JP3213587B2 - Auxiliary crane equipment - Google Patents

Auxiliary crane equipment

Info

Publication number
JP3213587B2
JP3213587B2 JP22632498A JP22632498A JP3213587B2 JP 3213587 B2 JP3213587 B2 JP 3213587B2 JP 22632498 A JP22632498 A JP 22632498A JP 22632498 A JP22632498 A JP 22632498A JP 3213587 B2 JP3213587 B2 JP 3213587B2
Authority
JP
Japan
Prior art keywords
auxiliary
bracket
stay
boom
link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP22632498A
Other languages
Japanese (ja)
Other versions
JP2000053378A (en
Inventor
寛 大橋
清一 松村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Construction Crane Co Ltd
Original Assignee
Sumitomo Heavy Industries Construction Crane Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Construction Crane Co Ltd filed Critical Sumitomo Heavy Industries Construction Crane Co Ltd
Priority to JP22632498A priority Critical patent/JP3213587B2/en
Publication of JP2000053378A publication Critical patent/JP2000053378A/en
Application granted granted Critical
Publication of JP3213587B2 publication Critical patent/JP3213587B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は補助クレーン装置に
関するものであり、特に、主作業以外の軽量物の揚げ降
ろし時にブームの先端部に装着される補助クレーン装置
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an auxiliary crane device, and more particularly, to an auxiliary crane device attached to the tip of a boom when lifting or lowering a lightweight object other than the main work.

【0002】[0002]

【従来の技術】図5は一般的なクローラクレーン1を示
したものであり、機体2の前部にブーム3を上下回動可
能に枢着し、該ブーム3の後方にウインチユニット4を
配置するとともに、ライブマスト5及びハイガントリー
6を前後回動可能に設けてある。ウインチユニット4か
ら繰り出したフックロープ7aは、ブーム3の先端部に
配設されたトップシーブ8を経由して、フックシーブ9
に掛け回されており、更に、該フックロープ7aに主フ
ック10が吊り下げられている。
2. Description of the Related Art FIG. 5 shows a general crawler crane 1 in which a boom 3 is pivotably mounted on a front part of a body 2 so as to be vertically rotatable, and a winch unit 4 is arranged behind the boom 3. In addition, the live mast 5 and the high gantry 6 are provided so as to be able to rotate back and forth. The hook rope 7a extended from the winch unit 4 passes through a top sheave 8 provided at a tip end of the boom 3 and a hook sheave 9a.
The main hook 10 is suspended from the hook rope 7a.

【0003】また、主作業以外の軽量物の揚げ降ろし時
には、主フック10とは別にブーム3の先端部に補助ク
レーン装置11を取り付ける場合がある。該補助クレー
ン装置11には補助シーブ12が枢着されており、この
補助シーブ12に補助ロープ7bを掛け回して補助フッ
ク13を吊り下げる。
In addition, when lifting and lowering lightweight objects other than the main work, an auxiliary crane device 11 may be attached to the tip of the boom 3 separately from the main hook 10. An auxiliary sheave 12 is pivotally mounted on the auxiliary crane device 11, and an auxiliary rope 7b is hung around the auxiliary sheave 12 to suspend an auxiliary hook 13.

【0004】図6は従来の補助クレーン装置11を示
し、補助クレーン装置11の基体である補助ジブ14
は、シーブロッド15の両端部を支持する左右のブラケ
ット16,16と、該ブラケット16,16にその一端
部を固設した左右のブラケットアーム17,17と、前
記左右のブラケットアーム17,17間に架設されたラ
チスロッド18,18…と、前記ブラケット16,16
の下部にその一端部が連結される左右のステー19,1
9とからなっている。該ステー19,19の他端部は予
めボルト等にてブーム3の先端部に固定してある。ま
た、前記補助シーブ12はシーブロッド15に枢着され
ている。
FIG. 6 shows a conventional auxiliary crane device 11 and an auxiliary jib 14 which is a base of the auxiliary crane device 11.
Are provided between left and right brackets 16 and 16 for supporting both ends of the sheave rod 15, left and right bracket arms 17 and 17 having one end fixed to the brackets 16 and 16, and between the left and right bracket arms 17 and 17. .., And the brackets 16, 16.
Left and right stays 19, 1 whose one end is connected to the lower part of
It consists of nine. The other ends of the stays 19 are fixed in advance to the tip of the boom 3 with bolts or the like. The auxiliary sheave 12 is pivotally attached to a sheave rod 15.

【0005】而して、前記補助クレーン装置11をブー
ム3の先端部に装着するときは、他のクレーンのフック
20によって補助ジブ14を吊り上げ、前記ブラケット
アーム17の他端部に開穿されたブーム取付孔17bを
ブーム3の先端部の取付孔3aに合致させるとともに、
前記ステー19の一端部に開穿されたブーム取付孔19
aをブラケット16の孔16aに合致させる。斯かる状
態で、これら重合した孔へ夫々ピン21を挿入して補助
ジブ14をブーム3の先端部に固定する。
When the auxiliary crane device 11 is mounted on the end of the boom 3, the auxiliary jib 14 is lifted by the hook 20 of another crane, and is opened at the other end of the bracket arm 17. While matching the boom mounting hole 17b with the mounting hole 3a at the tip of the boom 3,
Boom mounting hole 19 formed in one end of the stay 19
a is matched with the hole 16a of the bracket 16. In such a state, the pin 21 is inserted into each of the overlapped holes to fix the auxiliary jib 14 to the tip of the boom 3.

【0006】[0006]

【発明が解決しようとする課題】前記補助クレーン装置
は、建築作業に応じて頻繁に取り付け及び取り外しが行
われる。該補助クレーン装置は、取り外した後の運搬及
び保管等を考慮して、ブラケットアームとステーが分離
された構造であるため、現場で各部品をピンやボルト等
で連結しなければならず、脱着作業が煩雑であった。ま
た、該補助クレーン装置をブームへ装着する際は、他の
クレーンで補助ジブを吊り下げて、複数の作業者が各部
品を支えながら孔合わせとピンの挿入を行なうため、多
数の労力を必要とし、且つ、脱着作業に危険が伴ってい
た。
The auxiliary crane device is frequently attached and detached according to the construction work. The auxiliary crane device has a structure in which the bracket arm and the stay are separated in consideration of transportation and storage after removal, so each part must be connected at the site with pins and bolts, and The work was complicated. Also, when installing the auxiliary crane device on the boom, a lot of labor is required because the auxiliary jib is hung by another crane and a plurality of workers perform hole alignment and pin insertion while supporting each part. In addition, the desorption operation involves danger.

【0007】そこで、補助クレーン装置の脱着作業を容
易且つ安全に実施できるようにするとともに、取り外し
た状態での補助クレーン装置の運搬及び保管を容易にす
るために解決すべき技術的課題が生じてくるのであり、
本発明は該課題を解決することを目的とする。
Therefore, there is a technical problem to be solved in order to easily and safely carry out the attaching / detaching operation of the auxiliary crane device and to facilitate the transportation and storage of the auxiliary crane device in a detached state. Because
An object of the present invention is to solve the problem.

【0008】[0008]

【課題を解決するための手段】本発明は上記目的を達成
するために提案されたものであり、ブームの先端部に装
着される補助クレーン装置であって、該補助クレーン装
置は基体である補助ジブと、補助ジブの先端部に枢着さ
れた補助シーブと、該補助シーブに掛け回された補助ロ
ープと、該補助ロープに吊り下げられた補助フックとか
らなり、前記補助ジブはシーブロッドの両端部を支持す
る左右のブラケットと、該ブラケットにその一端部を固
設した左右のブラケットアームと、左右のブラケットア
ーム間に架設されたラチスロッドと、前記ブラケットの
下部にその一端部を回転自在に連結した左右のステー
と、前記ブラケットアームと前記ステーとを連結する左
右のリンクとから構成され、前記ブラケットアーム及び
ステーの夫々の他端部にはブーム取付用孔が設けられ、
更に、前記リンクの一端部は倒回可能に枢着され、且
つ、該リンクの他端部はブラケットアーム或いはステー
の何れか一方へ選択的に固定可能とした補助クレーン装
置を提供するものである。
SUMMARY OF THE INVENTION The present invention has been proposed to achieve the above object, and is an auxiliary crane device mounted on the tip of a boom. A jib, an auxiliary sheave pivotally attached to a distal end of the auxiliary jib, an auxiliary rope wrapped around the auxiliary sheave, and an auxiliary hook suspended from the auxiliary rope. Left and right brackets that support the bracket, left and right bracket arms having one end fixed to the bracket, a lattice rod bridged between the left and right bracket arms, and one end rotatably connected to the lower portion of the bracket. Left and right stays, and left and right links connecting the bracket arm and the stay, and the other ends of the bracket arm and the stay, respectively. Boom mounting hole is provided in,
Further, the present invention provides an auxiliary crane device in which one end of the link is pivotally attached so as to be able to turn over, and the other end of the link can be selectively fixed to either the bracket arm or the stay. .

【0009】[0009]

【発明の実施の形態】以下、本発明の一実施の形態を図
1乃至図4に従って詳述する。尚、従来と同一構成部分
には同一符号を付すものとする。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below in detail with reference to FIGS. It is to be noted that the same components as those in the related art are denoted by the same reference numerals.

【0010】図1は本発明の補助クレーン装置31がブ
ーム3の先端部に装着される直前の状態の斜視図であ
り、補助クレーン装置31の基体である補助ジブ34
は、シーブロッド15の両端部を支持する左右のブラケ
ット16,16と、該ブラケット16,16にその一端
部を固設した左右のブラケットアーム17,17と、前
記左右のブラケットアーム17,17間に架設されたラ
チスロッド18,18…と、前記ブラケット16,16
の下部に連結された左右のステー19,19とからな
る。従来型と異なり、予めステー19の一端部の孔19
aとブラケット16の孔16aを合致させてピン結合
し、該ステー19の一端部がブラケット16へ回転自在に連
結されている。
FIG. 1 is a perspective view showing a state immediately before the auxiliary crane device 31 of the present invention is mounted on the tip of the boom 3, and shows an auxiliary jib 34 as a base of the auxiliary crane device 31.
Are provided between left and right brackets 16 and 16 for supporting both ends of the sheave rod 15, left and right bracket arms 17 and 17 having one end fixed to the brackets 16 and 16, and between the left and right bracket arms 17 and 17. .., And the brackets 16, 16.
And left and right stays 19, 19 connected to the lower part of the vehicle. Unlike the conventional type, the hole 19 at one end of the stay 19 is previously set.
The bracket 19 and the hole 16a of the bracket 16 are aligned with each other and are pin-connected. One end of the stay 19 is rotatably connected to the bracket 16.

【0011】ここで、左右夫々のブラケットアーム17
とステー19との間にはリンク40を介装してあり、図
2に示すように、該リンク40の一端部40aはブラケ
ットアーム17に倒回可能に枢着され、該リンク40の
他端部40bはステー19に突設したラグ41にピン2
1にて連結されている。
Here, the left and right bracket arms 17
As shown in FIG. 2, one end 40a of the link 40 is pivotally attached to the bracket arm 17 so that the link 40 can be turned over. The portion 40b is provided with a pin 2 on a lug 41 protruding from the stay 19.
They are connected at 1.

【0012】いま仮に、ピン21を引き抜いてリンクの
他端部40bを引き上げれば、同図の二点鎖線で示すよ
うに、該リンク40がブラケットアーム17側へ倒回
し、ブラケットアーム17に突設したラグ42へ該リン
クの他端部40bをピン21にて固定することができ
る。また、該リンク40の中間部に凸片43を突設し、
この凸片43に係止孔44を開穿しておく。
If the other end 40b of the link is pulled up by pulling out the pin 21, the link 40 is turned down toward the bracket arm 17 as shown by the two-dot chain line in FIG. The other end 40b of the link can be fixed to the provided lug 42 with the pin 21. Also, a projecting piece 43 is protruded at an intermediate portion of the link 40,
A locking hole 44 is formed in the projection 43.

【0013】図示した状態では、リンクの他端部40b
がステー19のラグ41にピン結合されており、ピン2
1の他端には座金22が嵌挿されて、割ピン23にて抜
け止めが施されている。従って、左右夫々のブラケット
アーム17とステー19がリンク40により所定の角度
に固定され、ブラケットアーム17他端部のブーム取付
孔17bとステー19他端部のブーム取付孔19b間の
ピッチが、所定寸法(ブーム3先端部の孔3a,3b間
のピッチ)に設定されて、補助ジブ34がブーム3の先
端部へ装着可能な状態となっている。
In the illustrated state, the other end 40b of the link
Is pin-connected to the lug 41 of the stay 19, and the pin 2
A washer 22 is fitted and inserted into the other end of 1, and is secured by a split pin 23. Therefore, the left and right bracket arms 17 and the stay 19 are fixed at a predetermined angle by the link 40, and the pitch between the boom mounting hole 17b at the other end of the bracket arm 17 and the boom mounting hole 19b at the other end of the stay 19 is predetermined. The dimensions (the pitch between the holes 3a and 3b at the end of the boom 3) are set so that the auxiliary jib 34 can be attached to the end of the boom 3.

【0014】而して、該補助ジブ34を他のクレーンの
フック20によって吊り上げ、ブラケットアーム17他
端部のブーム取付孔17bをブーム3先端部の取付孔3
aへ合致させるとともに、ステー19他端部の孔19b
をブーム3先端部の取付孔3bへ合致させる。前述した
ように、ブラケットアーム17とステー19がリンク4
0によって固定されているため、夫々のブーム取付孔1
7b,19bがブーム先端部の取付孔3a,3bに正確
に一致する。
Thus, the auxiliary jib 34 is lifted by the hook 20 of another crane, and the boom mounting hole 17b at the other end of the bracket arm 17 is connected to the mounting hole 3 at the tip of the boom 3.
a and a hole 19b at the other end of the stay 19
To the mounting hole 3b at the end of the boom 3. As described above, the bracket arm 17 and the stay 19
0, each boom mounting hole 1
7b and 19b exactly match the mounting holes 3a and 3b at the end of the boom.

【0015】この状態で、これら重合した孔へ夫々ピン
21を挿入して補助ジブ34をブーム3の先端部に固定
する。然るのち、図5に示したように、補助シーブ12
に補助ロープ7bを掛け回して補助フック13を吊り下
げれば、補助クレーン装置31が使用可能となる。
In this state, the pin 21 is inserted into each of the overlapped holes to fix the auxiliary jib 34 to the tip of the boom 3. Thereafter, as shown in FIG.
When the auxiliary hook 13 is hung by hanging the auxiliary rope 7b around the auxiliary crane device 31, the auxiliary crane device 31 can be used.

【0016】一方、前記補助クレーン装置31をブーム
3の先端部から取り外す場合は、前述とは逆の操作を行
なう。そして、ブーム3から取り外した補助クレーン装
置31は、運搬及び保管が容易なように補助ジブ34を
折り畳む。先ず、図1及び図2に示したリンク40の他
端部40bからピン21を引き抜き、該リンク40をブ
ラケットアーム17側へ倒回して、ブラケットアーム1
7に突設したラグ42へ該リンクの他端部40bをピン
21にて固定する。
On the other hand, when removing the auxiliary crane device 31 from the tip of the boom 3, the reverse operation is performed. Then, the auxiliary crane device 31 removed from the boom 3 folds the auxiliary jib 34 so that the auxiliary jib 34 is easily transported and stored. First, the pin 21 is pulled out from the other end 40b of the link 40 shown in FIGS. 1 and 2, and the link 40 is turned down to the bracket arm 17 side, so that the bracket arm 1
The other end 40b of the link is fixed to the lug 42 protruding from the pin 7 with the pin 21.

【0017】続いて、前記ステー19をブラケットアー
ム17側へ回動し、図3及び図4に示すように、左右夫
々のブラケットアーム17とステー19とを接近させ
る。このとき、前記リンク40の凸片43とステー19
に突設したラグ41とが重合するので、凸片43の係止
孔44にピン21を挿通して結合することにより、左右
夫々のブラケットアーム17とステー19が接近した状
態で固定される。
Subsequently, the stay 19 is turned to the bracket arm 17 side, and as shown in FIGS. 3 and 4, the left and right bracket arms 17 and the stay 19 are made to approach each other. At this time, the convex piece 43 of the link 40 and the stay 19
Since the lugs 41 projecting from each other overlap, the pins 21 are inserted into the locking holes 44 of the convex pieces 43 and are connected to each other, whereby the left and right bracket arms 17 and the stay 19 are fixed in a state of approaching each other.

【0018】斯くして、補助ジブ34が折り畳まれた状
態で固定され、補助クレーン装置31の運搬時或いは収
納時に於ける容積を最小限にすることができ、且つ、各
部品が連結されたまま格納されるので、一部の部品が紛
失する虞がない。
In this manner, the auxiliary jib 34 is fixed in a folded state, so that the volume of the auxiliary crane device 31 during transportation or storage can be minimized, and each component remains connected. Since they are stored, there is no risk that some parts will be lost.

【0019】尚、本実施の形態では、前記リンク40の
一端部40aがブラケットアーム17に倒回可能に枢着
され、該リンク40の他端部40bはステー19に突設
したラグ41或いはブラケットアーム17に突設したラ
グ42の何れか一方へ選択的に固定可能となっている
が、これとは逆に、リンク40の他端部40bをステー
19に倒回可能に枢着し、該リンク40の一端部40a
をブラケットアーム17或いはステー19の何れか一方
へ選択的に固定できるように形成してもよい。
In this embodiment, one end 40a of the link 40 is pivotally attached to the bracket arm 17 so as to be able to turn over, and the other end 40b of the link 40 is connected to a lug 41 protruding from the stay 19 or a bracket. The lug 42 protruding from the arm 17 can be selectively fixed to one of the lugs 42. On the contrary, the other end 40b of the link 40 is pivotally attached to the stay 19 so as to be able to be turned over. One end 40a of link 40
May be formed so as to be selectively fixed to either the bracket arm 17 or the stay 19.

【0020】而して、本発明は、本発明の精神を逸脱し
ない限り種々の改変を為すことができ、そして、本発明
が該改変されたものに及ぶことは当然である。
Thus, the present invention can be variously modified without departing from the spirit of the present invention, and it goes without saying that the present invention extends to the modified ones.

【0021】[0021]

【発明の効果】本発明は上記一実施の形態にて詳述した
ように、補助ジブのブラケットにブラケットアームを固
設するとともにステーを回転可能に連結し、該ブラケッ
トアームとステーとの間にリンクを介装したので、補助
クレーン装置の組立時には該リンクを引き起こして固定
することにより、ブラケットアーム他端部とステー他端
部に夫々設けられているブーム取付用孔が、ブーム先端
部の取付孔に正確に一致する。
According to the present invention, as described in detail in the above embodiment, the bracket arm is fixedly mounted on the bracket of the auxiliary jib, and the stay is rotatably connected to the bracket. Since the link is interposed, the link is raised and fixed at the time of assembling the auxiliary crane device, so that the boom mounting holes respectively provided at the other end of the bracket arm and the other end of the stay can be attached to the end of the boom. Exactly matches the hole.

【0022】一方、補助クレーン装置の取り外し後は、
前記リンクを倒回して補助ジブを折り畳むため、容積が
小さくなって運搬及び保管が容易となる。しかも、各部
品が連結されたまま格納するため、運搬や保管時に部品
が紛失する虞がない等、正に著大なる効果を奏する発明
である。
On the other hand, after removing the auxiliary crane device,
Since the auxiliary jib is folded by inverting the link, the volume is reduced, and transport and storage are facilitated. In addition, since the components are stored while being connected, there is no possibility that the components will be lost during transportation or storage.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態を示し、ブーム装着時に
組み立てられた補助クレーン装置の斜視図。
FIG. 1 shows an embodiment of the present invention and is a perspective view of an auxiliary crane device assembled when a boom is mounted.

【図2】図1の要部拡大斜視図。FIG. 2 is an enlarged perspective view of a main part of FIG.

【図3】本発明の一実施の形態を示し、折り畳まれた補
助クレーン装置の斜視図。
FIG. 3 is a perspective view of the folded auxiliary crane device according to the embodiment of the present invention.

【図4】図3の要部拡大斜視図。FIG. 4 is an enlarged perspective view of a main part of FIG. 3;

【図5】補助クレーン装置を装着した一般的なクローラ
クレーンの側面図。
FIG. 5 is a side view of a general crawler crane equipped with an auxiliary crane device.

【図6】従来の補助クレーン装置の分解斜視図。FIG. 6 is an exploded perspective view of a conventional auxiliary crane device.

【符号の説明】[Explanation of symbols]

3 ブーム 12 補助シーブ 13 補助フック 15 シーブロッド 16 ブラケット 17 ブラケットアーム 17b ブーム取付孔 18 ラチスロッド 19 ステー 19b ブーム取付孔 21 ピン 31 補助クレーン装置 34 補助ジブ 40 リンク 41,42ラグ 3 Boom 12 Auxiliary Sheave 13 Auxiliary Hook 15 Sheave Rod 16 Bracket 17 Bracket Arm 17b Boom Mounting Hole 18 Lattice Rod 19 Stay 19b Boom Mounting Hole 21 Pin 31 Auxiliary Crane Device 34 Auxiliary Jib 40 Link 41, 42 Lug

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B66C 23/64 - 23/70 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 7 , DB name) B66C 23/64-23/70

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】ブームの先端部に装着される補助クレーン
装置であって、該補助クレーン装置は基体である補助ジ
ブと、補助ジブの先端部に枢着された補助シーブと、該
補助シーブに掛け回された補助ロープと、該補助ロープ
に吊り下げられた補助フックとからなり、前記補助ジブ
はシーブロッドの両端部を支持する左右のブラケット
と、該ブラケットにその一端部を固設した左右のブラケ
ットアームと、左右のブラケットアーム間に架設された
ラチスロッドと、前記ブラケットの下部にその一端部を
回転自在に連結した左右のステーと、前記ブラケットア
ームと前記ステーとを連結する左右のリンクとから構成
され、前記ブラケットアーム及びステーの夫々の他端部
にはブーム取付用孔が設けられ、更に、前記リンクの一
端部は倒回可能に枢着され、且つ、該リンクの他端部は
ブラケットアーム或いはステーの何れか一方へ選択的に
固定可能としたことを特徴とする補助クレーン装置。
1. An auxiliary crane device mounted on a tip of a boom, the auxiliary crane device comprising an auxiliary jib as a base, an auxiliary sheave pivotally attached to a tip of the auxiliary jib, and The auxiliary jib is composed of a suspended auxiliary rope and an auxiliary hook suspended from the auxiliary rope. The auxiliary jib includes left and right brackets supporting both ends of the sheave rod, and left and right brackets having one end fixed to the bracket. A bracket arm, a lattice rod bridged between the left and right bracket arms, a left and right stay rotatably connected to one end of the bracket below, and a left and right link connecting the bracket arm and the stay. The bracket arm and the stay each have a boom mounting hole provided at the other end thereof, and one end of the link is pivotally pivotable. It is, and the other end portion auxiliary crane apparatus being characterized in that a selectively securable to either one of the bracket arms or the stay of the link.
JP22632498A 1998-08-10 1998-08-10 Auxiliary crane equipment Expired - Fee Related JP3213587B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22632498A JP3213587B2 (en) 1998-08-10 1998-08-10 Auxiliary crane equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22632498A JP3213587B2 (en) 1998-08-10 1998-08-10 Auxiliary crane equipment

Publications (2)

Publication Number Publication Date
JP2000053378A JP2000053378A (en) 2000-02-22
JP3213587B2 true JP3213587B2 (en) 2001-10-02

Family

ID=16843412

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22632498A Expired - Fee Related JP3213587B2 (en) 1998-08-10 1998-08-10 Auxiliary crane equipment

Country Status (1)

Country Link
JP (1) JP3213587B2 (en)

Also Published As

Publication number Publication date
JP2000053378A (en) 2000-02-22

Similar Documents

Publication Publication Date Title
US5725112A (en) Crane
WO2012159385A1 (en) Crane, jib structure thereof, and jib lifting method
US20140083964A1 (en) Crane and crane assembling method
GB1570155A (en) Fly and jib assembly for a crane
JP4835209B2 (en) Crane winch removal method and upper swing body
JP3805033B2 (en) Derrick device for exchanging arm of power transmission tower and arm replacement method using the same
JP2004075294A (en) Jib strut self-assembling method for tower crane
JP2006199484A (en) Strut of crane
JP3213587B2 (en) Auxiliary crane equipment
JP4777821B2 (en) Tower crane
JP3009375B2 (en) Jib attachment / detachment device for crane beam
JPH09278368A (en) A-frame supporting device and a-frame fitting/removing method
JP4220051B2 (en) Working vehicle folding guard
JPH0743110Y2 (en) Tower crane
JP2781637B2 (en) Jib support rod mounting device for crane
JP3122068B2 (en) Backstay positioning device for crane high mast
JP2547044B2 (en) Jib loading and unloading method and device in crane
EP0617694A4 (en) A crane.
JP2542385Y2 (en) Counterweight attachment / detachment equipment for construction work machines
JP2001310895A (en) Counter weight detaching/attaching device for crawler crane
JP2004256240A (en) Crane
WO2023074493A1 (en) Crane attachment
JP2570505Y2 (en) Crane with multi-stage jib
JP2019199310A (en) Specification changing method of crane and specification-changeable crane
JPH07187574A (en) Jib device of crane

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100719

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110719

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110719

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120719

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120719

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130719

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees