JP2000096566A - Water jet preceeding machine in steel sheet pile joint section - Google Patents

Water jet preceeding machine in steel sheet pile joint section

Info

Publication number
JP2000096566A
JP2000096566A JP10286022A JP28602298A JP2000096566A JP 2000096566 A JP2000096566 A JP 2000096566A JP 10286022 A JP10286022 A JP 10286022A JP 28602298 A JP28602298 A JP 28602298A JP 2000096566 A JP2000096566 A JP 2000096566A
Authority
JP
Japan
Prior art keywords
steel sheet
sheet pile
press
joint section
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10286022A
Other languages
Japanese (ja)
Other versions
JP2987141B1 (en
Inventor
Kokichi Kameda
幸吉 亀田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP28602298A priority Critical patent/JP2987141B1/en
Application granted granted Critical
Publication of JP2987141B1 publication Critical patent/JP2987141B1/en
Publication of JP2000096566A publication Critical patent/JP2000096566A/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a water jet preceeding machine in a steel sheet pile joint section and a method thereof capable of press-fitting a steel sheet pile while inserting a high pressure water jet preceeding machine in a joint section of the steel sheet pile and preventing the compaction of earth and rocks inside the joint section while washing adhered soil. SOLUTION: When a steel sheet pile joint section inside water jet preceeding machine mounted with a high pressure hose 6 mounted to the upper end of a dog-leg mains fixing a jet nozzle 2 to the front end, mounting it to the high pressure hose with a metal fixture 10 at a proper interval and mounting an adjust rod 14 on the head of a vertical section of the mains and a joint section 12 of a steel sheet pile is pressed in the ground while fitting them to the joint section of the steel sheet pile pressed in advance, the compaction of earth and rocks entered into the joint section while spouting high pressure water inside the joint section is prevented to reduce frictional resistance, so that press-in work can smoothly be carried out. By the constitution, since press-in is made while washing the inside of the joint section of the steel sheet pile by jet, resistance is reduced in the case press-in of the joint section is made, the damage such as deformation or twist, etc., of the steel sheet pile can be prevented, and the steel sheet pile can repeatedly be used.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は鋼矢板継手部内水噴
射先行機及びその工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an internal water injection precedence machine for steel sheet pile joints and a method of construction thereof.

【0002】[0002]

【従来の技術】土木工事、建築工事、電力工事、鉄道工
事などあらゆる分野の工事に於て鋼矢板は、施工場所の
地盤の土圧、水圧などの壁体や止水として、或いは土留
めや仮締切などおもに横荷重を支持する壁体に使用さ
れ、その他には地盤沈下の縁切り、砂の流動防止、基礎
の補強、耐震補強などの目的のために使用される。
2. Description of the Related Art Steel sheet piles are used in civil engineering work, construction work, electric power work, railway work, and all other fields of construction. It is mainly used for walls that support lateral loads, such as temporary cutoffs, and for other purposes such as marginal settlement of ground subsidence, prevention of sand flow, reinforcement of foundations, and seismic reinforcement.

【0003】即ち、鋼矢板工法は、多くの優れた特徴が
あり、その用途は、永久構造物用と仮設構造物用に大別
される。永久構造物用は、土圧、水圧などの横荷重を支
持する構造用壁体と、横荷重の作用しない止水を目的と
した壁体に分類することができる。仮設構造物用は、土
留め、仮締切などおもに横荷重を支持する構造用壁体に
使用される。その他、地盤沈下の縁切り、砂の流動防
止、基礎の補強、耐震補強などに使用される。そして鋼
矢板の用途は、前述のように永久構造物用と仮設構造物
用に大別され、その用途は、圧入工法の優位性と鋼矢板
の特徴が調和して、土木工事、建築工事、電力工事、鉄
道工事などあらゆる分野に拡がっている。
[0003] That is, the steel sheet pile construction method has many excellent features, and its application is roughly classified into those for permanent structures and those for temporary structures. The wall for permanent structures can be classified into a structural wall supporting a lateral load such as earth pressure and water pressure, and a wall for the purpose of stopping water without a lateral load. Temporary structures are mainly used for structural walls that support lateral loads, such as earth retaining and temporary deadlines. In addition, it is used for cutting of land subsidence, prevention of sand flow, reinforcement of foundations, seismic reinforcement, etc. The uses of steel sheet piles are broadly divided into permanent structures and temporary structures, as described above.The uses of steel sheet piles are in harmony with the advantages of the press-in method and the characteristics of steel sheet piles. It has spread to all fields such as electric power construction and railway construction.

【0004】ところが、施工場所の地盤に鋼矢板を圧入
する場合、油圧式杭圧入引抜機を使用して圧入作業を行
なうが、油圧式杭圧入引抜機が鋼矢板上端を自走しなが
ら圧入するため鋼矢板の全長の上端部が、油圧式杭圧入
引抜機が時走可能の長さのところまでを地表面に残して
1枚ずつ地盤に垂直に圧入していくこととなる。それぞ
れの鋼矢板の継手を嵌入しながら圧入することで強固連
壁体を作ることができる。しかし地盤の土質状態は地層
構成、地下水の有無、土の種類及び土の性質によって異
なり、土質状態によっては油圧式杭圧入引抜機での単独
圧入は適切ではない場合がある。その場合ウオ−タ−ジ
ェット補助併用工法、ア−スオ−ガ−補助併用工法など
がある。
[0004] However, when a steel sheet pile is press-fitted into the ground at the construction site, press-fitting work is performed using a hydraulic pile press-in pull-out machine. Therefore, the upper end portion of the entire length of the steel sheet pile is vertically pressed into the ground one by one while leaving the hydraulic pile press-in / draw-out machine on the ground surface up to a length capable of running at an hour. A strong continuous wall can be made by press-fitting while fitting each steel sheet pile joint. However, the soil condition of the ground varies depending on the stratum composition, the presence or absence of groundwater, the type of soil, and the nature of the soil, and depending on the soil condition, single press-fitting with a hydraulic pile press-in / pull-out machine may not be appropriate. In this case, there are a water jet assisted combined construction method and an earth auger assisted combined construction method.

【0005】前述、ウオ−タ−ジェット工法とは、鋼矢
板下端部の地盤に高圧水を噴出して土粒子間の間隔水圧
を高める。そして、土粒子を移動しやすくした地盤に油
圧式杭圧入引抜機の圧入力で鋼矢板を押し込む。これに
より油圧式杭圧入引抜機の単独圧入より、鋼矢板先端の
土の剪断抵抗が少なくなり、また鋼矢板に粘着する土石
の締固まりを防ぐなど、潤滑材の役目をして、摩擦抵抗
を軽減する工法である。また、ア−スオ−ガ−補助工法
とは、ウオ−タ−ジェット補助工法では不向きな硬質地
盤へ圧入する工法で、鋼矢板中央下端部の地盤をア−ス
オ−ガ−で先行削孔しながら同時に圧入作業を行なう工
法である。
[0005] The water jet method mentioned above is to increase the water pressure between the soil particles by blowing high-pressure water onto the ground at the lower end of the steel sheet pile. Then, the steel sheet pile is pushed into the ground where the soil particles can be easily moved by the press-in of the hydraulic pile press-in / pull-out machine. As a result, the shear resistance of the soil at the tip of the steel sheet pile is reduced as compared with the single press-fitting of the hydraulic pile press-in and pull-out machine, and the frictional resistance is reduced by acting as a lubricant, such as preventing compaction of debris sticking to the steel sheet pile. It is a construction method to reduce. The earth auger auxiliary method is a method of press-fitting into the hard ground, which is not suitable for the water jet auxiliary method. The ground at the lower end of the center of the steel sheet pile is pre-drilled with an earth auger. This is a method of simultaneously performing press-fitting work.

【0006】[0006]

【発明が解決しようとする課題】しかし、いずれの工法
を用いても、油圧式杭圧入引抜機で鋼矢板を圧入するた
めに荷重を加えると鋼矢板の継手先端部の土砂を圧縮し
剪断抵抗が増大する。この剪断抵抗の増大が鋼矢板の継
手部の変形やねじれを生じ継手部が損傷することとな
り、鋼矢板の強度を得られないばかりか、鋼矢板を引き
抜いた後に再生ができなくなる。また、前述ウオ−タ−
ジェット工法では鋼矢板の中央から大量の高圧水を噴出
するため使用水量が多くなり泥水処理の作業が加わるこ
ととなる。地盤を高水圧にて緩くすることで鋼矢板の圧
入はしやすくなるが、継手部は他の鋼矢板の継手部へ嵌
入し継手部内が狭隘なので土砂が詰るのは避けられない
などの問題点があった。
However, no matter which construction method is used, when a load is applied to press-fit a steel sheet pile with a hydraulic pile press-in / pull-out machine, the soil at the joint end of the steel sheet pile is compressed and the shear resistance is reduced. Increase. This increase in shear resistance causes deformation and torsion of the joint portion of the steel sheet pile, and damages the joint section. Not only is the strength of the steel sheet pile not obtained, but also the steel sheet pile cannot be regenerated after being pulled out. In addition, the aforementioned water
In the jet method, a large amount of high-pressure water is blown out from the center of the steel sheet pile, so that the amount of water used increases and the work of muddy water treatment is added. By loosening the ground with high water pressure, it is easier to press-fit steel sheet piles, but the joints fit into the joints of other steel sheet piles and the joints are narrow, so it is inevitable that soil and sand are clogged. was there.

【0007】よって、鋼矢板の継手部内に高圧水の噴射
先行機を差し込みながら鋼矢板を圧入し、付着した土も
洗浄しながら継手部内の土石の締固まりを防ぐ鋼矢板継
手部内水噴射先行機及びその工法を提供することを目的
とする。
Accordingly, a steel sheet pile is press-fitted while inserting a high-pressure water jet preceding machine into the joint of the steel sheet pile and washing the attached soil to prevent compaction of debris in the joint while preventing the compaction of debris in the joint. And its construction method.

【課題を解決するための手段】本発明は上記課題を解決
するためになされたものであって、その要旨とするとこ
ろは、先端にジェットノズルを固着したく字形本管の上
端へ高圧ホ−スを取付し、く字形本管の上部と垂直部に
補強リブを、該補強リブの反対側に孔を設けた取付板を
く字形本管にそれぞれ一体に形成し、該取付板の孔へシ
ャックルを取付し、該シャックルヘワイヤ−を結縛し、
ワイヤ−が上方へ行くのに従って高圧ホ−スへ適宜間隔
を置いて取付金具にて取付けし、さらに本管の垂直部の
ヘッド上にアジャストロットを載置した鋼矢板継手部内
水噴射先行機と、鋼矢板の継手部を、予め圧入してある
鋼矢板の継手部へ嵌入しながら地盤内に圧入する際に、
継手部内に高圧水を噴出しながら継手部内の土の剪断抵
抗を少なくし、付着する土を洗浄しながら継手部に進入
する土石の締固まりを防いで摩擦抵抗を少なくし、スム
−ズに圧入作業を行なえることを特徴とする鋼矢板継手
部内水噴射先行機による工法である。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and the gist of the present invention is that a high-pressure hose is attached to the upper end of a rectangular main pipe having a jet nozzle fixed to its tip. A mounting plate provided with holes on the upper and vertical portions of the main square and a hole on the opposite side of the reinforcing ribs is formed integrally with the main square, and the holes are formed in the mounting plate. Attach a shackle, tie the shackle wire-
As the wire goes upward, it is attached to the high-pressure hose at appropriate intervals with mounting brackets, and further, a steel sheet pile joint internal water injection precedence machine in which an adjust rod is mounted on the head at the vertical portion of the main pipe. When press-fitting the joint of the steel sheet pile into the ground while fitting it into the joint of the steel sheet pile that has been press-fitted in advance,
Spouting high-pressure water into the joints to reduce the shear resistance of the soil in the joints, washing the adhering soil, preventing compaction of the debris that enters the joints while reducing the frictional resistance, and pressing into the smooth This is a construction method using a water jet precedence machine that is capable of performing work.

【0007】[0007]

【発明の実施の形態】図2に於て、1はく字形の本管
で、その先端にジェットノズル2が固着され上端には螺
子部が設けられている。6は高圧ホ−スで、該高圧ホ−
ス6の下部を本管1の螺子部へ螺入してナットにて一体
に取付けする。3は本管1の上部と垂直部9との間に一
体に設けた補強リブである。4は本管1の上部の補強リ
ブ3の反体側に一体に設けた取付板で、該取付板4の孔
へシャックル7を取付けする。8はワイヤ−で先端部が
シャックル7へ縛結してあり上方へ伸長して行くに従っ
て、取付金具10によって適宜間隔を置いて高圧ホ−ス
6へ一体に固止されている。14は本管1の垂直部9の
ヘッド5上へ載せるアジャストロットである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS In FIG. 2, reference numeral 1 denotes a main pipe in the shape of a letter. A jet nozzle 2 is fixed to the tip of the main pipe, and a thread is provided at the upper end. Reference numeral 6 denotes a high-pressure hose.
The lower part of the screw 6 is screwed into the thread part of the main pipe 1 and attached integrally with a nut. Reference numeral 3 denotes a reinforcing rib provided integrally between the upper portion of the main pipe 1 and the vertical portion 9. Reference numeral 4 denotes a mounting plate integrally provided on the opposite side of the reinforcing rib 3 on the upper portion of the main pipe 1, and a shackle 7 is mounted in a hole of the mounting plate 4. Reference numeral 8 denotes a wire which is tied to the shackle 7 at its tip and is integrally fixed to the high-pressure hose 6 at appropriate intervals by a mounting bracket 10 as it extends upward. Reference numeral 14 denotes an adjustment lot to be mounted on the head 5 of the vertical portion 9 of the main pipe 1.

【0008】(作用)施工場所での鋼矢板の圧入作業
は、図4に示す通り油圧式杭圧入引抜機13によって作
業を行なう。周辺装置として、油圧式杭圧入引抜機13
の動力源は油圧,電力を供給する油圧ユニット15を油
圧ホ−スと電源ケ−ブルで結び、油圧式杭圧入引抜機1
3に鋼矢板11をセットするためのクレ−ン(図示せ
ず)と、ウオ−タ−ジェット補助併用工法などの高水圧
を利用する場合には導水パイプを備えたウオ−タ−ジェ
ットポンプ16、更には水を貯め置く水槽(図示せず)
など作業工程に合わせ、それぞれを施工場所に設置した
後作業に取りかかる。鋼矢板11の圧入作業は、コ字形
の鋼矢板を1枚ずつ交互に継手部12を嵌入しながら連
結させ、鋼矢板11の平面から見て凹凸の形状に圧入す
ることでさらに剛性が増すこととなる。先ず、1枚目の
鋼矢板11aを油圧式杭圧入引抜機13にて地盤17へ
圧入完了後に作業者の人力で図1に示す通り、圧入した
1枚目の鋼矢板11aの継手部12内に、本発明の鋼矢
板継手部内水噴射先行機の先端部のジェットノズル2が
地盤17内下方に向くように挿入する。その上にアジャ
スットロット14を挿入した後、2枚目の鋼矢板11b
の継手部12が鋼矢板継手部内水噴射先行機上部のアジ
ャストロット14の上に載せ、2枚目の鋼矢板11b上
方より油圧式杭圧入引抜機13にて圧入すると、2枚目
の鋼矢板11bと鋼矢板継手部内水噴射先行機とが一緒
に地盤17内に押し込まれる。このときウオ−タ−ジェ
ットポンプ16から鋼矢板継手部内水噴射先行機に取付
けられた高圧ホ−ス6ヘ高圧水が流れ、先端のジェット
ノズル2からは高圧水を噴射しながら地盤17内下方に
進み、継手部12内を洗浄しながら土石の締固まりを防
ぎ摩擦抵抗を少なくし、スム−ズに圧入作業を行うこと
となる。地表面より一定の高さの1枚目の鋼矢板11a
と同じ高さになるように2枚目の鋼矢板11bを圧入し
た後、鋼矢板継手内水噴射先行機に取付けたワイヤ−8
と高圧ホ−ス6と共に引き上げる。このときアジャスト
ロット14はそのまま地盤内に使い捨てとなる。この作
業を順次繰り返し3枚目,4枚目と鋼矢板11を圧入し
ていく。
(Operation) The press work of the steel sheet pile at the construction site is performed by a hydraulic pile press-in and pull-out machine 13 as shown in FIG. As a peripheral device, a hydraulic pile press-in / pull-out machine 13
The power source is a hydraulic unit 15 for supplying hydraulic pressure and electric power, which is connected to a hydraulic hose and a power cable, and a hydraulic pile press-in / pull-out machine 1
A crane (not shown) for setting the steel sheet pile 11 in the water jet pump 3 and a water jet pump 16 provided with a water guide pipe when using high water pressure such as a water jet auxiliary combined method. A water tank for storing water (not shown)
After installing them at the construction site according to the work process, work begins. The press-fitting work of the steel sheet piles 11 is performed by connecting the U-shaped steel sheet piles alternately one by one while fitting the joint portions 12 into each other, and press-fitting the steel sheet piles 11 into a concave-convex shape when viewed from the plane of the steel sheet piles 11, thereby further increasing rigidity. Becomes First, after the first steel sheet pile 11a is press-fitted into the ground 17 by the hydraulic pile press-in / pull-out machine 13, the joints 12 of the press-inserted first steel sheet pile 11a as shown in FIG. Then, the jet nozzle 2 at the tip end of the steel sheet pile joint in-water jet preceding machine of the present invention is inserted so as to face downward in the ground 17. After inserting the adjust lot 14 thereon, the second steel sheet pile 11b
Is mounted on the adjusting lot 14 above the steel sheet pile joint inner water injection precedence machine, and press-fitted from above the second steel sheet pile 11b by the hydraulic pile press-in / pull-out machine 13, the second steel sheet pile is 11b and the preceding machine for injecting water into the steel sheet pile joint are pushed into the ground 17 together. At this time, high-pressure water flows from the water jet pump 16 to the high-pressure hose 6 attached to the steel sheet pile joint internal water injection precedence machine, and the high-pressure water is jetted from the jet nozzle 2 at the tip while lowering the inside of the ground 17. Then, while the inside of the joint portion 12 is being washed, compaction of the debris is prevented, frictional resistance is reduced, and the press-fitting operation is performed smoothly. First steel sheet pile 11a at a certain height above the ground surface
After press-fitting the second steel sheet pile 11b so as to have the same height as that of the above, the wire-8 attached to the steel sheet pile joint inner water injection precedence machine
And the high-pressure hose 6 are pulled up. At this time, the adjusting lot 14 is disposable in the ground as it is. This operation is sequentially repeated to press-fit the third and fourth sheets and the steel sheet pile 11.

【0009】しかし、鋼矢板11の全長は多少違いがあ
る。鋼矢板11の上端部上を油圧式杭圧入引抜機13が
自走しながら作業を行なうため、地表面から一定の高さ
にしなければならない。そのために図4に示すように鋼
矢板11の下端は多少の長さのばらつきがある。本発明
の鋼矢板継手部内水噴射先行機を引き上げるときに、図
5に示すように、後に圧入した鋼矢板11のほうが短い
ときには、前の鋼矢板11の継手部12内に、鋼矢板継
手部内水噴射先行機の先端部分が挿入されているため引
き上げることができない。その場合のためにアジャスト
ロット14が使用される。即ち図6に示す通り鋼矢板1
1の長さの違いの分だけ、つまり鋼矢板継手部内水噴射
先行機が継手部12内から外れる位置まで高圧水を噴射
した後、鋼矢板継手部内水噴射先行機を引き上げる。鋼
矢板11の長さの違いに合わせてアジャストロット14
を1本または複数本、適宜使用する。
However, the overall length of the sheet pile 11 is slightly different. Since the hydraulic pile press-in / pull-out machine 13 works on the upper end of the steel sheet pile 11 while traveling by itself, it must be at a certain height from the ground surface. Therefore, as shown in FIG. 4, the lower end of the steel sheet pile 11 has some length variation. As shown in FIG. 5, when the steel sheet pile joint inner water jet precedence machine of the present invention is pulled up, when the later pressed steel sheet pile 11 is shorter, the steel sheet pile joint part is inserted into the steel sheet pile joint part 12. The water jet precedence machine cannot be lifted because the tip is inserted. The adjusting lot 14 is used for that case. That is, as shown in FIG.
After injecting the high-pressure water by the length difference of 1, that is, the position where the steel sheet pile joint internal water jet preceding machine comes out of the joint portion 12, the steel sheet pile joint internal water jet preceding machine is pulled up. Adjust lot 14 according to the difference in length of steel sheet pile 11
One or a plurality of these are appropriately used.

【0010】[0010]

【発明の効果】鋼矢板の継手部内をジェット洗浄しなが
ら圧入するので継手部の圧入時の抵抗が少なくなり、鋼
矢板の変形やねじれなどの損傷を防ぐことができ、特に
砂質地盤に効果が期待できる。従来のウオ−タ−ジェッ
ト補助併用工法に比べ使用水量が少なくなり、それに伴
う泥水処理が軽減できる。1日の鋼矢板の圧入枚数が安
定する。
According to the present invention, since the inside of the joint portion of the steel sheet pile is press-fitted while being jet-cleaned, resistance at the time of press-fitting of the joint portion is reduced, and deformation such as deformation and twisting of the steel sheet pile can be prevented, and it is particularly effective for sandy ground. Can be expected. The amount of water used is smaller than that of the conventional water-jet assisted combined method, and the associated muddy water treatment can be reduced. The number of press-fitted steel sheet piles per day is stabilized.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の装置の使用状態を示す一部を欠截した
斜視図である。
FIG. 1 is a partially cutaway perspective view showing a use state of an apparatus of the present invention.

【図2】本発明の装置の正面図である。FIG. 2 is a front view of the device of the present invention.

【図3】本発明の装置の使用状態を示す平面図である。FIG. 3 is a plan view showing a use state of the device of the present invention.

【図4】本発明の装置を使用しての施工状態を示す参考
正面図である。
FIG. 4 is a reference front view showing a construction state using the apparatus of the present invention.

【図5】本発明の装置の使用状態を示す参考拡大正面図
である。
FIG. 5 is a reference enlarged front view showing a use state of the device of the present invention.

【図6】本発明の装置の使用状態を示す参考拡大正面図
である。
FIG. 6 is a reference enlarged front view showing a use state of the device of the present invention.

【符号の説明】[Explanation of symbols]

1 本管 2 ジェットノズル 3 補強リブ 4 取付板 5 ヘッド 6 高圧ホ−ス 7 シャックル 8 ワイヤ− 9 垂直部 10 取付金具 11 鋼矢板 11a 圧入後の鋼矢板 11b 圧入中の鋼矢板 12 継手部 13 油圧式杭圧入引抜機 14 アジャストロット 15 油圧ユニット 16 ウオ−タ−ジェットポンプ 17 地盤 DESCRIPTION OF SYMBOLS 1 Main pipe 2 Jet nozzle 3 Reinforcement rib 4 Mounting plate 5 Head 6 High pressure hose 7 Shackle 8 Wire 9 Vertical part 10 Mounting bracket 11 Steel sheet pile 11a Steel sheet pile after press-fit 11b Steel sheet pile during press-fit 12 Joint part 13 Hydraulic Pile press-in / draw-out machine 14 Adjust lot 15 Hydraulic unit 16 Water jet pump 17 Ground

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成11年8月25日(1999.8.2
5)
[Submission date] August 25, 1999 (1999.8.2
5)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】発明の名称[Correction target item name] Name of invention

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【発明の名称】 鋼矢板継手部内水噴射先行機[Title of the Invention] Preceding machine for water injection in steel sheet pile joint

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】特許請求の範囲[Correction target item name] Claims

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【特許請求の範囲】[Claims]

【手続補正3】[Procedure amendment 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0001[Correction target item name] 0001

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0001】[0001]

【発明の属する技術分野】本発明は鋼矢板継手部内水噴
射先行機に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a preceding machine for water injection in a steel sheet pile joint.

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0007[Correction target item name] 0007

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0007】[0007]

【課題を解決するための手段】本発明は上記課題を解決
するためになされたものであって、その要旨とするとこ
ろは、鋼矢板の継手部内に高圧水の噴射先行機を差し込
みながら鋼矢板を圧入し、付着した土も洗浄しながら継
手部内の土石の締固まりを防ぐ鋼矢板継手部内水噴射先
行機を提供することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and the gist of the present invention is to insert a high-pressure water jet preceding machine into a joint of a steel sheet pile and insert the steel sheet pile into the joint. It is an object of the present invention to provide a steel sheet pile joint internal water injection precedence machine that press-fits and prevents the compaction of debris in the joint while washing attached soil.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 先端にジェットノズルを固着したく字形
本管の上端へ高圧ホ−スを取付し、く字形本管の上部と
垂直部に補強リブを、該補強リブの反対側に孔を設けた
取付板をく字形本管にそれぞれ一体に形成し、該取付板
の孔へシャックルを取付し、該シャックルヘワイヤ−を
結縛し、ワイヤ−が上方へ行くのに従って高圧ホ−スへ
適宜間隔を置いて取付金具にて取付けし、さらに本管の
垂直部のヘッド上にアジャストロットを載置した鋼矢板
継手部内水噴射先行機。
1. A high-pressure hose is attached to the upper end of a rectangular main pipe to which a jet nozzle is fixed at a tip, and a reinforcing rib is provided on an upper part and a vertical portion of the rectangular main pipe, and a hole is formed on a side opposite to the reinforcing rib. The mounting plates provided are integrally formed on the main body of the U-shape, respectively, a shackle is mounted in the hole of the mounting plate, the wire is tied to the shackle, and as the wire goes upward, the high-pressure hose is connected. An internal water jet precedence machine with steel sheet pile joints mounted with mounting brackets at appropriate intervals, and with an adjustment lot mounted on the head at the vertical part of the main pipe.
【請求項2】 鋼矢板の継手部を、予め圧入してある鋼
矢板の継手部へ嵌入しながら地盤内に圧入する際に、継
手部内に高圧水を噴出しながら継手部内の土の剪断抵抗
を少なくし、付着する土を洗浄しながら継手部に進入す
る土石の締固まりを防いで摩擦抵抗を少なくし、スム−
ズに圧入作業を行なえることを特徴とする鋼矢板継手部
内水噴射先行機による工法。
2. When a joint portion of a steel sheet pile is press-fitted into the ground while being fitted into a joint portion of a steel sheet pile that has been press-fitted in advance, the shear resistance of soil in the joint portion while blowing out high-pressure water into the joint portion. And reduce frictional resistance by preventing compaction of debris that enters the joint while cleaning the adhering soil, reducing friction
A method using a water jet precedence machine in a steel sheet pile joint, characterized in that press-fitting work can be performed.
JP28602298A 1998-09-22 1998-09-22 Preceding machine for water injection in steel sheet pile joint Expired - Fee Related JP2987141B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28602298A JP2987141B1 (en) 1998-09-22 1998-09-22 Preceding machine for water injection in steel sheet pile joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28602298A JP2987141B1 (en) 1998-09-22 1998-09-22 Preceding machine for water injection in steel sheet pile joint

Publications (2)

Publication Number Publication Date
JP2987141B1 JP2987141B1 (en) 1999-12-06
JP2000096566A true JP2000096566A (en) 2000-04-04

Family

ID=17698975

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28602298A Expired - Fee Related JP2987141B1 (en) 1998-09-22 1998-09-22 Preceding machine for water injection in steel sheet pile joint

Country Status (1)

Country Link
JP (1) JP2987141B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002047646A (en) * 2000-08-02 2002-02-15 Fudo Constr Co Ltd Penetrating method for underground cutoff plate
JP2003055960A (en) * 2001-08-08 2003-02-26 Tenox Corp Consolidation preventive device and consolidation preventive method of soil cement in steel continuous wall member joint part
JP2012172338A (en) * 2011-02-18 2012-09-10 Kubota Corp Joint structure of columnar bodies and washing method of joint part

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5125740B2 (en) * 2008-05-08 2013-01-23 Jfeスチール株式会社 Steel sheet pile placing method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002047646A (en) * 2000-08-02 2002-02-15 Fudo Constr Co Ltd Penetrating method for underground cutoff plate
JP2003055960A (en) * 2001-08-08 2003-02-26 Tenox Corp Consolidation preventive device and consolidation preventive method of soil cement in steel continuous wall member joint part
JP2012172338A (en) * 2011-02-18 2012-09-10 Kubota Corp Joint structure of columnar bodies and washing method of joint part

Also Published As

Publication number Publication date
JP2987141B1 (en) 1999-12-06

Similar Documents

Publication Publication Date Title
JP6093923B2 (en) Steel pipe pile and steel pipe pile construction method
CN109403344A (en) A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method
JP2987141B1 (en) Preceding machine for water injection in steel sheet pile joint
US8596925B2 (en) Method of making a polymer sheet piling wall
KR100907904B1 (en) Movable Temporary Temper Structure
JP2863487B2 (en) Pile pull-out method and device
KR20040004961A (en) Basic pile with a screw
KR100349985B1 (en) Methods and tools for Constructing Reinforcement of Precast Concrete Facing Panel
JP2002021069A (en) Steel pipe setting method in method for constructing cast- in-place steel pipe reinforced concrete pile
JPH07113229A (en) Cast-in-place concrete pile method
CN206052733U (en) A kind of anchor draws inner support combined foundation ditch support structure
KR200291874Y1 (en) Basic pile with a screw
JP3500246B2 (en) Height adjustment bracket and concrete secondary product with height adjustment bracket
JPH073061B2 (en) Pilot pile
US11933014B2 (en) Reticulated driven micropile footing system
JPH09302659A (en) Construction method of drawing high pressure water injection type deformed place pile and device therefor
CN215167926U (en) Tool for preventing scaffold eye from being left on secondary structure masonry
CN219470900U (en) Steel sheet pile
JP2004218827A (en) Reclamation method for existing pipe
JPS6043495B2 (en) How to build a retaining wall
JP4549182B2 (en) Sabo dam and its construction method
JP2005030160A (en) Coil anchor for burying in brittle soil layer part and collapse prevention method in slope collapse prevention construction
JP2005127012A (en) Anchor for retaining earth
JP2565025Y2 (en) Nozzle for high pressure fluid injection used for pile driving method
JPS6335767B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees