JP2987141B1 - Preceding machine for water injection in steel sheet pile joint - Google Patents
Preceding machine for water injection in steel sheet pile jointInfo
- Publication number
- JP2987141B1 JP2987141B1 JP28602298A JP28602298A JP2987141B1 JP 2987141 B1 JP2987141 B1 JP 2987141B1 JP 28602298 A JP28602298 A JP 28602298A JP 28602298 A JP28602298 A JP 28602298A JP 2987141 B1 JP2987141 B1 JP 2987141B1
- Authority
- JP
- Japan
- Prior art keywords
- steel sheet
- sheet pile
- press
- joint
- fitting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
【要約】
【解決手段】 先端にジェットノズル2を固着したく字
形本管の上端へ高圧ホ−ス6を取付けし、高圧ホ−スへ
適宜間隔を置いて取付金具10にて取付けし、さらに本
管の垂直部のヘッド上にアジャストロット14を載置し
た鋼矢板継手部内水噴射先行機と、鋼矢板の継手部12
を、予め圧入してある鋼矢板の継手部へ嵌入しながら地
盤内に圧入する際に、継手部内に高圧水を噴出しながら
継手部に進入する土石の締固まりを防いで摩擦抵抗を少
なくし、スム−ズに圧入作業を行なえることを特徴とす
る鋼矢板継手部内水噴射先行機による工法。
【効果】 鋼矢板の継手部内をジェット洗浄しながら圧
入するので継手部の圧入時の抵抗が少なくなり、鋼矢板
の変形やねじれなどの損傷を防ぐことができ、繰り返し
使用可能である。A high-pressure hose (6) is attached to the upper end of a rectangular main pipe having a jet nozzle (2) fixed to the tip, and the high-pressure hose (6) is attached to the high-pressure hose at an appropriate interval by a mounting bracket (10). An internal water jet precedence machine with a steel sheet pile joint on which an adjusting lot 14 is mounted on a head at a vertical portion of the main pipe, and a steel sheet pile joint 12
When press-fitting into the ground while fitting into the joint of a steel sheet pile that has been press-fitted in advance, the frictional resistance is reduced by preventing compaction of debris that enters the joint while blowing out high-pressure water into the joint. A method using a water jet precedence machine, which is capable of performing a press-fitting work smoothly. [Effect] Since the inside of the joint portion of the steel sheet pile is press-fitted while being jet-cleaned, resistance at the time of press-fitting of the joint portion is reduced, and damage such as deformation and torsion of the steel sheet pile can be prevented, and the steel sheet pile can be used repeatedly.
Description
【0001】[0001]
【発明の属する技術分野】本発明は鋼矢板継手部内水噴
射先行機に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a preceding machine for water injection in a steel sheet pile joint.
【0002】[0002]
【従来の技術】土木工事、建築工事、電力工事、鉄道工
事などあらゆる分野の工事に於て鋼矢板は、施工場所の
地盤の土圧、水圧などの壁体や止水として、或いは土留
めや仮締切などおもに横荷重を支持する壁体に使用さ
れ、その他には地盤沈下の縁切り、砂の流動防止、基礎
の補強、耐震補強などの目的のために使用される。2. Description of the Related Art Steel sheet piles are used in civil engineering work, construction work, electric power work, railway work, and all other fields of construction. It is mainly used for walls that support lateral loads, such as temporary cutoffs, and for other purposes such as marginal settlement of ground subsidence, prevention of sand flow, reinforcement of foundations, and seismic reinforcement.
【0003】即ち、鋼矢板工法は、多くの優れた特徴が
あり、その用途は、永久構造物用と仮設構造物用に大別
される。永久構造物用は、土圧、水圧などの横荷重を支
持する構造用壁体と、横荷重の作用しない止水を目的と
した壁体に分類することができる。仮設構造物用は、土
留め、仮締切などおもに横荷重を支持する構造用壁体に
使用される。その他、地盤沈下の縁切り、砂の流動防
止、基礎の補強、耐震補強などに使用される。そして鋼
矢板の用途は、前述のように永久構造物用と仮設構造物
用に大別され、その用途は、圧入工法の優位性と鋼矢板
の特徴が調和して、土木工事、建築工事、電力工事、鉄
道工事などあらゆる分野に拡がっている。[0003] That is, the steel sheet pile construction method has many excellent features, and its application is roughly classified into those for permanent structures and those for temporary structures. The wall for permanent structures can be classified into a structural wall supporting a lateral load such as earth pressure and water pressure, and a wall for the purpose of stopping water without a lateral load. Temporary structures are mainly used for structural walls that support lateral loads, such as earth retaining and temporary deadlines. In addition, it is used for cutting of land subsidence, prevention of sand flow, reinforcement of foundations, seismic reinforcement, etc. The uses of steel sheet piles are broadly divided into permanent structures and temporary structures, as described above.The uses of steel sheet piles are in harmony with the advantages of the press-in method and the characteristics of steel sheet piles. It has spread to all fields such as electric power construction and railway construction.
【0004】ところが、施工場所の地盤に鋼矢板を圧入
する場合、油圧式杭圧入引抜機を使用して圧入作業を行
なうが、油圧式杭圧入引抜機が鋼矢板上端を自走しなが
ら圧入するため鋼矢板の全長の上端部が、油圧式杭圧入
引抜機が時走可能の長さのところまでを地表面に残して
1枚ずつ地盤に垂直に圧入していくこととなる。それぞ
れの鋼矢板の継手を嵌入しながら圧入することで強固連
壁体を作ることができる。しかし地盤の土質状態は地層
構成、地下水の有無、土の種類及び土の性質によって異
なり、土質状態によっては油圧式杭圧入引抜機での単独
圧入は適切ではない場合がある。その場合ウオ−タ−ジ
ェット補助併用工法、ア−スオ−ガ−補助併用工法など
がある。[0004] However, when a steel sheet pile is press-fitted into the ground at the construction site, press-fitting work is performed using a hydraulic pile press-in pull-out machine. Therefore, the upper end portion of the entire length of the steel sheet pile is vertically pressed into the ground one by one while leaving the hydraulic pile press-in / draw-out machine on the ground surface up to a length capable of running at an hour. A strong continuous wall can be made by press-fitting while fitting each steel sheet pile joint. However, the soil condition of the ground varies depending on the stratum composition, the presence or absence of groundwater, the type of soil, and the nature of the soil, and depending on the soil condition, single press-fitting with a hydraulic pile press-in / pull-out machine may not be appropriate. In this case, there are a water jet assisted combined construction method and an earth auger assisted combined construction method.
【0005】前述、ウオ−タ−ジェット工法とは、鋼矢
板下端部の地盤に高圧水を噴出して土粒子間の間隔水圧
を高める。そして、土粒子を移動しやすくした地盤に油
圧式杭圧入引抜機の圧入力で鋼矢板を押し込む。これに
より油圧式杭圧入引抜機の単独圧入より、鋼矢板先端の
土の剪断抵抗が少なくなり、また鋼矢板に粘着する土石
の締固まりを防ぐなど、潤滑材の役目をして、摩擦抵抗
を軽減する工法である。また、ア−スオ−ガ−補助工法
とは、ウオ−タ−ジェット補助工法では不向きな硬質地
盤へ圧入する工法で、鋼矢板中央下端部の地盤をア−ス
オ−ガ−で先行削孔しながら同時に圧入作業を行なう工
法である。[0005] The water jet method mentioned above is to increase the water pressure between the soil particles by blowing high-pressure water onto the ground at the lower end of the steel sheet pile. Then, the steel sheet pile is pushed into the ground where the soil particles can be easily moved by the press-in of the hydraulic pile press-in / pull-out machine. As a result, the shear resistance of the soil at the tip of the steel sheet pile is reduced as compared with the single press-fitting of the hydraulic pile press-in and pull-out machine, and the frictional resistance is reduced by acting as a lubricant, such as preventing compaction of debris sticking to the steel sheet pile. It is a construction method to reduce. The earth auger auxiliary method is a method of press-fitting into the hard ground, which is not suitable for the water jet auxiliary method. The ground at the lower end of the center of the steel sheet pile is pre-drilled with an earth auger. This is a method of simultaneously performing press-fitting work.
【0006】[0006]
【発明が解決しようとする課題】しかし、いずれの工法
を用いても、油圧式杭圧入引抜機で鋼矢板を圧入するた
めに荷重を加えると鋼矢板の継手先端部の土砂を圧縮し
剪断抵抗が増大する。この剪断抵抗の増大が鋼矢板の継
手部の変形やねじれを生じ継手部が損傷することとな
り、鋼矢板の強度を得られないばかりか、鋼矢板を引き
抜いた後に再生ができなくなる。また、前述ウオ−タ−
ジェット工法では鋼矢板の中央から大量の高圧水を噴出
するため使用水量が多くなり泥水処理の作業が加わるこ
ととなる。地盤を高水圧にて緩くすることで鋼矢板の圧
入はしやすくなるが、継手部は他の鋼矢板の継手部へ嵌
入し継手部内が狭隘なので土砂が詰るのは避けられない
などの問題点があった。However, no matter which construction method is used, when a load is applied to press-fit a steel sheet pile with a hydraulic pile press-in / pull-out machine, the soil at the joint end of the steel sheet pile is compressed and the shear resistance is reduced. Increase. This increase in shear resistance causes deformation and torsion of the joint portion of the steel sheet pile, and damages the joint section. Not only is the strength of the steel sheet pile not obtained, but also the steel sheet pile cannot be regenerated after being pulled out. In addition, the aforementioned water
In the jet method, a large amount of high-pressure water is blown out from the center of the steel sheet pile, so that the amount of water used increases and the work of muddy water treatment is added. By loosening the ground with high water pressure, it is easier to press-fit steel sheet piles, but the joints fit into the joints of other steel sheet piles and the joints are narrow, so it is inevitable that soil and sand are clogged. was there.
【0007】[0007]
【課題を解決するための手段】本発明は上記課題を解決
するためになされたものであって、その要旨とするとこ
ろは、鋼矢板の継手部内に高圧水の噴射先行機を差し込
みながら鋼矢板を圧入し、付着した土も洗浄しながら継
手部内の土石の締固まりを防ぐ鋼矢板継手部内水噴射先
行機を提供することを目的とする。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and the gist of the present invention is to insert a high-pressure water jet preceding machine into a joint of a steel sheet pile and insert the steel sheet pile into the joint. It is an object of the present invention to provide a steel sheet pile joint internal water injection precedence machine that press-fits and prevents the compaction of debris in the joint while washing attached soil.
【0007】[0007]
【発明の実施の形態】図2に於て、1はく字形の本管
で、その先端にジェットノズル2が固着され上端には螺
子部が設けられている。6は高圧ホ−スで、該高圧ホ−
ス6の下部を本管1の螺子部へ螺入してナットにて一体
に取付けする。3は本管1の上部と垂直部9との間に一
体に設けた補強リブである。4は本管1の上部の補強リ
ブ3の反体側に一体に設けた取付板で、該取付板4の孔
へシャックル7を取付けする。8はワイヤ−で先端部が
シャックル7へ縛結してあり上方へ伸長して行くに従っ
て、取付金具10によって適宜間隔を置いて高圧ホ−ス
6へ一体に固止されている。14は本管1の垂直部9の
ヘッド5上へ載せるアジャストロットである。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS In FIG. 2, reference numeral 1 denotes a main pipe in the shape of a letter. A jet nozzle 2 is fixed to the tip of the main pipe, and a thread is provided at the upper end. Reference numeral 6 denotes a high-pressure hose.
The lower part of the screw 6 is screwed into the thread part of the main pipe 1 and attached integrally with a nut. Reference numeral 3 denotes a reinforcing rib provided integrally between the upper portion of the main pipe 1 and the vertical portion 9. Reference numeral 4 denotes a mounting plate integrally provided on the opposite side of the reinforcing rib 3 on the upper portion of the main pipe 1, and a shackle 7 is mounted in a hole of the mounting plate 4. Reference numeral 8 denotes a wire which is tied to the shackle 7 at its tip and is integrally fixed to the high-pressure hose 6 at appropriate intervals by a mounting bracket 10 as it extends upward. Reference numeral 14 denotes an adjustment lot to be mounted on the head 5 of the vertical portion 9 of the main pipe 1.
【0008】(作用)施工場所での鋼矢板の圧入作業
は、図4に示す通り油圧式杭圧入引抜機13によって作
業を行なう。周辺装置として、油圧式杭圧入引抜機13
の動力源は油圧,電力を供給する油圧ユニット15を油
圧ホ−スと電源ケ−ブルで結び、油圧式杭圧入引抜機1
3に鋼矢板11をセットするためのクレ−ン(図示せ
ず)と、ウオ−タ−ジェット補助併用工法などの高水圧
を利用する場合には導水パイプを備えたウオ−タ−ジェ
ットポンプ16、更には水を貯め置く水槽(図示せず)
など作業工程に合わせ、それぞれを施工場所に設置した
後作業に取りかかる。鋼矢板11の圧入作業は、コ字形
の鋼矢板を1枚ずつ交互に継手部12を嵌入しながら連
結させ、鋼矢板11の平面から見て凹凸の形状に圧入す
ることでさらに剛性が増すこととなる。先ず、1枚目の
鋼矢板11aを油圧式杭圧入引抜機13にて地盤17へ
圧入完了後に作業者の人力で図1に示す通り、圧入した
1枚目の鋼矢板11aの継手部12内に、本発明の鋼矢
板継手部内水噴射先行機の先端部のジェットノズル2が
地盤17内下方に向くように挿入する。その上にアジャ
スットロット14を挿入した後、2枚目の鋼矢板11b
の継手部12が鋼矢板継手部内水噴射先行機上部のアジ
ャストロット14の上に載せ、2枚目の鋼矢板11b上
方より油圧式杭圧入引抜機13にて圧入すると、2枚目
の鋼矢板11bと鋼矢板継手部内水噴射先行機とが一緒
に地盤17内に押し込まれる。このときウオ−タ−ジェ
ットポンプ16から鋼矢板継手部内水噴射先行機に取付
けられた高圧ホ−ス6ヘ高圧水が流れ、先端のジェット
ノズル2からは高圧水を噴射しながら地盤17内下方に
進み、継手部12内を洗浄しながら土石の締固まりを防
ぎ摩擦抵抗を少なくし、スム−ズに圧入作業を行うこと
となる。地表面より一定の高さの1枚目の鋼矢板11a
と同じ高さになるように2枚目の鋼矢板11bを圧入し
た後、鋼矢板継手内水噴射先行機に取付けたワイヤ−8
と高圧ホ−ス6と共に引き上げる。このときアジャスト
ロット14はそのまま地盤内に使い捨てとなる。この作
業を順次繰り返し3枚目,4枚目と鋼矢板11を圧入し
ていく。(Operation) The press work of the steel sheet pile at the construction site is performed by a hydraulic pile press-in and pull-out machine 13 as shown in FIG. As a peripheral device, a hydraulic pile press-in / pull-out machine 13
The power source is a hydraulic unit 15 for supplying hydraulic pressure and electric power, which is connected to a hydraulic hose and a power cable, and a hydraulic pile press-in / pull-out machine 1
A crane (not shown) for setting the steel sheet pile 11 in the water jet pump 3 and a water jet pump 16 provided with a water guide pipe when using high water pressure such as a water jet auxiliary combined method. A water tank for storing water (not shown)
After installing them at the construction site according to the work process, work begins. The press-fitting work of the steel sheet piles 11 is performed by connecting the U-shaped steel sheet piles alternately one by one while fitting the joint portions 12 into each other, and press-fitting the steel sheet piles 11 into a concave-convex shape when viewed from the plane of the steel sheet piles 11, thereby further increasing rigidity. Becomes First, after the first steel sheet pile 11a is pressed into the ground 17 by the hydraulic pile press-in / pull-out machine 13, as shown in FIG. Then, the jet nozzle 2 at the tip end of the steel sheet pile joint in-water jet preceding machine of the present invention is inserted so as to face downward in the ground 17. After inserting the adjust lot 14 thereon, the second steel sheet pile 11b
Is mounted on the adjusting lot 14 above the steel sheet pile joint inner water injection precedence machine, and press-fitted from above the second steel sheet pile 11b by the hydraulic pile press-in / pull-out machine 13, the second steel sheet pile is 11b and the preceding machine for injecting water into the steel sheet pile joint are pushed into the ground 17 together. At this time, high-pressure water flows from the water jet pump 16 to the high-pressure hose 6 attached to the steel sheet pile joint internal water injection precedence machine, and the high-pressure water is jetted from the jet nozzle 2 at the tip while lowering the inside of the ground 17. Then, while the inside of the joint portion 12 is being washed, compaction of the debris is prevented, frictional resistance is reduced, and the press-fitting operation is performed smoothly. First steel sheet pile 11a at a certain height above the ground surface
After press-fitting the second steel sheet pile 11b so as to have the same height as the above, the wire-8 attached to the steel sheet pile joint in-water injection precedence machine
And the high-pressure hose 6 are pulled up. At this time, the adjusting lot 14 is disposable in the ground as it is. This operation is sequentially repeated to press-fit the third and fourth sheets and the sheet pile 11.
【0009】しかし、鋼矢板11の全長は多少違いがあ
る。鋼矢板11の上端部上を油圧式杭圧入引抜機13が
自走しながら作業を行なうため、地表面から一定の高さ
にしなければならない。そのために図4に示すように鋼
矢板11の下端は多少の長さのばらつきがある。本発明
の鋼矢板継手部内水噴射先行機を引き上げるときに、図
5に示すように、後に圧入した鋼矢板11のほうが短い
ときには、前の鋼矢板11の継手部12内に、鋼矢板継
手部内水噴射先行機の先端部分が挿入されているため引
き上げることができない。その場合のためにアジャスト
ロット14が使用される。即ち図6に示す通り鋼矢板1
1の長さの違いの分だけ、つまり鋼矢板継手部内水噴射
先行機が継手部12内から外れる位置まで高圧水を噴射
した後、鋼矢板継手部内水噴射先行機を引き上げる。鋼
矢板11の長さの違いに合わせてアジャストロット14
を1本または複数本、適宜使用する。However, the overall length of the sheet pile 11 is slightly different. Since the hydraulic pile press-in / pull-out machine 13 works on the upper end of the steel sheet pile 11 while traveling by itself, it must be at a certain height from the ground surface. Therefore, as shown in FIG. 4, the lower end of the steel sheet pile 11 has some length variation. As shown in FIG. 5, when the steel sheet pile joint internal water jet precedence machine of the present invention is pulled up, when the steel sheet pile 11 pressed in later is shorter, as shown in FIG. The water jet precedence machine cannot be lifted because the tip is inserted. The adjusting lot 14 is used for that case. That is, as shown in FIG.
After injecting high-pressure water by the length difference of one, that is, the position where the steel sheet pile joint inner water jet preceding machine comes out of the joint portion 12, the steel sheet pile joint inner water jet preceding machine is pulled up. Adjust lot 14 according to the difference in length of steel sheet pile 11
One or a plurality of these are appropriately used.
【0010】[0010]
【発明の効果】鋼矢板の継手部内をジェット洗浄しなが
ら圧入するので継手部の圧入時の抵抗が少なくなり、鋼
矢板の変形やねじれなどの損傷を防ぐことができ、特に
砂質地盤に効果が期待できる。従来のウオ−タ−ジェッ
ト補助併用工法に比べ使用水量が少なくなり、それに伴
う泥水処理が軽減できる。1日の鋼矢板の圧入枚数が安
定する。According to the present invention, since the inside of the joint portion of the steel sheet pile is press-fitted while being jet-cleaned, resistance at the time of press-fitting of the joint portion is reduced, and deformation such as deformation and twisting of the steel sheet pile can be prevented. Can be expected. The amount of water used is smaller than that of the conventional water-jet assisted combined method, and the associated muddy water treatment can be reduced. The number of press-fitted steel sheet piles per day is stabilized.
【図1】本発明の装置の使用状態を示す一部を欠截した
斜視図である。FIG. 1 is a partially cutaway perspective view showing a use state of an apparatus of the present invention.
【図2】本発明の装置の正面図である。FIG. 2 is a front view of the device of the present invention.
【図3】本発明の装置の使用状態を示す平面図である。FIG. 3 is a plan view showing a use state of the device of the present invention.
【図4】本発明の装置を使用しての施工状態を示す参考
正面図である。FIG. 4 is a reference front view showing a construction state using the apparatus of the present invention.
【図5】本発明の装置の使用状態を示す参考拡大正面図
である。FIG. 5 is a reference enlarged front view showing a use state of the device of the present invention.
【図6】本発明の装置の使用状態を示す参考拡大正面図
である。FIG. 6 is a reference enlarged front view showing a use state of the device of the present invention.
【符号の説明】 1 本管 2 ジェットノズル 3 補強リブ 4 取付板 5 ヘッド 6 高圧ホ−ス 7 シャックル 8 ワイヤ− 9 垂直部 10 取付金具 11 鋼矢板 11a 圧入後の鋼矢板 11b 圧入中の鋼矢板 12 継手部 13 油圧式杭圧入引抜機 14 アジャストロット 15 油圧ユニット 16 ウオ−タ−ジェットポンプ 17 地盤[Description of Signs] 1 Main pipe 2 Jet nozzle 3 Reinforcement rib 4 Mounting plate 5 Head 6 High pressure hose 7 Shackle 8 Wire 9 Vertical section 10 Mounting bracket 11 Steel sheet pile 11a Steel sheet pile after press-fit 11b Steel sheet pile during press-fit 12 Joint 13 Hydraulic pile press-in / pull-out machine 14 Adjust lot 15 Hydraulic unit 16 Water jet pump 17 Ground
Claims (1)
本管の上端へ高圧ホースを取付し、く字形本管の上部と
垂直部に補強リブを、該補強リブの反対側に孔を設けた
取付板をく字形本管にそれぞれ一体に形成し、該取付板
の孔へシャックルを取付し、該シャックルへワイヤーを
結縛し、ワイヤーが上方へ行くのに従って高圧ホースへ
適宜間隔を置いて取付金具にて取付けし、さらに本管の
垂直部のヘッド上にアジャストロットを載置した鋼矢板
継手部内水噴射先行機。1. A high-pressure hose is attached to the upper end of a rectangular main pipe to which a jet nozzle is fixed at a tip, and a reinforcing rib is provided on an upper part and a vertical part of the rectangular main pipe, and a hole is provided on a side opposite to the reinforcing rib. A mounting plate is integrally formed on each of the V-shaped main pipes, a shackle is mounted on a hole of the mounting plate, a wire is tied to the shackle, and a wire is mounted at an appropriate interval on a high-pressure hose as the wire goes upward. An internal water jet precedence machine with steel sheet pile joints mounted with metal fittings and an adjustment lot placed on the head in the vertical part of the main pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP28602298A JP2987141B1 (en) | 1998-09-22 | 1998-09-22 | Preceding machine for water injection in steel sheet pile joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP28602298A JP2987141B1 (en) | 1998-09-22 | 1998-09-22 | Preceding machine for water injection in steel sheet pile joint |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2987141B1 true JP2987141B1 (en) | 1999-12-06 |
JP2000096566A JP2000096566A (en) | 2000-04-04 |
Family
ID=17698975
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP28602298A Expired - Fee Related JP2987141B1 (en) | 1998-09-22 | 1998-09-22 | Preceding machine for water injection in steel sheet pile joint |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2987141B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009270361A (en) * | 2008-05-08 | 2009-11-19 | Jfe Steel Corp | Method for placing steel sheet pile |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4497390B2 (en) * | 2000-08-02 | 2010-07-07 | 株式会社不動テトラ | Penetration method of underground shielding plate |
JP4717281B2 (en) * | 2001-08-08 | 2011-07-06 | 株式会社テノックス | Soil cement anti-caking device and anti-caking method for steel continuous wall member joints |
JP5619650B2 (en) * | 2011-02-18 | 2014-11-05 | 株式会社クボタ | Columnar joint structure and method of cleaning the joint |
-
1998
- 1998-09-22 JP JP28602298A patent/JP2987141B1/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009270361A (en) * | 2008-05-08 | 2009-11-19 | Jfe Steel Corp | Method for placing steel sheet pile |
Also Published As
Publication number | Publication date |
---|---|
JP2000096566A (en) | 2000-04-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3927899B1 (en) | Vibratory driving of foundations | |
US20100183378A1 (en) | Spiral steel pile | |
US5724781A (en) | Method for raising foundations | |
WO2014203858A1 (en) | Steel-pipe pile and steel-pipe pile construction method | |
JP2987141B1 (en) | Preceding machine for water injection in steel sheet pile joint | |
JP2006188940A (en) | Earthquake resistant structure | |
JPWO2010089985A1 (en) | Steel member for foundation, method for placing steel member for foundation, and continuous steel wall for foundation | |
JP3733533B2 (en) | Foundation reinforcement method under pressure of existing structures | |
JP2011080195A (en) | Anchor device and method of installing anchor | |
JP2863487B2 (en) | Pile pull-out method and device | |
KR100907904B1 (en) | Movable Temporary Temper Structure | |
CN206916746U (en) | High-pressure jet, jetting type are removed obstacles immersed tube | |
JP2537410B2 (en) | Concrete sheet pile | |
KR20100027434A (en) | Post pile and sheet pile combination | |
CN206052733U (en) | A kind of anchor draws inner support combined foundation ditch support structure | |
KR20040004961A (en) | Basic pile with a screw | |
JP3500246B2 (en) | Height adjustment bracket and concrete secondary product with height adjustment bracket | |
CN1515757A (en) | Supporting structure for retaining wall | |
JP2017197951A (en) | Countermeasure wall against drawn-in subsidence and construction method thereof | |
US11933014B2 (en) | Reticulated driven micropile footing system | |
CN221276619U (en) | Foundation pit supporting structure and building foundation pit | |
JP4549182B2 (en) | Sabo dam and its construction method | |
DE102010024469A1 (en) | foundation system | |
KR200344980Y1 (en) | Earth anchor bracket | |
DE19740800A1 (en) | Plank introduction device into ground using pile-driver |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |