JP3084349B2 - Slab opening curing bar - Google Patents

Slab opening curing bar

Info

Publication number
JP3084349B2
JP3084349B2 JP07185108A JP18510895A JP3084349B2 JP 3084349 B2 JP3084349 B2 JP 3084349B2 JP 07185108 A JP07185108 A JP 07185108A JP 18510895 A JP18510895 A JP 18510895A JP 3084349 B2 JP3084349 B2 JP 3084349B2
Authority
JP
Japan
Prior art keywords
parallel
reinforcing bar
construction
slab
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP07185108A
Other languages
Japanese (ja)
Other versions
JPH08239950A (en
Inventor
拓司 大野
Original Assignee
株式会社アクス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社アクス filed Critical 株式会社アクス
Priority to JP07185108A priority Critical patent/JP3084349B2/en
Publication of JPH08239950A publication Critical patent/JPH08239950A/en
Application granted granted Critical
Publication of JP3084349B2 publication Critical patent/JP3084349B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、鉄筋コンクリー
ト構造の床板に形成された工事用穴を工事終了時に鉄筋
コンクリートで埋めるためのスラブ開口養生鉄筋に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a slab opening reinforcing bar for filling a reinforced concrete structure floor plate with a reinforced concrete at the time of completion of construction.

【0002】[0002]

【従来の技術】鉄筋コンクリートの建築物を施工する際
には、床下において各種の工事を行うために、鉄筋コン
クリート構造の床板(スラブ)に通称「だめ穴」と呼ば
れる工事用穴をあけておく場合がある。
2. Description of the Related Art When constructing a reinforced concrete building, in order to perform various types of work under the floor, there is a case where a hole for construction called a "usehole" is formed in a slab of a reinforced concrete structure. is there.

【0003】そこで、そのような工事用穴を形成するた
めに、工事用穴になる部分には床板用の鉄筋を張らずに
工事用穴の形に型枠を設置して、その型枠の周囲にコン
クリートを流し込んでいる。
In order to form such a construction hole, a formwork is installed in the form of a construction hole without forming a reinforcing bar for a floor plate in a portion to be the construction hole. Concrete is poured around.

【0004】そして、工事中は工事用穴の開口を鉄板等
で塞いでおいて必要な時にはそれを開き、工事終了時
に、工事用穴に鉄筋を張ってからコンクリートを流し込
んで穴を埋めている。
[0004] During the construction, the opening of the construction hole is closed with an iron plate or the like, and it is opened when necessary. At the end of the construction, a steel bar is set in the construction hole and concrete is poured to fill the hole. .

【0005】[0005]

【発明が解決しようとする課題】しかし上述のような工
程では、床板に鉄筋を張ってコンクリートを打ち、その
後、また工事用穴の部分にだけ鉄筋を張る工事をしなけ
ればならないので、はなはだ面倒である。
However, in the above-mentioned process, a steel bar is laid on the floor plate and concrete is struck, and then the steel bar must be laid only on the hole for the construction work. It is.

【0006】そして、工事用穴の部分に張られる鉄筋は
最初に床板の本体部分に打たれたコンクリートと結合し
ていないので、工事用穴を埋めた部分の強度が低くなる
ことは避けられない。
[0006] Since the reinforcing steel that is stretched in the hole for construction is not bonded to the concrete that has been initially struck on the main body of the floorboard, it is inevitable that the strength of the portion in which the hole for construction is filled is reduced. .

【0007】また、工事用穴を形成するために、最初の
コンクリート打ちの際に工事用穴の形状の型枠を配置し
て、コンクリート打ちが済んだらその型枠を取り除かな
ければならないので、その点でも工事が面倒である。
Also, in order to form a construction hole, a formwork having the shape of the construction hole must be arranged at the time of the first concrete pouring, and the formwork must be removed after the concrete is cast. The construction is also troublesome in point.

【0008】そこで本発明は、工事用穴の形成と穴埋め
を簡単な工程で行うことができ、しかも穴埋め部分につ
いて優れた強度を得ることができるスラブ開口養生鉄筋
を提供することを目的とする。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a slab-opening reinforcing steel which can form and fill a hole for construction in a simple process, and can obtain excellent strength in the filled portion.

【0009】[0009]

【課題を解決するための手段】上記の目的を達成するた
め、本発明のスラブ開口養生鉄筋は、鉄筋コンクリート
構造の床板に形成された工事用穴を工事終了時に鉄筋コ
ンクリートで埋めるためのスラブ開口養生鉄筋であっ
て、上記工事用穴内に設置されてその穴の開口部側から
見て平行に略真っ直ぐに配置された第1の平行部材と、
両端が上記第1の平行部材に対してスライド自在に係合
する一本又は複数の第1の移動鉄筋と、上記工事用穴内
に設置されてその穴の開口部側から見て上記第1の平行
部材と異なる方向に平行に略真っ直ぐに配置された第2
の平行部材と、両端が上記第2の平行部材に対してスラ
イド自在に係合して上記工事用穴の開口部側から見て上
記第1の移動鉄筋の移動範囲と重なる移動範囲を有する
一本又は複数の第2の移動鉄筋とを設けたことを特徴と
する。
In order to achieve the above-mentioned object, the present invention provides a cured slab opening reinforcing bar according to the present invention, which fills a construction hole formed in a floor plate of a reinforced concrete structure with reinforced concrete at the end of construction. A first parallel member installed in the construction hole and arranged substantially straight in parallel as viewed from the opening side of the hole;
One or a plurality of first movable rebars, both ends of which are slidably engaged with the first parallel member, and the first movable rebar installed in the construction hole and viewed from the opening side of the hole. A second, substantially straight, parallel arrangement in a direction different from the parallel member;
And a moving range in which both ends are slidably engaged with the second parallel member and overlap with the moving range of the first moving rebar when viewed from the opening side of the construction hole. A book or a plurality of second moving rebars is provided.

【0010】第1の移動鉄筋はその両端部で第1の平行
部材に対してスライドし、第2の移動鉄筋はその両端部
で第2の平行部材に対してスライドする。そして、両移
動鉄筋の移動範囲は工事用穴の開口部側から見て重なる
部分がある。
The first moving reinforcing bar slides at both ends thereof with respect to the first parallel member, and the second moving reinforcing bar slides at both ends thereof with respect to the second parallel member. The moving range of the two rebars overlaps when viewed from the opening side of the construction hole.

【0011】したがって、スラブ開口養生鉄筋を工事用
穴内に設置して両移動鉄筋を移動させることにより、工
事に必要なときは両移動鉄筋を端へスライドさせて穴を
開き、工事用穴にコンクリートを流し込んで埋める際に
は、両移動鉄筋を等間隔に並べて配置することができ
る。
[0011] Therefore, by setting the slab opening curing steel in the construction hole and moving both movable reinforcements, when necessary for construction, the two movable reinforcements are slid to the end to open a hole, and concrete is inserted into the construction hole. When pouring and filling, both moving rebars can be arranged at equal intervals.

【0012】なお、上記第1及び第2の平行部材が鉄筋
であってもよく、その鉄筋の少なくとも一方の延長部
に、上記工事用穴の外側に突出するアンカー部が形成さ
れていてもよい。
The first and second parallel members may be rebars, and at least one extension of the rebars may be formed with an anchor projecting outside the construction hole. .

【0013】また、上記平行部材が板状の部材であり、
上記工事用穴の外側に突出するアンカー部材の基部が上
記各板状部材に連結されていてもよく、上記各板状部材
から側方に適宜の間隔で上記アンカー部材が突出するよ
うに、上記各板状部材に対して複数のアンカー部材が連
結されていてもよい。
Further, the parallel member is a plate-like member,
The base of the anchor member protruding outside the construction hole may be connected to each of the plate members, and the anchor member protrudes laterally from the plate members at appropriate intervals. A plurality of anchor members may be connected to each plate member.

【0014】また、上記床板にコンクリートを流す際に
上記工事用穴の内周面となる部分に配置されて型枠とし
て機能する複数の鉄筋が、上記第1及び第2の平行部材
と連結して設けられていてもよく、上記型枠として機能
する鉄筋に、上記工事用穴の外側に突出するフック部が
突出形成されていてもよい。
In addition, a plurality of rebars, which are arranged on the inner peripheral surface of the construction hole when the concrete is poured on the floorboard and function as a formwork, are connected to the first and second parallel members. A hook portion protruding outside the construction hole may be formed so as to protrude from the reinforcing bar functioning as the formwork.

【0015】[0015]

【発明の実施の形態】図面を参照して実施の形態を説明
する。図1は、鉄筋コンクリート構造の床板に形成され
た工事用穴を工事終了時に鉄筋コンクリートで埋めるた
めのスラブ開口養生鉄筋の第1の実施の形態を示してお
り、その外周部には、床板にコンクリートを流す際に工
事用穴の内周面となる部分に配置されて型枠として機能
する複数の鉄筋1…(以下、「型枠鉄筋1」という)が
配置されている。
Embodiments will be described with reference to the drawings. Fig. 1 shows a first embodiment of a slab opening curing reinforcing bar for filling a hole for construction formed in a floor plate of a reinforced concrete structure with reinforced concrete at the time of completion of construction, and a concrete plate is provided on an outer peripheral portion thereof. A plurality of rebars 1... (Hereinafter referred to as “form rebars 1”) which are arranged on the inner peripheral surface of the construction hole when flowing and function as a formwork are arranged.

【0016】型枠鉄筋1…は、図2に分解して図示され
るように、U字形の一対の鉄筋を互いの開放端どうしで
溶接して長方形のリング状に形成し、その長方形状の鉄
筋を複数段(例えば5〜6段)積み重ねて形成されてい
る。
As shown in FIG. 2, a pair of U-shaped rebars are formed by welding a pair of U-shaped rebars to each other at their open ends to form a rectangular ring. It is formed by stacking a plurality of reinforcing bars (for example, 5 to 6 stages).

【0017】各型枠鉄筋1…は、中央の溶接部だけが部
分的に上下に重ね合わされているので、それ以外の部分
では、各型枠鉄筋1…の間に各々鉄筋一本分の隙間が形
成されている。
Since only the central welded portion of each of the form reinforcing bars 1 is partially overlapped with each other vertically, in the other portions, a gap of one reinforcing bar is provided between the form reinforcing bars 1. Are formed.

【0018】そして各型枠鉄筋1は、図1に示されるよ
うに、四隅に立設された支柱鉄筋2…に溶接されて固定
されている。なお、各支柱鉄筋2…の頂部は一番上の型
枠鉄筋1より少し上方に突出するようになっている。
As shown in FIG. 1, each form reinforcing bar 1 is fixed by welding to column reinforcing bars 2 standing at four corners. Note that the tops of the column reinforcing bars 2 project slightly upward from the top frame reinforcing bar 1.

【0019】3は、工事用穴内に設置されてその穴の開
口部側(上方)から見て平行に略真っ直ぐに配置された
第1の平行鉄筋であり、型枠鉄筋1の両側の長辺のすぐ
内側に各々配置されていて、上方に配置されている二本
の型枠鉄筋1,1の隙間から外側に突出し、そこで支柱
鉄筋2に溶接されている。
Reference numeral 3 denotes a first parallel reinforcing bar installed in the construction hole and arranged substantially straight in a parallel and parallel manner when viewed from the opening side (upper side) of the hole. And projecting outward from the gap between the two form-bar reinforcements 1, 1 arranged above, and are welded to the column reinforcement 2 there.

【0020】この溶接部分からさらに外側に伸び出した
部分は、床板のコンクリート打ちの時にそのコンクリー
トと結合するアンカー部4であり、このアンカー部4が
床板のコンクリートと結合することにより、第1の平行
鉄筋3が床板と強力に一体化される。
A portion extending further outward from the welded portion is an anchor portion 4 which is connected to the concrete when the floor plate is driven into concrete. The anchor portion 4 is connected to the concrete of the floor plate to form the first portion. The parallel reinforcing bar 3 is strongly integrated with the floor plate.

【0021】この第1の平行鉄筋3に対して直角に配置
された第1の移動鉄筋5は、両端部が各々J字状に曲げ
られていて、その部分が第1の平行鉄筋3を緩く囲むよ
うに配置されている。図3は、第1の平行鉄筋3と第1
の移動鉄筋5だけに斜線を施したものである。
The first movable reinforcing bar 5 arranged at a right angle to the first parallel reinforcing bar 3 has both ends bent in a J-shape, and the portion loosens the first parallel reinforcing bar 3. It is arranged to surround. FIG. 3 shows the first parallel reinforcing bar 3 and the first parallel reinforcing bar 3.
Only the moving rebar 5 is hatched.

【0022】したがって、第1の移動鉄筋5は両端が第
1の平行鉄筋3に対してスライド自在に係合しており、
第1の平行鉄筋3に沿って、図3の矢印A方向に自由に
スライドさせることができる。第1の移動鉄筋5はこの
実施の形態では8本設けられているが、工事用穴の大き
さ等に対応して、1本以上何本に設定してもよい。
Accordingly, both ends of the first movable reinforcing bar 5 are slidably engaged with the first parallel reinforcing bar 3.
3 can be freely slid along the first parallel reinforcing bar 3 in the direction of arrow A in FIG. In the present embodiment, eight first movable rebars 5 are provided, but any number of one or more may be set according to the size of a construction hole or the like.

【0023】図1に戻って、6は、工事用穴内に設置さ
れてその穴の開口部側から見て第1の平行鉄筋3と直角
の向きに配置された第2の平行鉄筋であり、型枠鉄筋1
の両側の短辺のすぐ内側に各々配置されていて、下方に
配置されている二本の型枠鉄筋1,1の隙間から外側に
突出し、そこで支柱鉄筋2に溶接されている。その延長
部分もアンカー部4である。
Returning to FIG. 1, reference numeral 6 denotes a second parallel reinforcing bar installed in the construction hole and arranged at right angles to the first parallel reinforcing bar 3 when viewed from the opening side of the hole. Formwork reinforcement 1
Are protruded outward from the gap between the two form reinforcing bars 1 and 1 disposed below, and are welded to the column reinforcing bars 2. The extended portion is also the anchor portion 4.

【0024】この第2の平行鉄筋6に対して直角に配置
された第2の移動鉄筋7は、第1の移動鉄筋5と同様に
両端部が各々J字状に曲げられて、その部分が第2の平
行鉄筋6を緩く囲むように配置されている。図4は、第
2の平行鉄筋6と第2の移動鉄筋7だけに斜線を施した
ものである。
The second movable reinforcing bar 7 arranged at a right angle to the second parallel reinforcing bar 6 has both ends bent in a J-shape, similarly to the first moving reinforcing bar 5, and the portion is bent. It is arranged so as to loosely surround the second parallel reinforcing bar 6. In FIG. 4, only the second parallel reinforcing bar 6 and the second moving reinforcing bar 7 are hatched.

【0025】したがって、第2の移動鉄筋7は両端が第
2の平行鉄筋6に対してスライド自在に係合しており、
第2の平行鉄筋6に沿って、図4の矢印B方向に自由に
スライドさせることができる。第2の移動鉄筋7はこの
実施の形態では4本設けられているが、工事用穴の大き
さ等に対応して、1本以上何本に設定してもよい。
Therefore, both ends of the second movable reinforcing bar 7 are slidably engaged with the second parallel reinforcing bar 6,
It is possible to slide freely along the second parallel reinforcing bar 6 in the direction of arrow B in FIG. In this embodiment, four second movable rebars 7 are provided, but one or more second movable rebars 7 may be set according to the size of a construction hole or the like.

【0026】なお、アンカー部4はこの実施の形態にお
いてはJ字状に曲げられているが、真っ直ぐでもよく、
あるいは他の各種形状に形成してもよい。また、第1及
び第2の平行鉄筋3,6は単線でも撚り線でもよい。
Although the anchor portion 4 is bent in a J-shape in this embodiment, it may be straight.
Or you may form in other various shapes. Further, the first and second parallel reinforcing bars 3, 6 may be single wires or stranded wires.

【0027】このようにして、型枠鉄筋1の内側のほぼ
全範囲において第1と第2の移動鉄筋5,7を直角方向
に自由にスライドさせることができる。したがって、第
1と第2の移動鉄筋5,7をともに外方に寄せれば、図
5に示されるように、型枠鉄筋1内に大きな開口が形成
される。
In this manner, the first and second movable reinforcing bars 5 and 7 can be freely slid in the right angle direction in almost the entire area inside the form reinforcing bar 1. Therefore, when the first and second movable reinforcing bars 5 and 7 are both moved outward, a large opening is formed in the formwork reinforcing bar 1 as shown in FIG.

【0028】上述のように構成されたスラブ開口養生鉄
筋は、床板にコンクリート打ちを行う際に、工事用穴を
形成する部分に設置される。そして、型枠鉄筋1が、工
事用穴を形成するための型枠になる。
The slab-opening curing steel bar configured as described above is installed in a portion where a construction hole is formed when concrete is cast on a floor plate. And formwork reinforcement 1 becomes a formwork for forming a hole for construction.

【0029】そして、床板にコンクリート打ちをする
と、型枠鉄筋1の外側に突出するアンカー部4が床板の
コンクリートと結合して平行鉄筋3,6が床板と強力に
一体化され、平行鉄筋3,6の固定状態に優れた強度が
得られる。そして、型枠鉄筋1の内側にはコンクリート
が流れ込まないので、そこに工事用穴が形成される。
Then, when concrete is hit on the floor plate, the anchor portions 4 projecting outside the form reinforcing bar 1 are connected to the concrete of the floor plate, and the parallel reinforcing bars 3 and 6 are strongly integrated with the floor plate. Excellent strength can be obtained in the fixed state of No. 6. Since no concrete flows into the inside of the form reinforcing bar 1, a construction hole is formed there.

【0030】そして、両移動鉄筋5,7をスライドさせ
ることにより、工事に必要なときは両移動鉄筋5,7を
端へスライドさせて穴を開き、工事が終了して工事用穴
にコンクリートを流し込んで埋める際には、両移動鉄筋
5,7をコンクリート打ちに適するように等間隔に並べ
て配置することができる。その時、型枠鉄筋1は工事用
穴内にいっしょに埋め込まれる。
Then, by sliding the movable reinforcing bars 5 and 7, when necessary for construction, the moving movable bars 5 and 7 are slid to the ends to make holes, and when the construction is completed, concrete is filled in the construction holes. When pouring and filling, both movable reinforcing bars 5 and 7 can be arranged at equal intervals so as to be suitable for concrete driving. At that time, the formwork reinforcing bar 1 is embedded together in the construction hole.

【0031】また、工事用穴を利用した工事のない状態
のときは、図6に示されるように、型枠鉄筋1の上に養
生蓋10を被せておけばよく、支柱鉄筋2の上端が型枠
鉄筋1の上端より突出しているので、養生蓋10の足1
0aが支柱鉄筋2に係合して、養生蓋10の位置ずれを
防止することができる。
When there is no construction using the construction hole, as shown in FIG. 6, a curing lid 10 may be placed on the form reinforcing bar 1, and the upper end of the column reinforcing bar 2 may be closed. Since it protrudes from the upper end of the formwork reinforcing bar 1,
Oa is engaged with the support rebar 2, and the displacement of the curing lid 10 can be prevented.

【0032】図7ないし図10は、本発明の第2の実施
の形態を示しており、図7はスラブ開口養生鉄筋の平面
図、図8はその正面断面図である。ただし、図8は、判
りやすくするために実際より縦長に図示されている。
FIGS. 7 to 10 show a second embodiment of the present invention. FIG. 7 is a plan view of a slab opening reinforcing bar, and FIG. 8 is a front sectional view thereof. However, FIG. 8 is drawn vertically longer than it is for easy understanding.

【0033】この実施の形態の特徴は、第1及び第2の
移動鉄筋15,17の両端をスライド自在に支えている
のが、例えば鉄板により形成された第1及び第2の平行
板13,16であり、アンカー鉄筋14…が、床板のコ
ンクリート中に所定の間隔で網目状に張られているスラ
ブ鉄筋100…に対応して、4枚の平行鉄板13,16
の各外面に多数突設されている点である。
The feature of this embodiment is that both ends of the first and second movable reinforcing bars 15, 17 are slidably supported by, for example, the first and second parallel plates 13, formed of an iron plate. 16 and four parallel iron plates 13, 16 corresponding to the slab reinforcing bars 100, which are meshed at predetermined intervals in the concrete of the floorboard.
Are protruded from each outer surface.

【0034】第1の平行鉄板13は、図9の斜視図にも
示されるように横長の向きに立てて配置されていて、第
1の移動鉄筋15の一端部をスライド自在に係合させる
ための溝18が水平方向に形成されている。
As shown also in the perspective view of FIG. 9, the first parallel iron plate 13 is arranged upright in a horizontally long direction, so that one end of the first movable reinforcing bar 15 is slidably engaged. Groove 18 is formed in the horizontal direction.

【0035】第1の平行鉄板13からは、上下2列に各
5本ずつのアンカー鉄筋14…が、スラブ鉄筋100…
の位置に対応するように外方に向けて突出しており、各
アンカー鉄筋14…の根部は第1の平行鉄板13に溶接
固定されている。なお、この実施の形態においては、ア
ンカー鉄筋14…の基端部にナットが螺合されていて、
第1の平行鉄板13に対して組み付け易くなっている。
From the first parallel iron plate 13, five anchor reinforcing bars 14 are provided in each of two upper and lower rows, and slab reinforcing bars 100.
Are projected outward so as to correspond to the positions of the anchor bars 14, and the roots of the anchor reinforcing bars 14 are fixed to the first parallel iron plate 13 by welding. In this embodiment, a nut is screwed into the base end of the anchor reinforcing bars 14.
It is easy to assemble to the first parallel iron plate 13.

【0036】そして、一対の第1の平行鉄板13が平行
に配置されていて、各第1の平行鉄板13の側端面13
aが型枠鉄筋1の内周面部分に溶接固定されている。一
対の第2の平行鉄板16も同様に構成されていて、その
側端面が第1の平行鉄板13に溶接固定されている。図
8に示される19は、第2の移動鉄筋17をスライド自
在に係合させるために、第2の平行鉄板16に形成され
た溝である。
A pair of first parallel iron plates 13 are arranged in parallel, and the side end surfaces 13 of each first parallel iron plate 13
a is welded and fixed to the inner peripheral surface of the formwork reinforcing bar 1. The pair of second parallel iron plates 16 have the same configuration, and their side end surfaces are fixed to the first parallel iron plate 13 by welding. Reference numeral 19 shown in FIG. 8 is a groove formed in the second parallel iron plate 16 for slidably engaging the second movable reinforcing bar 17.

【0037】第1及び第2の移動鉄筋15,17は、各
々一端部15a,17aが溝18,19の外側において
溝18,19の幅より太く形成されていて、他端側に
は、溝18,19の幅より太い外径を有するナットが、
溝18,19の外側に螺合させてある。
Each of the first and second movable reinforcing bars 15, 17 has one end 15a, 17a formed to be wider than the width of the groove 18, 19 outside the groove 18, 19, and has a groove at the other end. A nut having an outer diameter larger than the width of 18, 19 is
It is screwed outside the grooves 18 and 19.

【0038】したがって、第1及び第2の移動鉄筋1
5,17は、溝18,19から抜け出すことなく溝1
8,19に沿って移動自在であり、工事に必要なときは
両移動鉄筋15,17を、図10に示されるように端へ
スライドさせて穴を開き、工事用穴にコンクリートを流
し込んで埋める際には、図7に示されるように、両移動
鉄筋15,17を等間隔に並べて配置することができ
る。
Therefore, the first and second moving rebars 1
5 and 17 are grooves 1 without falling out of grooves 18 and 19.
It is free to move along 8, 19, and when necessary for construction, both moving rebars 15, 17 are slid to the end as shown in FIG. 10 to make a hole, and concrete is poured into the construction hole and filled. In this case, as shown in FIG. 7, both movable reinforcing bars 15, 17 can be arranged side by side at equal intervals.

【0039】なお、第1及び第2の移動鉄筋15,17
が溝18,19から抜け出さないようにする手段はどの
ようなものでもよく、例えば鉄筋の端部を折り曲げた
り、リベット等を利用してもよい。
The first and second moving reinforcing bars 15, 17
Any means can be used to prevent the metal from falling out of the grooves 18 and 19, for example, by bending the end of the reinforcing bar or using a rivet.

【0040】図7に示されるように、第1及び第2の移
動鉄筋15,17は、コンクリートに埋め込まれる際に
スラブ鉄筋100…とアンカー鉄筋14…とに対応して
配列できるだけの本数が設けられている。また、支柱鉄
筋2…は型枠鉄筋1の4辺の各中央部分付近に溶接され
ている。
As shown in FIG. 7, the first and second movable reinforcing bars 15, 17 are provided in such a number that they can be arranged corresponding to the slab reinforcing bars 100 and the anchor reinforcing bars 14 when embedded in concrete. Have been. The column reinforcing bars 2 are welded near the center of each of the four sides of the form reinforcing bar 1.

【0041】このように構成された第2の実施の形態に
おいては、最後にコンクリートに埋め込まれたときに、
各アンカー鉄筋14…を介してスラブ鉄筋100…と移
動鉄筋15…,17…が連結された状態になるので、非
常に優れた強度を確保することができる。
In the second embodiment configured as described above, when it is finally embedded in concrete,
Since the slab reinforcing bars 100 and the moving reinforcing bars 15, 17 are connected via the anchor reinforcing bars 14, extremely excellent strength can be secured.

【0042】なお、第1の平行鉄板13と第2の平行鉄
板16は、図11に示されるように上下に位置をずらし
て配置してもよい。また、図12に示されるように、型
枠鉄筋1の辺部の各々から外方に例えば半円状のフック
部1aを突出させれば、スラブ鉄筋100に加わる力が
それと直角方向に張られたスラブ鉄筋100にフック部
1aを介して伝達されるので、応力が分散されて補強強
度を向上させることができる。
Incidentally, the first parallel iron plate 13 and the second parallel iron plate 16 may be arranged so as to be shifted vertically as shown in FIG. Further, as shown in FIG. 12, if a semicircular hook portion 1 a is projected outward from each of the sides of the form reinforcing bar 1, the force applied to the slab reinforcing bar 100 is stretched in a direction perpendicular thereto. Since it is transmitted to the slab reinforcing bar 100 via the hook portion 1a, the stress is dispersed and the reinforcing strength can be improved.

【0043】なお、本発明は上記各実施の形態に限定さ
れるものではなく、例えば型枠鉄筋1は円形その他の形
状であってもよく、型枠鉄筋1を省略したものであって
もよい。
The present invention is not limited to the above embodiments. For example, the form reinforcing bar 1 may have a circular or other shape, or the form reinforcing bar 1 may be omitted. .

【0044】[0044]

【発明の効果】本発明によれば、スラブ開口養生鉄筋を
工事用穴内に設置して、工事に必要なときは移動鉄筋を
端へスライドさせて穴を開き、工事用穴にコンクリート
を流し込んで埋める際には、両移動鉄筋を等間隔に並べ
て配置すればよいので、工事用穴用の養生鉄筋の工事を
床板の鉄筋工事と一緒に行うことができ、工程を簡素化
することができる。
According to the present invention, a slab opening curing reinforcing bar is installed in a construction hole, and when necessary for construction, a movable reinforcing bar is slid to an end to open a hole, and concrete is poured into the construction hole. When burying, both moving rebars may be arranged at equal intervals, so that the construction of the curing rebar for the construction hole can be performed together with the rebar construction of the floor plate, and the process can be simplified.

【0045】そして、平行部材に形成されたアンカー部
材を床板のコンクリートと結合させることにより、平行
部材が床板側と一体化されるので、非常に優れた強度を
得ることができる。
By connecting the anchor member formed on the parallel member to the concrete of the floorboard, the parallel member is integrated with the floorboard side, so that extremely excellent strength can be obtained.

【0046】また、複数のアンカー部材を平行部材から
突出させて、スラブ鉄筋と対応するように配置すれば、
より優れた強度を得ることができる。
Further, if a plurality of anchor members are projected from the parallel members and arranged so as to correspond to the slab rebar,
More excellent strength can be obtained.

【0047】また、平行部材と連結された複数の鉄筋
を、床板にコンクリート打ちを行う際に工事用穴を形成
するための型枠として機能させることにより、その後で
工事用穴にコンクリートを流し込んで埋める際にはその
まま一緒に埋められるので、工事用穴形成のための型枠
の着脱が不要であり、工程が非常に簡素化される。
Further, the plurality of rebars connected to the parallel members function as a formwork for forming a construction hole when concrete is cast on the floorboard, and then concrete is poured into the construction hole. When filling, it is buried as it is, so it is not necessary to attach and detach the mold for forming the holes for construction, and the process is greatly simplified.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1の実施の形態のスラブ開口養生鉄
筋の斜視図である。
FIG. 1 is a perspective view of a slab opening curing reinforcing bar according to a first embodiment of the present invention.

【図2】本発明の第1の実施の形態の型枠鉄筋の分解斜
視図である。
FIG. 2 is an exploded perspective view of the formwork reinforcing bar according to the first embodiment of the present invention.

【図3】本発明の第1の実施の形態の第1の平行鉄筋と
第1の移動鉄筋に斜線を施して示す斜視図である。
FIG. 3 is a perspective view showing a first parallel reinforcing bar and a first moving reinforcing bar according to the first embodiment of the present invention with hatching.

【図4】本発明の第1の実施の形態の第2の平行鉄筋と
第2の移動鉄筋に斜線を施して示す斜視図である。
FIG. 4 is a perspective view showing a second parallel reinforcing bar and a second moving reinforcing bar according to the first embodiment of the present invention with hatching.

【図5】本発明の第1の実施の形態のスラブ開口養生鉄
筋を開いた状態の斜視図である。
FIG. 5 is a perspective view of the first embodiment of the present invention in which a slab opening curing reinforcing bar is opened.

【図6】本発明の第1の実施の形態の養生蓋が載せられ
た状態の側面部分断面図である。
FIG. 6 is a partial side sectional view of the first embodiment of the present invention in a state where a curing lid is placed.

【図7】本発明の第2の実施の形態のスラブ開口養生鉄
筋の平面図である。
FIG. 7 is a plan view of a slab opening curing reinforcing bar according to a second embodiment of the present invention.

【図8】本発明の第2の実施の形態のスラブ開口養生鉄
筋の正面断面図である。
FIG. 8 is a front sectional view of a slab opening curing steel according to a second embodiment of the present invention.

【図9】本発明の第2の実施の形態の平行鉄板部分の斜
視図である。
FIG. 9 is a perspective view of a parallel iron plate portion according to the second embodiment of the present invention.

【図10】本発明の第2の実施の形態のスラブ開口養生
鉄筋を開いた状態の平面図である。
FIG. 10 is a plan view of the second embodiment of the present invention in a state where a slab opening curing reinforcing bar is opened.

【図11】本発明の第3の実施の形態のスラブ開口養生
鉄筋の正面断面図である。
FIG. 11 is a front sectional view of a slab opening curing steel bar according to a third embodiment of the present invention.

【図12】本発明の第4の実施の形態の型枠鉄筋の斜視
図である。
FIG. 12 is a perspective view of a form reinforcing bar according to a fourth embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 型枠鉄筋 3 第1の平行鉄筋 4 アンカー部 5 第1の移動鉄筋 6 第2の平行鉄筋 7 第2の移動鉄筋 DESCRIPTION OF REFERENCE NUMERALS 1 Formwork reinforcing bar 3 First parallel reinforcing bar 4 Anchor part 5 First moving reinforcing bar 6 Second parallel reinforcing bar 7 Second moving reinforcing bar

Claims (7)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】鉄筋コンクリート構造の床板に形成された
工事用穴を工事終了時に鉄筋コンクリートで埋めるため
のスラブ開口養生鉄筋であって、 上記工事用穴内に設置されてその穴の開口部側から見て
平行に略真っ直ぐに配置された第1の平行部材と、両端
が上記第1の平行部材に対してスライド自在に係合する
一本又は複数の第1の移動鉄筋と、上記工事用穴内に設
置されてその穴の開口部側から見て上記第1の平行部材
と異なる方向に平行に略真っ直ぐに配置された第2の平
行部材と、両端が上記第2の平行部材に対してスライド
自在に係合して上記工事用穴の開口部側から見て上記第
1の移動鉄筋の移動範囲と重なる移動範囲を有する一本
又は複数の第2の移動鉄筋とを設けたことを特徴とする
スラブ開口養生鉄筋。
1. A slab-opening rebar for filling a construction hole formed in a floor plate of a reinforced concrete structure with reinforced concrete at the time of completion of construction, which is installed in the construction hole and viewed from the opening side of the hole. A first parallel member arranged substantially in parallel and straight, one or a plurality of first moving rebars whose both ends are slidably engaged with the first parallel member, and installed in the construction hole. And a second parallel member arranged substantially straight parallel to a direction different from the first parallel member when viewed from the opening side of the hole, and both ends slidably with respect to the second parallel member. A slab provided with one or a plurality of second moving rebars having a moving range overlapping with the moving range of the first moving reinforcing bar when viewed from the opening side of the construction hole. Opening-curing rebar.
【請求項2】第1及び第2の平行部材が鉄筋である請求
項1記載のスラブ開口養生鉄筋。
2. The slab opening reinforcing bar according to claim 1, wherein the first and second parallel members are reinforcing bars.
【請求項3】第1及び第2の平行部材の少なくとも一方
の延長部に、工事用穴の外側に突出するアンカー部が形
成されている請求項2記載のスラブ開口養生鉄筋。
3. The reinforcing steel slab opening according to claim 2, wherein at least one of the first and second parallel members has an extension protruding outside the construction hole.
【請求項4】平行部材が板状の部材であり、工事用穴の
外側に突出するアンカー部材の基部が上記各板状部材に
連結されている請求項1記載のスラブ開口養生鉄筋。
4. The rebar according to claim 1, wherein the parallel member is a plate-like member, and a base of an anchor member protruding outside the construction hole is connected to each of the plate-like members.
【請求項5】各板状部材から側方に適宜の間隔でアンカ
ー部材が突出するように、上記各板状部材に対して複数
のアンカー部材が連結されている請求項4記載のスラブ
開口養生鉄筋。
5. The slab opening curing according to claim 4, wherein a plurality of anchor members are connected to each of said plate members so that the anchor members protrude laterally from each of said plate members at appropriate intervals. Rebar.
【請求項6】床板にコンクリートを流す際に工事用穴の
内周面となる部分に配置されて型枠として機能する複数
の鉄筋が、第1及び第2の平行部材と連結して設けられ
ている請求項1、2、3、4又は5記載のスラブ開口養
生鉄筋。
6. A plurality of rebars, which are arranged on a portion to be an inner peripheral surface of a construction hole when concrete is poured on a floor plate and function as a formwork, are provided in connection with the first and second parallel members. The slab opening curing reinforcing bar according to claim 1, 2, 3, 4, or 5, wherein
【請求項7】型枠として機能する鉄筋に、工事用穴の外
側に突出するフック部が突出形成されている請求項6記
載のスラブ開口養生鉄筋。
7. The slab-opening reinforcing bar according to claim 6, wherein the reinforcing bar functioning as a form has a hook portion protruding outside the construction hole.
JP07185108A 1995-01-05 1995-07-21 Slab opening curing bar Expired - Fee Related JP3084349B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07185108A JP3084349B2 (en) 1995-01-05 1995-07-21 Slab opening curing bar

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP23395 1995-01-05
JP7-233 1995-01-05
JP07185108A JP3084349B2 (en) 1995-01-05 1995-07-21 Slab opening curing bar

Publications (2)

Publication Number Publication Date
JPH08239950A JPH08239950A (en) 1996-09-17
JP3084349B2 true JP3084349B2 (en) 2000-09-04

Family

ID=26333162

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07185108A Expired - Fee Related JP3084349B2 (en) 1995-01-05 1995-07-21 Slab opening curing bar

Country Status (1)

Country Link
JP (1) JP3084349B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100953989B1 (en) * 2007-12-07 2010-04-21 주식회사 빌드썬 Concrete mold for slab opening

Also Published As

Publication number Publication date
JPH08239950A (en) 1996-09-17

Similar Documents

Publication Publication Date Title
JP5317949B2 (en) Concrete assembly structure and construction method thereof
JP2535722B2 (en) Reinforcement concrete column and steel beam connection structure and building construction method
JP2006283333A (en) Construction method of reinforced concrete column/steel beam building
JP3084349B2 (en) Slab opening curing bar
JP2000038710A (en) Structure of concrete floor slab
JPH05287901A (en) Construction of stairs
JPH09195438A (en) Precast concrete plate and reinforcing structure of building
JP2737099B2 (en) Construction method of underground beam reinforcing bars and underground beams
JPS6134539B2 (en)
JP3519129B2 (en) Joint structure between precast concrete members
JPH0517957A (en) Foundation for building
JP2917159B2 (en) Column, beam joining method
CN107060072B (en) The plug-in board construction method of overall assembled building based on BIM technology
JP3174000U (en) Precast span beam structure
JPH03151443A (en) Reinforcing member for concrete slab and concrete slab using it
JP4435714B2 (en) Floor slab structure, method for manufacturing floor slab structure, and method for constructing floor slab
JPS63233133A (en) Steel plate/concrete panel structure
JP2651322B2 (en) Construction method of wall type rigid frame structure
JP2002121819A (en) STRUCTURE OF PCa WALL-SLAB JOINING SECTION
JP3000877U (en) Positioning structure of concrete rebar
JPH06146439A (en) Joining method for precast wall
JPH0633073Y2 (en) Precast concrete beam
JPS63261037A (en) Execution of waffle slab and lower constitution body of waffle slab
JPH084177A (en) Joint method of beam/slab
JPH11343665A (en) Hollow precast concrete column and construction method thereof

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110630

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110630

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120630

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120630

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130630

Year of fee payment: 13

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130630

Year of fee payment: 13

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130630

Year of fee payment: 13

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees