JP2967967B2 - Floating pier and its construction method - Google Patents

Floating pier and its construction method

Info

Publication number
JP2967967B2
JP2967967B2 JP5283304A JP28330493A JP2967967B2 JP 2967967 B2 JP2967967 B2 JP 2967967B2 JP 5283304 A JP5283304 A JP 5283304A JP 28330493 A JP28330493 A JP 28330493A JP 2967967 B2 JP2967967 B2 JP 2967967B2
Authority
JP
Japan
Prior art keywords
floating body
floating
column
mooring
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP5283304A
Other languages
Japanese (ja)
Other versions
JPH07132880A (en
Inventor
広泰 緒方
光喜 大浜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Kaseihin Kogyo KK
Original Assignee
Sekisui Kaseihin Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Kaseihin Kogyo KK filed Critical Sekisui Kaseihin Kogyo KK
Priority to JP5283304A priority Critical patent/JP2967967B2/en
Publication of JPH07132880A publication Critical patent/JPH07132880A/en
Application granted granted Critical
Publication of JP2967967B2 publication Critical patent/JP2967967B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、船への乗降,積み荷の
揚げ降ろし,船の接舷,繋船等の便宜を図るべく、比較
的干満差の大きな海域に面する漁港や港湾等に設置され
て、潮の満干等に応じて昇降するようにされた浮き桟橋
及びその造設方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is installed in a fishing port or a harbor, etc., facing a sea area with a relatively large difference in ebb and flow, for the convenience of getting on and off a ship, unloading and loading cargo, berthing a ship, and berthing. The present invention relates to a floating pier that is raised and lowered in response to tides and the like, and a method of constructing the pier.

【0002】[0002]

【従来の技術】従来、浮き桟橋としては、桟橋デッキ部
分を構成する浮体(ポンツーン)をチェーン等で弛緩係
留したものがあるが、この浮き桟橋は、波浪や風圧力あ
るいは上載物の偏り等によって揺れ易く、安定性に欠け
る嫌いがある。そのため、例えば実開平2−10699
8号公報や同じく2−89005号公報等にも見られる
如くに、浮体を水底地盤に打設された杭等の支持柱によ
り昇降自在に支持するようにした浮き桟橋が提案されて
いる。この浮き桟橋は、支持柱を水平方向に挟圧するよ
うに複数個のローラを浮体の側周部にローラ支持金具を
介して取り付けたものである。
2. Description of the Related Art Conventionally, as a floating pier, a floating body (pontoon) constituting a pier deck portion has been loosely moored with a chain or the like, and this floating pier is subject to waves, wind pressure, or unevenness of an overhead load. It is easy to shake and lacks stability. Therefore, for example, Japanese Utility Model Application Laid-Open No. 2-10699
As disclosed in Japanese Patent Publication No. 8 and JP-A-2-89005, a floating pier has been proposed in which a floating body is supported so as to be able to ascend and descend by a supporting column such as a pile installed on the underwater ground. In this floating pier, a plurality of rollers are mounted on a side peripheral portion of a floating body via a roller support fitting so as to sandwich a support column in a horizontal direction.

【0003】なお、上記した如くの浮き桟橋に使用され
る浮体は、例えば特開昭2−24286号公報等にも記
載されている如くに、鋼製,コンクリート製,FRP等
のプラスチック製,木製の他、プラスチック発泡体を芯
材としてその外周をコンクリートで被包したもの等が知
られている。また、上記支持柱としては、鋼管杭等が用
いられており、通常、その上部が水面から大きく突出す
るようにされている。
The floating body used for the floating pier as described above is made of steel, concrete, plastic such as FRP, or wood, as described in, for example, Japanese Patent Application Laid-Open No. 2-24286. In addition, a plastic foam having a core material whose outer periphery is covered with concrete is known. In addition, a steel pipe pile or the like is used as the support column, and the upper portion of the column generally projects greatly from the water surface.

【0004】[0004]

【発明が解決しようとする課題】上記した如くの、浮体
を水底地盤に打設した杭等の支持柱により昇降自在に支
持するようにした従来の浮き桟橋にあっては、ローラと
その支持金具が浮体の側周部から横方向に突出している
ので、かかるローラ及び支持金具を避けて船を接舷させ
なければならず、操船が難しくなって波が高い時等には
ローラ支持部金具に船が衝突する危険性があり、また、
浮体の側周部に防舷材を取り付けるにしても、上記ロー
ラ及び支持金具が邪魔になるためそれを連続的に取り付
けることができないという問題があった。
As described above, in a conventional floating pier in which a floating body is supported up and down by a supporting column such as a pile which is cast on a submerged ground, a roller and its supporting bracket are provided. Must protrude laterally from the side periphery of the floating body, so the ship must be attached to the ship avoiding such rollers and support fittings. There is a danger of the ship colliding,
Even if a fender is attached to the side peripheral portion of the floating body, there is a problem that the roller and the support fitting interfere with each other, so that they cannot be attached continuously.

【0005】さらに、上記従来の浮き桟橋は波浪が大き
いとき、特にヨットハーバー等に利用される小型の浮き
桟橋にあっては、上載荷重によって浮体の昇降落差が大
きくなるため、船への乗降や積み荷の揚げ降ろし作業が
厄介であり、それに加えて、支持柱が水面から大きく突
出しているので、積み荷の揚げ降ろし時等に何かと邪魔
になることが多いという問題もあった。
Further, the conventional floating jetty described above has a large floating pier used for yacht harbors or the like when the waves are large, especially when a floating body is used. The unloading and unloading of the cargo is troublesome, and in addition, since the support columns protrude greatly from the water surface, there is also a problem that it often interferes with unloading and unloading the cargo.

【0006】かかる点に鑑み本発明は、浮体の側周部に
ローラ及びその支持金具等の突出物を設けることを要さ
ず、従って船とそれらの突出物との衝突を確実に回避で
きて船を安全かつ容易に接舷させることができるととも
に、浮体の降下高さをコントロールできるようにして、
船への乗降や積み荷の揚げ降ろし作業等が楽に行えて安
全性を向上させことができるようにされた浮き桟橋を提
供すること、及びかかる浮き桟橋を合理的に短期間で造
設する方法を提供することを目的とする。
In view of the above, the present invention does not require the provision of protrusions such as rollers and supporting brackets on the side peripheral portion of the floating body, and therefore can reliably avoid collision between the boat and the protrusions. The ship can be safely and easily berthed, and the height of the floating body can be controlled,
To provide a floating pier that can be easily loaded and unloaded and unloaded and loaded cargo to improve safety, and a method of constructing such a floating pier in a reasonably short time. The purpose is to provide.

【0007】[0007]

【課題を解決するための手段】上述の目的を達成すべ
く、本発明に係る浮き桟橋は、複数箇所に係留穴が上下
に貫通するように穿設された、桟橋デッキ部分を構成す
る浮体と、上記係留穴にその下端部を上記浮体の底面よ
り下方に突出させた状態で挿着されたスリーブ部材と、
上記係留穴の上側開口を塞ぐように上記浮体の上面部に
取り付けられた頂板プレートと、水底地盤上に略鉛直に
立設された支持杭と、この支持杭に直列的に連結されて
上記係留穴に固定されたスリーブ部材に挿入された移動
防止柱と、上記頂板プレートと上記移動防止柱との間に
配された所定の厚みを有するクッション部材とを具備
し、潮の満干等に応じて上記浮体が上記移動防止柱に案
内されて略鉛直方向に昇降するとともに、上記浮体が所
定の高さ位置まで降下したとき、上記頂板プレートと上
記移動防止柱の頂部とが上記クッション部材を介して衝
接するようにされてなることを特徴とする。
In order to achieve the above-mentioned object, a floating pier according to the present invention is provided with a floating body which constitutes a pier deck portion and is provided with a plurality of mooring holes penetrating vertically. A sleeve member inserted into the mooring hole with its lower end protruding downward from the bottom surface of the floating body,
A top plate attached to the upper surface of the floating body so as to close the upper opening of the mooring hole, a support pile standing upright on the underwater ground, and the mooring connected in series to the support pile A movement prevention pillar inserted into the sleeve member fixed to the hole, and a cushion member having a predetermined thickness disposed between the top plate and the movement prevention pillar are provided. The floating body is guided by the movement prevention column and moves up and down in a substantially vertical direction, and when the floating body descends to a predetermined height position, the top plate and the top of the movement prevention column are interposed through the cushion member. It is characterized by being brought into contact.

【0008】[0008]

【0009】[0009]

【0010】また、本発明に係る浮き桟橋の造設方法
は、上記した例の浮き桟橋を造設するためのもので、具
体的には、予め複数箇所に係留穴が上下に貫通するよう
に穿設された浮体を用意し、該浮体を係留すべき場所に
曳航する工程と、上記浮体を係留すべき場所に、予め上
記浮体の各係留穴の位置に合わせて支持杭を水底地盤に
略鉛直に打設する工程と、上記支持杭の頂面に該頂面よ
り広幅の第1の調整プレートを取り付ける工程と、上記
浮体の各係留穴にスリーブ部材をその下端部が上記浮体
の底面より下方に突出する状態で挿着する工程と、先の
工程において打設された支持杭に連結すべき各移動防止
柱の底面に該底面より広幅の第2の調整プレートを取り
付けるとともに、該移動防止柱を水中から上記浮体に固
定された各スリーブ部材に挿入する工程と、上記浮体の
位置を調整しながら、各支持杭と移動防止柱にそれぞれ
取り付けられた第1の調整プレートと第2の調整プレー
トとを対向させて順次結合する工程と、頂板プレートの
下面にクッション部材を固定し、この頂面プレートを上
記係留穴の上側開口を塞ぐように上記浮体の上面部に取
り付ける工程と、含んで構成される。
The method for constructing a floating pier according to the present invention is for constructing the floating pier of the above-described example. Specifically, the method is such that mooring holes are previously penetrated at a plurality of locations in the vertical direction. Preparing a perforated floating body, towing the floating body to a place to be moored, and, in a place where the floating body should be moored, preliminarily aligning the position of each mooring hole of the floating body with a support pile substantially on the underwater ground; Vertically casting, attaching a first adjustment plate wider than the top surface to the top surface of the support pile, and attaching a sleeve member to each of the mooring holes of the floating body so that the lower end thereof is lower than the bottom surface of the floating body. A step of inserting in a state of projecting downward, and attaching a second adjustment plate wider than the bottom surface to the bottom surface of each movement prevention column to be connected to the support pile installed in the previous step; Each sleeve with pillars fixed to the floating body from underwater Inserting the first adjustment plate and the second adjustment plate respectively attached to the respective support piles and the movement prevention columns while adjusting the position of the floating body, and sequentially connecting the first adjustment plate and the second adjustment plate while facing each other; Fixing the cushion member to the lower surface of the top plate, and attaching the top plate to the upper surface of the floating body so as to close the upper opening of the mooring hole.

【0011】[0011]

【作 用】上述の如くの構成とされる本発明に係る浮き
桟橋においては、支持柱の上部が浮体内部に挿入される
ので、浮体の側周部にローラ及びその支持金具等の突出
物を設けないでよい。従って船とそれらの突出物との衝
突を確実に回避できて船を安全かつ容易に接舷させるこ
とができるとともに、支持柱は浮体の上面から突出する
こともないので、積み荷の揚げ降ろし作業等の邪魔にな
ることもない。
[Operation] In the floating pier according to the present invention having the above-described structure, since the upper portion of the support column is inserted into the floating body, the protrusions such as the rollers and the support metal fittings are provided on the side periphery of the floating body. It does not need to be provided. Therefore, collisions between the ship and those protruding objects can be reliably avoided, and the ship can be safely and easily berthed. In addition, since the support columns do not protrude from the upper surface of the floating body, operations such as lifting and unloading cargo can be performed. It doesn't get in the way.

【0012】また、浮体が所定の高さ位置まで降下した
とき、係留穴の上底部と支持柱の頂部とが衝接するよう
にされるので、浮体はかかる位置より下へは沈まない。
従って、係留穴の上底部と支持柱の頂部との離間距離を
適宜調整することにより、浮体の降下高さをコントロー
ルでき、船への乗降や積み荷の揚げ降ろし作業等の便宜
が図られる。
When the floating body descends to a predetermined height position, the upper bottom of the mooring hole and the top of the support column are brought into contact with each other, so that the floating body does not sink below this position.
Therefore, by appropriately adjusting the distance between the upper bottom of the mooring hole and the top of the support column, the descending height of the floating body can be controlled, and convenience such as getting on and off the ship and unloading the cargo can be achieved.

【0013】また、係留穴の上底部を構成する頂板プレ
ートと支持柱の頂部との間にクッション材を配すること
により、支持柱の頂部と頂板プレートとの衝接時の衝撃
が緩和され、安全性が増す。一方、本発明に係る浮き桟
橋の造設方法においては、支持柱が支持杭と移動防止柱
とで分割構成され、支持杭の水底地盤へのに打設及び移
動防止柱の浮体への挿入が別々に行われるとともに、支
持杭と移動防止柱との連結が第1の調整プレート及び第
2の調整プレートを介して行われる。そのため、仮に支
持杭の打設位置が多少ずれても移動防止柱の位置を適正
位置に修正した状態でそれらを連結することができる。
[0013] Further, by arranging a cushioning material between the top plate constituting the upper bottom of the mooring hole and the top of the support column, the impact at the time of contact between the top of the support column and the top plate is reduced. Increases safety. On the other hand, in the method of constructing a floating pier according to the present invention, the support pillar is divided into a support pile and a movement prevention pillar, and the support pile is placed on the underwater ground and the movement prevention pillar is inserted into the floating body. Separately, the connection between the support stake and the movement prevention column is performed via the first adjustment plate and the second adjustment plate. Therefore, even if the positions of the support piles are slightly shifted, they can be connected in a state where the positions of the movement prevention columns are corrected to appropriate positions.

【0014】また、係留穴の上底部がクッション部材が
固定された頂面プレートで構成されて浮体製作後に取り
付けられるようにされるので、浮体自体にはそれを上下
に貫通する係留穴を穿設しておけばよく、浮体の製造や
各部材の所定箇所への組み付け作業が容易となる。この
ようにされることにより、浮き桟橋の造設作業を合理的
に短期間で行うことができる。
Further, since the upper bottom portion of the mooring hole is constituted by a top plate to which a cushion member is fixed and can be attached after manufacturing the floating body, the floating body itself is provided with a mooring hole penetrating vertically. In this case, the manufacture of the floating body and the work of assembling each member to a predetermined position are facilitated. By doing so, the construction work of the floating pier can be performed in a reasonably short time.

【0015】[0015]

【実施例】以下、本発明の実施例を図面を参照しながら
説明する。図1〜図3は本発明に係る浮き桟橋の一実施
例を示し、図において、浮き桟橋1は、主要部として桟
橋デッキ部分を構成する浮体5と支持杭21及び移動防
止柱25からなる支持柱とを備えている。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 3 show an embodiment of a floating pier according to the present invention. In the drawing, the floating pier 1 has a supporting structure comprising a floating body 5, a supporting pile 21 and a movement preventing column 25 constituting a pier deck portion as a main part. With pillars.

【0016】浮体5は、芯材6がプラスチック発泡体と
され、外皮7が繊維強化コンクリートからなっている。
ここでは、上記芯材6を例えば発泡ポリスチレン(12
kg/m3 )からなる直方体片(縦約2m,横約1m,
厚さ約0.5m)を上下左右に並べて構成し、その外周
に繊維強化コンクリートを鋳込んで被包したもので、そ
の大きさは縦約5m,横約5m,厚さ約1mとされてい
る。
The floating body 5 has a core 6 made of plastic foam and an outer skin 7 made of fiber reinforced concrete.
Here, the core 6 is made of, for example, expanded polystyrene (12
kg / m 3 ) (about 2 m in length, about 1 m in width,
The thickness is about 0.5m), which is arranged side by side up, down, left and right, and the outer periphery is filled with fiber reinforced concrete and encased. The size is about 5m in length, about 5m in width, and about 1m in thickness. I have.

【0017】この浮体5のコーナー部には、断面円形の
係留穴8が上下に貫通するように穿設され(図2)、こ
の係留穴8の上側開口部周囲には凹部7aが形成されて
いる(図3)。上記係留穴8の内周には円筒状の鋼材
(SGP)からなる補強部材9が固定され、この補強部
材9の内周にはゴム等の弾性材料からなる緩衝スペーサ
11が固着され、この緩衝スペーサ11の内周にスリー
ブ部材12がその下端部を上記浮体5の底面より0.5
m程度下方に突出させた状態で挿着されている。このス
リーブ部材12の上端縁には上記凹部7aに嵌め込まれ
るフランジ部12aが設けられ、スリーブ部材12の内
周下部には前記移動防止柱25の外周に当接するメタル
ベアリング14が固定され、その上側には浮体5が移動
防止柱25に沿って鉛直方向に昇降動するのを助けるた
めのリング状の案内部材24が固定されている。
At the corner of the floating body 5, a mooring hole 8 having a circular cross section is formed so as to penetrate vertically (FIG. 2), and a concave portion 7a is formed around the upper opening of the mooring hole 8. (Fig. 3). A reinforcing member 9 made of a cylindrical steel material (SGP) is fixed to the inner periphery of the mooring hole 8, and a buffer spacer 11 made of an elastic material such as rubber is fixed to the inner periphery of the reinforcing member 9. A sleeve member 12 is provided on the inner periphery of the spacer 11 so that its lower end is 0.5
It is inserted so as to protrude downward by about m. A flange portion 12a to be fitted into the concave portion 7a is provided at an upper end edge of the sleeve member 12, and a metal bearing 14 which is in contact with an outer periphery of the movement preventing column 25 is fixed to an inner lower portion of the sleeve member 12, and an upper portion thereof is fixed. A ring-shaped guide member 24 for helping the floating body 5 to move up and down in the vertical direction along the movement preventing column 25 is fixed to the fin.

【0018】また、上記スリーブ部材12の上側開口を
塞ぐように上記凹部7aには鋼板(SS)からなる頂板
プレート17が平頭ねじ13により固定されている。こ
の場合、スリーブ部材12の上面は浮体5の上面と面一
となるようにされており、頂板プレート17の下面には
ラバ−等の弾性材料からなるクッション部材18が固着
されている。上記頂板プレート17及びクッション部材
18は、上記係留穴8の上底部を構成し、それらの中央
部には空気抜き用の孔19が形成されている。
A top plate 17 made of a steel plate (SS) is fixed to the recess 7a with a flat head screw 13 so as to close the upper opening of the sleeve member 12. In this case, the upper surface of the sleeve member 12 is flush with the upper surface of the floating body 5, and the cushion member 18 made of an elastic material such as rubber is fixed to the lower surface of the top plate 17. The top plate 17 and the cushion member 18 form an upper bottom portion of the mooring hole 8, and an air vent hole 19 is formed at a central portion thereof.

【0019】一方、上記支持杭21は、鋼管杭からなっ
ており、浮体5に固定されたスリーブ部材12の略真下
に位置するように水底地盤Q上に立設されており、この
支持杭21に直列的に移動防止柱25が、支持杭21の
上面に溶接接合された、該支持杭21の上面より広幅の
第1の調整プレート23及び移動防止柱25下面に、溶
接接合された、該移動防止柱25の下面より広幅の第2
の調整プレート27を介して連結されており、この移動
防止柱25の上部が上記スリーブ部材12内に挿入され
ている。
On the other hand, the support pile 21 is formed of a steel pipe pile, and is erected on the underwater ground Q so as to be located substantially directly below the sleeve member 12 fixed to the floating body 5. The movement prevention column 25 is welded to the upper surface of the support pile 21 in series with the first adjustment plate 23 wider than the upper surface of the support pile 21 and the lower surface of the movement prevention column 25. A second width wider than the lower surface of the movement prevention column 25
, And the upper part of the movement preventing column 25 is inserted into the sleeve member 12.

【0020】そして、図2においてPで示される海面が
図示の位置(例えば満潮時)にあるときには、上記スリ
ーブ部材12内に挿入された移動防止柱25の頂部と係
留穴8の上底部を形成するクッション部材18の下面と
が距離Sだけ離間せしめられるようにされている。この
ような構成を有する本実施例の浮き桟橋1においては、
潮の満干等に応じて上記浮体5が上記移動防止柱25に
案内されて略鉛直方向に昇降するとともに、上記浮体5
が所定の高さ位置まで降下したとき、上記頂板プレート
19と上記移動防止柱25の頂部とが上記クッション部
材18を介して衝接するようにされる。
When the sea surface indicated by P in FIG. 2 is at the position shown in FIG. 2 (for example, at high tide), the top of the movement preventing column 25 inserted into the sleeve member 12 and the upper bottom of the mooring hole 8 are formed. The cushion member 18 is separated from the lower surface of the cushion member 18 by a distance S. In the floating pier 1 of the present embodiment having such a configuration,
The floating body 5 is guided by the movement prevention column 25 in accordance with the tide and the like and rises and descends in a substantially vertical direction.
When the is lowered to a predetermined height position, the top plate 19 and the top of the movement preventing column 25 come into contact with each other via the cushion member 18.

【0021】上記の構成の浮き桟橋1は次の各工程から
造設される。すなわち、上記した構成の浮体1を用意
し、該浮体1を係留すべき場所に曳航する工程。上記
浮体1を係留すべき場所に、予め上記浮体1の各係留穴
8の位置に合わせて支持杭21を水底地盤Qに杭打機等
により略鉛直に打設する工程。上記支持杭21の頂面
に第1の調整プレート23を溶接接合する工程。上記
浮体5の各係留穴8にスリーブ部材12をその下端部が
上記浮体5の底面より下方に突出する状態で挿着する工
程。先の工程において打設された支持杭21に連結す
べき各移動防止柱25の下面に第2の調整プレート27
を溶接接合するとともに、該移動防止柱25を水中から
上記浮体5に固定された各スリーブ部材12に挿入する
工程。上記浮体5の位置を調整しながら、各支持杭2
1と移動防止柱25にそれぞれ取り付けられた第1の調
整プレート23と第2の調整プレート27とを対向させ
て順次接合する工程。頂板プレート17の下面にクッ
ション部材19を固定し、この頂面プレート17を上記
係留穴8の上側開口を塞ぐように上記浮体の凹部7aに
取り付ける工程。
The floating pier 1 having the above structure is constructed from the following steps. That is, a step of preparing the floating body 1 having the above configuration and towing the floating body 1 to a place to be moored. A step of placing the support pile 21 substantially vertically in a place where the floating body 1 is to be moored by using a pile driving machine or the like in advance in accordance with the position of each mooring hole 8 of the floating body 1. Welding the first adjustment plate 23 to the top surface of the support pile 21; A step of inserting the sleeve member 12 into each of the mooring holes 8 of the floating body 5 with its lower end protruding below the bottom surface of the floating body 5. A second adjustment plate 27 is provided on the lower surface of each of the movement preventing columns 25 to be connected to the support pile 21 that has been cast in the previous step.
And inserting the movement preventing columns 25 from the water into the respective sleeve members 12 fixed to the floating body 5. While adjusting the position of the floating body 5, each support pile 2
And a step of sequentially joining the first adjustment plate 23 and the second adjustment plate 27 respectively attached to the first and second movement prevention columns 25 so as to face each other. Fixing the cushion member 19 to the lower surface of the top plate 17 and attaching the top plate 17 to the concave portion 7a of the floating body so as to close the upper opening of the mooring hole 8;

【0022】上述の如くの構成とされる本実施例の浮き
桟橋1においては、支持柱の上部を構成する移動防止柱
25が浮体5内部に挿入されるので、浮体5の側周部に
ローラ及びその支持金具等の突出物を設けないでよい。
従って船とそれらの突出物との衝突を確実に回避できて
船を安全かつ容易に接舷させることができるとともに、
移動防止柱25は浮体5の上面から突出することもない
ので、積み荷の揚げ降ろし作業等の邪魔になることもな
い。
In the floating pier 1 according to the present embodiment having the above-described structure, the movement preventing pillar 25 constituting the upper part of the supporting pillar is inserted into the floating body 5, so that the roller is provided on the side peripheral portion of the floating body 5. Also, there is no need to provide a protrusion such as a support metal fitting.
Therefore, collisions between the ship and those protrusions can be reliably avoided, and the ship can safely and easily berth,
Since the movement preventing column 25 does not protrude from the upper surface of the floating body 5, it does not hinder the operation of lifting and lowering the cargo.

【0023】また、浮体5が所定の高さ位置まで降下し
たとき、係留穴8の上底部を構成するクッション部材1
8と移動防止柱25の頂部とが衝接するようにされるの
で、浮体5はかかる位置より下へは沈まない。従って、
頂板プレート17やクッション部材18の厚み等を適宜
変えることにより、移動防止柱25の頂部とクッション
部材18との離間距離Sを調整することができ、それに
よって浮体5の降下高さをコントロールできるので、船
への乗降や積み荷の揚げ降ろし作業等の便宜が図られ
る。
When the floating body 5 is lowered to a predetermined height, the cushion member 1 forming the upper bottom of the mooring hole 8 is formed.
The floating body 5 does not sink below such a position since the top 8 of the movement prevention column 25 is in contact with the top of the movement prevention column 25. Therefore,
By appropriately changing the thickness and the like of the top plate 17 and the cushion member 18, the separation distance S between the top of the movement prevention column 25 and the cushion member 18 can be adjusted, and thereby the height of the floating body 5 can be controlled. In addition, convenience such as getting on and off the ship and unloading and loading cargo can be achieved.

【0024】また、係留穴8の上底部を構成する頂板プ
レート17と移動防止柱25の頂部との間にクッション
材18を配することにより、移動防止柱25の頂部と頂
板プレート18との衝接時の衝撃が緩和され、安全性が
増す。一方、本実施例の浮き桟橋の造設方法において
は、支持柱が支持杭21と移動防止柱25とで分割構成
され、支持杭21の水底地盤への打設及び移動防止柱2
5の浮体5への挿入が別々に行われるとともに、支持杭
21と移動防止柱25との連結が第1の調整プレート2
3及び第2の調整プレート27を介して行われる。その
ため、仮に支持杭21の打設位置が多少ずれても移動防
止柱25の位置を適正位置に修正した状態でそれらを連
結することができる。
Further, the cushioning member 18 is arranged between the top plate 17 constituting the upper bottom of the mooring hole 8 and the top of the movement preventing column 25, so that the top of the movement preventing column 25 and the top plate 18 are in contact with each other. Impact at the time of contact is reduced, and safety is increased. On the other hand, in the method of constructing the floating pier according to the present embodiment, the support pillar is divided into the support pile 21 and the movement prevention pillar 25, and the support pile 21 is placed on the underwater ground and the movement prevention pillar 2.
5 are separately inserted into the floating body 5, and the connection between the support pile 21 and the movement prevention column 25 is made by the first adjustment plate 2.
This is performed via the third and second adjustment plates 27. Therefore, even if the placement positions of the support piles 21 are slightly shifted, they can be connected in a state where the positions of the movement prevention columns 25 are corrected to appropriate positions.

【0025】また、係留穴8の上底部がクッション部材
18が固定された頂面プレート17で構成されて浮体5
製作後に取り付けられるようにされるので、浮体5自体
にはそれを上下に貫通する係留穴8を穿設しておけばよ
く、浮体5の製造や各部材の所定箇所への組み付け作業
が容易となる。
The upper bottom of the mooring hole 8 is constituted by a top plate 17 to which a cushion member 18 is fixed.
Since the floating body 5 is attached after manufacture, the floating body 5 itself may be provided with a mooring hole 8 that penetrates the floating body 5 vertically, which facilitates the manufacture of the floating body 5 and the work of assembling each member to a predetermined position. Become.

【0026】このようにされることにより、浮き桟橋の
造設作業を合理的に短期間で行うことができる。なお、
図4に示される如くに、第1の調整プレート23と第2
の調整プレート27との間に硬質ゴム等からなるマウン
ト部材28を介装すれば、浮体5に対する横方向及び縦
方向の衝撃を緩和することができる。
By doing so, the construction work of the floating pier can be performed in a reasonably short time. In addition,
As shown in FIG. 4, the first adjustment plate 23 and the second adjustment plate
By interposing a mount member 28 made of hard rubber or the like between the adjustment plate 27 and the adjustment plate 27, impacts on the floating body 5 in the horizontal and vertical directions can be reduced.

【0027】[0027]

【発明の効果】以上の説明から理解されるように、本発
明によれば、浮体の側周部にローラ及びその支持金具等
の突出物を設けることを要さず、従って船とそれらの突
出物との衝突を確実に回避できて船を安全かつ容易に接
舷させることができるとともに、浮体の降下高さをコン
トロールできることから、船への乗降や積み荷の揚げ降
ろし作業等が楽に行えて安全性を向上させことができる
浮き桟橋を提供することが可能となる。また、本発明に
係る浮き桟橋の造設方法によれば、上記浮き桟橋を合理
的に短期間で造設することができるという効果が得られ
る。
As will be understood from the above description, according to the present invention, it is not necessary to provide a roller and a protruding member such as a support bracket on the side peripheral portion of the floating body, and accordingly, the ship and the protruding portions thereof are not required. The ship can be safely and easily berthed by avoiding collisions with objects, and the height of the floating body can be controlled, making it easier to get on and off the ship and unload cargo. It is possible to provide a floating pier that can improve the performance. Further, according to the method for constructing a floating pier according to the present invention, an effect is obtained that the floating pier can be constructed in a reasonably short time.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る浮き桟橋の一実施例を示す斜視
図。
FIG. 1 is a perspective view showing one embodiment of a floating pier according to the present invention.

【図2】実施例の要部断面図。FIG. 2 is a sectional view of a main part of the embodiment.

【図3】実施例の斜視図。FIG. 3 is a perspective view of the embodiment.

【図4】変形例を示す要部側面図。FIG. 4 is a side view of a main part showing a modification.

【符号の説明】[Explanation of symbols]

1−浮き桟橋 5−浮体 12−スリーブ部材 14−ベアリング 17−頂板プレート 18−クッション部材 21−支持杭 23−第1の調整プレート 25−移動防止柱 27−第2の調整プレート P−海面 1-Floating Pier 5-Floating Body 12-Sleeve Member 14-Bearing 17-Top Plate 18-Cushion Member 21-Support Pile 23-First Adjustment Plate 25-Movement Prevention Column 27-Second Adjustment Plate P-Sea Surface

フロントページの続き (58)調査した分野(Int.Cl.6,DB名) B63B 21/00,21/50 B63B 35/00,35/34,35/44 Continuation of the front page (58) Field surveyed (Int. Cl. 6 , DB name) B63B 21/00, 21/50 B63B 35/00, 35/34, 35/44

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 複数箇所に係留穴が上下に貫通するよう
に穿設された、桟橋デッキ部分を構成する浮体と、 上記係留穴にその下端部を上記浮体の底面より下方に突
出させた状態で挿着されたスリーブ部材と、 上記係留穴の上側開口を塞ぐように上記浮体の上面部に
取り付けられた頂板プレートと、 水底地盤上に略鉛直に立設された支持杭と、 この支持杭に直列的に連結されて上記係留穴に固定され
たスリーブ部材に挿入された移動防止柱と、 上記頂板プレートと上記移動防止柱との間に配された所
定の厚みを有するクッション部材とを具備し、 潮の満干等に応じて上記浮体が上記移動防止柱に案内さ
れて略鉛直方向に昇降するとともに、上記浮体が所定の
高さ位置まで降下したとき、上記頂板プレートと上記移
動防止柱の頂部とが上記クッション部材を介して衝接す
るようにされてなる、浮き桟橋。
1. A floating body constituting a pier deck portion, wherein mooring holes are drilled at a plurality of locations so as to penetrate vertically, and a state in which a lower end portion of the mooring hole projects downward from a bottom surface of the floating body. A top plate attached to the upper surface of the floating body so as to close the upper opening of the mooring hole; a support pile standing substantially vertically on the underwater ground; And a cushion member having a predetermined thickness disposed between the top plate and the movement preventing column. The floating body is guided by the movement prevention column in accordance with the tide, etc., and moves up and down in a substantially vertical direction.When the floating body descends to a predetermined height position, the top plate and the movement prevention column The top is A floating pier designed to be in contact with the vehicle via a member.
【請求項2】 下記a〜gの各工程を含んで構成される
請求項1記載の浮き桟橋の造設方法。 a.予め複数箇所に係留穴が上下に貫通するように穿設
された浮体を用意し、該浮体を係留すべき場所に曳航す
る工程。 b.上記浮体を係留すべき場所に、予め上記浮体の各係
留穴の位置に合わせて支持杭を水底地盤に略鉛直に打設
する工程。 c.上記支持杭の頂面に該頂面より広幅の第1の調整プ
レートを取り付ける工程。 d.上記浮体の各係留穴にスリーブ部材をその下端部が
上記浮体の底面より下方に突出する状態で挿着する工
程。 e.先の工程において打設された支持杭に連結すべき各
移動防止柱の底面に該底面より広幅の第2の調整プレー
トを取り付けるとともに、該移動防止柱を水中から上記
浮体に固定された各スリーブ部材に挿入する工程。 f.上記浮体の位置を調整しながら、各支持杭と移動防
止柱にそれぞれ取り付けられた第1の調整プレートと第
2の調整プレートとを対向させて順次接合する工程。 g.頂板プレートの下面にクッション部材を固定し、こ
の頂面プレートを上記係留穴の上側開口を塞ぐように上
記浮体の上面部に取り付ける工程。
2. The method for constructing a floating pier according to claim 1, comprising the following steps a to g. a. A step of preparing a floating body previously drilled at a plurality of locations so that mooring holes penetrate vertically and towing the floating body to a place to be moored. b. A step of placing a support pile approximately vertically in a place where the floating body is to be moored, in advance in accordance with the position of each mooring hole of the floating body. c. Attaching a first adjustment plate wider than the top surface to the top surface of the support pile. d. Inserting a sleeve member into each of the mooring holes of the floating body with its lower end protruding below the bottom surface of the floating body. e. A second adjusting plate wider than the bottom surface is attached to the bottom surface of each movement prevention column to be connected to the support pile installed in the previous step, and each movement prevention column is fixed to the floating body from underwater. Step of inserting into a member. f. A step of sequentially joining the first adjusting plate and the second adjusting plate attached to each of the support piles and the movement preventing column while adjusting the position of the floating body so as to face each other. g. Fixing a cushion member to the lower surface of the top plate, and attaching the top plate to the upper surface of the floating body so as to close the upper opening of the mooring hole.
JP5283304A 1993-11-12 1993-11-12 Floating pier and its construction method Expired - Fee Related JP2967967B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5283304A JP2967967B2 (en) 1993-11-12 1993-11-12 Floating pier and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5283304A JP2967967B2 (en) 1993-11-12 1993-11-12 Floating pier and its construction method

Publications (2)

Publication Number Publication Date
JPH07132880A JPH07132880A (en) 1995-05-23
JP2967967B2 true JP2967967B2 (en) 1999-10-25

Family

ID=17663725

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5283304A Expired - Fee Related JP2967967B2 (en) 1993-11-12 1993-11-12 Floating pier and its construction method

Country Status (1)

Country Link
JP (1) JP2967967B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG148046A1 (en) * 2007-05-14 2008-12-31 Sembcorp Marine Ltd A mooring system
KR101718902B1 (en) * 2013-05-24 2017-03-23 한국과학기술원 Supporting Structure of Floating Structures using Guide Piles and Method for Installing the Same
KR101642763B1 (en) * 2015-10-26 2016-07-26 조준호 Floating post structure
KR101950262B1 (en) * 2016-11-04 2019-02-20 주진영 Floating bridge and method of manufacturing for floating bridge
ES2618366B1 (en) * 2017-03-31 2018-04-09 Aquatica Ingenieria Civil S.L Connecting cell for fixing floating docks to piles
KR101977110B1 (en) * 2017-06-29 2019-05-13 한국철도기술연구원 Floating bridge structure

Also Published As

Publication number Publication date
JPH07132880A (en) 1995-05-23

Similar Documents

Publication Publication Date Title
WO1999057010A1 (en) Deep draft semi-submersible offshore structure
JP2967967B2 (en) Floating pier and its construction method
US5713296A (en) Lightweight concrete dock
US4470725A (en) Offshore platform structure intended to be installed in arctic waters, subjected to drifting icebergs
CA1052109A (en) Breakwater
US4181452A (en) Oil-production platform and method of assembling and installing the same on a sea bed
US4193714A (en) Method for erecting a deck on a marine structure
EP3532678B1 (en) Harbour plant and method for mooring a floating body in a harbour plant
WO2015136086A1 (en) A quay structure, a quay arrangement and a method of installing such structure
CA2561449C (en) Floating pontoon berthing facility for ferries and ships
CN211815980U (en) High-pile beam-slab wharf structure
JP3463604B2 (en) Dolphin construction method
JP2002220087A (en) Semisubmersible floating structure and construction method for the floating structure
JPH0415778Y2 (en)
JPH11117225A (en) Reinforcing method and device for mooring pile of floating pier
JP5736411B2 (en) Floating pier
JPH09195281A (en) Method of installing caisson on sea
JP3132540B2 (en) Floating structure installation structure
KR200310142Y1 (en) The frame gravity type mooring facilities
JP3987830B2 (en) Floating wave structure
JP4258792B2 (en) Catamaran cruise support device
US4695194A (en) Mobile marine operations structure
JP2508383Y2 (en) Floating pier
JP3140401B2 (en) Floating member, underwater / overwater construction method and underwater / overwater construction method for formwork support
JP3363386B2 (en) Drain material driving work boat

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080820

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090820

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100820

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100820

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110820

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120820

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120820

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130820

Year of fee payment: 14

LAPS Cancellation because of no payment of annual fees