JP3142741B2 - Heavy equipment - Google Patents

Heavy equipment

Info

Publication number
JP3142741B2
JP3142741B2 JP07111645A JP11164595A JP3142741B2 JP 3142741 B2 JP3142741 B2 JP 3142741B2 JP 07111645 A JP07111645 A JP 07111645A JP 11164595 A JP11164595 A JP 11164595A JP 3142741 B2 JP3142741 B2 JP 3142741B2
Authority
JP
Japan
Prior art keywords
column
pair
lifting
pulley
winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP07111645A
Other languages
Japanese (ja)
Other versions
JPH08301590A (en
Inventor
真也 品田
勝二 仁藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Original Assignee
Meidensha Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp filed Critical Meidensha Corp
Priority to JP07111645A priority Critical patent/JP3142741B2/en
Publication of JPH08301590A publication Critical patent/JPH08301590A/en
Application granted granted Critical
Publication of JP3142741B2 publication Critical patent/JP3142741B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、配電盤など重量物の据
付,撤去作業に使用する重量物移動装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a heavy object moving device used for installing and removing heavy objects such as a switchboard.

【0002】[0002]

【従来の技術】主として、工事現場における配電盤の据
え付け機械として使用するものに、実願平4−2779
8号「重量物移動装置」がある。これは、スライド結合
構造の下柱と上柱を手巻ウインチにより伸縮させるよう
にした一対の支柱と、スライド結合構造の外筒と内筒を
ねじ軸などからなる送り機構のハンドルを回して伸縮さ
せるようにしたはりと、一対のハンドキャッチパレット
とで構成し、ハンドキャッチパレットの積荷部を切断し
た部分に支柱の下部を結合するようにしたものである。
2. Description of the Related Art Japanese Unexamined Patent Publication No. Hei.
There is No. 8 "Heavy load moving device". This consists of a pair of columns that allow the lower and upper columns of the slide coupling structure to expand and contract with a hand-wound winch, and the outer cylinder and inner cylinder of the slide coupling structure rotate by turning the handle of a feed mechanism consisting of a screw shaft, etc. In this configuration, a lower portion of the support is connected to a portion of the hand catch pallet where the loading portion is cut, which is constituted by a beam to be made and a pair of hand catch pallets.

【0003】使用時に現場へ搬入する際には、支柱及び
はりを最も短くなるように縮め、搬入後に配電盤(重量
物)の大きさに対応するように支柱及びはりの長さを調
整する。そして、吊金具等を介してはりに配電盤を結合
し、その後に昇降手段により支柱と共に配電盤を吊り上
げ、配電盤ごと重量物移動装置を目的地まで移動させ
る。その後は前記と逆の手順で配電盤を降ろし、吊金具
等を取り外す。
[0003] When transported to the site during use, the columns and beams are contracted so as to be the shortest, and the lengths of the columns and beams are adjusted to correspond to the size of the switchboard (heavy load) after the transport. Then, the switchboard is connected to the beam via a hanging bracket or the like, and then the switchboard is lifted together with the support column by the elevating means, and the heavy object moving device together with the switchboard is moved to the destination. After that, the switchboard is lowered in the reverse procedure, and the hanging fittings and the like are removed.

【0004】[0004]

【発明が解決しようとする課題】ところが、移動装置自
体の重量が大きいため、運搬に当たって物上げ機械付き
の荷物車または別の物上げ設備が必要となる。たとえ、
分解したとしても、各部材の重量も大きく、100kg
以上のものがあるため、分解,組立に際して別の物上げ
設備や運搬機を必要とする。また、吊り荷の昇降は、油
圧ジャッキを使用せずに手巻ウインチにより柱を上下さ
せることで行うことが多いため、一対の支柱の高さが合
わず、柱が左右に傾く危険性がある。更に、支柱の外側
にハンドキャッチパレットが取り付けられているので、
広い作業スペースが必要となり、配電盤と壁の間隔が狭
い場合(例えば、1m以下の場合)には、使用不可能と
なる。
However, due to the heavy weight of the moving device itself, a luggage vehicle with a hoisting machine or another hoisting equipment is required for transportation. for example,
Even if disassembled, the weight of each member is large, 100 kg
Because of the above, separate lifting equipment and transport equipment are required for disassembly and assembly. In addition, the lifting of the suspended load is often performed by moving the column up and down by a hand-wound winch without using a hydraulic jack. Therefore, there is a risk that the height of the pair of columns does not match, and the column tilts left and right. . Furthermore, since a hand catch pallet is attached to the outside of the support,
A large work space is required, and when the distance between the switchboard and the wall is small (for example, 1 m or less), it cannot be used.

【0005】そこで本発明は、上記の課題を解決し、組
立,解体及び運搬が容易で、かつ重量物の移動を適確に
行うことができる重量物移動装置を提供することを目的
とする。
SUMMARY OF THE INVENTION It is an object of the present invention to solve the above-mentioned problems and to provide a heavy-weight moving apparatus which can be easily assembled, disassembled and transported, and can move heavy objects accurately.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
の本発明は、上部柱材と下部柱材をスライド結合構造と
して伸縮可能とした一対の支柱と、一対の支柱の上端間
を連結する吊りビームと、支柱を立設する一対のキャス
タ付き脚部と、上部柱材をスライドさせるために支柱に
付設した一対の柱昇降用手巻ウインチと、支柱に付設し
た一対の荷吊り用手巻ウインチと、荷吊り用手巻ウイン
チのワイヤを案内するために支柱及び吊りビームに取り
付けられる複数の滑車と、脚部に昇降自在に設置した一
対の自立用ベースと、支柱の下部柱材に着脱自在に取り
付けられる一対のビーム吊り上げ用滑車付きアームと、
一対の脚部間を連結する仮設用アングルとで構成し、荷
吊り用手巻ウインチをそのワイヤの掛け替えにより吊り
ビーム取付用として兼用するようにしたこと、柱昇降用
手巻ウインチにより支柱の高さを加減し、ロックピンに
より所要の高さに固定するようにしたこと、並びに吊り
ビームの柱取付穴ピッチと滑車取付穴ピッチを合わせ
て、吊りビームの取付位置及び滑車の取付位置を任意に
設定できるようにしたことを特徴とする。
SUMMARY OF THE INVENTION In order to achieve the above object, according to the present invention, there is provided a pair of columns which can be extended and contracted as an upper column member and a lower column member as a slide connection structure, and are connected between upper ends of the pair of columns. A hanging beam, a pair of legs with casters for erecting a column, a pair of hand-winding winches for column raising and lowering attached to the column for sliding the upper column material, and a pair of manual winding for load lifting attached to the column. A plurality of pulleys attached to the support and the suspension beam to guide the wire of the winch and the hand-wound winch for lifting the load, a pair of free-standing bases installed on the legs so as to be able to move up and down, and detachable to the lower column of the support A pair of arms with pulleys for beam lifting that can be freely mounted,
It consists of a temporary angle connecting the pair of legs, and the hand-winding winch for loading is also used for mounting the hanging beam by replacing the wire. The height of the suspension beam and the pitch of the pulley mounting holes, and the mounting position of the suspension beam and the pulley It is characterized in that it can be set.

【0007】[0007]

【作用】現場への搬入は解体した状態で行われる。この
状態では、支柱は、上部柱材と下部柱材に分離されてお
り、柱昇降用のワイヤは上部柱材に取り付けられてい
る。組み立ては、脚部への下部柱材の取り付け、上部柱
材の下部柱材への挿入の順序で行われ、自立用ベースを
キャスタより下降させた状態で支柱の立て起こしを行い
自立させる。次に、仮設用アングルを一対の脚部間に掛
け渡して取付用ボルトで固定する。下部柱材の上端部に
滑車付きアームを取り付け、荷吊り用ウインチのワイヤ
を滑車に掛けて吊りビームを支柱上端まで巻き上げる。
吊りビームを柱上端に固定した後、仮設用部材を取り外
し、荷吊り用滑車を所要の位置に取り付けて、ワイヤを
掛け替える。この後、柱昇降用ウインチにより両支柱が
同じ高さとなるように上部柱材を上昇させ、所要の高さ
の所でロックピンを挿入して固定する。そして、自立用
ベースを上昇させてキャスタで支持するようにすれば、
準備完了となる。即ち、一種の移動式門形クレーンとし
て重量物の上げ下げ,移動を行うことになる。
[Function] Carrying in to the site is performed in a disassembled state. In this state, the column is separated into an upper column member and a lower column member, and the wire for column lifting is attached to the upper column member. The assembling is performed in the order of attaching the lower pillars to the legs and inserting the upper pillars into the lower pillars, and erects the pillars with the self-supporting base lowered from the casters to stand up. Next, the temporary angle is hung between the pair of legs and fixed with mounting bolts. Attach the pulley arm to the upper end of the lower pillar, hook the wire of the load winch on the pulley, and wind the suspension beam up to the upper end of the pillar.
After the suspension beam is fixed to the upper end of the pillar, the temporary member is removed, the load pulley is attached at a required position, and the wire is replaced. Thereafter, the upper column material is raised by the column lifting winch so that both columns have the same height, and a lock pin is inserted and fixed at a required height. And if you raise the self-supporting base and support it with casters,
Ready. In other words, heavy loads are lifted, lowered, and moved as a kind of mobile portal crane.

【0008】[0008]

【実施例】以下、本発明を図面に示す実施例に基づいて
詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail based on embodiments shown in the drawings.

【0009】本発明による重量物移動装置の実施例を図
1〜図19に示す。図中、1は伸縮可能な一対の支柱、
2は支柱1を立設する一対の脚部、3は一対の支柱1の
上端間を連結するI形の吊りビーム、4は荷吊り用手巻
ウインチ、5は脚部2に昇降自在に設置した自立用ベー
ス、6A及び6Bは荷吊り用滑車である。滑車6Aは吊
りビーム3に、滑車6Bは支柱1に取り付ける。
An embodiment of the heavy object moving device according to the present invention is shown in FIGS. In the figure, 1 is a pair of extendable columns,
2 is a pair of legs for erecting the column 1, 3 is an I-shaped hanging beam connecting the upper ends of the pair of columns 1, 4 is a hand-wound winch for hanging a load, and 5 is a vertically movable leg mounted on the leg 2. The self-standing bases 6A and 6B are load sheaves. The pulley 6A is attached to the suspension beam 3, and the pulley 6B is attached to the column 1.

【0010】支柱1は、図1〜図4に示すように角筒状
の下部柱材11内に角筒状の上部柱材12を挿入し、柱
昇降用手巻ウインチ13によりこの上部柱材12を上下
動させる、いわゆるスライド結合による伸縮構造として
いる。下部柱材11の下端には取付板14を固定し、そ
の内面(上面)に内部角パイプ15を立設している。内
部角パイプ15は、下部柱材11より少し短く、かつ上
部柱材12より細いものを用い、上端部に上部滑車16
Aを、下端部に下部滑車16Bをそれぞれ配設してい
る。両滑車16A,16Bは、柱昇降用手巻ウインチ1
3のワイヤ13aを案内するためのものであり、大半は
内部角パイプ15内に位置している。下部柱材11及び
内部角パイプ15の側面には、ワイヤ13aを通すため
の開口部11a,15a,15bを形成するとともに、
下部柱材11の内側面に上部柱材12の挿入下限となる
ストッパ11bを設けている。ウインチ13は、下部柱
材11の側面に設けた取付台17A上に設置し、一端を
上部柱材12の下端に固定されて滑車16A,16Bに
掛けられたワイヤ13aを、そのハンドル13bの操作
で巻胴13cに巻取るようにしている。下部柱材11に
は、更にウインチ用取付台17Bを設け、その上に荷吊
り用手巻ウインチ4を設置するとともに、その上方の外
側面に高さ設定用の穴11cを設けている。また、上部
柱材12の上端には、吊りビーム3を取り付けるための
取付板18を固定し、その少し下方に荷吊り用滑車6B
を取り付けている。上部柱材12の外側面には、一定の
ピッチで高さ調整穴12aを設け、下部柱材11の高さ
設定用の穴11cからロックピン(後述)を挿入して支
柱1の高さ、つまり吊りビーム3の高さを設定値に固定
するようにしている。
As shown in FIGS. 1 to 4, the column 1 has a rectangular column-shaped upper column member 12 inserted into a rectangular column-shaped lower column member 11. 12 is moved up and down, that is, a so-called slide structure is used. A mounting plate 14 is fixed to the lower end of the lower pillar 11, and an internal square pipe 15 is erected on the inner surface (upper surface) thereof. The inner square pipe 15 is slightly shorter than the lower column member 11 and thinner than the upper column member 12, and has an upper pulley 16 at the upper end.
A and a lower pulley 16B at the lower end. Both pulleys 16A and 16B are hand-wound winches 1 for column lifting.
3 for guiding the third wire 13 a, and most of them are located inside the internal square pipe 15. Openings 11a, 15a, 15b for passing the wire 13a are formed on the side surfaces of the lower pillar 11 and the internal square pipe 15,
A stopper 11b serving as a lower limit of insertion of the upper pillar 12 is provided on the inner surface of the lower pillar 11. The winch 13 is installed on a mounting table 17A provided on the side surface of the lower column member 11, and one end of the winch 13 is fixed to the lower end of the upper column member 12 and the wire 13a hung on the pulleys 16A and 16B is operated by operating the handle 13b. To wind up on the winding drum 13c. The lower pillar 11 is further provided with a winch mounting base 17B, on which a hand-wound winch 4 for suspending a load is installed, and a hole 11c for setting a height is provided on an outer surface above the winch mounting base 17B. A mounting plate 18 for mounting the suspension beam 3 is fixed to the upper end of the upper column member 12, and the load pulley 6B is located slightly below the mounting plate 18.
Is installed. Height adjustment holes 12a are provided on the outer side surface of the upper pillar 12 at a constant pitch, and a lock pin (described later) is inserted from a height setting hole 11c of the lower pillar 11 so that the height of the support 1 is increased. That is, the height of the suspension beam 3 is fixed at the set value.

【0011】キャスタ付き脚部2は、図1,図2に示す
ように脚材21の両端部にキャスタ22を取り付け、上
面の中央部に支柱1の立設位置を設定している。脚材2
1には、キャスタ22の内側に位置するように自立用ベ
ース5を設置している。自立用ベース5は、図11に示
すようにベース本体51,ねじ軸(回り止めキー付き)
52,回転ナット53,ハンドル54等により昇降自在
に構成している。
The caster leg 2 has casters 22 attached to both ends of a leg member 21 as shown in FIGS. 1 and 2, and the upright position of the column 1 is set at the center of the upper surface. Leg material 2
1 is provided with a self-standing base 5 so as to be located inside the casters 22. The self-standing base 5 includes a base body 51 and a screw shaft (with a detent key) as shown in FIG.
52, a rotating nut 53, a handle 54, and the like are configured to be vertically movable.

【0012】吊りビーム3は、I形鋼の一本物を使用し
ており、支柱間寸法の最大値を3200mm、吊り上げ
高さ(滑車下有効範囲)の最大値を3200mmに設定
した本実施例では、長さを3600mmとしている。吊
りビーム3の下辺部には、柱取付穴3aを等間隔に設け
ている。この柱取付穴3aは、荷吊り用滑車の取付穴と
しても利用し、所要位置に荷吊り用滑車6Aを取り付け
て、ウインチ4のワイヤ41を掛ける。
The suspension beam 3 is made of a single piece of I-shaped steel. In this embodiment, the maximum value of the distance between the columns is set to 3200 mm, and the maximum value of the lifting height (effective range below the pulley) is set to 3200 mm. , And the length is 3600 mm. On the lower side of the suspension beam 3, pillar mounting holes 3a are provided at equal intervals. The pillar mounting hole 3a is also used as a mounting hole for a load-lifting pulley, and a load-lifting pulley 6A is mounted at a required position, and the wire 41 of the winch 4 is hung.

【0013】なお、本実施例では、解体(分解)して運
搬することを前提として設計しており、組立時に使用す
る仮設用品としてビーム吊り上げ用滑車付きアーム7と
仮設用アングル8を付属させている。ビーム吊り上げ用
滑車付きアーム7は、図5に示すように角材71の一方
の端部を直角に曲げて、この部分に取付板72を固着
し、角材71の他方の端部に滑車73を取り付けた構造
としている。滑車付きアーム7は、支柱1の下部柱材1
1の上端部側面に取り付けて使用するものであり、下部
柱材11の所定位置には取付部を形成している。仮設用
アングル8は、図6に示すように吊りビーム3と略同じ
長さとし、吊りビーム3の柱取付穴の間隔と同間隔に取
付用ボルト穴8aを設けている。
The present embodiment is designed on the premise that it is disassembled (disassembled) and transported, and is provided with a beam-lifting pulley arm 7 and a temporary angle 8 as temporary articles used during assembly. I have. As shown in FIG. 5, the beam-equipped pulley arm 7 has one end of a square member 71 bent at a right angle, a mounting plate 72 is fixed to this end, and a pulley 73 is attached to the other end of the square member 71. Structure. The pulley arm 7 is a lower pillar 1 of the support 1.
The lower column 11 is provided with a mounting portion at a predetermined position. As shown in FIG. 6, the temporary angle 8 has substantially the same length as the suspension beam 3, and is provided with mounting bolt holes 8 a at the same interval as the column mounting holes of the suspension beam 3.

【0014】次に、作用について述べる。重量物移動装
置は解体した状態で現場へ運搬する。この点を前提とし
て各部材が構成されており、各部材(吊りビーム3,下
部柱材11,上部柱材12,脚部2,仮設用アングル
8,ビーム吊り上げ用アーム7)は、2人で持ち運べる
重さ、例えば最も重い吊りビーム3で約60kgとして
いる。ウインチ4,13は下部柱材11に、自立用ベー
ス5はキャスタ付き脚部2にそれぞれ付属させている。
このため、荷積み,荷降ろしは人手でも十分であり、物
上げ機械付きの荷物車を使用することなく、重量物移動
装置を運搬することができる。
Next, the operation will be described. The heavy goods moving device is transported to the site in a disassembled state. Each member is configured on the premise of this point, and each member (suspending beam 3, lower pillar 11, upper pillar 12, leg 2, temporary angle 8, beam lifting arm 7) is two people. The portable weight is, for example, about 60 kg for the heaviest suspension beam 3. The winches 4 and 13 are attached to the lower pillar 11, and the self-standing base 5 is attached to the caster leg 2.
For this reason, loading and unloading can be performed by hand, and the heavy goods moving device can be transported without using a luggage car with a hoisting machine.

【0015】現場での組立に際しては、まず、図7に示
すように脚部2,支柱1の下部柱材11を準備する。即
ち、脚部2の脚材21を角材K1で仮受けし横倒しにす
る。これに合わせて下部支柱11を角材K2上に載せ、
下端の取付板14を脚材21の中央部にボルト91で固
定する(図8)。この後、下部柱材11に上部柱材12
を挿入する。この場合、図9に示すように一端が上部柱
材12の下端に固定されている柱昇降用ウインチ13の
ワイヤ13aを内部角パイプ15内に挿入し、先端を柱
材11の開口部11aから引き出してウインチ13の巻
胴13cに掛ける。次に、上部柱材12を下部柱材11
内に挿入し、下端が下部柱材11側のストッパ11bに
当接するまで押し入れる。同時に、ウインチ13のハン
ドル13bを回しワイヤ17aが張るまで巻取る。この
作業時には、ワイヤ13aが上部滑車16Aに掛かって
いることを確認する。
When assembling at the site, first, as shown in FIG. 7, the lower pillar 11 of the leg 2 and the pillar 1 is prepared. That is, the leg member 21 of the leg portion 2 is temporarily received by the square member K1 and turned sideways. In accordance with this, the lower support 11 is placed on the square timber K2,
The lower end mounting plate 14 is fixed to the center of the leg member 21 with a bolt 91 (FIG. 8). After this, the upper pillar 12 is attached to the lower pillar 11.
Insert In this case, as shown in FIG. 9, the wire 13 a of the column lifting winch 13 whose one end is fixed to the lower end of the upper column 12 is inserted into the internal square pipe 15, and the tip is inserted through the opening 11 a of the column 11. Pull it out and hang it on the winding drum 13c of the winch 13. Next, the upper pillar 12 is replaced with the lower pillar 11
And push it in until the lower end contacts the stopper 11b on the lower pillar 11 side. At the same time, the handle 13b of the winch 13 is turned and wound up until the wire 17a is stretched. During this operation, it is confirmed that the wire 13a is hooked on the upper pulley 16A.

【0016】支柱1と脚部2の組み付けが完了したなら
ば、立て起こしに移るが、その前に図10,図11に示
すように自立用ベース5をその本体51がキャスタ22
より下降するようにハンドル54を操作する。この後、
矢印a方向に立て起こして自立させる。一対の支柱1の
間隔は、移動対象の配電盤の大きさに基づいて算定した
寸法とする。自立状態にある一対の脚部2の脚材21上
に、図12に示すように仮設用アングル8を掛け渡し、
所要位置の取付用ボルト穴8aに取付用ボルト92を挿
通して固定する。これにより、自立状態が安定化する。
When the support 1 and the leg 2 have been assembled, the operation proceeds to erecting. Before that, as shown in FIG. 10 and FIG.
The handle 54 is operated so as to descend further. After this,
The user stands upright in the direction of arrow a to stand alone. The distance between the pair of columns 1 is a dimension calculated based on the size of the switchboard to be moved. As shown in FIG. 12, the temporary angle 8 is laid over the leg members 21 of the pair of legs 2 in a self-standing state,
The mounting bolt 92 is inserted and fixed in the mounting bolt hole 8a at a required position. Thereby, the self-sustaining state is stabilized.

【0017】次に、図5,図13に示すようにビーム吊
り上げ用滑車付きアーム7を下部柱材11にボルト93
により固定する。アーム7の先端の滑車73に荷吊り用
ウインチ4のワイヤ41を掛け、先端部で脚材21上に
準備して置いた吊りビーム3を結ぶ。一対のウインチ4
のハンドル42を操作してワイヤ41を巻胴43に巻く
と、図14に示すように吊りビーム3が引き上げられて
支柱1の上方に達する。ここでビーム3を上部柱材12
上端に載せ、その取付板18にボルト94で固定する。
この後、ビーム吊り上げ用アーム7と仮設用アングル8
を取り外し、図15に示すように荷吊り用滑車6Aを吊
りビーム3の所要位置(配電盤の吊りフックと対応する
位置)にボルト95で固定する。これで、門形パターン
が形成されるが、そのパターンの例を図17〜図19に
示す。滑車取付後、荷吊り用ウインチ4のワイヤ41を
荷吊り用滑車6A,6Bに掛け替える。なお、作業員が
多くいて、人力で吊りビーム3を上げられる場合や、他
の物上げ機械がある場合には、ビーム吊り上げ用滑車付
きアーム7を取り付け、荷吊り用ウインチ4を利用して
ビーム3を吊り上げる作業は、省略する。
Next, as shown in FIGS. 5 and 13, the arm 7 with the pulley for lifting the beam is attached to the lower pillar 11 by bolts 93.
Fix with. The wire 41 of the load winch 4 is hung on the pulley 73 at the tip of the arm 7, and the suspension beam 3 prepared and placed on the leg material 21 is connected at the tip. A pair of winches 4
When the handle 41 is operated to wind the wire 41 around the winding drum 43, the suspension beam 3 is lifted up and reaches above the column 1 as shown in FIG. Here, the beam 3 is connected to the upper pillar 12
It is placed on the upper end and fixed to the mounting plate 18 with bolts 94.
Thereafter, the beam lifting arm 7 and the temporary angle 8
Then, as shown in FIG. 15, the load pulley 6A is fixed to a required position of the suspension beam 3 (a position corresponding to the suspension hook of the switchboard) with a bolt 95. Thus, a gate-shaped pattern is formed. Examples of the pattern are shown in FIGS. After the pulleys are attached, the wires 41 of the winch 4 are suspended from the pulleys 6A and 6B. In the case where there are many workers and the lifting beam 3 can be lifted manually or when there is another lifting machine, the arm 7 with the pulley for lifting the beam is attached, and the beam is used by the winch 4 for lifting the load. The operation of lifting 3 is omitted.

【0018】続いて、柱昇降用ウインチ13を操作して
上部柱材12を上昇させる。この場合、一対の支柱1が
同じ高さとなるよう、同調させる。所要の高さになった
ならば、図16に示すようにロックピン96を支柱1の
高さ設定用穴11c及び高さ調整穴12aに挿入して固
定する。この後、自立用ベース5のハンドル54を回し
て本体51を上昇させると、キャスタ22で支持するよ
うになる。つまり、重量物移動装置の移動が可能とな
る。
Subsequently, the upper column 12 is raised by operating the column lifting winch 13. In this case, the pair of columns 1 are synchronized so that they have the same height. When the required height is reached, the lock pin 96 is inserted and fixed into the height setting hole 11c and the height adjustment hole 12a of the column 1 as shown in FIG. After that, when the main body 51 is raised by turning the handle 54 of the self-supporting base 5, the main body 51 is supported by the casters 22. That is, the heavy object moving device can be moved.

【0019】配電盤を据え付けるには、本装置を作業位
置まで移動させて、配電盤の吊りフックに荷吊り用ウイ
ンチ4のワイヤ41の先端部を引っ掛け、ウインチ4の
操作で配電盤を吊り上げる。この吊り上げ状態で据え付
け位置まで移動し、徐々に下降させて所定の位置に置
く。そして、ワイヤ41を外し本装置を移動させる。移
動後、固定,配線等の作業を行うと、据え付け完了とな
る。
To install the switchboard, the apparatus is moved to a working position, the tip of the wire 41 of the load winch 4 is hooked on the hanging hook of the switchboard, and the switchboard is lifted by operating the winch 4. In this lifted state, it is moved to the installation position, and is gradually lowered to a predetermined position. Then, the wire 41 is removed and the apparatus is moved. After the movement, if work such as fixing and wiring is performed, the installation is completed.

【0020】なお、本装置の解体(分解)は、上述の組
立作業の逆の手順となる。また、配電盤の撤去作業にも
同様に適用できる。
The disassembly (disassembly) of the present apparatus is the reverse procedure of the above-mentioned assembling work. In addition, the present invention can be similarly applied to the work of removing the switchboard.

【0021】[0021]

【発明の効果】以上のように本発明によれば、一対の伸
縮構造の支柱,一本物の吊りビーム,支柱を立設するキ
ャスタ付き脚部,脚部に付属する自立用ベース,支柱に
付属する柱昇降用手巻ウインチ,荷吊り用手巻ウインチ
及び滑車,仮設用部材等の構成部材を人手で運搬可能な
重量を目安に分けてあるので、運搬時に特別な物上げ機
械付きの荷物車を必要とせず、しかも組立,分解に際し
ては構成部材に付属する手巻ウインチを利用することが
可能であり、組立,解体及び運搬が容易となる。また、
作業前に吊りビームの高さを調節し、作業中は荷吊り用
ウインチの操作で重量物の上げ下げを行うので、重量物
を安定に、かつ適確に移動できるとともに、作業時間も
大幅に短縮できる。しかも、重量物の上げ下げをウイン
チで行うため、作業スペースが少なくてすむようにな
り、使用条件の緩和に伴い活用範囲を拡大できる。更
に、吊りビームの柱取付穴ピッチと滑車取付穴ピッチを
一致させたので、ビームの取付位置及び滑車の取付位置
を自由に設定できるようになり、据え付け場所の状況に
最も適した門形パターンを選択できるといった利点があ
る。
As described above, according to the present invention, a pair of columns having a telescopic structure, a single suspension beam, a leg with a caster for standing the column, a free-standing base attached to the leg, and a column attached to the column. Since the weight of the components, such as the hand-lifted winch for lifting and lowering the pillars, the hand-wound winch for loading and the pulleys, and the temporary members, is divided by the guide, the luggage vehicle with a special hoisting machine during transportation Is not required, and it is possible to use a hand-wound winch attached to a component member during assembly and disassembly, which facilitates assembly, disassembly and transportation. Also,
The height of the suspension beam is adjusted before the work, and during the work, the load can be moved up and down by operating the load winch, so that the load can be moved stably and accurately, and the work time is greatly reduced. it can. In addition, since the lifting and lowering of heavy objects is performed by the winch, the working space can be reduced, and the range of use can be expanded as the use conditions are relaxed. Furthermore, since the pitch of the mounting holes of the suspension beam and the pitch of the pulley mounting holes are matched, the mounting position of the beam and the mounting position of the pulley can be freely set, and a gate-shaped pattern most suitable for the situation of the installation location can be obtained. There is an advantage that you can choose.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による重量物移動装置の実施例を示す正
面図。
FIG. 1 is a front view showing an embodiment of a heavy object moving device according to the present invention.

【図2】本発明による重量物移動装置の実施例を示す側
面図。
FIG. 2 is a side view showing an embodiment of the heavy object moving device according to the present invention.

【図3】本発明による重量物移動装置の実施例における
支柱構造を示す断面図。
FIG. 3 is a sectional view showing a support structure in the embodiment of the heavy object moving device according to the present invention.

【図4】本発明による重量物移動装置の実施例における
支柱構造を示す断面図。
FIG. 4 is a sectional view showing a support structure in an embodiment of the heavy object moving device according to the present invention.

【図5】本発明による重量物移動装置の実施例における
ビーム吊り上げ用滑車付きアームを示す正面図。
FIG. 5 is a front view showing an arm with a pulley for lifting a beam in the embodiment of the heavy object moving device according to the present invention.

【図6】本発明による重量物移動装置の実施例における
仮設用アングルを示す平面図。
FIG. 6 is a plan view showing a temporary angle in the embodiment of the heavy object moving device according to the present invention.

【図7】実施例の組立過程における脚部及び下部柱材の
準備状態を示す正面図。
FIG. 7 is a front view showing a prepared state of a leg portion and a lower pillar in an assembling process of the embodiment.

【図8】実施例の組立過程における脚部と下部柱材の連
結作業を説明するための正面図。
FIG. 8 is a front view for explaining an operation of connecting the leg and the lower pillar in the assembling process of the embodiment.

【図9】実施例の組立過程における下部柱材への上部柱
材の挿入作業を説明するための断面図。
FIG. 9 is a cross-sectional view for explaining an operation of inserting the upper pillar into the lower pillar during the assembling process of the embodiment.

【図10】実施例の組立過程における脚部及び支柱の立
て起こし作業を説明するための正面図。
FIG. 10 is a front view for explaining an upright operation of the leg and the support in the assembling process of the embodiment.

【図11】実施例の組立過程における自立用ベースの下
降動作を説明するための正面図。
FIG. 11 is a front view for explaining the lowering operation of the self-supporting base in the assembling process of the embodiment.

【図12】実施例の組立過程における仮設用アングルの
取付状態を示す正面図。
FIG. 12 is a front view showing a mounting state of a temporary angle in an assembling process of the embodiment.

【図13】実施例の組立過程における吊りビームの取付
作業を説明するための側面図。
FIG. 13 is a side view for explaining the operation of attaching the suspension beam in the assembling process of the embodiment.

【図14】実施例の組立過程における吊りビームの取付
作業を説明するための側面図。
FIG. 14 is a side view for explaining the operation of attaching the suspension beam in the assembling process of the embodiment.

【図15】実施例の組立過程における荷吊り用滑車の取
付状態を示す正面図。
FIG. 15 is a front view showing an attached state of the load pulley in an assembling process of the embodiment.

【図16】実施例の組立過程における支柱の高さ調整及
び固定作業を説明するための正面図。
FIG. 16 is a front view for explaining the height adjustment and fixing work of the column in the assembling process of the embodiment.

【図17】実施例の門形パターンを示す正面図。FIG. 17 is a front view showing a gate pattern of the embodiment.

【図18】実施例の門形パターンを示す正面図。FIG. 18 is a front view showing a gate pattern of the embodiment.

【図19】実施例の門形パターンを示す正面図。FIG. 19 is a front view showing a gate-shaped pattern according to the embodiment.

【符号の説明】[Explanation of symbols]

1…支柱 2…キャスタ付き脚部 3…吊りビーム 4…荷吊り用手巻ウインチ 5…自立用ベース 6A,6B…荷吊り用滑車 7…ビーム吊り上げ用滑車付きアーム 8…仮設用アングル 11…下部柱材 12…上部柱材 13…柱昇降用手巻ウインチ DESCRIPTION OF SYMBOLS 1 ... Support | pillar 2 ... Leg part with a caster 3 ... Suspended beam 4 ... Hand-wound winch for load hanging 5 ... Base for self-sustaining 6A, 6B ... Pulley for load hanging 7 ... Arm with pulley for beam lifting 8 ... Temporary angle 11 ... Lower part Pillar material 12 ... Upper pillar material 13 ... Hand-winding winch for pillar lifting

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭50−43655(JP,A) 特開 平7−101674(JP,A) 特開 昭56−78794(JP,A) 実開 平5−86985(JP,U) 実開 平1−62289(JP,U) (58)調査した分野(Int.Cl.7,DB名) B66F 9/06 B66C 19/00 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-50-43655 (JP, A) JP-A-7-101674 (JP, A) JP-A-56-78794 (JP, A) 86985 (JP, U) Japanese Utility Model 1-62289 (JP, U) (58) Field surveyed (Int. Cl. 7 , DB name) B66F 9/06 B66C 19/00

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 上部柱材と下部柱材をスライド結合構造
として伸縮可能とした一対の支柱と、一対の支柱の上端
間を連結する吊りビームと、支柱を立設する一対のキャ
スタ付き脚部と、上部柱材をスライドさせるために支柱
に付設した一対の柱昇降用手巻ウインチと、支柱に付設
した一対の荷吊り用手巻ウインチと、荷吊り用手巻ウイ
ンチのワイヤを案内するために支柱及び吊りビームに取
り付けられる複数の滑車と、脚部に昇降自在に設置した
一対の自立用ベースと、支柱の下部柱材に着脱自在に取
り付けられる一対のビーム吊り上げ用滑車付きアーム
と、一対の脚部間を連結する仮設用アングルとで構成
し、荷吊り用手巻ウインチをそのワイヤの掛け替えによ
り吊りビーム取付用として兼用するようにしたことを特
徴とする重量物移動装置。
1. A pair of pillars which are made of an upper pillar material and a lower pillar material which can be extended and contracted as a slide connection structure, a suspension beam connecting upper ends of the pair of pillars, and a pair of caster legs for standing the pillars. And a pair of hand-lifting winches for column lifting and lowering attached to the column to slide the upper column material, and a pair of hand-lifting winches for lifting and lowering of the load attached to the column to guide the wires of the manual winding winch for load lifting. A plurality of pulleys attached to the column and the suspension beam, a pair of self-standing bases installed on the legs so as to be able to move up and down, and a pair of beam-raising pulley arms detachably attached to the lower column of the column. And a temporary angle for connecting between the legs, and the hand-operated winch for hanging the load is also used for attaching a hanging beam by replacing the wire. .
【請求項2】 柱昇降用手巻ウインチにより支柱の高さ
を加減し、ロックピンにより所要の高さに固定するよう
にしたことを特徴とする請求項1に記載の重量物移動装
置。
2. The heavy object moving device according to claim 1, wherein the height of the column is adjusted by a hand-winding winch for raising and lowering the column, and the column is fixed to a required height by a lock pin.
【請求項3】 吊りビームの柱取付穴ピッチと滑車取付
穴ピッチを合わせて、吊りビームの取付位置及び滑車の
取付位置を任意に設定できるようにしたことを特徴とす
る請求項1または2に記載の重量物移動装置。
3. The mounting position of a suspension beam and the position of a pulley can be arbitrarily set by matching the pitch of a pillar mounting hole and the pitch of a pulley mounting hole of a suspension beam. The heavy object moving device as described in the above.
JP07111645A 1995-05-10 1995-05-10 Heavy equipment Expired - Fee Related JP3142741B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07111645A JP3142741B2 (en) 1995-05-10 1995-05-10 Heavy equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07111645A JP3142741B2 (en) 1995-05-10 1995-05-10 Heavy equipment

Publications (2)

Publication Number Publication Date
JPH08301590A JPH08301590A (en) 1996-11-19
JP3142741B2 true JP3142741B2 (en) 2001-03-07

Family

ID=14566575

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07111645A Expired - Fee Related JP3142741B2 (en) 1995-05-10 1995-05-10 Heavy equipment

Country Status (1)

Country Link
JP (1) JP3142741B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060835A (en) * 2017-04-11 2017-08-18 山东科技大学 A kind of underground change the outfit chamber branch hang combination unit and its construction method

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104310213A (en) * 2014-09-30 2015-01-28 苏州速腾电子科技有限公司 Telescopic gallows frame
CN105035968A (en) * 2015-07-31 2015-11-11 苏州速腾电子科技有限公司 Carrying device capable of ascending and descending
CN105858474A (en) * 2016-06-15 2016-08-17 吴传涛 Marine equipment lifting machine
KR102139122B1 (en) * 2020-01-10 2020-07-29 오승재 Movable gantry crane
KR102175558B1 (en) * 2020-05-14 2020-11-06 장병곤 scaffold system
CN112374358B (en) * 2020-10-30 2023-06-20 上海宝冶冶金工程有限公司 Crane beam replacement method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060835A (en) * 2017-04-11 2017-08-18 山东科技大学 A kind of underground change the outfit chamber branch hang combination unit and its construction method
CN107060835B (en) * 2017-04-11 2019-02-05 山东科技大学 A kind of underground chamber branch-that changes the outfit hangs combination unit and its construction method

Also Published As

Publication number Publication date
JPH08301590A (en) 1996-11-19

Similar Documents

Publication Publication Date Title
KR20070116222A (en) Clamp for a construction apparatus
JP2017190244A (en) Crane device used at construction site of reinforced concrete building
JP3142741B2 (en) Heavy equipment
KR102252089B1 (en) Lifting appratus for beam
JP2000288111A (en) Safety belt fitting device
US4125193A (en) Climbing device for climbing crane
CN113550604A (en) Movable ALC light partition plate installation device
JP3859442B2 (en) Method and apparatus for rebuilding transmission tower
JPH07187575A (en) Floor install type crane
JP2002356296A (en) Portal crane
JPH0628548Y2 (en) Lifting device for self-propelled work platform
JPH0328066Y2 (en)
JP3532161B2 (en) Tower construction machine and tower construction method
JP6953655B1 (en) A set of boxes that make up the scaffold
JPH0648683A (en) Tower crane
JP3234125B2 (en) Hanging jig for heavy object moving device
JP2575571B2 (en) Automatic beam reinforcement device under load of temporary machine
JPH09183595A (en) Indoor unloading method and device thereof
CN220432195U (en) Ladder type device for dismounting anti-falling device of elevator
JPH11117523A (en) Lifting work platform for elevator parking and method using the same
JPH06322992A (en) Wall erection device
JPH04203079A (en) Column body and assembly method thereof
JP2521282Y2 (en) Horizontal lift device with crane
JPH03232690A (en) Lifter
JPS5855236Y2 (en) Converter bricklaying equipment

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees