DE19740800A1 - Plank introduction device into ground using pile-driver - Google Patents
Plank introduction device into ground using pile-driverInfo
- Publication number
- DE19740800A1 DE19740800A1 DE1997140800 DE19740800A DE19740800A1 DE 19740800 A1 DE19740800 A1 DE 19740800A1 DE 1997140800 DE1997140800 DE 1997140800 DE 19740800 A DE19740800 A DE 19740800A DE 19740800 A1 DE19740800 A1 DE 19740800A1
- Authority
- DE
- Germany
- Prior art keywords
- planks
- vibration
- bentonite suspension
- ground
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/18—Placing by vibrating
Abstract
Description
Die Erfindung betrifft ein Verfahren zum Einbringen von Bohlen, insbesondere von Spundbohlen oder Kanaldielen in Erdreich mit Hilfe von Vibrationsbären.The invention relates to a method for introducing Planks, especially sheet piles or duct boards in Soil with the help of vibrating bears.
Das Einbringen von Bohlen, insbesondere von Spundbohlen oder Kanaldielen ins Erdreich, wird für den temporären oder verlorenen Verbau verwendet, um z. B. verbaute Gräben oder Baugrubenumschließungen herzustellen. Der Einsatz dieser Bohlen als konstruktives Element bei Bauwerken, wie z. B. bei Fundamenten und Wänden ist ebenfalls möglich.The installation of planks, especially sheet piles or channel planks in the ground, is used for the temporary or lost shoring used to e.g. B. built trenches or manufacture pit enclosures. The use of these planks as a constructive element Buildings such as B. with foundations and walls also possible.
Verfahren, diese Bohlen durch Vibrationsbären in Erdreich einzubringen, sind z. B. aus BMT 2, April 1995 (Bauverfahrenstechnik) bekannt. Hier kommen Vibrationsbären zum Einsatz, deren Arbeitsfrequenz mit 30 bis 50 Hz weit über den Eigenfrequenzen des normalen Baugrundes liegt und daher ein erschütterungsarmes Arbeiten ermöglichen.Process these planks through vibrating bears in soil bring in, z. B. from BMT 2, April 1995 (Construction process engineering) known. Come here Vibrating bears are used, their working frequency with 30 up to 50 Hz far above the natural frequencies of normal Soil is located and therefore a low vibration Enable work.
Um gerade bei Böden mit großer Lagerungsdichte das Einbringen der Bohlen ins Erdreich zu vereinfachen, werden zur Unterstützung der Rammtätigkeit im wesentlichen zwei Rammhilfen verwendet. Especially for floors with a high storage density To simplify placing the planks in the ground, are used to support ramming in used essentially two ramming aids.
Hierbei handelt es sich zum einem um eine Spülung mit Wasser und zum anderen um die Anordnung von Entlastungsbohrungen. Beide Methoden sind z. B. aus der Zeitschrift TIEFBAU 3/1995 bekannt.On the one hand, this involves flushing with Water and the other about the arrangement of Relief drilling. Both methods are e.g. B. from the TIEFBAU 3/1995 magazine known.
Bei der bekannten Spülmethode werden an der Spundbohle Spüllanzen angebracht, durch die Wasser am unteren Ende der Bohlen ins Erdreich eingepreßt wird. Der Spüldruck richtet sich hier nach der Bodenbeschaffenheit. Durch diese Aufschwemmung des Bodens am Ende der Bohlen wird eine Baugrundauflockerung erreicht, die es ermöglicht, mit einem geringeren Arbeitsaufwand die Bohlen einzutreiben.In the known flushing method, the sheet pile is used Dishwashing lances attached through the water at the bottom the plank is pressed into the ground. The flush pressure depends on the nature of the soil. By this suspension of the soil will end up on the planks has loosened the ground, which enables the planks with less work to collect.
Bei der Bohrmethode werden Entlastungsbohrungen, deren Durchmesser sich nach der Bodenbeschaffenheit richten, in der Spundwandtrasse niedergebracht, um die angetroffene Lagerungsdichte zu verringern.In the drilling method, relief bores are used Diameters depend on the nature of the soil, in the sheet pile route brought down to the encountered Reduce storage density.
Bei der Wasserspülung hat es sich als nachteilig erwiesen, daß die Bodenauflockerungen nicht wieder nachträglich verdichtet werden können, so daß es bei Belastung des Grundes zum Beispiel zu Setzungen kommen kann, die insbesondere Gebäudeschäden hervorrufen können.When it comes to flushing water, it has proven to be disadvantageous proved that the soil loosening does not reappear can be subsequently compressed so that it is Settling the ground, for example, can lead to subsidence can, which can cause damage to buildings in particular.
Weiterhin ist nachteilig, daß es bei Betrieb eines Hochfrequenzvibrationsbären zu einer Abstrahlung von kinetischer Energie kommt, die zu Schäden an der benachbarten Bausubstanz führt. Ebenfalls wird eine verstärkte Schallabstrahlung beobachtet. Dies umso mehr, da die Bohlen im aufstehenden Zustand wie große schallerzeugende Membranen wirken. Another disadvantage is that it is in operation High frequency vibration bears to an emission of kinetic energy comes, which damages the leads neighboring building fabric. Also one increased sound radiation observed. All the more so because the planks like big when standing up sound-generating membranes work.
Bei der Verwendung von hochfrequent betriebenen Vibrationsbären hat es sich gezeigt, daß mit zunehmender Eindringtiefe der Bohlen und der damit verbundenen höheren Leistungsaufnahme die Drehzahl unter den Hochfrequenzbereich fallen kann, so daß dies wiederum zu einer unerwünschten Schwingungsausbreitung im Bereich der Eigenfrequenzen des Bauuntergrundes und der Überschreitung vorgegebener Mindestwerte der Schwinggeschwindigkeit führt.When using high-frequency operated Vibration bears have been shown to increase Penetration depth of the planks and the associated planks higher power consumption the speed under the High frequency range can fall, so this in turn an undesirable vibration propagation in the area of Natural frequencies of the building surface and the The specified minimum values of the Vibration speed leads.
Aufgabe der Erfindung ist es, ein Verfahren der eingangs genannten Art derart zu verbessern, daß eine Auflockerung des Baugrundes ausschließlich nur während der Einbringtätigkeit der Bohlen erzeugt wird und die Schall- und Schwingungsemission beim Einsatz von insbesondere hochfrequenten Vibrationsbären über das bekannte Maß hinaus reduziert wird.The object of the invention is a method of the beginning to improve the type mentioned so that loosening of the building ground only during the Loading activity of the planks is generated and the sound and vibration emission when using in particular high-frequency vibrating bears beyond the known measure is also reduced.
Diese Aufgabe wird erfindungsgemäß dadurch gelöst, daß unter gleichzeitiger Verwendung einer thixotropen Bentonit-Suspension als Schmier- und Spülmittel und einem niederfrequent bis hochfrequent betriebenen Vibrationsbär die Bohlen ins Erdreich eingetrieben werden.This object is achieved in that while using a thixotropic Bentonite suspension as a lubricant and detergent and one low-frequency to high-frequency vibrating bear the planks are driven into the ground.
Wegen der thixotropischen Eigenschaften wird die Bentonit-Suspension erst unter mechanischer Beanspruchung, wie sie z. B. beim Einvibrieren der Bohlen auftritt, flüssig und weist dabei, im Vergleich zu Wasser, wesentlich bessere Schmierungseigenschaften auf. Hierdurch wird erreicht, daß die Bohlen mit einem geringeren Arbeitsaufwand in das Erdreich eingebracht werden und der Schwingungsgeschwindigkeitsbeiwert reduziert wird. Because of the thixotropic properties, the Bentonite suspension only under mechanical Stress such as z. B. when vibrating the planks occurs, fluid and thereby, compared to Water, much better lubrication properties. This ensures that the planks with a less work is put into the soil and the vibration velocity coefficient is reduced.
Darüberhinaus resultiert aus der Schmierung mit der Bentonit-Suspension eine deutliche Verringerung der Abstrahlung kinetischer Energie, wodurch Schäden an der umliegenden Bausubstanz vermieden werden. Die Schallemission wird so ebenfalls verringert.In addition, the lubrication with the Bentonite suspension a significant reduction in Radiation of kinetic energy, causing damage to the surrounding buildings are avoided. The This also reduces noise emissions.
Weiterhin ergibt sich durch die Thixotropie der Bentonit- Suspension, daß sich diese im Ruhezustand wieder verfestigt und sich so nach dem Einbringen der Bohlen, oder aber auch nach dem Ziehen der Bohlen mit diesem Verfahren ein optimaler und belastbarer Bauuntergrund vorliegt.Furthermore, the thixotropy of bentonite Suspension that this is at rest again solidified and so after the planks were brought in, or even after pulling the planks with it Process an optimal and resilient building surface is present.
Es ist von Vorteil, wenn die Bentonit-Suspension mit Hilfe wenigstens einer an den Bohlen befestigten Spüllanze im unteren Bereich der Bohlen in das Erdreich eingepreßt wird, da in diesem Fall die Suspension nicht nur den Boden im Fußbereich der Bohlen auflockert, sondern auch von dort aus zur Oberfläche des Baugrundes strömt und so auch noch die Mantelreibung zwischen der Bohle und dem Erdreich herabsetzt.It is advantageous if the bentonite suspension is used Help at least one attached to the planks Flush lance in the lower part of the planks in the ground is pressed, since in this case the suspension is not only loosens the floor in the foot area of the planks, but also from there to the surface of the building ground flows and so does the skin friction between the Screed and the soil.
Hierfür ist es von besonderem Vorteil, wenn die thixotrope Bentonit-Suspension verpreßfähig und insbesondere ohne Klumpenbildung aufbereitet wird, so daß die Spüllanzen für die Bentonitschmierung mittels eines Pumpaggregats permanent beaufschlagt werden können, um die Suspension mit bis zu 250 bar Druck, d. h. insbesondere mit hohem Druck bei geringem Durchfluß oder aber mit geringem Druck bei hohem Durchfluß während des Vibrationsvorgangs in das Erdreich einzupressen.For this it is particularly advantageous if the thixotropic bentonite suspension compressible and is processed in particular without lump formation, so that the flushing lances for the bentonite lubrication by means of a Pump unit can be permanently applied to the suspension with up to 250 bar pressure, d. H. especially with high pressure with low flow or but with low pressure and high flow during the Press vibration process into the ground.
Als ebenfalls vorteilhaft hat es sich erwiesen, wenn vor dem Einbringen der Bohlen der Baugrund mit Bohrungen versehen wird, deren Durchmesser sich nach der Bodenbeschaffenheit richtet. Die Position der Bohrungen ergibt sich durch die Art der verwendeten Spundbohlenprofile, so daß insbesondere im Bereich der Schlösser zweier Bohlen eine leichtere Bodenverdrängung erreicht wird.It has also proven to be advantageous if before the installation of the planks of the building ground with holes is provided, the diameter of which varies according to the Soil quality. The position of the holes results from the type of used Sheet pile profiles, so that especially in the area of Locks of two planks make displacement easier is achieved.
Von Vorteil zeigt sich bei diesem Verfahren, daß die Steuerung der Vorschubkraft am Vibrationsbär nachgeschaltet wird, wodurch gewährleistet ist, daß das Einvibrieren der Bohlen während der gesamten Betriebsdauer und unabhängig von der Eindringtiefe der Bohlen mit einer konstanten Frequenz von insbesondere 40 Hz erfolgt. Hierdurch wird sichergestellt, daß der Vibrationsbär immer in hinreichend großen Abstand vom Eigenfrequenzbereich des Bodens und der benachbarten Bebauung von etwa 18 Hz arbeitet.An advantage of this process is that the Control of the feed force on the vibrating bear is connected downstream, which ensures that the Vibrate the planks throughout Operating time and regardless of the penetration depth of the Screeds with a constant frequency of 40 in particular Hz takes place. This ensures that the Vibration bear always at a sufficient distance from the Natural frequency range of the floor and the neighboring ones Development of about 18 Hz works.
Bei dem hier vorgestellten Verfahren kann vorteilhafterweise auch während des Einvibrierens der Bohlen fortwährend an mehreren Meßstellen rechnergesteuert die Emission der Schwingungen anhand mehrerer Parameter kontrolliert und graphisch ausgewertet werden. Somit wird gewährleistet, daß vorgebene Grenzwerte der Schwinggeschwindigkeit und Schallemission nicht überschritten werden.With the method presented here can advantageously also during the vibration of the Screeds continuously at several measuring points computer-controlled the emission of the vibrations several parameters checked and evaluated graphically become. This ensures that the specified Limits of vibration speed and noise emission not be exceeded.
Bei dem erfindungsgemäßen Verfahren zeigte sich, daß die Schwingungs- und Schallemission gegenüber herkömmlichen Verfahren um einen Faktor in der Größe von mindestens 2 bis 10 unterschritten wird.In the process according to the invention it was found that the Vibration and noise emissions compared to conventional ones Process by a factor of at least 2 to fall below 10.
Ein Ausführungsbeispiel des erfindungsgemäßen Verfahrens ist in der anhängenden Zeichnung schematisch dargestellt und wird im folgenden näher beschrieben.An embodiment of the method according to the invention is shown schematically in the accompanying drawing and is described in more detail below.
An der Stelle des Baugrundes mit der Oberfläche 1, wo eine Spundwand gesetzt werden soll, werden zunächst mit einer Bohrschnecke 2 an den Orten senkrechte Bohrungen mit einem Durchmesser von 150 bis 400 mm, insbesondere von 250 mm eingebracht, wo sich bei der späteren Spundwand die Verbindungsschlösser der einzelnen Spundwandelemente 3a befinden.At the location of the subsoil with the surface 1 , where a sheet pile wall is to be placed, vertical bores with a diameter of 150 to 400 mm, in particular of 250 mm, are first made with a auger 2 at the locations, where the later sheet pile wall connection locks the individual sheet pile wall elements 3a are.
An dem Spundwandelement 3a wird mittig eine Spüllanze 5 angebracht, die mit ihrer Düsenöffnung 6 am unteren Ende des Wandelements 3a befestigt wird. Die Spüllanze 5 wird sodann mittels einer hydrostatischen Pumpe 8 durch die Verbindungsleitung 7 mit der Bentonit-Suspension beaufschlagt, die zuvor klumpenfrei und verpreßfähig durch einen Zementagitator und ein Mischaggregat aufbereitet wurde.A flushing lance 5 is centrally attached to the sheet pile element 3 a, which is fastened with its nozzle opening 6 at the lower end of the wall element 3 a. The flushing lance 5 is then acted upon by means of a hydrostatic pump 8 through the connecting line 7 with the bentonite suspension, which was previously prepared in a lump-free and compressible manner by a cement agitator and a mixing unit.
Die Pumpe 8 erzeugt einen Druck von bis zu 250 bar, der jedoch aufgrund von Reibungsverlusten in der Verbindungsleitung 7 an der Düsenöffnung auf etwa 20-50 bar abgefallen ist.The pump 8 generates a pressure of up to 250 bar, which, however, has dropped to approximately 20-50 bar due to friction losses in the connecting line 7 at the nozzle opening.
Unter Einsatz der Bentonit-Spülung wird nun das Spundwandelement 3a mit Hilfe eines vorschubgeregelten Vibrationsbären 4 mit einer Frequenz von 30 bis 50 hz, vorzugsweise mit 40 Hz senkrecht in den Baugrund einvibriert, wobei die Schwingungs- und Schallemission rechnerunterstützt fortwährend kontrolliert und gesteuert wird. Using the bentonite mud is now the sheet pile element 3a by means of a feed-controlled vibration bears 4 hz with a frequency of 30 to 50, preferably vibrated at 40 Hz vertically into the ground, the vibration and acoustic emission computer assistance is continuously monitored and controlled.
Von dem nun einvibrierten Spundwandelement 3b wird die Spüllanze 5 entfernt, so daß diese zum Einbringen des nächsten Elementes wieder zu Verfügung steht.The flushing lance 5 is removed from the now vibrated sheet pile element 3 b, so that it is available again for introducing the next element.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1997140800 DE19740800B4 (en) | 1997-09-17 | 1997-09-17 | Method of placing planks in soil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1997140800 DE19740800B4 (en) | 1997-09-17 | 1997-09-17 | Method of placing planks in soil |
Publications (2)
Publication Number | Publication Date |
---|---|
DE19740800A1 true DE19740800A1 (en) | 1999-03-18 |
DE19740800B4 DE19740800B4 (en) | 2006-10-26 |
Family
ID=7842581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1997140800 Expired - Fee Related DE19740800B4 (en) | 1997-09-17 | 1997-09-17 | Method of placing planks in soil |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE19740800B4 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1012243C2 (en) * | 1999-06-04 | 2000-12-12 | Voorbij Groep Bv | Method and device for manufacturing a pile in the ground. |
NL2003982C2 (en) * | 2009-12-18 | 2011-06-21 | Konink Bam Groep Nv | METHOD AND FOUNDATION INSTALLATION FOR THE FOUNDATION OF A FOUNDATION POLE. |
WO2020207651A1 (en) * | 2019-04-12 | 2020-10-15 | Innogy Se | Coating for a foundation |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006060643B4 (en) * | 2006-12-21 | 2008-09-18 | Technische Universität Hamburg-Harburg | Method and arrangement for introducing elongate profiles into a ground |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2236901A1 (en) * | 1971-08-04 | 1973-02-22 | Rella & Co Bauges | DEVICE FOR THE PRODUCTION OF CONCRETE POST OR NARROW WALLS |
US3973408A (en) * | 1975-04-07 | 1976-08-10 | Paverman Grisha H | Construction of underground dams and equipment therefor |
AT346776B (en) * | 1973-03-10 | 1978-11-27 | Klammt Kg Baugesellschaft | METHOD AND DEVICE FOR DRIVING IN SHEET PILES, PILES, AND THE LIKE. IN THE GROUND |
DE69109663T2 (en) * | 1991-05-14 | 1995-09-07 | Sol Comp Du | Method and device for making thin walls in the floor. |
-
1997
- 1997-09-17 DE DE1997140800 patent/DE19740800B4/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2236901A1 (en) * | 1971-08-04 | 1973-02-22 | Rella & Co Bauges | DEVICE FOR THE PRODUCTION OF CONCRETE POST OR NARROW WALLS |
AT346776B (en) * | 1973-03-10 | 1978-11-27 | Klammt Kg Baugesellschaft | METHOD AND DEVICE FOR DRIVING IN SHEET PILES, PILES, AND THE LIKE. IN THE GROUND |
US3973408A (en) * | 1975-04-07 | 1976-08-10 | Paverman Grisha H | Construction of underground dams and equipment therefor |
DE69109663T2 (en) * | 1991-05-14 | 1995-09-07 | Sol Comp Du | Method and device for making thin walls in the floor. |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1012243C2 (en) * | 1999-06-04 | 2000-12-12 | Voorbij Groep Bv | Method and device for manufacturing a pile in the ground. |
WO2000075436A1 (en) * | 1999-06-04 | 2000-12-14 | Voorbij Groep B.V. | Process and device for producing a pile in the earth |
US6663321B1 (en) * | 1999-06-04 | 2003-12-16 | Voorbij Groep B.V. | Process and device for producing a pile in the earth |
NL2003982C2 (en) * | 2009-12-18 | 2011-06-21 | Konink Bam Groep Nv | METHOD AND FOUNDATION INSTALLATION FOR THE FOUNDATION OF A FOUNDATION POLE. |
WO2020207651A1 (en) * | 2019-04-12 | 2020-10-15 | Innogy Se | Coating for a foundation |
JP7404391B2 (en) | 2019-04-12 | 2023-12-25 | エル・ヴェー・エー リニューワブルズ ゲゼルシャフト ミット ベシュレンクテル ハフツング | cladding for foundations |
Also Published As
Publication number | Publication date |
---|---|
DE19740800B4 (en) | 2006-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3927899B1 (en) | Vibratory driving of foundations | |
WO2014095767A1 (en) | Device and method for ground compaction and/or ground stabilization | |
DE102010022661A1 (en) | Methods for soil compaction of sands and gravels, involves generating vertical vibration movements of compression tool by vibration device which is fitted on upper end of compression tool | |
EP3953530A1 (en) | Coating for a foundation | |
DE1292586B (en) | Method and device for producing a concrete casing pipe | |
EP1134319B1 (en) | Method and apparatus for obtaining a cast in situ concrete pile | |
EP2388377A2 (en) | Method and device for manufacturing pipe bedding | |
DE19740800B4 (en) | Method of placing planks in soil | |
EP0516942B1 (en) | Method and device for stabilising friction soils and bordering cohesive soils | |
DE19941302C2 (en) | Device and method for producing support columns sunk into the ground | |
DE102005008679A1 (en) | Pile driving by head-, internal-, or vibration driving of pile tube, employs double-walled pile tube with filling of sand in annulus between walls | |
DE4409008C2 (en) | Depth compressors | |
EP1553230B1 (en) | Method for rehabilitating retaining walls | |
DE723903C (en) | Process for compaction of natural or artificial, water-saturated, loose soil masses | |
DE4303742C1 (en) | Dewatering ground with high water content | |
EP2511223B1 (en) | Method for producing a lifting device in the ground and use of same | |
AT228865B (en) | Method and device for embedding a line, a cable or the like under the terrain or river bed | |
DE102004013017B4 (en) | Device for manufacture of in-situ concrete foundations for overhead line masts, for example, comprises prefabricated shuttering component with outer walls or at least one outer wall having circular openings | |
DE3511856C2 (en) | ||
DE102005044104B3 (en) | Foundation element capping method e.g. for upper end, involves capping upper end of element from concrete with jet arrangement provided which provides, under high pressure rinsing water or water air mixture across nozzle | |
DE102011111036A1 (en) | Method for introducing foundation pipe into seabed during establishment of offshore wind power plant, involves loosening soil using drilling tool with drill rod in foundation pipe through operation of vibrator | |
DE102013226121B4 (en) | Apparatus and method for soil compaction and / or soil compaction | |
DE2654994A1 (en) | Shuttering tube ramming system - in which tube is set on foot with seal, and vibrations are transmitted from top edge | |
EP1916341A2 (en) | Method and device for inserting profiles into the ground | |
JPS6124718A (en) | Ground compacting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
8127 | New person/name/address of the applicant |
Owner name: BILFINGER BERGER AG, 68165 MANNHEIM, DE |
|
8110 | Request for examination paragraph 44 | ||
8364 | No opposition during term of opposition | ||
8320 | Willingness to grant licences declared (paragraph 23) | ||
R082 | Change of representative |
Representative=s name: COHAUSZ HANNIG BORKOWSKI WISSGOTT, DE Representative=s name: COHAUSZ HANNIG BORKOWSKI WISSGOTT, 40237 DUESSELDO |
|
R081 | Change of applicant/patentee |
Owner name: BILFINGER BERGER SE, DE Free format text: FORMER OWNER: BILFINGER BERGER AG, 68165 MANNHEIM, DE Effective date: 20120229 |
|
R082 | Change of representative |
Representative=s name: COHAUSZ HANNIG BORKOWSKI WISSGOTT, DE Effective date: 20120229 |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |
Effective date: 20120403 |