landfill
earth
sand
binder
admixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24933990A
Other languages
Japanese (ja)
Other versions
JPH04128423A (en
Inventor
久 白木
利夫 永久
健志 原田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KITAGAWA TETSUKOSHO KK
Original Assignee
KITAGAWA TETSUKOSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KITAGAWA TETSUKOSHO KK filed Critical KITAGAWA TETSUKOSHO KK
Priority to JP24933990A priority Critical patent/JP2895595B2/en
Publication of JPH04128423A publication Critical patent/JPH04128423A/en
Application granted granted Critical
Publication of JP2895595B2 publication Critical patent/JP2895595B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION 【発明の属する分野の説明】DESCRIPTION OF THE FIELD OF THE INVENTION

本発明は、海洋の埋立作業を行う装置でり、土砂と結
合材とを作業船上にて混練することにより、事前に土砂
の改良を行った上で船上から埋立管を用いて連続的に土
砂を海底に堆積させて海水の汚濁を抑え、効率的に埋立
を行う作業船に関するものである。
The present invention relates to an apparatus for performing land reclamation work in an ocean, in which the earth and sand are kneaded on a work boat to improve the soil in advance, and the earth and sand are continuously conveyed from the ship using a land reclamation pipe. The present invention relates to a work boat that deposits water on the sea floor to suppress pollution of seawater and efficiently reclaim land.

【従来技術及びその問題点】[Prior art and its problems]

近年、人工島、海上空港等の大規模な埋立工事が増加
している。小規模な埋立工事であれば、埋立海域周辺の
海底土砂をポンプ浚渫船にて浚渫し、ポンプ圧送して埋
立てる工法がとられるが、大規模な埋立工事では海底土
砂の確保が困難であるため、山から切出した土砂を底開
式土運船に積込み、該土運船を埋立海域まで曳航し、直
投する工法がとられている。 しかし、この従来工法によれば、埋立土砂の不同沈下
や地震時の地盤の液状化、ゆり込み沈下などが発生しや
すく、それを防止するために埋立後に地盤改良を施す必
要があり、工事が長期化するとともにコストが高くつく
という欠点がある。しかも該地盤改良は部分的に改良す
る場合が多く、安定した地盤になるとは言えない。 また、底開式土運船による工法は、海面から海底まで
土砂を落下させるために、海水の汚濁が非常に多く発生
するという欠点がある。 また、底開式土運船によれば、海面上の埋立が不可能
であり、海面上は他の工法(ダンプトラックによる陸上
輸送等)に変更しなくてはならないという欠点がある。
In recent years, large-scale landfill works such as artificial islands and marine airports have been increasing. In the case of small-scale landfill construction, the method of dredging the seabed sediment around the landfill sea area with a pump dredger and pumping it by pumping is used, but it is difficult to secure the seabed sediment in large-scale landfill work. In this method, earth and sand cut from the mountain are loaded on an open-bottomed earth-moving ship, and the earth-moving ship is towed to a landfill sea area and directly thrown. However, according to this conventional method, uneven settlement of the landfill, liquefaction of the ground at the time of the earthquake, and sinking of the ground are apt to occur, and it is necessary to improve the ground after the landfill to prevent it. There is a drawback that the cost is prolonged and the cost is high. Further, the ground improvement is often partially improved, and it cannot be said that the ground becomes stable. In addition, the construction method using an open-bottomed earth transport ship has a drawback that extremely large amounts of seawater are polluted because earth and sand fall from the sea surface to the sea floor. In addition, according to the open-bottom type earth transport ship, landfill on the sea surface is impossible, and there is a disadvantage that the sea surface must be changed to another method (land transportation by dump truck, etc.).

【問題を解決するための手段】[Means to solve the problem]

本発明は、如上の問題点を解決すべくなされたもの
で、その目的とするところは、船上にて土砂と結合材と
を混練して事前に土砂の改良をすることにより、従来行
われていた埋立後の地盤改良工事を不要にし、また土砂
の囲い手段を使用して土砂の埋立を行うことにより、海
水の汚濁を大巾に軽減し、さらに海面上の埋立作業も行
え、短工期で低コストな埋立工事ができる作業船を提供
することである。 以下、本発明を図面を基づいて詳細に説明する。 第1図は、本発明の基本概念を示す図である。土砂の
受入ホッパ2、結合材の貯蔵槽3、混和材の貯蔵槽4及
び土砂と結合材及び混和材とを混ぜ合せるための混練装
置5は、船体1に具備されている。受入ホッパ2及び各
貯蔵槽3、4から引出された各材料は、各々の計量手段
21、22、23にて所定配合比となるように計量され、さら
に供給装置6、7、8により混練装置5へ供給されるよ
うになしている。また、混練装置5にて結合材及び混和
材と混練された土砂は搬送装置9にて埋立管10まで輸送
されるようになしている。該埋立管10は、昇降装置11に
より海面12上から海底13まで昇降可能であり、埋立の際
には埋立管10の下端を海底13まで降下させ、土砂を海底
13位置から堆積させて埋立作業を行うようになしてい
る。
The present invention has been made in order to solve the above problems, and an object of the present invention is to improve the earth and sand in advance by kneading earth and binder with a binder on a ship. By eliminating the need for soil improvement work after land reclamation, and by burying the earth and sand using earth and sand enclosing means, the pollution of seawater can be greatly reduced and landfill work on the sea surface can be performed. An object of the present invention is to provide a work boat capable of low-cost landfill work. Hereinafter, the present invention will be described in detail with reference to the drawings. FIG. 1 is a diagram showing the basic concept of the present invention. The hull 1 is provided with a hopper 2 for receiving earth and sand, a storage tank 3 for a binder, a storage tank 4 for an admixture, and a kneading device 5 for mixing soil and binder with the admixture. Each material withdrawn from the receiving hopper 2 and each of the storage tanks 3 and 4 is supplied to each weighing unit.
The mixture is measured at 21, 22, and 23 so as to have a predetermined mixing ratio, and further supplied to the kneading device 5 by the supply devices 6, 7, and 8. The earth and sand kneaded with the binder and the admixture in the kneading device 5 is transported to the landfill pipe 10 by the transport device 9. The landfill pipe 10 can be moved up and down from the sea surface 12 to the seabed 13 by a lifting device 11, and at the time of landfill, the lower end of the landfill pipe 10 is lowered to the seabed 13, and sediment is removed from the seabed.
Landfill work is performed by depositing from 13 locations.

【実施例】【Example】

本発明の一実施例を図面により説明する。 第2図は本発明に係る埋立作業船の上面図、第3図は
該埋立作業船の側面図である。 埋立に使用される土砂の受入ホッパ2、結合材として
セメントの貯蔵槽3、混和材の貯蔵槽4、土砂とセメン
ト及び混和材との混練装置として円筒内面にスパイラル
羽根を有したドラムを回転させることにより、連続的に
混練するようになした連続練ミキサ5は、船体1の甲板
上に適宜配置され、各々固着されている。 土砂の埋立管として、下端が開放で側面に埋立深さに
応じて土砂が随意に投入できるように複数個の投入口10
aを有した中空円筒形状のパイプの内部にスクリュー羽
根を配し、該パイプの上端に付設した駆動モータ10bに
よりスクリュー羽根を回転させて、パイプ内の土砂を下
方へ推進させるようになしたスクリューフィーダ10は、
船体1の甲板上に末端を支持、固定されたジブ14の先端
から、昇降装置として船体1の甲板上に固着された昇降
ウインチ11により、ワイヤーロープ15を介して垂下され
ており、該昇降ウインチ11の操作により海面12上から海
底13まで昇降可能であり、任意な位置へ移動できるよう
になしている。 ベントコンベア6a、6bは土砂の受入ホッパ2からミキ
サ5の投入口5aへ連結されており、該受入ホッパ2下部
に付設されたゲート2aの開度により土砂を定量的にミキ
サ5へ供給するようになしている。スクリューコンベア
7はセメントの貯蔵槽3からミキサ5の投入口5aへ連結
されており、さらにスクリューコンベア8は混和材の貯
蔵槽4からスクリューコンベア7の途中に連結されてお
り、セメントと混和材とを混合しつつ定量的にミキサ5
へ供給するようになしている。ベルトコンベア9a、9b、
9cはミキサ5の下部に付設された排出シュート5bからス
クリューフィーダ10の投入口10aへ連結されており、ミ
キサ5にてセメント及び混和材と混練された土砂をスク
リューフィーダ10へ搬送するようになしている。 また、前記ベルトコンベア9bはフレーム9xの末端を船
体1の甲板上にピン支持され、ジブ14に固着された起伏
ウインチ16によりワイヤーロープ17を介してフレーム9x
の先端付近を支持されており、ベルトコンベア9cは、ベ
ルトコンベア9bのフレーム9x下部に付設したレール9y上
に設けられており、ベルトコンベア9bと平行に移動可能
となしている。起伏ウインチ16の操作、及びベルトコン
ベア9cの移動により該ベルトコンベア9cの先端とスクリ
ューフィーダ10の投入口10aの位置が合うように調整可
能となしている。 なお、18はスクリューフィーダ10の振れを防止するた
めのガイドであり、19は各機器の運転操作を遠隔で行う
ための操作室であり、20は電力を供給するための発電機
である。 本実施例によれば、ミキサ5を2基設けてセメント及
び混和材と混練された土砂を1本のスクリューフィーダ
10に集合させ、埋立作業を行うようになしたが、スクリ
ュータィーダ10を複数本としてセメント及び混和材と混
練された土砂を分配して埋立作業を行うようになしても
よい。 また、土砂とセメント及び混和材との混練装置として
連続練ミキサ5としたが、内部に回転羽根を有する強制
練ミキサとすることも可能である。 また、土砂の計量手段として受入ホッパのゲート開度
により定量的に供給する手段及びセメントと混和材の計
量手段として定量搬送スクリューコンベアを用いたが、
各材料ともに重量を測定する計量器を設けることも可能
である。 また、土砂の埋立管としてスクリューフィーダ10とし
たが、下端が開放で側面に投入口を有した中空円筒形状
のパイプとなすこともできる。 また、スクリューフィーダ10に変わり、バケットエレ
ベータとなして埋立土砂をバケットに受入れ、該バケッ
トを降下させることにより埋立作業を行うことも可能で
あり、本発明の他の実施例とする。
An embodiment of the present invention will be described with reference to the drawings. FIG. 2 is a top view of the landfill work ship according to the present invention, and FIG. 3 is a side view of the landfill work ship. Receiving hopper 2 for earth and sand used for landfill, storage tank 3 for cement as a binder, storage tank 4 for an admixture, and rotating a drum having spiral blades on the inner surface of a cylinder as a kneading device for earth, sand, cement and the admixture Thereby, the continuous kneading mixers 5 that are continuously kneaded are appropriately arranged on the deck of the hull 1 and are fixed to each other. As a landfill pipe for earth and sand, a plurality of inlets 10 are provided so that the lower end is open and the side can be optionally filled with soil according to the landfill depth.
A screw blade is arranged inside a hollow cylindrical pipe having a, and the screw blade is rotated by a drive motor 10b attached to the upper end of the pipe so that the earth and sand in the pipe is propelled downward. Feeder 10
The end of the jib 14 supported and fixed on the deck of the hull 1 is suspended from the tip of a jib 14 via a wire rope 15 by a lifting winch 11 fixed on the deck of the hull 1 as a lifting device. It is possible to move up and down from the sea level 12 to the sea floor 13 by the operation of 11, so that it can be moved to any position. The vent conveyors 6a and 6b are connected from the receiving hopper 2 for the earth and sand to the inlet 5a of the mixer 5, and the amount of the earth and sand is quantitatively supplied to the mixer 5 by the opening degree of the gate 2a provided below the receiving hopper 2. I am doing it. The screw conveyor 7 is connected from the cement storage tank 3 to the input port 5a of the mixer 5, and the screw conveyor 8 is connected from the admixture storage tank 4 to the middle of the screw conveyor 7, and the cement and the admixture are mixed. Mixer 5 while mixing
To supply to. Belt conveyors 9a, 9b,
9c is connected from the discharge chute 5b attached to the lower part of the mixer 5 to the inlet 10a of the screw feeder 10, so that the earth and sand kneaded with the cement and the admixture in the mixer 5 are conveyed to the screw feeder 10. ing. Further, the belt conveyor 9b is supported by a pin at the end of the frame 9x on the deck of the hull 1 and is provided with a hoisting winch 16 fixed to a jib 14 via a wire rope 17 to the frame 9x.
The belt conveyor 9c is provided on a rail 9y attached to a lower portion of the frame 9x of the belt conveyor 9b, and is movable in parallel with the belt conveyor 9b. By operating the undulating winch 16 and moving the belt conveyor 9c, the tip of the belt conveyor 9c and the position of the input port 10a of the screw feeder 10 can be adjusted. Reference numeral 18 denotes a guide for preventing the swing of the screw feeder 10, reference numeral 19 denotes an operation room for remotely operating each device, and reference numeral 20 denotes a generator for supplying electric power. According to this embodiment, two mixers 5 are provided, and the earth and sand kneaded with the cement and the admixture are mixed into one screw feeder.
Although the landfill operation is performed by assembling the cemented materials into ten, the landfilling operation may be performed by distributing the cement and the admixture and the earth and sand kneaded with a plurality of screw taiders 10. Further, the continuous kneading mixer 5 is used as a kneading apparatus for mixing earth and sand, cement and an admixture, but a forced kneading mixer having rotating blades inside may also be used. In addition, although a quantitative feeding screw conveyor was used as a means for quantitatively supplying soil and sand by means of a gate opening of a receiving hopper and a means for measuring cement and admixture,
It is also possible to provide a measuring device for measuring the weight of each material. Although the screw feeder 10 is used as a landfill pipe for earth and sand, a hollow cylindrical pipe having an opening at the lower end and an inlet on the side may be used. In addition, instead of the screw feeder 10, it is also possible to receive landfill earth and sand into a bucket as a bucket elevator and lower the bucket to perform a landfill operation, which is another embodiment of the present invention.

【作用】 次に、以上の構成からなる本発明の埋立作業船の作用
について詳述する。 本発明の埋立作業船を埋立海域へ曳航し係留する。昇
降ウインチ11の操作によりスクリューフィーダ10を降下
させ、該スクリューフィーダ10の下端が海底13に位置す
るようになす。そしてベルトコンベア9bの起伏角度を起
伏ウインチ16の操作により調整するとともに、ベルトコ
ンベア9cを移動して該ベルトコンベア9cの先端からスク
リューフィーダ10の投入口10aへ土砂が落下する位置と
なす。 他の土運船を本発明の埋立作業船に横付けし、クラム
シェル等で土運船から受入ホッパ2へ土砂を受入れると
同時に、各ベルトコンベア6a、6b、9a、9b、9c、スクリ
ューコンベア7、8、ミキサ5の運転を開始することに
より、土砂はミキサ5へ定量的に供給されるとともに、
セメントもスクリューコンベア7にて混和材と混合され
つつ定量的にミキサ5へ供給され、ミキサ5内にて連続
して混練させることとなる。 さらに、ミキサ内にて事前に改良された埋立土砂は、
排出シュート5bからベルトコンベア9a、9b、9cを経由
し、投入口10aからスクリューフィーダ10内に送られる
こととなる。 そして、該埋立土砂はスクリューフィーダ10内のスク
リュー羽根により下方に推進され、海底13上に堆積され
て、連続的に埋立てられることとなる。
Next, the operation of the landfill work ship of the present invention having the above-described configuration will be described in detail. The landfill work ship of the present invention is towed and moored in a landfill sea area. The screw feeder 10 is lowered by operating the lifting winch 11 so that the lower end of the screw feeder 10 is located on the seabed 13. Then, the undulation angle of the belt conveyor 9b is adjusted by operating the undulation winch 16, and the belt conveyor 9c is moved to a position where earth and sand fall from the tip of the belt conveyor 9c to the input port 10a of the screw feeder 10. Another earth transport vessel is placed beside the landfill work vessel of the present invention, and the earth and sand is received from the earth transport vessel to the receiving hopper 2 by a clamshell or the like, and at the same time, each belt conveyor 6a, 6b, 9a, 9b, 9c, screw conveyor 7 , 8, by starting the operation of the mixer 5, the earth and sand are quantitatively supplied to the mixer 5,
The cement is also quantitatively supplied to the mixer 5 while being mixed with the admixture on the screw conveyor 7, and continuously kneaded in the mixer 5. In addition, the landfill improved in advance in the mixer is
From the discharge chute 5b, via the belt conveyors 9a, 9b, 9c, it is sent from the inlet 10a into the screw feeder 10. The landfill is propelled downward by the screw blades in the screw feeder 10, is deposited on the seabed 13, and is continuously buried.

【発明の効果】【The invention's effect】

本発明の埋立作業船によれば、土砂と結合材及び混和
材とを混練し、土砂の改良を行った上で埋立を行うた
め、海中に埋立られた土砂は強度を有し、従来行ってい
た埋立後の地盤改良工事を不要にすることができる。し
かも、事前に結合材と混和材を混合した上でミキサにて
土砂とともに強制的に混練するため、強度のバラツキが
少なく安定した土砂を製造できる。さらに結合材及び混
和材の量を変化させることにより、埋立土上の構築物に
応じて埋立土砂の強度を任意に調整することが可能とな
る。さらに、連続ミキサを使用することにより、埋立作
業が連続的に行えるとともに、むらのない埋立が行え
る。 また、埋立管としてスクリューフィーダを使用し、該
埋立管の下端を海底に位置させて、埋立土砂を船上から
徐々に移動させて海底付近で海中に落下させるため、海
水を汚濁させることがなく、海洋汚染の問題を解消でき
る。 また、埋立管の位置の設定により、1回の埋立厚さを
任意に調整することができる。しかも埋立管を海面上へ
上昇させることにより、土運船では不可能であった海面
上の埋立が可能となり、従来のように海面上の埋立を他
の工法(ダンプトラックによる陸上輸送等)に変更する
必要がなく、本発明の埋立作業船にて海底から海面上ま
での埋立作業が可能となる。 また、埋立管を複数本にすることにより、埋立範囲を
広くすることができ、より均一な埋立面を形成すること
ができる。 本発明は、以上のような効果と利点を有した極めて優
秀な埋立作業船である。
According to the landfill work ship of the present invention, since the earth and sand are kneaded with the binder and the admixture, and the soil is improved before the landfill, the earth and sand buried in the sea has strength and is conventionally used. Ground improvement work after landfill can be eliminated. In addition, since the binder and the admixture are mixed in advance, and the mixture is forcibly kneaded with the earth and sand by the mixer, stable earth and sand with less variation in strength can be manufactured. Further, by changing the amounts of the binder and the admixture, the strength of the landfill soil can be arbitrarily adjusted according to the construction on the landfill. Further, by using the continuous mixer, the landfill operation can be performed continuously, and the landfill can be performed evenly. In addition, using a screw feeder as a landfill pipe, the lower end of the landfill pipe is located on the seabed, landfill soil is gradually moved from the ship and dropped into the sea near the seabed, without contaminating seawater, The problem of marine pollution can be solved. Further, the thickness of one landfill can be arbitrarily adjusted by setting the position of the landfill tube. In addition, by raising the landfill pipe to the sea surface, landfill on the sea surface, which was impossible with an earth transport ship, becomes possible, and landfill on the sea surface can be replaced by another method (land transportation by dump truck, etc.) as before. There is no need to change, and the landfill work ship of the present invention enables landfill work from the seabed to the sea surface. Further, by using a plurality of landfill pipes, the landfill range can be widened and a more uniform landfill surface can be formed. The present invention is an extremely excellent landfill work boat having the above effects and advantages.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明の基本概念を示す図であり、第2図、第
3図は本発明の一実施例の平面図及び側面図である。 1……船体 2……土砂の受入ホッパ 3……結合材(セメント)の貯蔵槽 4……混和材の貯蔵槽 5……混練装置(ミキサ) 10……埋立管(スクリューフィーダ)
FIG. 1 is a view showing the basic concept of the present invention, and FIGS. 2 and 3 are a plan view and a side view of one embodiment of the present invention. DESCRIPTION OF SYMBOLS 1 ... Hull 2 ... Receiving hopper of earth and sand 3 ... Storage tank of binder (cement) 4 ... Storage tank of admixture 5 ... Kneading device (mixer) 10 ... Landfill pipe (screw feeder)

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭61−130518(JP,A) 特開 昭54−51193(JP,A) 特開 平2−262491(JP,A) 特開 昭49−48090(JP,A) 実開 昭59−35443(JP,U) 実開 昭56−48990(JP,U) 実開 昭60−50237(JP,U) (58)調査した分野(Int.Cl.6,DB名) B63B 35/00 E02D 15/10 E02B 3/18 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-61-130518 (JP, A) JP-A-54-51193 (JP, A) JP-A-2-2621491 (JP, A) JP-A-49-49 48090 (JP, A) Fully open sho 59-35443 (JP, U) Fully open sho 56-48990 (JP, U) Fully open sho 60-50237 (JP, U) (58) Field surveyed (Int. 6 , DB name) B63B 35/00 E02D 15/10 E02B 3/18

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】土砂の受入ホッパ、結合材の貯蔵槽、土砂
と結合材とを混ぜ合せる混練装置及び該混練装置にて混
練された土砂を船上から海底へ搬送するときの土砂の囲
い手段を具備し、上記の土砂と結合材を所定配合比とな
すための計量手段を有するとともに混練装置へ各材料を
供給する供給装置及び混練装置から混練された土砂を前
記囲い手段へ輸送する搬送装置からなる埋立作業船。
A hopper for receiving earth and sand, a storage tank for a binder, a kneading device for mixing the soil and the binder, and means for enclosing the earth and sand when the earth and sand kneaded by the kneader are conveyed from a ship to the seabed. A feeding device for supplying each material to the kneading device and a conveying device for transporting the kneaded earth and sand from the kneading device to the enclosing means, having a measuring means for making the above-mentioned earth and sand and the binder a predetermined mixing ratio. Landfill work boat.
JP24933990A 1990-09-18 1990-09-18 Landfill work boat Expired - Fee Related JP2895595B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24933990A JP2895595B2 (en) 1990-09-18 1990-09-18 Landfill work boat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24933990A JP2895595B2 (en) 1990-09-18 1990-09-18 Landfill work boat

Publications (2)

Publication Number Publication Date
JPH04128423A JPH04128423A (en) 1992-04-28
JP2895595B2 true JP2895595B2 (en) 1999-05-24

Family

ID=17191550

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24933990A Expired - Fee Related JP2895595B2 (en) 1990-09-18 1990-09-18 Landfill work boat

Country Status (1)

Country Link
JP (1) JP2895595B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5067844B2 (en) * 2007-06-21 2012-11-07 五洋建設株式会社 Underwater casting pipe mixing device and underwater casting pipe mixing method
JP5959256B2 (en) * 2012-03-23 2016-08-02 株式会社五常 Biomass circulation processing system for livestock manure

Also Published As

Publication number Publication date
JPH04128423A (en) 1992-04-28

Similar Documents

Publication Publication Date Title
US4945661A (en) Dredging apparatus
JP2867235B2 (en) Self-propelled soil improvement machine
JP2017190667A (en) Improvement method for water bottom ground, operation ship, and inner bucket pressure controlling system
US5853264A (en) Bridge, dock and pier shoring-up bulk-delivery floating conveyor unit
JP2895595B2 (en) Landfill work boat
JPH1018345A (en) Reclamation construction method by soft earth and dredging reclamation-through execution work system
JP3070007B2 (en) Casting boat
US5042178A (en) Apparatus and process for solid dredge material disposal
JP2009002036A (en) Mixing device for underwater placement pipe, and method of mixing interior of underwater placement pipe
JP4789151B2 (en) Waste mud regeneration processing apparatus and processing method
US20030230009A1 (en) Marine-based platform for dredged solids management
CN211816535U (en) Desilting solidification construction equipment
JP3711351B2 (en) Bottom sediment mixing method and equipment
JP3480699B2 (en) Land transfer method for sediment transfer such as dredging
JP3053179B2 (en) Solidification and transfer processing method for earth and sand such as dredging
JP2971041B2 (en) Underwater charging device and method
JP2005330731A (en) Artificial tideland material using dredged cohesive soil, manufacturing device for the same, and artificial tideland construction method
JPH0755320B2 (en) Mud processing equipment
KR20120117607A (en) Deep cement mixing equipment equipped with slime gathering facility and environmently friendly deep cement mixing method using the same
JPH02243830A (en) High concentration dredging and discharging device
JPH09141298A (en) Solidifying treatment of dredging soil
JPS6073920A (en) Settled-mud dredger
JP3896556B2 (en) Landfill method using dredged soil
JPH01250527A (en) Casting method for earth or the like into water
JPH10147286A (en) Force feed barge for soft mud solidification treatment

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20090305

LAPS Cancellation because of no payment of annual fees