JP3030738U - Roadbed position marking gutter - Google Patents

Roadbed position marking gutter

Info

Publication number
JP3030738U
JP3030738U JP1995014876U JP1487695U JP3030738U JP 3030738 U JP3030738 U JP 3030738U JP 1995014876 U JP1995014876 U JP 1995014876U JP 1487695 U JP1487695 U JP 1487695U JP 3030738 U JP3030738 U JP 3030738U
Authority
JP
Japan
Prior art keywords
roadbed
gutter
construction
road
owner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1995014876U
Other languages
Japanese (ja)
Inventor
弘 谷本
Original Assignee
弘 谷本
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 弘 谷本 filed Critical 弘 谷本
Priority to JP1995014876U priority Critical patent/JP3030738U/en
Application granted granted Critical
Publication of JP3030738U publication Critical patent/JP3030738U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Road Repair (AREA)

Abstract

(57)【要約】 【課題】 本考案は、道路舗装工事に於ける、実測に
依存する、路盤の位置、厚さ管理を、安全で、スピード
に優るオペレータの目測に切り替え、施工能力の向上を
図り、早く、安く、良質の舗装道路造りにあり、その切
り替えを可能にする目測の指針となる、施主指定の路盤
の路床位置を示す、路床線を表示したことを特徴とす
る、側溝に関するものである。 【解決手段】 本考案は、道路舗装工事で、路盤造り
に先行して、施主の指示する路面の位置に、側溝の上面
2を水平に合せて埋設する側溝の側壁3に、施主の指定
する路面からの路盤の位置を、路面と水平である側溝上
面2から割り出し、その位置に、目測の目標となる路床
線を表示し、その路床線を指針に、本考案の課題である
目測に拠る路盤造りを可能にした。
(57) [Abstract] [Problem] The present invention improves the construction ability by switching the roadbed position and thickness management, which depend on actual measurement in road pavement work, to a safe and fast operator's visual inspection. It is characterized by displaying the roadbed line indicating the roadbed position of the roadbed designated by the owner, which is a quick, cheap, and good-quality paved road construction and serves as a guide for visual observation to enable switching. It concerns a gutter. According to the present invention, in road pavement construction, prior to roadbed construction, the owner designates on the side wall 3 of the gutter which is buried by aligning the upper surface 2 of the gutter horizontally at the position of the road surface indicated by the owner. The position of the roadbed from the road surface is indexed from the upper surface 2 of the gutter which is horizontal to the road surface, and the roadbed line that is the target of visual measurement is displayed at that position. Made possible to build a roadbed based on.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the device belongs]

本考案は、道路舗装工事に於ける手元要員のパワーショベルの運転を中断する 危険で、時間を要する、実測に依存する路盤造りを、安全でスピードに優るオペ レータの目測に切り替え、安全性の向上、施工能力の向上を図るもので、その切 り替えを可能にする、施主指定の路盤の、路床位置を示す、本考案に成る路床線 を、路盤造りに先行埋設する、側溝の側壁に表示する側溝に関するものである。 The present invention replaces dangerous and time-consuming, time-consuming, actual measurement-dependent roadbed construction with operator's visual inspection, which is dangerous and time-consuming, to interrupt the operation of power shovels at hand during road paving work. In order to improve the road capacity and the construction capacity, the roadbed line of the present invention showing the roadbed position of the roadbed designated by the owner, which enables the switching, is embedded in the roadway structure in advance. The present invention relates to a gutter displayed on the side wall.

【0002】[0002]

【従来の技術】[Prior art]

施主指定の道路舗装工事に於ける路盤造りの、掘削、整正、舗装材の投入、敷 均し、転圧、路層の位置、厚さ等の管理は総べて、熟練したオペレータの技術と 、パワーショベルの運転を中断する、手元要員の危険で、時間を要する、実測に 依存する工法であった。 In the road pavement work designated by the owner, excavation, leveling, pavement material input, leveling, rolling compaction, road layer position, thickness, etc. are all managed by skilled operators. Then, it was a construction method that interrupted the operation of the power shovel, was dangerous for the personnel at hand, took time, and relied on actual measurement.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

本考案は、前述した実測に依存する欠点のある工法を、安全で、スピードに優 るオペレータの目側に拠る工法に切り替え、安全性の向上、施工能力の向上を図 り、前述の欠点を解消しようとするもので、その切り替えを可能にする、オペレ ータの目側の指針となる、施主指定の路盤の路床位置を示す、本考案になる路床 線を、路盤作りに先行埋設する、側溝の側壁に表示することを特徴とする側溝を 提供し、安全で、早く、安く、仕上精度の高い舗装道路造りを可能とし、前述の 欠点を解消しようとするものである。 The present invention replaces the above-mentioned faulty construction method, which depends on actual measurement, with a construction method that depends on the operator's eye side, which is safe and excels in speed, in order to improve safety and construction ability. The roadbed line according to the present invention, which indicates the roadbed position of the roadbed designated by the owner and serves as a guideline on the operator's eye side that enables the switching, is embedded before the roadbed is made. The purpose of the present invention is to provide a gutter that is characterized by being displayed on the side wall of the gutter, to enable the construction of a paved road that is safe, fast, cheap, and has a high finishing accuracy, and to solve the above-mentioned drawbacks.

【0004】[0004]

【課題を解決するための手段】[Means for Solving the Problems]

上記の目的を達成するために、本考案は、道路補装工事で、路盤造りに先行し 施主の指示する路面の高さに、側溝1の上面2を水平に合わせて埋設する、側溝 1の側壁3に、施主の指定する路面からの、路盤の位置4,5,6を路面と水平 である側溝1の上面2から割り出し、その位置に、本考案の根幹である、目側の 正確な指針となる、路床位置を示す、路床線7,8,9を標示し、目側に拠る路 盤造りを可能にし、課題解決の手段とした。 In order to achieve the above-mentioned object, the present invention is a method for burying a gutter 1 in which the upper surface 2 of the gutter 1 is horizontally aligned and buried at the height of the road surface instructed by the owner prior to roadbed construction in road repair work. On the side wall 3, the position 4, 5, 6 of the roadbed from the road surface designated by the owner is indexed from the upper surface 2 of the gutter 1 which is horizontal to the road surface, and at that position, the accurate eye side, which is the basis of the present invention, is located. The roadbed lines 7, 8 and 9 that indicate the roadbed position, which serves as a guideline, were marked to enable the construction of the roadbed depending on the eye side, which was a means of solving the problem.

【0005】[0005]

【考案の実施の形態】[Embodiment of device]

本考案の実施の形態を図面を参照に符号に従って説明する、図面は本考案に因 る、3層舗装路盤の実施例で1は道路舗装工事で先行埋設される側溝、2は施主 の指示する路面の位置と水平になる側溝1の上面、3は目測の指針となる路床線 7、8、9を標示する側溝1の側壁、4は切込砕石の下層路盤、5は粒調砕石の 上層路盤、6は密粒度アスコンの表層路盤、実線7、8、9は施主指定の路面と 水平である、側溝1の上面2から割り出された、施主指定の路盤4、5、6の路 床を示す、本考案に成る路床線で、7は下層路盤の路床、8は上層路盤の路床、 9は表層路盤の路床である、路床線は実施例に示す実線に限定するものではなく 破線、鎖線を色分け使用する、路床線の太さは施主指定の無い場合は路床位置の 公差以内とする、路床線の数は施主の指定する路床の数に合せる、路床線は下段 路層の天井を示す線でもある。 DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described with reference to the drawings with reference to the drawings. The drawings show an embodiment of a three-layer paved roadbed according to the present invention, in which 1 is a gutter previously buried in a road pavement work, and 2 is an owner's instruction. The upper surface of the gutter 1 that is horizontal to the position of the road surface, 3 is the side wall of the gutter 1 that indicates the roadbed lines 7, 8 and 9 that serve as a guide for visual measurement, 4 is the lower roadbed of the crushed crushed stone, and 5 is the grain crushed stone Upper layer roadbed, 6 is a surface layer roadbed of dense grain ascon, solid lines 7, 8 and 9 are the roads of the roadbeds 4, 5 and 6 designated by the owner, which are indexed from the upper surface 2 of the gutter 1, which is horizontal to the road surface designated by the owner. The roadbed line according to the present invention showing the floor, 7 is the roadbed of the lower roadbed, 8 is the roadbed of the upper roadbed, 9 is the roadbed of the surface roadbed, and the roadbed line is limited to the solid line shown in the embodiment Do not use broken lines and chain lines with different colors.The thickness of the subgrade line should be within the tolerance of the subgrade position unless specified by the owner. The number of subgrade lines match the number of subgrade designated by the Buyer, subgrade line is also a line indicating the ceiling of the lower path layers.

【0006】[0006]

【考案の効果】[Effect of device]

本考案は、上記のとおり、施主指定の路盤の位置を示す、本考案に成る路床線 が、側溝の側壁に標示されているので、目側に拠る路盤作りが可能となり、次に 記載する効果を奏する。 According to the present invention, as described above, since the roadbed line according to the present invention indicating the position of the roadbed designated by the owner is marked on the side wall of the gutter, it is possible to make the roadbed depending on the eye side. Produce an effect.

【0007】 手元要員の危険で時間を要する、実側作業を省き、手元要員の安全性が向上し 省人化も可能になる。[0007] It is possible to eliminate the dangerous and time-consuming work of the personnel at hand, to reduce the work on the actual side, improve the safety of the personnel at hand, and save labor.

【0008】 パワーショベルの運転を中断する、実側作業が減少し、施工能力が向上する。[0008] The operation of the power shovel is interrupted, the actual work is reduced, and the construction capacity is improved.

【0009】 路床線を手引きに、路盤造りが容易となり、熟練したオペレータを不要とし、 オペレータの確保が容易となる。Roadbed construction is facilitated by using the roadbed line as a guide, no skilled operator is required, and it is easy to secure an operator.

【0010】 路床線を指針に、検査、監督が随時可能となり、施工管理が容易になる。Inspection and supervision can be performed at any time by using the roadbed line as a guideline, and construction management becomes easy.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案に基づく、3層舗装路盤の斜視図FIG. 1 is a perspective view of a three-layer paved roadbed based on the present invention.

【符号の説明】[Explanation of symbols]

1 側溝 2 上面 3 側壁 4 下層路盤 5 上層路盤 6 表層路盤 7 下層路盤の路床位置を示す路床線 8 上層路盤の路床位置を示す路床線 9 表層路盤の路床位置を示す路床線 1 Gutter 2 Upper surface 3 Sidewall 4 Lower roadbed 5 Upper roadbed 6 Surface roadbed 7 Roadbed line indicating the roadbed position of the lower roadbed 8 Roadbed line indicating the roadbed position of the upper roadbed 9 Roadbed indicating the roadbed position of the surface roadbed line

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 側溝の側壁に舗装路盤の路床位置を、路
床線を引いて標示した側溝。
1. A gutter in which the roadbed position of a paved roadbed is marked on the side wall of the gutter by drawing a roadbed line.
JP1995014876U 1995-12-25 1995-12-25 Roadbed position marking gutter Expired - Lifetime JP3030738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1995014876U JP3030738U (en) 1995-12-25 1995-12-25 Roadbed position marking gutter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1995014876U JP3030738U (en) 1995-12-25 1995-12-25 Roadbed position marking gutter

Publications (1)

Publication Number Publication Date
JP3030738U true JP3030738U (en) 1996-11-05

Family

ID=43165718

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1995014876U Expired - Lifetime JP3030738U (en) 1995-12-25 1995-12-25 Roadbed position marking gutter

Country Status (1)

Country Link
JP (1) JP3030738U (en)

Similar Documents

Publication Publication Date Title
CN106592368A (en) Asphalt pavement paving no-cutting construction method
CN106567410A (en) New construction method of municipal road inspection well
CN112144573B (en) Reverse-slotting PC (polycarbonate) member rapid inspection well construction method
CN114232649B (en) Construction method for filling earthwork of ballastless track roadbed
CN108221533A (en) A kind of laying method in backroad face
JP3030738U (en) Roadbed position marking gutter
CN109082961B (en) Road construction method with steep slope
EP2390623B1 (en) Method and apparatus for forming bearing course of traffic route
US11619012B2 (en) Rotor depth visual indication zones
CN114908630A (en) Factory road structure and secondary permanent-temporary combined layered construction method
RU2710585C1 (en) Method for repair of road surface
Capachi Excavation & Grading Handbook
JPH03504882A (en) Method and apparatus for forming working holes
US20120170979A1 (en) Road construction apparatus and method
CN204676387U (en) A kind of cement concrete pavement becomes base layer structure
CN113338103B (en) Premixed foamed asphalt in-situ cold regeneration base layer and bottom surface layer construction method
CN105401555A (en) Concrete wave-resistant dam crest
CN106049221A (en) Construction method of urban multi-functional non-absolute isolation device
CN211947764U (en) Prefabricated interim guidance tape structure
JPH0710004U (en) Square pavement with precast blocks
Putnam Field performance of porous pavements in South Carolina
CN116927023A (en) Construction method for widening old road in hilly area
JPH05302338A (en) Underground construction method
Indonesla Submitted by
CN114369981A (en) Construction and paving method for sidewalk