JP3081150B2 - Clamp separation device with holes for reinforced mat holding jig - Google Patents

Clamp separation device with holes for reinforced mat holding jig

Info

Publication number
JP3081150B2
JP3081150B2 JP08070548A JP7054896A JP3081150B2 JP 3081150 B2 JP3081150 B2 JP 3081150B2 JP 08070548 A JP08070548 A JP 08070548A JP 7054896 A JP7054896 A JP 7054896A JP 3081150 B2 JP3081150 B2 JP 3081150B2
Authority
JP
Japan
Prior art keywords
clamp
holes
clamps
hole
jig frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08070548A
Other languages
Japanese (ja)
Other versions
JPH09254130A (en
Inventor
郁久 嶋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsubakimoto Chain Co
Original Assignee
Tsubakimoto Chain Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsubakimoto Chain Co filed Critical Tsubakimoto Chain Co
Priority to JP08070548A priority Critical patent/JP3081150B2/en
Publication of JPH09254130A publication Critical patent/JPH09254130A/en
Application granted granted Critical
Publication of JP3081150B2 publication Critical patent/JP3081150B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、発泡コンクリート
の固化工程で使用された鉄筋マット保持治具を分解した
後、新たに保持する鉄筋マットに対応するように鉄筋マ
ット保持治具を組み直して鉄筋マットを組み付ける一連
の工程を自動的に行うようにした鉄筋マット自動組付シ
ステムにおいて、鉄筋マット保持治具の治具フレームと
孔付クランプとを分離させる装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforcing steel mat holding jig used in a solidification process of foamed concrete, and then reassembling the reinforcing steel mat holding jig so as to correspond to a reinforcing steel mat to be newly held. The present invention relates to an apparatus for separating a jig frame of a reinforcing bar mat holding jig and a clamp with holes in an automatic reinforcing bar mat assembling system which automatically performs a series of steps for mounting a mat.

【0002】[0002]

【従来の技術】従来、軽量建材等として用いられる発泡
コンクリート(ALC)の製造工程においては、型枠内
に発泡コンクリートを流し込んで固化させる際に、前記
発泡コンクリートを補強するための鉄筋マットを型枠内
にセットしている。
2. Description of the Related Art Conventionally, in the production process of foamed concrete (ALC) used as a lightweight building material, when a foamed concrete is poured into a mold and solidified, a reinforcing steel mat for reinforcing the foamed concrete is used. It is set in the frame.

【0003】前記鉄筋マットは、発泡コンクリートがあ
る程度固化するまでは、型枠内で自重で下方に沈降した
り傾いたりしないように保持しておく必要があり、従来
は、枠状の治具フレームに棒状の孔付クランプの両端部
を固定し、前記孔付クランプに形成されているピン支持
孔に鉄筋ピンを差し込んで鉄筋マット保持治具を組み立
て、鉄筋マットを鉄筋ピンの下端に係合させてこれを吊
り下げた状態で、型枠上に治具フレームを位置決め固定
して型枠内の定位置に鉄筋マットが保持されるようにし
ていた。
Until the foamed concrete is solidified to some extent, it is necessary to hold the reinforced mat so that it does not settle down or tilt under its own weight in the formwork. Then, fix both ends of the rod-shaped clamp with holes, insert a reinforcing bar pin into a pin support hole formed in the clamp with holes, assemble a reinforcing bar mat holding jig, and engage the reinforcing bar mat with a lower end of the reinforcing bar pin. The jig frame is positioned and fixed on the formwork in a state where it is suspended so that the reinforcing bar mat is held at a fixed position in the formwork.

【0004】そして、前記型枠内に発泡コンクリートを
注入した後、発泡コンクリートが完全に固化しないうち
に、鉄筋ピンを発泡コンクリート内の鉄筋マットから取
り外して、鉄筋マット保持治具を分離した後、治具フレ
ームから孔付クランプと鉄筋ピンとを分離して、再び新
しい鉄筋マットのサイズにあわせて、鉄筋マット保持治
具を組み立てる作業を行っていた。
After the foamed concrete is poured into the mold, before the foamed concrete is completely solidified, the reinforced pins are removed from the reinforced mat in the foamed concrete, and the reinforced mat holding jig is separated. The clamp with holes and the reinforced pins were separated from the jig frame, and the work of assembling the reinforced mat holding jig was again performed according to the size of the new reinforced mat.

【0005】[0005]

【発明が解決しようとする課題】従来では、前述したよ
うな、鉄筋マット保持治具を組み立てて鉄筋マットを組
み付ける工程や、使用後に鉄筋マット保持治具を分解す
る工程を、ほとんど手作業で行っているため、作業効率
が悪く、また、作業の安全性等、作業環境にも問題があ
った。
Conventionally, the steps of assembling the reinforcing bar mat holding jig and assembling the reinforcing bar mat as described above and disassembling the reinforcing bar mat holding jig after use have been performed almost manually. Therefore, the work efficiency is poor, and there is also a problem in the work environment such as work safety.

【0006】特に、型枠に対して鉄筋マット保持治具を
正確に位置決めしなければならないため、鉄筋マット保
持治具のうち治具フレームと孔付クランプは固定ねじ部
材により強固に固定されており、複数の孔付クランプを
治具フレームから分離させることは、きわめて煩雑であ
り作業効率を著しく低下させていた。
In particular, since the rebar mat holding jig must be accurately positioned with respect to the formwork, the jig frame and the hole clamp of the rebar mat holding jig are firmly fixed by fixing screw members. Separating the plurality of perforated clamps from the jig frame is extremely complicated and significantly reduces work efficiency.

【0007】そこで、本発明は、発泡コンクリートの固
化工程で使用された鉄筋マット保持治具を分解した後、
新たな鉄筋マットのサイズに適合するように鉄筋マット
保持治具を組み直した状態で鉄筋マットを組み付ける一
連の工程を自動化して、作業効率を向上させるため、鉄
筋マット保持治具の治具フレームから孔付クランプを分
離させる装置を提供することを目的とする。
Therefore, the present invention disassembles the reinforcing mat holding jig used in the solidification process of foamed concrete,
From the jig frame of the rebar mat holding jig, to automate the series of steps of assembling the rebar mat with the rebar mat holding jig re-assembled to fit the new rebar mat size and improve work efficiency It is an object to provide a device for separating a perforated clamp.

【0008】[0008]

【課題を解決するための手段】前記目的のため、矩形枠
状の治具フレームの上方で該治具フレームの長辺に沿っ
て移動可能な可動フレームに、前記治具フレーム長辺に
掛け渡された複数の孔付クランプの固定ねじ部材に進退
動して前記固定ねじ部材の締め付けを解除するソケット
アセンブリと、締め付けが解除された前記孔付クランプ
を把持して前記治具フレームから分離させる昇降自在な
ハンドと、分離された孔付クランプを前記ハンドから受
け取って1つの治具フレーム上の孔付クランプの総てが
分離されるまで該孔付クランプを一時的に貯留する貯留
部とを設けた孔付クランプ分離装置により前記課題を解
決した。
In order to achieve the above object, the jig frame is stretched over a long frame of the jig frame on a movable frame movable along the long side of the jig frame above the rectangular frame-shaped jig frame. A socket assembly for moving back and forth to the fixing screw members of the plurality of clamps with holes to release the tightening of the fixing screw members, and lifting and lowering the clamps with the holes released and separating from the jig frame A free hand and a storage unit for receiving the separated hole clamps from the hand and temporarily storing the hole clamps until all the hole clamps on one jig frame are separated are provided. The above problem was solved by a clamp separation device with holes.

【0009】前記貯留部は、分離された孔付クランプを
前記ハンドから受け取る中継レールと、該中継レール上
に載置された孔付クランプを移動させる押送ドグと、該
押送ドグによって移動させられた複数の孔付クランプを
前記治具フレームの側方に排出する搬送ローラとより構
成することが望ましい。また、前記孔付クランプ分離装
置を、前記治具フレーム上の孔付クランプのピッチ毎に
移動させることが望ましい。
The storage portion is moved by the relay rail for receiving the separated clamp with a hole from the hand, a pushing dog for moving a clamp with a hole placed on the relay rail, and the pushing dog. It is preferable that a plurality of clamps with holes are constituted by a conveying roller for discharging the clamp to the side of the jig frame. In addition, it is desirable that the clamp separation device with holes is moved at every pitch of the clamp with holes on the jig frame.

【0010】[0010]

【作用】孔付クランプ分離装置は、まず、治具フレーム
の長辺に掛け渡された孔付クランプを把持する。そし
て、ソケットアセンブリが固定ねじ部材に向って移動し
てその締め付けを解除し、治具フレームと孔付クランプ
の固定が解かれる。ハンドは、締め付けが解除された孔
付クランプを把持しており、その状態で孔付クランプを
治具フレームから分離させる。孔付クランプ分離装置
は、さらに、貯留部を有しており、ハンドが把持した孔
付クランプをその貯留部上に載置する。治具フレームに
固定された複数の孔付クランプの分離が完了した後、貯
留部はその孔付クランプを孔付クランプ分離装置の側方
に排出する。
The hole-separated clamp separating device first grips the hole-mounted clamp spanned over the long side of the jig frame. Then, the socket assembly moves toward the fixing screw member to release the tightening, and the fixing of the jig frame and the clamp with the hole is released. The hand grips the clamp with the hole that has been released, and separates the clamp with the hole from the jig frame in this state. The perforated clamp separating device further has a storage section, and mounts the perforated clamp held by the hand on the storage section. After the separation of the plurality of perforated clamps fixed to the jig frame is completed, the reservoir discharges the perforated clamps to the side of the perforated clamp separating device.

【0011】貯留部は、1つの治具フレームに固定され
た同種の孔付クランプをまとめた後、孔付クランプ分離
装置から排出させるためのものであり、ハンドから受け
取った孔付クランプは中継レール上に一時的に載置さ
れ、その後、押送ドグが起動させられて1つ毎に搬送ロ
ーラ上に移動させられる。治具フレームに固定された孔
付クランプの総てが分離されるまで、この動作が繰り返
されると、同種の孔付クランプは搬送ローラ上に貯留さ
れる。その後、搬送ローラが起動させられて、一群の孔
付クランプは孔付クランプ分離装置から側方に排出され
る。
The storage section is for collecting the same kind of perforated clamps fixed to one jig frame and then discharging the same from the perforated clamp separating device. The perforated clamp received from the hand is a relay rail. The push dog is activated temporarily, and is then moved one by one onto the transport roller. If this operation is repeated until all of the perforated clamps fixed to the jig frame are separated, the same type of perforated clamp is stored on the transport roller. Thereafter, the transport roller is activated and the group of perforated clamps is ejected laterally from the perforated clamp separating device.

【0012】また、治具フレームには、鉄筋マットの種
類に応じて所定のピッチで孔付クランプが固定されてお
り、孔付クランプ分離装置はそのピッチ毎に移動させら
れる。所定のピッチだけ移動した後、ハンド、ソケット
アセンブリ及び貯留部が作動して、治具フレーム上の孔
付クランプが順次分離され、そして、孔付クランプ全数
が貯留部上に載置させられる。このため、孔付クランプ
分離装置の側方には、治具フレームの長辺と平行に延び
るラックが延設されており、また、孔付クランプ分離装
置には走行駆動装置が設けられている。走行駆動装置
は、前記ラックに噛合する駆動ピニオンを有し、孔付ク
ランプのピッチに応じて駆動ピニオンが回転することに
より、孔付クランプは次々と分離させられる。なお、処
理手順データを予め入力した制御装置によって上記動作
が統括して行われる。
Further, clamps with holes are fixed to the jig frame at a predetermined pitch according to the type of the reinforcing bar mat, and the clamp separation device with holes is moved at each pitch. After moving by a predetermined pitch, the hand, the socket assembly, and the storage section are operated, the perforated clamps on the jig frame are sequentially separated, and all the perforated clamps are placed on the storage section. For this reason, a rack extending in parallel with the long side of the jig frame is provided on the side of the perforated clamp separating device, and a traveling drive device is provided in the perforated clamp separating device. The traveling drive device has a drive pinion that meshes with the rack, and the drive pinions rotate according to the pitch of the hole clamps, whereby the hole clamps are sequentially separated. The above operation is performed by a control device to which processing procedure data is input in advance.

【0013】[0013]

【実施例】以下、図面に基づいて本発明の実施例を説明
する。発泡コンクリートの固化工程では、型枠内に補強
部材として鉄筋マットが配置された状態で発泡コンクリ
ートが流し込まれる。その際、図1に示すように、前記
鉄筋マットMは、治具フレームJに取り付けられた孔付
クランプCに上端側を支持されている鉄筋ピンPによっ
て治具フレームJの下方に吊り下げた状態で、発泡コン
クリートが流し込まれる図示していない型枠内に配置さ
れ、発泡コンクリートがある程度固まるまで鉄筋マット
が発泡コンクリートの下方に沈んだり傾いたりしないよ
うに型枠上に治具フレームを固定して支持される。
Embodiments of the present invention will be described below with reference to the drawings. In the step of solidifying the foamed concrete, the foamed concrete is poured in a state in which a reinforcing bar mat is arranged as a reinforcing member in the formwork. At that time, as shown in FIG. 1, the reinforcing bar mat M was suspended below the jig frame J by a reinforcing bar pin P whose upper end side was supported by a clamp C with a hole attached to the jig frame J. In this state, the jig frame is fixed on a formwork, which is placed in a formwork (not shown) into which the foamed concrete is poured, so that the reinforced mat does not sink or tilt below the foamed concrete until the foamed concrete is hardened to some extent. Supported.

【0014】前記治具フレームJは型鋼によって、矩形
の枠状に形成されており、その4隅には、リフター等の
吊具で把持して搬送を行うための吊りピンJ1が取り付
けられている。また、治具フレームJの前後の短辺に
は、それぞれ左右一対の横行ローラJ2が回転自在に設
けられており、前記横行ローラJ2をガイドレール上に
支持させて治具フレームJを横方向へ移動できるように
なっている。
The jig frame J is formed in a rectangular frame shape from a shape steel, and hanging pins J1 are attached to four corners of the jig for holding and transporting by means of a lifting tool such as a lifter. . A pair of left and right traversing rollers J2 are rotatably provided on the front and rear short sides of the jig frame J, respectively, and the traversing rollers J2 are supported on guide rails to move the jig frame J in the lateral direction. It can be moved.

【0015】治具フレームJの長辺間には、棒状の孔付
クランプCが掛け渡されており、その両端部に設けられ
ている固定ねじ部材C1によって治具フレームJに固定
されている。前記孔付クランプCには、その長手方向に
多数のピン支持孔C2が上下方向に貫通して形成されて
いる。前記それぞれのピン支持孔C2には、上方から鉄
筋ピンPが差し込まれており、鉄筋ピンPの下端は孔付
クランプCの下方に突き出して多数の鉄筋マットMを吊
り下げている。鉄筋ピンPには、その上部に孔付クラン
プCのピン支持孔C2の周縁部によって保持される鍔部
P1が設けられており、また、下端部には、係合部P2
が形成されている。
Between the long sides of the jig frame J, a bar-shaped clamp C with a hole is hung and fixed to the jig frame J by fixing screw members C1 provided at both ends thereof. A large number of pin support holes C2 are formed in the holed clamp C in the longitudinal direction so as to penetrate in the vertical direction. Reinforcing bar pins P are inserted into the respective pin support holes C2 from above, and the lower ends of the rebar pins P protrude below the clamps C with holes, and hang a large number of reinforcing bar mats M. The rebar pin P is provided at its upper part with a flange portion P1 which is held by the peripheral portion of the pin support hole C2 of the clamp C with a hole.
Are formed.

【0016】一方、鉄筋マットMは、複数の細い棒鋼を
溶接して組み立てられており、その長手方向に間隔をお
いて、鉄筋ピンPが挿入される鉄筋ピン連結部M1が設
けられている。前記鉄筋ピン連結部M1は、上下に間隔
をあけて配置されている上部プレートM2と下部プレー
トM3とから構成され、上部プレートM2と下部プレー
トM3とには、鉄筋マットMの長手方向に長く形成され
た長孔M4,M5がそれぞれ形成されている。前記鉄筋
ピンPは、上部プレートM2の長孔M4と下部プレート
M3の長孔M5とを貫通して、係合部P2が下部プレー
トM3の長孔M5に係合するようになっている。前記係
合部P2は下部プレートM3の長孔M5に差し込んでか
ら鉄筋ピンPを所定角度回転すると係合状態となる形状
となっている。係合部P2としては、例えば長孔M5に
適合した長円形断面をもつ形状とし、その長径部分の両
側に溝を形成して長孔5M内で係合部P2を90度回し
て前記溝が長孔M5の短径部分に係合するような形状と
することができる。
On the other hand, the reinforcing bar mat M is assembled by welding a plurality of thin steel bars, and is provided with a reinforcing bar pin connecting portion M1 into which the reinforcing bar pins P are inserted at intervals in the longitudinal direction. The rebar pin connecting portion M1 is composed of an upper plate M2 and a lower plate M3 which are vertically spaced from each other. The upper plate M2 and the lower plate M3 are formed so as to be long in the longitudinal direction of the rebar mat M. The elongated holes M4 and M5 are respectively formed. The reinforcing pin P penetrates the long hole M4 of the upper plate M2 and the long hole M5 of the lower plate M3, and the engaging portion P2 is engaged with the long hole M5 of the lower plate M3. The engaging portion P2 is shaped to be in an engaged state when the reinforcing pin P is rotated by a predetermined angle after being inserted into the elongated hole M5 of the lower plate M3. The engaging portion P2 has, for example, a shape having an oval cross section adapted to the long hole M5, and a groove is formed on both sides of the long diameter portion, and the engaging portion P2 is turned 90 degrees in the long hole 5M to form the groove. It can be shaped to engage with the short diameter portion of the long hole M5.

【0017】なお、本文中においては、治具フレームJ
と孔付クランプCと鉄筋ピンPの3者が一体に組み立て
られているものを、鉄筋マットMを保持している治具と
いう意味で鉄筋マット保持治具という用語で表現してい
る。
Note that in the text, the jig frame J
A jig for holding the reinforcing bar mat M is expressed by a term "rebar mat holding jig" in which the three members of the clamp C with holes and the reinforcing bar pin P are integrally assembled.

【0018】図2は、本発明の孔付クランプ分離装置が
用いられる鉄筋マット自動組付システムのシステムフロ
ーを示す概略図であって、発泡コンクリート固化工程で
半固化状態の発泡コンクリート内に鉄筋マットを残し
て、型枠から分離された鉄筋マット保持治具がメインラ
イン1から搬送されてくると、前記鉄筋マット保持治具
は、前記メインライン1から処理ライン2へ搬入され
る。
FIG. 2 is a schematic diagram showing a system flow of an automatic rebar mat assembling system in which the clamp separating apparatus with holes according to the present invention is used. When the reinforcing mat holding jig separated from the formwork is conveyed from the main line 1, the reinforcing mat holding jig is carried into the processing line 2 from the main line 1.

【0019】前記鉄筋マット自動組付システムの処理ラ
イン2では、先ず、第1の工程で、ピン抜取装置によっ
て、前記鉄筋マット保持治具の孔付クランプから鉄筋ピ
ンが抜き取られ、抜き取られた鉄筋ピンは、ピンストレ
ージラインW1に貯留される。第2の工程では、孔付ク
ランプから鉄筋ピンが抜き取られた治具フレームから、
さらに、孔付クランプが取り外され、クランプストレー
ジラインS1に貯留される。第3の工程では、前記クラ
ンプストレージラインS1から孔付クランプが取り出さ
れて、前記第2の工程で孔付クランプが取り外された治
具フレームの新たな指定位置に、孔付クランプが装着さ
れる。治具フレームへの孔付クランプの装着位置は、こ
れから使用される鉄筋マットのサイズに応じて選択され
る。さらに、第4の工程では、前記第3の工程で治具フ
レームに装着された孔付クランプにピンストレージライ
ンW1から取り出された鉄筋ピンが差し込まれるが、そ
の際、孔付クランプの下方には、マット供給ライン3か
ら鉄筋マットが搬入されており、ここで、治具フレーム
と孔付クランプと鉄筋ピンとからなる鉄筋マット保持治
具の組立が完了すると同時に、その鉄筋ピンに鉄筋マッ
トが吊り下げられ、鉄筋マット保持治具への鉄筋マット
の組み付けが完了し、搬出ライン4から再びメインライ
ン1の発泡コンクリートの固化工程へ送り出される。
In the processing line 2 of the rebar mat automatic assembling system, first, in a first step, a rebar pin is extracted from a clamp with a hole of the rebar mat holding jig by a pin extracting device, and the extracted rebar is provided. The pins are stored in the pin storage line W1. In the second step, from the jig frame from which the reinforcing rod pins were removed from the clamps with holes,
Further, the perforated clamp is removed and stored in the clamp storage line S1. In the third step, the clamp with the hole is taken out from the clamp storage line S1, and the clamp with the hole is attached to a new designated position of the jig frame from which the clamp with the hole was removed in the second step. . The mounting position of the clamp with a hole on the jig frame is selected according to the size of the reinforcing bar mat to be used. Further, in the fourth step, the rebar pins taken out from the pin storage line W1 are inserted into the clamps with holes attached to the jig frame in the third step. , A reinforcing bar mat is carried in from the mat supply line 3. At this point, the reinforcing bar mat holding jig including the jig frame, the clamp with holes, and the reinforcing bar pin is completed, and at the same time, the reinforcing bar mat is suspended from the reinforcing bar pin. Then, the rebar mat is assembled to the rebar mat holding jig, and the rebar mat is sent out from the unloading line 4 again to the foamed concrete solidifying step of the main line 1.

【0020】次に図3は鉄筋マット自動組付システムを
示す平面図である。同図において、前記固化工程で使用
されたマット保持治具を回収する搬入台車D1は、地上
に敷設されている一対のレールR1に沿って前記メイン
ラインと引き込み位置Q1との間を移動可能に設けられ
ている。メインラインから搬入された前記搬入台車D1
は、その上面に鉄筋マット保持治具が搭載されており、
図1に示すその治具フレームJには、孔付クランプCと
前記孔付クランプCの支持孔C2に差し込まれている鉄
筋ピンPが付属されている。前記引き込み位置Q1の手
前側の前記搬入台車D1の走行経路の上方には、ピン抜
取装置E1が配置されており、治具フレームJに固定さ
れている複数の孔付クランプCから鉄筋ピンPが抜き取
られる。孔付クランプCから抜き取られた鉄筋ピンP
は、ピンストレージラインW1に送出される。鉄筋ピン
Pの抜き取り作業を終えると、搬入台車D1は、図3に
示す位置Q1まで移動され、ここで、搬送台車D1上に
搭載されている治具フレームJは、図示していないリフ
ターによって搬送台車D2上へ移載される。空になった
搬入台車D1は、次の鉄筋マット保持治具を受け取るた
めにメインライン側へ戻る。
FIG. 3 is a plan view showing an automatic reinforcing bar mat assembling system. In the figure, a carry-in truck D1 for collecting the mat holding jig used in the solidification step is movable between the main line and the retracted position Q1 along a pair of rails R1 laid on the ground. Is provided. The carry-in cart D1 carried in from the main line
Has a reinforced mat holding jig on its upper surface,
The jig frame J shown in FIG. 1 is provided with a clamp C with a hole and a reinforcing pin P inserted into a support hole C2 of the clamp C with a hole. Above the traveling path of the carry-in cart D1 on the front side of the retraction position Q1, a pin extracting device E1 is arranged, and a plurality of clamps C with holes fixed to the jig frame J receive rebar pins P. It is extracted. Reinforcing pin P pulled out from holed clamp C
Is sent to the pin storage line W1. After the work of removing the reinforcing rod pins P is completed, the carry-in cart D1 is moved to a position Q1 shown in FIG. 3, where the jig frame J mounted on the carry cart D1 is carried by a lifter (not shown). It is transferred onto the cart D2. The empty loading cart D1 returns to the main line side to receive the next rebar mat holding jig.

【0021】前記搬送台車D2の搬送路の上方には、孔
付クランプ分離装置N1がレールR2上を移動自在に設
けられている。孔付クランプ分離装置N1は、治具フレ
ームJから孔付クランプCを順次取り外して搬入リフタ
ーS2へ送り出す。そして、搬入リフターS2は、孔付
クランプCをクランプストレージラインS1に送りだ
す。クランプストレージラインS1は、複数のクランプ
ストレージコンベヤS3で構成されており、異なる種類
の孔付クランプCを種類別に貯留することが可能になっ
ている。
Above the transport path of the transport truck D2, a clamp separation device N1 with holes is provided movably on a rail R2. The perforated clamp separation device N1 sequentially removes the perforated clamps C from the jig frame J and sends them to the carry-in lifter S2. Then, the carry-in lifter S2 sends out the clamp C with holes to the clamp storage line S1. The clamp storage line S1 is composed of a plurality of clamp storage conveyors S3, and can store different types of perforated clamps C by type.

【0022】孔付クランプCが外された治具フレームJ
を搭載した搬送台車D2は、図3に示す位置Q2へ移動
し、ここで、図示していないリフターによって、治具フ
レームJは、搬入台車D2から搬送台車D3へ移載され
る。空になった搬送台車D2は、再び搬入台車D1で搬
送されてくる次の治具フレームJを受け取るために後退
する。治具フレームJが搭載された搬送台車D3は、孔
付クランプ装着装置F1によって前記治具フレームJの
新たな位置に孔付クランプCを装着するために所定位置
まで前進して停止する。
Jig frame J with clamp C with hole removed
Is moved to a position Q2 shown in FIG. 3, where the jig frame J is transferred from the carry-in cart D2 to the carry cart D3 by a lifter (not shown). The empty transport vehicle D2 retreats to receive the next jig frame J transported by the transport vehicle D1 again. The transport trolley D3 on which the jig frame J is mounted moves forward to a predetermined position and is stopped in order to mount the perforated clamp C at a new position of the jig frame J by the perforated clamp mounting device F1.

【0023】孔付クランプ装着装置F1は、クランプス
トレージラインS1下流端に設けられた搬出リフターS
4から孔付クランプCを受け取り、搬送台車D3上の治
具フレームJに孔付クランプCを固定する。搬送台車D
3は、指定された数の孔付クランプCが治具フレームJ
上に装着されると、図3に示す位置Q3へ向かって前方
へ移動する。
The clamp mounting device F1 with a hole is provided with a carry-out lifter S provided at the downstream end of the clamp storage line S1.
4, the clamp C with holes is received, and the clamp C with holes is fixed to the jig frame J on the carriage D3. Carriage D
3 is a jig frame J in which a designated number of clamps C with holes are provided.
When mounted on the top, it moves forward toward a position Q3 shown in FIG.

【0024】位置Q3において、鉄筋マット組付装置A
1が鉄筋ピンを前記孔付クランプの新たに指定されるピ
ン支持孔へ差し込んで、前記鉄筋ピンを鉄筋マットに係
合させる。閉じた搬送路を形成するコンベヤ装置B1か
ら供給される鉄筋マットMは、マット移載機B7を介し
て、マット反転機A2を搭載している水平ビームB8に
送出される。搬送台車D3上の治具フレームJは、位置
決め台車A3上に移乗し、鉄筋マット組付装置A1によ
り孔付クランプCに鉄筋ピンPが挿入固定される。次い
で、鉄筋マットMが組み付けられた治具フレームJが搬
送台車D4上に搭載され、搬送台車D4は図3の位置Q
4へ移動する。
At the position Q3, the reinforcing bar mat assembling apparatus A
1 inserts a reinforced pin into a newly designated pin support hole of the perforated clamp to engage the reinforced pin with the reinforced mat. The reinforced mat M supplied from the conveyor device B1 forming a closed transport path is sent out to a horizontal beam B8 carrying a mat reversing machine A2 via a mat transfer machine B7. The jig frame J on the transport trolley D3 is transferred onto the positioning trolley A3, and the reinforced pins P are inserted and fixed in the clamps C with holes by the reinforced mat assembling device A1. Next, the jig frame J on which the reinforcing bar mat M is mounted is mounted on the transport trolley D4, and the transport trolley D4 is positioned at the position Q in FIG.
Move to 4.

【0025】そして、鉄筋マットを吊り下げた鉄筋マッ
ト保持治具はトラバーサ等によって処理ラインから排出
され、その鉄筋マット保持治具は型枠に配置される。そ
の後、メインラインにおいて型枠内に発砲コンクリート
が流し込まれる。
Then, the jig holding the reinforcing mat is discharged from the processing line by a traverser or the like, and the jig holding jig is placed on a mold. Thereafter, foamed concrete is poured into the formwork on the main line.

【0026】図4乃至図6は、本発明の孔付クランプ分
離装置N1を詳細に示し、搬送台車D2の搬送路の上方
には、孔付クランプ分離装置N1がレールR2上を搬送
台車D2の搬送経路に沿って移動自在に設けられてい
る。前記孔付クランプ分離装置N1には、図4に示すよ
うに、搬送台車D2に搭載されている治具フレームJの
孔付クランプCに設けられている固定ねじ部材C1に対
向する位置にソケットアダプタN2が先端に取り付けら
れたソケットアセンブリN3が左右一対設けられてい
る。
FIGS. 4 to 6 show in detail the perforated clamp separating device N1 according to the present invention. Above the conveying path of the transport vehicle D2, the perforated clamp separating device N1 is mounted on the rail R2. It is provided movably along the transport path. As shown in FIG. 4, a socket adapter is provided at the position opposed to the fixing screw member C1 provided on the clamp C with a hole of the jig frame J mounted on the carrier D2, as shown in FIG. A pair of left and right socket assemblies N3 each having N2 attached to the distal end are provided.

【0027】ソケットアセンブリN3は、孔付クランプ
分離装置N1の本体側にリニアガイドN4を介して孔付
クランプ分離装置N1の移動方向と直交方向にスライド
自在に支持され、エアシリンダN5によって進退駆動さ
れるようになっている。また、前記ソケットアセンブリ
N3には、ソケットアダプタN2を回転させるための駆
動機構が内蔵されている。
The socket assembly N3 is slidably supported on the main body side of the holed clamp separating device N1 via a linear guide N4 in a direction orthogonal to the moving direction of the holed clamp separating device N1, and is driven forward and backward by an air cylinder N5. It has become so. Further, a driving mechanism for rotating the socket adapter N2 is built in the socket assembly N3.

【0028】前記ソケットアセンブリN3の上方には、
孔付クランプCを把持する一対のハンドN6が設けられ
ている。前記ハンドN6は昇降フレームN7に支持さ
れ、アクチュエータN8によって回動される水平軸N9
に取り付けられている。前記昇降フレームN7は、左右
一対のリニアガイドN10によって可動フレームN11
に対して昇降自在に支持され、昇降シリンダN12によ
って昇降駆動されるようになっている。
Above the socket assembly N3,
A pair of hands N6 for holding the clamp C with holes is provided. The hand N6 is supported by a lifting frame N7, and is rotated by an actuator N8.
Attached to. The lifting frame N7 is moved by a movable frame N11 by a pair of left and right linear guides N10.
Is supported to be able to move up and down, and is driven to move up and down by a lifting cylinder N12.

【0029】図5に示すように、前記可動フレームN1
1は、孔付クランプ分離装置N1の移動方向と同じ方向
に水平移動自在に、孔付クランプ分離装置N1の本体フ
レームに支持されており、水平移動シリンダN13によ
って往復移動されるようになっている。前記水平移動シ
リンダN13の下方には、孔付クランプ分離装置N1の
移動方向に平行な回転軸線を有する、複数の搬送ローラ
N14が配置されている。前記搬送ローラN14のソケ
ットアセンブリN3側には、前記搬送ローラN14の軸
線方向に、中継レールN15が一部搬送ローラN14間
へ入り込むように配置され、また、前記中継レールN1
5と平行したガイドレールN16によって押送ドグN1
7がスライド自在に設けられている。搬送ローラN1
4、中継レールN15及び押圧ドグN17によって、分
離された孔付クランプCを一時的に貯留する貯留部が構
成される。
As shown in FIG. 5, the movable frame N1
Numeral 1 is supported by the main body frame of the clamped / separated device N1 so as to be horizontally movable in the same direction as the direction of movement of the clamped / separated device N1 and is reciprocated by a horizontal moving cylinder N13. . Below the horizontal moving cylinder N13, a plurality of transport rollers N14 having a rotation axis parallel to the moving direction of the clamped separating device N1 with holes are arranged. On the socket assembly N3 side of the transport roller N14, a relay rail N15 is disposed so as to partially enter between the transport rollers N14 in the axial direction of the transport roller N14.
Pushing dog N1 by guide rail N16 parallel to
7 is slidably provided. Transport roller N1
4. The storage section for temporarily storing the separated holed clamp C is constituted by the relay rail N15 and the pressing dog N17.

【0030】前記押送ドグN17を駆動するためのシリ
ンダN18が搬送ローラN14の下方に配置されてい
る。前記中継レールN15のソケットアセンブリN3に
近い側の端部近傍には、ストッパN19が垂直面内で揺
動自在に枢着されており、その上端側が自重によって中
継レールN15の上面から常時突出するように付勢され
ている。また、前記押送ドグN17下部には、前記スト
ッパN19の下部を押し上げてその上端側を中継レール
N15の上面から没入させるストッパ倒伏ローラN20
が取り付けられている。
A cylinder N18 for driving the pushing dog N17 is disposed below the transport roller N14. Near the end of the relay rail N15 near the socket assembly N3, a stopper N19 is pivotally mounted in a vertical plane so as to be swingable, and its upper end always projects from the upper surface of the relay rail N15 by its own weight. Has been energized. A stopper lowering roller N20 is provided below the pushing dog N17 so as to push up the lower portion of the stopper N19 so that its upper end is immersed from the upper surface of the relay rail N15.
Is attached.

【0031】さらに、クランプ分離装置N1は、サーボ
モータを内蔵した走行駆動装置N21を有している。前
記走行駆動装置N21には、左右の支持車輪N22を支
持しているレールR2の、内側に配置されているラック
Lに噛み合っている駆動ピニオンN23が設けられてお
り、前記駆動ピニオンN23を回転させてクランプ分離
装置N1を指定された位置に移動して位置決めできるよ
うになっている。
Further, the clamp separation device N1 has a traveling drive device N21 having a built-in servomotor. The traveling drive device N21 is provided with a drive pinion N23 meshing with a rack L disposed inside a rail R2 supporting left and right support wheels N22, and rotating the drive pinion N23. Thus, the clamp separation device N1 can be moved to a designated position and positioned.

【0032】前述したように構成されている孔付クラン
プ分離装置N1が、治具フレームJから孔付クランプC
を分離する場合には、駆動装置N21によって、ソケッ
トアダプタN2が搬送台車D2上の治具フレームJに固
定されている孔付クランプC両端の固定ねじ部材C1に
対向する位置まで移動し、エアシリンダN5によって両
側のソケットアダプタN2をそれぞれ固定ねじ部材C1
の頭部に嵌合させる。
The clamp separation device with hole N1 configured as described above is used to move the clamp with hole C from the jig frame J.
Is separated by the driving device N21, the socket adapter N2 is moved to a position opposed to the fixing screw members C1 at both ends of the clamps C with holes fixed to the jig frame J on the carrier trolley D2. The socket adapters N2 on both sides are respectively fixed to the fixing screw members C1 by N5.
To the head.

【0033】その際、昇降シリンダN12と水平移動シ
リンダN13を駆動して、一対のハンドN6を孔付クラ
ンプCの位置へ移動して前記ハンドN6によって孔付ク
ランプCを把持する。次いで両側のソケットアセンブリ
N3を駆動してそれぞれのソケットアダプタN2を回転
させ、孔付クランプCの固定ねじ部材C1を緩めて治具
フレームJへの締め付けを解除すると、治具フレームJ
と孔付クランプCの固定が解かれる。その後、昇降シリ
ンダN12を作動させてハンドN6によって孔付クラン
プCを治具フレームJから上方に分離し、次いでアクチ
ュエータN8によってハンドN6は90度向きが回転さ
せられる。さらに、水平移動シリンダN13を作動させ
て可動フレームN11ごとハンドN6を水平に移動さ
せ、その後、昇降シリンダN12を再度作動させてハン
ドN6を下降させ、中継レールN15上へ孔付クランプ
Cを横倒しの状態で載置する。
At this time, the lifting cylinder N12 and the horizontal moving cylinder N13 are driven to move the pair of hands N6 to the positions of the clamps C with holes, and the clamps C with holes are gripped by the hands N6. Next, the socket assemblies N3 on both sides are driven to rotate the respective socket adapters N2, and the fixing screw members C1 of the clamps C with holes are loosened to release the fastening to the jig frame J.
And the clamp C with a hole is released. Thereafter, the lifting cylinder N12 is operated to separate the clamp C with holes from the jig frame J by the hand N6, and then the hand N6 is rotated 90 degrees by the actuator N8. Further, the horizontal moving cylinder N13 is operated to move the hand N6 horizontally together with the movable frame N11. Thereafter, the elevating cylinder N12 is operated again to lower the hand N6, and the clamp C with holes is laid down on the relay rail N15. Place in the state.

【0034】この時、押送ドグN17は、図5に示す位
置にあり、また、ストッパN19は突出状態となってい
る。次いで、ハンドN6が上方へ待避すると、エアシリ
ンダN18が駆動され、押送ドグN17が搬送ローラN
14側へ移動を開始する。その際、押送ドグN17が一
定距離移動するまでは、中継レールN15上の孔付クラ
ンプCはストッパN19によって、移動を規制されてお
り、姿勢のずれが防止されている。
At this time, the pushing dog N17 is at the position shown in FIG. 5, and the stopper N19 is in a protruding state. Next, when the hand N6 is retracted upward, the air cylinder N18 is driven, and the pushing dog N17 is moved to the conveying roller N17.
Start moving to the 14 side. At this time, until the pushing dog N17 moves by a certain distance, the movement of the clamp C with a hole on the relay rail N15 is restricted by the stopper N19, and the displacement of the posture is prevented.

【0035】そして押送ドグN17のストッパ倒伏ロー
ラN20がストッパN19の下部に突き当たると前記ス
トッパN1は回動されて中継レールN15下方に没入
し、孔付クランプCは、押送ドグN17で押されて搬送
ローラN14上へ移載される。
When the stopper falling roller N20 of the pushing dog N17 hits the lower part of the stopper N19, the stopper N1 is rotated to enter below the relay rail N15, and the clamp C with a hole is pushed by the pushing dog N17 and conveyed. It is transferred onto the roller N14.

【0036】こうして治具フレームJから一つの孔付ク
ランプCの取り外し作業が終了すると孔付クランプ分離
装置N1は、ラックLに噛合する駆動ピニオンN23が
回転駆動されて次の孔付クランプCの上方に移動する。
そして、前記の動作を繰り返して順次取り外した孔付ク
ランプCを搬送ローラN14上へ移動させる。一つの搬
送台車D2上に搭載されている治具フレームJから総て
の孔付クランプCの取り外し作業が終了すると、孔付ク
ランプ分離装置N1は、原位置へ後退し、ここで、前記
搬送ローラN14上に一時的に蓄積されている複数の孔
付クランプCを搬送ローラN14を駆動して側方に設け
られている図3に示すクランプストレージラインS1の
入口側に設置されている搬入リフターS2へ送り出す。
When the operation of removing one of the clamps with holes C from the jig frame J is completed, the drive pinion N23 meshing with the rack L is driven to rotate by the drive pinion N23 above the next clamp C with holes. Go to
Then, the above operation is repeated, and the sequentially removed clamp C with holes is moved onto the transport roller N14. When the work of removing all the clamps C with holes from the jig frame J mounted on one carrier D2 is completed, the clamp-separating device N1 withdraws to the original position, where the transport roller The carry-in lifter S2 installed at the entrance side of the clamp storage line S1 shown in FIG. 3 provided on the side by driving the transport roller N14 with the plurality of clamps C with holes temporarily stored on N14. Send to

【0037】前記クランプストレージラインS1は、図
6に示すように、上下に4段に設けられている複数のク
ランプストレージコンベヤS3で構成されており、それ
ぞれの段には、異なる種類の孔付クランプCを種類別に
貯留することが可能になっている。前記搬入リフターS
2は、孔付クランプ分離装置N1側から受け取った同種
の孔付クランプCを指定された段のクランプストレージ
コンベヤS3へ搬入する。
As shown in FIG. 6, the clamp storage line S1 is composed of a plurality of clamp storage conveyors S3 provided in four stages above and below, each stage having a different type of clamp with holes. C can be stored by type. The carry-in lifter S
2 carries the same type of perforated clamp C received from the perforated clamp separating device N1 into the specified-stage clamp storage conveyor S3.

【0038】前述した装置は、図示していない処理手順
データが入力されている制御装置が統括して制御してお
り、アクチュエータや昇降シリンダの動作タイミング、
駆動ピニオンの回転駆動量、分離された孔付クランプが
搬入されるクランプストレージラインの指定等が前記制
御装置に入力されているデータによって行われる。
The above-described apparatus is controlled by a control apparatus to which processing procedure data (not shown) is input, and controls the operation timings of the actuator and the lifting / lowering cylinder.
The amount of rotation of the drive pinion, the designation of a clamp storage line into which the separated clamp with holes is carried, and the like are performed based on data input to the control device.

【0039】[0039]

【発明の効果】以上説明したように、本発明の孔付クラ
ンプ分離装置によれば、従来殆ど手作業で行っていた治
具フレームと孔付クランプとの分離作業を自動的に行う
ことができるため、作業効率を向上させることができる
とともに、作業環境を改善することができる。
As described above, according to the clamp separation device with holes of the present invention, the separation work between the jig frame and the clamp with holes, which has been performed almost manually in the past, can be automatically performed. Therefore, the working efficiency can be improved and the working environment can be improved.

【0040】また、1つの治具フレーム上の孔付クラン
プを貯留部上に一時的に貯留した後、まとめて排出させ
ることとしたので、その後に分解された治具フレームと
孔付クランプを組み立てる作業を行う際、複数種ある孔
付クランプの混入を避けて鉄筋マット保持治具の誤組立
を防止することができる。
Further, since the clamps with holes on one jig frame are temporarily stored in the storage portion and then discharged together, the disassembled jig frame and the clamp with holes are assembled thereafter. When performing the work, it is possible to avoid mixing of a plurality of types of holed clamps and prevent erroneous assembly of the reinforcing bar mat holding jig.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の孔付クランプ分離装置の対象となる
鉄筋マット保持治具であって、治具フレームに孔付クラ
ンプ、鉄筋ピン及び鉄筋マットを組み付けた状態を示す
斜視図。
FIG. 1 is a perspective view showing a reinforcing bar mat holding jig which is an object of a clamped separator with holes of the present invention, in which a clamp with holes, a reinforcing bar pin and a reinforcing bar mat are assembled to a jig frame.

【図2】 本発明の孔付クランプ分離装置が用いられる
鉄筋マット自動組付システムの概略を示す図。
FIG. 2 is a view schematically showing an automatic rebar mat assembling system in which the perforated clamp separating apparatus of the present invention is used.

【図3】 図2の鉄筋マット自動組付システムの1実施
例を示す下位部分の平面図。
FIG. 3 is a plan view of a lower part showing one embodiment of the reinforcing bar mat automatic assembling system of FIG. 2;

【図4】 本発明の孔付クランプ分離装置の正面図。FIG. 4 is a front view of the clamp separation device with holes according to the present invention.

【図5】 本発明の孔付クランプ分離装置の側面図。FIG. 5 is a side view of the clamp separation device with holes of the present invention.

【図6】 図3のA−A線位置から矢印方向に見た側面
図。
FIG. 6 is a side view as viewed in the direction of the arrow from the position of the line AA in FIG. 3;

【符号の説明】[Explanation of symbols]

1 メインライン 2 処理ラインライン A1 マット組付装置 B1 コンベヤ装置 E1 ピン抜取装置 F1 孔付クランプ装着装置 N1 孔付クランプ分離装置 N2 ソケットアダプタ N3 ソケットアセンブリ N6 ハンド N7 昇降フレーム N11 可動フレーム N14 搬送ローラ N15 中継レール N17 押送ドグ N19 ストッパ N20 ストッパ倒伏ローラ N23 駆動ピニオン S1 クランプストレージライン S2 搬入リフター S3 クランプストレージコンベヤ S4 搬出リフター DESCRIPTION OF SYMBOLS 1 Main line 2 Processing line line A1 Mat assembling device B1 Conveyor device E1 Pin extraction device F1 Clamp mounting device with hole N1 Clamp separating device with hole N2 Socket adapter N3 Socket assembly N6 Hand N7 Elevating frame N11 Moving frame N14 Transport roller N15 Relay Rail N17 Pushing Dog N19 Stopper N20 Stopper Falling Roller N23 Drive Pinion S1 Clamp Storage Line S2 Loading Lifter S3 Clamp Storage Conveyor S4 Loading Lifter

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 矩形枠状の治具フレームの上方で該治具
フレームの長辺に沿って移動可能な可動フレームに、 前記治具フレーム長辺に掛け渡された複数の孔付クラン
プの固定ねじ部材に進退動して前記固定ねじ部材の締め
付けを解除するソケットアセンブリと、 締め付けが解除された前記孔付クランプを把持して前記
治具フレームから分離させる昇降自在なハンドと、 分離された孔付クランプを前記ハンドから受け取って1
つの治具フレーム上の孔付クランプの総てが分離される
まで該孔付クランプを一時的に貯留する貯留部と、 を設けた、鉄筋マット保持治具の孔付クランプ分離装
置。
1. A plurality of clamps each having a plurality of holes fixed to a movable frame movable along a long side of the jig frame above a jig frame having a rectangular frame shape. A socket assembly for moving back and forth to the screw member to release the tightening of the fixing screw member; a liftable hand for gripping the clamp with the hole released and releasing the clamp from the jig frame; and a separated hole. Receiving the attached clamp from the hand
And a storage portion for temporarily storing the clamps with holes on all the jig frames until all of the clamps with holes on the jig frame are separated from each other.
【請求項2】 前記貯留部が、分離された孔付クランプ
を前記ハンドから受け取る中継レールと、該中継レール
上に載置された孔付クランプを移動させる押送ドグと、
該押送ドグによって移動させられた複数の孔付クランプ
を前記治具フレームの側方に排出する搬送ローラとを有
する、第1項の孔付クランプの分離装置。
2. A relay rail in which the storage unit receives the separated clamp with a hole from the hand, a pushing dog for moving a clamp with a hole placed on the relay rail,
2. The separation device for perforated clamps according to claim 1, further comprising a conveying roller for discharging the plurality of perforated clamps moved by the pushing dog to a side of the jig frame.
【請求項3】 前記孔付クランプ分離装置が、前記可動
フレームを前記治具フレーム上の孔付クランプのピッチ
毎に移動させる走行駆動装置を有する、第1項又は第2
項の孔付クランプ分離装置。
3. The first or second traveling drive device, wherein the perforated clamp separating device has a traveling drive device for moving the movable frame at every pitch of perforated clamps on the jig frame.
Item Clamp separation device with hole.
JP08070548A 1996-03-26 1996-03-26 Clamp separation device with holes for reinforced mat holding jig Expired - Fee Related JP3081150B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08070548A JP3081150B2 (en) 1996-03-26 1996-03-26 Clamp separation device with holes for reinforced mat holding jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08070548A JP3081150B2 (en) 1996-03-26 1996-03-26 Clamp separation device with holes for reinforced mat holding jig

Publications (2)

Publication Number Publication Date
JPH09254130A JPH09254130A (en) 1997-09-30
JP3081150B2 true JP3081150B2 (en) 2000-08-28

Family

ID=13434692

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08070548A Expired - Fee Related JP3081150B2 (en) 1996-03-26 1996-03-26 Clamp separation device with holes for reinforced mat holding jig

Country Status (1)

Country Link
JP (1) JP3081150B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112828210A (en) * 2020-12-31 2021-05-25 江苏天元智能装备股份有限公司 Make things convenient for device of reinforcing bar net equipment

Also Published As

Publication number Publication date
JPH09254130A (en) 1997-09-30

Similar Documents

Publication Publication Date Title
EP0483652A1 (en) Laser machining cell
KR101699150B1 (en) Shell Removing Apparatus For Lost Wax Casting And Method Thereof
JP3081150B2 (en) Clamp separation device with holes for reinforced mat holding jig
CN212528287U (en) Double-silicon-rod diamond wire squarer
US20030074786A1 (en) Machine tool and method for working elongated elements, in particular metallic profiled elements
KR101765028B1 (en) Shell Removing Apparatus For Lost Wax Casting And Method Thereof
JPH09254127A (en) Reinforced mat automatic assembling system
JP3171976B2 (en) Molded sheet removal reversing device
JPH09254129A (en) Perforated clamp mounting device of reinforcing bar mat holding jig
JP3556573B2 (en) Roll shaft attachment / detachment device
JP2564530B2 (en) Residual core collection device
JP2004313116A (en) Apparatus for stacking raising seedling box
JPH0825196B2 (en) Method and apparatus for transferring reinforcing cages to the alignment table
US20030079586A1 (en) Brick recycling method and apparatus
CN219238498U (en) Bearing steel bar feeding device
JP3081151B2 (en) Pin extraction device
CN217147689U (en) Variable-pitch splitting and combining inserting device
JPH02165826A (en) Die holding and guiding device
JPS59201716A (en) Cutting and storage of rod material
CN114871647B (en) Intelligent welding machine for processing ship accessories and processing technology of ship accessories
JPH0596483A (en) Hydraulic gripper
RU2773074C2 (en) Device and method for processing bars
JP2000326321A (en) Reinforced mat incorporating installation
JPH09254789A (en) Transport carriage with elevatable function of jig frame
JP2606724B2 (en) Middle frame demounting device for concrete forming form

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees