JP3082851B2 - Construction method of sound absorbing scaffold under viaduct - Google Patents
Construction method of sound absorbing scaffold under viaductInfo
- Publication number
- JP3082851B2 JP3082851B2 JP10328008A JP32800898A JP3082851B2 JP 3082851 B2 JP3082851 B2 JP 3082851B2 JP 10328008 A JP10328008 A JP 10328008A JP 32800898 A JP32800898 A JP 32800898A JP 3082851 B2 JP3082851 B2 JP 3082851B2
- Authority
- JP
- Japan
- Prior art keywords
- sound absorbing
- sound
- viaduct
- scaffold
- absorbing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Bridges Or Land Bridges (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、高架道路や高架鉄
道などの空中に架設された高架橋の桁下に空中敷設され
る足場兼用吸音装置(以下、吸音足場)に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a scaffolding / sound absorbing device (hereinafter referred to as "sound absorbing scaffold") which is laid in the air below a girder of an elevated bridge such as an elevated road or an elevated railway.
【0002】[0002]
【従来の技術】高架橋における騒音公害は、高架橋上を
走行する車両からの騒音と、高架橋下の地上を走行する
車両が発する騒音の反響によるものから構成される。高
架橋上の騒音対策については、従来より考慮が払われて
いるが、高架橋による地上騒音の反響による二次的騒音
については、吸音板を従来工法で設置することによって
これに対応している。この従来工法について以下簡潔に
説明する。2. Description of the Related Art Noise pollution in a viaduct is composed of noise from vehicles traveling on the viaduct and the reverberation of noise generated by vehicles traveling on the ground under the viaduct. Noise countermeasures on viaducts have been considered in the past, but secondary noise due to the reflection of ground noise due to viaducts has been dealt with by installing sound-absorbing plates using conventional methods. This conventional method will be briefly described below.
【0003】先ず、高架橋の桁下に専用の足場を組み付
ける作業を行うと共に高架橋現場の正確な測量・調査作
業を行う。そして、これに基づく綿密な計画・設計・製
図作業の後、吸音板の製作作業に移る。ここ迄の作業を
終えるのに通常半年という期間が費消される。次には、
現場工事に移る。すなわち、既設スチフナーの穴空け作
業や新設スチフナーの溶接・取付け作業を行い、その
後、ブラケット取付け作業、吊り材取付け作業、縦梁取
付け作業、横梁取付け作業、吸音板(パネル)取付け作
業、化粧板取付け作業等を経て、最終的に足場を撤去す
ることにより現場工事が完了する。通常この一連の現場
工事の間中、高架橋下を走行する車両の大規模な車両規
制が行われる。[0003] First, a work for assembling a dedicated scaffold under a girder of the viaduct and an accurate surveying / investigation work for the viaduct site are performed. Then, after careful planning, design, and drafting work based on this, the operation moves to a sound absorbing plate manufacturing work. It usually takes half a year to finish the work. Next,
Move to on-site construction. That is, drilling work for existing stiffeners and welding and mounting work for new stiffeners, and then mounting work for brackets, hanging materials, installing vertical beams, installing horizontal beams, installing sound absorbing panels (panels), and installing decorative panels After the work, the scaffolding is finally removed to complete the site construction. Usually, during this series of site works, large-scale vehicle regulation of vehicles traveling under the viaduct is performed.
【0004】[0004]
【発明が解決しようとする課題】しかるに、上記従来工
法にあっては、上述したように現場工事に移るまでに非
常に長期間を要するという不都合がある。また、現場工
事に移った後においては、これまた長期間の間、交通規
制を行わなければならないという不都合がある。更に、
現場工事の完了後には足場が撤去されてしまうので、将
来的に補修工事等を行う場合に、再度足場を組み付ける
必要があり、極めて不経済であるという不都合がある。However, in the above-mentioned conventional method, there is a disadvantage that it takes a very long time before starting the on-site construction as described above. In addition, there is a disadvantage that traffic control must be performed for a long period of time after moving to the site construction. Furthermore,
Since the scaffold is removed after the completion of the on-site construction, it is necessary to reassemble the scaffold when performing repair work or the like in the future, which is disadvantageous in that it is extremely uneconomical.
【0005】そこで、本発明は、斯かる従来工法の有す
る様々な不都合を見事に解決できる革新的な工法を提供
することをその課題とする。[0005] Therefore, an object of the present invention is to provide an innovative construction method capable of solving various inconveniences of the conventional construction method.
【0006】[0006]
【課題を解決するための手段】上記課題を解決するため
に、本発明に係る吸音足場の施工方法は、高架橋補修工
事用のために高架橋の下側に架設される足場用吸音パネ
ルの施工方法であって、高架橋の下側の複数の所定部位
に、長さ調整可能な要素を含み且つ着脱可能な吊り部材
を取付ける工程、吸音パネルを持ち上げて前記吊り部材
で空中にこれを保持する作業を行って、複数の吸音パネ
ルを足場状に敷並べる工程、高架橋の下側に設けた前記
吊り部材の近傍に固定部材を固設する工程、前記吊り部
材の長さ調整可能な要素により前記各吸音パネル相互の
高さを揃えるように調整する工程、前記固定部材により
前記各吸音パネルを高架橋に確定的に固定した後、前記
吊り部材を撤去する工程、の諸工程より成ることを特徴
とする。In order to solve the above-mentioned problems, a method of constructing a sound-absorbing scaffold according to the present invention comprises a method of repairing a viaduct.
Sound-absorbing panel for scaffolding installed under the viaduct for business use
A construction method of Le, a plurality of predetermined portions of the lower viaduct, Ru attached to and removable hanging member comprises a length adjustable component steps, the air in the lifting member lifts the acoustical panel working to hold the step of Ru lined laid a plurality of acoustical panels in a scaffold-like, wherein provided on the lower side of the viaduct
Fixing a fixing member in the vicinity of the suspending member;
Step of adjusting to align the height of the absorbing panels each other by a length-adjustable element of wood, by the fixing member
After deterministically fixing the absorbing panels in viaduct, the
A step of removing the hanging member, and wherein the formation Rukoto from various steps.
【0007】好ましくは、吸音パネルは、鉄筋を立体骨
組み状に溶接した構造体と、該構造体内に装着した吸音
部材、とを含んで成る。好ましくは、吸音パネルは、構
造体に吸音部材が装着された状態で高架橋に搬送され
る。好ましくは、吸音パネルは、構造体に吸音部材が装
着されていない状態で高架橋に搬送され、そこで装着さ
れる。好ましくは、吸音パネルは、その構造体の上側の
吸音板を更に含む。好ましくは、吸音パネルは、その吸
音板の上側の足場板を更に含む。好ましくは、吸音パネ
ルは、その空中保持のために、吊り部材と係合する係合
部を有する。好ましくは、吸音パネルは、平面視形状が
矩形状である吸音パネルと、平面視形状が略台形状であ
る吸音パネル、とを含む。好ましくは、吸音パネル間の
隙間は、所定部材によって被われる。 [0007] Preferably, the sound absorbing panel includes a structure in which a reinforcing bar is welded in a three-dimensional frame shape, and a sound absorbing member mounted in the structure. Preferably, the sound absorbing panel is transported to the viaduct with the sound absorbing member attached to the structure. Preferably, the sound absorbing panel is transported to the viaduct in a state where the sound absorbing member is not mounted on the structure, and is mounted there. Preferably, the sound absorbing panel further includes a sound absorbing plate above the structure. Preferably, the sound absorbing panel further includes a scaffold above the sound absorbing plate. Preferably, the sound absorbing panel has an engaging portion that engages with the suspending member for holding the sound absorbing panel in the air. Preferably, the sound absorbing panel includes a sound absorbing panel having a rectangular shape in plan view and a sound absorbing panel having a substantially trapezoidal shape in plan view. Preferably, the gap between the sound-absorbing panels, Ru covered by a given member.
【0008】[0008]
【発明の実施の形態】以下、本発明の実施の形態を図面
を参照して説明する。先ず、本発明の要部を成す、吸音
足場を構成する要素である吸音パネルの単体構造の実施
例について図1〜8を参照して以下詳細に説明する。図
1及び2を参照すると、この吸音パネル1は、本出願人
が製造及び販売する立体溶接鉄筋構造体(ファブデッキ
(商品名))3と、この鉄筋構造体内部に装着される吸
音部材5、とを本質的に有して成り、更に、鉄筋構造体
3の上に配置される矩形板状の吸音板7と、吸音板7の
上に配置される床板(足場板)9、とを含んで構成され
る。Embodiments of the present invention will be described below with reference to the drawings. First, an embodiment of a single structure of a sound absorbing panel which is an element constituting a sound absorbing scaffold, which is a main part of the present invention, will be described in detail with reference to FIGS. Referring to FIGS. 1 and 2, the sound absorbing panel 1 includes a three-dimensional welded reinforcing bar structure (fab deck (trade name)) 3 manufactured and sold by the present applicant, and a sound absorbing member 5 mounted inside the reinforcing bar structure. , And a rectangular plate-shaped sound absorbing plate 7 disposed on the reinforcing bar structure 3 and a floor plate (scaffold plate) 9 disposed on the sound absorbing plate 7. It is comprised including.
【0009】図3にその単体を斜視的に示す鉄筋構造体
(ファブデッキ)3は、工場で自動溶接機により鉄筋同
士が自動接合されることによって大量に規格量産される
ものであって、基本的に、上下及び横に平行に配置され
た主筋すなわち縦筋11(筋径:8〜11φ、縦筋間
隔:150mm程度、高さ:〜125mm)と、縦筋11を
横断するように配置された上下の配力筋すなわち横筋1
3(筋径:8〜11φ、横筋間隔:200mm程度)と、
上下の縦筋11を連結固定すると共にこれと横筋13と
を連結固定するための三角波状に折曲して成るウエブ筋
15(筋径:6φ程度)、とを含んで成る。FIG. 3 is a perspective view of a reinforcing bar structure (fab deck) 3 of a single body. The reinforcing bar 3 is a mass-produced mass-produced steel bar which is automatically joined by an automatic welding machine at a factory. manner, the vertical and the main muscle that vertical line 11 which is arranged parallel to the transverse (Suji径: 8~11Fai, vertical line spacing: 150 mm approximately, height: ~125mm) and, arranged so as to cross the vertical line 11 distribution force muscle or lateral muscles first vertical which is
3 (muscle diameter: 8-11φ, horizontal muscle spacing: about 200mm),
A web bar 15 (bar diameter: about 6φ) formed by connecting and fixing the upper and lower vertical bars 11 and connecting and fixing the upper and lower vertical bars 11 in a triangular wave shape.
【0010】図4に拡大して示すように、鉄筋構造体3
の内部には、多数のウエブ筋部分によって横方向に延び
る三角柱状の空間部が多数画成され、これらの空間部に
は、例えば1つ置きに、三角柱状の吸音部材5とその2
面を被うようにV字形に折曲したいわゆるパンチングプ
レート17(例えば、t=1.5mmアルミ板、15φ穴)とが
横方向から装着される。尚、吸音部材5の装着に関して
は、工場生産中に行う場合に限られるものではなく、現
場において当該作業を行うようにすることもできる。ま
た、総ての空間部に吸音部材5を埋め尽くすように構成
することもできる。[0010] As shown in an enlarged scale in FIG.
, A large number of triangular prism-shaped spaces extending in the lateral direction are defined by a large number of web streaks, and in these spaces, for example, every other triangular prism-shaped sound absorbing member 5 and its two
A so-called punching plate 17 (for example, t = 1.5 mm aluminum plate, 15φ hole) bent in a V shape so as to cover the surface is mounted from the lateral direction. The mounting of the sound absorbing member 5 is not limited to the case where the sound absorbing member 5 is mounted during factory production, and the work can be performed on site. Further, the sound absorbing member 5 may be configured to fill all the spaces.
【0011】図5にその単体を示すをパンチングプレー
ト17は、吸音部材5を支える機能の他に、吸音部材5
の劣化を防止すると共に美観を保持する機能を有し、多
数の穴(15φ)は音波の自由な通過を許容するためのも
のである。図6にその単体の横断面を示す吸音部材5の
各々は、パンチングプレート17に接する面に撥水性ガ
ラスクロスが付設された撥水性グラスウール(例えば、
32kg/m3)から成る。尚、このグラスウールに代えて、
ロックウール或いは他の部材を採用できる。FIG. 5 shows a single unit. The punching plate 17 has a function of supporting the sound absorbing member 5 and a function of supporting the sound absorbing member 5.
The hole has a function of preventing deterioration of the sound and maintaining an aesthetic appearance, and a large number of holes (15φ) are for allowing free passage of sound waves. Each of the sound absorbing members 5, whose cross section is shown in FIG. 6 alone, has a water-repellent glass wool having a water-repellent glass cloth attached to the surface in contact with the punching plate 17 (for example,
32 kg / m 3 ). In addition, instead of this glass wool,
Rock wool or other members can be employed.
【0012】図7にその単体の断面を示す、鉄筋構造体
3の上側に配置される吸音板7は、一般グラスウール
(例えば、32kg/m3、50mm厚)から成る。吸音板7の上
側の床板(踏み板もしくは足場板)9は、例えば、200m
m幅の所定長さのデッキ板を隙間なく接続した構成から
成る(図1)。以上のパネル構成要素は、枠体19等で
一体化(剛的に連結されていなくても良い)され、これ
により吸音パネル1が構成され、吸音パネル上面の略四
隅には、取付け用プレート21が突設される(図8)。FIG. 7 shows a cross section of a single body, and the sound absorbing plate 7 disposed above the reinforcing bar structure 3 is made of general glass wool (for example, 32 kg / m 3 , 50 mm thick). The floor board (stepping board or scaffolding board) 9 above the sound absorbing board 7 is, for example, 200 m
It has a configuration in which deck plates of a predetermined length of m width are connected without gaps (FIG. 1). The above-described panel components are integrated (not necessarily rigidly connected) by the frame 19 or the like, whereby the sound absorbing panel 1 is formed. At approximately four corners on the upper surface of the sound absorbing panel, mounting plates 21 are provided. Are protruded (FIG. 8).
【0013】尚、上記吸音パネルに関する説明において
用いた縦横(桁梁)などの用語は、後述する高架橋の構
造とは直接的な関係はなく、吸音足場として剛性の大き
い方向が縦(桁)と呼び、ウエブ筋で補強する方向を単
に意味している。従って、高架橋の桁方向と吸音足場の
桁方向とは一致させても一致させなくても差し支えな
い。It should be noted that the terms such as length and width (girder beams) used in the description of the sound absorbing panel have no direct relation to the viaduct structure described later. It simply means the direction of reinforcement with web bars. Therefore, the girder direction of the viaduct and the girder direction of the sound-absorbing scaffold may or may not match.
【0014】以下には、上述した吸音パネル1の設置
(作業)工程の一例を詳細に説明する。しかし、ここで
説明する本発明に係る設置工程自体が斬新な特徴を有す
るのであって、その吸音パネルが上述した吸音パネル構
造に絶対的に限定されるものではない。換言すると、本
設置工程は、上記本発明に係る鉄筋構造体(ファブデッ
キ)3に吸音部材5を詰めたタイプの吸音パネル1に限
定されない。経済的、重量的、構造的等において、ファ
ブデッキの優位性は絶対的であるが、例えば、鉄板(特
に、床板用デッキプレート等)の下部に金網等から成る
受け部を設け、その中に適切な吸音部材を詰めること
(更には、スパンを構造的に問題無い長さ、例えば1m
にすること)によっても、類似の効果を得ることができ
る。従って、そのような構成も本発明に包含されると言
える。Hereinafter, an example of an installation (operation) process of the above-described sound absorbing panel 1 will be described in detail. However, the installation process itself according to the present invention described here has a novel feature, and the sound absorbing panel is not absolutely limited to the above sound absorbing panel structure. In other words, the installation step is not limited to the above-described sound absorbing panel 1 in which the sound absorbing member 5 is packed in the reinforcing steel structure (fab deck) 3 according to the present invention. In terms of economy, weight, structure, etc., the advantage of the fab deck is absolutely essential. Packing a suitable sound absorbing member (Furthermore, make the span a length that is structurally acceptable, for example, 1 m.
A similar effect can also be obtained. Therefore, it can be said that such a configuration is also included in the present invention.
【0015】(1)先ず、図9及び10に示すように、
高所作業車31を用いて、作業者Pは、そのステージ手
摺りから、高架橋33の各橋脚35の間に親綱を設置す
る作業を行う。作業者Pは安全帯を使用することとし、
工事範囲全体に亙って安全作業が行われるように配慮す
る。 (2)図11に示すように、I形断面の桁37の下面の
要所要所にチェーン吊金具39をクランプ固定して、こ
れに直接又は丸棒状部材を介して足場用チェーン41を
取付け、更にフック付タンバックル43を取付ける。(1) First, as shown in FIGS. 9 and 10,
Using the aerial work vehicle 31, the worker P performs an operation of installing a master rope between the piers 35 of the viaduct 33 from the stage handrail. Worker P uses safety belt,
Care is taken to ensure that safe work is performed throughout the construction area. (2) As shown in FIG. 11, a chain hanging member 39 is clamped and fixed to a required portion on the lower surface of the I-shaped cross-section girder 37, and a scaffolding chain 41 is attached directly or via a round bar-like member. Further, a buckle 43 with a hook is attached.
【0016】(3)図12及び13に示すように、重機
により吸音パネル1を持ち上げ、それに足場用チェーン
41(フック付タンバックル43)を引っ掛ける作業を
多数の吸音パネル1について次から次に行い、多数の吸
音パネル1を所定高さ位置に略水平な面(足場面)を構
成し得るように空間的に保持する。最外側部の吸音パネ
ル1には、予めカバー支柱45が立設される。(3) As shown in FIGS. 12 and 13, the work of lifting the sound absorbing panel 1 by a heavy machine and hooking the scaffolding chain 41 (tanbuckle 43 with hooks) on the sound absorbing panel 1 is performed on a large number of sound absorbing panels 1 one after another. The plurality of sound absorbing panels 1 are spatially held at a predetermined height so as to form a substantially horizontal surface (foot scene). On the outermost sound absorbing panel 1, a cover support 45 is set up in advance.
【0017】(4)図14に示すように、最外側部のパ
ネル側面に、足場ブラケット47を介して、ファブステ
ージ足場49を取付ける。更にファブステージ足場49
の側面近傍上面に養生パネル((通称)あさがおパネル)
51を組み付ける。そして、吸音パネル全面及びファブ
ステージ足場49に防災シート53を敷き詰める。 (5)図15に示すように、桁37の側面下部の要所要
所にブラケット取付け板55を溶接する。(4) As shown in FIG. 14, a fab stage scaffold 49 is attached to the outermost panel side surface via a scaffold bracket 47. Fab Stage Scaffold 49
Curing panel (commonly known as Asagao panel)
Assemble 51. Then, a disaster prevention sheet 53 is spread over the entire surface of the sound absorbing panel and the fab stage scaffold 49. (5) As shown in FIG. 15, the bracket mounting plate 55 is welded to a required portion below the side surface of the girder 37.
【0018】(6)図16に示すように、ブラケット取
付け板55にチャンネル状のブラケット57をボルトで
固定する。 (7)図17に示すように、桁37と一体化されたブラ
ケット57と、吸音パネル1の取付け用プレート21と
を、吊下げチャンネル59を間に介してボルトで仮止め
連結する。この際、ボルト締結は緩めにしておく。この
工程の作業は、関係する総ての吸音パネル1について行
う。(6) As shown in FIG. 16, a channel-shaped bracket 57 is fixed to the bracket mounting plate 55 with bolts. (7) As shown in FIG. 17, the bracket 57 integrated with the spar 37 and the mounting plate 21 of the sound absorbing panel 1 are temporarily connected by bolts with the suspension channel 59 interposed therebetween. At this time, the bolts should be loosened. The operation in this step is performed for all the related sound absorbing panels 1.
【0019】(8)図18に示すように、基準にすべき
吸音パネル1とその高さ(レベル)とを決定し、当該吸
音パネル1がその高さになるように、フック付タンバッ
クル43を調整する。 (9)図19に示すように、前記工程の吸音パネル1の
レベル調整後に上下方向ボルトの本締((あ))を行い、
吸音パネル1の通りを出す(相互間調整)作業を行って
から、縦横ボルトの本締(( い) )を行い、吸音パネル
1を完全に桁37側に固定する。以降は、この固定完了
した吸音パネル1を基準にして他の吸音パネル1の固定
作業を次々に行っていく。(8) As shown in FIG. 18, the sound absorbing panel 1 to be used as a reference and its height (level) are determined, and the tambuckle 43 with hooks is set so that the sound absorbing panel 1 is at that height. To adjust. (9) As shown in FIG. 19, after the level adjustment of the sound absorbing panel 1 in the above step, the vertical bolts are fully tightened ((A)).
After performing the operation of putting out the sound absorbing panel 1 (adjustment between each other), the vertical and horizontal bolts are fully tightened ((I)), and the sound absorbing panel 1 is completely fixed to the spar 37 side. Thereafter, the fixing work of the other sound absorbing panels 1 is performed one after another with reference to the sound absorbing panel 1 which has been fixed.
【0020】(10)図20に示すように、総ての吸音
パネル1の固定後に、カバー支柱45の外側面に化粧パ
ネル61を取付けていく。そして、防災シートを撤去す
る。 (11)図21及び22に示すように、養生パネル5
1、防災シート53、及び、ファブステージ足場49を
取り外して撤去する。図23は、内部が見えるように高
架橋の上部を破断して、吸音パネル1が整然と固定配置
されて(敷き詰められた)状態を斜視的に描いたもので
ある。(10) As shown in FIG. 20, after all the sound absorbing panels 1 are fixed, the decorative panel 61 is attached to the outer surface of the cover support 45. Then, the disaster prevention sheet is removed. (11) As shown in FIGS. 21 and 22, the curing panel 5
1. The disaster prevention sheet 53 and the fab stage scaffold 49 are removed and removed. FIG. 23 is a perspective view illustrating a state in which the upper portion of the viaduct is broken so that the inside can be seen, and the sound absorbing panel 1 is fixedly arranged (paved) in an orderly manner.
【0021】図24は、吸音パネルの取付けが完了した
高架橋全体の横断面を描いたものである。尚、吸音パネ
ル(足場)間の隙間には、踏み板兼用の目板を配設する
ことが考えられる。この場合、合わせ目の違和感をなく
すと共に物の落下をなくすことができ好ましい。ところ
で、高架橋が直線的に延びているような場合には、図2
5に示すように吸音パネルは矩形状(平面視)に敷き詰
められることになる。しかし、高架橋が曲がっている場
合も当然にあり、その場合の例を図26(曲率が小さ
い)と図27(曲率が大きい)に示す。FIG. 24 illustrates a cross section of the entire viaduct in which the installation of the sound absorbing panel has been completed. In addition, it is conceivable to provide an eye plate also serving as a tread plate in the gap between the sound absorbing panels (scaffolds). In this case, it is preferable because it is possible to eliminate a feeling of discomfort at the joint and to prevent the object from falling. By the way, when the viaduct extends linearly, FIG.
As shown in FIG. 5, the sound absorbing panels are laid out in a rectangular shape (in plan view). However, there is naturally a case where the viaduct is bent, and examples of such a case are shown in FIG. 26 (small curvature) and FIG. 27 (large curvature).
【0022】高架橋の直線部分に用いるべき一般的な矩
形状の吸音パネルを敷き詰めてもこのような湾曲したパ
ネル群(パネル面)を構成できる。その場合は、吸音パ
ネル間の隙間が非常に大きくなる虞れがあるが、目板で
これを埋めるようにすれば、其れ程の問題は生じない。
或いは、高架橋の湾曲部分専用の略台形状ないし扇形
(平面視)の吸音パネルを別途設計・製作して、これに
対応するようにすることもできる。Such a curved panel group (panel surface) can be formed even by laying a general rectangular sound-absorbing panel to be used for a straight portion of a viaduct. In that case, there is a possibility that the gap between the sound absorbing panels becomes very large. However, if the gap is filled with the eye plate, such a problem does not occur.
Alternatively, a substantially trapezoidal or fan-shaped (plan view) sound-absorbing panel dedicated to the curved portion of the viaduct can be separately designed and manufactured to cope with this.
【0023】最後に、本実施態様の効果について箇条書
き式に挙げると次のようになる。 (1)既設の高架橋等の空間に架設物による地上の騒音
の反射を大幅に低減することができ、騒音問題の解決が
得られる。 (2)構造が丈夫であるから、騒音に対する吸音効果と
共に常設の高架橋などの補修工事用足場になるので、補
修の都度足場架設は不要になる。Finally, the effects of the present embodiment can be summarized as follows in an itemized manner. (1) The reflection of noise on the ground due to an object installed in an existing space such as a viaduct can be significantly reduced, and the noise problem can be solved. (2) Since the structure is durable, it becomes a scaffold for repair work such as a permanent viaduct along with a sound absorbing effect against noise, so that scaffold erection is not required every time repair is performed.
【0024】(3)吸音パネルの力学的特徴は、鉄筋を
溶接接合した立体トラス構造体とし、上下外板で挟んだ
板状構造(パネル)又は上部外板と合成されるため、非
常に軽量かつ剛性に富む。 (4)吸音パネルの構造は工場生産のプレファブロック
となっているので、専用の加工・組立て等の設備が利用
でき、生産の短期化、品質と精度の向上、製造コストの
低減を図ることができる。(3) The mechanical characteristic of the sound absorbing panel is that it is a three-dimensional truss structure in which a reinforcing bar is welded and joined to a plate-like structure (panel) sandwiched between upper and lower outer plates or an upper outer plate, so that it is extremely lightweight. And rich in rigidity. (4) Since the structure of the sound absorbing panel is a pre-fabricated factory block, dedicated processing and assembly equipment can be used to shorten production, improve quality and accuracy, and reduce manufacturing costs. it can.
【0025】(5)ブロック化により現場搭載点数が大
幅に減るので、工事期間を短縮できる。 (6)既設構造物に取付けるに際して、主体構造の橋桁
などに取付け穴の穿孔作業や溶接接合作業を避けること
ができる。 (7)現場建設にあたり、可撓性を有した伸縮吊り具を
用いて一時的に保持して吊り足場を形成する等して別途
架設用足場を組むような作業が不要となる。(5) The number of on-site installation points is greatly reduced by the blocking, so that the construction period can be shortened. (6) When attaching to an existing structure, it is possible to avoid drilling work and welding joining work for mounting holes in a bridge girder having a main structure. (7) When constructing the site, there is no need to perform a separate work such as forming a suspended scaffold by temporarily holding a flexible telescopic hanging tool to form a suspended scaffold.
【0026】(8)建設重機械の使用を短時間にとどめ
て、交通妨害を大幅に減らすことができる。 (9)足場ブロック間に若干の隙間を許容できる場合、
大半は長方形の標準規格寸法のもので賄えるし、或い
は、当該隙間を目板で塞ぐようにしてもよい。足場の敷
設区域の中心部を前記の規格パネルを敷き並べて、周辺
部を先に設置した中心部を基準にして計測・現場型取り
法等を適用することができる。いずれの方法によるも、
施工前の精密な測量、規格外れや異形の足場パネルの利
用を大幅に低減でき、経済効果は絶大である。(8) The use of heavy construction equipment can be kept for a short time, and traffic obstruction can be greatly reduced. (9) If a slight gap between the scaffold blocks can be tolerated,
Most may be covered by a rectangular standard size, or the gap may be closed with a blind board. The standard panel can be laid on the center of the scaffold laying area, and the measurement and on-site molding methods can be applied based on the center where the peripheral part is installed first. Either way,
Precise surveying before construction, the use of non-standard and irregular scaffold panels can be greatly reduced, and the economic effect is enormous.
【0027】(10)本実施例の鉄筋立体骨組み構造
は、構造美に優れ、鉄筋剥き出しで設置周辺の環境に調
和し、美観を損なうことがない。 (11)本実施例の鉄筋立体骨組み構造は、亜鉛鍍金、
塗装などにより、美観と耐久性に優れ、補修の機会と費
用を大幅に減少させ得る。 (12)設置現場の精密な測量作業や現場型取り工程を
省略することができる。(10) The three-dimensional reinforcing frame structure of the present embodiment is excellent in structural beauty, is exposed to the reinforcing bar, is in harmony with the surrounding environment, and does not impair the aesthetic appearance. (11) The three-dimensional reinforcing frame structure of the present embodiment is galvanized,
By painting, etc., it has excellent aesthetics and durability, and can greatly reduce repair opportunities and costs. (12) Precise surveying work at the installation site and a site casting process can be omitted.
【0028】以上のように、本実施態様においては非常
に多くの優れた効果が期待できることが理解されよう。As described above, it can be understood that a great many excellent effects can be expected in this embodiment.
【0029】[0029]
【発明の効果】以上説明したように本発明によれば、上
記従来工法の有する様々な不都合を見事に解決でき、作
業経済性、安全性、環境保護性等の面で社会に著しく貢
献できる。As described above, according to the present invention, various inconveniences of the above-mentioned conventional method can be satisfactorily solved, and it can greatly contribute to society in terms of work economy, safety, environmental protection and the like.
【図1】吸音パネル単体の要部破断斜視図である。FIG. 1 is a cutaway perspective view of a main part of a sound absorbing panel alone.
【図2】吸音パネルを示す図であり、同図(a)は平面
図、同図(b)は正面図、同図(c)は側面図である。2 (a) is a plan view, FIG. 2 (b) is a front view, and FIG. 2 (c) is a side view.
【図3】鉄筋構造体の斜視図である。FIG. 3 is a perspective view of a reinforcing bar structure.
【図4】鉄筋構造体の要部拡大図であり、同図(a)は
側面図、同図(b)は正面図である。FIG. 4 is an enlarged view of a main part of the reinforcing bar structure, wherein FIG. 4 (a) is a side view and FIG. 4 (b) is a front view.
【図5】パンチングプレート単体を示す図であり、同図
(a)は長手方向から見た図、同図(b)は側方から見
た図である。5A and 5B are diagrams showing a punching plate alone, wherein FIG. 5A is a diagram viewed from a longitudinal direction, and FIG. 5B is a diagram viewed from a side.
【図6】吸音部材を長手方向から見た図である。FIG. 6 is a view of the sound absorbing member viewed from a longitudinal direction.
【図7】吸音板の断面図である。FIG. 7 is a cross-sectional view of the sound absorbing plate.
【図8】吸音パネルの取付け用プレートを示す図であ
り、同図(a)は吸音パネル長手方向から見た図、同図
(b)は側方から見た図である。8A and 8B are diagrams showing a mounting plate of the sound absorbing panel, wherein FIG. 8A is a diagram viewed from the longitudinal direction of the sound absorbing panel, and FIG. 8B is a diagram viewed from the side.
【図9】親綱の設置作業状態を示す図である。FIG. 9 is a diagram showing an installation operation state of the master rope.
【図10】親綱の設置作業状態を別の角度から示した図
である。FIG. 10 is a view showing the installation operation state of the master rope from another angle.
【図11】足場用チェーンの取付け作業状態を示す図で
ある。FIG. 11 is a view showing a state of attachment work of the scaffold chain.
【図12】吸音パネルの保持状態を示す図である。FIG. 12 is a view showing a holding state of the sound absorbing panel.
【図13】吸音パネルの保持状態の要部斜視図である。FIG. 13 is a perspective view of a main part of the sound absorbing panel in a holding state.
【図14】ファブステージ足場の取付け状態を示す図で
ある。FIG. 14 is a view showing an attached state of a fab stage scaffold.
【図15】ブラケット取付け板の溶接作業を示す図であ
る。FIG. 15 is a diagram showing a welding operation of the bracket mounting plate.
【図16】ブラケットの取付け作業を示す図である。FIG. 16 is a diagram showing an operation of attaching a bracket.
【図17】吊下げチャンネルの取付け作業を示す図であ
る。FIG. 17 is a diagram showing an operation of attaching a suspension channel.
【図18】吸音パネルの高さ出し作業を示す図である。FIG. 18 is a diagram showing a heightening operation of the sound absorbing panel.
【図19】吸音パネルの本固定作業を示す図である。FIG. 19 is a diagram illustrating a main fixing operation of the sound absorbing panel.
【図20】化粧パネルの取付け作業を示す図である。FIG. 20 is a diagram illustrating an operation of attaching a decorative panel.
【図21】養生パネル等の取り外し作業を示す図であ
る。FIG. 21 is a view showing a work of removing a curing panel and the like.
【図22】養生パネル等の取り外し作業を全体的に示す
図である。FIG. 22 is a diagram showing an entire operation of removing a curing panel and the like.
【図23】高架橋の桁下に固定配置された吸音パネルの
要部破断斜視図である。FIG. 23 is a cutaway perspective view of a main part of a sound-absorbing panel fixedly arranged below a bridge of a viaduct.
【図24】本実施例に係る吸音足場設置済みの高架橋全
体の横断面図である。FIG. 24 is a cross-sectional view of the entire viaduct with the sound-absorbing scaffold installed according to the present embodiment.
【図25】吸音パネルの矩形状設置状態の平面図であ
る。FIG. 25 is a plan view of the sound absorbing panel in a rectangular installation state.
【図26】小さな曲率で曲がっている吸音パネル設置状
態の一例の平面図である。FIG. 26 is a plan view of an example of a sound absorbing panel installation state bent at a small curvature.
【図27】大きな曲率で曲がっている吸音パネル設置状
態の一例の平面図である。FIG. 27 is a plan view of an example of a state where a sound absorbing panel is bent with a large curvature.
1…吸音パネル 3…鉄筋構造体 5…吸音部材 7…吸音板 9…床板 11…縦筋 13…横筋 15…ウエブ筋 17…パンチングプレート 21…取付け用プレート 33…高架橋 35…橋脚 39…チェーン吊金具 41…足場用チェーン 43…フック付タンバックル 45…カバー支柱 47…足場ブラケット 49…ファブステージ足場 55…ブラケット取付け板 57…ブラケット 59…吊下げチャンネル 61…化粧パネル DESCRIPTION OF SYMBOLS 1 ... Sound absorption panel 3 ... Reinforcement structure 5 ... Sound absorption member 7 ... Sound absorption plate 9 ... Floor plate 11 ... Vertical stripe 13 ... Horizontal stripe 15 ... Web stripe 17 ... Punching plate 21 ... Mounting plate 33 ... Viaduct 35 ... Bridge pier 39 ... Chain suspension Metal fittings 41 ... Chain chain 43 ... Tan buckle with hook 45 ... Cover strut 47 ... Scaffold bracket 49 ... Fab stage scaffold 55 ... Bracket mounting plate 57 ... Bracket 59 ... Hanging channel 61 ... Facing panel
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E01D 19/10 E01D 21/00 E01F 8/00 ──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int. Cl. 7 , DB name) E01D 19/10 E01D 21/00 E01F 8/00
Claims (9)
に架設される足場用吸音パネルの施工方法であって、 高架橋の下側の複数の所定部位に、長さ調整可能な要素
を含み且つ着脱可能な吊り部材を取付ける工程、 吸音パネルを持ち上げて前記吊り部材で空中にこれを保
持する作業を行って、複数の吸音パネルを足場状に敷並
べる工程、高架橋の下側に設けた前記吊り部材の近傍に固定部材を
固設する工程、 前記吊り部材の長さ調整可能な要素により前記各 吸音パ
ネル相互の高さを揃えるように調整する工程、前記 固定部材により前記各吸音パネルを高架橋に確定的
に固定した後、前記吊り部材を撤去する工程、 の諸工程より成 ることを特徴とする高架橋下の吸音足場
の施工方法。1. Underside of viaduct for viaduct repair work
A construction method of a scaffold for acoustical panel that is spanned, the plurality of predetermined portions of the lower viaduct, length adjustable component
And removable hanging member to install them step comprises, at said hanging member by lifting the sound-absorbing panels working to hold it in the air, that Shikinami <br/> base a plurality of sound-absorbing panels scaffold-like process A fixing member is provided in the vicinity of the suspension member provided below the viaduct.
A step of fixedly provided, the step of adjusting the length-adjustable element of said hanging member to align the height of the absorbing panels mutually After deterministically fixing the absorbing panels in viaduct by the fixing member, the suspension step of removing the member, the construction method of the sound absorbing scaffold elevated Hashimoto, wherein from adult Rukoto various steps.
接した構造体と、該構造体内に装着した吸音部材、とを
含んで成ることを特徴とする請求項1記載の高架橋下の
吸音足場の施工方法。2. The sound absorbing panel according to claim 1, wherein the sound absorbing panel includes a structure in which a reinforcing bar is welded in a three-dimensional frame shape, and a sound absorbing member mounted in the structure .
Construction method of sound absorbing scaffold .
された状態で高架橋に搬送されることを特徴とする請求
項2記載の高架橋下の吸音足場の施工方法。3. The method for constructing a sound-absorbing scaffold under a viaduct according to claim 2, wherein the sound-absorbing panel is transported to the viaduct in a state where the sound-absorbing member is mounted on the structure.
されていない状態で高架橋に搬送され、そこで装着され
ることを特徴とする請求項2記載の高架橋下の吸音足場
の施工方法。4. The sound- absorbing scaffold under a viaduct according to claim 2, wherein the sound-absorbing panel is transported to the viaduct in a state where the sound absorbing member is not attached to the structure, and is attached there.
Construction method.
板を更に含むことを特徴とする請求項1記載の高架橋下
の吸音足場の施工方法。5. The underpass according to claim 1, wherein the sound absorbing panel further comprises a sound absorbing plate above the structure.
Construction method of sound absorbing scaffold .
板を更に含むことを特徴とする請求項1記載の高架橋下
の吸音足場の施工方法。6. The underpass according to claim 1, wherein the sound absorbing panel further comprises a scaffold plate above the sound absorbing plate.
Construction method of sound absorbing scaffold .
吊り部材と係合する係合部を有することを特徴とする請
求項1記載の高架橋下の吸音足場の施工方法。7. The sound-absorbing panel is provided for holding in the air.
The construction method of a sound-absorbing scaffold under a viaduct according to claim 1, further comprising an engaging portion that engages with the suspension member.
る吸音パネルと、平面視形状が略台形状である吸音パネ
ル、とを含むことを特徴とする請求項1記載の高架橋下
の吸音足場の施工方法。8. The underpass of a viaduct according to claim 1, wherein the sound absorbing panel includes a sound absorbing panel having a rectangular shape in plan view and a sound absorbing panel having a substantially trapezoidal shape in plan view.
Construction method of sound absorbing scaffold .
て被われることを特徴とする請求項1記載の高架橋下の
吸音足場の施工方法。9. The underpass according to claim 1, wherein the gap between the sound absorbing panels is covered by a predetermined member.
Construction method of sound absorbing scaffold .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10328008A JP3082851B2 (en) | 1998-11-18 | 1998-11-18 | Construction method of sound absorbing scaffold under viaduct |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10328008A JP3082851B2 (en) | 1998-11-18 | 1998-11-18 | Construction method of sound absorbing scaffold under viaduct |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000144635A JP2000144635A (en) | 2000-05-26 |
JP3082851B2 true JP3082851B2 (en) | 2000-08-28 |
Family
ID=18205488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10328008A Expired - Fee Related JP3082851B2 (en) | 1998-11-18 | 1998-11-18 | Construction method of sound absorbing scaffold under viaduct |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3082851B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4717705B2 (en) * | 2006-04-26 | 2011-07-06 | 三菱重工鉄構エンジニアリング株式会社 | Viaduct makeup structure and makeup structure construction method |
CN103628407A (en) * | 2012-08-25 | 2014-03-12 | 江苏雄宇重工科技股份有限公司 | Variable-cross-section beam hanging basket suspension for bridge |
CN114086471A (en) * | 2021-10-25 | 2022-02-25 | 中国五冶集团有限公司 | Simple and easy mobile device of bridge annex installation |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2968494B2 (en) * | 1997-01-21 | 1999-10-25 | 有限会社ケンオン興産 | Permanent scaffolding of viaduct |
-
1998
- 1998-11-18 JP JP10328008A patent/JP3082851B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2000144635A (en) | 2000-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4310444B1 (en) | Width expansion material for road bridges | |
JP3145945B2 (en) | Mounting structure for sound-absorbing members that also serve as scaffolds for viaduct | |
KR101390169B1 (en) | Arch type footpath girder bridge and construction method thereof | |
JP5090577B1 (en) | Suspension frame for suspension scaffold | |
JP2824684B2 (en) | Bridge pier inspection and repair scaffold | |
JP3708074B2 (en) | Road width expansion material and its installation method | |
JP3082851B2 (en) | Construction method of sound absorbing scaffold under viaduct | |
CN110820559B (en) | Cement concrete bridge deck pavement and construction method | |
CN209194354U (en) | High-altitude long-span binder base-supporting shellfish thunder support construction | |
JP3328626B2 (en) | Temporary guardrail parts | |
JPH0544202A (en) | Scaffold structure for repairing bridge handrail and hanging metal structure therefor | |
JP4284518B2 (en) | Wide bridge structure of existing bridge and construction method of wide walk structure | |
JP2000144641A (en) | Execution method for combination scaffold and back plate of elevated structure | |
JP4005955B2 (en) | Bridge, bridge erection method, and decorative plate used for the bridge | |
JP5807883B1 (en) | Suspended scaffolding | |
JP3225933U (en) | Railing-mounted scaffolding and its scaffolding support | |
EP1206611B1 (en) | Scaffolding | |
KR102195684B1 (en) | bridge structure with earthquake proof function | |
JP5059719B2 (en) | Panel mounting method and panel mounting structure | |
JP2968494B2 (en) | Permanent scaffolding of viaduct | |
JP7212825B2 (en) | CABLE RACK INSTALLATION STRUCTURE, CABLE RACK CONSTRUCTION METHOD, AND SUPPORT STRETCH | |
JP4296548B2 (en) | Exterior wall structure | |
JPH0881918A (en) | Pipe and construction method thereof | |
JP2676598B2 (en) | Sound absorbing material for viaducts that also serves as scaffolds | |
JPH08158696A (en) | Fitting construction method of fitting vibration control device to steel skeleton |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080630 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090630 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100630 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110630 Year of fee payment: 11 |
|
LAPS | Cancellation because of no payment of annual fees |