JP3270179B2 - Underground structure that also serves as a foundation - Google Patents

Underground structure that also serves as a foundation

Info

Publication number
JP3270179B2
JP3270179B2 JP06440593A JP6440593A JP3270179B2 JP 3270179 B2 JP3270179 B2 JP 3270179B2 JP 06440593 A JP06440593 A JP 06440593A JP 6440593 A JP6440593 A JP 6440593A JP 3270179 B2 JP3270179 B2 JP 3270179B2
Authority
JP
Japan
Prior art keywords
foundation
concrete
predetermined space
underground structure
space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP06440593A
Other languages
Japanese (ja)
Other versions
JPH06272264A (en
Inventor
明 岸
彰一 上野
英樹 辻山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP06440593A priority Critical patent/JP3270179B2/en
Publication of JPH06272264A publication Critical patent/JPH06272264A/en
Application granted granted Critical
Publication of JP3270179B2 publication Critical patent/JP3270179B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は住居用の基礎を兼用する
地下構造体にかかり、詳しくは地下室や駐車場となる地
下空間を形成する基礎兼用地下構造体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an underground structure which also serves as a dwelling foundation, and more particularly to an underground structure which forms an underground space serving as a basement or a parking lot.

【0002】[0002]

【従来の技術】近年、都市区やその近郊における土地高
騰に伴い、住宅においては限られたスペースに如何に多
くの居住空間を造りだすかが大きな課題になっている。
一定の土地面積から多くの居住空間を造るためには、当
然その高層化が考えられ、従来では主に2階建てであっ
た住宅が近年では3階建て、4階建てに代わりつつあ
る。
2. Description of the Related Art In recent years, with the soaring land in an urban area and its suburbs, how to create a large number of living spaces in a limited space in a house has become a major issue.
In order to create a lot of living space from a certain land area, it is natural that the height of the house may be increased. In recent years, a house mainly having two stories has been replaced by a three story or four story house in recent years.

【0003】しかし、このような高層化はその周りの住
宅事情によっては日照権等の問題から許されない場合も
あり、また構造強度等を十分に高めなければならないな
どの点から施工費用が当然高くなるため、予算的に折り
合わず、結果として従来の低層住宅(例えば2階建て)
を余儀されなくなるといった場合もある。このような高
層化とは逆に、地下室を造って住宅全体の居住空間を拡
げるといったことも考えられ、近年では既に多くの住宅
で実施されている。
[0003] However, such an increase in height may not be allowed due to problems such as the right to sunshine depending on the circumstances of the surrounding housing, and construction costs are naturally high due to the need to sufficiently increase structural strength and the like. As a result, conventional low-rise housing (for example, two-story) is not available
In some cases, you may not be able to do so. Contrary to such an increase in height, it is also conceivable to expand the living space of the entire house by constructing a basement, and in recent years it has already been implemented in many houses.

【0004】[0004]

【発明が解決しようとする課題】ところが、地下室を造
る場合には、通常基礎とは別に地下室を施工するため設
計的に難しく、またコンクリートの打設量も多くなるこ
となどから施工コストが割高になり、コンクリートの養
生期間が長くなってしまうことなどから工期も長くなっ
てしまうといった問題がある。このような背景から、プ
レハブ基礎兼用地下室についての技術が提案されている
(特開昭57−33630号)。この技術は、壁体と床
体の一部とを一体に形成したプレキャスト鉄筋コンクリ
ート壁パネルを並設し、床体間に現場打ちコンクリート
を打設して壁パネル間に地下室を形成するとともに、壁
パネルを基礎として用い、これの上に上家を建築するも
のである。
However, in the case of constructing a basement, it is usually difficult to design the basement separately from the foundation, and the construction cost is high due to the large amount of concrete to be cast. In other words, there is a problem that the construction period becomes longer because the curing period of the concrete becomes longer. Against this background, a technique for a prefabricated basement basement has been proposed (Japanese Patent Laid-Open No. 57-33630). In this technology, precast reinforced concrete wall panels that integrally form a wall body and a part of the floor body are juxtaposed, and cast-in-place concrete is cast between the floor bodies to form a basement between the wall panels, The panel is used as a basis, and a house is built on it.

【0005】しかしながら、このような技術をもってし
ても、プレキャスト鉄筋コンクリート壁パネルを据え付
けた後、これらの間に現場打ちコンクリートを打設する
ことから、施工が2段階となり、地下室の床となるコン
クリートの養生期間を考えると十分な工期の短縮が図れ
ないといった問題がある。この発明は前記事情に鑑みて
なされたもので、その目的とするところは、十分に工期
短縮が図れ、かつ施工コストも安価となる基礎兼用地下
構造を提供することにある。
[0005] However, even with such a technique, after the precast reinforced concrete wall panels are installed, cast-in-place concrete is cast between them, so that the construction is performed in two stages, and the concrete to be the floor of the basement is constructed. Considering the curing period, there is a problem that the construction period cannot be sufficiently shortened. The present invention has been made in view of the above-mentioned circumstances, and an object of the present invention is to provide a basement / underground structure that can sufficiently shorten the construction period and reduce the construction cost.

【0006】[0006]

【課題を解決するための手段】本発明における請求項1
記載の基礎兼用地下構造体では、一部が地中に埋設され
る住居用のコンクリート製布基礎が所定空間を囲繞して
配置され、該コンクリート製布基礎の一部に前記所定空
間とコンクリート製布基礎の外界とを連通せしめる切欠
部が、コンクリート製布基礎の上端から外界の地表面と
略同じ高さにまで切り欠かれて形成され、前記所定空間
内が地表面より下方に掘削され、掘削された底面から前
記切欠部における外界の地表面近傍の箇所にかけて、該
底面をほぼ覆うようにしてプレキャストコンクリート版
が斜めに設置され、その傾斜方向中央部が前記底面から
上方に延ばされた独立基礎によって支持されてなること
を前記課題の解決手段とした。請求項2記載の基礎兼用
地下構造では、一部が地中に埋設される住居用のコン
クリート製布基礎が所定空間を囲繞して配置され、該所
定空間内が地表面より下方に掘削され、掘削された底面
にプレキャストコンクリート版が設置されてなる第1の
基礎兼用地下構造体と請求項1記載の第2の基礎兼用地
下構造体とが、コンクリート製布基礎の一部を共有する
よう隣接して配設され、該共有されるコンクリート製布
基礎に、前記第1の基礎兼用地下構造体における所定空
間と前記第2の基礎兼用地下構造体における所定空間と
を連通せしめる貫通部が形成されてなることを前記課題
の解決手段とした。
Means for Solving the Problems Claim 1 of the present invention
Some of the underground / underground structures described are partially buried underground.
Concrete foundation for a house
The predetermined empty space is arranged on a part of the concrete fabric foundation.
Notch that allows the space to communicate with the outside world of the concrete fabric foundation
From the top of the concrete fabric foundation to the external ground surface
It is cut out to approximately the same height and is formed in the predetermined space.
The inside is excavated below the ground surface, and from the excavated bottom
Over the notch near the ground surface near the outside,
Precast concrete plate almost covering the bottom
Are installed diagonally, and the center of the inclination direction is from the bottom.
The object of the present invention is to be supported by an independent foundation extending upward . Claim 2
In underground structures, Con residential part is buried in the ground
A cleat fabric foundation is arranged surrounding a predetermined space, and
The fixed space is excavated below the ground surface, and the excavated bottom surface
The first that a precast concrete slab is installed in
An underground structure that also serves as a base and a second ground that also serves as a base according to claim 1.
The lower structure shares part of the concrete fabric foundation
Such that the concrete fabric is disposed adjacent to the shared fabric
The base is provided with a predetermined space in the first basement / underground structure.
And a predetermined space in the second basement / underground structure
Is formed as a means for solving the above-mentioned problem.

【0007】[0007]

【作用】本発明における請求項1記載の基礎兼用地下構
造体によれば、所定空間がコンクリート製布基礎に形成
した切欠部によって外界に通じ、しかもプレキャスト
ンクリート版が外界の地表面近傍から傾斜して設置され
ていることから、形成された所定空間が前記切欠部を通
ることによって外界との出入りが自由となり、したがっ
て所定空間を例えば駐車場とすることが可能になる。
た、傾斜して設置されたプレキャストコンクリート版
は、その傾斜方向中央部が、掘削された底面から上方に
延ばされた独立基礎によって支持されているので、この
ように形成された傾斜面の支持強度を保つために、傾斜
面と底面との間に掘削土を埋め戻したり、コンクリート
などを打設したりする必要がない。請求項2記載の基礎
兼用地下構造体によれば、前記第2の基礎兼用地下構造
体と前記第1の基礎兼用地下構造体とを隣接して配置
し、これらの間に貫通部を形成したものであるから、
記第1の基礎兼用地下構造体における所定空間を通るこ
とによって外から直接前記第2の基礎兼用地下構造体に
おける所定空間内に出入りすることが可能になる。
According to basic combined underground structure according to claim 1, wherein in the present invention, leads to the outside by a notch Tokoro constant space is formed in the concrete fabric foundation, moreover precast co
Since the concrete plate is installed obliquely from the vicinity of the ground surface of the outside world, it is possible to freely enter and exit the outside world by passing the formed predetermined space through the cutout portion, and thus the predetermined space is, for example, a parking lot. Becomes possible. Ma
Precast concrete slab installed at an angle
Has its center in the direction of inclination upward from the excavated bottom
Supported by an extended independent foundation,
In order to maintain the support strength of the slope formed, the slope
Backfill excavated soil between the surface and
There is no need to cast them. According to the second combined use underground structure, the second combined use underground structure and the first combined use underground structure are disposed adjacent to each other, and a penetrating portion is formed therebetween. Before
By passing through a predetermined space in the first basement / underground structure, the second basement / underground structure is directly connected to the outside from the outside.
It is possible to get in and out of a predetermined space.

【0008】[0008]

【実施例】図1および図2は本発明の基礎兼用地下構造
体を寒地における構造体に適用した場合の一実施例を示
すもので、これらの図において符号1はコンクリート製
布基礎である。このコンクリート製布基礎1は、フーチ
ング2とこれから立ち上がった立上部3からなる断面逆
T字状のもので、寒地であることから凍害等を考慮して
暖地に比べ基礎梁成が高く、すなわち立上部3が高く形
成されたものであり、その分地中に深く埋設されたもの
である。また、このコンクリート製布基礎1は、この例
では建地を多数の正方形状に区画するようにしてフーチ
ング2のみ通常の現場打ちで形成され、立上部3はプレ
キャストコンクリート版によって形成されたものであ
る。この布基礎1により囲繞され区画された空間のう
ち、互いに隣接する所定空間A、Bを除く空間には埋め
戻しがなされいる。なお、フーチング2をプレキャスト
コンクリートとしてもよいのはもちろんである。
1 and 2 show an embodiment in which the basement / underground structure according to the present invention is applied to a structure in a cold region. In these figures, reference numeral 1 denotes a concrete cloth foundation. . The concrete fabric foundation 1 has an inverted T-shaped cross section composed of a footing 2 and a rising portion 3 rising from the foot. The foundation is higher in a cold region than in a warm region in consideration of frost damage. The rising part 3 is formed high, and is buried deep in the ground. In this example, only the footing 2 of the concrete fabric foundation 1 is formed by ordinary cast-in-place so as to divide the building into a number of squares, and the rising portion 3 is formed by a precast concrete slab. is there. Of the spaces surrounded and partitioned by the cloth foundation 1, spaces other than the predetermined spaces A and B adjacent to each other are backfilled. It is needless to say that the footing 2 may be precast concrete.

【0009】所定空間A、Bには埋め戻しがなされず、
したがってその底面はフーチング2の底面とほぼ同じレ
ベルになっている。そして、所定空間Aは地下室となる
もので、その底面には矩形板状のプレキャストコンクリ
ート版4…が隙間なく並列して設置されている。これら
プレキャストコンクリート版4…としては、一般的なコ
ンクリートからなるものでもよいが、軽量気泡コンクリ
ート製のものを用いれば断熱効果を高めることができ好
ましい。また、これらプレキャストコンクリート版4…
は、図2に示すように布基礎1のフーチング2との間に
僅かに隙間をあけて置かれたもので、フーチング2との
隙間にはモルタル等が充填されて地面が所定空間A内に
露出しないようになっている。なお、プレキャスト版4
…を設置するに先立ち、これらを載せる底面には予め平
坦均しが行われ、さらに公知の防水処理、例えば防水シ
ートを敷設するなどの処理がなされているのはもちろん
である。また、該所定空間Aを囲繞する部分の布基礎1
にも、所定空間Aと反対側の面に予め防水シート5が貼
られ、これによって防止処理が施されている。
The predetermined spaces A and B are not backfilled,
Therefore, the bottom surface is substantially at the same level as the bottom surface of the footing 2. The predetermined space A serves as a basement, and rectangular plate-shaped precast concrete plates 4 are arranged side by side on the bottom surface without any gap. These precast concrete slabs 4 may be made of general concrete, but it is preferable to use lightweight aerated concrete because the heat insulating effect can be enhanced. In addition, these precast concrete slabs 4 ...
Is placed with a slight gap between it and the footing 2 of the cloth foundation 1 as shown in FIG. 2. The gap between the footing 2 and the footing 2 is filled with mortar or the like, and the ground is placed in the predetermined space A. It is not exposed. In addition, precast version 4
Prior to the installation, the bottom surface on which these are placed is previously flattened and, of course, is subjected to a known waterproofing process, for example, a process of laying a waterproof sheet. Further, the cloth foundation 1 surrounding the predetermined space A
Also, a waterproof sheet 5 is pasted on a surface opposite to the predetermined space A in advance, and thereby a prevention process is performed.

【0010】所定空間Bは駐車場となるもので、所定空
間Aと反対側の布基礎部分1aが基礎全体の最外部とな
るように配置されたものであり、該布基礎部分1aの外
側は外界、すなわち住宅を建てた後庭や道路に面する空
地となるようになっている。また、布基礎部分1aに
は、その上端から外側の地表面近傍まで矩形状に切り欠
かれてなる切欠部6が形成されている。この切欠部6
は、外から所定空間B内に出入りするための出入り口と
なるもので、少なくとも車一台が出入りできるだけの幅
を有している。
The predetermined space B serves as a parking lot, and the cloth base portion 1a opposite to the predetermined space A is arranged so as to be the outermost of the entire foundation. It has become an open space facing the outside world, that is, the yard or road after building a house. Further, the cloth base portion 1a is formed with a cutout portion 6 which is cut out in a rectangular shape from the upper end to the vicinity of the outer ground surface. This notch 6
Is a doorway for entering and exiting the predetermined space B from outside, and has a width that allows at least one vehicle to enter and exit.

【0011】また、所定空間B内には、その底面から前
記切欠部6を形成した布基礎部分1aにかけて、所定空
間B内の底面を覆うようにしてプレキャストコンクリー
ト版7…が斜めに並列して設置されている。すなわちこ
れらプレキャストコンクリート版7…は、下端部が所定
空間Aと所定空間Bとを区切る布基礎部分1bのフーチ
ング2の側面に当接するようにして配置され、かつ上端
部が前記布基礎部分1aの切欠部6に載せられて設置さ
れたものである。また、これらプレキャストコンクリー
ト版7…は、先の場合と同様に互いに隙間なく並列した
もので、その傾斜方向中央部は所定空間Bの底面上に設
けられた独立基礎8によって支持されている。
In the predetermined space B, precast concrete plates 7 are arranged diagonally in parallel from the bottom surface to the cloth base portion 1a in which the notch 6 is formed so as to cover the bottom surface in the predetermined space B. is set up. That is, these precast concrete slabs 7 are arranged such that the lower end thereof is in contact with the side surface of the footing 2 of the cloth base portion 1b separating the predetermined space A and the predetermined space B, and the upper end portion is formed of the cloth base portion 1a. It is placed and installed in the notch 6. These precast concrete slabs 7 are arranged side by side without any gaps as in the previous case, and the center in the direction of inclination is supported by an independent foundation 8 provided on the bottom surface of the predetermined space B.

【0012】また、所定空間Aと所定空間Bとを区切る
布基礎部分1bには、これらの間の通行が可能となるよ
う立上部3の一部が貫通し、この貫通部9にドア10が
取り付けられている。さらに、これら地下室あるいは駐
車場となる所定空間A、Bを囲繞する布基礎1の上に
は、図2に示すようにプレキャストコンクリート版等か
らなる天井材11が架け渡され、予め布基礎1中に埋設
されたアンカーボルト(図示略)等によって固定されて
いる。
Further, a part of the rising portion 3 penetrates through the cloth base portion 1b which divides the predetermined space A and the predetermined space B so as to allow passage therebetween. Installed. Further, a ceiling material 11 made of a precast concrete plate or the like is laid over the cloth foundation 1 surrounding the predetermined spaces A and B serving as basements or parking lots as shown in FIG. Is fixed by an anchor bolt (not shown) or the like buried therein.

【0013】一方、他の部分の布基礎1内には、独立基
礎(図示略)が適宜配設されており、これら布基礎1お
よび独立基礎上には木製パネル等からなる床材(図示
略)が架け渡され固定されている。そして、これら床材
や前記天井材11の上に、アンカーボルト等によって布
基礎1に固定されるようにして上家が建てられることに
より、所定空間Aを地下室とし、所定空間Bを駐車場と
する住宅が構築される。なお、地下室となる所定空間A
内では、もちろんその周壁となる布基礎1の立上部3の
側面に防水処理や断熱処理などがなされ、さらにその上
に公知の内装仕上げがなされるようになっており、また
プレキャストコンクリート版4…の上にも同様の処理が
なされた後、フローリング等の床仕上げがなされるよう
になっている。さらに、この所定空間A内には、その上
の天井材11を通り抜けて地階の居住空間に出入りがで
きるよう、階段等が設けられているのはもちろんであ
る。
On the other hand, independent foundations (not shown) are appropriately disposed in the other portion of the cloth foundation 1, and floor materials (not shown) made of a wooden panel or the like are provided on the cloth foundation 1 and the independent foundation. ) Is suspended and fixed. Then, an upper house is built on the floor material and the ceiling material 11 so as to be fixed to the cloth foundation 1 by anchor bolts or the like, so that the predetermined space A is a basement and the predetermined space B is a parking lot. Housing to be built. In addition, the predetermined space A to be the basement
In the inside, of course, the side surface of the rising portion 3 of the cloth foundation 1 serving as the peripheral wall is subjected to a waterproofing treatment and a heat insulating treatment, and further, a known interior finish is further performed thereon. After similar processing is performed on the floor, floor finishing such as flooring is performed. Further, in the predetermined space A, of course, stairs and the like are provided so as to pass through the ceiling material 11 thereon and to enter and exit the living space on the basement floor.

【0014】また、駐車場となる所定空間Bにおいて
は、そのプレキャストコンクリート版7…に例えば車が
布基礎部分1bにまで下らないように輪止めを埋め込ん
でおいたり、車が出る際スリップしないよう斜面に滑り
止めを設けたりしておくのはもちろんであり、また雨水
が入り込んでもこれが排出されるよう排水溝(図示略)
なども設けられている。さらに、布基礎部分1aの切欠
部6にはシャッター等の扉(図示略)が取り付けられて
おり、その外側には雨水が駐車場内に流入するのを防ぐ
ための排水溝(図示略)が設けられている。
Further, in the predetermined space B serving as a parking lot, for example, a buckle is embedded in the precast concrete slab 7 so that the vehicle does not go down to the fabric base portion 1b, or a slope is provided so that the vehicle does not slip when leaving. It is a matter of course that a non-slip is provided on the floor, and a drain (not shown) so that even if rainwater enters, it is discharged.
And so on. Further, a door (not shown) such as a shutter is attached to the notch 6 of the cloth base portion 1a, and a drain groove (not shown) for preventing rainwater from flowing into the parking lot is provided outside the door. Have been.

【0015】このような基礎兼用地下構造体を施工する
には、まずコンクリート製布基礎1を配置する所定位置
に該基礎1用の穴を掘削するとともに、所定空間A、B
となる地面を掘削してその底面を前記基礎1用の穴と同
レベルにしておく。次に、基礎1用の穴に型枠を組み、
配筋した後コンクリートを打設して布基礎1のフーチン
グ2を形成するとともに、プレキャストコンクリート版
を硬化前のフーチング2の所定位置上に立てて布基礎1
を完成した後、さらに布基礎1の型枠を外すとともに、
所定空間A、B以外の布基礎1用の穴に埋め戻しを行
う。
In order to construct such an underground structure that also serves as a foundation, first, a hole for the concrete fabric foundation 1 is excavated at a predetermined position where the foundation 1 is to be placed, and a predetermined space A, B
And the bottom surface thereof is set at the same level as the hole for the foundation 1. Next, assemble the formwork into the hole for foundation 1,
After arranging the reinforcement, the concrete is cast to form the footing 2 of the cloth foundation 1, and the precast concrete slab is erected on a predetermined position of the footing 2 before hardening to form the cloth foundation 1.
After completing the above, while removing the formwork of the cloth foundation 1 further,
The holes for the cloth foundation 1 other than the predetermined spaces A and B are backfilled.

【0016】なお、埋め戻しに先立ち、所定空間A、B
を囲繞する布基礎1には、適宜防水処理が施されるのは
もちろんである。また、所定空間Aと反対側の布基礎部
分1aについては、予め切欠部6が形成されたプレキャ
ストコンクリート版が用いられており、さらに所定空間
Aと所定空間Bとを区切る布基礎部分1bについては、
予め貫通部9が形成されたプレキャストコンクリート版
が用いられている。
Prior to backfilling, predetermined spaces A, B
Of course, the cloth foundation 1 surrounding the is subjected to a waterproof treatment as appropriate. Further, a precast concrete slab in which a notch 6 is formed in advance is used for the cloth base portion 1a on the opposite side to the predetermined space A, and a cloth base portion 1b that separates the predetermined space A and the predetermined space B is used. ,
A precast concrete slab in which a through portion 9 is formed in advance is used.

【0017】次いで、所定空間Aとなる掘削面にプレキ
ャストコンクリート版4…を並列配置し、該プレキャス
トコンクリート版4、4間、およびプレキャストコンク
リート版4…と布基礎1のフーチング2との間にモルタ
ル等を充填する。なお、プレキャストコンクリート版4
…を並列配置するに際しては、そのレベル出しのため予
め掘削面にL型鋼などを置き、その上にプレキャストコ
ンクリート版4…を敷設してもよい。また、その場合に
は、例えば予めプレキャストコンクリート版4に貫通孔
を形成しておき、その貫通孔からモルタルをプレキャス
トコンクリート版4…の下の空間に打設してプレキャス
トコンクリート版4…を固定するのが好ましい。
Next, precast concrete slabs 4 are arranged in parallel on an excavated surface which is a predetermined space A, and mortar is provided between the precast concrete slabs 4 and between the precast concrete slabs 4 and the footing 2 of the cloth foundation 1. And so on. In addition, precast concrete slab 4
When arranging in parallel, an L-shaped steel or the like may be placed in advance on the excavated surface for leveling, and a precast concrete slab 4 may be laid thereon. In this case, for example, a through hole is formed in the precast concrete slab 4 in advance, and mortar is poured into the space below the precast concrete slab 4 from the through hole to fix the precast concrete slab 4. Is preferred.

【0018】一方、所定空間Bにも、予め独立基礎8を
形成した後、プレキャストコンクリート版7…をその一
方を前記切欠部6に架けて斜めに並列配置する。なお、
このプレキャストコンクリート版7…にも、その間やフ
ーチング2との間、さらには切欠部6および独立基礎8
上端との間をモルタルで埋め固着する。その後、布基礎
1上に天井材11や床材が架け渡され、さらにその上に
上家が施工される。また、所定空間A、Bには内装が施
され、それぞれ地下室、駐車場とされる。
On the other hand, after the independent foundation 8 is formed in the predetermined space B in advance, the precast concrete slabs 7 are arranged obliquely side by side with one of the precast concrete slabs 7 being bridged over the notch 6. In addition,
This precast concrete slab 7 also has a notch 6 and an independent foundation 8 between it and the footing 2.
The space between the top and the top is filled with mortar and fixed. After that, the ceiling material 11 and the floor material are laid on the cloth foundation 1, and the house is further constructed thereon. The predetermined spaces A and B are furnished with a basement and a parking lot, respectively.

【0019】このような構成の基礎兼用地下構造体にあ
っては、布基礎1の立上部3が周壁に兼用されて地下
室、駐車場が形成されることから、基礎とは全く別に地
下室や地下駐車場を構築する場合に比べ工期が短縮でき
るとともにコンクリート打設量などが少なくなって材料
費も軽減される。またプレキャストコンクリート版7
は、その傾斜方向中央部を独立基礎8によって支持され
ているので、プレキャストコンクリート7の下面に形成
される空間に掘削土を埋め戻したり、コンクリートなど
を打設する必要がなく、そのための工期が短縮できると
ともにコンクリート打設量などが少なくなって材料費も
軽減される。したがって、全体としての施工コストが大
幅に低減する。また、地下室や駐車場の床部分の形成
を、従来のごとく現場打ちコンクリートの打設によら
ず、単にプレキャストコンクリート版4、7の設置によ
って行っているため、布基礎1形成後速やかに床部形成
が行え、したがってコンクリート養生のために施工が中
断されるといった不都合がほとんどなくなる。また、所
定空間A、B間に貫通部9が形成されていることから、
雨の日など車を駐車場に入れた後、地下室を通って上家
に入ることができ、雨に濡れることがなく極めて便利で
ある。
In the base / underground structure having such a structure, the upright portion 3 of the cloth base 1 is also used as a peripheral wall to form a basement and a parking lot. The construction period can be shortened as compared with the case of constructing a parking lot, and the amount of concrete placed is reduced, so that material costs are reduced . Precast concrete slab 7
Is supported by an independent foundation 8 at the center in the direction of inclination.
Formed on the underside of precast concrete 7
Backfilling excavated soil in concrete space, concrete, etc.
It is not necessary to cast
In both cases, the amount of concrete placed is reduced, and material costs are also reduced.
It is reduced. Therefore, the construction cost as a whole is greatly reduced. In addition, since the floor of the basement or the parking lot is formed by simply installing the precast concrete slabs 4 and 7 instead of casting the cast-in-place concrete as in the related art, the floor is quickly formed after the cloth foundation 1 is formed. The formation can be performed, and therefore, there is almost no inconvenience that the construction is interrupted due to concrete curing. Further, since the through portion 9 is formed between the predetermined spaces A and B,
After putting the car in the parking lot on a rainy day, you can enter the house through the basement, which is extremely convenient without getting wet in the rain.

【0020】なお、前記実施例では、本発明の地下構造
体を寒地における地下構造体に適用したが、布基礎の立
上部の成を高くすれば暖地における地下構造体にも適用
できるのはもちろんである。また、布基礎1のフーチン
グ2を現場打ちにて形成したが、フーチンについても、
一部コンクリート打設用の貫通部を有するプレキャスト
コンクリート版をベースとして用い、これの貫通部に部
分的にコンクリートを打設して形成するようにしてもよ
い。
In the above embodiment, the underground structure of the present invention is applied to an underground structure in a cold region. However, if the height of the upright portion of the cloth foundation is increased, the underground structure in a warm region can also be applied. Of course. In addition, the footing 2 of the fabric base 1 was formed by casting in place.
It is also possible to use a precast concrete slab having a through portion for concrete casting as a base, and to form concrete by partially casting concrete into the through portion.

【0021】[0021]

【発明の効果】以上説明したように本発明における請求
項1記載の基礎兼用地下構造、所定空間がコンクリ
ート製布基礎に形成した切欠部によって外界に通じ、し
かもプレキャスト版が外界の地表面近傍から傾斜して設
置されていることから、形成された所定空間が前記切欠
部を通ることによって外界との出入りが自由となり、し
たがって所定空間を例えば駐車場とすることができる。
また、傾斜して設置されたプレキャストコンクリート版
はその傾斜方向中央部が掘削された底面から上方に延ば
された独立基礎によって支持されているので、このよう
に形成された傾斜面の支持強度を保つために、傾斜面と
底面との間に掘削土を埋め戻したり、コンクリートなど
を打設したりする必要がない。したがってその工期の短
縮や施工コストの低減を図ることができる。請求項
載の基礎兼用地下構造体は、前記第1の基礎兼用地下構
造体と前記第2の基礎兼用地下構造体とを隣接して配置
し、これらの間に貫通部を形成したものであるから、
記第2の基礎兼用地下構造体における所定空間を通るこ
とによって外から直接前記第1の基礎兼用地下構造体に
おける所定空間内に出入りすることができ、したがって
例えば請求項記載のものを駐車場とし、前記第1の基
礎兼用地下構造体における所定空間を上家に通じる地下
室とすれば、雨の日など車を駐車場に入れた後、地下室
を通って上家に入ることができ、雨に濡れることがなく
極めて便利である。
Basic shared underground structure according to claim 1, wherein in the present invention as described in the foregoing, through to the outside by a notch Tokoro constant space is formed in the concrete fabric foundation, yet the earth precast version outside of Since it is installed obliquely from the vicinity of the surface, the formed predetermined space passes through the cutout portion, so that it can freely enter and exit from the outside world. Therefore, the predetermined space can be used as, for example, a parking lot.
In addition, precast concrete plates installed at an angle
Extends upward from the excavated bottom
Supported by an independent foundation,
In order to maintain the support strength of the slope formed in the
Backfilling excavated soil with the bottom, concrete, etc.
There is no need to cast. Therefore, the construction period can be shortened and the construction cost can be reduced. The underground structure that also serves as a base according to claim 2 , wherein the first underground structure that also serves as a base and the second underground structure that also serves as a base are arranged adjacent to each other, and a penetrating portion is formed therebetween. because there, before
By passing through a predetermined space in the second combined use underground structure, the first combined use use underground structure is directly
Predetermined can go in and out the space, thus for example the ones according to claim 1, wherein the parking, said first group of definitive
If the designated space in the basement / underground structure is a basement that leads to the house, the car can be put into the parking lot on a rainy day, and then enter the house through the basement. It is convenient.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の基礎兼用地下構造の一実施例を示す
斜視図。
Perspective view showing an embodiment of a basic combined subsurface structure of the present invention; FIG.

【図2】本発明の基礎兼用地下構造の一実施例を示す
側断面図。
Side cross-sectional view showing an embodiment of a basic combined subsurface structure of the present invention; FIG.

【符号の説明】[Explanation of symbols]

1 コンクリート製布基礎 2 フーチング 3 立上部 4、7 プレキャストコンクリート版 6 切欠部8 独立基礎 9 貫通部 A、B 所定空間DESCRIPTION OF SYMBOLS 1 Concrete fabric foundation 2 Footing 3 Erect part 4, 7 Precast concrete plate 6 Notch 8 Independent foundation 9 Penetration A, B Predetermined space

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平2−248528(JP,A) 特開 昭57−33630(JP,A) 特開 昭59−15170(JP,A) 特開 平2−125071(JP,A) 特開 昭50−7340(JP,A) 実開 昭58−129946(JP,U) 実公 平2−15958(JP,Y2) (58)調査した分野(Int.Cl.7,DB名) E02D 29/00 E02D 27/10 E04H 1/02 E04H 6/02 ──────────────────────────────────────────────────続 き Continuation of front page (56) References JP-A-2-248528 (JP, A) JP-A-57-33630 (JP, A) JP-A-59-15170 (JP, A) JP-A-2- 125071 (JP, A) JP-A-50-7340 (JP, A) JP-A-58-129946 (JP, U) JP-A-2-15958 (JP, Y2) (58) Fields investigated (Int. 7 , DB name) E02D 29/00 E02D 27/10 E04H 1/02 E04H 6/02

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 一部が地中に埋設される住居用のコンク
リート製布基礎が所定空間を囲繞して配置され、該コン
クリート製布基礎の一部に前記所定空間とコンクリート
製布基礎の外界とを連通せしめる切欠部が、コンクリー
ト製布基礎の上端から外界の地表面と略同じ高さにまで
切り欠かれて形成され、前記所定空間内が地表面より下
方に掘削され、掘削された底面から前記切欠部における
外界の地表面近傍の箇所にかけて、該底面をほぼ覆うよ
うにしてプレキャストコンクリート版が斜めに設置さ
、その傾斜方向中央部が前記底面から上方に延ばされ
た独立基礎によって支持されてなることを特徴とする基
礎兼用地下構造体。
1. A concrete cloth foundation for a house, a part of which is buried in the ground, is disposed so as to surround a predetermined space, and a part of the concrete cloth foundation is surrounded by the predetermined space and the outside of the concrete cloth foundation. Is cut out from the upper end of the concrete fabric foundation to approximately the same height as the ground surface of the outside world, and the predetermined space is excavated below the ground surface, and the excavated bottom surface is formed. A precast concrete slab is installed obliquely so as to substantially cover the bottom surface from the vicinity of the outer surface of the ground in the notch portion, and a central portion in the inclination direction is extended upward from the bottom surface.
A basement / substructure that is supported by an independent foundation .
【請求項2】 一部が地中に埋設される住居用のコンク
リート製布基礎が所定空間を囲繞して配置され、該所定
空間内が地表面より下方に掘削され、掘削された底面に
プレキャストコンクリート版が設置されてなる第1の
礎兼用地下構造体と請求項記載の第2の基礎兼用地下
構造体とが、コンクリート製布基礎の一部を共有するよ
う隣接して配設され、該共有されるコンクリート製布基
礎に、前記第1の基礎兼用地下構造体における所定空間
前記第2の基礎兼用地下構造体における所定空間とを
連通せしめる貫通部が形成されてなることを特徴とする
基礎兼用地下構造体。
2. Concentrate for a house partially buried underground
A reed fabric base is arranged surrounding a predetermined space, and the
The space is excavated below the ground surface, and
Adjacent to precast concrete plate and the second basic combined underground structure according to claim 1, wherein the first base <br/> foundation combined subsurface structure formed by installed, share some of the concrete fabric foundation It is arranged to, in concrete fabric foundation is the shared, penetrations allowed to communicating the predetermined space in the a predetermined space second basic combined subsurface structure in the first basic combined subsurface structure is formed An underground structure that also serves as a foundation.
JP06440593A 1993-03-23 1993-03-23 Underground structure that also serves as a foundation Expired - Fee Related JP3270179B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06440593A JP3270179B2 (en) 1993-03-23 1993-03-23 Underground structure that also serves as a foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06440593A JP3270179B2 (en) 1993-03-23 1993-03-23 Underground structure that also serves as a foundation

Publications (2)

Publication Number Publication Date
JPH06272264A JPH06272264A (en) 1994-09-27
JP3270179B2 true JP3270179B2 (en) 2002-04-02

Family

ID=13257377

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06440593A Expired - Fee Related JP3270179B2 (en) 1993-03-23 1993-03-23 Underground structure that also serves as a foundation

Country Status (1)

Country Link
JP (1) JP3270179B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5645316B2 (en) * 2011-07-28 2014-12-24 株式会社大建 Improved ground, improved ground creation method and underground building

Also Published As

Publication number Publication date
JPH06272264A (en) 1994-09-27

Similar Documents

Publication Publication Date Title
US5809704A (en) Hillside multistory residential dwelling structure
US4231199A (en) Method and components for construction of building from concrete slabs
US5067289A (en) Foundation system for manufactured housing
AU2007100518A4 (en) Building Construction System
JP4083334B2 (en) Underground structure having arch roof and method for constructing the same
JP3270179B2 (en) Underground structure that also serves as a foundation
US10829924B2 (en) Composite wall and methods of constructing a composite wall
CN214302989U (en) Build assembled garage parking on ground additional
JP3641227B2 (en) Construction method of underground structure
JP2971810B2 (en) Construction method of underground structure of multi-story parking lot
JPH06306872A (en) Formation of pressure plate type grit post footing
US2648101A (en) Building construction
JPH072870Y2 (en) Unit type basement
JP2571427B2 (en) Heavy load work floor method using existing underground structure
JPH0324525B2 (en)
JPH11117320A (en) Foundation of vibration isolation building
US3545149A (en) Concrete grade beam support
JP2676128B2 (en) Complex building
JP3673332B2 (en) Basement structure
JP2782263B2 (en) Underground structure and construction method
JP3532957B2 (en) Building with basement
JP4094763B2 (en) Unit building structure with basement
JPH0145306Y2 (en)
JP2000257169A (en) Unit building structure on sloping ground
AU2007202788B2 (en) Building Construction System

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20011218

LAPS Cancellation because of no payment of annual fees