

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090426

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090426

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100426

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees