JP3133011U - Concrete foundation for electric water heater - Google Patents

Concrete foundation for electric water heater Download PDF

Info

Publication number
JP3133011U
JP3133011U JP2007002561U JP2007002561U JP3133011U JP 3133011 U JP3133011 U JP 3133011U JP 2007002561 U JP2007002561 U JP 2007002561U JP 2007002561 U JP2007002561 U JP 2007002561U JP 3133011 U JP3133011 U JP 3133011U
Authority
JP
Japan
Prior art keywords
rail
electric water
water heater
base block
rails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2007002561U
Other languages
Japanese (ja)
Inventor
芳昭 竹原
Original Assignee
株式会社竹原電設
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社竹原電設 filed Critical 株式会社竹原電設
Priority to JP2007002561U priority Critical patent/JP3133011U/en
Application granted granted Critical
Publication of JP3133011U publication Critical patent/JP3133011U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

【課題】より簡単でスピーディーに設置でき、耐震性の高い電気温水器用コンクリート基礎を提供する。
【解決手段】電気温水器用コンクリート基礎は、電気温水器のタンクユニットを載せるための2つのベースブロックと、2つのベースブロックを載せて所定の間隔で平行な状態で連結するための2本のレールと、上部がレールに固定され、土中に埋められる2つの杭コンクリート柱からなり、ベースブロックの上面にはレールが埋め込まれ、レール内を移動可能な取付けボルトによってタンクユニットがベースブロックに固定され、ベースブロックは2本のレール内を移動可能な取付けボルトによってレールに固定され、2本のレールは平行に配置されて、杭アンカーによってそれぞれが杭コンクリート柱に固定される。
【選択図】図1
An object of the present invention is to provide a concrete foundation for an electric water heater that can be installed more simply and speedily and has high earthquake resistance.
A concrete foundation for an electric water heater includes two base blocks for mounting a tank unit of the electric water heater, and two rails for mounting the two base blocks and connecting them in parallel at a predetermined interval. The upper part consists of two pile concrete pillars fixed to the rail and buried in the soil. The rail is embedded on the upper surface of the base block, and the tank unit is fixed to the base block by mounting bolts that can move in the rail. The base block is fixed to the rail by mounting bolts movable in the two rails, the two rails are arranged in parallel, and each is fixed to the pile concrete column by a pile anchor.
[Selection] Figure 1

Description

本考案は、電気温水器のタンクユニットを屋外に設置する際に用いる電気温水器用コンクリート基礎に関する。   The present invention relates to a concrete foundation for an electric water heater used when a tank unit of an electric water heater is installed outdoors.

電気温水器にはタンクユニット等、設備の一部を屋外に設置するのが一般的である。このように、屋外に電気温水器のタンクユニット等を設置する際には、タンクユニット等の重量に耐えうる基礎が必要となる。 It is common for an electric water heater to install a part of equipment such as a tank unit outdoors. Thus, when installing the tank unit of an electric water heater etc. outdoors, the foundation which can endure the weight of a tank unit etc. is needed.

タンクユニット等を設置する場所として、コンクリート等の十分な強度があり水平な場所が確保できれば、その上に直接載せてアンカー等での固定する場合もある。 If the tank unit or the like is installed with sufficient strength such as concrete and a horizontal place can be secured, it may be placed directly on the tank unit and fixed with an anchor or the like.

しかし、屋外の地面に設置する場合には、基礎が必要となる。このような場合には、コンクリートを打設して基礎を作る方法や、コンクリートブロックを並べて基礎とする方法などがある。 However, when installing on the ground outdoors, a foundation is required. In such a case, there are a method of placing concrete to form a foundation and a method of arranging concrete blocks as a foundation.

このように、基礎を作る場合に重要なのが、基礎の表面を水平に仕上げることである。これは、タンクユニットを水平に設置する必要があるので、基礎表面をできるだけ水平に仕上げなければならない。   Thus, when making a foundation, it is important to finish the surface of the foundation horizontally. This requires the tank unit to be installed horizontally, so that the foundation surface must be finished as horizontally as possible.

しかし、現地でコンクリートを打設する方法だと、水平に仕上げる手間が掛かるという問題があった。さらに、コンクリートが完全に硬化するまでタンクユニットを設置できないという問題点があった。   However, the method of placing concrete locally has the problem that it takes time to finish horizontally. Furthermore, there is a problem that the tank unit cannot be installed until the concrete is completely cured.

そして、地震対策のために、コンクリート基礎の厚みを十分に厚くして重量を稼ぐ必要があり、さらに転倒防止用に、タンクユニットを固定するアンカーを埋め込む手間が掛かる。   And for earthquake countermeasures, it is necessary to increase the thickness of the concrete foundation sufficiently to gain weight, and further, it takes time and effort to embed an anchor for fixing the tank unit to prevent falling.

また、単にコンクリートブロックを並べて基礎とする場合には、地震時に転倒する恐れがあり、耐震性に問題があった。   In addition, when the concrete blocks are simply arranged side by side, there is a risk of overturning during an earthquake, and there is a problem with earthquake resistance.

本考案では、従来の施工手間を省略し、かつ地震時の転倒に対しても転倒防止効果を有する電気温水器用コンクリート基礎を提供することを目的としている。   An object of the present invention is to provide a concrete foundation for an electric water heater that eliminates the conventional construction labor and has an effect of preventing the fall even when an earthquake occurs.

本考案の電気温水器用コンクリート基礎は、電気温水器のタンクユニットを載せるための2つのベースブロックと、上記2つのベースブロックを載せて所定の間隔で平行な状態で連結するための2本のレールと、上部が上記レールに固定され、土中に埋められる2つの杭コンクリート柱からなり、上記ベースブロックの上面にはレールが埋め込まれ、上記レール内を移動可能な取付けボルトによって上記タンクユニットが上記ベースブロックに固定され、上記ベースブロックは上記2本のレール内を移動可能な取付けボルトによって上記レールに固定され、上記2本のレールは平行に配置されて、杭アンカーによってそれぞれが上記杭コンクリート柱に固定されることを特徴とする。 The concrete foundation for electric water heater of the present invention includes two base blocks for mounting a tank unit of the electric water heater, and two rails for mounting the two base blocks and connecting them in parallel at a predetermined interval. And two pile concrete pillars, the upper part of which is fixed to the rail and buried in the soil, the rail is embedded on the upper surface of the base block, and the tank unit is attached to the tank unit by mounting bolts movable in the rail. Fixed to the base block, the base block is fixed to the rail by means of mounting bolts movable in the two rails, the two rails are arranged in parallel, and each of the pile concrete pillars by a pile anchor It is characterized by being fixed to.

そして、上記2本のレールおよび上記ベースブロックに埋め込まれたレールの断面形状が、略U字形状であり、U字の上部が両方ともフック状に内側に折り曲げられており、タンクユニットの上記取付けボルトおよびベースブロックの上記取付けボルトは、上記レール内を移動可能に横から挿入されるプレートが取付けられていることが好ましい。   The cross-sectional shape of the rails embedded in the two rails and the base block is substantially U-shaped, and both upper portions of the U-shape are bent inwardly in a hook shape. The bolt and the mounting bolt of the base block are preferably provided with a plate inserted from the side so as to be movable in the rail.

また、上記杭コンクリート柱は、断面が6角形で、裾広がりの形状となっており、そしてつば部を有することが好ましい。   Moreover, it is preferable that the said pile concrete pillar has a hexagonal cross section, has a flared shape, and has a collar portion.

本考案の電気温水器用コンクリート基礎は、電気温水器のタンクユニットを載せるための2つのベースブロックと、上記2つのベースブロックを載せて所定の間隔で平行な状態で連結するための2本のレールと、上部が上記レールに固定され、土中に埋められる2つの杭コンクリート柱からなり、上記ベースブロックの上面にはレールが埋め込まれ、上記レール内を移動可能な取付けボルトによって上記タンクユニットが上記ベースブロックに固定され、上記ベースブロックは上記2本のレール内を移動可能な取付けボルトによって上記レールに固定され、上記2本のレールは平行に配置されて、杭アンカーによってそれぞれが上記杭コンクリート柱に固定されることによって、より簡単にベースブロックを水平に設置できるようになり、電気温水器用コンクリート基礎設置時の作業性が向上する。 The concrete foundation for electric water heater of the present invention includes two base blocks for mounting a tank unit of the electric water heater, and two rails for mounting the two base blocks and connecting them in parallel at a predetermined interval. And two pile concrete pillars, the upper part of which is fixed to the rail and buried in the soil, the rail is embedded on the upper surface of the base block, and the tank unit is mounted by a mounting bolt movable in the rail. Fixed to the base block, the base block is fixed to the rail by means of mounting bolts movable in the two rails, the two rails are arranged in parallel, and each of the pile concrete pillars by a pile anchor The base block can be installed horizontally more easily by Workability at the time of water heater concrete foundation installation is improved.

そして、上記2本のレールおよび上記ベースブロックに埋め込まれたレールの断面形状が、略U字形状であり、U字の上部が両方ともフック状に内側に折り曲げられており、タンクユニットの上記取付けボルトおよびベースブロックの上記取付けボルトは、上記レール内を移動可能に横から挿入されるプレートが取付けられていることによって、レール内をスムーズに取付けボルトが移動可能となり、ベースブロックを所定の間隔に固定する時、あるいは、電気温水器を固定する時の作業性を向上することが可能となる。   The cross-sectional shape of the rails embedded in the two rails and the base block is substantially U-shaped, and both upper portions of the U-shape are bent inwardly in a hook shape. The bolts and the mounting bolts of the base block are fitted with a plate that is inserted from the side so as to be movable in the rail, so that the mounting bolt can be moved smoothly in the rail, and the base block is kept at a predetermined interval. It is possible to improve workability when fixing or fixing the electric water heater.

また、上記杭コンクリート柱は、断面が6角形で、裾広がりの形状となっており、そしてつば部を有することによって、土中に埋め込まれた杭コンクリート柱が地震時に電気温水器の転倒に対して抵抗する力が強くなり、地震にもより強い電気温水器用コンクリート基礎が実現可能となる。   Moreover, the above-mentioned pile concrete column has a hexagonal cross section and a hem-spreading shape, and by having a brim portion, the pile concrete column embedded in the soil can withstand the overturning of an electric water heater during an earthquake. Therefore, it becomes possible to realize a concrete foundation for electric water heaters that is more resistant to earthquakes.

以下に、図を用いて本考案の電気温水器用コンクリート基礎1について詳しく説明する。 Below, the concrete foundation 1 for electric water heaters of this invention is demonstrated in detail using figures.

図1に示すのが、本考案の電気温水器用コンクリート基礎1の斜視図である。 FIG. 1 is a perspective view of a concrete foundation 1 for an electric water heater according to the present invention.

図1に示すように、本考案の電気温水器用コンクリート基礎1は、2つのベースブロック2と、2本のレール3、2つの杭コンクリート柱4、およびこれらを取付けるためのボルト類から構成される。   As shown in FIG. 1, the concrete foundation 1 for electric water heaters of this invention is comprised from the two base blocks 2, the two rails 3, the two pile concrete pillars 4, and the bolts for attaching these. .

上記ベースブロック2の上面には、レール7が埋め込まれており、レール7内を取付けボルト5が移動可能となっている。   A rail 7 is embedded in the upper surface of the base block 2, and the mounting bolt 5 can be moved in the rail 7.

上記ベースブロック2はコンクリートブロックであり、図6に示すように、その内部には補強のためのメッシュ金網9が埋め込まれている。また、上記ベースブロック2を持ち運びしやすいように、両側面の下側に持ち手掛かり用の切込み10が設けられている。   The base block 2 is a concrete block, and a mesh wire mesh 9 for reinforcement is embedded in the interior thereof as shown in FIG. Moreover, in order to carry the said base block 2 easily, the notch 10 for a handle is provided in the lower side of both sides.

そして、上記ベースブロック2には、2箇所貫通穴8が設けられており、この貫通穴8を利用して、上記レール7に固定される。   The base block 2 is provided with two through holes 8 and is fixed to the rail 7 using the through holes 8.

上記レール3およびレール7は、略U字形状であり、U字の上部が両方ともフック状に内側に折り曲げられており(図3、4、5参照)、溶融亜鉛メッキ鋼板を用いて加工している。   The rail 3 and the rail 7 are substantially U-shaped, and both upper portions of the U-shape are bent inward in a hook shape (see FIGS. 3, 4, and 5), and are processed using hot-dip galvanized steel sheets. ing.

上記杭コンクリート柱4は、図2に示すように、断面が6角形で、裾広がりの形状となっており、そしてつば部11を有する。そして、上面には、杭アンカー13用のボルト受12が埋め込まれている。   As shown in FIG. 2, the pile concrete column 4 has a hexagonal cross section, a hem-spread shape, and a collar portion 11. And the bolt receiver 12 for the pile anchor 13 is embedded in the upper surface.

続いて、上述の各部材の固定方法について説明する。   Then, the fixing method of each above-mentioned member is demonstrated.

ベースブロック2とレール3の固定は、取付けボルト6を用いる。図7の(a)に示すように、取付けボルト6は、ボルト21、プレート22、ワッシャ23、サブワッシャ24、ナット25から構成される。   A fixing bolt 6 is used to fix the base block 2 and the rail 3. As shown in FIG. 7A, the mounting bolt 6 includes a bolt 21, a plate 22, a washer 23, a sub washer 24, and a nut 25.

取付けボルト6のプレート22は、レール3内に横から挿入可能な大きさであり、ボルト21にプレート22を取り付けた状態で、プレート22をレール3に挿入し、ボルト21をレール3の所定の位置にセットする。   The plate 22 of the mounting bolt 6 is large enough to be inserted into the rail 3 from the side. With the plate 22 attached to the bolt 21, the plate 22 is inserted into the rail 3, and the bolt 21 is inserted into the predetermined rail 3. Set to position.

そして、ベースブロック2の貫通穴8に上記ボルトを下から挿入して、ベースブロック2をレール3に載せる。この時に再度ベースブロック2の位置決めを行った後、上記ボルト21にワッシャ23、サブワッシャ24を嵌めて、ナット25を締め込み、図3の(b)の状態となる。   Then, the bolt is inserted into the through hole 8 of the base block 2 from below, and the base block 2 is placed on the rail 3. At this time, after positioning the base block 2 again, the washer 23 and the sub-washer 24 are fitted to the bolt 21, the nut 25 is tightened, and the state shown in FIG.

このようにして、2つのベースブロック2を2本のレール3に所定の間隔で平行に並べ、2つのベースブロック2と2本のレール3を井形に組み立てる。   In this way, the two base blocks 2 are arranged in parallel on the two rails 3 at a predetermined interval, and the two base blocks 2 and the two rails 3 are assembled in a well shape.

次に、レール3と杭コンクリート柱4との固定方法について説明する。レール3と杭コンクリート柱4は、図2示すような杭アンカー13を用いて固定する。   Next, the fixing method of the rail 3 and the pile concrete pillar 4 is demonstrated. The rail 3 and the pile concrete column 4 are fixed using a pile anchor 13 as shown in FIG.

杭アンカー13は、図2に示すように、ボルト31、金具32、ワッシャ33、ナット34から構成される。   The pile anchor 13 is comprised from the volt | bolt 31, the metal fitting 32, the washer 33, and the nut 34, as shown in FIG.

杭コンクリート柱4の上にレール3を載せる。この時、レール3の中央の底部に開けられた穴を杭コンクリート柱4の上面に設けられたボルト受12に合わせる。そして、ボルト31をボルト受12に締め込む。   The rail 3 is placed on the pile concrete pillar 4. At this time, the hole drilled in the bottom of the center of the rail 3 is aligned with the bolt receiver 12 provided on the upper surface of the pile concrete column 4. Then, the bolt 31 is fastened to the bolt receiver 12.

ボルト31を締め込んだら、ボルト31に金具32を入れる。この時、図4に示すように、金具32でレール3を上から押さえ込むように位置を合わせてレール3に載せる。そして、ワッシャ33を嵌めて、ナット34で締め付けて、レール3を杭コンクリート柱4に固定する。   When the bolt 31 is tightened, the metal fitting 32 is inserted into the bolt 31. At this time, as shown in FIG. 4, the position is adjusted so that the rail 3 is pressed from above by the metal fitting 32, and the rail 3 is placed on the rail 3. Then, a washer 33 is fitted and tightened with a nut 34 to fix the rail 3 to the pile concrete column 4.

次に、電気温水器のタンクユニット14の固定方法を説明する。タンクユニット14は、図5に示すように取付けボルト5を用いて、ベースブロック2に固定する。   Next, a method for fixing the tank unit 14 of the electric water heater will be described. The tank unit 14 is fixed to the base block 2 using mounting bolts 5 as shown in FIG.

取付けボルト5は、図7の(b)に示すように、ボルト41、プレート42、ワッシャ43、サブワッシャ44、ナット45から構成される。   The mounting bolt 5 includes a bolt 41, a plate 42, a washer 43, a sub washer 44, and a nut 45 as shown in FIG.

取付けボルト5のプレート42は、レール7内に横から挿入可能な大きさであり、ボルト41にプレート42を取り付けた状態で、プレート42をレール7に横から挿入し、ボルト41をレール7の所定の位置にセットする。   The plate 42 of the mounting bolt 5 is of a size that can be inserted into the rail 7 from the side. With the plate 42 attached to the bolt 41, the plate 42 is inserted into the rail 7 from the side, and the bolt 41 is inserted into the rail 7. Set to a predetermined position.

上記ボルト41にタンクユニット14の脚17の穴を合わせて、タンクユニット14をベースブロック2に載せる。そして、ボルト41にワッシャ43、サブワッシャ44を嵌めて、ナット45で締め込んで、タンクユニット14をベースブロック2に固定する。   The holes of the legs 17 of the tank unit 14 are aligned with the bolts 41 and the tank unit 14 is placed on the base block 2. Then, a washer 43 and a sub-washer 44 are fitted to the bolt 41 and tightened with a nut 45 to fix the tank unit 14 to the base block 2.

次に、本考案の電気温水器用コンクリート基礎1を地面に設置する手順について、図5を用いて説明する。   Next, the procedure for installing the concrete foundation 1 for electric water heater of the present invention on the ground will be described with reference to FIG.

まず初めに、電気温水器用コンクリート基礎1を設置する範囲よりも大きく地面を掘削する。深さは、全体としてはレール3の厚みとその下に敷く砕石およびセメントを考慮した深さとする。   First, the ground is excavated larger than the range where the concrete foundation 1 for electric water heaters is installed. The depth is assumed to be a depth considering the thickness of the rail 3 and crushed stones and cement laid under the rail 3 as a whole.

そして、2つの杭コンクリート柱4を設置する場所は、それぞれ、杭コンクリート柱4の高さとその下に敷く砕石およびセメントを考慮した深さとし、回りよりも一段深く掘削する。このようにして、掘削が完了したら、砕石を敷き均し、さらにセメントを敷いてある程度平らにする。 And the place which installs the two pile concrete pillars 4 is made into the depth which considered the height of the pile concrete pillar 4, and the crushed stone and cement laid under it, respectively, and excavates one step deeper than the circumference. In this way, when excavation is completed, the crushed stone is spread and leveled, and then the cement is further spread and flattened to some extent.

次に、平らな場所で、2本のレール3と2つのベースブロック2の固定を行う。まず、2本のレール2をベースブロック2の2つの貫通穴8の間隔と同じ間隔で平行に並べ、2本のレール3にボルト21に取付けたプレート22をそれぞれ2個ずつレール3の横から挿入し所定の位置にセットする。   Next, the two rails 3 and the two base blocks 2 are fixed on a flat place. First, the two rails 2 are arranged in parallel at the same interval as the interval between the two through holes 8 of the base block 2, and two plates 22 attached to the bolts 21 on the two rails 3, respectively, from the side of the rail 3. Insert and set in place.

そして、上記2本のレール3その上に2つのベースブロック2を平行に並べて載せる。この時、ベースブロック2の貫通穴8にボルト21を挿入する。このようにして、上記2本のレール3と2つのベースブロック2は井形に組み合わされる。その後、上記レール3と上記ベースブロック2を、取付けボルト5のワッシャ23、サブワッシャ24、ナット25を用いて上述の方法で固定する。この際、2つのベースブロックの間隔を上に載せる電気温水器のタンクユニット14の脚15の間隔に合わせて調節しておく。 Then, two base blocks 2 are placed in parallel on the two rails 3. At this time, the bolt 21 is inserted into the through hole 8 of the base block 2. In this way, the two rails 3 and the two base blocks 2 are combined in a well shape. Thereafter, the rail 3 and the base block 2 are fixed by the above-described method using the washer 23, the sub-washer 24, and the nut 25 of the mounting bolt 5. At this time, the interval between the two base blocks is adjusted in accordance with the interval between the legs 15 of the tank unit 14 of the electric water heater to be placed on top.

次に、杭コンクリート柱4を一段深く掘削した場所にセットする。そして、その上に、上述のベースブロック2を固定したレール3を載せる。この時、レール3の底面に開けられた穴を、上記杭コンクリート4の上面のボルト受12に合わせる。そして、杭アンカー13を用いて上述の方法で、上記レール3と上記杭コンクリート柱4を固定する。   Next, the pile concrete pillar 4 is set in a place excavated one step deeper. And the rail 3 which fixed the above-mentioned base block 2 is mounted on it. At this time, the hole opened on the bottom surface of the rail 3 is aligned with the bolt receiver 12 on the top surface of the pile concrete 4. And the said rail 3 and the said pile concrete pillar 4 are fixed by the above-mentioned method using the pile anchor 13. FIG.

このようにして、電気温水器用コンクリート基礎1の組み立てが完了したら、次に、上記杭コンクリート4の周囲をコンクリート等を用いて埋め戻す。さらに、上記レール3の周囲等も砕石等を用いて周囲の地面と同じ高さに敷き均す。これで、電気温水器用コンクリート基礎1の設置が完了となる。   When the assembly of the electric water heater concrete foundation 1 is completed in this manner, the periphery of the pile concrete 4 is then backfilled with concrete or the like. Further, the periphery of the rail 3 is laid on the same height as the surrounding ground using crushed stone or the like. This completes the installation of the concrete foundation 1 for an electric water heater.

この後、上記ベースブロック2のレール7に、ボルト41にプレート42を取り付けた状態で、プレート42をレール3の横から挿入し、ボルト41を上に設置する電気温水器のタンクユニット14の脚15の穴の位置に合わせてセットする。そして、ベースブロック2に電気温水器のタンクユニット14を載せ、その脚15を上述のような方法で、取付けボルト5を用いて固定する。これで、図5のような状態となり、全て完了となる。   After that, with the plate 42 attached to the bolt 41 to the rail 7 of the base block 2, the plate 42 is inserted from the side of the rail 3 and the bolt 41 is installed on the legs of the tank unit 14 of the electric water heater. Set according to the position of 15 holes. And the tank unit 14 of an electric water heater is mounted on the base block 2, and the leg 15 is fixed with the attachment bolt 5 by the method as mentioned above. Thus, the state as shown in FIG. 5 is obtained, and all the processes are completed.

このように、本考案の電気温水器用コンクリート基礎は、設置の際に水平にするのが簡単で、より施工性が良く、設置時間が短縮できる。また、杭コンクリート柱を土中に埋め込むことにより、耐震性を向上させることが可能となった。   Thus, the concrete foundation for an electric water heater of the present invention can be easily leveled during installation, has better workability, and can shorten the installation time. In addition, by embedding pile concrete columns in the soil, it became possible to improve earthquake resistance.

その結果、より簡単で、よりスピーディーな設置が可能となり、低コストで、安全性を向上することが可能となる。 As a result, simpler and faster installation is possible, and safety can be improved at low cost.

本考案の電気温水器用コンクリート基礎の斜視図である。It is a perspective view of the concrete foundation for electric water heaters of this invention. 杭コンクリート柱及び杭アンカーの斜視図である。It is a perspective view of a pile concrete pillar and a pile anchor. (a)は、レールにベースブロックを固定した状態の断面図であり、(b)は(a)のA部の拡大図である。(A) is sectional drawing of the state which fixed the base block to the rail, (b) is an enlarged view of the A section of (a). 杭コンクリート柱にレールを固定した状態を示す斜視図である。It is a perspective view which shows the state which fixed the rail to the pile concrete pillar. 本考案の電気温水器用コンクリート基礎を用いて、電気温水器のタンクユニットを設置した状態を示す概略側面図である。It is a schematic side view which shows the state which installed the tank unit of the electric water heater using the concrete foundation for electric water heaters of this invention. ベースブロックの斜視図であり、内部のメッシュ筋を描いた図である。It is a perspective view of a base block, and is a figure which drew an internal mesh line. (a)は取付けボルト6の斜視図、(b)は取付けボルト5の斜視図である。(A) is a perspective view of the mounting bolt 6, and (b) is a perspective view of the mounting bolt 5.

符号の説明Explanation of symbols

1 電気温水器用コンクリート基礎
2 ベース部材
3 レール
4 杭コンクリート柱
5 取付けボルト
6 取付けボルト
7 レール
8 貫通穴
9 メッシュ金網
10 切り込み
11 つば部
12 ボルト受
13 杭アンカー
14 タンクユニット
15 脚
21 ボルト
22 プレート
23 ワッシャ
24 サブワッシャ
25 ナット
31 ボルト
32 金具
33 ワッシャ
34 ナット
41 ボルト
42 プレート
43 ワッシャ
44 サブワッシャ
45 ナット
DESCRIPTION OF SYMBOLS 1 Concrete foundation for electric water heaters 2 Base member 3 Rail 4 Pile concrete pillar 5 Mounting bolt 6 Mounting bolt 7 Rail 8 Through hole 9 Mesh wire mesh 10 Cut 11 Collar part 12 Bolt receiver 13 Pile anchor 14 Tank unit 15 Leg 21 Bolt 22 Plate 23 Washer 24 Sub washer 25 Nut 31 Bolt 32 Metal fitting 33 Washer 34 Nut 41 Bolt 42 Plate 43 Washer 44 Sub washer 45 Nut

Claims (3)

電気温水器のタンクユニットを載せるための2つのベースブロックと、上記2つのベースブロックを載せて所定の間隔で平行な状態で連結するための2本のレールと、上部が上記レールに固定され、土中に埋められる2つの杭コンクリート柱からなり、
上記ベースブロックの上面にはレールが埋め込まれ、上記レール内を移動可能な取付けボルトによって上記タンクユニットが上記ベースブロックに固定され、
上記ベースブロックは上記2本のレール内を移動可能な取付けボルトによって上記レールに固定され、
上記2本のレールは平行に配置されて、杭アンカーによってそれぞれが上記杭コンクリート柱に固定されることを特徴とする電気温水器用コンクリート基礎。
Two base blocks for mounting a tank unit of an electric water heater, two rails for mounting the two base blocks and connecting them in parallel at a predetermined interval, and an upper portion fixed to the rails, It consists of two pile concrete pillars buried in the soil,
A rail is embedded in the upper surface of the base block, and the tank unit is fixed to the base block by a mounting bolt that can move in the rail.
The base block is fixed to the rail by mounting bolts movable in the two rails,
A concrete foundation for an electric water heater, wherein the two rails are arranged in parallel and each is fixed to the pile concrete pillar by a pile anchor.
上記2本のレールおよび上記ベースブロックに埋め込まれたレールの断面形状が、略U字形状であり、U字の上部が両方ともフック状に内側に折り曲げられており、タンクユニットの上記取付けボルトおよびベースブロックの上記取付けボルトは、上記レール内を移動可能に横から挿入されるプレートが取付けられていることを特徴とする請求項1に記載の電気温水器用コンクリート基礎。   The cross-sectional shape of the two rails and the rail embedded in the base block is substantially U-shaped, and both upper portions of the U-shape are bent inwardly in a hook shape. 2. The electric water heater concrete foundation according to claim 1, wherein the mounting bolt of the base block is provided with a plate inserted from the side so as to be movable in the rail. 上記杭コンクリート柱は、断面が6角形で、裾広がりの形状となっており、そしてつば部を有することを特徴とする請求項1又は2に記載の電気温水器用コンクリート基礎。   The concrete foundation for an electric water heater according to claim 1 or 2, wherein the pile concrete column has a hexagonal cross section, a hem-spread shape, and a collar portion.
JP2007002561U 2007-04-11 2007-04-11 Concrete foundation for electric water heater Expired - Lifetime JP3133011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007002561U JP3133011U (en) 2007-04-11 2007-04-11 Concrete foundation for electric water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007002561U JP3133011U (en) 2007-04-11 2007-04-11 Concrete foundation for electric water heater

Publications (1)

Publication Number Publication Date
JP3133011U true JP3133011U (en) 2007-06-28

Family

ID=43283715

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007002561U Expired - Lifetime JP3133011U (en) 2007-04-11 2007-04-11 Concrete foundation for electric water heater

Country Status (1)

Country Link
JP (1) JP3133011U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016050458A (en) * 2014-09-02 2016-04-11 株式会社サイコン工業 Structure for equipment installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016050458A (en) * 2014-09-02 2016-04-11 株式会社サイコン工業 Structure for equipment installation

Similar Documents

Publication Publication Date Title
KR100588445B1 (en) Method for installation of environment friendly electric utility pole
KR101341679B1 (en) Device for constructing an underground structure and method thereof
KR100933660B1 (en) Structure for supporting stone wall for reinforcement and construction method thereof
KR100955788B1 (en) A pile head reinforcement structure ofprecastconcrete pile
EP3420138B1 (en) Anchoring device for a fence
JP2011006849A (en) Method for constructing foundation
JP3133011U (en) Concrete foundation for electric water heater
JP2011241547A (en) Strut and building provided with the same
KR200482057Y1 (en) Head Fixing System of Inclined Earth Retaining Structure
KR101632840B1 (en) Construction method of underground road way having drain structure of temporary and permanent wall
JP2020094443A (en) Method for constructing foundation of building
JP4446544B2 (en) Basic structure of a house
AU2010226975A1 (en) Precast Concrete Foundation Block and Foundation
EP3124705A1 (en) Formers
KR20220099010A (en) Foundation construction method with anchorage plate
JP6083788B2 (en) Temporary support method for foundation
JP5056534B2 (en) Structure installation method for water gradient floor
JP5570333B2 (en) Installation structure of outdoor equipment
KR20130142443A (en) Foundation construction of bus stop using concrete block and method for constructionn the same
KR101707376B1 (en) Structure for constructing underground structure using composite beams and the construction method thereof
JP3170488U (en) Concrete foundation
JP2001226973A (en) Slope protecting method
KR101052650B1 (en) A pile head reinforcement structure of pile
JP4809446B2 (en) Septic tank installation structure
JP4774502B2 (en) Simple foundation

Legal Events

Date Code Title Description
R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110606

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110606

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130606

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130606

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140606

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term