JP2819343B2 - Enlargement method of existing sewer and double shield excavator used for the method - Google Patents

Enlargement method of existing sewer and double shield excavator used for the method

Info

Publication number
JP2819343B2
JP2819343B2 JP2117558A JP11755890A JP2819343B2 JP 2819343 B2 JP2819343 B2 JP 2819343B2 JP 2117558 A JP2117558 A JP 2117558A JP 11755890 A JP11755890 A JP 11755890A JP 2819343 B2 JP2819343 B2 JP 2819343B2
Authority
JP
Japan
Prior art keywords
sewer
shield
excavator
existing
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2117558A
Other languages
Japanese (ja)
Other versions
JPH0416698A (en
Inventor
浩之 武内
Original Assignee
株式会社間組
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社間組 filed Critical 株式会社間組
Priority to JP2117558A priority Critical patent/JP2819343B2/en
Publication of JPH0416698A publication Critical patent/JPH0416698A/en
Application granted granted Critical
Publication of JP2819343B2 publication Critical patent/JP2819343B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は2連型のシールド掘削装置を用いた既設管渠
の拡大工法及びその工法に使用する2連型シールド掘削
装置に関する。
DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a method of enlarging an existing sewer using a double shield excavator and a double shield excavator used in the method.

〈従来の技術〉 従来の既設管渠の拡大工法としては、既設管渠の外径
よりも大なる内径を有する新設管渠を、前記既設管渠の
外周地盤内に同心状に貫入し、この後、前記新設管渠の
内部に残置された、前記既設管渠を撤去する既設管渠の
拡大工法が知られている。
<Conventional technology> As a conventional method of expanding an existing sewer, a new sewer having an inner diameter larger than the outer diameter of the existing sewer is penetrated concentrically into the outer ground of the existing sewer. Later, there is known a method of enlarging an existing culvert for removing the existing culvert, which is left inside the new culvert.

また、先端に掘削装置を備えたシールド機によって、
既設管渠及びその周囲の地上を同時に掘削した後、前記
シールド機の後方に大断面の新たな管渠を構築する工法
も知られている。
Also, with a shield machine equipped with a drilling device at the tip,
It is also known to construct a new duct with a large cross section behind the shield machine after excavating the existing duct and the surrounding ground at the same time.

さらにまた、これらの既設管渠の拡大工法とは別に、
前面にヘッドカッタが装着された複数個のシールドドラ
ムを、共通の支持胴の前側に個別に揺動可能に並設支承
し、また、これらシールドドラム相互を接線方向に逆向
きに揺動させる首振り機構を備えたシールド掘削機が提
案されている。
Furthermore, apart from these methods of expanding existing sewers,
A plurality of shield drums, each having a head cutter mounted on the front surface, are separately supported side by side in a swingable manner on the front side of a common support cylinder, and a neck for swinging these shield drums in opposite directions in a tangential direction. A shield excavator equipped with a swing mechanism has been proposed.

〈発明が解決しようとする課題〉 しかし、従来の既設管渠の拡大工法では、いずれも新
設管渠内で資機材及び掘削土の搬出入を行う必要があ
り、このため電力や通信等のケーブルを架設している既
設管渠の敷設替えを行うには、作業スペースが狭く、資
機材、掘削土等の搬出入が困難であり、作業スペースを
確保するには必要以上に口径を広げるか、一時的にケー
ブルの撤去を行うなどの対策が必要であった。
<Problems to be solved by the invention> However, in the conventional method of expanding existing sewers, it is necessary to carry in and out the equipment and excavated soil in the newly constructed sewers. In order to replace the existing sewer where the erection is being carried out, the work space is narrow, it is difficult to carry in and out the equipment and materials, excavated soil, etc. It was necessary to take measures such as temporarily removing the cable.

また、既設管渠と同時にその外周部を環状に掘削する
工法では、既設管渠の覆工がセグメントの場合には、鉄
筋や治具等が数多く埋込まれているため、マシーンでの
粉砕は困難であり、事実上場所打ちコンクリートにしか
対応できないという問題点があった。
In addition, in the method of excavating the outer periphery of the existing sewer in an annular shape at the same time as the existing sewer, if the existing sewer lining is a segment, a large number of reinforcing bars and jigs are embedded, so grinding with a machine is not possible. It was difficult, and there was a problem that it could be applied only to cast-in-place concrete.

本発明は、上記欠点を解決すべくなされたものであ
り、その目的は、既設管渠の敷設替えを行う場合にも、
新設管渠構築用の資機材及び掘削土などの搬出入を行う
スペースを十分確保すると共に、解体した既設管渠を効
率よく外部へ撤去できる既設管渠の拡大工法及びその工
法に使用する2連型シールド掘削装置を提供することに
ある。
The present invention has been made in order to solve the above-mentioned drawbacks, and its purpose is to replace existing pipes,
A sufficient space to carry in and out the equipment and materials for the construction of the new sewer and the excavated soil, as well as a method of expanding the existing sewer that can dismantle the existing sewer efficiently to the outside, and using it for the construction method An object of the present invention is to provide a mold shield excavator.

他の目的は、必要以上に大口径のトンネルを掘削する
ことによって、土地の収容面積を大きくする必要がな
く、また既設管周辺の障害物を回避して既設管渠を拡大
することができる既設管渠の拡大工法及びその工法に使
用する2連型シールド掘削装置を提供することにある。
Another purpose is to excavate a tunnel with a diameter larger than necessary, so that it is not necessary to increase the land storage area, and it is also possible to expand the existing sewer by avoiding obstacles around the existing pipe. An object of the present invention is to provide a method for enlarging a sewer and a double shield excavator used for the method.

〈課題を解決するための手段〉 本発明は、複断面シールドトンネルを構築する従来の
2連型のシールド掘削装置の利点を生かしつつ、既設管
渠の敷設替えを行うものであり、その要旨は、2基のシ
ールドドラムを並設し、各シールドドラムの前面にヘッ
ドカッタを装着した、2連型シールド掘削装置を用いて
2本のトンネルを同時に掘削するシールド掘削工法にお
いて、前記2連型シールド掘削装置における第一のシー
ルド掘削機によって既設管渠の外周部を環状に掘削する
ことにより、前記既設管渠を残置しつつ、その外周部に
新設管渠を構築すると共に、第二のシールド掘削機によ
って、前記新設管渠構築用の作業抗を構築し、前記新設
管渠内に残置した既設管渠を順次解体し、前記作業抗よ
り搬出する既設管渠の拡大工法にある。
<Means for Solving the Problems> The present invention is to replace an existing sewer while laying the advantage of a conventional double-type shield excavator for constructing a multi-section shield tunnel. In a shield excavation method in which two shield drums are juxtaposed and a head cutter is attached to the front of each shield drum, and two tunnels are simultaneously excavated using a double shield excavator, By excavating the outer periphery of the existing sewer in a ring shape by the first shield excavator in the excavator, the new sewer is constructed on the outer periphery thereof while the existing sewer is left, and the second shield excavation is performed. The construction method for constructing the new sewer is constructed by a machine, the existing sewer remaining in the new sewer is sequentially dismantled, and the existing sewer carried out from the work sewer is enlarged.

また、本発明の他の要旨は、2基のシールドドラムを
並設し、各シールドドラムの前面にヘッドカッタを装着
した、2連型シールド掘削装置において、該掘削装置
は、既設管渠をガイドとしてこの外周部を環状に掘削す
るため、既設管渠の外径よりも大なる内径のカッタヘツ
ドを有する第一のシールド掘削機と、該第一のシールド
掘削機に並設し、前記第一のシールド掘削機によって新
設管渠の構築用の作業抗を掘削する第二のシールド掘削
機とからなり、前記新設管渠内に配設し、解体した既設
管渠を前記作業抗内に運搬する運搬手段と、前記作業抗
内に配設し、前記新設管渠のための資機材及び掘削土を
搬出入すると共に、前記運搬手段による搬出物を外部へ
搬出するための搬送手段とを備える2連型シールド掘削
装置にある。
Further, another gist of the present invention is a dual shield excavator in which two shield drums are juxtaposed and a head cutter is mounted on the front surface of each shield drum, wherein the excavator guides an existing sewer. In order to excavate this outer peripheral portion in a ring shape, a first shield excavator having a cutter head having an inner diameter larger than the outer diameter of the existing sewer and a first shield excavator are juxtaposed to the first shield excavator, A second shield excavator for excavating a work for constructing a new sewer by a shield excavator, disposed in the new sewer, and transporting the dismantled existing sewer into the work sewer. Means and a transport means disposed in the work area, for carrying in and out the materials and excavated soil for the newly constructed culvert, and for carrying out the products carried out by the transport means to the outside. In the type shield drilling rig.

なお、前記第二のシールド掘削機には、前記第一のシ
ールド掘削機を中心として旋回堀進するため、前記シー
ルドドラムを揺動させる首振り機構を備えることもでき
る。
In addition, the second shield excavator may include a swing mechanism for swinging the shield drum in order to make a turn around the first shield excavator.

〈作用〉 本発明に係る既設管渠の拡大工法は、前記第一のシー
ルド掘削機によって、既設管渠を残置させつつ、この外
周部を環状に掘削して新設管渠を構築し、これと同時に
前記第二のシールド掘削機によって、前記新設管渠構築
のための作業抗を通して新設管渠構築用の資機材及び掘
削土の搬出入を行うと共に、新設管渠内に残置された既
設管渠を解体し、この作業抗と通じて外部へ搬出撤去す
る。
<Operation> The method of enlarging an existing sewer according to the present invention is to construct a new sewer by annularly excavating the outer peripheral part while leaving the existing sewer by the first shield excavator. At the same time, the second shield excavator carries in and out the materials and excavated soil for constructing the new sewer through the work for constructing the new sewer, and the existing sewer remaining in the new sewer. Is dismantled and carried out and removed through the work site.

また、本発明に係る第2連型シールド掘削装置は、既
設管渠をガイドとして、既設管渠の外径よりも大なる内
径のカッタヘツドを有する第一のシールド掘削機によっ
て、既設管渠の外周部を環状に掘削する。これと同時に
第二のシールド掘削機によって、新設管渠を構築するた
めの作業抗を掘削する。この新設管渠構築用の資機材及
び掘削土等は、前記作業抗に配設した搬送手段により搬
出入を行う。また、新設管渠内に残置した既設管渠を解
体し、この解体物を前記運搬手段によって作業抗内に運
搬し、前記搬送手段によって外部へ搬送撤去する。
In addition, the second continuous shield excavator according to the present invention uses the existing sewer as a guide, and the first shield excavator having a cutter head having an inner diameter larger than the outer diameter of the existing sewer uses the outer periphery of the existing sewer. Excavate the part in a ring. At the same time, the second shield excavator will excavate work to construct a new sewer. The equipment and the excavated soil for constructing the new sewer are carried in and out by the conveyance means arranged in the work area. Further, the existing culvert left in the newly constructed culvert is dismantled, and the dismantled material is conveyed into the work area by the above-mentioned conveying means, and is conveyed and removed to the outside by the above-mentioned conveying means.

〈実施例〉 本発明の工法に使用する2連型シールド掘削装置の一
実施例を添付図面に基づいて説明する。
<Example> An example of a double shield excavator used in the method of the present invention will be described with reference to the accompanying drawings.

第1図より2連型シールド掘削装置1は、既設管渠30
をガイドとしてこの外周部を環状に掘削するため、既設
管渠30の外径よりも大なる内径カッタヘッドを有する第
一のシールド掘削機10と、該第一のシールド掘削機10に
比べ小なる径を有し、該第一のシールド掘削機10によっ
て新設管渠Aを構築するための作業抗Bを掘削する第二
のシールド掘削機20とで、2連型シールド掘削装置を構
成している。前記第一及び第二のシールド掘削機10,20
は、前面にヘッドカッタ11,21を配するシールドドラム1
2,22を並設し、ドーナツ型のシールドドラム12と既設管
渠30との間に環状に配したエアーバック13によりシール
され、また、シールドドラム22は、支持胴23の前端部に
嵌合し、支持胴23に対して揺動自在に支承され、いわゆ
る首振り機構を有するものである。
As shown in FIG.
The first shield excavator 10 having an inner diameter cutter head larger than the outer diameter of the existing sewer 30 and the first shield excavator 10 are smaller than the first shield A second shield excavator 20 having a diameter and a second shield excavator 20 for excavating a work B for constructing a new sewer A by the first shield excavator 10 is formed. . The first and second shield excavators 10, 20
Is a shield drum 1 with head cutters 11, 21 on the front.
2,22 are arranged side by side and sealed by an air bag 13 arranged in a ring between the donut-shaped shield drum 12 and the existing sewer 30, and the shield drum 22 is fitted to the front end of the support drum 23. In addition, it is swingably supported by the support cylinder 23 and has a so-called swing mechanism.

第2図に示すように第一のシールド掘削機10後方に
は、掘削の際のガイドとして利用した既設管渠30が残置
されており、この既設管渠30の外縁部には、新設管渠構
築用の新設セグメント14を組み込む際に使用するエレク
ター15aを伸縮可能に支持するエレクターガイドリング1
5を備えている。さらにこの後方の新設管渠A内上部に
は、新設セグメント14及び解体した既設管渠30を運ぶ電
動ホイスト16aを備えており、新設管渠A内下部には、
前記電動ホイスト16によって運ばれた新設セグメント14
aを掘削先端部へ搬送するためのセグメント搬送機17を
備える。なお、新設管渠A内に残置された既設管渠30
は、既設管渠仮受台18によって下方から支承されてい
る。
As shown in FIG. 2, an existing sewer 30 used as a guide for excavation is left behind the first shield excavator 10, and an outer edge of the existing sewer 30 has a new sewer. An erector guide ring 1 that expandably supports an erector 15a used when incorporating a new segment 14 for construction.
Has five. In addition, an electric hoist 16a for carrying the new segment 14 and the dismantled existing sewer 30 is provided in the upper part of the new sewer A behind the lower part.
New segment 14 carried by the electric hoist 16
A segment transporter 17 for transporting a to the excavation tip is provided. In addition, the existing sewer 30 left inside the new sewer A
Is supported from below by an existing sewer temporary support stand 18.

一方、第二のシールド掘削機20後方には、作業抗B構
築用の新設セグメント14bを組み込む際に使用するエレ
クター15bを備え、作業抗B内上部には、セグメント台
車24によって外部より搬送された新設セグメント14bを
エレクター15b付近まで搬送する電動ホイスト16bを備え
ている。
On the other hand, the rear of the second shield excavator 20 is provided with an erector 15b used when incorporating the new segment 14b for constructing the work anti-B, and the upper part inside the work anti-B is transported from the outside by the segment cart 24. An electric hoist 16b for transporting the newly installed segment 14b to the vicinity of the erector 15b is provided.

なお、新設管渠Aと作業抗Bとの間には、この間を貫
通する資機材搬出入用の資材搬入口cを間隔をあけて適
宜設けてある。
In addition, between the newly installed sewer A and the work counter B, a material carrying-in port c for carrying in and out of materials and equipment penetrating therethrough is appropriately provided at intervals.

次に新設管渠Aの拡大工法について説明する。まず、
送泥管40を通して切羽面を泥水で加圧しながら、第一の
シールド掘削機10によって既設管渠30の外周部を環状に
掘削すると同時に、第二のシールド掘削機20によって作
業抗Bを掘削し、掘削した泥水は、拝泥管41を通して外
部へ排出する。掘進に際しては、油圧式のシールドジャ
ッキ42を伸長させ、新設セグメント14a,14bの先端部に
反力をとって行い、掘進が進み、シールドジャッキ42が
所定距離伸長したところで掘進を停止し、シールドジャ
ッキ42を収縮させ、これによって生じたスペースに新設
セグメントを組み立てるものである。
Next, a method of enlarging the newly installed sewer A will be described. First,
While pressurizing the face with muddy water through the mud pipe 40, the outer periphery of the existing sewer 30 is excavated in an annular shape by the first shield excavator 10, and at the same time the work shield B is excavated by the second shield excavator 20. The excavated mud is discharged to the outside through the mud pipe 41. At the time of excavation, the hydraulic shield jack 42 is extended, a reaction force is applied to the tip of the new segments 14a, 14b, the excavation proceeds, and when the shield jack 42 extends a predetermined distance, the excavation is stopped, and the shield jack is stopped. 42 is contracted, and a new segment is assembled in a space created by the contraction.

なお、このシールド掘削機による掘進工程において、
前記第二のシールド掘削機20の前方地盤中に、埋設物等
の障害物が存在し、掘削の支障となる場合には、前記首
振り機構によって第一のシールド掘削機を中心として旋
回掘進することにより、前記障害物を回避することがで
きる。
In the excavation process using this shield excavator,
In the ground in front of the second shield excavator 20, there is an obstacle such as a buried object, and when it hinders excavation, the swing mechanism excavates around the first shield excavator by the swing mechanism. Thus, the obstacle can be avoided.

次に、作業抗Bに敷設したセグメント台車24によって
新設セグメント14aを搬入し、新設管渠A上部に取り付
けた電動ホイスト16aによってこれを懸吊し、セグメン
ト搬送機17上へ運ぶ。運ばれた新設セグメント14aは、
セグメント搬送機17によって、先端側へ搬送され、ここ
でエレクター15aに保持された後、所定位置に組み込ま
れる。
Next, the new segment 14a is carried in by the segment truck 24 laid on the work counter B, suspended by the electric hoist 16a mounted on the upper part of the new sewer A, and transported onto the segment transporter 17. The new segment 14a carried is
It is conveyed to the front end side by the segment conveyor 17, where it is held by the erector 15a, and then assembled at a predetermined position.

また、作業抗B内ではこの作業と並行して、セグメン
ト台車24で後方より搬送された新設セグメント14bを、
電動ホイスト16bで懸吊し、先端側へ運び、同様にエレ
クター15bによって所定位置に組み込む。このように新
設管渠A及び作業抗Bともに新設セグメント14a,14bを
環状に組み込み覆工した後、再び先端部の新設セグメン
ト14a,14bに反力をとって掘進を続行する。
In parallel with this work, the newly-installed segment 14b conveyed from behind by the segment cart 24 in the work counter B,
It is suspended by the electric hoist 16b, carried to the tip side, and similarly assembled at a predetermined position by the erector 15b. In this way, after both the new pipe A and the work counter B have the new segments 14a and 14b incorporated in a ring shape and lining, the excavation is continued by taking the reaction force again to the new segments 14a and 14b at the tips.

一方、新設管渠A内に残置した既設管渠30は、その後
端部から順次解体を行う。この解体物は、前記電動ホイ
スト16aによって懸吊し、資材搬入口Cから作業抗B内
に配した台車25へ積み込み、バッテリーカー26でけん引
し、外部へ搬出する(第3図)。以上の工程を繰り返し
て新設管渠Aを順次構築していく。なお、新設管渠Aを
構築後、前記作業抗Bは勿論洞道としても利用できる。
On the other hand, the existing culvert 30 left inside the newly constructed culvert A is sequentially dismantled from the rear end. The dismantled product is suspended by the electric hoist 16a, loaded from the material entrance C to the carriage 25 arranged in the work counter B, towed by the battery car 26, and carried out (FIG. 3). The above steps are repeated to construct a new sewer A sequentially. After the construction of the new sewer A, the work counter B can of course be used as a tunnel.

本実施例で示した既設管渠30が電力・通信用ケーブル
を布設した管渠の場合には、既設管渠内のケーブルラッ
ク31上のケーブル32(第4,5図)を構築した新設暗渠A
に設けたケーブルラック31′上に順次移行させれば良く
(第1図参照)、ケーブル32を一時的に撤去する必要は
ない。
In the case where the existing culvert 30 shown in the present embodiment is a culvert in which power and communication cables are laid, a newly constructed culvert in which a cable 32 (FIGS. 4 and 5) on a cable rack 31 in the existing culvert is constructed. A
It is only necessary to sequentially move the cables 32 onto the cable rack 31 'provided at (see FIG. 1), and it is not necessary to temporarily remove the cables 32.

また、本工法を利用した他の実施例としては、既設管
渠を撤去せず、この既設管渠の外周部にコンクリート又
はモルタル等を注入して、既設管渠の補強を行い、容量
拡大分には前記作業坑を当てることも可能である。
In another embodiment using this method, concrete or mortar is injected into the outer periphery of the existing sewer without removing the existing sewer, and the existing sewer is reinforced to increase the capacity. It is also possible to hit the work well.

〈効果〉 本発明に係る既設管渠の拡大工法によれば、2連型シ
ールド掘削装置のうち第一のシールド掘削機によって既
設管渠を残置しつつ、この外周部を環状に掘削して新設
暗渠を構築すると共に、第二のシールド掘削機によって
前記新設暗渠構築のための資機材搬出入用の作業坑を並
設して構築する。従って、前記作業坑を通じて資機材及
び掘削土等を搬出入を行うことにより、新設管渠の口径
を必要以上に拡大することなく、作業スペースを確保で
きる。
<Effect> According to the method for enlarging the existing sewer according to the present invention, the outer peripheral part is excavated in a ring shape while the existing sewer is left by the first shield excavator of the double shield excavator, and the new construction is performed. While constructing a culvert, the second shield excavator also constructs a work pit for loading and unloading materials and equipment for the construction of the new culvert. Therefore, by carrying in and out materials and excavated soil through the work pit, a work space can be secured without unnecessarily increasing the diameter of the newly installed sewer.

また、新設管渠内に残置した既設管渠をシールド掘削
機によらず順次解体するので、新設管渠の掘進の進行と
既設管渠の破砕・解体は独立した作業となり、効率的に
施工することができる。
In addition, the existing sewer remaining in the new sewer is dismantled sequentially without using a shield excavator, so the progress of excavation of the new sewer and the crushing and dismantling of the existing sewer are independent work, and efficient construction is performed. be able to.

さらに本発明に係る2連型シールド掘削装置によれ
ば、既設管渠の外周部を環状に掘削する第一のシールド
掘削機と、第二のシールド掘削機とを並設したので、前
記第一のシールド掘削機によって既設管渠をガイドとし
て掘進し、これと隣接して同時に第二のシールド掘削機
によって作業坑を掘削できる。また、解体した既設管渠
を運搬する運搬手段設け、さらにこの解体物及び新設暗
渠構築用の資機材を搬出入する搬送手段を作業坑内に設
けたので、十分な作業スペースを確保でき、効率的に新
設暗渠の構築並びに既設暗渠の撤去を行うことが可能で
ある。
Furthermore, according to the double shield excavator according to the present invention, the first shield excavator for excavating the outer periphery of the existing sewer in a ring and the second shield excavator are arranged side by side. With the shield excavator described above, excavation can be performed using the existing sewer as a guide, and at the same time, a work pit can be excavated by the second shield excavator adjacent thereto. In addition, a transportation means for transporting the dismantled existing culvert and a transportation means for carrying in and out the dismantled material and materials for constructing a new culvert are provided in the work pit, so that a sufficient work space can be secured and efficient. It is possible to construct a new culvert and remove the existing one.

【図面の簡単な説明】 第1図は本発明に係る2連型シールド掘削装置を示す一
部透視斜視図、第2図は搬入された新設セグメントを組
み込む状況を示す2連型シールド掘削装置の側面を示す
断面図、第3図は解体した既設管渠を搬出撤去する状況
を示す2連型シールド掘削装置の断面図、第4図は第2
図における線IV−IV断面図、第5図は第2図における線
V−V断面図である。 1……2連型シールド掘削装置、10……第一のシールド
掘削機、20……第二のシールド掘削機、30……既設管
渠、16a,16b……電動ホイスト(運搬手段)、24……セ
グメント台車(搬送手段)、25……台車(搬送手段)。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a partially transparent perspective view showing a double shielded digging apparatus according to the present invention, and FIG. 2 is a perspective view of a double shielded digging apparatus showing a situation where a newly installed segment is incorporated. FIG. 3 is a cross-sectional view of a double shielded excavator showing a situation in which a dismantled existing sewer is carried out and removed, and FIG.
FIG. 5 is a sectional view taken along line IV-IV in FIG. 5, and FIG. 5 is a sectional view taken along line VV in FIG. 1 double shield excavator, 10 first shield excavator, 20 second shield excavator, 30 existing sewer, 16a, 16b electric hoist (transportation means), 24 …… Segment trolley (transportation means), 25 …… Dolly (transportation means).

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】2基のシールドドラムを並設し、各シール
ドドラム前面にヘッドカッタを装着した、2連型シール
ド堀削装置を用いて2本のトンネルを同時に堀削するシ
ールド掘削工法において、 前記2連型シールド掘削装置における第一のシールド掘
削機によって既設管渠の外周部を環状に掘削することに
より、前記既設管渠を残置しつつ、その外周部に新設管
渠を構築し、 第二のシールド掘削機によって前記新設管堀渠構築用の
作業抗を構築し、 前記新設管渠内に残置した既設管渠を順次解体して前記
作業抗より搬出する既設管渠の拡大工法。
1. A shield excavation method in which two shield drums are juxtaposed and a head cutter is mounted on the front of each shield drum, and two tunnels are simultaneously excavated using a double shield excavator. By excavating the outer periphery of the existing sewer in an annular shape by the first shield excavator in the double shielded excavator, a new sewer is constructed on the outer periphery of the existing sewer while leaving the existing sewer. A method for constructing a work channel for the construction of the new sewer with the second shield excavator, and sequentially dismantling the existing sewer remaining in the new sewer and carrying out the work from the work sewer to enlarge the existing sewer.
【請求項2】2基のシールドドラムを並設し、各シール
ドドラムの前面にヘッドカッタを装着した、2連型シー
ルド堀削装置において、 該掘削装置は、既設管渠をガイドとしてこの外周部を環
状に掘削するため、既設管渠の外径よりも大なる内径の
ヘッドカッタを有する第一のシールド掘削機と、 該第一のシールド掘削機に並設し、前記第一のシールド
掘削機によって新設管渠の構築用の作業抗を掘削する第
二のシールド掘削機とからなり、 前記新設管渠内に配設し、解体した既設管渠を前記作業
抗内へ運搬する運搬手段と、 前記作業抗内に配設し、前記新設管渠のための資機材及
び掘削土を搬出入すると共に、前記運搬手段による搬出
物を外部へ搬出するための搬送手段とを備える2連型シ
ールド掘削装置。
2. A double shield drilling machine in which two shield drums are juxtaposed and a head cutter is mounted on the front surface of each shield drum. A first shielded excavator having a head cutter with an inner diameter larger than the outer diameter of the existing sewer, and a first shielded excavator juxtaposed to the first shielded excavator A second shield excavator for excavating a work channel for constructing a new sewer by arranging in the new sewer, transport means for transporting the dismantled existing sewer into the work sewer, A double shielded excavator, which is provided in the work area, and is provided with carrying means for carrying in and out the materials and excavated soil for the newly constructed culvert, and carrying out the goods carried out by the carrying means to the outside. apparatus.
【請求項3】前記第二のシールド掘削機には、前記第一
のシールド掘削機を中心として旋回掘進するため、前記
シールドドラムを揺動させる首振り機構を備えることを
特徴とする請求項2記載の2連型シールド掘削装置。
3. The second shield excavator is provided with a swing mechanism for swinging the shield drum in order to perform turning excavation around the first shield excavator. The double-type shield excavator according to claim 1.
JP2117558A 1990-05-09 1990-05-09 Enlargement method of existing sewer and double shield excavator used for the method Expired - Fee Related JP2819343B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2117558A JP2819343B2 (en) 1990-05-09 1990-05-09 Enlargement method of existing sewer and double shield excavator used for the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2117558A JP2819343B2 (en) 1990-05-09 1990-05-09 Enlargement method of existing sewer and double shield excavator used for the method

Publications (2)

Publication Number Publication Date
JPH0416698A JPH0416698A (en) 1992-01-21
JP2819343B2 true JP2819343B2 (en) 1998-10-30

Family

ID=14714793

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2117558A Expired - Fee Related JP2819343B2 (en) 1990-05-09 1990-05-09 Enlargement method of existing sewer and double shield excavator used for the method

Country Status (1)

Country Link
JP (1) JP2819343B2 (en)

Also Published As

Publication number Publication date
JPH0416698A (en) 1992-01-21

Similar Documents

Publication Publication Date Title
JPH0517946A (en) Excavating device for underground continuous wall
JP4181980B2 (en) Tunnel construction method
JP6345077B2 (en) Conveying apparatus and conveying method
JP2017048588A (en) Excavated object carrying-out system and carrying-out method
JP2819343B2 (en) Enlargement method of existing sewer and double shield excavator used for the method
JP4557931B2 (en) Excavator body recovery device in tunnel excavator
JP5528049B2 (en) Tunnel drilling equipment
JPH07127374A (en) Method for constructing tunnel
JPH0489992A (en) Existing pipe duct enlarging method and shield excavation device used with the method
JP3831900B2 (en) Tunnel construction method
KR20010049877A (en) 3 dimensional multi phase tunneling mathod and apparatus corresponding same
JP2956486B2 (en) Forming equipment for lining tunnel arches
JP4557930B2 (en) Excavator body recovery device in tunnel excavator
JP7465832B2 (en) Excavator
JP5279676B2 (en) Box assembly equipment
RU2320915C2 (en) Method of uncovering of buried pipe (versions)
JPS5820898A (en) Method and apparatus for constructing small inner diameter pipe in ground
JP7465831B2 (en) Excavator
JP4172330B2 (en) Widening equipment and widening method for existing tunnels
JP4698512B2 (en) Method of collecting excavator body in tunnel excavator
JP3440661B2 (en) Tunnel protection method
KR20180070079A (en) excavator using propulsion of assembled front tip
JP2553961B2 (en) Form moving / assembling device for shield construction method
JPH0828176A (en) Large sectional tunnel excavating machine
JPH0288883A (en) Method of shielding construction and excavator thereof

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees