CN107060835B - A kind of underground chamber branch-that changes the outfit hangs combination unit and its construction method - Google Patents

A kind of underground chamber branch-that changes the outfit hangs combination unit and its construction method Download PDF

Info

Publication number
CN107060835B
CN107060835B CN201710232011.6A CN201710232011A CN107060835B CN 107060835 B CN107060835 B CN 107060835B CN 201710232011 A CN201710232011 A CN 201710232011A CN 107060835 B CN107060835 B CN 107060835B
Authority
CN
China
Prior art keywords
fashioned iron
chamber
frame structure
outfit
changes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710232011.6A
Other languages
Chinese (zh)
Other versions
CN107060835A (en
Inventor
刘立民
闫旭
张进鹏
付彪
吕国娜
曹君陟
孙伟
李扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201710232011.6A priority Critical patent/CN107060835B/en
Publication of CN107060835A publication Critical patent/CN107060835A/en
Application granted granted Critical
Publication of CN107060835B publication Critical patent/CN107060835B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00Trolleys or crabs, e.g. operating above runways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Abstract

The invention discloses a kind of underground chamber branch-that changes the outfit to hang combination unit, it includes helping the frame structure with top installation in the chamber two that changes the outfit, crane girder is installed in frame structure two sides, driving horizontal mobile mechanism, upper and lower hoisting mechanism and driving operation chamber are sequentially installed on crane girder;Above-mentioned frame structure is made of the frame frame sectional shelf-unit that continuous arrangement is arranged;It is connected with each other between every two framves sectional shelf-unit with steel connecting rod, all sectional shelf-units is made to form whole frame structure.The present invention combines chamber support and allotment shipment driving system together, directly on the frame structure by the installation of allotment shipment driving system, frame structure plays supporting chamber, play the role of support allotment shipment driving system guide-track groove again, the concrete column of guide-track groove is individually built no longer by the way of placing concrete, as long as processing component from well, it is assembled in underground chamber, construction and installation are convenient, and structure is simple, and cost is greatly reduced.

Description

A kind of underground chamber branch-that changes the outfit hangs combination unit and its construction method
Technical field
The present invention relates to construction of coal mine fields.
Background technique
Currently, coal deep mining encounters the problem of high stress, large section soft rock tunnel.The especially supporting of underground chamber It is more difficult.It adds, the problem of underground large scale equipment maintenance support becomes increasingly conspicuous, and has seriously affected the manufacturing schedule of coal mine. Therefore, " frame not upper well " repairs the large scale equipments such as hydraulic support using the underground chamber that changes the outfit, and deploys and ships, it has also become The mainstream of domestic large coal mine future development.At present underground change the outfit chamber other than the independent supporting of cave wall will also using pour coagulation The mode of soil builds two rows of concrete columns, and the guide-track groove of allotment shipment driving system is supported, then arranges on guide-track groove Driving system is installed, so long construction period, system complex, costly.Therefore it there is an urgent need to a set of novel supporting and hangs Combination is filled to solve the above problems.
Summary of the invention
To solve change the outfit under existing well long construction period existing for chamber technology, system complex, costly problem, this hair A kind of bright underground chamber branch-that changes the outfit that proposes hangs combination unit.
Present invention simultaneously provides this underground chamber branch-that changes the outfit to hang the construction method of combination unit.
In order to achieve the above objectives, the technical solution adopted by the present invention is that:
A kind of underground chamber branch-that changes the outfit hangs combination unit, which is characterized in that it is included in the chamber two that changes the outfit and helps and top peace The frame structure for filling construction is installed on fixed on the certain altitude of frame structure two sides and visits platform, and two guide-track groove difference are tight It is affixed on the spy platform of frame structure two sides, crane girder is set up on guide-track groove, row is sequentially installed on crane girder Vehicle horizontal mobile mechanism, upper and lower hoisting mechanism and driving operation chamber;The frame frame that above-mentioned frame structure is arranged by continuous arrangement Sectional shelf-unit composition;It is connected with each other between every two frame with steel connecting rod, all sectional shelf-units is made to form whole frame knot Structure;Combinations of the above bracket by two help fashioned iron column, top fashioned iron arc top beam and prefabricated set component form, by prefabricated Set component is by fashioned iron column together with fashioned iron arc top beam grafting anchoring.
Further, pucking phenomenon occurs for chamber in order to prevent, is connected in the bottom of every frame sectional shelf-unit by prefabricated set component It is connected to fashioned iron arc bottom beam.
Further, above-mentioned fashioned iron column, the fashioned iron arc top beam at top and fashioned iron arc bottom beam are using double muscle H profile steels.
Further, above-mentioned prefabricated set component is the high-intensitive steel body covered in double muscle H profile steels an of corner shape Component.
It is a kind of as the above-mentioned underground chamber branch-that changes the outfit hangs the construction method of combination unit, comprising:
The first step, in having tunneled the chamber that changes the outfit completed with gib, frame frame installation from inside to outside is used for cave wall The sectional shelf-unit of supporting is helped to excavate column placement groove two first, in accordance with design size, and helps fashioned iron column for two with pull rod It is fastened on two to help on country rock wall, then installs prefabricated set component at the top of fashioned iron column, then fashioned iron arc top beam is inserted into advance It in system set component, then is anchored or is welded, fashioned iron column and fashioned iron arc top beam is made to link into an integrated entity;When latter sectional shelf-unit It after being installed, is linked together with steel connecting rod and previous sectional shelf-unit, all sectional shelf-units is made to form whole frame Frame structure;
Second step sets up purlin on the frame structure, with the gap between backboard fill frame structure and country rock wall, then Entire chamber surface whitewashing processing;Then, anchor cable is installed on chamber top plate, helps installation connection steel part and steel band in chamber two, Carry out strengthening supporting;
Third step installs lifting crane system;It is installed first on the fashioned iron column of frame structure two sides on fixed and visits platform, Two guide-track grooves are respectively secured on the spy platform of frame structure two sides, crane girder is set up on guide-track groove, are then being risen Driving horizontal mobile mechanism, rope hoisting mechanism and driving operation chamber are successively installed on heavy-duty machine girder;Wherein rope hoisting Mechanism includes winding plant, wirerope, pulley and suspension hook.
Further, pucking phenomenon occurs for chamber in order to prevent, should be vertical in fashioned iron when fashioned iron column is helped in first step construction two Prefabricated base angle set component is installed in the bottom of column, then by the set component of fashioned iron arc bottom beam insertion base angle, then carry out anchoring or Welding, makes fashioned iron column and fashioned iron arc bottom beam link into an integrated entity.
The positive effect of the present invention: chamber support and allotment shipment driving system are combined together, directly ship allotment Driving system is installed on the frame structure, and frame structure plays supporting chamber, and plays support allotment shipment vehicle-driving The effect of system guide-track groove, individually builds the concrete column of guide-track groove no longer by the way of placing concrete, as long as adding from well The good component of work is assembled in underground chamber, and construction and installation are convenient, and structure is simple, and cost is greatly reduced.
Detailed description of the invention
Fig. 1 is the integral frame structure schematic diagram that sectional shelf-unit is formed;
Fig. 2 is double muscle H profile steel structural upright schematic diagrames;
Fig. 3 is to visit platform structural upright schematic diagram;
Fig. 4 is Components Shape schematic diagram;
Fig. 5 is chamber support mode sectional schematic diagram;
Fig. 6 is lifting crane structural schematic diagram.
In figure, 1- fashioned iron column, the prefabricated set component of 2-, the base angle 2a- covers component, 3- fashioned iron arc top beam, the connection of 4- steel Rod piece, 5- fashioned iron arc bottom beam, 6- steel band, 7- anchor pole, 8- backboard, 9- anchor cable, 10- purlin, 11- suspension hook, 12- move horizontally machine Structure, 13- wirerope, 14- driving operation chamber, 15- winding plant, 16- visit platform, 17- guide-track groove, 18- girder.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
For a certain mine according to mining geological conditions and production requirement, the width that is designed and sized to the chamber that changes the outfit is 8000mm, A height of 6000mm;Stalk a height of 4000mm, sagitta 2000mm.
The present invention devises a kind of underground chamber branch-that changes the outfit thus and hangs combination unit.The structure of the device as shown in fig. 6, It includes helping the frame structure with top installation in the chamber two that changes the outfit, and frame structure is as shown in Figure 1, further include in frame knot It is installed on the certain altitude of structure two sides and visits platform 16 on fixed, visit the construction of platform 16 as shown in figure 3, two guide-track grooves 17 are tight respectively It is affixed on the spy platform 16 of frame structure two sides, crane girder 18 is set up on guide-track groove 17, then on crane girder 18 Successively installation driving horizontal mobile mechanism 12, rope hoisting mechanism 13 and driving operation chamber 14;Above-mentioned frame structure is by even One frame frame sectional shelf-unit of continuous arranged forms (see Fig. 1);It is connected with each other between every two frame with steel connecting rod 4, makes institute There is sectional shelf-unit to form whole frame structure;Combinations of the above bracket by two help fashioned iron column 1, top fashioned iron arched top Beam 3 and prefabricated set component 2 composition, will be together with fashioned iron column 1 and 3 grafting of fashioned iron arc top beam anchoring by prefabricated set component 2.
Further, pucking phenomenon occurs for chamber in order to prevent, is equipped with fashioned iron arc bottom beam in the bottom of every frame sectional shelf-unit 5, fashioned iron arc bottom beam 5 covers component 2a by prefabricated base angle and connect with fashioned iron column 1.
Further, above-mentioned fashioned iron column 1, the fashioned iron arc top beam 3 at top and fashioned iron arc bottom beam 5 are using double muscle H-types Steel.The construction of double muscle H profile steels is as shown in Figure 2.
Further, above-mentioned prefabricated set component 2 is the high-intensitive steel body covered in double muscle H profile steels an of corner shape Component;Base angle set component 2a constructs essentially identical with prefabricated set component 2, and only interior angle angle is according to steel column 1 and fashioned iron arc The connection angle design of shape bottom beam 5, Components Shape is as shown in Figure 4.
Above-mentioned underground change the outfit chamber branch-hang combination unit construction method it is as follows:
The first step, as shown in Figure 1, a frame frame is pacified from inside to outside in having tunneled the chamber that changes the outfit completed with gib Dress is used for cave wall sectional shelf-unit;Sectional shelf-unit array pitch 1500mm, by two help fashioned iron column 1, top 2 and of fashioned iron arc top beam Prefabricated set component 3 forms;When every frame sectional shelf-unit is installed, help to excavate column placement groove two first, in accordance with design size, and It helps fashioned iron column 1 to be fastened on two for two with pull rod to help on country rock wall, then installs prefabricated set component 2 at the top of fashioned iron column 1, Fashioned iron arc top beam 3 is inserted into prefabricated set component 2 again, then is anchored or is welded, fashioned iron column 1 and fashioned iron arc top beam are made 3 link into an integrated entity;After latter sectional shelf-unit is installed, linked together with steel connecting rod 4 and previous sectional shelf-unit, All sectional shelf-units are made to form whole frame structure as shown in Figure 1;
Second step is filled as shown in figure 5, setting up purlin 10 (showing a purlin in figure) on the frame structure with backboard 8 Gap between frame structure and country rock wall, then handled in the whitewashing of entire chamber surface, then carry out strengthening supporting;Strengthening supporting It is installation anchor cable 9, anchor cable 9 model φ 17.8mm × 6000mm, spacing 1600mm, array pitch 1500mm on chamber top plate;? Between the fashioned iron column 1 that chamber two is helped, upper bolt 7 and steel band 6 are conventionally installed.
Third step, as shown in fig. 6, installation lifting crane system;It is installed on the fashioned iron column 1 of frame structure two sides first Platform 16 is visited in fixation.Two guide-track grooves 17 are respectively secured on the spy platform 16 of frame structure two sides, are set up on guide-track groove 17 Crane girder 18, then on crane girder 18 successively installation driving horizontal mobile mechanism 12, rope hoisting mechanism and Driving operation chamber 14;Wherein rope hoisting mechanism includes winding plant 15, wirerope 13, pulley and suspension hook 11.Visit platform 16 Construction is as shown in Figure 3.
Further, pucking phenomenon occurs for chamber in order to prevent, should be in fashioned iron when fashioned iron column 1 is helped in first step construction two Prefabricated base angle set component 2a is installed in the bottom of column 1, then fashioned iron arc bottom beam 5 is inserted into the set component 2a of base angle, then into Row anchoring or welding, make fashioned iron column 1 and fashioned iron arc bottom beam 5 link into an integrated entity.

Claims (5)

1. a kind of underground changes the outfit, chamber branch-hangs the construction method of combination unit, which is characterized in that the underground changes the outfit chamber Combination unit prop up-is hung, including helping the frame structure with top installation in the chamber two that changes the outfit, installation is solid in frame structure two sides Surely there is spy platform, two guide-track grooves are respectively secured on the spy platform of frame structure two sides, crane girder is provided on guide-track groove, Driving horizontal mobile mechanism, upper and lower hoisting mechanism and driving operation chamber are sequentially installed on crane girder;Above-mentioned frame Structure is made of the frame frame sectional shelf-unit that continuous arrangement is arranged;It is mutually interconnected between every two framves sectional shelf-unit with steel connecting rod It connects, all sectional shelf-units is made to form whole frame structure;Combinations of the above bracket by two help fashioned iron column, top fashioned iron Arc top beam and prefabricated set component composition, are anchored at one for fashioned iron column and fashioned iron arc top beam grafting by prefabricated set component It rises;The underground chamber branch-that changes the outfit hangs the construction method of combination unit and is:
The first step, in having tunneled the chamber that changes the outfit completed with gib, frame frame installation from inside to outside is used for the supporting of cave wall Sectional shelf-unit, first, in accordance with design size two help excavate column place groove, and with pull rod by two help fashioned iron column fasten It is helped on country rock wall two, then installs prefabricated set component at the top of fashioned iron column, then fashioned iron arc top beam is inserted into prefabricated set It in component, then is anchored or is welded, fashioned iron column and fashioned iron arc top beam is made to link into an integrated entity;When latter sectional shelf-unit is installed After the completion, it is linked together with steel connecting rod and previous sectional shelf-unit, all sectional shelf-units is made to form whole frame knot Structure;
Second step sets up purlin on the frame structure, with the gap between backboard fill frame structure and country rock wall, then entire Chamber surface whitewashing processing;Then, anchor cable is installed on chamber top plate, helps installation connection steel part and steel band in chamber two, carries out Strengthening supporting;
Third step installs lifting crane system;It is installed first on the fashioned iron column of frame structure two sides on fixed and visits platform, by two Root guide-track groove is respectively secured on the spy platform of frame structure two sides, crane girder is set up on guide-track groove, then in crane Driving horizontal mobile mechanism, rope hoisting mechanism and driving operation chamber are successively installed on girder;Wherein rope hoisting mechanism Including winding plant, wirerope, pulley and suspension hook.
2. underground as described in claim 1 changes the outfit, chamber branch-hangs the construction method of combination unit, which is characterized in that in every frame The bottom of sectional shelf-unit is connected with fashioned iron arc bottom beam by prefabricated set component.
3. underground as described in claim 1 changes the outfit, chamber branch-hangs the construction method of combination unit, which is characterized in that described Fashioned iron column, the fashioned iron arc top beam at top and fashioned iron arc bottom beam are using double muscle H profile steels.
4. underground as described in claim 1 changes the outfit, chamber branch-hangs the construction method of combination unit, which is characterized in that described Prefabricated set component is the high-intensitive steel body component covered in double muscle H profile steels an of corner shape.
5. underground as described in claim 1 changes the outfit, chamber branch-hangs the construction method of combination unit, which is characterized in that first Step construction two is when helping fashioned iron column, should install prefabricated base angle in the bottom of fashioned iron column and cover component, then by fashioned iron arcuate bottom Beam is inserted into the set component of base angle, then is anchored or welded, and fashioned iron column and fashioned iron arc bottom beam is made to link into an integrated entity.
CN201710232011.6A 2017-04-11 2017-04-11 A kind of underground chamber branch-that changes the outfit hangs combination unit and its construction method Expired - Fee Related CN107060835B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710232011.6A CN107060835B (en) 2017-04-11 2017-04-11 A kind of underground chamber branch-that changes the outfit hangs combination unit and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710232011.6A CN107060835B (en) 2017-04-11 2017-04-11 A kind of underground chamber branch-that changes the outfit hangs combination unit and its construction method

Publications (2)

Publication Number Publication Date
CN107060835A CN107060835A (en) 2017-08-18
CN107060835B true CN107060835B (en) 2019-02-05

Family

ID=59602006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710232011.6A Expired - Fee Related CN107060835B (en) 2017-04-11 2017-04-11 A kind of underground chamber branch-that changes the outfit hangs combination unit and its construction method

Country Status (1)

Country Link
CN (1) CN107060835B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117027924B (en) * 2023-10-10 2023-12-12 山西联盛科技有限公司 Underground safety refuge chamber

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3142741B2 (en) * 1995-05-10 2001-03-07 株式会社明電舎 Heavy equipment
CN103213905A (en) * 2013-05-07 2013-07-24 四川广旺能源发展(集团)有限责任公司唐家河煤矿 Underground hoisting system
CN203430563U (en) * 2013-08-16 2014-02-12 中煤第一建设有限公司 Narrow and small deviated well bore space pipe conveying and hoisting device
CN203669879U (en) * 2014-01-23 2014-06-25 四川川煤华荣能源股份有限公司花山煤矿 Down-hole hydraulic support assembling chamber
CN203796285U (en) * 2014-03-20 2014-08-27 中铁七局集团第三工程有限公司 Tunnel supporting structure with steel frames
CN204552783U (en) * 2015-03-24 2015-08-12 兰州交通大学 A kind of loess tunnel vertical deformation control structure
CN205154191U (en) * 2015-12-08 2016-04-13 四川省交通运输厅公路规划勘察设计研究院 Tunnel preliminary bracing steel pipe concrete steelframe
CN105952490A (en) * 2016-06-28 2016-09-21 淮南矿业(集团)有限责任公司 Hydraulic travelling crane and underground hydraulic bracket assembling system applying same

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3142741B2 (en) * 1995-05-10 2001-03-07 株式会社明電舎 Heavy equipment
CN103213905A (en) * 2013-05-07 2013-07-24 四川广旺能源发展(集团)有限责任公司唐家河煤矿 Underground hoisting system
CN203430563U (en) * 2013-08-16 2014-02-12 中煤第一建设有限公司 Narrow and small deviated well bore space pipe conveying and hoisting device
CN203669879U (en) * 2014-01-23 2014-06-25 四川川煤华荣能源股份有限公司花山煤矿 Down-hole hydraulic support assembling chamber
CN203796285U (en) * 2014-03-20 2014-08-27 中铁七局集团第三工程有限公司 Tunnel supporting structure with steel frames
CN204552783U (en) * 2015-03-24 2015-08-12 兰州交通大学 A kind of loess tunnel vertical deformation control structure
CN205154191U (en) * 2015-12-08 2016-04-13 四川省交通运输厅公路规划勘察设计研究院 Tunnel preliminary bracing steel pipe concrete steelframe
CN105952490A (en) * 2016-06-28 2016-09-21 淮南矿业(集团)有限责任公司 Hydraulic travelling crane and underground hydraulic bracket assembling system applying same

Also Published As

Publication number Publication date
CN107060835A (en) 2017-08-18

Similar Documents

Publication Publication Date Title
CN205776347U (en) Novel cover for subway station digs against making structural system
CN103328820B (en) For the method assembling the shell segmentation of the tower section for forming mixing wind turbine tower
CN102230313B (en) Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof
CN102505846B (en) Steel pipe column bearing table girder connection construction method
CN106193055B (en) A kind of subway foundation pit liftable support system and its lifting construction method
CN103556749A (en) Hanging flexible connection of precast concrete infill wall
CN107740420A (en) Foundation ditch tears support and support replacement system and method open
CN107399656A (en) Outdoor installation elevator and its construction method
CN107060835B (en) A kind of underground chamber branch-that changes the outfit hangs combination unit and its construction method
CN109208915A (en) A kind of cooling tower systems and steel vestibule construction method for lifting whole
CN109826082B (en) Construction method for installing decorative structure in multi-tower combined space of cable-stayed bridge
CN108086344A (en) A kind of lattice tower-crane foundation structure and construction method
CN111794529A (en) Modular construction hoisting method for arch type space pipe truss steel structure system
CN107604924A (en) A kind of construction method of bridge bearing platform excavation of foundation pit protection subway
CN112523112A (en) Method for dismantling overhead suspension casting hanging basket
CN107587885A (en) Two lining trolley structures and assembling method in a kind of standard cross-section of tunnel
CN103015432A (en) Construction method for changing steel pipe supports of ramp foundation pit
CN210684718U (en) Combined foundation pit supporting structure
CN201972095U (en) Chain block lifting platform for thin-walled hollow piers of bridges
CN207175138U (en) Outdoor installation elevator
CN108797380B (en) Suspension construction device and construction method for suspension irrigation continuous beam bracket
CN207633795U (en) A kind of foundation pit suspension lane device
CN203546618U (en) Splayed supporting frame for bridge cast-in-place concrete formwork
CN109505225A (en) A kind of safe and stable type suspension bridge and its construction technology
CN205297595U (en) Excavate roadway subject to dynamic pressure support system in opposite directions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190205