JP3463604B2 - Dolphin construction method - Google Patents

Dolphin construction method

Info

Publication number
JP3463604B2
JP3463604B2 JP13425699A JP13425699A JP3463604B2 JP 3463604 B2 JP3463604 B2 JP 3463604B2 JP 13425699 A JP13425699 A JP 13425699A JP 13425699 A JP13425699 A JP 13425699A JP 3463604 B2 JP3463604 B2 JP 3463604B2
Authority
JP
Japan
Prior art keywords
box
dolphin
pile
mooring
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP13425699A
Other languages
Japanese (ja)
Other versions
JP2000319849A (en
Inventor
邦彦 滝本
義信 秋山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP13425699A priority Critical patent/JP3463604B2/en
Publication of JP2000319849A publication Critical patent/JP2000319849A/en
Application granted granted Critical
Publication of JP3463604B2 publication Critical patent/JP3463604B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、海上に設置される
浮体構造物や超大型浮体構造物に適用されるモノポット
タイプの係留や接岸用等のドルフィンあるいは上部工面
積を必要としない船舶や洋上石油備蓄タンク等に適用さ
れる係留や接岸用等のドルフィン施工方法に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a monopot type mooring applied to a floating structure or a super-large floating structure installed on the sea, a ship that does not require a dolphin for berthing or an upper construction area. it relates Dolphin methods construction such as for mooring or berthing applied to offshore oil reserve tanks.

【0002】[0002]

【従来の技術】船舶や洋上石油備蓄タンクの係留や接岸
用等のドルフィンの構造形式は、図4に示すように、杭
式(ラーメン式,斜杭式,撓み式)、ジャケット式、重
力式がある。船舶や洋上石油備蓄タンクのドルフィンの
場合、船舶運搬物の荷揚げのためのスペースあるいは防
舷材等のメンテナンスのためのスペース等を確保するた
めに、上部にある程度の広い面積を有することが必要と
なることが多い。
2. Description of the Related Art As shown in FIG. 4, dolphin structures for mooring ships and offshore oil storage tanks and for berthing are pile type (ramen type, oblique pile type, flexible type), jacket type, gravity type. There is. In the case of dolphins for ships and offshore oil storage tanks, it is necessary to have a certain large area on the upper part in order to secure a space for unloading cargo to be transported or a space for maintenance of fenders, etc. Often becomes.

【0003】図4(a) に示す杭式ドルフィンの場合、複
数本の鋼管杭50を正確に打設するための仮設の導材
(定規のイメージ)を設置し、鋼管杭50を海底地盤に
打設していく。その後、洋上でコンクリートプラント船
を使用して現場打ちコンクリートで上部工51を構築す
るか、もしくは、プレキャスト製の上部工51を大型起
重機船で鋼管杭50の上に設置する方法が採られる。
In the case of the pile type dolphin shown in FIG. 4 (a), a temporary guide material (image of a ruler) for accurately placing a plurality of steel pipe piles 50 is installed, and the steel pipe piles 50 are placed on the seabed. I will set it. After that, a method of constructing the superstructure 51 with cast-in-place concrete using a concrete plant ship on the sea or installing the precast superstructure 51 on the steel pipe pile 50 by a large hoist ship is adopted.

【0004】図4(b) に示すジャケット式ドルフィンの
場合、ジャケット60を海底面に設置し、ジャケットの
レグ60aを通して鋼管杭61を海底地盤に打設する方
法が採られる。ジャケット60の上には、前述と同様
に、現場打ちコンクリートやプレキャスト製の上部工6
2が設けられる。この方法では、ジャケット60の運搬
や設置に大型起重機船が必要となることが多い。
In the case of the jacket type dolphin shown in FIG. 4 (b), a method is adopted in which the jacket 60 is installed on the sea bottom and the steel pipe piles 61 are driven on the sea bottom ground through the legs 60a of the jacket. On the jacket 60, in the same way as above, cast superstructure 6 made of cast-in-place concrete or precast.
Two are provided. This method often requires a large hoist ship to carry and install the jacket 60.

【0005】図4(c) に示す重力式ドルフィンの場合、
陸上もしくは海域で事前に製作したケーソン70を曳航
し、沈設することにより、工事が行なわれる。
In the case of the gravity type dolphin shown in FIG. 4 (c),
The construction is carried out by towing and digging the caisson 70 manufactured in advance on land or in the sea area.

【0006】[0006]

【発明が解決しようとする課題】前述した船舶や洋上石
油備蓄タンクに用いられる係留や接岸用等のドルフィン
は、比較的大型な構造で施工も面倒であり、工期および
工費がかかり、特に多数のドルフィンを必要とする浮体
構造物や超大型浮体構造物に適用しようとすると、工期
および工費が増大し、経済的に不利である。
The above-mentioned dolphins for mooring and berthing used for ships and offshore oil storage tanks have a relatively large structure and are troublesome to construct. If it is applied to a floating structure or a super-large floating structure that requires dolphin, the construction period and construction cost increase, which is economically disadvantageous.

【0007】浮体構造物や超大型浮体構造物のドルフィ
ンとしては、上部工はあくまで浮体の係留反力を受けそ
して下部工に伝える役目を持てば良いこととすれば、上
部工はコンパクトな構造が可能となり、モノポットタイ
プ等の構造形式が選択の一つになる。また、船舶や洋上
石油備蓄タンクにおいても、広い上部工面積が必要で無
い場合も、同形式のドルフィンが可能になる。
As a dolphin for a floating structure or a super-large floating structure, if the superstructure has only to receive the mooring reaction force of the floating structure and transmit it to the substructure, the superstructure has a compact structure. It becomes possible, and the structural type such as the monopot type becomes one of the choices. Further, even in the case of ships and offshore oil storage tanks, the same type of dolphin can be used even when a large superstructure area is not required.

【0008】本発明は、このような事情に鑑みなされた
もので、その目的は、比較的簡単な構造で浮体の係留を
行なうことができると共に、施工も容易となり、工期お
よび工費の大幅な低減を図ることができる係留や接岸用
等のドルフィン施工方法を提供することにある。
The present invention has been made in view of the above circumstances, and an object thereof is to make it possible to moor a floating body with a relatively simple structure, to facilitate construction, and to greatly reduce the construction period and construction cost. It is intended to provide a method of constructing a dolphin for mooring, for berthing, etc.

【0009】[0009]

【課題を解決するための手段】本発明の請求項1は、
留や接岸用等のドルフィンの施工方法であり支柱(鋼
管柱等)と杭(鋼管杭等)が上下移動可能に取付けられ
た函体(鋼製函体,プレキャストコンクート函体等)
支柱と杭を仮固定した状態で設置海域へ曳航し、設置海
域で前記函体を仮係留した後、函体をガイドとして支柱
を海底地盤に打設し、この支柱をガイドとして函体を注
水により沈降させ、着底した函体と支柱とを固定した
後、杭を函体をガイドとして海底地盤中に打設すること
を特徴とする。函体と支柱下部の固定および函体と杭頭
部の固定には、グラウト材、もしくはグラウト材とせん
断キーで結合するのが好ましい。
According to a first aspect of the present invention , there is provided a method for constructing a dolphin for mooring, berthing, etc., in which a column (steel pipe column or the like) and a pile (steel pipe pile or the like) are mounted so as to be vertically movable.
The box body (the steel box-making body, precast Conch over door a box body or the like)
With the columns and piles temporarily fixed, tow them into the installation area and
After mooring the box in the area, use the box as a guide
Is placed on the seabed, and a box is poured using this pillar as a guide.
It was made to settle with water, and the bottomed box and support were fixed.
After that, the pile is driven into the seabed by using the box as a guide . Fixing the box body and the lower part of the column and the box body and the pile head
For fixing the part, grout material or grout material
It is preferable to connect with a break key.

【0010】支柱および杭は、函体を上下移動可能な形
式とし、函体の曳航時には函体から上方に突出した状態
で仮固定でき、設置海域では、海上の函体をガイドして
支柱を海底地盤に仮打設でき、次にこの支柱をガイドし
て函体を沈設でき、さらに沈設した函体をガイド(導材
工)として杭を海底地盤に打設できるようにするのが好
ましい。
The pillars and stakes are of a type in which the box can be moved up and down, and can be temporarily fixed while protruding upward from the box when the box is towed. It is preferable that the piles can be temporarily placed on the seabed, then the box can be sunk by guiding the columns, and the piles can be placed on the seabed by using the sunk box as a guide (guide material work).

【0011】本発明の請求項2は、係留や接岸用等のド
ルフィンの施工方法であり、支柱(鋼管柱等)と杭(鋼
管杭等)が上下移動可能に取付けられた函体(鋼製函
体,プレキャストコンクート函体等)支柱と杭を仮固
定した状態で設置海域へ曳航し、設置海域で前記函体を
仮係留した後、函体をガイドとして支柱を海底地盤に打
設し、この支柱をガイドとして函体を注水により沈降さ
せ、着底した函体と支柱とを固定した後、杭を函体をガ
イドとして海底地盤中に打設し、支柱と杭の上部とを斜
材で連結することを特徴とする。函体と支柱下部の固
函体と杭頭部の固定、斜材端部と支柱および杭との
固定には、グラウト材、もしくはグラウト材とせん断キ
ーで結合するのが好ましい。
A second aspect of the present invention is a method for constructing a dolphin for mooring, berthing, etc., wherein a box (steel pipe pile) and a pile (steel pipe pile) are vertically movable . box body, the precast conc over preparative box making and the like) and towed to the installation sea area struts and piles in temporarily fixed state, after temporarily anchoring the box making body installation sea area, and Da設the post to seabed to a box body as a guide After the box is settled by pouring water by using this pillar as a guide and the bottom box and the pillar are fixed, the pile is driven into the seabed ground using the box as a guide, and the pillar and the upper part of the pile are inclined.
It is characterized by being connected with a material . Fixing the box and the lower part of the pillar, fixing the box and the head of the pile , connecting the end of the diagonal member to the pillar and the pile
For fixing, it is preferable to connect the grout material or the grout material with a shear key.

【0012】以上のような構成において、係留や接岸用
等のドルフィンは、海底地盤に沈設される函体と、この
函体に下部が固定される支柱と、函体を海底地盤に固定
する複数本の杭から構成され、比較的簡単な構造のドル
フィンとすることができ、特に多数のドルフィンを必要
とする超大型浮体構造物において工期および工費の大幅
な低減を図ることができる。
In the above-mentioned structure, the dolphins for mooring, berthing, etc. are a box body to be sunk in the seabed, a column whose lower part is fixed to this box, and a plurality of boxes for fixing the box to the seabed. A dolphin made of a pile of books and having a relatively simple structure can be provided, and particularly in a super-large floating body structure requiring a large number of dolphins, the construction period and the construction cost can be significantly reduced.

【0013】施工に際しては、函体が、施工時(曳航・
仮係留時)には、浮力体として機能すると共に、杭打設
のための仮設工としての導材工として機能し、完成時に
は函体をドルフィンの海中基礎フーチングとして利用で
きる。函体浮力を利用してドルフィン構造部材を運搬す
ることができるため、大型起重機船が不要となり、ま
た、杭を函体に上下移動可能な形式とし、函体をガイド
として杭を打設するため、特別な導材工も不要となり、
さらに、函体をガイドとして支柱を簡単に打設すること
ができる。ドルフィンの構造部材を利用して迅速な施工
ができるため、工期および工費の大幅な低減を図ること
ができる。
At the time of construction, the box body is
At the time of temporary mooring), it functions as a buoyant body and as a guide material work as a temporary work for pile driving, and when completed, the box can be used as a dolphin underwater foundation footing. Since the dolphin structural members can be transported by utilizing the buoyancy of the box, a large hoist ship is not required, and the pile can be moved up and down on the box, and the pile can be driven using the box as a guide. , No special guide material is required,
Furthermore, the pillar can be easily placed by using the box as a guide. Since the construction can be performed quickly using the dolphin structural members, the construction period and construction cost can be significantly reduced.

【0014】さらに、函体・支柱・杭等をプレキャスト
部材等で構成することができ、基礎フーチング構築等の
ための洋上でのコンクリート打設が不要となる。また、
函体と支柱の結合,函体と基礎杭の結合はグラウト結合
とすることにより、比較的小型の作業船(モルタル船)
での施工が可能となる。また、函体が設置海域に入域直
後に、支柱の下部を海底地盤に仮打設することにより、
係留索による係留等の時間が短縮できると共に、施工に
おける不安定な状態を極力回避することができる。
Further, the box body, columns, piles, etc. can be made of precast members, etc., so that it is not necessary to place concrete on the sea for constructing foundation footing. Also,
Grout connection is used to connect the box and columns and the box and foundation piles to make a relatively small work boat (mortar ship).
Can be installed in In addition, immediately after the box enters the installation area, by temporarily placing the lower part of the pillar on the seabed,
It is possible to reduce the time required for mooring with mooring lines and to avoid an unstable state during construction as much as possible.

【0015】[0015]

【発明の実施の形態】以下、本発明を図示する実施の形
態に基づいて説明する。この実施形態は船舶に本発明を
適用した例であり、図1は本発明を係留および接岸併用
としてのドルフィンに適用した1例を示したものであ
る。図2は本発明の施工方法を工程順に示したものであ
る。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, the present invention will be described based on illustrated embodiments. This embodiment is an example in which the present invention is applied to a ship, and FIG. 1 shows an example in which the present invention is applied to a dolphin for both mooring and berthing. FIG. 2 shows the construction method of the present invention in the order of steps.

【0016】図1において、本発明の係留や接岸用等の
ドルフィン1は、主として、浮力体・導材工・海中基礎
フーチングとして機能する函体2と、沈設した函体2か
ら海上に突出して船舶Aを係留する支柱3と、函体2お
よび支柱3を海底地盤Bに固定するための複数本の杭4
と、支柱3の頭部に設置される係留のための面積の小さ
い上部工5から構成されている。
In FIG. 1, a dolphin 1 for mooring or berthing of the present invention is mainly a box 2 that functions as a buoyant body, a guide material work, and an undersea foundation footing, and projects from the sunk box 2 to the sea. A pillar 3 mooring the ship A and a plurality of piles 4 for fixing the box body 2 and the pillar 3 to the seabed B.
And a superstructure 5 having a small area for mooring installed on the head of the column 3.

【0017】函体2は、鋼殻や浮力体付き鋼製ジャケッ
トなどのプレファブ鋼製函体、あるいはPC構造やRC
構造などのプレキャストコンクリート函体であり、浮力
を有して海上を曳航することができると共に、バラスト
室に注水することにより海底へ沈設することができる。
The box body 2 is a prefabricated steel box body such as a steel shell or a steel jacket with a buoyant body, or a PC structure or RC.
It is a precast concrete box with a structure, which can be towed over the sea with buoyancy and can be sunk to the sea floor by pouring water into the ballast chamber.

【0018】支柱3は、船舶Aの係留反力を函体2およ
び杭4を介して海底地盤Bへ伝達する太径の柱であり、
鋼管柱とするのが好ましい。なお、プレキャストコンク
リート柱や鋼管とコンクリート等による複合柱でもよ
い。杭4も鋼管杭が好ましいが、プレキャストコンクリ
ート杭や複合杭でもよい。
The column 3 is a large-diameter column for transmitting the mooring reaction force of the ship A to the seabed B via the box 2 and the pile 4.
It is preferably a steel tube column. In addition, a precast concrete column or a composite column made of steel pipe and concrete or the like may be used. The pile 4 is also preferably a steel pipe pile, but may be a precast concrete pile or a composite pile.

【0019】これら支柱3および杭4を函体2に上下移
動可能に取付け、海上に突出した状態で函体2と共に設
置海域に曳航でき、設置海域では、海上の函体2をガイ
ドして支柱3を仮打設でき、また、仮打設した支柱3を
ガイドとして函体2を沈設でき、さらに沈設した函体2
をガイド(導材工)として杭4を打設できるようにす
る。
The pillars 3 and the piles 4 are attached to the box body 2 so as to be movable up and down, and can be towed together with the box body 2 to the installation sea area in a state of protruding above the sea. 3 can be temporarily laid, and the box 2 can be sunk by using the stanchions 3 that have been temporarily laid as a guide.
The pile 4 can be driven by using as a guide.

【0020】支柱3は、函体2の中央部に設けた取付孔
とガイド孔を兼ねる開口部2aに挿入配置し、杭4は、
この開口部2aの周囲に設けた取付孔とガイド孔を兼ね
る開口部2bに挿入配置し、これら開口部の周壁に設け
たローラ等を支柱3・杭4の外周面に当接させて支柱3
・杭4を上下移動可能に案内支持する。また、曳航時に
おける支柱3・杭4の函体2への仮固定は、支柱3・杭
4へピンを挿入するなどして行なえばよい。
The support column 3 is inserted and arranged in the opening 2a provided in the central portion of the box 2 and serving as a mounting hole and a guide hole.
The support 2 is inserted and arranged in the opening 2b provided around the opening 2a and also serves as a mounting hole and a guide hole, and rollers provided on the peripheral walls of these openings are brought into contact with the outer peripheral surfaces of the support pillar 3 and the pile 4 to support the support pillar 3
-Guiding and supporting the pile 4 so that it can move up and down. Further, the temporary fixing of the columns 3 and the piles 4 to the box body 2 at the time of towing may be performed by inserting pins into the columns 3 and the piles 4, for example.

【0021】上部工5は、防舷材11や係船柱12等を
取付けるための部材であり、支柱3の頭部を取り囲む形
状の鋼製やコンクリート製の箱体とし、起重機船やクロ
ーラクレーン付きの台船等で運搬し、ドルフィン本体の
施工完了後に支柱3の頭部に設置され、グラウト材等で
固定される。
The superstructure 5 is a member for mounting the fender 11 and mooring column 12, etc., and is a steel or concrete box surrounding the head of the column 3, with a hoist ship and a crawler crane. The dolphin is transported by a ship, installed on the head of the column 3 after the completion of the construction of the dolphin body, and fixed with grout material or the like.

【0022】以上のような構成の係留や接岸用等のドル
フィン1を次のような手順で設置海域に構築する(図2
参照)。なお、ドルフィン1は、船舶の場合、図1(b)
に示すように、船舶Aの片側において船舶に接するよう
に、あるいは船舶から離して多数配置される。13はプ
ラットフォームである。
The dolphin 1 for mooring or berthing having the above structure is constructed in the installation area by the following procedure (Fig. 2).
reference). The dolphin 1 is shown in Fig. 1 (b) in the case of a ship.
As shown in FIG. 4, a large number of vessels are arranged so as to contact the vessel on one side of the vessel A or apart from the vessel. 13 is a platform.

【0023】(1) 予め製作ヤードなどで製作した函体2
を進水させ、支柱3および杭4を函体2に仮固定する。
支柱3および杭4は、図2(i) に示すように、下部を開
口部2a,2b内に挿入して固定し、函体2から上方へ
突出した状態とする。
(1) Box 2 prefabricated in a manufacturing yard
Is launched, and the support column 3 and the pile 4 are temporarily fixed to the box body 2.
As shown in FIG. 2 (i), the columns 3 and the piles 4 have their lower portions inserted and fixed in the openings 2a and 2b so as to project upward from the box 2.

【0024】(2) 図2(i) に示すように、支柱3・杭4
が仮固定された函体2を曳船6により設置海域まで曳航
する。 (3) 図2(ii)に示すように、設置海域に到達すると、函
体2を係留索7により仮係留し、支柱3をバイブロハン
マーもしくは油圧ハンマー等により函体2の開口部2a
をガイドとして仮打設し、支柱3の下部を海底地盤B内
に仮固定する。この支柱3の仮固定後は、函体2の位置
保持を支柱3で行なえるため、自然環境条件によって
は、係留索7による係留を解除することができる。
(2) As shown in FIG. 2 (i), the column 3 and the pile 4
The box 2 temporarily fixed by the tow is towed by the tow boat 6 to the installation area. (3) As shown in FIG. 2 (ii), when the installation area is reached, the box 2 is temporarily moored by the mooring line 7, and the support column 3 is opened by the vibro hammer or hydraulic hammer.
Is temporarily placed as a guide, and the lower part of the support column 3 is temporarily fixed in the seabed B. After the column 3 is temporarily fixed, the box 3 can be held in position by the column 3, so that the mooring by the mooring line 7 can be released depending on the natural environment conditions.

【0025】(4) 図2(iii) に示すように、函体2内に
注水を行い、函体2を支柱3をガイドとして沈設する。
杭4が上方に突出した状態の函体2が海底地盤B上に着
底する。
(4) As shown in FIG. 2 (iii), water is poured into the box body 2 and the box body 2 is sunk by using the column 3 as a guide.
The box body 2 with the piles 4 protruding upward reaches the bottom of the seabed B.

【0026】(5) 図2(iii) の状態で函体2と支柱3と
を固定する。この固定は間詰めモルタル等のグラウト材
8を開口部2aの内周面と支柱3の外周面との間に充填
することにより行う。間詰めモルタル等だけで強度が不
足する場合には、シアキー等を事前に取付けておく。
(5) Fix the box 2 and the column 3 in the state shown in FIG. 2 (iii). This fixing is performed by filling a grout material 8 such as a filling mortar between the inner peripheral surface of the opening 2a and the outer peripheral surface of the support column 3. If the strength is insufficient with just the filling mortar, install a shear key in advance.

【0027】(6) 図2(iv)に示すように、水中バイブロ
ハンマーやヤットコを併用し、バイブロハンマーあるい
は油圧ハンマーにより、杭4を函体2の開口部2bをガ
イドとして海底地盤B中に打設する。
(6) As shown in FIG. 2 (iv), a submersible vibro hammer or a yatco is also used, and the pile 4 is placed in the seabed B using the opening 2b of the box 2 as a guide by a vibro hammer or a hydraulic hammer. To set.

【0028】(7) 図2(v) に示すように、杭4の打設が
完了すると、函体2と杭4の頭部とを固定する。この固
定も間詰めモルタル等のグラウト材9を開口部2bの内
周面と杭4の外周面との間に充填することにより行い、
間詰めモルタル等だけで強度が不足する場合には、シア
キー等を事前に取付けておく。以上により、仮固定され
た支柱3が、海中基礎フーチングとしての函体2と杭4
により海底地盤Bに強固に固定される。
(7) As shown in FIG. 2 (v), when the driving of the pile 4 is completed, the box body 2 and the head of the pile 4 are fixed. This fixing is also performed by filling a grouting material 9 such as filling mortar between the inner peripheral surface of the opening 2b and the outer peripheral surface of the pile 4,
If the strength is insufficient with just the filling mortar, install a shear key in advance. As described above, the temporarily fixed support columns 3 serve as the box body 2 and the piles 4 as the undersea foundation footing.
Is firmly fixed to the seabed B.

【0029】(8) 図2(vi)に示すように、起重機船やク
ローラクレーン付き台船等の揚重機械を使用し、支柱3
の頭部に上部工5を設置し、間詰めモルタル等のグラウ
ト材10で固定する。この場合も、間詰めモルタル等だ
けで強度が不足する場合には、シアキー等を事前に取付
けておく。
(8) As shown in FIG. 2 (vi), a hoisting machine such as a hoist ship or a barge with a crawler crane is used, and
The superstructure 5 is installed on the head of the, and fixed with the grout material 10 such as filling mortar. Also in this case, when the strength is insufficient only with the filling mortar or the like, a shear key or the like is attached in advance.

【0030】(9) 防舷材11や係船柱12等の付属品の
取付けを行なう。完成したドルフィン1の一部およびプ
ラットフォーム13に船舶Aを接岸し、接岸用および係
留用のドルフィンの係船柱12に係留索14でもやうこ
とにより、船舶Aの接岸および係留がなされる。なお、
上部工5に防舷材11や係船柱12等を取付けておき、
上部工5の設置と一緒に設置することもできる。上部工
5は支柱3を取り囲む形状でよく、占有面積の殆ど無い
コンパクトな構造とすることができる。
(9) Accessories such as fenders 11 and mooring columns 12 are attached. The ship A is berthed and moored by berthing the ship A on a part of the completed dolphin 1 and the platform 13 and also by mooring lines 14 on the mooring columns 12 of the dolphin for berthing and mooring. In addition,
Attach fenders 11 and mooring posts 12 to superstructure 5,
It can also be installed together with the superstructure 5. The superstructure 5 may have a shape that surrounds the support column 3 and can have a compact structure with almost no occupied area.

【0031】また、支柱3の断面(径や板厚等)を小さ
くする場合は、図3に示すような斜材ブロック15を事
前にあるいは事後に設置することで対応が可能である。
即ち、斜材ブロック15は、支柱3の回りに複数配置さ
れ側面視で円錐台を構成する斜材15aと、複数の斜材
15aの上部を一体化し支柱3を隙間をおいて挿入可能
な上部円筒部15bと、各斜材15aの下部に一体的に
設けられ杭4を隙間をおいて挿入可能な下部円筒部15
cから構成し、図3(a) に示すように、函体2上に仮固
定された支柱3・杭4に斜材ブロック15を予め組み付
けておき、設置海域で支柱3を仮打設した後、函体2と
共に沈設し、あるいは図3(b) に示すように、別途運搬
してきた斜材ブロック15を杭4の打設完了後に支柱3
をガイドとして沈設する。斜材ブロック15と支柱3お
よび杭4との固定は、前述と同様に間詰めモルタル等の
グラウト材16やシアキー等で行う。
Further, when the cross section (diameter, plate thickness, etc.) of the support column 3 is made small, it is possible to deal with it by installing the diagonal block 15 as shown in FIG. 3 in advance or afterwards.
That is, the diagonal block 15 includes a plurality of diagonal blocks 15a that are arranged around the support column 3 and form a truncated cone in a side view, and an upper portion of the multiple diagonal blocks 15a that are integrated so that the column 3 can be inserted with a gap therebetween. The cylindrical portion 15b and the lower cylindrical portion 15 which is integrally provided at the lower portion of each diagonal member 15a and into which the pile 4 can be inserted with a gap.
As shown in Fig. 3 (a), the diagonal block 15 is assembled in advance to the pillar 3 and the pile 4 which are temporarily fixed on the box body 2, and the pillar 3 is temporarily placed in the installation sea area. After that, as shown in Fig. 3 (b), the diagonal block 15 which is sunk together with the box 2 or is separately carried is used after the piles 4 have been placed.
Is used as a guide. The fixation of the diagonal block 15 to the pillars 3 and the piles 4 is carried out by the grout material 16 such as the filling mortar or the shear key, as described above.

【0032】なお、以上は船舶に適用する場合について
説明したが、これに限らず、浮体構造物,超大型浮体構
造物,洋上石油備蓄タンク等にも適用できることはいう
までもない。
It should be noted that although the case where the invention is applied to a ship has been described above, it is needless to say that the invention is not limited to this and can be applied to a floating structure, a super-large floating structure, an offshore oil storage tank, and the like.

【0033】[0033]

【発明の効果】本発明は、以上のような構成からなるの
で、次のような効果を奏することができる。
Since the present invention is constructed as described above, the following effects can be obtained.

【0034】(1) 係留や接岸用等のドルフィンは函体と
支柱と複数本の杭から構成され、比較的簡単な構造のド
ルフィンとすることができ、多数のドルフィンを必要と
する船舶,浮体構造物,超大型浮体構造物において工期
および工費の大幅な低減を図ることができる。
(1) A dolphin for mooring, berthing, etc. is composed of a box, columns and a plurality of piles, and can be a dolphin with a relatively simple structure. It is possible to significantly reduce the construction period and construction cost for structures and super-large floating structures.

【0035】(2) 施工に際しては、函体を浮力体・導材
工・海中基礎フーチングとして利用でき、函体浮力を利
用してドルフィン構造部材を運搬することができるた
め、大型起重機船が不要となり、また、杭を函体に上下
移動可能に設け、函体をガイドとして杭を打設するた
め、特別な導材工も不要となり、さらに、函体をガイド
として支柱を簡単に打設することができ、ドルフィンの
構造部材を利用して迅速な施工ができるため、工期およ
び工費の大幅な低減を図ることができる。
(2) At the time of construction, the box can be used as a buoyant body, a guide material work, and an undersea foundation footing, and the dolphin structure member can be transported by using the buoyancy of the box, so that a large hoist ship is not required. In addition, since the pile is provided on the box so as to be movable up and down and the pile is driven by using the box as a guide, no special guide material work is required. Further, the pillar can be easily placed by using the box as a guide. Since the construction can be performed quickly using the structural member of the dolphin, the construction period and the construction cost can be significantly reduced.

【0036】(3) 函体・支柱・杭等をプレキャスト部材
等で構成することができ、基礎フーチング構築等のため
の洋上でのコンクリート打設が不要となり、工費および
工期の面で有利となる。
(3) Boxes, stanchions, piles, etc. can be composed of precast members, etc., so that concrete placing on the sea for constructing foundation footing is unnecessary, which is advantageous in terms of construction cost and construction period. .

【0037】(4) 函体と支柱の結合,函体と基礎杭の結
合はグラウト結合とすることにより、比較的小型の作業
船(モルタル船)での施工が可能となり、工費および工
期の面で有利となる。
(4) By using a grout connection for the connection between the box and the column and the connection between the box and the foundation pile, it is possible to carry out the work on a relatively small work boat (mortar ship), and the construction cost and construction period are reduced. Will be advantageous.

【0038】(5) 函体が設置海域に入域直後に、支柱の
下部を海底地盤に仮打設することにより、係留索による
係留等の時間が短縮できると共に、施工における不安定
な状態を極力回避することができ、工費・工期・安全性
の面で有利となる。
(5) Immediately after the box enters the installation area, by temporarily placing the lower part of the support pillar on the seabed, it is possible to reduce the time required for mooring with mooring lines and to reduce the instability of construction. It can be avoided as much as possible, which is advantageous in terms of construction cost, construction period, and safety.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の係留や接岸用等のドルフィンの1例を
示し、(a) はドルフィンの設置固定状態の斜視図、(b)
はドルフィンの配置状況を示す平面図である。
FIG. 1 shows an example of a dolphin for mooring or berthing of the present invention, (a) is a perspective view of the dolphin installed and fixed, (b)
[Fig. 6] is a plan view showing the arrangement of dolphins.

【図2】本発明の係留や接岸用等のドルフィンの施工方
法の1例を工程順に示す断面図である。
FIG. 2 is a cross-sectional view showing an example of a method of constructing a dolphin for mooring, berthing, etc. according to the present invention in the order of steps.

【図3】本発明のドルフィンにおいて斜材ブロックを設
けて支柱断面を小さくする場合を示す施工方法の断面図
である。
FIG. 3 is a cross-sectional view of a construction method showing a case in which a diagonal block is provided in the dolphin of the present invention to reduce the cross section of the column.

【図4】従来の係留や接岸用等のドルフィンの構造形式
を示す側面図である。
FIG. 4 is a side view showing a structure type of a conventional dolphin for mooring or berthing.

【符号の説明】[Explanation of symbols]

1……係留や接岸用等のドルフィン 2……函体、2a,2b…開口部 3……支柱 4……杭 5……上部工 6……曳船 7……係留索 8……グラウト材 9……グラウト材 10……グラウト材 11……防舷材 12……係船柱 13……プラットフォーム 14……係留索 15……斜材ブロック 16……グラウト材 1 …… Dolphin for mooring and berthing 2 ... Box, 2a, 2b ... Opening 3 ... Support 4 ... Pile 5: Superstructure 6 ... Tugboat 7 ... Mooring line 8: Grout material 9: Grout material 10 ... Grout material 11 ... Fender 12 ... Mooring pillar 13 ... Platform 14 ... Mooring line 15 ... diagonal block 16: Grout material

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02B 3/20 - 3/24 E02B 3/28 B63B 21/00 E02B 17/00 - 17/08 E02D 27/52 ─────────────────────────────────────────────────── ─── Continuation of front page (58) Fields surveyed (Int.Cl. 7 , DB name) E02B 3/20-3/24 E02B 3/28 B63B 21/00 E02B 17/00-17/08 E02D 27 / 52

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 支柱と杭が上下移動可能に取付けられた
函体を支柱と杭を仮固定した状態で設置海域へ曳航し、
設置海域で前記函体を仮係留した後、函体をガイドとし
て支柱を海底地盤に打設し、この支柱をガイドとして函
体を注水により沈降させ、着底した函体と支柱とを固定
した後、杭を函体をガイドとして海底地盤中に打設する
ことを特徴とするドルフィンの施工方法。
1. A pillar and a stake are mounted so as to be vertically movable.
The towed to the installation waters pillars and piles while temporarily fixing the box body,
After tentatively mooring the box in the installation sea area, the pillar was driven into the seabed by using the box as a guide, and the box was settled by pouring water by using the pillar as a guide, and the bottomed box and the pillar were fixed. After that, a method for constructing a dolphin is characterized in that the pile is driven into the seabed with the box as a guide.
【請求項2】 支柱と杭が上下移動可能に取付けられた
函体を支柱と杭を仮固定した状態で設置海域へ曳航し、
設置海域で前記函体を仮係留した後、函体をガイドとし
て支柱を海底地盤に打設し、この支柱をガイドとして函
体を注水により沈降させ、着底した函体と支柱とを固定
した後、杭を函体をガイドとして海底地盤中に打設し、
支柱と杭の上部とを斜材で連結することを特徴とするド
ルフィンの施工方法。
2. A pillar and a stake are mounted so as to be vertically movable.
The towed to the installation waters pillars and piles while temporarily fixing the box body,
After tentatively mooring the box in the installation sea area, the pillar was driven into the seabed by using the box as a guide, and the box was settled by pouring water by using the pillar as a guide, and the bottomed box and the pillar were fixed. After that, piles are placed in the seabed using the box as a guide ,
A method for constructing a dolphin, characterized in that the pillar and the upper part of the pile are connected by a diagonal member .
JP13425699A 1999-05-14 1999-05-14 Dolphin construction method Expired - Lifetime JP3463604B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13425699A JP3463604B2 (en) 1999-05-14 1999-05-14 Dolphin construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13425699A JP3463604B2 (en) 1999-05-14 1999-05-14 Dolphin construction method

Publications (2)

Publication Number Publication Date
JP2000319849A JP2000319849A (en) 2000-11-21
JP3463604B2 true JP3463604B2 (en) 2003-11-05

Family

ID=15124057

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13425699A Expired - Lifetime JP3463604B2 (en) 1999-05-14 1999-05-14 Dolphin construction method

Country Status (1)

Country Link
JP (1) JP3463604B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101954345B1 (en) * 2018-07-27 2019-06-11 한림코퍼레이션(주) Berth facility using floating platform

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101324579B1 (en) 2011-12-02 2013-11-01 삼성중공업 주식회사 Guide Assembly For Leg of Vessel and Installing Method of It
JP5820861B2 (en) * 2013-10-08 2015-11-24 財團法人船舶▲き▼海洋▲産▼業研發中心 Construction method of offshore building
KR101645362B1 (en) * 2014-02-27 2016-08-04 한국해양대학교 산학협력단 Jacket support structure for offshore wind turbine using precast housing and suction pile and the construction method
CN111827239A (en) * 2020-07-27 2020-10-27 曹灵涛 Construction method of assembled berthing pier
JP7096561B1 (en) 2022-02-15 2022-07-06 三国屋建設株式会社 Attachment for structure installation and installation method of the structure to which the attachment is attached

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101954345B1 (en) * 2018-07-27 2019-06-11 한림코퍼레이션(주) Berth facility using floating platform

Also Published As

Publication number Publication date
JP2000319849A (en) 2000-11-21

Similar Documents

Publication Publication Date Title
JPH01318612A (en) Protective barrier for protecting ocean structure and arrangement thereof
KR101211811B1 (en) Cast in concrete pile With precast type Caisson
CA3011203A1 (en) Seabed base structure and method for installation of same
JP3463604B2 (en) Dolphin construction method
JP3582701B2 (en) Offshore structure construction method
US4193714A (en) Method for erecting a deck on a marine structure
JP3145641B2 (en) Jacket structure
JP3075179B2 (en) Bridge pier foundation structure and its construction method
JPS58143023A (en) Caisson for pile supporting type breakwater
JP2002364004A (en) Installation method for underwater foundation
JP2002047665A (en) Installation method for jacket structure
JP3378982B2 (en) Basic structure of underwater tunnel
JP3132846B2 (en) Construction method of pile type offshore structure
JP2953823B2 (en) Construction method of offshore substructure
JP2632795B2 (en) How to build artificial ground
JP2815492B2 (en) How to build an underwater foundation
JP2001081790A (en) Jacket structural body and construction method of the structure
JPS60215924A (en) Settlement of steel skeleton for underwater foundation structure
KR102169627B1 (en) Installation method of concrete sinker for floating structure
JPH0742182A (en) Underwater tunnel with legs and underwater tunnel with legs
CN216973476U (en) Gravity type fan foundation that caisson and steel-pipe pile combine
JP2003041604A (en) Underwater foundation and its setting method
JP2001214419A (en) Installation method of offshore structure by caisson
WO2025097762A1 (en) Floating bridge structure and construction process thereof
JPH10121450A (en) Binding engineering method of caison and foundation pile

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20030722

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090822

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120822

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150822

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term