JP3081151B2 - Pin extraction device - Google Patents

Pin extraction device

Info

Publication number
JP3081151B2
JP3081151B2 JP08070549A JP7054996A JP3081151B2 JP 3081151 B2 JP3081151 B2 JP 3081151B2 JP 08070549 A JP08070549 A JP 08070549A JP 7054996 A JP7054996 A JP 7054996A JP 3081151 B2 JP3081151 B2 JP 3081151B2
Authority
JP
Japan
Prior art keywords
pin
pair
rebar
clamp
pins
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08070549A
Other languages
Japanese (ja)
Other versions
JPH09254131A (en
Inventor
郁久 嶋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsubakimoto Chain Co
Original Assignee
Tsubakimoto Chain Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsubakimoto Chain Co filed Critical Tsubakimoto Chain Co
Priority to JP08070549A priority Critical patent/JP3081151B2/en
Publication of JPH09254131A publication Critical patent/JPH09254131A/en
Application granted granted Critical
Publication of JP3081151B2 publication Critical patent/JP3081151B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属するの技術分野】本発明は、発泡コンクリー
トの固化工程で使用された鉄筋マット保持治具から鉄筋
マットを保持していた使用済みの複数の鉄筋ピンを、一
括して抜き取って後工程へ搬出するピン抜取装置に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a post-process in which a plurality of used reinforcing bar pins holding a reinforcing bar mat are collectively extracted from a reinforcing bar mat holding jig used in a solidifying process of foamed concrete. The present invention relates to a pin removal device for carrying out to a pin.

【0002】[0002]

【従来の技術】従来、軽量建材等として用いられる発泡
コンクリート(ALC)の製造工程においては、型枠内
に発泡コンクリートを流し込んで固化させる際に、前記
発泡コンクリートを補強するための鉄筋マットを型枠内
にセットしている。
2. Description of the Related Art Conventionally, in the production process of foamed concrete (ALC) used as a lightweight building material, when a foamed concrete is poured into a mold and solidified, a reinforcing steel mat for reinforcing the foamed concrete is used. It is set in the frame.

【0003】前記鉄筋マットは、発泡コンクリートがあ
る程度固化するまでは、型枠内で自重で下方に沈降した
り傾いたりしないように保持しておく必要があり、枠状
の治具フレームに棒状の孔付クランプの両端部を固定
し、前記孔付クランプに形成されているピン支持孔に鉄
筋ピンを差し込んで鉄筋マット保持治具を組み立て、鉄
筋マットを鉄筋ピンの下端に係合させてこれを吊り下げ
た状態で、型枠上に治具フレームを位置決め固定して、
型枠内の定位置に鉄筋マットが保持されるようにしてい
た。そして、前記型枠内に発泡コンクリートを注入した
後、発泡コンクリートが完全に固化しないうちに、鉄筋
ピンを発泡コンクリート内の鉄筋マットから取り外し
て、鉄筋マット保持治具を分離した後、治具フレームか
ら孔付クランプと鉄筋ピンとを分離し、再び新しい鉄筋
マットのサイズにあわせて、鉄筋マット保持治具を組み
立てる作業を行っていた。
Until the foam concrete is solidified to some extent, it is necessary to hold the reinforcing mat so that it does not sink or tilt downward by its own weight in the mold. Fix both ends of the holed clamp, insert a reinforcing pin into the pin support hole formed in the holed clamp, assemble a reinforcing bar mat holding jig, engage the reinforcing bar mat with the lower end of the reinforcing bar pin, and In the suspended state, position and fix the jig frame on the formwork,
The reinforcing bar mat was held in a fixed position in the formwork. Then, after injecting the foamed concrete into the formwork, before the foamed concrete is completely solidified, the reinforcing pin is removed from the reinforcing bar in the foamed concrete, and the reinforcing bar holding jig is separated. Was separated from the clamp with holes and the reinforced pins, and the work of assembling the reinforced mat holding jig was again performed according to the size of the new reinforced mat.

【0004】[0004]

【発明が解決しようとする課題】前述した、鉄筋マット
保持治具から鉄筋ピンを分離する作業を、従来では手作
業によって、孔付クランプから一本ずつ抜き取っている
ため、作業効率が悪く、また、作業の安全性等、作業環
境にも問題があった。
The work of separating the rebar pins from the rebar mat holding jig as described above has conventionally been performed by hand, one by one from the clamp with holes, so that the work efficiency is poor. There were also problems with the working environment, such as work safety.

【0005】そこで、本発明は、マット保持治具から鉄
筋ピンを抜き取る作業を自動化して作業効率の向上を図
るとともに、作業環境を改善することができるピン抜取
装置を提供することを目的とする。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a pin extracting device that can improve the working efficiency by automating the operation of extracting a reinforcing rod pin from a mat holding jig and improve the working environment. .

【0006】[0006]

【課題を解決するための手段】前記目的のため、本発明
のピン抜取装置は、孔付クランプの支持孔に挿通されて
いる複数の鉄筋ピンの上端付近に設けられた鍔部を一括
して把持して上方に抜き取る昇降自在な一対の把持アー
ムと、鉄筋ピンの鍔部を両側から挟んで吊り下げた状態
で搬送する一対のピン搬出用スクリューと、前記把持ア
ームの上昇限位置で把持アームに把持されている複数の
鉄筋ピンの中間部を両側から挟んで一括して受け取ると
ともに、前記ピン搬出用スクリューの下方両側に移動し
て2つのピン搬出用スクリュー間の搬入側から前記複数
の鉄筋ピンを一列に侵入させて受け渡す一対の移載クラ
ンプとを備えたものである。
In order to achieve the above object, a pin extracting device according to the present invention collectively includes a flange provided near an upper end of a plurality of rebar pins inserted into a support hole of a clamp with holes. A pair of vertically movable gripping arms that are gripped and pulled out upward, a pair of pin unloading screws that are transported in a state where the flanges of the rebar pins are sandwiched from both sides and suspended, and a gripping arm at a position where the gripping arm can be lifted as far as possible The intermediate portion of the plurality of rebar pins gripped by the pin is received from both sides in a lump, and is moved to both lower sides of the pin unloading screw to move the plurality of rebar pins from the loading side between the two pin unloading screws. And a pair of transfer clamps for passing the pins in a row.

【0007】[0007]

【作用】支持孔に複数の鉄筋ピンが挿通されている孔付
クランプを一対の把持アーム下方に位置決めした後、前
記把持アームを開放した状態で下降させ、複数の鉄筋ピ
ンの上端付近に設けられた鍔部を一括して把持し、次い
で、前記把持アームを上昇させてこれらの鉄筋ピンを孔
付クランプの支持孔から上方に抜き出す。
After positioning a clamp with holes in which a plurality of rebar pins are inserted into the support holes below a pair of gripping arms, the clamp is lowered in a state where the gripping arms are opened, and provided near the upper ends of the plurality of rebar pins. Then, the gripping arm is raised, and the reinforcing pins are pulled out from the support holes of the clamp with holes.

【0008】前記一対の把持アームの上昇限位置で、一
対の移載クランプによって前記把持アームに把持されて
いる複数の鉄筋ピンの中間部を両側から挟んで一括して
保持した後、把持アームを開放して前記移載クランプに
鉄筋ピンを受け渡す。
[0008] At the ascending limit position of the pair of gripping arms, the intermediate portions of the plurality of rebar pins gripped by the gripping arms by the pair of transfer clamps are collectively held from both sides, and then the gripping arms are moved. Open and transfer the rebar pins to the transfer clamp.

【0009】次に、前記一対の移載クランプを一対の搬
出スクリューの下方まで移動させて、前記一対のクラン
プで保持されている複数の鉄筋ピンを、2つのピン搬出
用スクリュー間の搬入側から一列に侵入させる。鉄筋ピ
ンが全て2つの搬出スクリュー間に侵入した位置で移載
クランプを開放すると、それぞれの鉄筋ピンは自重によ
って落下し、それぞれの鍔部が一対のピン搬送スクリュ
ーによって受け止められる。前記一対のピン搬送スクリ
ュー上に移載された複数の鉄筋ピンは、2つのピン搬送
スクリューの回転により、吊り下げられた状態で下流側
に送り出される。
Next, the pair of transfer clamps are moved below the pair of unloading screws, and the plurality of reinforcing pins held by the pair of clamps are moved from the loading side between the two pin unloading screws. Infiltrate in a row. When the transfer clamp is opened at a position where all of the rebar pins have entered between the two carry-out screws, the respective rebar pins fall by their own weight, and the respective flange portions are received by the pair of pin transport screws. The plurality of rebar pins transferred onto the pair of pin transport screws are sent to the downstream side in a suspended state by the rotation of the two pin transport screws.

【0010】[0010]

【実施例】以下、図面に基づいて本発明の実施例を説明
する。図1は本発明のピン抜取装置が適用される鉄筋マ
ット保持治具の構造を示したものであって、前記鉄筋マ
ット保持治具は、型鋼によって矩形の枠状に形成されて
いる治具フレームJと前記治具フレームJの長辺間に固
定ねじ部材C1によって着脱自在に掛け渡されている、
棒状の孔付クランプCと、前記孔付クランプCの長手方
向に沿って多数上下方向に貫通したピン支持孔C2に上
方から挿通されて鍔部P1が係止された状態で、下方で
鉄筋マットMを吊持する鉄筋ピンPとを備えている。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows a structure of a reinforcing bar mat holding jig to which the pin extracting device of the present invention is applied, wherein the reinforcing bar mat holding jig is formed in a rectangular frame shape by a mold steel. J is detachably mounted between the long side of the jig frame J by a fixing screw member C1.
In a state where the flange P1 is locked by being inserted from above into a rod-shaped clamp C with holes and a plurality of pin support holes C2 vertically penetrating along the longitudinal direction of the clamp C with holes, And a reinforcing pin P for suspending the M.

【0011】前記鉄筋マットMは複数の細い棒鋼を溶接
して組み立てられており、その長手方向に間隔をおい
て、鉄筋ピンPが挿入される鉄筋ピン連結部M1が設け
られている。前記鉄筋ピン連結部M1は、上下に間隔を
あけて配置されている上部プレートM2と下部プレート
M3とから構成され、上部プレートM2と下部プレート
M3とには、鉄筋マットMの長手方向に長く形成された
長孔M4,M5がそれぞれ形成されている。前記鉄筋ピ
ンPは、上部プレートM2の長孔M4と下部プレートM
3の長孔M5とを貫通して、係合部P2が下部プレート
M3の長孔M5に係合するようになっている。前記係合
部P2は、下部プレートM3の長孔M5に差し込んでか
ら鉄筋ピンPを所定角度回転すると係合状態となる形状
となっている。
The reinforcing bar mat M is assembled by welding a plurality of thin steel bars, and is provided with a reinforcing bar pin connecting portion M1 into which the reinforcing bar pins P are inserted at intervals in the longitudinal direction. The rebar pin connecting portion M1 is composed of an upper plate M2 and a lower plate M3 which are vertically spaced from each other. The upper plate M2 and the lower plate M3 are formed so as to be long in the longitudinal direction of the rebar mat M. The elongated holes M4 and M5 are respectively formed. The reinforcing pin P is provided with a long hole M4 of the upper plate M2 and a
3, the engaging portion P2 is engaged with the long hole M5 of the lower plate M3. The engaging portion P2 has a shape which is brought into an engaged state when the reinforcing pin P is rotated by a predetermined angle after being inserted into the elongated hole M5 of the lower plate M3.

【0012】前記係合部P2としては、例えば長孔M5
に適合した長円形断面をもつ形状とし、その長径部分の
両側に溝を形成して長孔M5内で係合部P2を90度回
して前記溝が長孔M5の短径部分に係合するような形状
とすることができる。
As the engaging portion P2, for example, a long hole M5
A groove is formed on both sides of the long diameter portion, and the engaging portion P2 is turned 90 degrees in the long hole M5 so that the groove engages with the short diameter portion of the long hole M5. Such a shape can be adopted.

【0013】発泡コンクリートの固化工程においては、
図示しない型枠内に前記構造の鉄筋マット保持治具で鉄
筋マットMを吊り下げた状態で発泡コンクリートが流し
込まれ、発泡コンクリートが半固化状態のときに、鉄筋
ピンPと鉄筋マットMとの係合を解除した後、鉄筋ピン
Pを治具フレームJごと上方へ引き上げて型枠内から抜
き出している。
In the process of solidifying foam concrete,
Foamed concrete is poured into a formwork (not shown) in a state where the reinforced mat M is suspended by the reinforced mat holding jig having the above structure. When the foamed concrete is in a semi-solidified state, the connection between the reinforced pin P and the reinforced mat M is made. After releasing the joint, the rebar pins P are pulled up together with the jig frame J and pulled out of the mold.

【0014】図2は、前記使用済みのマット保持治具か
ら鉄筋ピンPを抜き取るために使用される本発明のピン
抜取装置の側面図であって、同図に示すように、ピン抜
取装置1は、前記固化工程で使用されたマット保持治具
を回収する運搬台車Dが移動する通路の上方に設けら
れ、昇降シリンダ2によって昇降される昇降枠3を備え
ている。前記昇降枠3にはエアシリンダ4によって開閉
動作が行われる一対の把持アーム5が取り付けられてい
る。
FIG. 2 is a side view of the pin extracting device of the present invention used for extracting the reinforcing pin P from the used mat holding jig. As shown in FIG. Has a lifting frame 3 that is provided above a passage in which a carrier D for collecting the mat holding jig used in the solidification step moves and that is raised and lowered by a lifting cylinder 2. A pair of gripping arms 5 that are opened and closed by an air cylinder 4 are attached to the lifting frame 3.

【0015】図3は、昇降枠3の下降限位置にある把持
アーム5の一部を示す側面図、図4は、把持アーム5の
開閉機構を示す横断面図であって、これらの図に示すよ
うに、前記一対の把持アーム5は、前記運搬台車Dの幅
方向に長く形成されている一対の把持部5Aと、それぞ
れの下端が把持部5Aによって相互に一体に連結され、
上端が前記昇降枠3の下面に枢軸5Bによって揺動自在
に支持されている3組の対の揺動アーム部材5Cとによ
って構成されている。
FIG. 3 is a side view showing a part of the gripping arm 5 at the lower limit position of the lifting frame 3, and FIG. 4 is a cross-sectional view showing an opening / closing mechanism of the gripping arm 5. As shown in the figure, the pair of gripping arms 5 are connected to a pair of gripping portions 5A formed long in the width direction of the transport trolley D, and their lower ends are integrally connected to each other by the gripping portions 5A.
The upper end is constituted by three pairs of swing arm members 5C which are swingably supported on the lower surface of the elevating frame 3 by a pivot 5B.

【0016】前記エアシリンダ4は、昇降枠3の長手方
向に2箇所設置され、前記昇降枠3と並行して下方に配
置されているリフトビーム4Aを上下動するように支持
している。前記リフトビーム4Aと各揺動アーム部材5
Cの中間部とは連結リンク4Bによって連結されてお
り、エアシリンダ4によってリフトビーム4Aが上下動
すると、前記連結リンク4Bを介して各揺動アーム部材
5Cの開閉動作が行われるようになっている。
The air cylinders 4 are installed at two places in the longitudinal direction of the lifting frame 3 and support a lift beam 4A, which is disposed in parallel with the lifting frame 3 and below, so as to move up and down. The lift beam 4A and each swing arm member 5
The intermediate portion of C is connected by a connecting link 4B. When the lift beam 4A moves up and down by the air cylinder 4, the opening and closing operation of each swing arm member 5C is performed via the connecting link 4B. I have.

【0017】図2に示すように、昇降枠3の上昇限位置
のさらに上方には、水平なガイドレール6が配置されて
いる。前記ガイドレール6は、エアシリンダ7によって
水平移動されるピン受取装置8を、前記運搬台車Dの移
動経路の上方位置と前記移動経路から外れた側方位置と
の間で往復移動自在に支持している。
As shown in FIG. 2, a horizontal guide rail 6 is disposed above the ascending position of the elevating frame 3. The guide rail 6 supports the pin receiving device 8 horizontally moved by the air cylinder 7 so that the pin receiving device 8 can reciprocate between an upper position of a moving path of the carrier D and a lateral position deviated from the moving path. ing.

【0018】図2及び図5に示すように、前記ピン受取
装置8は、上昇限位置まで上昇された昇降枠3や把持ア
ーム5の両側を跨いで移動する一対の縦枠部9Aを有す
る横行枠9を備えており、前記一対の縦枠部9Aのそれ
ぞれに、昇降枠3の上昇限位置で把持アーム5の把持部
5Aに把持されている鉄筋ピンPの中間部を両側から挟
んで、前記把持アーム5から受け取るための一対の移載
クランプ10が取り付けられている。
As shown in FIGS. 2 and 5, the pin receiving device 8 has a pair of vertical frame portions 9A which move across both sides of the lifting frame 3 and the gripping arm 5 raised to the upper limit position. A frame 9 is provided, and a pair of vertical frame portions 9A sandwiches, from both sides, an intermediate portion of a reinforcing rod pin P gripped by the gripping portion 5A of the gripping arm 5 at the ascending limit position of the lifting frame 3, A pair of transfer clamps 10 for receiving from the grip arm 5 are attached.

【0019】前記一対の移載クランプ10は、エアシリ
ンダ11で縦枠部9Aに対して小距離上下動するように
支持された水平なエアシリンダ12によってそれぞれ支
持され、前記エアシリンダ12によって、そのクランプ
部10Aで鉄筋ピンPの中間部の側面を把持開放可能に
なっているとともに、開放位置にあるときに、昇降枠3
と把持アーム5が前記一対の移載クランプ10間を上下
に通過できるようになっている。また、前記一対の移載
クランプ10は、それぞれのクランプ部10Aから下方
に垂下されたガイド板10Bを有しており、それぞれの
ガイド板10Bの下端側は、互いに内側に折り曲げられ
て対向し、鉄筋ピンPを把持する場合に、鉄筋ピンPの
揺れを規制する役割を果たしている。なお、前記ガイド
板10Bは、把持アーム5から鉄筋ピンPを受け取る際
に、鉄筋ピンPの揺れが問題を生じない程度であれば、
必ずしも設ける必要はない。
The pair of transfer clamps 10 are respectively supported by horizontal air cylinders 12 supported by an air cylinder 11 so as to move up and down a small distance with respect to the vertical frame portion 9A. The clamp portion 10A can hold and open the side surface of the intermediate portion of the reinforcing bar pin P. When the clamp portion 10A is in the open position, the lifting frame 3
And the gripping arm 5 can pass vertically between the pair of transfer clamps 10. In addition, the pair of transfer clamps 10 has guide plates 10B that hang down from the respective clamp portions 10A, and lower end sides of the respective guide plates 10B are bent inward to face each other, and face each other. When grasping the rebar pin P, the rebar pin P plays a role of restricting the swing of the rebar pin P. When the guide plate 10B receives the reinforcing pin P from the grip arm 5, if the swing of the reinforcing pin P does not cause a problem,
It is not necessarily required.

【0020】ピン受取装置8が、図4に示すように運搬
台車Dの移動経路から外れた側方位置にきたときに、前
記一対の移載クランプ10から鉄筋ピンPを受け取っ
て、後工程へ送り出すための一対のピン搬出用スクリュ
ー13が、前記側方位置における横行枠9の縦枠部9A
の間で移載クランプ10の上方に位置するように配置さ
れている。
When the pin receiving device 8 arrives at a lateral position deviating from the moving route of the carrier D as shown in FIG. 4, the pin receiving device 8 receives the rebar pins P from the pair of transfer clamps 10 and proceeds to a subsequent process. A pair of pin unloading screws 13 for sending out the vertical frame 9A of the horizontal frame 9 at the lateral position.
And is located above the transfer clamp 10 between them.

【0021】前記一対のピン搬出用スクリュー13は、
鉄筋ピンPが通過可能な間隔で並行して配置されてお
り、それぞれに形成されているスクリュー溝に鉄筋ピン
Pの鍔部P1の下面を係合させ、鉄筋ピンPを吊り下げ
た状態で搬送するように構成されている。なお、ピン受
取装置8がピン搬出用スクリュー13側へ移動するとき
には、移載クランプ10はエアシリンダ11によって上
昇位置に持ち上げられ、ピン搬出用スクリュー13と、
移載クランプ10に把持されている鉄筋ピンPの鍔部P
1とが干渉が防止される。
The pair of pin unloading screws 13 includes:
The rebar pins P are arranged in parallel at an interval that allows the rebar pins P to pass through, and the lower surface of the flange portion P1 of the rebar pins P is engaged with the screw grooves formed in each of them, and the rebar pins P are transported in a suspended state. It is configured to be. When the pin receiving device 8 moves to the pin unloading screw 13 side, the transfer clamp 10 is lifted to the raised position by the air cylinder 11, and the pin unloading screw 13 and
The flange P of the rebar pin P gripped by the transfer clamp 10
1 prevents interference.

【0022】次に、前述したピン抜取装置1の動作につ
いて説明する。発泡コンクリートの固化工程で使用され
た鉄筋マット保持治具は、図2に示すように運搬台車D
によって把持アーム5の下方に搬入される。そして、把
持アーム5の把持部5A直下に一つの孔付クランプCが
位置するように運搬台車Dを位置決めして停止させ、把
持アーム5を開いた状態で前記昇降シリンダ2を縮めて
昇降枠3を下降させ、次いでエアシリンダ4を作動させ
て、把持部5Aで孔付クランプCに支持されている多数
の鉄筋ピンPを同時に把持し、再び昇降シリンダ2を伸
ばして昇降枠3を上昇させて、図1に示す孔付クランプ
の支持孔C2から上方に鉄筋ピンPを引き抜いた後、上
昇限位置で停止させる。
Next, the operation of the above-described pin extracting device 1 will be described. The reinforced mat holding jig used in the solidification process of the foamed concrete includes a carrier D as shown in FIG.
Is carried under the gripping arm 5. Then, the carriage D is positioned and stopped so that one clamp C with a hole is located immediately below the gripping portion 5A of the gripping arm 5, and the lifting cylinder 2 is contracted with the gripping arm 5 opened to retract the lifting frame 3. Is lowered, and then the air cylinder 4 is operated to simultaneously hold a large number of the rebar pins P supported by the clamps C with holes by the holding portion 5A, and extend the lifting cylinder 2 again to raise the lifting frame 3. After pulling out the reinforcing pin P upward from the support hole C2 of the holed clamp shown in FIG. 1, it is stopped at the ascending limit position.

【0023】なお、治具フレームJは、運搬台車Dの床
面に鉄筋ピンPの先端が当接して、図4に示すように鉄
筋ピンPの鍔部P1と孔付クランプCの上面との間に把
持部5Aを侵入可能な隙間Sが空く高さで運搬台車D上
に支持されている。
In the jig frame J, the tip of the reinforcing rod pin P abuts on the floor surface of the transport trolley D, and the flange P1 of the reinforcing rod pin P and the upper surface of the clamp C with holes as shown in FIG. A gap S between which the gripper 5A can enter is vacant and supported on the carrier D at a height.

【0024】一方、この時までに、ピン受取装置8は、
運搬台車Dの上方に到達して、前記ピン受取装置8の横
行枠9の一対の縦枠部9Aは、上昇位置にある一対の把
持アームの両外側に位置している。そして、前記一対の
縦枠部9Aに設けられている移載クランプ10は、エア
シリンダ11によって下方に移動した位置で、前記一対
の把持アーム5の把持部5Aに支持されている複数の鉄
筋ピンPの中間部分へエアシリンダ12によって両側か
ら突出し、これらの鉄筋ピンPをそのクランプ部10A
によって一括して把持する。
On the other hand, by this time, the pin receiving device 8
Reaching above the transport trolley D, the pair of vertical frame portions 9A of the traversing frame 9 of the pin receiving device 8 are located on both outer sides of the pair of gripping arms at the ascending position. The transfer clamp 10 provided on the pair of vertical frame portions 9A is provided with a plurality of rebar pins supported by the gripping portions 5A of the pair of gripping arms 5 at a position moved downward by the air cylinder 11. P is projected from both sides by an air cylinder 12 to an intermediate portion of P, and these reinforcing pins P are clamped by their clamp portions 10A.
And collectively.

【0025】次いで、エアシリンダ4によって把持アー
ム5が開放され、鉄筋ピンPはその把持部5Aから移載
クランプ10へ受け渡される。移載クランプ10が鉄筋
ピンPを受け取ると、エアシリンダ11が作動して、移
載クランプ10を上方へ小距離移動させ、前記移載クラ
ンプ10によって把持されている鉄筋ピンPの鍔部P1
が前記一対のピン搬出用スクリュー13より上位に位置
するようにした後、横行枠9の縦枠部9Aの間に前記一
対のピン搬出用スクリュー13が入り込む位置までピン
受取装置8を移動させる。この際、ピン受取装置8の一
対の移載クランプ10に両側から把持されている複数の
鉄筋ピンPは、2つのピン搬出用スクリュー13の搬入
側からこれらの間に侵入する。
Next, the gripping arm 5 is released by the air cylinder 4, and the rebar pin P is transferred from the gripping portion 5A to the transfer clamp 10. When the transfer clamp 10 receives the reinforcing rod pin P, the air cylinder 11 operates to move the transfer clamp 10 upward by a small distance, and the flange P1 of the reinforcing rod pin P gripped by the transfer clamp 10 is moved.
Is positioned higher than the pair of pin unloading screws 13, and then the pin receiving device 8 is moved to a position where the pair of pin unloading screws 13 enters between the vertical frame portions 9 </ b> A of the traversing frame 9. At this time, the plurality of rebar pins P gripped from both sides by the pair of transfer clamps 10 of the pin receiving device 8 enter between the two pin unloading screws 13 from the loading side.

【0026】そして、前記一対の移載クランプ10に把
持されている全ての鉄筋ピンPが一対のピン搬出用スク
リュー13の間に入った時点で、エアシリンダ12を作
動させて前記一対の移載クランプ10を開放すると、そ
れぞれの鉄筋ピンPは自重によって落下し、回転駆動さ
れている一対のピン搬出用スクリュー13の上面に鍔部
Pが支持され、それぞれの鉄筋ピンPは、ピン搬出用ス
クリュー13の下流側に向けて連続的に送り出され、そ
の下流端で、図示していない別のコンベヤ等に受け渡さ
れ所望の場所へ搬送される。
When all the rebar pins P gripped by the pair of transfer clamps 10 enter between the pair of pin unloading screws 13, the air cylinder 12 is operated to transfer the pair of transfer clamps 10. When the clamp 10 is released, each of the rebar pins P falls by its own weight, and a flange portion P is supported on the upper surface of a pair of pin unloading screws 13 that are rotationally driven. At the downstream end, it is delivered to another conveyor (not shown) and conveyed to a desired place.

【0027】一方、運搬台車Dは、搭載されている治具
フレームJに固定されている一つの孔付クランプCから
の鉄筋ピンPの抜き取り作業が完了すると、後方の孔付
きクランプCがピン抜取装置1の直下に位置するように
移動し、ピン抜取装置1は前述したピン抜き取り作業を
再び繰り返す。
On the other hand, when the work of removing the rebar pins P from one clamp C with holes fixed to the jig frame J mounted thereon is completed, the rear clamp C with holes is pulled out. The pin removing device 1 moves so as to be located directly below the device 1, and the pin removing operation described above is repeated again.

【0028】このようにして、治具フレームJ上の全て
の孔付クランプCから鉄筋ピンPの抜き取り作業を終え
ると、運搬台車Dは、治具フレームJ上から孔付クラン
プCを取り外すための次工程へ搬出され、前記コンクリ
ート固化工程で使用されたマット保持治具を搭載してい
る別の運搬台車が新たにピン抜取装置1の下方まで搬入
されて同様な作業が繰り返される。
When the work of extracting the reinforcing rod pins P from all the clamps C with holes on the jig frame J is completed in this way, the transporting trolley D removes the clamp C with holes from the jig frame J. It is carried out to the next step, another carriage carrying the mat holding jig used in the concrete solidification step is newly carried in below the pin extracting device 1, and the same operation is repeated.

【0029】なお、本実施例では、移動クランプ10を
エアシリンダ11によって、横行枠9の縦枠部9Aに対
して小距離上下動するように構成しているが、前記エア
シリンダ11は省略してもよい。なお、その場合には、
昇降フレーム3の上昇限位置で把持アーム5に把持され
ている鉄筋ピンPの鍔部P1の位置が、搬出用スクリュ
ー13の上面よりも上方になるように設定しておく必要
がある。また、本発明のピン抜取装置に用いている把持
アームや移動クランプの把持機構は、前述した実施例に
記載した構成に限定するものではなく、鉄筋ピンの鍔部
や中間部を把持できる機能を備えるものであればよい。
In this embodiment, the movable clamp 10 is configured to be vertically moved by a small distance with respect to the vertical frame portion 9A of the horizontal frame 9 by the air cylinder 11, but the air cylinder 11 is omitted. You may. In that case,
It is necessary to set the position of the flange P1 of the rebar pin P gripped by the gripping arm 5 at the ascending limit position of the lifting frame 3 above the upper surface of the unloading screw 13. Further, the gripping mechanism of the gripping arm or the moving clamp used in the pin extracting device of the present invention is not limited to the configuration described in the above-described embodiment, and has a function of gripping the flange portion and the intermediate portion of the rebar pin. What is necessary is just to have.

【0030】[0030]

【発明の効果】以上説明したように、本発明のピン抜取
装置によれば、従来手作業で行っていた発泡コンクリー
トの固化工程から回収された鉄筋マット保持治具から鉄
筋ピンを抜き取る作業を、孔付きクランプ単位で一括し
て行い、回収した鉄筋ピンを次工程に自動的に送り出す
ことができるため、作業効率を向上させることができる
とともに、作業環境を改善することができる。
As described above, according to the pin extracting device of the present invention, the operation of extracting the reinforcing pin from the reinforcing mat holding jig recovered from the solidification process of the foamed concrete, which has been conventionally performed manually, Since the rebar pins can be automatically sent to the next step by performing the operation in units of clamps with holes and collectively, the working efficiency can be improved and the working environment can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明のピン抜取装置が適用されるマット保
持治具の斜視図。
FIG. 1 is a perspective view of a mat holding jig to which a pin extracting device according to the present invention is applied.

【図2】 本発明のピン抜取装置の1実施例を示す側面
図。
FIG. 2 is a side view showing one embodiment of the pin extracting device of the present invention.

【図3】 本発明のピン抜取装置における、把持アーム
の一部を示す側面図。
FIG. 3 is a side view showing a part of a gripping arm in the pin extracting device of the present invention.

【図4】 本発明のピン抜取装置における、把持アーム
の開閉機構を示す横断面図。
FIG. 4 is a cross-sectional view showing an opening and closing mechanism of a gripping arm in the pin extracting device of the present invention.

【図5】 図2のA−A線位置の断面図。FIG. 5 is a sectional view taken along line AA of FIG. 2;

【符号の説明】[Explanation of symbols]

1 ピン抜取装置 2 昇降シリンダ 3 昇降フレーム 4 エアシリンダ 4A リフトビーム 4B 連結リンク 5 把持アーム 5A 把持部 5B 枢軸 5C 揺動アーム部材 6 ガイドレール 7 エアシリンダ 8 ピン受取装置 9 横行枠 9A 縦枠部 10 移載クランプ 10A クランプ部 10B ガイド板 11 エアシリンダ 12 エアシリンダ 13 ピン搬送用スクリュー DESCRIPTION OF SYMBOLS 1 Pin removal device 2 Lifting cylinder 3 Lifting frame 4 Air cylinder 4A Lift beam 4B Connecting link 5 Holding arm 5A Holding portion 5B Pivot 5C Swing arm member 6 Guide rail 7 Air cylinder 8 Pin receiving device 9 Horizontal frame 9A Vertical frame 10 Transfer clamp 10A Clamp section 10B Guide plate 11 Air cylinder 12 Air cylinder 13 Pin transport screw

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 孔付クランプの支持孔に挿通されている
複数の鉄筋ピンの上端付近に設けられた鍔部を一括して
把持して上方に抜き取る昇降自在な一対の把持アーム
と、 鉄筋ピンの鍔部を両側から挟んで吊り下げた状態で搬送
する一対のピン搬出用スクリューと、 前記把持アームの上昇限位置で把持アームに把持されて
いる複数の鉄筋ピンの中間部を両側から挟んで一括して
受け取るとともに、前記ピン搬出用スクリューの下方に
移動して2つのピン搬出用スクリュー間の搬入側から前
記複数の鉄筋ピンを一列に侵入させて受け渡す一対の移
載クランプとを備えたことを特徴とするピン抜取装置。
1. A pair of vertically movable gripping arms for simultaneously gripping and pulling upwardly a flange provided near an upper end of a plurality of rebar pins inserted through a support hole of a clamp with holes, and a rebar pin. A pair of pin unloading screws that are transported in a state of being suspended with both flanges sandwiched from both sides, and an intermediate portion of a plurality of rebar pins gripped by the gripping arm at the ascending limit position of the gripping arm from both sides. And a pair of transfer clamps that receive the package in a lump, move below the pin unloading screw, and allow the plurality of rebar pins to enter and be transferred in a row from the loading side between the two pin unloading screws. A pin removing device characterized by the above-mentioned.
JP08070549A 1996-03-26 1996-03-26 Pin extraction device Expired - Fee Related JP3081151B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08070549A JP3081151B2 (en) 1996-03-26 1996-03-26 Pin extraction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08070549A JP3081151B2 (en) 1996-03-26 1996-03-26 Pin extraction device

Publications (2)

Publication Number Publication Date
JPH09254131A JPH09254131A (en) 1997-09-30
JP3081151B2 true JP3081151B2 (en) 2000-08-28

Family

ID=13434720

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08070549A Expired - Fee Related JP3081151B2 (en) 1996-03-26 1996-03-26 Pin extraction device

Country Status (1)

Country Link
JP (1) JP3081151B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112458913B (en) * 2020-11-17 2021-07-13 中铁六局集团路桥建设有限公司 Automatic ligature platform of hollow mound reinforcing bar of bridge

Also Published As

Publication number Publication date
JPH09254131A (en) 1997-09-30

Similar Documents

Publication Publication Date Title
US8012391B2 (en) Process for the production of reinforced and cast, cellular or foamed concrete bodies and reinforcement support frame for the use in such a process
JP3081151B2 (en) Pin extraction device
JP3236252B2 (en) Unframer for casting line
CN214925590U (en) Unloading transfer system of logical long reinforcing bar of prefabricated case roof beam longitudinal distribution of railway
CN206028650U (en) Work piece of warding off shell assembly line breaks away from mechanism
CN113927732A (en) System and method for processing stirrup of bottom web plate of small box girder
JPS58196162A (en) Takeout device for casting
CN107142961B (en) Concrete pouring integral movable formwork
CN215854681U (en) Truss hanging track device
JP2788003B2 (en) Rebar prefabricated automatic assembly equipment
CN114729543B (en) Template
JP2937683B2 (en) Precast slab construction method in suspended slab bridge construction method and jig used for the construction method
JP2974278B2 (en) Rebar prefabricated automatic assembly system
CN220943166U (en) Upper box turnover machine and sand box carrying system
CN109484990B (en) Intelligent steel mould transports fixed equipment
JP3081150B2 (en) Clamp separation device with holes for reinforced mat holding jig
KR20110107952A (en) Moving tool for mold of concrete building
US20220396007A1 (en) Formwork device
JPH04134518U (en) Wall balustrade forming equipment
JPH09254127A (en) Reinforced mat automatic assembling system
JPH09254128A (en) Reinforced mat automatic assembling apparatus
JPH08192985A (en) Carrying method of long material and device thereof
CN116274764A (en) Reinforcement cage production line and reinforcement cage production method
JP2704542B2 (en) Method and apparatus for transferring articles on pallets
JP2000326321A (en) Reinforced mat incorporating installation

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees