JP3153468B2 - Construction method of concrete structure - Google Patents

Construction method of concrete structure

Info

Publication number
JP3153468B2
JP3153468B2 JP12157096A JP12157096A JP3153468B2 JP 3153468 B2 JP3153468 B2 JP 3153468B2 JP 12157096 A JP12157096 A JP 12157096A JP 12157096 A JP12157096 A JP 12157096A JP 3153468 B2 JP3153468 B2 JP 3153468B2
Authority
JP
Japan
Prior art keywords
concrete
reinforcing bar
shear
nut
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP12157096A
Other languages
Japanese (ja)
Other versions
JPH09302690A (en
Inventor
正道 安永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP12157096A priority Critical patent/JP3153468B2/en
Publication of JPH09302690A publication Critical patent/JPH09302690A/en
Application granted granted Critical
Publication of JP3153468B2 publication Critical patent/JP3153468B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、地下タンクの底版
等のコンクリート構造物の構築方法およびコンクリート
構造物に関するものである。
The present invention relates to a method for constructing a concrete structure such as a bottom plate of an underground tank and a concrete structure.

【0002】[0002]

【従来の技術】LNG等を貯蔵する地下タンク等の大型
地下構造物は、地下50mから60m程度の深さに直径
70m程度の規模で構築される。地下タンクの底版は支
保工なしで、直径70mあり、大きな水圧が作用するの
で、厚さ10m程度の大型鉄筋コンクリート製スラブと
なっている。
2. Description of the Related Art A large underground structure such as an underground tank for storing LNG or the like is constructed at a depth of about 50 m to about 60 m and a diameter of about 70 m. The bottom plate of the underground tank has a diameter of 70 m without any support and a large water pressure acts, so it is a large reinforced concrete slab with a thickness of about 10 m.

【0003】図4は、このような底版101の概略構成
図である。図4において、103は下側鉄筋、105は
中段鉄筋、107は上側鉄筋、109はせん断補強鉄
筋、111は1回目コンクリート、113は2回目コン
クリート、115は1回目コンクリート111と2回目
コンクリート113との境界(継目)である。
FIG. 4 is a schematic structural view of such a bottom plate 101. As shown in FIG. In FIG. 4, reference numeral 103 denotes a lower reinforcing bar, 105 denotes a middle reinforcing bar, 107 denotes an upper reinforcing bar, 109 denotes a shear reinforcing bar, 111 denotes a first concrete, 113 denotes a second concrete, and 115 denotes a first concrete 111 and a second concrete 113. Is the boundary (seam).

【0004】底版101には下側からの大きな水圧に抵
抗できるように鉄筋が配置されるので、上側鉄筋107
は51mmの太径鉄筋が6段から7段配置される。この上
側鉄筋107の重量が大きいので、この場合には高さ1
0mの底版は1回目コンクリート111を7m打設し、
図6、7に示すように1回目コンクリートの上面に鉄筋
の受け架台119、121を設け、この受け架台11
9、121上に上側鉄筋を配置し、2回目コンクリート
113を打設する。
[0004] Reinforcing bars are arranged on the bottom slab 101 so as to resist large water pressure from the lower side.
Has a large diameter rebar of 51 mm arranged in 6 to 7 steps. Since the weight of the upper reinforcing bar 107 is large, the height is 1 in this case.
For the bottom slab of 0m, the first time concrete 111 is cast 7m,
As shown in FIGS. 6 and 7, on the upper surface of the first concrete, support bars 119 and 121 for reinforcing bars are provided.
9 and 121, the upper rebar is arranged, and the second concrete 113 is poured.

【0005】図5は、1回目コンクリート111を打設
する際の説明図である。117は作業通路兼鉄筋受け架
台である。作業通路兼鉄筋受け架台117は高さが約2
m毎に作業通路が設けられる。中段鉄筋105は1回目
コンクリート111の上部のひび割れ防止のために配置
される。
FIG. 5 is an explanatory view when the first concrete 111 is poured. Reference numeral 117 denotes a work passage / rebar support cradle. The height of the work passage / rebar support stand 117 is about 2
A work passage is provided for each m. The middle reinforcing bar 105 is arranged to prevent the upper portion of the first concrete 111 from cracking.

【0006】すなわち、下側鉄筋103、せん断補強鉄
筋109を配置した後、作業通路兼鉄筋受け架台117
を設置し、この作業通路兼鉄筋受け架台117を支えと
して中段鉄筋105を配置する。そして、作業通路兼鉄
筋受け架台117内を作業員等が通行し、1回目コンク
リート111を打設する。
That is, after the lower reinforcing bar 103 and the shear reinforcing bar 109 are arranged, the work passage and the reinforcing bar support 117 are arranged.
And the middle rebar 105 is arranged with the work passage / rebar support stand 117 as a support. Then, a worker or the like passes through the inside of the work passage / rebar receiving gantry 117 and places the first concrete 111.

【0007】図6は、上側鉄筋107を配置する場合の
説明図であり、図7は、図6のB方向からの矢視図であ
る。1回目コンクリート111の打設が完了した後、1
回目コンクリート111の上面に形鋼の受け架台11
9、121を設け、受け架台121上に6段から7段の
上側鉄筋107を配置し、2回目コンクリート113を
打設する。
FIG. 6 is an explanatory view when the upper reinforcing bar 107 is arranged, and FIG. 7 is a view as seen from the direction B in FIG. After the first placement of concrete 111, 1
On the upper surface of the first concrete 111,
9 and 121 are provided, and upper and lower reinforcing bars 107 of 6 to 7 steps are arranged on the receiving stand 121, and second concrete 113 is poured.

【0008】[0008]

【発明が解決しようとする課題】しかしながら、従来の
方法では、せん断補強鉄筋109と受け架台117、1
19が林立していたため、作業性が非常に悪いという問
題があった。また、受け架台117、119としてかな
りの量の鋼材を使用していたのでコストアップを招いて
いた。
However, according to the conventional method, the shear reinforcing bar 109 and the pedestal 117, 1
There was a problem that workability was very poor because 19 were established. Further, since a considerable amount of steel material is used for the receiving stands 117 and 119, the cost is increased.

【0009】本発明は、このような問題に鑑みてなされ
たもので、その目的とするところは、作業性が良好で、
コストダウンを図ることのできるコンクリート構造物の
構築方法を提供することにある。
[0009] The present invention has been made in view of such a problem, and an object thereof is to provide good workability.
An object of the present invention is to provide a method for constructing a concrete structure capable of reducing costs.

【0010】[0010]

【課題を解決するための手段】前述した目的を達成する
ために本発明は、コンクリートを2回に分けて打設し
て、スラブ状のコンクリート構造物を構築するコンクリ
ート構造物の構築方法であって、1回目のコンクリート
を打設する部分では、下側鉄筋を配置し、所定間隔で複
数のせん断補強鉄筋を配置し、前記せん断補強鉄筋の所
定の位置にナットを設け、前記ナットにL形鋼を取り付
け、前記L形鋼の間に作業用通路を配置し、上部に中段
鉄筋を配置し、1回目のコンクリートを打設することを
特徴とするコンクリート構造物の構築方法であり、第2
の発明は、コンクリートを2回に分けて打設して、スラ
ブ状のコンクリート構造物を構築するコンクリート構造
物の構築方法であって、下側鉄筋を配置し、所定間隔で
複数のせん断補強鉄筋を配置し、1回目のコンクリート
を打設し、2回目のコンクリートを打設する部分では、
前記1回目のコンクリートの上部に突出した複数の前記
せん断補強鉄筋の所定の位置にナットを設け、前記ナッ
ト間に鉄筋受け金物を複数のせん断補強鉄筋で支持され
るように設け、前記鉄筋受け金物上に上側鉄筋を配置
し、2回目のコンクリートを打設することを特徴とする
コンクリート構造物の構築方法である。
SUMMARY OF THE INVENTION In order to achieve the above-mentioned object, the present invention relates to a method of constructing a concrete structure for constructing a slab-like concrete structure by laying concrete in two parts. In the part where the first concrete is poured, a lower reinforcing bar is arranged, a plurality of shear reinforcing bars are arranged at predetermined intervals, a nut is provided at a predetermined position of the shear reinforcing bar, and an L-shaped nut is provided on the nut. A method of constructing a concrete structure, comprising: attaching steel, arranging a work passage between the L-shaped steels, arranging a middle reinforcing bar at an upper portion, and placing a first concrete.
The invention of the invention is a method of constructing a concrete structure in which concrete is cast in two parts to construct a slab-like concrete structure, comprising arranging a lower reinforcing bar and a plurality of shear reinforcing bars at predetermined intervals. Is placed, the first concrete is poured, and in the part where the second concrete is poured,
A nut is provided at a predetermined position of the plurality of shear reinforcing bars protruding above the first concrete, and a reinforcing bar receiving member is provided between the nuts so as to be supported by the plurality of shear reinforcing bars. This is a method for constructing a concrete structure, characterized by arranging an upper reinforcing bar on top and placing concrete for the second time.

【0011】[0011]

【発明の実施の形態】以下、図面に基づいて本発明の実
施の形態を詳細に説明する。本実施の形態においても図
4に示すような底版を構築する。図1は、このような底
版1の1回目コンクリート15を打設する際の説明図で
ある。本実施の形態では、せん断補強鉄筋5を利用し
て、1回目コンクリート15部に配置される鉄筋受けお
よび作業通路用架台および2回目コンクリート31部の
鉄筋の受け架台を組み立てるものである。
Embodiments of the present invention will be described below in detail with reference to the drawings. Also in the present embodiment, a bottom plate as shown in FIG. 4 is constructed. FIG. 1 is an explanatory view when the first concrete 15 of the bottom slab 1 is poured. In the present embodiment, a reinforcing bar receiver and a work passage pedestal arranged in 15 parts of the first concrete and a pedestal of a reinforcing steel bar of 31 parts of the second concrete are assembled by using the shear reinforcement 5.

【0012】図1において、3は下側鉄筋、5はせん断
補強鉄筋、7はナット、9はL形鋼、11は中段鉄筋
で、せん断補強鉄筋5はネジ鉄筋であり、1mから2m
間隔で配置される。
In FIG. 1, 3 is a lower reinforcing bar, 5 is a shear reinforcing bar, 7 is a nut, 9 is an L-shaped steel, 11 is a middle reinforcing bar, and a shear reinforcing bar 5 is a screw reinforcing bar.
They are arranged at intervals.

【0013】下側鉄筋3を配置し、1mから2m間隔で
せん断補強鉄筋5を配置する。せん断補強鉄筋5はネジ
鉄筋であるので、任意の位置にナット7をねじ込める。
このナット7にL形鋼9を溶接等で取り付ける。そし
て、L形鋼9の間に作業通路13を配置し、上部ではL
形鋼9上に中段鉄筋11を配置する。そして、1回目コ
ンクリート15を打設する。17は1回目コンクリート
と2回目コンクリートの境界(継目)を示し、図1の場
合では、境界17は1回目コンクリート15の上面とな
っている。
The lower reinforcing bar 3 is arranged, and the shear reinforcing bars 5 are arranged at intervals of 1 m to 2 m. Since the shear reinforcement 5 is a screw reinforcement, the nut 7 can be screwed into an arbitrary position.
An L-shaped steel 9 is attached to the nut 7 by welding or the like. Then, the work passage 13 is arranged between the L-shaped steel members 9, and L
The middle rebar 11 is arranged on the section steel 9. Then, the first concrete 15 is cast. Reference numeral 17 denotes a boundary (seam) between the first concrete and the second concrete. In the case of FIG. 1, the boundary 17 is the upper surface of the first concrete 15.

【0014】図2は、上側鉄筋29を配置する際の説明
図であり、図3は、図2のA方向からの矢視図である。
1回目コンクリート15の打設が完了した場合、1回目
コンクリート15の境界(上面)17からはせん断補強
鉄筋5が突出している。このせん断補強鉄筋5にナット
21をねじ込ませ、ナット間に補強鋼材23、25を取
り付け、更に上部のナット21にL形の鉄筋受け金物2
7を取り付ける。そして、鉄筋受け金物27上に6段か
ら7段の上側鉄筋29を配置する。さらに、2回目コン
クリート31を打設して底版1を構築する。
FIG. 2 is an explanatory view when the upper rebar 29 is arranged, and FIG. 3 is a view as seen from the direction A in FIG.
When the first concrete 15 has been placed, the shear reinforcement 5 protrudes from the boundary (upper surface) 17 of the first concrete 15. A nut 21 is screwed into the shear reinforcing steel bar 5 and reinforcing steel materials 23 and 25 are attached between the nuts.
7 is attached. Then, the upper rebars 29 of six to seven steps are arranged on the rebar receiving hardware 27. Furthermore, the second concrete 31 is cast to construct the bottom slab 1.

【0015】このように、本実施の形態では、せん断補
強鉄筋5を作業通路の支柱、中段鉄筋11および上側鉄
筋29の受け架台として利用するので、従来のように別
途作業通路兼鉄筋受け架台117や受け架台119を設
ける必要がない。すなわち、従来はせん断補強鉄筋と受
け架台が林立していたので作業性が悪かったが、本実施
の形態ではせん断補強鉄筋5を受け架台として兼用する
ことにより、従来の受け架台117、119が不要とな
り、作業性も良好となる。また、受け架台117、11
9用の仮設鋼材の量を低減でき、コストダウンを図るこ
とができる。
As described above, in this embodiment, since the shear reinforcing reinforcing bar 5 is used as a support of the working passage, the middle reinforcing bar 11 and the receiving stand of the upper reinforcing bar 29, the working passage and reinforcing bar receiving stand 117 are separately provided as in the related art. It is not necessary to provide the receiving stand 119. That is, the workability was poor because the shear reinforcement bars and the receiving stand were standing in the past, but in the present embodiment, the conventional receiving stands 117 and 119 are unnecessary by using the shear reinforcing bars 5 as the receiving stand. And workability is also improved. In addition, receiving stands 117, 11
The number of temporary steel materials for No. 9 can be reduced, and the cost can be reduced.

【0016】[0016]

【発明の効果】以上、詳細に説明したように本発明によ
れば、作業性が良好で、コストダウンを図ることのでき
るコンクリート構造物の構築方法を提供することができ
る。
As described in detail above, according to the present invention, it is possible to provide a method of constructing a concrete structure which has good workability and can reduce the cost.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 1回目コンクリート15を打設する際の説明
FIG. 1 is an explanatory view when the first concrete 15 is poured.

【図2】 上側鉄筋29を設置する際の説明図FIG. 2 is an explanatory view when the upper reinforcing bar 29 is installed.

【図3】 図2のA方向からの矢視図FIG. 3 is a view as seen from an arrow A in FIG. 2;

【図4】 底版101の概略構成を示す図FIG. 4 is a diagram showing a schematic configuration of a bottom plate 101

【図5】 1回目コンクリート111を打設する際の説
明図
FIG. 5 is an explanatory view when the first concrete 111 is poured.

【図6】 上側鉄筋107を設置する際の説明図FIG. 6 is an explanatory view when the upper reinforcing bar 107 is installed.

【図7】 図6のB方向からの矢視図FIG. 7 is an arrow view from the direction B in FIG. 6;

【符号の説明】[Explanation of symbols]

1………底版 3………下側鉄筋 5………せん断補強鉄筋 7………ナット 11………中段鉄筋 15………1回目コンクリート 21………ナット 27………鉄筋受け金物 29………上側鉄筋 31………2回目コンクリート 1 Bottom slab 3 Lower reinforcing bar 5 Shear reinforcing bar 7 Nut 11 Middle tier 15 First concrete 21 Nut 27 Metal fitting 29 ……… upper bar 31 …… the second concrete

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02D 29/045 - 29/055 E04G 21/12 E04C 5/00 - 5/20 E02D 27/38 E04H 7/18 ──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int.Cl. 7 , DB name) E02D 29/045-29/055 E04G 21/12 E04C 5/00-5/20 E02D 27/38 E04H 7 / 18

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 コンクリートを2回に分けて打設して、
スラブ状のコンクリート構造物を構築するコンクリート
構造物の構築方法であって、 1回目のコンクリートを打設する部分では、下側鉄筋を
配置し、所定間隔で複数のせん断補強鉄筋を配置し、 前記せん断補強鉄筋の所定の位置にナットを設け、前記
ナットにL形鋼を取り付け、前記L形鋼の間に作業用通
路を配置し、上部に中段鉄筋を配置し、 1回目のコンクリートを打設することを特徴とするコン
クリート構造物の構築方法。
1. Concrete is poured in two separate times,
Concrete for building slab-like concrete structures
In the method of constructing a structure, the part where the first concrete is cast
Arrange, arrange a plurality of shear reinforcement at predetermined intervals, provide a nut at a predetermined position of the shear reinforcement,
Attach the L-shaped steel to the nut and pass the work between the L-shaped steels.
A road is laid, a middle reinforcing bar is laid at the top, and the first concrete is cast.
How to build a cleat structure.
【請求項2】 コンクリートを2回に分けて打設して、
スラブ状のコンクリート構造物を構築するコンクリート
構造物の構築方法であって、 下側鉄筋を配置し、所定間隔で複数のせん断補強鉄筋を
配置し、1回目のコンクリートを打設し、 2回目のコンクリートを打設する部分では、前記1回目
のコンクリートの上部に突出した複数の前記せん断補強
鉄筋の所定の位置にナットを設け、前記ナット間に鉄筋
受け金物を複数のせん断補強鉄筋で支持されるように設
け、前記鉄筋受け金物上に上側鉄筋を配置し、 2回目のコンクリートを打設することを特徴とするコン
クリート構造物の構築方法。
2. Casting concrete in two parts
Concrete for building slab-like concrete structures
A method of constructing a structure, comprising arranging a lower reinforcing bar and forming a plurality of shear reinforcing bars at predetermined intervals.
In the part where the concrete is placed and the first concrete is poured,
A plurality of the above-mentioned shear reinforcement protruding above the concrete
A nut is provided at a predetermined position on the reinforcing bar, and a reinforcing bar is provided between the nuts.
Set the receiving hardware so that it is supported by multiple shear reinforcing bars.
And a second concrete is placed by placing an upper rebar on the rebar receiving hardware.
How to build a cleat structure.
【請求項3】 前記2回目のコンクリートを打設する部
分では、前記複数のせん断補強鉄筋の間に、補強材が設
けられることを特徴とする請求項2記載のコンクリート
構造物の構築方法。
3. A part for placing concrete for the second time
In other words, a reinforcing material is provided between the plurality of reinforcing steel bars.
3. The concrete according to claim 2, wherein
How to build the structure.
JP12157096A 1996-05-16 1996-05-16 Construction method of concrete structure Expired - Fee Related JP3153468B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12157096A JP3153468B2 (en) 1996-05-16 1996-05-16 Construction method of concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12157096A JP3153468B2 (en) 1996-05-16 1996-05-16 Construction method of concrete structure

Publications (2)

Publication Number Publication Date
JPH09302690A JPH09302690A (en) 1997-11-25
JP3153468B2 true JP3153468B2 (en) 2001-04-09

Family

ID=14814512

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12157096A Expired - Fee Related JP3153468B2 (en) 1996-05-16 1996-05-16 Construction method of concrete structure

Country Status (1)

Country Link
JP (1) JP3153468B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102421893B1 (en) * 2015-10-27 2022-07-18 엘지전자 주식회사 Energy storage system
KR102463396B1 (en) 2015-10-23 2022-11-04 엘지전자 주식회사 Energy storage system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4524755B2 (en) * 2005-09-01 2010-08-18 清水建設株式会社 Side wall construction method for underground tank

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102463396B1 (en) 2015-10-23 2022-11-04 엘지전자 주식회사 Energy storage system
KR102421893B1 (en) * 2015-10-27 2022-07-18 엘지전자 주식회사 Energy storage system

Also Published As

Publication number Publication date
JPH09302690A (en) 1997-11-25

Similar Documents

Publication Publication Date Title
US5588272A (en) Reinforced monolithic concrete wall structure for spanning spaced-apart footings and the like
WO2002066757A9 (en) A load bearing building panel
US3842558A (en) Wall attachment system
WO1995012034A1 (en) A method of constructing a roofed structure
JP3153468B2 (en) Construction method of concrete structure
JPH08189042A (en) Structure of h-section continuous footing beam for tying in building member
JP2736912B2 (en) Wall protection method
JP2885023B2 (en) Construction method of reinforced concrete slab which does not need support under slab and temporary beam generating peeling
JP2002097716A (en) Short support slab supporting structure
JPH0881918A (en) Pipe and construction method thereof
JPS6030819B2 (en) building substructure
JPH06346471A (en) Construction of reinforced concrete retaining wall by use of large size precast slab
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JP3229231B2 (en) Building seismic reinforcement structure
JPH06341186A (en) Flat slab construction method using no timbering
JP2811211B2 (en) Flat slab construction method
JP3249076B2 (en) Building floor and foundation structure
JPH0416574B2 (en)
JP2536250Y2 (en) Steel foundation beam
JP3312945B2 (en) Construction method of concrete structure
JPH05125740A (en) Working of exterior retaining wall
JPS6245858A (en) Construction of upstairs
JP3044143B2 (en) How to build a balcony
JPS5833662A (en) Constructing of slab structure
JPH05248020A (en) Execution method for bearing floor