JP3026544B2 - Method and apparatus for moving overhanging work vehicle - Google Patents

Method and apparatus for moving overhanging work vehicle

Info

Publication number
JP3026544B2
JP3026544B2 JP16104695A JP16104695A JP3026544B2 JP 3026544 B2 JP3026544 B2 JP 3026544B2 JP 16104695 A JP16104695 A JP 16104695A JP 16104695 A JP16104695 A JP 16104695A JP 3026544 B2 JP3026544 B2 JP 3026544B2
Authority
JP
Japan
Prior art keywords
work vehicle
rail
bridge
overhanging
moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP16104695A
Other languages
Japanese (ja)
Other versions
JPH0913328A (en
Inventor
外夫 桜井
利之 岡沢
Original Assignee
株式会社ピー・エス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ピー・エス filed Critical 株式会社ピー・エス
Priority to JP16104695A priority Critical patent/JP3026544B2/en
Publication of JPH0913328A publication Critical patent/JPH0913328A/en
Application granted granted Critical
Publication of JP3026544B2 publication Critical patent/JP3026544B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】平面線形が曲線であるプレストレ
ストコンクリートの橋梁を、張出し架設する張出架設作
業車の移動方法及びその装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for moving an overhanging work vehicle for overhanging a prestressed concrete bridge having a curved linear shape.

【0002】[0002]

【従来の技術】張出ブロック工法では、片持の張出架設
作業車を使用し、橋脚上から橋体荷重をやじろ兵衛方式
で左右にバランスさせながら、橋体ブロックを交互に張
出して施工し橋体を構築する。すなわち橋軸方向に3〜
5m程度の長さに分割した橋体を順次左右にバランスを
取りながら、交互に張り出して橋体を延長する。
2. Description of the Related Art In the overhang block method, a cantilevered overhanging work vehicle is used, and the bridge body blocks are alternately overhanged while the load of the bridge body is balanced right and left from the pier by a jigging system. Build a bridge. That is, 3 ~ in the bridge axis direction
The bridge body, which is divided into lengths of about 5 m, is stretched alternately to extend the bridge body, while keeping the balance in order from side to side.

【0003】このような、橋体ブロックを順次張出し施
工し橋体を延長してゆく張出ブロック工法は、長大スパ
ンの橋梁の施工が容易にでき、桁下空間条件に規制され
ないなどの特徴があり、広く採用されている。張出架設
作業車は移動可能なレールを既設橋体ブロック上に仮固
定し、そのレール上に架設作業車を前後進可能に載置
し、この架設作業車から型枠や足場を鋼棒などで吊下支
持し、鉄筋などを組み立て、型枠内にコンクリートを打
設して橋体ブロックを順次構築、延長するものである。
すなわち、この方法は次ブロックの構築に備え、レール
の仮固定を解除し、レールを次ブロック施工位置まで前
進させて再度仮固定し、作業車を次ブロック構築位置ま
で前進させる工程を繰り返し次々と橋体ブロックを構築
し、橋体を延長する方法である。
[0003] The overhang block construction method in which the bridge body blocks are sequentially overhanged and the bridge body is extended is characterized in that the construction of a bridge with a long span can be easily performed and the bridge is not restricted by the space condition under the girder. Yes, widely used. For the overhang work vehicle, the movable rail is temporarily fixed on the existing bridge block, and the work vehicle is mounted on the rail so that it can move forward and backward, and the formwork and scaffolds are steel rods etc. from this work vehicle In this way, the bridge is suspended and supported, the rebar is assembled, concrete is poured into the formwork, and the bridge blocks are sequentially constructed and extended.
That is, this method prepares the next block, releases the temporary fixing of the rail, advances the rail to the next block construction position, temporarily fixes again, and repeatedly advances the work vehicle to the next block construction position. This is a method of constructing a bridge block and extending the bridge.

【0004】[0004]

【発明が解決しようとする課題】橋梁の平面線形が直線
の場合は単純にブロック長分だけ次々と移動をすること
によって位置ずれを生ずることなく施工することができ
るが、平面線形に曲線線形が入ると、レールが直線状で
あるため、レールを前進移動すると、軸線からずれる。
平面図形が円曲線のように単一曲率を持つ曲線の場合は
予めレールをその曲率に合わせて曲げ加工したレールを
用いることによって対応することが可能である。しか
し、このようなレールは他に転用することが難しく、加
工費用などからみて経済的ではない。また、曲線線形が
S字曲線やクロソイド曲線のような場合はますます困難
となる。このため、軸線上からはずれたレールをジャッ
キなどでジャッキアップし、いわゆる軸を振り戻すとい
う作業を行う必要があった。
If the horizontal alignment of the bridge is a straight line, the bridge can be constructed without displacement by simply moving one by one by the block length. When entering, the rail is straight, so that when the rail is moved forward, it is shifted from the axis.
In the case where the plane figure is a curve having a single curvature such as a circular curve, it is possible to cope with this by using a rail which has been previously bent in accordance with the curvature. However, such rails are difficult to convert to other uses, and are not economical in view of processing costs and the like. Further, it becomes more and more difficult when the curve shape is an S-shaped curve or a clothoid curve. For this reason, it is necessary to jack up rails that are off the axis with a jack or the like, and perform a work of swinging back the axis.

【0005】本発明は、平面線形が曲線である橋梁の張
出ブロック工法の張出架設作業車の前進移動の際に、レ
ールの位置を簡単に変更することができるように改善し
た張出架設作業車の移動方法及びその装置を提供するこ
とを目的とする。
SUMMARY OF THE INVENTION The present invention is directed to an improved overhanging erection so that the position of the rail can be easily changed when the work vehicle for overhanging the overhanging construction method of the overhanging block method on a bridge having a curved horizontal alignment can be easily moved. An object of the present invention is to provide a method and a device for moving a work vehicle.

【0006】[0006]

【課題を解決するための手段】本発明は、平面線形が曲
線である橋梁の張出ブロック工法の張出架設作業車の移
動に当たり、レール後部を横移動自在に上方から支持す
る支持部材を既設橋体上に準備し、レール軸線が次ブロ
ック構築基準線と一致するまでレール後部を横移動さ
せ、位置合わせを行うことを特徴とする張出架設作業車
の移動方法である。
SUMMARY OF THE INVENTION According to the present invention, a support member for supporting a rear portion of a rail from above in a laterally movable manner when an overhang work vehicle is moved by an overhang block construction method for a bridge having a curved planar alignment. This is a method for moving an overhanging work vehicle, which is prepared on a bridge body, and laterally moves and positions the rear portion of the rail until the rail axis coincides with the next block construction reference line.

【0007】上記方法を好適に実施することができる本
発明の装置は、架設作業車移動用レールの上面を受ける
門型スライド架構と、該門型スライド架構の梁下面と前
記移動用レール上面との間に挟設した低摩擦材とを備え
たことを特徴とする張出架設作業車の移動装置である。
この場合に、前記低摩擦材としては、フッ素樹脂シート
を用いると好ましく、また、ローラ又はボールとしても
よい。
[0007] The apparatus of the present invention, which can suitably carry out the above method, comprises a gate-type slide frame for receiving an upper surface of a rail for moving a construction vehicle, a lower surface of a beam of the gate-type slide frame, and an upper surface of the transfer rail. And a low-friction material interposed therebetween.
In this case, a fluororesin sheet is preferably used as the low friction material, and a roller or a ball may be used.

【0008】[0008]

【作用】張出ブロック工法は、橋脚上から、橋軸方向に
左右交互にブロックを張出し架設して橋梁の構築を行う
工法であって、既設橋体から前方に張出してブロック構
築を行う張出架設作業車を用いる。このような張出ブロ
ック工法においては1ブロック張出し施工するごとに張
出架設作業車を前進移動させる。
[Function] The overhang block construction method is a method of constructing a bridge by erection and erection of blocks from left and right in the direction of the bridge axis from the pier, and overhangs the existing bridge body to construct the block. Use a construction vehicle. In such an overhang block construction method, the overhang work vehicle is moved forward each time one block is overhanged.

【0009】図9はブロック構築を行う張出架設作業車
1の側面図である。既設橋体50上にレール6を敷設
し、このレール6上に張出架設作業車1を載せて用い
る。張出架設作業車1は、四辺形状のメインフレーム3
上に横梁2を掛け渡し、この横梁2から鋼棒7を吊下
し、この鋼棒7に次のブロックの型枠支持材51、型枠
52を取付け、また作業用吊り足場53、54を設け、
型枠52内にコンクリートを打設する。メインフレーム
3の後部はレール6上に載っており、尾端に反力支持装
置20を備えて、レール6に係止させ、コンクリートの
反力を支持させるようにしている。
FIG. 9 is a side view of the overhanging work vehicle 1 for constructing a block. The rail 6 is laid on the existing bridge body 50, and the overhanging work vehicle 1 is mounted on the rail 6 for use. The overhanging work vehicle 1 has a quadrilateral main frame 3.
A steel beam 7 is suspended from the beam 2, a form support member 51 and a form 52 of the next block are attached to the steel bar 7, and working suspension scaffolds 53 and 54 are attached to the steel bar 7. Provided,
Concrete is poured into the formwork 52. The rear portion of the main frame 3 rests on the rail 6 and is provided with a reaction force support device 20 at the tail end so that the main frame 3 is engaged with the rail 6 to support the reaction force of concrete.

【0010】平面曲線がS字曲線又はクロソイド曲線の
ような曲線形を有する橋梁を張出ブロック工法で架設す
る場合に、本発明では、レールの尾端を横方向に摺動可
能にしたことによって、平面曲線が任意の曲線である橋
梁を簡易に、施工することができる。図8は平面線形が
曲線である橋体の平面図である。既設橋体ブロック50
b、50c、50dの前方に橋体ブロック50eを施工
するためにレール6を移設する状況を描いてある。
According to the present invention, when a bridge having a curved surface such as an S-shaped curve or a clothoid curve is erected by the overhang block method, the tail end of the rail can be slid in the lateral direction. The bridge whose plane curve is an arbitrary curve can be easily constructed. FIG. 8 is a plan view of a bridge body whose horizontal alignment is a curve. Existing bridge block 50
The situation where the rail 6 is relocated in order to construct the bridge block 50e in front of b, 50c, 50d is illustrated.

【0011】本発明では、レール6を横移動自在に上方
から支持する支持部材として門形スライド架構10を既
設橋体上に準備する。この支持部材は、レールの上面を
受ける門型スライド架構であって、本発明は、この門型
スライド架構の梁下面とレール上面との間に挟設した低
摩擦材とを備えた張出架設作業車の移動装置である。こ
の場合に、前記低摩擦材としては、フッ素樹脂シート
(商品名:テフロン)等を用いることが好適である。ま
た、低摩擦材としてローラ又はボールなどを用いるもの
であってもよい。
In the present invention, a gate-shaped slide frame 10 is prepared on an existing bridge as a support member for supporting the rail 6 from above so as to be able to move laterally. The support member is a portal slide frame that receives the upper surface of the rail, and the present invention provides an overhanging structure including a low friction material sandwiched between the lower surface of the beam of the portal slide structure and the upper surface of the rail. It is a moving device of a working vehicle. In this case, it is preferable to use a fluororesin sheet (trade name: Teflon) or the like as the low friction material. Further, a roller or a ball may be used as the low friction material.

【0012】[0012]

【実施例】図1〜図3は、本発明の実施例の張出架設作
業車1を示すものである。図1は右半分に張出架設作業
車1の型枠支持材51を吊下している部分の正面図を示
し、左半分は門型スライド架構10(支持部材)の部分
の正面図である。図3は、この門型スライド架構10の
拡大図である。図2は右半分に張出架設作業車1の型枠
支持材51を吊下している部分、左半分に張出架設作業
車1の後部アンカ(反力支持装置20)を示している。
メインフレーム3はレール6上を走行する車輪5と、レ
ール6の上フランジの下面に浮上力を支持させるローラ
とを有している。また、メインフレーム3を浮上させる
ジャッキ4を備えている。張出架設作業車1のメインフ
レーム3の尾端には反力支持装置20が設けられ、フレ
ーム21に取付けられたローラ22はレール6の上フラ
ンジの下面に係止するようになっている。鋼棒23に連
結されたジャッキ24は、フレーム21の浮上力を支持
する。
1 to 3 show an overhanging work vehicle 1 according to an embodiment of the present invention. FIG. 1 shows a front view of a portion where a form support member 51 of the overhanging work vehicle 1 is suspended in a right half, and a left half shows a front view of a portion of a gate-type slide frame 10 (support member). . FIG. 3 is an enlarged view of the portal slide frame 10. FIG. 2 shows a portion where the form support member 51 of the overhanging work vehicle 1 is suspended in the right half, and a rear anchor (reaction force support device 20) on the overhanging work vehicle 1 in the left half.
The main frame 3 has wheels 5 running on rails 6 and rollers for supporting a floating force on the lower surface of the upper flange of the rails 6. Further, a jack 4 for lifting the main frame 3 is provided. A reaction force support device 20 is provided at the tail end of the main frame 3 of the overhanging work vehicle 1, and a roller 22 attached to the frame 21 is engaged with a lower surface of an upper flange of the rail 6. The jack 24 connected to the steel bar 23 supports the levitation force of the frame 21.

【0013】本発明では、レール6の尾端の浮上力を支
持する支持部材として門型スライド架構10を備えてい
る。門型スライド架構10は、梁11と脚12を備えた
門型をなし、既設橋体ブロック50上に載置され、アン
カ鋼棒13により既設橋体ブロック50に固定される。
梁11の下面に、低摩擦部材14を介装した摺動部材1
5を備えており、レール6の上面がこの低摩擦部材14
を介して梁11の下面を摺動して、矢印18で示すよう
に横移動する。
In the present invention, a gate-type slide frame 10 is provided as a support member for supporting the floating force of the tail end of the rail 6. The portal-type slide frame 10 has a portal shape including beams 11 and legs 12, is mounted on the existing bridge block 50, and is fixed to the existing bridge block 50 by the anchor steel rod 13.
Sliding member 1 having low friction member 14 interposed on the lower surface of beam 11
5 and the upper surface of the rail 6 is
Slides on the lower surface of the beam 11 and moves laterally as indicated by an arrow 18.

【0014】次に示す曲線橋に本発明を適用した例を以
下に説明する。 橋長さ: 85m 幅員 : 8.0m ブロック長: 3.0〜3.5m 平面曲率半径: 60m最小(クロソイド曲線) シフト量: 5cm(1ブロック当たり最大) 張出架設作業車1の移動について図4〜図7を参照して
説明する。
An example in which the present invention is applied to the following curved bridge will be described below. Bridge length: 85m Width: 8.0m Block length: 3.0-3.5m Plane radius of curvature: 60m minimum (clothoid curve) Shift amount: 5cm (maximum per block) Movement of the overhanging work vehicle 1 This will be described with reference to FIGS.

【0015】図4は既設橋体ブロック50a、50b、
50c上にレール6を敷設し、その上に張出架設作業車
1を固定し、張出架設作業車1のフレーム3上の横梁2
から鋼棒7を吊下して型枠支持材51を支持し、次のブ
ロック50dのコンクリートを打設する状況を示してい
る。この時、張出架設作業車1の尾端の反力支持装置2
0は既設橋体ブロック50bにアンカ鋼棒で固定されて
おり、門型スライド架構10はレール6の最尾端位置
で、橋体ブロック50aに固定されている。
FIG. 4 shows the existing bridge blocks 50a, 50b,
A rail 6 is laid on 50c and the overhanging work vehicle 1 is fixed thereon, and the cross beam 2 on the frame 3 of the overhanging work vehicle 1 is fixed.
This shows a situation in which a steel bar 7 is suspended from above to support the form support material 51, and concrete for the next block 50d is cast. At this time, the reaction force support device 2 at the tail end of the overhanging work vehicle 1
0 is fixed in the en mosquitoes steel rod into the existing bridge body block 50b, portal slide Frames 10 is the top tail position of the rail 6 is fixed to Hashitai block 50a.

【0016】この状態でコンクリート打設を終了し、張
出架設作業車1を前方へ移設する段階を図5に示してい
る。図5ではレール6の尾部にあった門型スライド架構
10を架設作業車1の尾端隣接位置に移動し、既設橋体
ブロック50bにアンカ鋼棒により固定する。次に、図
6の工程に移る。張出架設作業車1のメインフレーム3
下のジャッキ4(図1参照)を伸張し既設橋体ブロック
50cに反力をとり、張出架設作業車1を浮上させる。
ついで、レール6の橋体との仮固定を解除すると共に、
架設作業車1の尾端の反力支持装置20のアンカ鋼棒と
の結合を緩める。これにより、レール6の中間部に、張
出架設作業車1の転倒モーメントによる引上力が生じ、
メインフレーム3の尾部フレーム21(図2参照)から
垂下しているレール6移動用ローラ22(図2参照)が
レール6の上フランジ下面を押上げ、レール6を吊り上
げる。従って、レール6の上面が門型スライド架構10
の梁11下に、低摩擦部材14であるテフロンシートを
介装した摺動部材15に当接する。
FIG. 5 shows a stage in which the concrete casting is completed in this state and the overhanging work vehicle 1 is moved forward. In FIG. 5, the gate-type slide frame 10 located at the tail of the rail 6 is moved to a position adjacent to the tail end of the erection work vehicle 1 and fixed to the existing bridge block 50b with an anchor steel bar. Next, the procedure moves to the step of FIG. Main frame 3 of overhang work vehicle 1
The lower jack 4 (see FIG. 1) is extended, and a reaction force is applied to the existing bridge block 50c to lift the overhanging work vehicle 1.
Then, while releasing the temporary fixation of the rail 6 to the bridge,
The connection between the tail end of the erection work vehicle 1 and the anchor steel rod of the reaction force support device 20 is loosened. As a result, a pulling force due to the overturning moment of the overhanging work vehicle 1 is generated in an intermediate portion of the rail 6,
The rail 6 moving roller 22 (see FIG. 2) hanging from the tail frame 21 (see FIG. 2) of the main frame 3 pushes up the lower surface of the upper flange of the rail 6 and lifts the rail 6. Accordingly, the upper surface of the rail 6 is
Abuts a sliding member 15 having a Teflon sheet as a low friction member 14 under the beam 11 of FIG.

【0017】橋軸線内周側のメインフレーム3下のジャ
ッキ4を基準点として、レール6の軸線が次ブロック構
築時基準線と一致するまでレール6の尾端を橋軸と直交
する方向外側に摺動させる(図8参照)。張出架設作業
車1の反力支持装置20をアンカに仮固定し、レール6
を次の橋体ブロックを施工する所定位置まで前進させる
(図8参照)。
With the jack 4 below the main frame 3 on the inner circumference side of the bridge axis as a reference point, the tail end of the rail 6 is moved outward in the direction orthogonal to the bridge axis until the axis of the rail 6 coincides with the reference line when constructing the next block. Slide (see FIG. 8). The reaction force support device 20 of the overhanging work vehicle 1 is temporarily fixed to the anchor, and the rail 6
Is advanced to a predetermined position where the next bridge block is to be constructed (see FIG. 8).

【0018】張出架設作業車1のジャッキ4を縮め、メ
インフレーム3を架設作業車移動用車輪5(図1参照)
に受け替え、既設橋体ブロック50d上まで前進させた
レール6上を次ブロック構築位置まで前進させると図7
に示す状態となる。そこで、再度、レール6の尾端を横
方向に移動させ、架設作業車1から吊下されている型枠
(図示省略)の位置合わせを行う。この時、レール6の
尾端は、門型スライド架構10の梁の下面に当接してい
る。
The jack 4 of the overhanging work vehicle 1 is contracted, and the main frame 3 is moved to the work vehicle moving wheels 5 (see FIG. 1).
7 and when the rail 6 which has been advanced to the existing bridge block 50d is advanced to the next block construction position, FIG.
The state shown in FIG. Then, the tail end of the rail 6 is again moved in the lateral direction, and the positioning of the form (not shown) suspended from the erection work vehicle 1 is performed. At this time, the tail end of the rail 6 is in contact with the lower surface of the beam of the portal slide frame 10.

【0019】型枠(図示省略)の位置調整が完了した
ら、レール6の仮固定、張出架設作業車1の尾部の反力
支持装置20のアンカのセット、メインフレーム3下の
ジャッキ4の伸張固定を行って、次の橋体ブロック型枠
のセットなど、次の橋体ブロックの構築の準備をする。
この時、図4の状態に戻っている。以上の作業を繰り返
し橋体を構築する。
When the position adjustment of the formwork (not shown) is completed, the rail 6 is temporarily fixed, the anchor of the reaction force support device 20 at the tail of the overhanging work vehicle 1 is set, and the jack 4 below the main frame 3 is extended. After fixing, prepare for the construction of the next bridge block, such as the next set of bridge block formwork.
At this time, it has returned to the state of FIG. The above work is repeated to build a bridge.

【0020】以上の例では、門型スライド架構の摺動面
に低摩擦部材としてテフロンシートを使用した例を示し
たが、低摩擦部材としては、ローラ、スチールボールな
どの摩擦係数の小さいものを挟設することでも好適に機
能する。
In the above example, a Teflon sheet was used as a low friction member on the sliding surface of the gate-type slide frame , but a low friction member such as a roller or a steel ball having a small friction coefficient was used. It works well even if it is interposed.

【0021】[0021]

【発明の効果】本発明の方法によれば、レールの横曲げ
加工などを必要としなくなり、簡単な門型スライド架構
を用いて、あらゆる平面曲線線形の橋梁の構築が可能と
なる。また、本発明の門型スライド架構は転用が可能で
汎用性に富むものである。
According to the method of the present invention, it is not necessary to laterally bend the rails, and it is possible to construct bridges having any plane curve alignment using a simple portal slide frame. In addition, the portal slide structure of the present invention is versatile and versatile.

【図面の簡単な説明】[Brief description of the drawings]

【図1】実施例の張出架設作業車を示し、右半分はメイ
ンフレームの正面図、左半分は門型スライド架構の正面
図である。
FIG. 1 shows the overhanging erection work vehicle of the embodiment, the front view of the right half of the main frame, the left half is a front view of the portal slide Frames.

【図2】実施例の張出架設作業車を示し、右半分はメイ
ンフレームの正面図、左半分は反力支持装置の正面図で
ある。
FIG. 2 shows the overhang work vehicle of the embodiment, the right half is a front view of a main frame, and the left half is a front view of a reaction force support device.

【図3】門型スライド架構の正面拡大図である。FIG. 3 is an enlarged front view of a portal slide frame.

【図4】実施例の工程を示す説明図である。FIG. 4 is an explanatory view showing the steps of the embodiment.

【図5】実施例の工程を示す説明図である。FIG. 5 is an explanatory view showing the steps of the embodiment.

【図6】実施例の工程を示す説明図である。FIG. 6 is an explanatory diagram showing the steps of the example.

【図7】実施例の工程を示す説明図である。FIG. 7 is an explanatory view showing the steps of the embodiment.

【図8】平面線形が曲線の平面図である。FIG. 8 is a plan view in which a horizontal alignment is a curve.

【図9】張出架設作業車の説明図である。FIG. 9 is an explanatory view of an overhang work vehicle.

【符号の説明】[Explanation of symbols]

1 架設作業車 2 横梁 3 メインフレーム 4 ジャッキ 5 車輪 6 レール 7 鋼棒 10 門型スライ
ド架構(支持部材) 11 梁 12 脚 13 鋼棒 14 低摩擦部材 15 摺動部材 20 反力支持装
置 21 フレーム 22 ローラ 23 鋼棒 50(50a、50b、50c、50d、50e) 橋
体ブロック 51 型枠支持材 52 型枠 53、54 足場
REFERENCE SIGNS LIST 1 construction work vehicle 2 cross beam 3 main frame 4 jack 5 wheel 6 rail 7 steel rod 10 portal slide frame (supporting member) 11 beam 12 leg 13 steel rod 14 low friction member 15 sliding member 20 reaction force support device 21 frame 22 Roller 23 Steel rod 50 (50a, 50b, 50c, 50d, 50e) Bridge block 51 Form support 52 Form 53, 54 Scaffold

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 平面線形が曲線である橋梁の張出ブロッ
ク工法の張出架設作業車の移動に当たり、レール後部を
横移動自在に上方から支持する支持部材を既設橋体上に
準備し、レール軸線が次ブロック構築基準線と一致する
までレール後部を横移動させ、位置合わせを行うことを
特徴とする張出架設作業車の移動方法。
1. A support member for supporting a rear portion of a rail from the upper side so as to be able to move laterally so as to be movable on an existing bridge body when moving an overhanging work vehicle in an overhang block method of a bridge having a curved linear shape. A method for moving an overhanging work vehicle, comprising: laterally moving a rear portion of a rail until an axis coincides with a reference line for constructing a next block;
【請求項2】 架設作業車移動用レール後部に橋体に固
定した門型スライド架構を設け、該門型スライド架構の
梁下面と前記移動用レール上面との間に低摩擦材を挟設
したことを特徴とする張出架設作業車の移動装置。
2. A portal slide frame fixed to a bridge body is provided at a rear portion of a rail for moving an installation work vehicle, and a low friction material is sandwiched between a lower surface of a beam of the portal slide frame and an upper surface of the rail for transportation. A moving device for an overhang work vehicle.
【請求項3】 前記低摩擦材がフッ素樹脂シートである
ことを特徴とする請求項2記載の張出架設作業車の移動
装置。
3. The moving device for an overhanging work vehicle according to claim 2, wherein the low friction material is a fluororesin sheet.
【請求項4】 前記低摩擦材がローラ又はボールである
ことを特徴とする請求項2記載の張出架設作業車の移動
装置。
4. The moving device for an overhanging work vehicle according to claim 2, wherein the low friction material is a roller or a ball.
JP16104695A 1995-06-27 1995-06-27 Method and apparatus for moving overhanging work vehicle Expired - Fee Related JP3026544B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16104695A JP3026544B2 (en) 1995-06-27 1995-06-27 Method and apparatus for moving overhanging work vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16104695A JP3026544B2 (en) 1995-06-27 1995-06-27 Method and apparatus for moving overhanging work vehicle

Publications (2)

Publication Number Publication Date
JPH0913328A JPH0913328A (en) 1997-01-14
JP3026544B2 true JP3026544B2 (en) 2000-03-27

Family

ID=15727580

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16104695A Expired - Fee Related JP3026544B2 (en) 1995-06-27 1995-06-27 Method and apparatus for moving overhanging work vehicle

Country Status (1)

Country Link
JP (1) JP3026544B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102395731B (en) * 2009-04-15 2014-08-20 Vsl国际股份公司 Overhead form traveller and method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149590B (en) * 2017-12-26 2020-06-26 中交路桥华南工程有限公司 Full-hydraulic continuous traveling system of rear anchor hanging basket and construction method
CN109990755B (en) * 2019-04-02 2020-11-06 石家庄铁道大学 Vehicle-curve bridge coupling system power experimental equipment and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102395731B (en) * 2009-04-15 2014-08-20 Vsl国际股份公司 Overhead form traveller and method

Also Published As

Publication number Publication date
JPH0913328A (en) 1997-01-14

Similar Documents

Publication Publication Date Title
JP3885584B2 (en) Construction method of composite truss bridge
JP4748420B2 (en) Construction method of corrugated steel web bridge using girder for erection work
JP2008088782A (en) Cantilever overhang erection method of corrugated steel plate web bridge
JP6752160B2 (en) Mobile work vehicle
EP1111135A2 (en) Method of building viaducts
JP3026544B2 (en) Method and apparatus for moving overhanging work vehicle
JP4329535B2 (en) Mobile work vehicle for overhanging slabs
JPH10183999A (en) Method of building movable form for arched concrete body
JP2539150B2 (en) Bridge erection equipment
JP4351523B2 (en) Column head construction method
JP3032477B2 (en) Moving scaffold for floor slab assembly
JPS58523B2 (en) The most important thing is the most important thing.
JPH1088521A (en) Overhang erection work device
JPH0336362B2 (en)
JP3326724B2 (en) Construction method of concrete cable-stayed bridge and form support trolley used for it
JPH10204830A (en) Method for bridging bridge girder
JP2000087314A (en) Method and device for construction of floor slab
CN115341482A (en) Single-side widening non-balancing weight cantilever box girder hanging basket and construction method thereof
JPH06185017A (en) Bridge girder erection method and device thereof
JPS62185905A (en) Moving type mold frame construction method of slab of high bridge
JP3179710B2 (en) Structural slide erection method and its work system
JPS649407B2 (en)
JPH0340983Y2 (en)
JP3318133B2 (en) How to build artificial ground
CN114319067A (en) Large-section steel box girder and construction method thereof

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20000111

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees