DE19740800A1 - Plank introduction device into ground using pile-driver - Google Patents

Plank introduction device into ground using pile-driver

Info

Publication number
DE19740800A1
DE19740800A1 DE1997140800 DE19740800A DE19740800A1 DE 19740800 A1 DE19740800 A1 DE 19740800A1 DE 1997140800 DE1997140800 DE 1997140800 DE 19740800 A DE19740800 A DE 19740800A DE 19740800 A1 DE19740800 A1 DE 19740800A1
Authority
DE
Germany
Prior art keywords
planks
vibration
bentonite suspension
ground
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE1997140800
Other languages
German (de)
Other versions
DE19740800B4 (en
Inventor
Herrmann Maagh
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bilfinger SE
Original Assignee
MAAGH LEITUNGSBAU GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAAGH LEITUNGSBAU GmbH filed Critical MAAGH LEITUNGSBAU GmbH
Priority to DE1997140800 priority Critical patent/DE19740800B4/en
Publication of DE19740800A1 publication Critical patent/DE19740800A1/en
Application granted granted Critical
Publication of DE19740800B4 publication Critical patent/DE19740800B4/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/26Placing by using several means simultaneously
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating

Abstract

The device has a bentonite suspension which is pressed into the earth area with the aid of at least one flushing lance (5) fixed to planks (3a,b) in their lower area. A vibration driver (4) is operated with a constant frequency of 30 to 50 Hz and a permanent advance feed force control. The bentonite suspension after vibration is fixed and forms a compressed structural base (1)

Description

Die Erfindung betrifft ein Verfahren zum Einbringen von Bohlen, insbesondere von Spundbohlen oder Kanaldielen in Erdreich mit Hilfe von Vibrationsbären.The invention relates to a method for introducing Planks, especially sheet piles or duct boards in Soil with the help of vibrating bears.

Das Einbringen von Bohlen, insbesondere von Spundbohlen oder Kanaldielen ins Erdreich, wird für den temporären oder verlorenen Verbau verwendet, um z. B. verbaute Gräben oder Baugrubenumschließungen herzustellen. Der Einsatz dieser Bohlen als konstruktives Element bei Bauwerken, wie z. B. bei Fundamenten und Wänden ist ebenfalls möglich.The installation of planks, especially sheet piles or channel planks in the ground, is used for the temporary or lost shoring used to e.g. B. built trenches or manufacture pit enclosures. The use of these planks as a constructive element Buildings such as B. with foundations and walls also possible.

Verfahren, diese Bohlen durch Vibrationsbären in Erdreich einzubringen, sind z. B. aus BMT 2, April 1995 (Bauverfahrenstechnik) bekannt. Hier kommen Vibrationsbären zum Einsatz, deren Arbeitsfrequenz mit 30 bis 50 Hz weit über den Eigenfrequenzen des normalen Baugrundes liegt und daher ein erschütterungsarmes Arbeiten ermöglichen.Process these planks through vibrating bears in soil bring in, z. B. from BMT 2, April 1995 (Construction process engineering) known. Come here Vibrating bears are used, their working frequency with 30 up to 50 Hz far above the natural frequencies of normal Soil is located and therefore a low vibration Enable work.

Um gerade bei Böden mit großer Lagerungsdichte das Einbringen der Bohlen ins Erdreich zu vereinfachen, werden zur Unterstützung der Rammtätigkeit im wesentlichen zwei Rammhilfen verwendet. Especially for floors with a high storage density To simplify placing the planks in the ground, are used to support ramming in used essentially two ramming aids.  

Hierbei handelt es sich zum einem um eine Spülung mit Wasser und zum anderen um die Anordnung von Entlastungsbohrungen. Beide Methoden sind z. B. aus der Zeitschrift TIEFBAU 3/1995 bekannt.On the one hand, this involves flushing with Water and the other about the arrangement of Relief drilling. Both methods are e.g. B. from the TIEFBAU 3/1995 magazine known.

Bei der bekannten Spülmethode werden an der Spundbohle Spüllanzen angebracht, durch die Wasser am unteren Ende der Bohlen ins Erdreich eingepreßt wird. Der Spüldruck richtet sich hier nach der Bodenbeschaffenheit. Durch diese Aufschwemmung des Bodens am Ende der Bohlen wird eine Baugrundauflockerung erreicht, die es ermöglicht, mit einem geringeren Arbeitsaufwand die Bohlen einzutreiben.In the known flushing method, the sheet pile is used Dishwashing lances attached through the water at the bottom the plank is pressed into the ground. The flush pressure depends on the nature of the soil. By this suspension of the soil will end up on the planks has loosened the ground, which enables the planks with less work to collect.

Bei der Bohrmethode werden Entlastungsbohrungen, deren Durchmesser sich nach der Bodenbeschaffenheit richten, in der Spundwandtrasse niedergebracht, um die angetroffene Lagerungsdichte zu verringern.In the drilling method, relief bores are used Diameters depend on the nature of the soil, in the sheet pile route brought down to the encountered Reduce storage density.

Bei der Wasserspülung hat es sich als nachteilig erwiesen, daß die Bodenauflockerungen nicht wieder nachträglich verdichtet werden können, so daß es bei Belastung des Grundes zum Beispiel zu Setzungen kommen kann, die insbesondere Gebäudeschäden hervorrufen können.When it comes to flushing water, it has proven to be disadvantageous proved that the soil loosening does not reappear can be subsequently compressed so that it is Settling the ground, for example, can lead to subsidence can, which can cause damage to buildings in particular.

Weiterhin ist nachteilig, daß es bei Betrieb eines Hochfrequenzvibrationsbären zu einer Abstrahlung von kinetischer Energie kommt, die zu Schäden an der benachbarten Bausubstanz führt. Ebenfalls wird eine verstärkte Schallabstrahlung beobachtet. Dies umso mehr, da die Bohlen im aufstehenden Zustand wie große schallerzeugende Membranen wirken. Another disadvantage is that it is in operation High frequency vibration bears to an emission of kinetic energy comes, which damages the leads neighboring building fabric. Also one increased sound radiation observed. All the more so because the planks like big when standing up sound-generating membranes work.  

Bei der Verwendung von hochfrequent betriebenen Vibrationsbären hat es sich gezeigt, daß mit zunehmender Eindringtiefe der Bohlen und der damit verbundenen höheren Leistungsaufnahme die Drehzahl unter den Hochfrequenzbereich fallen kann, so daß dies wiederum zu einer unerwünschten Schwingungsausbreitung im Bereich der Eigenfrequenzen des Bauuntergrundes und der Überschreitung vorgegebener Mindestwerte der Schwinggeschwindigkeit führt.When using high-frequency operated Vibration bears have been shown to increase Penetration depth of the planks and the associated planks higher power consumption the speed under the High frequency range can fall, so this in turn an undesirable vibration propagation in the area of Natural frequencies of the building surface and the The specified minimum values of the Vibration speed leads.

Aufgabe der Erfindung ist es, ein Verfahren der eingangs genannten Art derart zu verbessern, daß eine Auflockerung des Baugrundes ausschließlich nur während der Einbringtätigkeit der Bohlen erzeugt wird und die Schall- und Schwingungsemission beim Einsatz von insbesondere hochfrequenten Vibrationsbären über das bekannte Maß hinaus reduziert wird.The object of the invention is a method of the beginning to improve the type mentioned so that loosening of the building ground only during the Loading activity of the planks is generated and the sound and vibration emission when using in particular high-frequency vibrating bears beyond the known measure is also reduced.

Diese Aufgabe wird erfindungsgemäß dadurch gelöst, daß unter gleichzeitiger Verwendung einer thixotropen Bentonit-Suspension als Schmier- und Spülmittel und einem niederfrequent bis hochfrequent betriebenen Vibrationsbär die Bohlen ins Erdreich eingetrieben werden.This object is achieved in that while using a thixotropic Bentonite suspension as a lubricant and detergent and one low-frequency to high-frequency vibrating bear the planks are driven into the ground.

Wegen der thixotropischen Eigenschaften wird die Bentonit-Suspension erst unter mechanischer Beanspruchung, wie sie z. B. beim Einvibrieren der Bohlen auftritt, flüssig und weist dabei, im Vergleich zu Wasser, wesentlich bessere Schmierungseigenschaften auf. Hierdurch wird erreicht, daß die Bohlen mit einem geringeren Arbeitsaufwand in das Erdreich eingebracht werden und der Schwingungsgeschwindigkeitsbeiwert reduziert wird. Because of the thixotropic properties, the Bentonite suspension only under mechanical Stress such as z. B. when vibrating the planks occurs, fluid and thereby, compared to Water, much better lubrication properties. This ensures that the planks with a less work is put into the soil and the vibration velocity coefficient is reduced.  

Darüberhinaus resultiert aus der Schmierung mit der Bentonit-Suspension eine deutliche Verringerung der Abstrahlung kinetischer Energie, wodurch Schäden an der umliegenden Bausubstanz vermieden werden. Die Schallemission wird so ebenfalls verringert.In addition, the lubrication with the Bentonite suspension a significant reduction in Radiation of kinetic energy, causing damage to the surrounding buildings are avoided. The This also reduces noise emissions.

Weiterhin ergibt sich durch die Thixotropie der Bentonit- Suspension, daß sich diese im Ruhezustand wieder verfestigt und sich so nach dem Einbringen der Bohlen, oder aber auch nach dem Ziehen der Bohlen mit diesem Verfahren ein optimaler und belastbarer Bauuntergrund vorliegt.Furthermore, the thixotropy of bentonite Suspension that this is at rest again solidified and so after the planks were brought in, or even after pulling the planks with it Process an optimal and resilient building surface is present.

Es ist von Vorteil, wenn die Bentonit-Suspension mit Hilfe wenigstens einer an den Bohlen befestigten Spüllanze im unteren Bereich der Bohlen in das Erdreich eingepreßt wird, da in diesem Fall die Suspension nicht nur den Boden im Fußbereich der Bohlen auflockert, sondern auch von dort aus zur Oberfläche des Baugrundes strömt und so auch noch die Mantelreibung zwischen der Bohle und dem Erdreich herabsetzt.It is advantageous if the bentonite suspension is used Help at least one attached to the planks Flush lance in the lower part of the planks in the ground is pressed, since in this case the suspension is not only loosens the floor in the foot area of the planks, but also from there to the surface of the building ground flows and so does the skin friction between the Screed and the soil.

Hierfür ist es von besonderem Vorteil, wenn die thixotrope Bentonit-Suspension verpreßfähig und insbesondere ohne Klumpenbildung aufbereitet wird, so daß die Spüllanzen für die Bentonitschmierung mittels eines Pumpaggregats permanent beaufschlagt werden können, um die Suspension mit bis zu 250 bar Druck, d. h. insbesondere mit hohem Druck bei geringem Durchfluß oder aber mit geringem Druck bei hohem Durchfluß während des Vibrationsvorgangs in das Erdreich einzupressen.For this it is particularly advantageous if the thixotropic bentonite suspension compressible and is processed in particular without lump formation, so that the flushing lances for the bentonite lubrication by means of a Pump unit can be permanently applied to the suspension with up to 250 bar pressure, d. H. especially with high pressure with low flow or but with low pressure and high flow during the Press vibration process into the ground.

Als ebenfalls vorteilhaft hat es sich erwiesen, wenn vor dem Einbringen der Bohlen der Baugrund mit Bohrungen versehen wird, deren Durchmesser sich nach der Bodenbeschaffenheit richtet. Die Position der Bohrungen ergibt sich durch die Art der verwendeten Spundbohlenprofile, so daß insbesondere im Bereich der Schlösser zweier Bohlen eine leichtere Bodenverdrängung erreicht wird.It has also proven to be advantageous if before the installation of the planks of the building ground with holes  is provided, the diameter of which varies according to the Soil quality. The position of the holes results from the type of used Sheet pile profiles, so that especially in the area of Locks of two planks make displacement easier is achieved.

Von Vorteil zeigt sich bei diesem Verfahren, daß die Steuerung der Vorschubkraft am Vibrationsbär nachgeschaltet wird, wodurch gewährleistet ist, daß das Einvibrieren der Bohlen während der gesamten Betriebsdauer und unabhängig von der Eindringtiefe der Bohlen mit einer konstanten Frequenz von insbesondere 40 Hz erfolgt. Hierdurch wird sichergestellt, daß der Vibrationsbär immer in hinreichend großen Abstand vom Eigenfrequenzbereich des Bodens und der benachbarten Bebauung von etwa 18 Hz arbeitet.An advantage of this process is that the Control of the feed force on the vibrating bear is connected downstream, which ensures that the Vibrate the planks throughout Operating time and regardless of the penetration depth of the Screeds with a constant frequency of 40 in particular Hz takes place. This ensures that the Vibration bear always at a sufficient distance from the Natural frequency range of the floor and the neighboring ones Development of about 18 Hz works.

Bei dem hier vorgestellten Verfahren kann vorteilhafterweise auch während des Einvibrierens der Bohlen fortwährend an mehreren Meßstellen rechnergesteuert die Emission der Schwingungen anhand mehrerer Parameter kontrolliert und graphisch ausgewertet werden. Somit wird gewährleistet, daß vorgebene Grenzwerte der Schwinggeschwindigkeit und Schallemission nicht überschritten werden.With the method presented here can advantageously also during the vibration of the Screeds continuously at several measuring points computer-controlled the emission of the vibrations several parameters checked and evaluated graphically become. This ensures that the specified Limits of vibration speed and noise emission not be exceeded.

Bei dem erfindungsgemäßen Verfahren zeigte sich, daß die Schwingungs- und Schallemission gegenüber herkömmlichen Verfahren um einen Faktor in der Größe von mindestens 2 bis 10 unterschritten wird.In the process according to the invention it was found that the Vibration and noise emissions compared to conventional ones Process by a factor of at least 2 to fall below 10.

Ein Ausführungsbeispiel des erfindungsgemäßen Verfahrens ist in der anhängenden Zeichnung schematisch dargestellt und wird im folgenden näher beschrieben.An embodiment of the method according to the invention is shown schematically in the accompanying drawing and is described in more detail below.

An der Stelle des Baugrundes mit der Oberfläche 1, wo eine Spundwand gesetzt werden soll, werden zunächst mit einer Bohrschnecke 2 an den Orten senkrechte Bohrungen mit einem Durchmesser von 150 bis 400 mm, insbesondere von 250 mm eingebracht, wo sich bei der späteren Spundwand die Verbindungsschlösser der einzelnen Spundwandelemente 3a befinden.At the location of the subsoil with the surface 1 , where a sheet pile wall is to be placed, vertical bores with a diameter of 150 to 400 mm, in particular of 250 mm, are first made with a auger 2 at the locations, where the later sheet pile wall connection locks the individual sheet pile wall elements 3a are.

An dem Spundwandelement 3a wird mittig eine Spüllanze 5 angebracht, die mit ihrer Düsenöffnung 6 am unteren Ende des Wandelements 3a befestigt wird. Die Spüllanze 5 wird sodann mittels einer hydrostatischen Pumpe 8 durch die Verbindungsleitung 7 mit der Bentonit-Suspension beaufschlagt, die zuvor klumpenfrei und verpreßfähig durch einen Zementagitator und ein Mischaggregat aufbereitet wurde.A flushing lance 5 is centrally attached to the sheet pile element 3 a, which is fastened with its nozzle opening 6 at the lower end of the wall element 3 a. The flushing lance 5 is then acted upon by means of a hydrostatic pump 8 through the connecting line 7 with the bentonite suspension, which was previously prepared in a lump-free and compressible manner by a cement agitator and a mixing unit.

Die Pumpe 8 erzeugt einen Druck von bis zu 250 bar, der jedoch aufgrund von Reibungsverlusten in der Verbindungsleitung 7 an der Düsenöffnung auf etwa 20-50 bar abgefallen ist.The pump 8 generates a pressure of up to 250 bar, which, however, has dropped to approximately 20-50 bar due to friction losses in the connecting line 7 at the nozzle opening.

Unter Einsatz der Bentonit-Spülung wird nun das Spundwandelement 3a mit Hilfe eines vorschubgeregelten Vibrationsbären 4 mit einer Frequenz von 30 bis 50 hz, vorzugsweise mit 40 Hz senkrecht in den Baugrund einvibriert, wobei die Schwingungs- und Schallemission rechnerunterstützt fortwährend kontrolliert und gesteuert wird. Using the bentonite mud is now the sheet pile element 3a by means of a feed-controlled vibration bears 4 hz with a frequency of 30 to 50, preferably vibrated at 40 Hz vertically into the ground, the vibration and acoustic emission computer assistance is continuously monitored and controlled.

Von dem nun einvibrierten Spundwandelement 3b wird die Spüllanze 5 entfernt, so daß diese zum Einbringen des nächsten Elementes wieder zu Verfügung steht.The flushing lance 5 is removed from the now vibrated sheet pile element 3 b, so that it is available again for introducing the next element.

Claims (7)

1. Verfahren zum Einbringen von Bohlen, insbesondere von Spundbohlen oder Kanaldielen ins Erdreich mit Hilfe eines Vibrationsbären, dadurch gekennzeichnet, daß unter gleichzeitiger Verwendung einer thixotropen Bentonit- Suspension als Schmier- und Spülmittel und einem niederfrequent bis hochfrequent betriebenen Vibrationsbär (4) die Bohlen (3a, b) ins Erdreich (1) eingetrieben werden.1. A method for the introduction of planks, in particular sheet piles or duct boards into the ground with the help of a vibrating bear, characterized in that the planks ( 4 ) the planks (simultaneously) using a thixotropic bentonite suspension as a lubricant and detergent and a low-frequency to high-frequency vibrating bear ( 4 ) 3 a, b) are driven into the ground ( 1 ). 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Bentonit-Suspension mit Hilfe wenigstens einer an den Bohlen (3a, b) befestigten Spüllanze (5) im unteren Bereich der Bohlen (3a, b) in das Erdreich (1) eingepreßt wird.2. The method according to claim 1, characterized in that the bentonite suspension with the aid of at least one flushing lance ( 5 ) attached to the planks ( 3 a, b) in the lower region of the planks ( 3 a, b) into the soil ( 1 ) is pressed. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß Bohrungen mit Durchmessern von 150-400 mm vor dem Einbringen der Bohlen (3a, b) zur Entspannung des Erdreichs (1) gesetzt werden. 3. The method according to claim 1 or 2, characterized in that holes with diameters of 150-400 mm are placed before the introduction of the planks ( 3 a, b) to relax the soil ( 1 ). 4. Verfahren nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, daß der Vibrationsbär (4) mit einer konstanten Frequenz von 30 bis 50 Hz und einer permanenten Vorschubkraftsteuerung betrieben wird.4. The method according to any one of the preceding claims, characterized in that the vibration bear ( 4 ) is operated at a constant frequency of 30 to 50 Hz and a permanent feed force control. 5. Verfahren nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, daß die Bentonit-Suspension verpreßfähig und ohne Klumpenbildung aufbereitet wird.5. The method according to any one of the preceding claims, characterized in that the Bentonite suspension compressible and without lump formation is processed. 6. Verfahren nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, daß die Bohlen (3a, b) durch die thixotrope Eigenschaft der Bentonit-Suspension in Verbindung mit der hochfrequenten Schwingung des Vibrationsbären (4) und einer permanenten rechnergesteuerten Kontrolle der emittierten Schwingungen über Dauermeßstellen erschütterungsarm ins Erdreich (1) eingebracht werden.6. The method according to any one of the preceding claims, characterized in that the planks ( 3 a, b) by the thixotropic property of the bentonite suspension in conjunction with the high-frequency vibration of the vibrating bear ( 4 ) and permanent computer-controlled control of the emitted vibrations via continuous measuring points can be introduced into the soil ( 1 ) with low vibration. 7. Verfahren nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, daß sich die Bentonit-Suspension nach dem Vibrieren verfestigt und einen verdichteten Baugrund (1) bildet.7. The method according to any one of the preceding claims, characterized in that the bentonite suspension solidifies after vibrating and forms a compacted subsoil ( 1 ).
DE1997140800 1997-09-17 1997-09-17 Method of placing planks in soil Expired - Fee Related DE19740800B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1997140800 DE19740800B4 (en) 1997-09-17 1997-09-17 Method of placing planks in soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1997140800 DE19740800B4 (en) 1997-09-17 1997-09-17 Method of placing planks in soil

Publications (2)

Publication Number Publication Date
DE19740800A1 true DE19740800A1 (en) 1999-03-18
DE19740800B4 DE19740800B4 (en) 2006-10-26

Family

ID=7842581

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1997140800 Expired - Fee Related DE19740800B4 (en) 1997-09-17 1997-09-17 Method of placing planks in soil

Country Status (1)

Country Link
DE (1) DE19740800B4 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1012243C2 (en) * 1999-06-04 2000-12-12 Voorbij Groep Bv Method and device for manufacturing a pile in the ground.
NL2003982C2 (en) * 2009-12-18 2011-06-21 Konink Bam Groep Nv METHOD AND FOUNDATION INSTALLATION FOR THE FOUNDATION OF A FOUNDATION POLE.
WO2020207651A1 (en) * 2019-04-12 2020-10-15 Innogy Se Coating for a foundation

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006060643B4 (en) * 2006-12-21 2008-09-18 Technische Universität Hamburg-Harburg Method and arrangement for introducing elongate profiles into a ground

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2236901A1 (en) * 1971-08-04 1973-02-22 Rella & Co Bauges DEVICE FOR THE PRODUCTION OF CONCRETE POST OR NARROW WALLS
US3973408A (en) * 1975-04-07 1976-08-10 Paverman Grisha H Construction of underground dams and equipment therefor
AT346776B (en) * 1973-03-10 1978-11-27 Klammt Kg Baugesellschaft METHOD AND DEVICE FOR DRIVING IN SHEET PILES, PILES, AND THE LIKE. IN THE GROUND
DE69109663T2 (en) * 1991-05-14 1995-09-07 Sol Comp Du Method and device for making thin walls in the floor.

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2236901A1 (en) * 1971-08-04 1973-02-22 Rella & Co Bauges DEVICE FOR THE PRODUCTION OF CONCRETE POST OR NARROW WALLS
AT346776B (en) * 1973-03-10 1978-11-27 Klammt Kg Baugesellschaft METHOD AND DEVICE FOR DRIVING IN SHEET PILES, PILES, AND THE LIKE. IN THE GROUND
US3973408A (en) * 1975-04-07 1976-08-10 Paverman Grisha H Construction of underground dams and equipment therefor
DE69109663T2 (en) * 1991-05-14 1995-09-07 Sol Comp Du Method and device for making thin walls in the floor.

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1012243C2 (en) * 1999-06-04 2000-12-12 Voorbij Groep Bv Method and device for manufacturing a pile in the ground.
WO2000075436A1 (en) * 1999-06-04 2000-12-14 Voorbij Groep B.V. Process and device for producing a pile in the earth
US6663321B1 (en) * 1999-06-04 2003-12-16 Voorbij Groep B.V. Process and device for producing a pile in the earth
NL2003982C2 (en) * 2009-12-18 2011-06-21 Konink Bam Groep Nv METHOD AND FOUNDATION INSTALLATION FOR THE FOUNDATION OF A FOUNDATION POLE.
WO2020207651A1 (en) * 2019-04-12 2020-10-15 Innogy Se Coating for a foundation
JP7404391B2 (en) 2019-04-12 2023-12-25 エル・ヴェー・エー リニューワブルズ ゲゼルシャフト ミット ベシュレンクテル ハフツング cladding for foundations

Also Published As

Publication number Publication date
DE19740800B4 (en) 2006-10-26

Similar Documents

Publication Publication Date Title
EP3927899B1 (en) Vibratory driving of foundations
WO2014095767A1 (en) Device and method for ground compaction and/or ground stabilization
DE102010022661A1 (en) Methods for soil compaction of sands and gravels, involves generating vertical vibration movements of compression tool by vibration device which is fitted on upper end of compression tool
EP3953530A1 (en) Coating for a foundation
DE1292586B (en) Method and device for producing a concrete casing pipe
EP1134319B1 (en) Method and apparatus for obtaining a cast in situ concrete pile
EP2388377A2 (en) Method and device for manufacturing pipe bedding
DE19740800B4 (en) Method of placing planks in soil
EP0516942B1 (en) Method and device for stabilising friction soils and bordering cohesive soils
DE19941302C2 (en) Device and method for producing support columns sunk into the ground
DE102005008679A1 (en) Pile driving by head-, internal-, or vibration driving of pile tube, employs double-walled pile tube with filling of sand in annulus between walls
DE4409008C2 (en) Depth compressors
EP1553230B1 (en) Method for rehabilitating retaining walls
DE723903C (en) Process for compaction of natural or artificial, water-saturated, loose soil masses
DE4303742C1 (en) Dewatering ground with high water content
EP2511223B1 (en) Method for producing a lifting device in the ground and use of same
AT228865B (en) Method and device for embedding a line, a cable or the like under the terrain or river bed
DE102004013017B4 (en) Device for manufacture of in-situ concrete foundations for overhead line masts, for example, comprises prefabricated shuttering component with outer walls or at least one outer wall having circular openings
DE3511856C2 (en)
DE102005044104B3 (en) Foundation element capping method e.g. for upper end, involves capping upper end of element from concrete with jet arrangement provided which provides, under high pressure rinsing water or water air mixture across nozzle
DE102011111036A1 (en) Method for introducing foundation pipe into seabed during establishment of offshore wind power plant, involves loosening soil using drilling tool with drill rod in foundation pipe through operation of vibrator
DE102013226121B4 (en) Apparatus and method for soil compaction and / or soil compaction
DE2654994A1 (en) Shuttering tube ramming system - in which tube is set on foot with seal, and vibrations are transmitted from top edge
EP1916341A2 (en) Method and device for inserting profiles into the ground
JPS6124718A (en) Ground compacting device

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
8127 New person/name/address of the applicant

Owner name: BILFINGER BERGER AG, 68165 MANNHEIM, DE

8110 Request for examination paragraph 44
8364 No opposition during term of opposition
8320 Willingness to grant licences declared (paragraph 23)
R082 Change of representative

Representative=s name: COHAUSZ HANNIG BORKOWSKI WISSGOTT, DE

Representative=s name: COHAUSZ HANNIG BORKOWSKI WISSGOTT, 40237 DUESSELDO

R081 Change of applicant/patentee

Owner name: BILFINGER BERGER SE, DE

Free format text: FORMER OWNER: BILFINGER BERGER AG, 68165 MANNHEIM, DE

Effective date: 20120229

R082 Change of representative

Representative=s name: COHAUSZ HANNIG BORKOWSKI WISSGOTT, DE

Effective date: 20120229

R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20120403