JPH09195281A - Method of installing caisson on sea - Google Patents

Method of installing caisson on sea

Info

Publication number
JPH09195281A
JPH09195281A JP2294096A JP2294096A JPH09195281A JP H09195281 A JPH09195281 A JP H09195281A JP 2294096 A JP2294096 A JP 2294096A JP 2294096 A JP2294096 A JP 2294096A JP H09195281 A JPH09195281 A JP H09195281A
Authority
JP
Japan
Prior art keywords
caisson
installation
air bag
bottomed
installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2294096A
Other languages
Japanese (ja)
Other versions
JP3754985B2 (en
Inventor
Masaharu Makibuchi
正治 巻渕
Satoru Tezuka
哲 手塚
Masao Shiga
正夫 志賀
Tokio Naganuma
時男 長沼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
UNYUSHO DAINI KOWAN KENSETSUKY
UNYUSHO DAINI KOWAN KENSETSUKYOKU
WAKACHIKU CONSTR
WAKACHIKU KENSETSU KK
Original Assignee
UNYUSHO DAINI KOWAN KENSETSUKY
UNYUSHO DAINI KOWAN KENSETSUKYOKU
WAKACHIKU CONSTR
WAKACHIKU KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by UNYUSHO DAINI KOWAN KENSETSUKY, UNYUSHO DAINI KOWAN KENSETSUKYOKU, WAKACHIKU CONSTR, WAKACHIKU KENSETSU KK filed Critical UNYUSHO DAINI KOWAN KENSETSUKY
Priority to JP02294096A priority Critical patent/JP3754985B2/en
Publication of JPH09195281A publication Critical patent/JPH09195281A/en
Application granted granted Critical
Publication of JP3754985B2 publication Critical patent/JP3754985B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

PROBLEM TO BE SOLVED: To safely perform a work for installing a caisson in a position having a proper distance from a bottomed caisson bottomed on a foundation riprap on the sea bottom in a short time. SOLUTION: An installing caisson 2 is situated in the state where its bottom part 2a is separated from a foundation riprap 6 on the sea near a bottomed caisson 1 bottomed on the foundation riprap 6. Caisson moving means 3 set on the bottomed caisson 1 and the installing caisson 2 are laid in operable state, and two or more air bags 4b of a shock absorber 4 are suspended from the upper surface of the bottomed caisson 1 to the side wall 1b opposed to the installing caisson 2 and made into high pressure. The installing caisson 2 is lowered by water injection, pulled to the bottomed caisson 1 side by the caisson moving means 3, and brought into contact with the air bags 4b, the position of the installing caisson 2 is moved and corrected by the caisson moving means 3 while adjusting the pressures within the air bags 4b. Thereafter, the installing caisson 2 is bottomed by water injection, and the air bags 4b are then contracted and lifted up.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、防波堤,岸壁,護
岸,係船施設,突堤,離岸堤等に使用され底部が閉塞さ
れているコンクリート製や鋼製のケーソンを海底に敷き
詰められた基礎捨石上に順次据え付ける際に、予め基礎
捨石上に着底せしめられている既設のケーソン(以下、
着底ケーソンと言うことがある)との衝突を防止しなが
ら、安全且つ迅速に着底ケーソンに隣接する所定の位置
に次に据え付けるべきケーソン(以下、単に据付ケーソ
ンと言うことがある)を据え付けることのできる海上に
おけるケーソンの据付方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation rubble laid on the seabed with a caisson made of concrete or steel used for breakwaters, quays, seawalls, mooring facilities, jetties, breakwaters, etc. When installing sequentially on top, the existing caisson (hereinafter,
Safely and quickly install a caisson to be installed next (hereinafter sometimes simply referred to as an installation caisson) at a predetermined position adjacent to the bottom caisson while preventing a collision with the bottom caisson. It relates to a caisson installation method that can be done at sea.

【0002】[0002]

【従来の技術】底部が閉塞されているコンクリート製や
鋼製のケーソンを使用して防波堤,岸壁,護岸,係船施
設,突堤,離岸堤等を構築するには、海底の所定の位置
に捨石を敷き詰めて基礎捨石を構成し、製造されたケー
ソンの底部をこの基礎捨石上の所定の位置に載置するよ
うに着底せしめ、次いでこの着底せしめられた着底ケー
ソンに隣接して適当な間隔を隔てた位置に次に据え付け
られる据付ケーソンを基礎捨石上に着底させて据え付け
る作業を、順次繰り返し行うのである。
2. Description of the Related Art To construct a breakwater, a quay wall, a seawall, a mooring facility, a jetty, a breakwater, etc. by using a caisson made of concrete or steel with a closed bottom, rubble is placed at a predetermined position on the seabed. To form a foundation rubble, place the bottom of the manufactured caisson on the foundation rubble at a specified position, and then place the bottom caisson on the bottom of the caisson. The installation caisson, which is to be installed next at spaced intervals, is installed on the foundation rubble by bottoming and installing it.

【0003】着底ケーソンに隣接して据付ケーソンを据
え付けるための一般的な作業は、図6にフローシートで
示す如く、 先ず、据付ケーソンを海上に浮遊させた状態で据え
付けるべき位置近傍である所定の海域まで曳船により曳
航する。 そして、曳航してきた据付ケーソンを着底ケーソン
に或る程度まで近付けて後、ケーソン移動手段を稼動可
能状態とする。このケーソン移動手段としては、例えば
据付ケーソン又は着底ケーソンに設置されているウイン
チと、このウインチが設置されているケーソンと反対側
の着底ケーソン又は据付ケーソンに端部を連結されてい
て滑車を介して前記ウインチに巻取・巻出される引寄用
ワイヤーロープと、一端を海底に係止されており前記据
付ケーソン又は着底ケーソンに設置されているウインチ
に巻取・巻出されるアンカーワイヤーロープとを備えて
いる態様や、据付ケーソン又は着底ケーソンに設置され
ているウインチと、このウインチが設置されているケー
ソンと反対側の着底ケーソン又は据付ケーソンに設けら
れている滑車と、一端を海底に係止されており前記滑車
を介して前記ウインチに巻取・巻出される引寄用ワイヤ
ーロープ兼アンカーワイヤーロープとを備えている態様
を挙げることができる。 次いでケーソン移動手段のウインチを操作して、着
底ケーソンに対して据付ケーソンが適当な間隔を隔てた
位置に位置するように移動させる。 この据付ケーソンを着底ケーソン側に移動させると
きに、据付ケーソンの側壁と閉塞されている底部とによ
り囲まれている内部に注水(一次注水)することによっ
てその底部が基礎捨石の上面から適当な距離だけ離れた
位置に位置するまで据付ケーソンを沈降させる。 しかる後、据付け位置の精密な位置決め及び確認を
行うと共に、更に据付ケーソンの内部に注水(二次注
水)して、未だ浮いた状態にある据付ケーソンを基礎捨
石上に着底させる。 かくして据え付けられたケーソン及び着底ケーソン
に設置したケーソン移動手段等の機材を取り外してケー
ソンの据付が完了する。これら一連の作業は、気象条件
の良い,すなわち風が弱く波が静かなときに一気に行わ
れる。
The general work for installing the installation caisson adjacent to the bottom caisson is, as shown in the flow sheet of FIG. 6, first, the installation caisson is placed in the vicinity of the position to be installed in a floating state on the sea. Towed to the sea area of. Then, after the towed installation caisson is brought close to the bottom caisson to a certain extent, the caisson moving means is made operable. As this caisson moving means, for example, a winch installed on an installation caisson or a bottom caisson and an end part connected to the bottom caisson or the installation caisson on the side opposite to the caisson on which this winch is installed are connected to a pulley. A pulling wire rope that is wound and unwound onto the winch via an anchor wire rope that is wound and unwound on the winch installed at the installation caisson or bottom caisson and has one end locked to the seabed. And a winch installed on the installation caisson or the bottom caisson, and a pulley installed on the bottom caisson or the installation caisson opposite to the caisson on which the winch is installed, and one end An anchoring wire rope that is locked on the seabed and is wound around and unwound from the winch via the pulley. It can be exemplified embodiment comprises and. Then, the winch of the caisson moving means is operated to move the installation caisson with respect to the bottom caisson so as to be positioned at a proper distance. When this installation caisson is moved to the bottom caisson side, by pouring water (primary water injection) into the inside surrounded by the side wall of the installation caisson and the closed bottom, the bottom of the caisson can be properly adjusted from the top surface of the foundation rubble. Let the installation caisson settle until it is located a distance away. After that, precise positioning and confirmation of the installation position are performed, and water is further injected into the installation caisson (secondary water injection) so that the installation caisson still in a floating state is bottomed on the foundation rubble. The caisson thus installed and the caisson moving means installed on the bottom caisson are removed to complete the caisson installation. This series of operations is performed at once in good weather conditions, that is, when the wind is weak and the waves are quiet.

【0004】ケーソン移動手段としては、前記した如き
態様の他に、図8に示す如くウインチ3aが設置されてい
る起重機船7を利用し、着底ケーソン1に一端を連結さ
れている引寄用ワイヤロープ3cが据付ケーソン2に設け
られた滑車3bを介して起重機船7のウインチ3aに巻取・
巻出自在に装着されている態様や、図示しないが同じく
ウインチが設置されている起重機船を利用し、据付ケー
ソンに一端を連結されている引寄用ワイヤロープが着底
ケーソンに設けられた滑車を介して起重機船のウインチ
に巻取・巻出自在に装着されている態様等種々挙げるこ
とができ、これらの態様の場合、通常据付ケーソン2に
対して着底ケーソン1の反対側及び法線10と直交する方
向等据付ケーソン2の周辺に引船9が配されていてこの
引船9と据付ケーソン2とがロープで繋がれている。そ
して、この引船9によって引っ張りながら据付ケーソン
2を移動する作業が行われる。ここで、例えば据付ケー
ソン2の浮力が小さい場合等に、クレーン8を設置され
ている起重機船7を利用し、図9に示す如く据付ケーソ
ン2の上端に端部を連結されている吊下用ワイヤロープ
8aを前記クレーン8のフックに引っ掛けて据付ケーソン
2を吊り下げた状態にし、据付ケーソン2を据え付ける
べき所定の海域に位置させたり、クレーン操作によって
沈降させて基礎捨石6上に着底させたりする作業が行わ
れることもある。
As the caisson moving means, in addition to the above-mentioned mode, a hoisting ship 7 having a winch 3a as shown in FIG. 8 is used, and one end of the caisson 1 is connected to the bottom caisson 1. The wire rope 3c is wound around the winch 3a of the hoist ship 7 via the pulley 3b provided on the installation caisson 2.
A pulley in which a pulling wire rope whose one end is connected to an installation caisson is provided on the bottom caisson by using a hoisting ship in which a winch is also installed (not shown). There are various modes such as being mounted on a winch of a hoist ship so as to be able to be wound and unwound freely. In the case of these modes, the side opposite to the bottom caisson 1 and the normal line to the normal installation caisson 2 are usually used. A tugboat 9 is arranged around the installation caisson 2 in a direction orthogonal to 10, and the tugboat 9 and the installation caisson 2 are connected by a rope. Then, the work of moving the installation caisson 2 while pulling by the tugboat 9 is performed. Here, for example, when the buoyancy of the installation caisson 2 is small, the hoisting ship 7 with the crane 8 installed is used to suspend the end of the installation caisson 2 as shown in FIG. Wire rope
8a is hooked on the hook of the crane 8 so that the installation caisson 2 is suspended, and the installation caisson 2 is located in a predetermined sea area where the caisson 2 should be installed, or it is settled by a crane operation and settled on the foundation rubble 6. Sometimes work is done.

【0005】このようなケーソンの据付作業は、気象条
件の良いときに行うと言っても海上の作業であるから浮
いている据付ケーソン2は常にあらゆる方向に揺動して
いるのであり、据付ケーソン2が着底ケーソン1に近接
せしめられた状態では据付ケーソン2が着底ケーソン1
に衝突して互いに破損する恐れがあるので、着底ケーソ
ン1の据付ケーソン2と対向する側壁1bに図7,8に示
す如く緩衝材5を配して衝撃を緩めてケーソン1,2の
破損を防止することが極めて重要であった。
Even if the caisson installation work as described above is performed at sea even when the weather conditions are good, the installation caisson 2 that is floating is always swinging in all directions. Installation caisson 2 is the bottom caisson 1 when 2 is close to the bottom caisson 1.
Since there is a risk that they will collide with each other and be damaged, the cushioning material 5 is placed on the side wall 1b of the bottom caisson 1 facing the installation caisson 2 as shown in FIGS. It was extremely important to prevent

【0006】従来、ケーソンの衝突による破損を防止す
るための前記緩衝材5としては、角材(木材),ゴム防
舷材,ゴムタイヤ等が使用されており、ロープ等の吊り
下げ手段により作業者が着底ケーソン1上の所定の位置
で把持することによりこの緩衝材5を着底ケーソン1の
上端より吊り下げていた。すなわち、据付ケーソン2は
着底ケーソン1に対して所定の間隔を隔てて据え付けら
れるので、この所定の間隔と略同幅の緩衝材5をロープ
等の吊り下げ手段により所定の位置に着底ケーソン1の
上端より吊り下げた状態で据付け位置の精密な位置決め
及び確認・修正を行って据付ケーソン2を基礎捨石6上
に着底させて後、作業者により緩衝材5を引き上げて取
り除いていた。
[0006] Conventionally, as the cushioning material 5 for preventing the damage due to the collision of the caisson, a square bar (wood), a rubber fender, a rubber tire, etc. have been used, and a worker can be suspended by a rope or the like. The cushioning material 5 was suspended from the upper end of the bottom caisson 1 by gripping it at a predetermined position on the bottom caisson 1. That is, since the installation caisson 2 is installed at a predetermined interval with respect to the bottom caisson 1, the cushioning material 5 having a width substantially equal to the predetermined interval is placed at a predetermined position on the bottom caisson by suspending means such as a rope. After the installation caisson 2 was precisely positioned and confirmed / corrected in a state of being suspended from the upper end of 1, the installation caisson 2 was bottomed on the foundation rubble 6, and the cushioning material 5 was removed by an operator.

【0007】しかしながら、前述した如く据付ケーソン
2は常にあらゆる方向に揺動しており且つ据付ケーソン
2の位置調整はウインチの巻取・巻出によって行われる
ので、寸分の狂いが生じること無く据え付けることは困
難である。従ってウインチによって据付ケーソン2を着
底ケーソン1側に引き寄せすぎると、据付ケーソン2と
着底ケーソン1との間に緩衝材5が強く挾持されて緩衝
材5を引き上げることができなくなるという欠点があっ
た。このような場合には、精度良く据え付けられた据付
ケーソン2を内部の水を排水したりクレーン8で吊り下
げている場合にはクレーン操作によって僅かに浮かせて
からケーソン移動手段によって緩衝材5を取り除くこと
ができる程度に着底ケーソン1と反対側に移動させ、緩
衝材5を取り除いてから再び注水又はクレーン操作を行
って着底させるのであるが、据付ケーソン2を着底ケー
ソン1と反対側に移動させたときに位置がズレることが
あり据付ケーソン2を再び精度良く所定に位置に着底さ
せて据え付けるのに時間を要するという欠点があった。
However, as described above, the installation caisson 2 is always swinging in all directions, and the position adjustment of the installation caisson 2 is performed by winding and unwinding the winch, so that the installation caisson 2 should be installed without any misalignment. It is difficult. Therefore, when the installation caisson 2 is pulled too close to the bottom caisson 1 side by the winch, the cushioning material 5 is strongly held between the installation caisson 2 and the bottom caisson 1 and the cushioning material 5 cannot be pulled up. It was In such a case, if the installed caisson 2 installed with high precision is drained of the water inside or suspended by the crane 8, the caisson moving means removes the cushioning material 5 after floating it slightly by operating the crane. The caisson 1 is moved to the opposite side to the extent that it can be removed, and the cushioning material 5 is removed, and then water is poured or the crane operation is performed again to reach the bottom. The position of the caisson 2 may be displaced when it is moved, and it takes a long time to accurately set the caisson 2 to a predetermined position and set it down.

【0008】更に、着底ケーソン1上にはワイヤーロー
プ,アンカーワイヤーロープ,ウインチ,滑車等のケー
ソン移動手段を構成する部材や据付ケーソン2内部へ海
水を注水又は排水するためのポンプその他の機械器具が
設けられていて煩雑な状態にあり且つ緩衝材5は前記し
た如く作業者が着底ケーソン1上で吊り下げ手段により
把持しているので、据付ケーソン2と着底ケーソン1と
の間に緩衝材5が挾持されていて作業者が吊り下げ手段
をしっかり把持している状態のときにうねりの影響等を
受けて緩衝材5が挾持されている力が急激に弱くなる
と、その反動により作業者がバランスを失って煩雑な機
械器具につまずいて転んだり浮いている据付ケーソン2
と着底ケーソン1との間の海に転落したりして非常に危
険であるという欠点があった。
Further, on the bottom caisson 1, members such as wire ropes, anchor wire ropes, winches, pulleys, and the like that constitute the caisson moving means, and pumps and other mechanical devices for injecting or draining seawater into the installed caisson 2 are installed. Is provided and is in a complicated state, and since the operator holds the cushioning material 5 by the suspending means on the bottom caisson 1 as described above, the cushioning material 5 is provided between the installation caisson 2 and the bottom caisson 1. When the force to hold the cushioning material 5 suddenly weakens due to the influence of swelling while the material 5 is being held and the operator is firmly gripping the suspending means, the operator is recoiled by the reaction. Loses balance and trips over complicated machinery, falls and floats. Installation caisson 2
There was a drawback that it was very dangerous because it fell into the sea between the bottom and the bottom caisson 1.

【0009】[0009]

【発明が解決しようとする課題】本発明は、上記従来技
術の欠点を解消し、海底の基礎捨石上に着底されている
既設のケーソンに隣接する所定の間隔を隔てた位置に次
に据え付けられるケーソンを着底させる作業を、安全に
且つ短時間に行うことができる海上におけるケーソンの
据付方法を提供することを課題とする。
DISCLOSURE OF THE INVENTION The present invention solves the above-mentioned drawbacks of the prior art, and next installs it at a predetermined space adjacent to an existing caisson on the foundation rubble on the seabed. It is an object of the present invention to provide a method of installing a caisson on the sea, which allows a caisson to be bottomed safely and in a short time.

【0010】[0010]

【課題を解決するための手段】本発明者等は、かかる課
題を解決すべく鋭意検討を重ねた結果、海底に敷き詰め
られた基礎捨石上に底部を予め着底されている着底ケー
ソンの近傍の海上に据付ケーソンを底部が該基礎捨石か
ら離れた状態に位置させた後、前記着底ケーソンから所
定の間隔を隔てた位置に移動させて該基礎捨石上に着底
させるに際し、据付ケーソンを移動させるため着底ケー
ソンと据付ケーソンとに設置されているケーソン移動手
段を稼動可能な状態にすると共に、圧力調整手段と該圧
力調整手段により内部圧力を調整されて着底ケーソンか
ら据付ケーソンが据え付けられる所定の間隔より広幅な
ケーソン当接部分を形成される空気袋とを備えた緩衝装
置の該空気袋を、着底ケーソンの上面より据付ケーソン
と対向する側壁に間隔を隔てて2個以上吊り下げてその
内部を高圧にして、据付ケーソンをその底部が基礎捨石
の近傍に位置するまで沈降させると共にケーソン移動手
段によって据付ケーソンを着底ケーソン側に引き寄せて
緩衝装置の空気袋に当接させた状態から、空気袋内の圧
力を調整しながら据付ケーソンの位置をケーソン移動手
段によって移動修正して後、据付ケーソンの底部が基礎
捨石上に載置されて着底されるまで据付ケーソンを沈降
させ、しかる後に空気袋内圧力を圧力調整手段によって
低下させて空気袋を収縮させてから引き上げれば、着底
ケーソンから所定の間隔を隔てた位置に次に据え付ける
べき据付ケーソンを着底させて据え付ける作業を安全且
つ迅速に行えることを究明して本発明を完成したのであ
る。
Means for Solving the Problems As a result of intensive studies to solve the above problems, the inventors of the present invention have found that the bottom of the caisson is bottomed on a rubble foundation laid on the seabed. After locating the installation caisson on the sea in a state in which the bottom part is separated from the foundation rubble, when moving the installation caisson to a position at a predetermined distance from the bottom caisson to settle on the foundation rubble, In order to move the caisson moving means installed in the bottom caisson and the installation caisson, the pressure adjusting means and the internal pressure are adjusted by the pressure adjusting means to install the installation caisson from the bottom caisson. A bladder having a bladder formed with a caisson abutting portion wider than a predetermined interval, the bladder being provided on a side wall facing the installation caisson from an upper surface of the bottom caisson. Two or more pieces are hung from each other and a high pressure is applied to the inside to sink the installed caisson until the bottom of the caisson is located near the foundation rubble, and the caisson moving means pulls the installed caisson to the bottom caisson side to absorb the shock. After adjusting the pressure inside the air bladder from the state of contacting it with the air bladder, the position of the installation caisson is corrected by moving the caisson moving means, and then the bottom of the installation caisson is placed on the foundation rubble and bottoms. Until the installation caisson is settled, and then the pressure inside the bladder is reduced by the pressure adjusting means to contract the bladder, and then the bladder is pulled up, then it should be installed at a position spaced a predetermined distance from the bottom caisson. The present invention has been completed by investigating that the work of mounting the installation caisson on the bottom can be performed safely and quickly.

【0011】[0011]

【発明の実施の形態】以下、図面により本発明に係る海
上におけるケーソンの据付方法について詳細に説明す
る。図1は本発明方法に好ましく使用される緩衝装置を
示す正面説明図、図2は本発明方法に使用されるコンク
リート製のケーソンの1例を示す斜視図、図3はケーソ
ンが基礎捨石上に据え付けられた状態を示しており(イ)
は側面説明図で(ロ)は平面説明図、図4は本発明方法を
実施している過程を示しており着底ケーソンの近傍に浮
いている据付ケーソンと着底ケーソンとにケーソン移動
手段を稼働可能状態とすると共に緩衝装置の空気袋を着
底ケーソンの上部より吊り下げている状態を示す(イ)は
側面説明図で(ロ)は平面説明図、図5は本発明方法を実
施している過程を示しておりケーソン移動手段によって
据付ケーソンを着底ケーソン側に移動させると共に位置
決めを行っている状態を示す(イ)は側面説明図で(ロ)は
平面説明図である。
BEST MODE FOR CARRYING OUT THE INVENTION A caisson installation method according to the present invention will be described in detail below with reference to the drawings. FIG. 1 is a front explanatory view showing a shock absorber preferably used in the method of the present invention, FIG. 2 is a perspective view showing an example of a concrete caisson used in the method of the present invention, and FIG. 3 is a caisson on a foundation rubble. It shows the installed state (a)
Is a side view and (b) is a plan view, and FIG. 4 shows a process of carrying out the method of the present invention. A caisson moving means is installed between the installation caisson and the bottom caisson floating near the bottom caisson. (A) is a side explanatory view, (b) is a plan explanatory view, and FIG. 5 shows the method of the present invention when the air bag of the shock absorber is suspended from the upper part of the bottom caisson. FIG. 7B is a side view and FIG. 8B is a plan view showing a state in which the installation caisson is moved to the bottom caisson side by the caisson moving means and the positioning is performed.

【0012】図面中、1は海底に敷き詰められた基礎捨
石6上に底部1aを予め着底されている着底ケーソン、2
はこの着底ケーソン1に隣接して所定の間隔を隔てた位
置に前記着底ケーソン1と同様に基礎捨石6上に底部2a
を載置されて着底される据付ケーソンである。これらの
着底ケーソン1及び据付ケーソン2は、コンクリートや
鋼板より構成されており、図2に示す如く少なくとも対
向する側壁1b,2bがフラットに形成されており側壁1b,
2bに囲まれた空間に全高さに亘って隔壁1c,2cが形成さ
れていて底部1a,2aが閉塞されている。
In the drawings, 1 is a bottom caisson in which a bottom portion 1a is preliminarily bottomed on a foundation rubble 6 laid on the seabed, 2
Like the bottom caisson 1, the bottom part 2a is located on the foundation rubble 6 at a position adjacent to the bottom bottom caisson 1 and at a predetermined interval.
It is an installation caisson that is placed and bottomed. The bottom caisson 1 and the installation caisson 2 are made of concrete or steel plate, and at least opposing side walls 1b and 2b are formed flat as shown in FIG.
Partitions 1c and 2c are formed over the entire height in a space surrounded by 2b, and bottoms 1a and 2a are closed.

【0013】3は底部2aが基礎捨石6から離れた状態で
位置せしめられている据付ケーソン2を着底ケーソン1
側に移動させたり着底ケーソン1の側面とその側面とが
一直線を成すようにすなわち法線10の方向の位置を修正
したりするためのケーソン移動手段であり、従来技術と
して説明したケーソン移動手段を使用することができる
のでその説明は省略する。
Reference numeral 3 designates an installation caisson 2 which is positioned with the bottom portion 2a thereof separated from the foundation rubble 6, and a bottom caisson 1 is attached.
It is a caisson moving means for moving to the side or correcting the position in the direction of the normal 10 so that the side surface of the bottom caisson 1 and the side surface thereof form a straight line. Can be used, the description thereof will be omitted.

【0014】4は圧力調整手段4aとこの圧力調整手段4a
によって空気を供給・排出されて容積が増減せしめられ
膨張・収縮される軟質な材料より形成されている空気袋
4bとを備えている緩衝装置である。空気袋4bは、空気が
供給されてその内部が高圧となって膨張した状態で着底
ケーソン1から据付ケーソン2が据え付けられる所定の
間隔より広幅なケーソン当接部分4bcを有している。更
にこの空気袋4bには、着底ケーソン1上からの吊下げ及
び着底ケーソン1の着底後にこの空気袋4bを引き上げる
ためにロープ4bdが装着されている。
Reference numeral 4 is a pressure adjusting means 4a and this pressure adjusting means 4a.
An air bag made of a soft material that is expanded and contracted by supplying and discharging air to increase and decrease its volume.
4b and a shock absorber. The air bag 4b has a caisson abutting portion 4bc wider than a predetermined interval at which the bottom caisson 1 to the installation caisson 2 are installed in a state where air is supplied and the inside thereof is inflated to a high pressure. Further, a rope 4bd is attached to the air bag 4b in order to suspend the air bag 4b from above the bottom caisson 1 and pull up the air bag 4b after the bottom caisson 1 bottoms.

【0015】また空気袋4bを形成している材料として
は、この空気袋4bは後述する如く着底ケーソン1と据付
ケーソン2との間で押圧されるものであってケーソンは
小さいものでも1,000トン程度の重量を有している
ので着底ケーソン1と据付ケーソン2とで押圧されたと
きに耐え得る強度を有し且つ容積が増減せしめられるも
のであれば使用することができる。更に海面近傍位置に
吊り下げられて使用され且つ据付ケーソン2を所定の位
置に着底させた後に作業者により引き上げられるので、
水を吸収する材質であると空気袋4bの重量が増大して引
き上げるときに作業者にかかる負担が大きくなるので水
を吸収しないものであることが好ましい。これらを考慮
して、種々のゴム等より形成されていることが好まし
く、図1に示す如く空気袋4bはゴム製の本体4ba内にナ
イロンコードの如き補強材を埋設されているゴム製の補
強帯4bbが縦方向及び横方向にそれぞれ間隔を隔てて周
設されているものを挙げることができる。
As a material for forming the air bag 4b, the air bag 4b is pressed between the bottom caisson 1 and the installation caisson 2 as will be described later, and even if the caisson is small 1, Since it has a weight of about 000 tons, any one can be used as long as it has a strength to withstand when pressed by the bottom caisson 1 and the installation caisson 2 and the volume can be increased or decreased. Furthermore, since it is used by being suspended at a position near the sea surface, and the installation caisson 2 is set on the predetermined position and then pulled up by the operator,
If the material absorbs water, the weight of the air bladder 4b increases and the burden on the operator when pulling up the air bag 4b increases. Therefore, it is preferable that the material does not absorb water. In consideration of these, it is preferable that the air bag 4b is made of various kinds of rubber or the like. As shown in FIG. 1, the air bag 4b has a rubber body in which a reinforcing material such as a nylon cord is embedded in a rubber body. The band 4bb may be provided at intervals in the vertical direction and the horizontal direction, respectively.

【0016】また、このような空気袋4bのケーソン当接
部分4bcには、その表面とケーソンとが当接したときに
生じる摩擦抵抗を小さくする部材,例えばふっ素樹脂製
の板体が固定されていたり二硫化モリブデンの粉末が混
入された塗料が塗布されていたりすることが空気袋4bの
損傷を防止することができるので好ましい。
Further, a member for reducing the frictional resistance generated when the surface and the caisson are in contact with each other, such as a plate made of fluororesin, is fixed to the caisson contact portion 4bc of the air bag 4b. It is preferable that the air bag 4b is prevented from being damaged or that a paint mixed with powder of molybdenum disulfide is applied.

【0017】圧力調整手段4aとしては、コンプレッサ4a
aと、一端がこのコンプレッサ4aaにまた他端が空気袋4b
に連結されている空気供給可撓管4abと、空気袋4b内の
圧力を検出する圧力計4acと、空気袋4b内の空気を排気
するためのバルブ4adとを備えて構成されているものを
挙げることができる。
As the pressure adjusting means 4a, the compressor 4a
a, this compressor 4aa at one end and air bag 4b at the other end
An air supply flexible tube 4ab connected to, a pressure gauge 4ac for detecting the pressure in the air bladder 4b, and a valve 4ad for exhausting the air in the air bladder 4b. Can be mentioned.

【0018】本発明方法を実施して着底ケーソン2に隣
接して基礎捨石6上の所定の間隔を隔てた位置に据付ケ
ーソン2を着底させて据え付けるには、先ず据付ケーソ
ン2を所定の位置に,すなわち既に着底されていて次に
据付ケーソン2を隣接して据え付けられる着底ケーソン
1の近傍位置に据付ケーソン2を底部2aが基礎捨石6か
ら離れた状態で位置せしめるのであり、ケーソンが置か
れているケーソン仮置場より据え付けるべき据付ケーソ
ン2を、浮遊させた状態で引船によって前記所定の位置
まで曳航したり、クレーン8が設置されている起重機船
7を利用しこのクレーン8に吊下用ワイヤロープ8aを介
して吊り下げた状態で起重機船7を航行させて前記所定
の位置まで運んだりする。
In order to carry out the method of the present invention and set the installation caisson 2 on the foundation rubble 6 at a position spaced by a predetermined distance adjacent to the bottom caisson 2, the installation caisson 2 is first set to a predetermined position. The installation caisson 2 is located at a position, that is, in the vicinity of the bottom caisson 1 that has already been bottomed and the installation caisson 2 is next installed next to the caisson. The installation caisson 2 to be installed from the temporary storage area where the crane is placed is towed to the above-mentioned predetermined position by a tug in a floating state, or is suspended on this crane 8 using the hoist ship 7 on which the crane 8 is installed. The hoist ship 7 is made to sail and carried to the predetermined position while being suspended via the lower wire rope 8a.

【0019】そして、着底ケーソン1上に圧力調整手段
4aを設置すると共に空気袋4bを圧力調整手段4aによりそ
の内部を高圧にしてケーソン当接部分4bcが形成された
状態で着底ケーソン1上から据付ケーソン2に対向せし
められる側壁1bに間隔を隔てて2個以上吊り下げて、緩
衝装置4を着底ケーソン1に設置する。空気袋4bの吊下
げは、着底ケーソン1に吊下げ金具を固定しておき、こ
の吊下げ金具に空気袋4bに装着されているロープ4bdを
固定すれば良い。また、着底ケーソン1の近傍位置に位
置せしめられ底部2aが基礎捨石6から離れた状態の据付
ケーソン2を移動せしめるケーソン移動手段3を設置す
る。
Pressure adjusting means is provided on the bottom caisson 1.
4a is installed and the inside of the air bag 4b is made high in pressure by the pressure adjusting means 4a so that the caisson contact portion 4bc is formed with a space between the bottom caisson 1 and the side wall 1b facing the installation caisson 2. 2 or more, and the shock absorber 4 is installed in the bottom caisson 1. To suspend the air bag 4b, a hanging metal fitting may be fixed to the bottom caisson 1, and the rope 4bd attached to the air bag 4b may be fixed to the hanging metal fitting. Further, a caisson moving means 3 for moving the installation caisson 2 which is located in the vicinity of the bottom caisson 1 and whose bottom portion 2a is away from the foundation rubble 6 is installed.

【0020】次いで、据付ケーソン2を移動させるため
着底ケーソン1と据付ケーソン2とに設置されているケ
ーソン移動手段3を稼動可能な状態にして、このケーソ
ン移動手段3によって据付ケーソン2を着底ケーソン1
側に移動させるのであるが、このとき前記した如く据付
ケーソン2を曳航するときには据付ケーソン2に働く水
の抵抗を低減させるために据付ケーソン2は比較的浅く
浮いている状態であるから据付ケーソン2の側壁2bで囲
まれた空間内に一次注水して、またクレーン8で吊り下
げている場合にはクレーン8を操作して基礎捨石6上の
近傍に底部2aが位置するが未だ着底しない浮いている状
態に沈降させる。このように据付ケーソン2を沈降させ
たり浮上させたりする操作は、据付ケーソン内に注水・
排水したりクレーン8を操作したりすることによって行
われるのであり、以下単に沈降又は浮上と言うことがあ
る。
Next, in order to move the installation caisson 2, the caisson moving means 3 installed in the bottom caisson 1 and the installation caisson 2 is made operable, and the caisson moving means 3 bottoms the installation caisson 2. Caisson 1
At this time, when the installation caisson 2 is towed as described above, the installation caisson 2 is in a relatively shallow floating state in order to reduce the resistance of water acting on the installation caisson 2. When the primary water is injected into the space surrounded by the side wall 2b of the above, and when the crane 8 is suspended, the crane 8 is operated to locate the bottom 2a near the foundation rubble 6 Let it settle. In this way, the operation to settle or float the installation caisson 2 is performed by pouring water into the installation caisson.
It is performed by draining water or operating the crane 8, and may be simply referred to as sedimentation or floating.

【0021】そして、据付ケーソン2を着底ケーソン1
側に引き寄せて緩衝装置4の空気袋4bに当接させた状態
にして据付ケーソン2と着底ケーソン1とを前記所定の
間隔より広い間隔で保持する。この状態から据付ケーソ
ン2の法線10の方向の位置をケーソン移動手段3によっ
て移動修正すると共に据付ケーソン2の着底ケーソン1
からの間隔が所定の間隔となるように空気袋内4bの圧力
を圧力調整手段4aによって調整しながらケーソン移動手
段3によって据付ケーソン2を移動修正する。このと
き、据付ケーソン2はケーソン移動手段3により着底ケ
ーソン1側に或る程度の力で引き寄せられている。
Then, the installation caisson 2 is attached to the bottom caisson 1
The installation caisson 2 and the bottom caisson 1 are held at a wider distance than the predetermined distance while being pulled toward the side and brought into contact with the air bag 4b of the shock absorber 4. From this state, the position of the installation caisson 2 in the direction of the normal 10 is moved and corrected by the caisson moving means 3, and the bottom caisson 1 of the installation caisson 2 is fixed.
The installation caisson 2 is moved and corrected by the caisson moving means 3 while adjusting the pressure in the air bladder 4b by the pressure adjusting means 4a so that the distance from is a predetermined distance. At this time, the installation caisson 2 is pulled toward the bottom caisson 1 by the caisson moving means 3 with a certain amount of force.

【0022】しかる後、据付ケーソン2の底部2aが基礎
捨石6上に載置されて着底されるまで沈降させて据付ケ
ーソン2の据付を完了したら、空気袋4b内の圧力を圧力
調整手段4aによって低下させて空気袋4bを収縮させてか
ら引き上げれば全作業が完了する。
After that, the bottom portion 2a of the installation caisson 2 is placed on the foundation rubble 6 and settled until it reaches the bottom, and when the installation of the installation caisson 2 is completed, the pressure in the air bag 4b is adjusted by the pressure adjusting means 4a. The entire work is completed by lowering the air bag 4b to shrink it and then pulling it up.

【0023】[0023]

【発明の効果】このような本発明方法を実施して、既に
基礎捨石6上に着底されている着底ケーソン1に隣接し
て所定の間隔を隔てた位置に据付ケーソン2を着底させ
て据え付けると、着底ケーソン1の近傍に位置せしめら
れ浮いている状態の据付ケーソン2を着底ケーソン1側
に移動させるときに据付ケーソン2は波の影響を受けて
あらゆる方向に揺動していて着底ケーソン1側にも揺動
するのであるが、着底ケーソン1の据付ケーソン2と対
向する側壁1bに緩衝装置4の空気袋4bが吊り下げられて
いるので据付ケーソン2が着底ケーソン1に衝突するこ
とが防止され、非常に高価なケーソンを破損させること
なく据え付けることができる。
By carrying out the method of the present invention as described above, the installation caisson 2 is bottomed at a position which is adjacent to the bottom caisson 1 already bottomed on the foundation rubble 6 and is separated by a predetermined distance. When the installation caisson 2 is located near the bottom caisson 1 and floats, the installation caisson 2 is swung in all directions under the influence of waves when moved to the bottom caisson 1 side. It also swings to the bottom caisson 1 side, but since the air bag 4b of the shock absorber 4 is hung on the side wall 1b of the bottom caisson 1 facing the installation caisson 2, the installation caisson 2 is the bottom caisson. It is prevented from hitting the 1 and can be installed without damaging the very expensive caisson.

【0024】また、緩衝装置4の空気袋4bは空気が供給
されて膨張した状態では着底ケーソン1から据付ケーソ
ン2の据え付けられる所定の間隔より広幅なケーソン当
接部分4bcを有しているので、据付ケーソン2と着底ケ
ーソン1との間隔を緩衝装置4の空気袋4b内の圧力を調
整することによって据付ケーソン2が着底されるまでの
間或る程度調整保持することができ、且つ緩衝装置4の
圧力調整手段4aのバルブ4adを開いて空気袋4b内の空気
を排出し圧力を低くすることによって空気袋4b内の容積
を減少せしめて据付ケーソン2と着底ケーソン1との間
隔を狭くするように修正することができる。すなわち、
緩衝装置4の空気袋4bが間隔を隔てて2個以上吊り下げ
られているので、据付ケーソン2が法線10に対してズレ
た角度で空気袋4bに当接しているときに、一方の側(着
底ケーソン1と据付ケーソン2との間隔が広い側)の空
気袋4b内の圧力を前記した如く低くすることによって据
付ケーソン2と着底ケーソン1との間隔を調整し、前記
角度を修正することができる。
Further, the air bag 4b of the shock absorber 4 has a caisson contact portion 4bc wider than a predetermined space at which the bottom caisson 1 to the installation caisson 2 are installed in a state where the air bag 4b is inflated by being supplied with air. , The distance between the installation caisson 2 and the bottom caisson 1 can be adjusted and held to some extent until the installation caisson 2 is bottomed by adjusting the pressure in the air bag 4b of the shock absorber 4. The valve 4ad of the pressure adjusting means 4a of the shock absorber 4 is opened to discharge the air in the air bladder 4b to lower the pressure, thereby reducing the volume in the air bladder 4b and reducing the distance between the installation caisson 2 and the bottom caisson 1. Can be modified to be narrower. That is,
Since two or more air bladders 4b of the shock absorber 4 are hung at intervals, one side of the installation caisson 2 is in contact with the air bladders 4b at an angle deviated from the normal line 10. By adjusting the pressure inside the air bag 4b (on the side where the distance between the bottom caisson 1 and the installation caisson 2 is wide) to be low as described above, the distance between the installation caisson 2 and the bottom caisson 1 is adjusted to correct the angle. can do.

【0025】更に、緩衝装置4の空気袋4bは軟質な材料
より形成されているので、空気袋4b内の空気を排出して
圧力を低下させることによって、着底ケーソン1を基礎
捨石6上に着底させて後、着底ケーソン1と据付ケーソ
ン2との間の間隙から空気袋4bを容易に引き上げること
ができる。従って緩衝装置4の空気袋4bを繰り返し使用
することができるので経済的である。そして、緩衝装置
4の空気袋4bのケーソン当接部分4bcに摩擦抵抗を小さ
くする部材が設けられていると、空気袋4bの損傷を防止
することができて空気袋4bの寿命を長くすることができ
てより経済的である。
Further, since the air bag 4b of the shock absorber 4 is made of a soft material, the air in the air bag 4b is discharged to reduce the pressure so that the bottom caisson 1 is placed on the foundation rubble 6. After bottoming the bottom, the air bag 4b can be easily pulled up from the gap between the bottom caisson 1 and the installation caisson 2. Therefore, the air bag 4b of the shock absorber 4 can be repeatedly used, which is economical. If the caisson abutting portion 4bc of the air bag 4b of the shock absorber 4 is provided with a member for reducing frictional resistance, the air bag 4b can be prevented from being damaged and the life of the air bag 4b can be extended. It is more economical to do so.

【0026】緩衝装置4の空気袋4bは着底ケーソン1上
の吊下げ金具からロープで吊り下げておけばよく作業者
により支持する必要がなく、且つ空気袋4b内の圧力を調
整するための圧力調整手段4aの操作は側壁から離れた位
置に圧力調整手段4aを設置しておくことによってこの位
置から行えば良いので、着底ケーソン1と据付ケーソン
2との間の海上に作業者が転落することがなく安全性に
非常に優れている。
The air bag 4b of the shock absorber 4 need not be supported by the operator if it is hung from a hanging metal fitting on the bottom caisson 1 with a rope, and the pressure in the air bag 4b is adjusted. The pressure adjusting means 4a can be operated from this position by installing the pressure adjusting means 4a at a position distant from the side wall, so that the operator falls to the sea between the bottom caisson 1 and the installation caisson 2. It is very safe without doing.

【0027】このように種々の効果を奏する本発明に係
る海上におけるケーソンの据付方法は、その工業的価値
の非常に大きなものである。
As described above, the method of installing a caisson on the sea according to the present invention, which exhibits various effects, is of great industrial value.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明方法に好ましく使用される緩衝装置を示
す正面説明図である。
FIG. 1 is a front explanatory view showing a shock absorber preferably used in the method of the present invention.

【図2】本発明方法に使用されるコンクリート製のケー
ソンの1例を示す斜視図である。
FIG. 2 is a perspective view showing an example of a concrete caisson used in the method of the present invention.

【図3】ケーソンが基礎捨石上に据え付けられた状態を
示しており(イ)は側面説明図、(ロ)は平面説明図であ
る。
FIG. 3 shows a state in which a caisson is installed on a foundation rubble, (a) is a side view and (b) is a plan view.

【図4】本発明方法を実施している過程を示しており着
底ケーソンの近傍に浮いている据付ケーソンと着底ケー
ソンとにケーソン移動手段を稼働可能状態とすると共に
緩衝装置の空気袋を着底ケーソンの上部より吊り下げて
いる状態を示す(イ)は側面説明図で(ロ)は平面説明図で
ある。
FIG. 4 shows a process in which the method of the present invention is carried out, in which the caisson moving means is set in an operable state with the installation caisson and the bottom caisson floating near the bottom caisson, and the air bag of the shock absorber is installed. (A) is a side explanatory view and (B) is a plan explanatory view showing a state of being suspended from the upper part of the bottom caisson.

【図5】本発明方法を実施している過程を示しており、
ケーソン移動手段によって据付ケーソンを着底ケーソン
側に移動させると共に位置決めを行っている状態を示す
(イ)は側面説明図、(ロ)は平面説明図である。
FIG. 5 shows a process for carrying out the method of the invention,
Shows a state in which the installation caisson is moved to the bottom caisson side and positioned by the caisson moving means.
(A) is a side view and (B) is a plan view.

【図6】着底ケーソンに所定の間隔を隔てて次に据え付
けられる据付ケーソンを据え付ける一連の作業を説明す
るフローシートである。
FIG. 6 is a flow sheet illustrating a series of operations for installing an installation caisson, which is to be installed next on the bottom caisson at a predetermined interval.

【図7】従来の緩衝材を使用して据付ケーソンと着底ケ
ーソンとの直接接触を防止して据付作業を行っている状
態を示す側面説明図である。
FIG. 7 is a side view showing a state where installation work is performed by using a conventional cushioning material to prevent direct contact between the installation caisson and the bottom caisson.

【図8】ケーソン移動手段を示す平面説明図である。FIG. 8 is an explanatory plan view showing caisson moving means.

【図9】起重機船に設置されているクレーンによって据
付ケーソンを吊り下げている状態を示す正面説明図であ
る。
FIG. 9 is a front explanatory view showing a state where an installation caisson is suspended by a crane installed on a hoist ship.

【符号の説明】[Explanation of symbols]

1 着底ケーソン 1a 底部 1b 側壁 1c 隔壁 2 据付ケーソン 2a 底部 2b 側壁 2c 隔壁 3 ケーソン移動手段 3a ウインチ 3b 滑車 3c 引寄用ワイヤロープ 3d アンカワイヤロープ 4 緩衝装置 4a 圧力調整手段 4aa コンプレッサ 4ab 空気供給可撓管 4ac 圧力計 4ad バルブ 4b 空気袋 4ba 本体 4bb 補強帯 4bc ケーソン当接部分 4bd ロープ 5 緩衝材 6 基礎捨石 7 起重機船 8 クレーン 8a 吊下用ワイヤロープ 9 引船 10 法線 1 bottom caisson 1a bottom 1b side wall 1c bulkhead 2 installation caisson 2a bottom 2b side wall 2c bulkhead 3 caisson moving means 3a winch 3b pulley 3c pulling wire rope 3d anchor wire rope 4 shock absorber 4a pressure adjusting means 4aa compressor 4ab air supply possible Flexible tube 4ac Pressure gauge 4ad Valve 4b Air bag 4ba Main body 4bb Reinforcement band 4bc Caisson contact part 4bd Rope 5 Buffer material 6 Foundation rubble 7 Hoist ship 8 Crane 8a Suspended wire rope 9 Towboat 10 Normal line

フロントページの続き (72)発明者 志賀 正夫 福島県いわき市小名浜字栄町65番地 運輸 省第二港湾建設局小名浜港工事事務所内 (72)発明者 長沼 時男 宮城県仙台市青葉区本町2の10の28 若築 建設株式会社内Front Page Continuation (72) Masao Shiga Inventor Masao Shiga 65 Sakaemachi, Onahama, Iwaki, Fukushima Prefecture Onboard Harbor Construction Office, Second Port Construction Bureau, Ministry of Transportation (72) Tokio Naganuma 2-10 Honmachi, Aoba-ku, Sendai City, Miyagi Prefecture Of 28 Wakatsuki Construction Co., Ltd.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 海底に敷き詰められた基礎捨石(6)上に
底部(1a)を予め着底されている着底ケーソン(1)の近傍
の海上に据付ケーソン(2)を底部(2a)が該基礎捨石(6)
から離れた状態に位置させた後、前記着底ケーソン(1)
から所定の間隔を隔てた位置に移動させて該基礎捨石
(6)上に着底させるに際し、据付ケーソン(2)を移動さ
せるため着底ケーソン(1)と据付ケーソン(2)とに設置
されているケーソン移動手段(3)を稼動可能な状態にす
ると共に、圧力調整手段(4a)と該圧力調整手段(4a)によ
り内部圧力を調整されて着底ケーソン(1)から据付ケー
ソン(2)が据え付けられる所定の間隔より広幅なケーソ
ン当接部分(4bc)を形成される空気袋(4b)とを備えた緩
衝装置(4)の該空気袋(4b)を、着底ケーソン(1)の上面
より据付ケーソン(2)と対向する側壁(1b)に間隔を隔て
て2個以上吊り下げてその内部を高圧にして、据付ケー
ソン(2)をその底部(2a)が基礎捨石(6)の近傍に位置す
るまで沈降させると共にケーソン移動手段(3)によって
据付ケーソン(2)を着底ケーソン(1)側に引き寄せて緩
衝装置(4)の空気袋(4b)に当接させた状態から、空気袋
内(4b)の圧力を調整しながら据付ケーソン(2)の位置を
ケーソン移動手段(3)によって移動修正して後、据付ケ
ーソン(2)の底部(2a)が基礎捨石(6)上に載置されて着
底されるまで据付ケーソン(2)を沈降させ、しかる後に
空気袋(4b)内圧力を圧力調整手段(4a)によって低下させ
てから空気袋(4b)を収縮させてから引き上げることを特
徴とする海上におけるケーソンの据付方法。
1. A bottom caisson (1) is pre-bottomed on a foundation rubble (6) laid on the sea floor. The foundation rubble (6)
After placing it away from the bottom caisson (1)
To a position separated by a predetermined distance from the foundation rubble
(6) When the bottom caisson (2) is moved to the bottom, the caisson moving means (3) installed on the bottom caisson (1) and the installation caisson (2) is moved so as to move. Along with the pressure adjusting means (4a), the internal pressure is adjusted by the pressure adjusting means (4a) so that the installation caisson (2) is installed from the bottom caisson (1). The air bag (4b) of the shock absorber (4) provided with the air bag (4b) formed on the side wall (1b) facing the installation caisson (2) from the upper surface of the bottom caisson (1). Suspend two or more pieces at a distance to make the inside high pressure, and let the installation caisson (2) settle until its bottom (2a) is located near the foundation rubble (6), and by means of the caisson moving means (3). The state where the installation caisson (2) is pulled toward the bottom caisson (1) side and brought into contact with the air bag (4b) of the shock absorber (4). After adjusting the pressure in the air bag (4b) to move and correct the position of the installation caisson (2) by the caisson moving means (3), the bottom part (2a) of the installation caisson (2) is replaced with a foundation rubble (6). ) The installation caisson (2) is allowed to settle until it is placed on the bottom and bottomed, and then the pressure inside the air bladder (4b) is reduced by the pressure adjusting means (4a), and then the air bladder (4b) is contracted. A caisson installation method at sea, which is characterized by pulling up afterwards.
【請求項2】 空気袋(4b)として、ゴム製の本体(4ba)
の周面に補強帯(4bb)が周設されているものを使用する
請求項1に記載の海上におけるケーソンの据付方法。
2. A rubber body (4ba) as the air bag (4b)
The method for installing a caisson at sea according to claim 1, wherein a reinforcing band (4bb) is provided around the peripheral surface of the caisson.
【請求項3】 空気袋(4b)として、ケーソン当接部分(4
bc)にケーソンとの間に生じる摩擦抵抗を小さくする部
材が設けられているものを使用する請求項1又は2に記
載の海上におけるケーソンの据付方法。
3. The air bag (4b) serves as a caisson contact portion (4).
The method for installing a caisson on the sea according to claim 1 or 2, wherein a member for reducing frictional resistance generated between the caisson and bc) is provided.
JP02294096A 1996-01-17 1996-01-17 Caisson installation method at sea Expired - Lifetime JP3754985B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP02294096A JP3754985B2 (en) 1996-01-17 1996-01-17 Caisson installation method at sea

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP02294096A JP3754985B2 (en) 1996-01-17 1996-01-17 Caisson installation method at sea

Publications (2)

Publication Number Publication Date
JPH09195281A true JPH09195281A (en) 1997-07-29
JP3754985B2 JP3754985B2 (en) 2006-03-15

Family

ID=12096633

Family Applications (1)

Application Number Title Priority Date Filing Date
JP02294096A Expired - Lifetime JP3754985B2 (en) 1996-01-17 1996-01-17 Caisson installation method at sea

Country Status (1)

Country Link
JP (1) JP3754985B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008190254A (en) * 2007-02-06 2008-08-21 Toa Harbor Works Co Ltd Existing breakwater reinforcing method
CN102108710A (en) * 2010-12-30 2011-06-29 中铁大桥局集团第二工程有限公司 Method for stopping horizontal oscillation in large-scale steel open caisson construction
JP2012233363A (en) * 2011-05-06 2012-11-29 Penta Ocean Construction Co Ltd Underwater structure contacting protection member and underwater structure installation method
CN108824469A (en) * 2018-07-05 2018-11-16 浙江科技学院 A kind of device and its reinforcement means for reinforcing bottom sealing
CN114277827A (en) * 2021-12-31 2022-04-05 中铁广州工程局集团有限公司 double-GPS positioning round caisson transportation, installation and construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243729A (en) * 2013-05-10 2013-08-14 王炳贞 Lifting method of large-scale caisson

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008190254A (en) * 2007-02-06 2008-08-21 Toa Harbor Works Co Ltd Existing breakwater reinforcing method
CN102108710A (en) * 2010-12-30 2011-06-29 中铁大桥局集团第二工程有限公司 Method for stopping horizontal oscillation in large-scale steel open caisson construction
JP2012233363A (en) * 2011-05-06 2012-11-29 Penta Ocean Construction Co Ltd Underwater structure contacting protection member and underwater structure installation method
CN108824469A (en) * 2018-07-05 2018-11-16 浙江科技学院 A kind of device and its reinforcement means for reinforcing bottom sealing
CN114277827A (en) * 2021-12-31 2022-04-05 中铁广州工程局集团有限公司 double-GPS positioning round caisson transportation, installation and construction method

Also Published As

Publication number Publication date
JP3754985B2 (en) 2006-03-15

Similar Documents

Publication Publication Date Title
US6009825A (en) Recoverable system for mooring mobile offshore drilling units
US4661014A (en) Prefabricated civil engineering module, method for the construction of a structure including said module and resulting structure
EP3436640B1 (en) Seabed base structure and method for installation of same
EP1280695A1 (en) Temporary floatation stabilization device and method
JPH09508186A (en) High tension leg platform and its installation method
JPH09195281A (en) Method of installing caisson on sea
US10988905B2 (en) Harbour plant and method for mooring a floating body in a harbour plant
JP2003278137A (en) Floating body type gate device
KR100979145B1 (en) Floating structure of moving and controlling position
US3500785A (en) System for salvaging submerged objects
JPH1121866A (en) Oil fence
JP4258792B2 (en) Catamaran cruise support device
GB2222190A (en) Installing large, heavy structures on the sea bottom
JPH09195282A (en) Method of connecting floating structures on sea
JP2001003332A (en) Immersion method for caisson and floater for immersing the caisson
JPS5911021B2 (en) Cell transport method and device
CN116306082B (en) Design method for installation parameters of submarine pipeline in deep sea section
CN116812071A (en) Gravity anchor placing method and floating body
WO2022182258A1 (en) Transport cap of a sea foundation pile, installation cradle of the transport cap of a sea foundation pile, method of installing a transport cap inside a foundation pile, towing set of sea foundation piles, method of sea towage foundation piles and preparation of a foundation pile for installation in the seabed
CN115929990A (en) Deep sea section submarine pipeline installation method
JP2003027509A (en) Adjusting device of immersed caisson body and method therefor
CN115556901A (en) Installation method of slideway cross beam
JPS6023215B2 (en) Towing method for depositing steel cells
JPH0797816A (en) Construction facility for underwater structure
JPS63147018A (en) Marine transportation, storage, and setting method of structure

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051021

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051101

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051102

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090106

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150106

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term