JP2975297B2 - Casting block for construction work and steel tower temporary construction method using this block - Google Patents

Casting block for construction work and steel tower temporary construction method using this block

Info

Publication number
JP2975297B2
JP2975297B2 JP7296111A JP29611195A JP2975297B2 JP 2975297 B2 JP2975297 B2 JP 2975297B2 JP 7296111 A JP7296111 A JP 7296111A JP 29611195 A JP29611195 A JP 29611195A JP 2975297 B2 JP2975297 B2 JP 2975297B2
Authority
JP
Japan
Prior art keywords
block
casting
construction work
construction
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7296111A
Other languages
Japanese (ja)
Other versions
JPH09111775A (en
Inventor
晄 望月
友道 矢崎
勝則 川口
孝 土屋
武尚 小芦
湧司郎 原田
良雄 伊藤
幹郎 武元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Koei Co Ltd
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Nippon Koei Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc, Nippon Koei Co Ltd filed Critical Tokyo Electric Power Co Inc
Priority to JP7296111A priority Critical patent/JP2975297B2/en
Publication of JPH09111775A publication Critical patent/JPH09111775A/en
Application granted granted Critical
Publication of JP2975297B2 publication Critical patent/JP2975297B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、仮鉄塔、足場鉄塔基礎
などに用いられる建設工事用鋳物ブロックとこの建設工
事用鋳物ブロックを用いた鉄塔仮設工法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a casting block for construction work used for foundations of temporary towers, scaffolding towers, and the like, and to a temporary construction method of a steel tower using the casting block for construction work.

【0002】[0002]

【従来の技術】従来、仮鉄塔、足場鉄塔基礎として、コ
ンクリートを使用した逆T字型独立基礎であるI型、4
脚の床板部を一体化したIV型、それにPC鋼棒で緊張
したPC基礎などが用いられ、また、支線根枷基礎とし
てコンクリートブロックが多く用いられている。
2. Description of the Related Art Conventionally, as a foundation of a temporary tower and a scaffolding tower, an inverted T-shaped independent foundation using concrete, i-type,
An IV type having an integrated floor plate portion of a leg, a PC foundation tensioned with a PC steel rod, and the like are used, and a concrete block is often used as a branch line anchoring foundation.

【0003】たとえば、縦、横、高さがそれぞれ数メー
トルの鋼製枠からなるブロック収納ケースを作り、必要
な個数のコンクリートブロックをその中に入れ、電線流
し留め用アンカーブロックとしたり、支線アンカーブロ
ックに用いたりしていた。
[0003] For example, a block storage case made of a steel frame having a length, width and height of several meters each is made, and a required number of concrete blocks are put therein to make an anchor block for draining electric wires, or a branch line anchor. Used for blocks.

【0004】また、図10に示すように、仮鉄塔、足場
鉄塔基礎として、IV型コンクリート基礎工法では、地
盤11を十分深く掘削し、鉄筋補強のコンクリート基礎
32を据付け、仮鉄塔33を結合し、鉄筋補強のコンク
リート基礎32とその上から埋め戻し土12で耐引き揚
げ支持力Tを得るようにしたものである。鉄塔撤去時の
コンクリート基礎32の破壊を容易にするため、鉄筋の
代用としてPC鋼棒を使用し、解体時にPCを抜き取
り、静的破砕剤でコンクリートを破壊する、いわゆるI
V型PC工法が採用されることもある。
[0004] As shown in FIG. 10, in the IV-type concrete foundation method, a ground 11 is dug sufficiently deep, a concrete foundation 32 reinforced with reinforcing steel is installed, and a temporary iron tower 33 is connected. In this case, a withstand pulling support force T is obtained by a concrete foundation 32 reinforced with reinforcing steel and backfill soil 12 from above. In order to facilitate the destruction of the concrete foundation 32 when the steel tower is removed, a PC steel rod is used as a substitute for a reinforcing bar, PC is removed at the time of dismantling, and concrete is destroyed with a static crushing agent.
The V-type PC method may be adopted.

【0005】[0005]

【発明が解決しようとする課題】ブロック収納ケースの
中に、必要な個数のコンクリートブロックを入れ、電線
流し留め用アンカーブロックや支線アンカーブロックと
する方法では、コンクリートブロックの比重が比較的小
さいために、必要な荷重を得るにはかなり多くの個数を
必要とするだけでなく、全体が嵩張るため、作業性が悪
く、また、積込や解体時にコンクリートブロックが壊れ
易いなどの問題があった。
In a method in which a required number of concrete blocks are put in a block storage case to form an anchor block for wire drainage or a branch anchor block, the specific gravity of the concrete block is relatively small. In addition, not only a considerable number is required to obtain the required load, but also the whole is bulky, so that the workability is poor and the concrete block is easily broken at the time of loading or dismantling.

【0006】図3(a)に示すように、地盤11に埋設
した既設コンクリート構造物10に、所定の引き揚げ支
持力Tを持たせようとする場合とか、図3(b)に示す
ように、切り土13による不足土量14に起因する既設
コンクリート構造物10に対する支持力不足を補うよう
な場合に、コンクリートブロックを使用しても、埋め戻
し土12との比重がそれほど違いがなく十分な耐引き揚
げ支持力が得られないという問題があった。
As shown in FIG. 3 (a), there is a case where an existing concrete structure 10 buried in the ground 11 is to have a predetermined lifting support force T, or as shown in FIG. 3 (b). Even when a concrete block is used, the specific gravity with the backfill soil 12 is not so different from the backfill soil 12 even when the insufficient support capacity for the existing concrete structure 10 due to the insufficient soil amount 14 due to the cut soil 13 is used, and sufficient durability is provided. There was a problem that the lifting support force could not be obtained.

【0007】図10に示すように、IV型コンクリート
基礎工法では、工法や構造が永久構造物とほとんど変わ
りがなく、地盤11の掘削作業、仮鉄塔建設工事、埋め
戻し土12の埋め戻し作業などが面倒であるばかりか、
撤去時のコンクリート基礎32の解体時に大きな騒音と
振動が発生し、しかも、コンクリートを破壊した後の廃
棄物処理に苦労している。いわゆるIV型PC工法を採
用すると、コンクリート破壊時の騒音と振動がほとんど
感じない程度であり、その点では評価されるが、依然と
して廃棄物処理に苦労し、また、ジャッキによるPC鋼
棒の緊張作業が、組立て時と解体時の2回必要とし、工
事費用が高くなるなどの問題があった。
As shown in FIG. 10, in the IV type concrete foundation method, the construction method and structure are almost the same as those of the permanent structure, and the excavation work of the ground 11, the construction of the temporary tower, the backfill work of the backfill soil 12, etc. Is not only troublesome,
Loud noise and vibration are generated when the concrete foundation 32 is dismantled at the time of removal, and furthermore, it is difficult to dispose of the waste after destroying the concrete. When the so-called IV-type PC method is adopted, the noise and vibration at the time of concrete destruction are hardly felt, and it is evaluated in that respect. However, it is still difficult to dispose of the waste, and the jacking work of the PC steel rod by the jack is performed. However, there are problems such as the necessity of twice assembling and disassembling, which increases construction costs.

【0008】本発明は、廃棄物の廃棄処理がなく、しか
も簡単で、安全性も十分な工法を得るための建設工事用
鋳物ブロックとこのブロックを用いた鉄塔仮設工法を提
供することを目的とするものである。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a casting block for construction work and a method for temporarily installing a steel tower using this block in order to obtain a construction method which does not require waste disposal, is simple, and has sufficient safety. Is what you do.

【0009】[0009]

【課題を解決するための手段】本発明は、略正多角形
で、所定の厚さを有する立体の鋳物からなり、辺部に、
運搬用凹部15と嵌合凹部18と嵌合凸部19とを有
し、隣同士のブロック8の嵌合凹部18と嵌合凸部19
とを互いに嵌合して並べるようにしたことを特徴とする
建設工事用鋳物ブロックであり、また、本発明による鉄
塔仮設は、建設地を掘削し、整地する工程と、整地した
地盤に、床板材38をその上面が全体的に水平になるよ
うに取り付ける工程と、前記床板材38の上に、脚取付
け材40を有する脚取付け梁39を取り付ける工程と、
前記床板材38の上に、建設工事用鋳物ブロック8を順
次嵌合しつつ並べ、かつ必要個所には、複数段重ねる工
程と、前記脚取付け材40に仮鉄塔33を取り付ける工
程とからなる工法である。
SUMMARY OF THE INVENTION The present invention comprises a three-dimensional casting having a substantially regular polygon and a predetermined thickness.
It has a concave portion 15 for transportation, a fitting concave portion 18 and a fitting convex portion 19, and the fitting concave portion 18 and the fitting convex portion 19 of the adjacent blocks 8.
And a casting block for construction work characterized in that they are fitted to each other and arranged side by side, and the steel tower temporary construction according to the present invention is a step of digging a construction site and leveling the ground, Attaching the plate member 38 so that the upper surface thereof is generally horizontal, attaching a leg attachment beam 39 having a leg attachment member 40 on the floor plate member 38,
A construction method comprising a step of sequentially fitting the casting blocks 8 for construction work on the floor plate 38 while fitting them together, and stacking a plurality of steps where necessary, and a step of attaching the temporary tower 33 to the leg attachment member 40. It is.

【0010】[0010]

【作用】必要な個数の建設工事用鋳物ブロック8をブロ
ック収納ケースの中に入れ、電線流し留め用アンカーブ
ロックとしたり、支線アンカーブロックに用いたりする
ことができる。既設コンクリート構造物10に、所定の
引き揚げ支持力を持たせようとする場合には、必要な個
数の建設工事用鋳物ブロック8を1段または数段に重ね
て敷き詰めると、引き揚げ支持力Tに対して十分に耐え
ることができる。建設工事用鋳物ブロック8を埋め込む
ことにより十分な引き揚げ支持力が得られる。仮鉄塔3
3を撤去する場合には、建設工事用鋳物ブロック8、平
板37、床板材38、脚取付け梁39などの再使用がで
きるので、騒音や産業物の廃棄処理は全く発生しない。
The required number of casting blocks for construction work 8 can be put in a block storage case to be used as an anchor block for draining electric wires or as a branch anchor block. In the case where the existing concrete structure 10 is to have a predetermined lifting support force, a necessary number of construction work casting blocks 8 are stacked in one or several stages and spread, and the lifting support force T Can withstand enough. By embedding the casting block 8 for construction work, a sufficient lifting support force can be obtained. Temporary tower 3
When removing 3, the casting block 8 for construction work, the flat plate 37, the floor plate material 38, the leg attachment beams 39, and the like can be reused, so that no noise or disposal of industrial products is generated.

【0011】[0011]

【実施例】以下、本発明の実施例を図面に基づき説明す
る。図1において、8は、重し(ウエィト)として十分
作用するだけの重さを有し、しかも扱いやすく構成した
本発明による建設工事用鋳物ブロックである。具体的に
は、この建設工事用鋳物ブロック8は、縦×横×高さが
70cm×70cm×15cmで、重さ500kgの正
4角形の立体の鋳物からなるものである。
Embodiments of the present invention will be described below with reference to the drawings. In FIG. 1, reference numeral 8 denotes a casting block for construction work according to the present invention which has a weight sufficient to act as a weight and is easy to handle. More specifically, the casting block 8 for construction work is a square, three-dimensional casting having a length, width, and height of 70 cm × 70 cm × 15 cm and a weight of 500 kg.

【0012】前記建設工事用鋳物ブロック8は、各辺毎
に、中央部に、運搬用凹部15が形成され、この運搬用
凹部15の左側には嵌合凹部18が形成され、右側には
嵌合凸部19が形成され、さらに前記運搬用凹部15の
上面に上面切欠き16が、下面に下面切欠き17が形成
されている。また、建設工事用鋳物ブロック8の上面に
は、4角に同一間隔で4個の円錐台形状の位置合わせ突
起20が形成され、また、下面には、これらの位置合わ
せ突起20と嵌合する位置合わせ孔21が形成されてい
る。
In the casting block 8 for construction work, a transport recess 15 is formed at the center of each side, a fitting recess 18 is formed on the left side of the transport recess 15, and a fitting recess 18 is formed on the right side. A mating projection 19 is formed, and an upper surface notch 16 is formed on the upper surface of the concave portion 15 for transportation, and a lower surface notch 17 is formed on the lower surface. On the upper surface of the casting block 8 for construction work, four truncated cone-shaped positioning projections 20 are formed at equal intervals at four corners, and on the lower surface, these positioning projections 20 are fitted. An alignment hole 21 is formed.

【0013】このようにして形成された建設工事用鋳物
ブロック8は、隣同士のブロック8の嵌合凹部18と嵌
合凸部19とが順次平面的に嵌合連結されるとともに、
上面にも順次重ねることができる。上面に重ねるときに
は、上側のブロック8を下側のブロック8全体に重ねる
ようにすることもできるし、上側のブロック8を下側の
2個のブロック8に半分ずつ重ねるようにすることもで
きるし、上側のブロック8を下側4個のブロック8に4
分の1ずつ重ねるようにすることもできる。
In the casting block 8 for construction work thus formed, the fitting concave portion 18 and the fitting convex portion 19 of the adjacent blocks 8 are sequentially fitted and connected in a plane.
It can also be sequentially stacked on the upper surface. When overlapping on the upper surface, the upper block 8 may be overlapped with the entire lower block 8, or the upper block 8 may be overlapped with the lower two blocks 8 by half. , The upper block 8 into the lower four blocks 8
It is also possible to make them overlap one by one.

【0014】つぎに、図2は、前記建設工事用鋳物ブロ
ック8の積込み、並べ替え、運搬などのときに使用され
るブロックはさみ34である。このブロックはさみ34
は、2本のアーム22が上端部付近で回動軸23により
回動自在に連結されたもので、上端のワイヤ係止孔30
にワイヤ31を掛けてクレーン、ウインチなどに吊る
す。このとき、一方のアーム22に回動ピン27で連結
された安全レバー26のガイド溝28の外側に、他方の
アーム22の係止ピン29を係合しておく。この状態で
建設工事用鋳物ブロック8の位置まで移動して、両側の
アーム22の下端の係合突部24をブロック8の両側の
運搬用凹部15に嵌合し、さらに安全レバー26のガイ
ド溝28と係止ピン29との係合を外して、係合突部2
4をブロック8の下面切欠き17に嵌め込む。すると、
運搬用凹部15の突起部分がアーム22の係合凹部25
と係合する。ブロック8を持ち上げる前に、安全レバー
26のガイド溝28の内側に係止ピン29を係合して2
本のアーム22が開かないようにする。このようにして
前記建設工事用鋳物ブロック8の積込み、並べ替え、運
搬などが行われる。
FIG. 2 shows a block scissor 34 used for loading, rearranging, transporting, etc. the casting block 8 for construction work. This block scissors 34
The two arms 22 are rotatably connected to each other by a rotation shaft 23 near an upper end thereof.
And hang it on a crane, winch or the like. At this time, the locking pin 29 of the other arm 22 is engaged with the outside of the guide groove 28 of the safety lever 26 connected to the one arm 22 by the rotation pin 27. In this state, it is moved to the position of the casting block 8 for construction work, the engaging projections 24 at the lower ends of the arms 22 on both sides are fitted into the transport recesses 15 on both sides of the block 8, and the guide groove of the safety lever 26 28 is disengaged from the locking pin 29, and the engaging projection 2
4 is fitted into the lower surface notch 17 of the block 8. Then
The projecting portion of the carrying recess 15 is engaged with the engaging recess 25 of the arm 22.
Engage with. Before lifting the block 8, the locking pin 29 is engaged inside the guide groove 28 of the safety lever 26 to
The book arm 22 is not opened. In this way, loading, rearranging, transporting, and the like of the casting block 8 for construction work are performed.

【0015】以上のように構成された建設工事用鋳物ブ
ロック8の使用例を説明する。 (1)鋼製枠からなるブロック収納ケースを作り、必要
な個数のブロック8をその中に入れ、電線流し留め用ア
ンカーブロックとしたり、支線アンカーブロックに用い
たりする。ブロック8は、鋳物であるから比重が大きい
ために、少ない個数で十分なウエイトが得られ、しかも
全体が嵩張ることがなく、作業性にすぐれ、また、積込
や解体時に扱い易い。
An example of use of the casting block 8 for construction work constructed as described above will be described. (1) A block storage case made of a steel frame is made, and a required number of blocks 8 are put therein, and used as an anchor block for draining electric wires or as a branch anchor block. Since the block 8 is a casting and has a large specific gravity, a sufficient number of weights can be obtained with a small number, and the entire block is not bulky, has excellent workability, and is easy to handle during loading and dismantling.

【0016】(2)図3(a)に示すように、地盤11
に埋設した既設コンクリート構造物10に、所定の引き
揚げ支持力Tを持たせようとする場合には、引き揚げ支
持力を持たせようとする部分Aであって、既設コンクリ
ート構造物10の周りに、必要な個数のブロック8を1
段または数段に重ねて敷き詰めると、引き揚げ支持力T
に対して十分に耐えることができる。 (3)図3(b)に示すように、既設コンクリート構造
物10に対する支持力不足を補うような場合に、ブロッ
ク8を永久構造物として埋め込むことにより十分な引き
揚げ支持力が得られる。
(2) As shown in FIG.
When the existing concrete structure 10 buried in is to have a predetermined lifting support force T, the portion A where the lifting support force is to be provided, and around the existing concrete structure 10, The required number of blocks 8 is 1
When it is laid in layers or several layers, the lifting support force T
Can withstand enough. (3) As shown in FIG. 3B, in a case where the insufficient supporting force for the existing concrete structure 10 is compensated, a sufficient lifting supporting force can be obtained by embedding the block 8 as a permanent structure.

【0017】前記実施例では、建設工事用鋳物ブロック
8を正4角形とした場合について説明したが、これに限
られるものではない。たとえば、図4(a)に示すよう
に、正6角形とし、各辺毎に運搬用凹部15、嵌合凹部
18、嵌合凸部19を形成したものとすることもできる
し、図4(b)に示すように、正8角形とし、8つの辺
に順次運搬用凹部15、嵌合凹部18、運搬用凹部1
5、嵌合凸部19、運搬用凹部15、嵌合凹部18、運
搬用凹部15、嵌合凸部19を形成したものとすること
もできる。
In the above-described embodiment, the case where the casting block 8 for construction work is a regular square is described, but the invention is not limited to this. For example, as shown in FIG. 4 (a), it may be a regular hexagon, and a transporting concave portion 15, a fitting concave portion 18, and a fitting convex portion 19 may be formed on each side. As shown in b), it is a regular octagon, and the carrying recess 15, the fitting recess 18, and the carrying recess 1 are sequentially arranged on eight sides.
5, the fitting convex portion 19, the carrying concave portion 15, the fitting concave portion 18, the carrying concave portion 15, and the fitting convex portion 19 may be formed.

【0018】つぎに建設工事用鋳物ブロック8を用いた
鉄塔仮設工法の実施例を図5ないし図9に基づき説明す
る。建設する仮鉄塔33は、30から50メートル程度
の高さとする。 第1工程(図5(a)) 建設地を、縦×横×深さ=10m×10m×820mm
程度に掘削し、掘削した部分に100mm程度に砂36
を敷き詰めて平らに均し、整地する。また掘削地の外周
に転落防止柵35を設ける。
[0018] Then the construction example of construction for casting block 8 pylons temporary construction method using the based on FIGS. 5 to 9 will be described. The temporary tower 33 to be constructed has a height of about 30 to 50 meters. First Step (FIG. 5 (a)) The construction site is divided into vertical, horizontal, and depth = 10m × 10m × 820mm.
Excavation to about 100mm in the excavated part
And spread it flat and level. A fall prevention fence 35 is provided on the outer periphery of the excavation site.

【0019】第2工程(図5(b)) 敷き詰めた砂36の上に、図6および図7に示すよう
に、クレーンなどにより平板37を敷き詰める。この平
板37は、たとえば厚さ×幅×長さ=20〜30×15
00〜3000×3000mmの鉄板が用いられる。
Second step (FIG. 5 (b)) Flat plates 37 are spread on the spread sand 36 by a crane or the like as shown in FIGS. This flat plate 37 has, for example, thickness × width × length = 20-30 × 15
An iron plate of 00 to 3000 × 3000 mm is used.

【0020】第3工程(図5(c)) 平板37の上に、図6および図7に示すように、クレー
ンにより所定間隔で床板材38を取り付ける。このと
き、床板材38の上面が全体的に水平になるように取り
付ける。この床板材38は、たとえば、長さが9000
mmで、幅が300mmのH300H型鋼材であり、取
付け間隔は、両側部分だけ600mmとし、その他の部
分は750mmとする。
Third Step (FIG. 5C) Floor plates 38 are mounted on the flat plate 37 at predetermined intervals by a crane as shown in FIGS. At this time, the floor plate 38 is mounted such that the upper surface thereof is entirely horizontal. The floor plate 38 has a length of, for example, 9000
mm, a 300 mm wide H300H steel, and the mounting interval is 600 mm on both sides and 750 mm on the other parts.

【0021】第4工程(図5(d)) 床板材38の上に、図6および図7に示すように、クレ
ーンによりたとえばH400のH型鋼からなる井桁状の
脚取付け梁39を取り付ける。この脚取付け梁39は、
工場で井桁状に組み立てたものでは、搬送が面倒になる
ので、いくつかに分割して運び込み、現場で組み立て
る。具体的には、図7(b)に示すように、井桁の4角
を4つのX字状部41に分割するとともに、これらを連
結する4つの直線部42とに分割する。また、X字状部
41の交差部分には、予め、図8またはず9に示すよう
な脚取付け材40を、ベース板43とリブ板44により
取り付けておく。前記X字状部41と直線部42は、図
6に示すように、互いに接する面に垂直な板材45を溶
接し、ボルト46で固定的に連結する。このようにして
井桁に組み立てられた脚取付け梁39は、先に敷き詰め
られた床板材38に適当個所でボルト46により取り付
けられる。
Fourth step (FIG. 5 (d)) As shown in FIGS. 6 and 7, a crane-like, leg-shaped leg attachment beam 39 made of H-section steel of H400, for example, is mounted on the floor plate 38. This leg attachment beam 39
If assembled in a girder shape at the factory, transportation becomes troublesome, so it is divided into several parts, transported, and assembled on site. Specifically, as shown in FIG. 7B, the four corners of the girder are divided into four X-shaped parts 41, and are further divided into four linear parts 42 connecting these. Further, a leg attachment member 40 as shown in FIG. 8 or 9 is attached in advance to the intersection of the X-shaped portions 41 with the base plate 43 and the rib plate 44. As shown in FIG. 6, the X-shaped portion 41 and the linear portion 42 are fixedly connected to each other by welding plate members 45 perpendicular to surfaces that contact each other and by bolts 46. The leg attachment beams 39 assembled in the cross beam in this manner are attached to the floor board 38 previously spread by bolts 46 at appropriate locations.

【0022】第5工程(図5(e)) 床板材38の上に、図6に示すように、建設工事用鋳物
ブロック8を順次嵌合しつつ並べ、かつ必要個所には、
2段、3段、4段と重ねる。床板材38の上にブロック
8を並べるとき、脚取付け梁39の縁の部分にも一部掛
かるようにするために、床板材38の上にスペーサ47
を介在して高さを揃えるようにする。具体的には、床板
材38全体にまずブロック8を2段重ねにする。つぎ
に、脚取付け梁39の4角の部分には、特に引き揚げ力
が掛かる場合があるので、さらに2段重ねして4段に重
ねる。その他の部分は、3段に重ねにするか、または2
段重ねのままとする。
Fifth Step (FIG. 5 (e)) As shown in FIG. 6, the casting blocks 8 for construction work are sequentially fitted and arranged on the floor plate 38, and at the necessary places,
Stack two, three, and four stages. When arranging the blocks 8 on the floor plate 38, the spacers 47 are arranged on the floor plate 38 so as to partially cover the edges of the leg attachment beams 39.
To make the height uniform. Specifically, first, the blocks 8 are stacked in two steps over the entire floor plate 38. Next, since a lifting force may be particularly applied to the four corners of the leg attachment beam 39, the leg mounting beam 39 is further stacked in two stages and stacked in four stages. Other parts are stacked in three layers or two
Leave it in a stack.

【0023】第6工程(図5(f)) 建設工事用鋳物ブロック8の積み重ね終了後、脚取付け
材40に仮鉄塔33が取り付けられる。また、美観の点
からブロック8の上にシート48を被せて砂36を平ら
に敷き詰める。
Sixth Step (FIG. 5 (f)) After the stacking of the casting blocks 8 for construction work, the temporary iron tower 33 is attached to the leg attachment material 40. In addition, the sheet 36 is placed on the block 8 from the aesthetic point of view, and the sand 36 is spread evenly.

【0024】以上のようにした建設した仮鉄塔33を撤
去する場合には、図5の工程を(f)から逆に行えばよ
く、コンクリートの破壊による騒音がなく、また、ブロ
ック8、平板37、床板材38、脚取付け梁39などの
再使用ができ、産業物の廃棄処理は全く発生しない。
When the temporary tower 33 constructed as described above is to be removed, the process shown in FIG. 5 may be performed in reverse order from FIG. The floor plate 38, the leg attachment beams 39, and the like can be reused, and no industrial waste disposal occurs.

【0025】[0025]

【発明の効果】【The invention's effect】

(1)鋼製枠からなるブロック収納ケースを作り、必要
な個数の建設工事用鋳物ブロック8をその中に入れ、電
線流し留め用アンカーブロックとしたり、支線アンカー
ブロックに用いたりすることができる。この場合、鋳物
からなるブロック8は、比重が大きいために、少ない個
数で十分なウエイトが得られ、しかも全体が嵩張ること
がなく、作業性にすぐれ、また、積込や解体時に扱い易
い。
(1) A block storage case made of a steel frame is made, and a required number of casting blocks 8 for construction work are put therein, and can be used as an anchor block for electric wire drainage or as a branch anchor block. In this case, since the specific gravity of the block 8 made of a casting is large, a sufficient number of weights can be obtained with a small number, and the whole is not bulky, has excellent workability, and is easy to handle during loading and dismantling.

【0026】(2)地盤11に埋設した既設コンクリー
ト構造物10に、所定の引き揚げ支持力を持たせようと
する場合には、既設コンクリート構造物10の周りに、
必要な個数のブロック8を1段または数段に重ねて敷き
詰めると、引き揚げ支持力Tに対して十分に耐えること
ができる。
(2) When the existing concrete structure 10 buried in the ground 11 is to have a predetermined lifting support force, the surroundings of the existing concrete structure 10
If the required number of blocks 8 are laid one on the other or several stages, they can sufficiently withstand the lifting support force T.

【0027】(3)既設コンクリート構造物10に対す
る支持力不足を補うような場合に、ブロック8を永久構
造物として埋め込むことにより十分な引き揚げ支持力が
得られる。
(3) In order to compensate for the insufficient supporting force for the existing concrete structure 10, a sufficient lifting supporting force can be obtained by embedding the block 8 as a permanent structure.

【0028】(4)建設した仮鉄塔33を撤去する場合
には、コンクリートの破壊による騒音がなく、また、ブ
ロック8、平板37、床板材38、脚取付け梁39など
の再使用ができ、産業物の廃棄処理は全く発生しない。
(4) When the constructed temporary tower 33 is removed, there is no noise due to the destruction of the concrete, and the blocks 8, the flat plate 37, the floor plate 38, the leg attachment beams 39, etc. can be reused, and No waste disposal occurs.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による建設工事用鋳物ブロック8の一実
施例を示すもので、(a)は平面図、(b)は正面図、
(c)はA−A線端面図、(d)はB−B線端面図であ
る。
1 shows an embodiment of a casting block 8 for construction work according to the present invention, wherein (a) is a plan view, (b) is a front view,
(C) is an AA line end view, and (d) is a BB line end view.

【図2】建設工事用鋳物ブロック8を運搬するときに使
用するブロックはさみ34の正面図である。
FIG. 2 is a front view of a block scissor used for transporting a casting block 8 for construction work.

【図3】(a)は、引き揚げ支持力付与時の例を示す説
明図、(b)は、土量不足を補ったときの例を示す説明
図である。
FIG. 3A is an explanatory diagram showing an example when a lifting support force is applied, and FIG. 3B is an explanatory diagram showing an example when a shortage of soil volume is compensated.

【図4】(a)は建設工事用鋳物ブロック8が6角形の
場合の正面図、(b)建設工事用鋳物ブロック8が8角
形の場合の正面図である。
FIG. 4A is a front view when the casting block for construction 8 is hexagonal, and FIG. 4B is a front view when the casting block 8 for construction is octagonal.

【図5】建設工事用鋳物ブロック8を用いた鉄塔仮設工
法9の工程順序を示す説明図である。
FIG. 5 is an explanatory view showing a process sequence of a steel tower temporary construction method 9 using a casting block 8 for construction work.

【図6】床板材38の上に建設工事用鋳物ブロック8を
載せたときの状態を示す説明図である。
FIG. 6 is an explanatory view showing a state where a casting block for construction work 8 is placed on a floor plate 38.

【図7】(a)は、平板37、床板材38、脚取付け梁
39、建設工事用鋳物ブロック8を順次組み立てた状態
の一部切り欠いた平面図、(b)は、脚取付け梁39の
分解平面図である。
7A is a partially cutaway plan view of a state in which a flat plate 37, a floor plate 38, a leg attachment beam 39, and a casting block 8 for construction work are sequentially assembled, and FIG. 7B is a leg attachment beam 39. FIG.

【図8】脚取付け梁39に脚取付け材40を取り付けた
状態の斜視図である。
FIG. 8 is a perspective view showing a state in which a leg attachment member 40 is attached to a leg attachment beam 39.

【図9】脚取付け梁39に脚取付け材40を取り付けた
状態の他の例を示す斜視図である。
FIG. 9 is a perspective view showing another example of a state where the leg attachment member 40 is attached to the leg attachment beam 39.

【図10】従来の仮鉄塔建設状態の説明図である。FIG. 10 is an explanatory view of a conventional temporary tower construction state.

【符号の説明】[Explanation of symbols]

8…建設工事用鋳物ブロック、10…既設コンクリート
構造物、11…地盤、12…埋め戻し土、13…切り
土、14…不足土量、15…運搬用凹部、16…上面切
欠き、17…下面切欠き、18…嵌合凹部、19…嵌合
凸部、20…位置合わせ突起、21…位置合わせ孔、2
2…アーム、23…回動軸、24…係合突部、25…係
合凹部、26…安全レバー、27…回動ピン、28…ガ
イド溝、29…係止ピン、30…ワイヤ係止孔、31…
ワイヤ、32…コンクリート基礎、33…仮鉄塔、34
…ブロックはさみ、35…転落防止柵、36…砂、37
…平板、38…床板材、39…脚取付け梁、40…脚取
付け材、41…X字状部、42…直線部、43…ベース
板、44…リブ板、45…板材、46…ボルト、47…
スペーサ、48…シート、49…ずれ防止材。
8: Casting block for construction work, 10: Existing concrete structure, 11: Ground, 12: Backfill soil, 13: Cut soil, 14: Insufficient soil, 15: Conveying recess, 16: Notch on top, 17 ... Lower surface notch, 18 fitting recess, 19 fitting projection, 20 alignment protrusion, 21 alignment hole, 2
2 ... arm, 23 ... rotating shaft, 24 ... engaging protrusion, 25 ... engaging recess, 26 ... safety lever, 27 ... rotating pin, 28 ... guide groove, 29 ... locking pin, 30 ... wire locking Hole, 31 ...
Wire, 32: Concrete foundation, 33: Temporary tower, 34
... block scissors, 35 ... fall prevention fence, 36 ... sand, 37
... flat plate, 38 ... floor plate material, 39 ... leg attachment beam, 40 ... leg attachment material, 41 ... X-shaped part, 42 ... linear part, 43 ... base plate, 44 ... rib plate, 45 ... plate material, 46 ... bolt, 47 ...
Spacer, 48 ... sheet, 49 ... slip prevention material.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 川口 勝則 東京都新宿区新宿5丁目4番9号 東京 電力株式会社東京西支店内 (72)発明者 土屋 孝 東京都千代田区内幸町1丁目1番3号 東京電力株式会社内 (72)発明者 小芦 武尚 東京都港区南麻布2丁目11番10号 日本 工営株式会社内 (72)発明者 原田 湧司郎 東京都港区南麻布2丁目11番10号 日本 工営株式会社内 (72)発明者 伊藤 良雄 東京都港区南麻布2丁目11番10号 日本 工営株式会社内 (72)発明者 武元 幹郎 千葉県船橋市坪井町1099−15 (56)参考文献 特開 平6−316942(JP,A) 実開 昭63−65704(JP,U) 実開 昭60−195336(JP,U) (58)調査した分野(Int.Cl.6,DB名) E02D 27/42 E01C 5/00 - 5/22 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Katsunori Kawaguchi 5-4-9 Shinjuku, Shinjuku-ku, Tokyo Tokyo Electric Power Company Tokyo West Branch (72) Inventor Takashi Tsuchiya 1-3-1 Uchisaiwaicho, Chiyoda-ku, Tokyo No. Tokyo Electric Power Co., Inc. (72) Inventor Takehisa Koashi 2--11-10 Minamiazabu, Minato-ku, Tokyo Japan Koei Co., Ltd. (72) Inventor Haruji Yushiro 2--11-10 Minamiazabu, Minato-ku, Tokyo Nippon Koei Co., Ltd. (72) Inventor Yoshio Ito 2--11-10 Minamiazabu, Minato-ku, Tokyo Nippon Koei Co., Ltd. (72) Inventor Mikio Takemoto 1099-15, Tsuboi-cho, Funabashi-shi, Chiba (56) References JP-A-6-316942 (JP, A) JP-A 63-65704 (JP, U) JP-A 60-195336 (JP, U) (58) Fields investigated (Int. Cl. 6 , DB name) ) E02D 27/42 E01C 5/00-5/22

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 略正多角形で、所定の厚さを有する立体
の鋳物からなり、辺部に、運搬用凹部15と嵌合凹部1
8と嵌合凸部19とを有し、隣同士のブロック8の嵌合
凹部18と嵌合凸部19とを互いに嵌合して並べるよう
にしたことを特徴とする建設工事用鋳物ブロック。
1. A substantially three-dimensional casting made of a regular polygon and having a predetermined thickness.
8. A casting block for construction work, comprising: a fitting projection 8; and a fitting projection 19, wherein the fitting recesses 18 and the fitting projections 19 of the adjacent blocks 8 are fitted and arranged with each other.
【請求項2】 略正多角形とは、4角形、6角形または
8角形からなる請求項1記載の建設工事用鋳物ブロッ
ク。
2. The casting block for construction work according to claim 1, wherein the substantially regular polygon is a quadrangle, a hexagon or an octagon.
【請求項3】 上面の角隅近くに位置合わせ突起20を
設け、下面の角隅近くに位置合わせ孔21を設け、上下
同士のブロック8の位置合わせ突起20と位置合わせ孔
21とを嵌合して重ねるようにしてなる請求項1または
2記載の建設工事用鋳物ブロック。
3. An alignment projection 20 is provided near a corner on the upper surface, an alignment hole 21 is provided near a corner on the lower surface, and the alignment projection 20 and the alignment hole 21 of the upper and lower blocks 8 are fitted. The casting block for construction work according to claim 1 or 2, wherein the casting block is overlapped.
【請求項4】 建設地を掘削し、整地する工程と、整地
した地盤に、床板材38をその上面が全体的に水平にな
るように取り付ける工程と、前記床板材38の上に、脚
取付け材40を有する脚取付け梁39を取り付ける工程
と、前記床板材38の上に、建設工事用鋳物ブロック8
を順次嵌合しつつ並べ、かつ必要個所には、複数段重ね
る工程と、前記脚取付け材40に仮鉄塔33を取り付け
る工程とからなることを特徴とする建設工事用鋳物ブロ
ックを用いた鉄塔仮設工法。
4. A step of excavating and leveling a construction site, a step of mounting a floor plate 38 on the ground which has been leveled so that an upper surface thereof is generally horizontal, and mounting a leg on the floor plate 38. Attaching a leg attachment beam 39 having a member 40;
Are arranged while sequentially fitting them, and where necessary, a step of stacking a plurality of steps and a step of attaching a temporary tower 33 to the leg attachment member 40 are provided. Construction method.
【請求項5】 建設地を掘削し、整地する工程と、整地
した地盤に平板37を敷き詰める工程と、この平板37
の上に、床板材38をその上面が全体的に水平になるよ
うに取り付ける工程と、前記床板材38の上に、脚取付
け材40を有する井桁状の脚取付け梁39を取り付ける
工程と、前記床板材38の上に、建設工事用鋳物ブロッ
ク8を順次嵌合しつつ並べ、かつ必要個所には、複数段
重ねる工程と、前記脚取付け材40に仮鉄塔33を取り
付ける工程とからなることを特徴とする建設工事用鋳物
ブロックを用いた鉄塔仮設工法。
5. A step of excavating and leveling a construction site, a step of laying a flat plate 37 on the leveled ground,
A step of mounting a floor board 38 so that the upper surface thereof is generally horizontal, a step of mounting a cross beam-shaped leg mounting beam 39 having a foot mounting material 40 on the floor board 38, On the floor plate 38, the casting blocks 8 for construction work are sequentially fitted and arranged, and where necessary, a step of stacking a plurality of steps and a step of attaching the temporary tower 33 to the leg attachment material 40 are described. A temporary construction method for steel towers using cast blocks for construction work.
【請求項6】 建設地を掘削し、掘削した部分に砂36
を敷き詰めて平らに均し、整地する工程と、敷き詰めた
砂36の上に鉄板からなる平板37を敷き詰める工程
と、平板37の上に、所定間隔でH型鋼材からなる床板
材38を取り付ける工程と、H型鋼からなる井桁状の脚
取付け梁39を、角隅部の脚取付け材40を有するX字
状部41とこれらを連結する直線部42とに分割して運
び込み、現場で組み立てて床板材38の上に取り付ける
工程と、前記床板材38の上に、建設工事用鋳物ブロッ
ク8を順次嵌合しつつ並べ、かつ必要個所には、複数段
に重ねる工程と、建設工事用鋳物ブロック8の積み重ね
終了後、美観の点から建設工事用鋳物ブロック8の上に
シート48を被せて砂36を平らに敷き詰め、さらに脚
取付け材40に仮鉄塔33を取り付ける工程とからなる
ことを特徴とする建設工事用鋳物ブロックを用いた鉄塔
仮設工法。
6. Excavation of a construction site, and sand 36
Laying flat and leveling, leveling, laying flat plate 37 made of iron plate on laid sand 36, and attaching floor plate 38 made of H-shaped steel at predetermined intervals on flat plate 37 And an X-shaped leg-mounting beam 39 made of H-shaped steel, which is divided into an X-shaped portion 41 having a leg-mounting material 40 at a corner and a straight portion 42 connecting the X-shaped portion 41 and carried, and assembled at the site to construct a floor. A step of mounting on the plate material 38, a step of sequentially fitting the construction work casting blocks 8 on the floor plate material 38 while arranging them, and stacking a plurality of stages at necessary places; After completion of stacking, a step of covering the sheet 48 on the casting block 8 for construction work, spreading the sand 36 flat, and attaching the temporary tower 33 to the leg attachment material 40 from the viewpoint of aesthetics. Construction Tower temporary method using the construction work for the casting block.
JP7296111A 1995-10-19 1995-10-19 Casting block for construction work and steel tower temporary construction method using this block Expired - Lifetime JP2975297B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7296111A JP2975297B2 (en) 1995-10-19 1995-10-19 Casting block for construction work and steel tower temporary construction method using this block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7296111A JP2975297B2 (en) 1995-10-19 1995-10-19 Casting block for construction work and steel tower temporary construction method using this block

Publications (2)

Publication Number Publication Date
JPH09111775A JPH09111775A (en) 1997-04-28
JP2975297B2 true JP2975297B2 (en) 1999-11-10

Family

ID=17829284

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7296111A Expired - Lifetime JP2975297B2 (en) 1995-10-19 1995-10-19 Casting block for construction work and steel tower temporary construction method using this block

Country Status (1)

Country Link
JP (1) JP2975297B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5761861B2 (en) * 2012-05-09 2015-08-12 株式会社九建 Wire retention anchor for wire drawing work
CN103508339B (en) * 2013-03-01 2015-11-25 李文泽 Mobile tower flap seat

Also Published As

Publication number Publication date
JPH09111775A (en) 1997-04-28

Similar Documents

Publication Publication Date Title
US4684287A (en) Retaining wall construction and method for erection
JP2002256573A (en) Foundation for existing foundation reinforcing steel tower and construction method for it
JP2975297B2 (en) Casting block for construction work and steel tower temporary construction method using this block
JP2000265574A (en) High floor type steel frame footing beam method
JP2797045B2 (en) Solid foundation method with stabilizer
JPH09317208A (en) Base isolation construction method for existing wooden house
JP3770665B2 (en) Ground improvement composite foundation
JPH06264453A (en) Precast concrete-made permanent form for foundation, and foundation practice using its form
JP2003138573A (en) Platform and its repairing method
JP3109038B2 (en) Underground skeleton structure and construction method
JP2900840B2 (en) How to build underground structures
JP2800688B2 (en) Foundation method of building consisting of high-rise building and low-rise building
JP7510328B2 (en) Construction Method
JP2024131721A (en) Protective works, methods for constructing protective works, and methods for dismantling protective works
JPH10245847A (en) Retaining wall structure and its construction method
JP2583830B2 (en) Construction method of concrete deep foundation pile
JPH0730564B2 (en) Construction method of underground structure
JP2004143675A (en) Supporting device for earth retaining liner plate and earth retaining method making use thereof
JPH0726569A (en) Pile foundation construction method for structure exposed to partial earth pressure
JP2940451B2 (en) How to build underground structures
JPS6290445A (en) Block for foundation and its manufacture
JPH0492021A (en) Foundation structure of building and construction method thereof
JPH04117040U (en) Building foundation structure
JP3401282B2 (en) Construction method of soil between unit type buildings
JP2724734B2 (en) Concrete block and retaining wall construction method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090903

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100903

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110903

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120903

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130903

Year of fee payment: 14

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term