JP3440661B2 JP31276695A JP31276695A JP3440661B2 JP 3440661 B2 JP3440661 B2 JP 3440661B2 JP 31276695 A JP31276695 A JP 31276695A JP 31276695 A JP31276695 A JP 31276695A JP 3440661 B2 JP3440661 B2 JP 3440661B2
Authority
JP
Japan
Prior art keywords
tunnel
cutter
planned
ground
protection method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP31276695A
Other languages
Japanese (ja)
Other versions
JPH09151691A (en
Inventor
恵樹 芦田
文男 木下
實 青井
博明 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP31276695A priority Critical patent/JP3440661B2/en
Publication of JPH09151691A publication Critical patent/JPH09151691A/en
Application granted granted Critical
Publication of JP3440661B2 publication Critical patent/JP3440661B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明はトンネル掘削前にト
ンネル建設予定線上に防護工を施すトンネルの防護工法
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tunnel protection method for performing a protection work on a planned tunnel construction line before excavating the tunnel.

【0002】[0002]

【従来の技術】とくに地下トンネルの場合、掘削による
地盤沈下によって地表面の構造物が破損、倒壊すること
のないように、補助工法として、トンネル上地盤を補強
するための防護工を施す必要がある。
2. Description of the Related Art Particularly in the case of an underground tunnel, it is necessary to provide protective work to reinforce the ground above the tunnel as an auxiliary method so that the structure on the ground surface will not be damaged or collapsed due to ground subsidence due to excavation. is there.

【0003】また、圧気シールド工法や泥水シールド工
法のようにトンネル内を加圧して切羽を安定させる工法
をとる場合、地表への漏気、泥水の噴発を防止する必要
がある。
Further, when adopting a method for stabilizing the face by pressurizing the inside of the tunnel, such as a pressure shield construction method and a muddy water shield construction method, it is necessary to prevent leakage of air to the ground surface and spouting of muddy water.

【0004】とくに、大口径シールド工法の場合、トン
ネル上端と下端の土圧差が大きく、切羽の安定には下端
側の圧力でバランスをとることからトンネル内上部の圧
力が土圧よりも高くなるため、漏気や噴発が起こり易
く、防護工の必要性が高い。
In particular, in the case of the large-diameter shield construction method, the earth pressure difference between the upper and lower ends of the tunnel is large, and the pressure on the lower end side is balanced to stabilize the face, so the pressure in the upper part of the tunnel becomes higher than the earth pressure. , Air leaks and spouts are likely to occur, and there is a high need for protective work.

【0005】従来、この地盤補強、シールド工法におけ
る漏気や噴発の防止のためのトンネルの防護工法とし
て、パイプルーフ工法、すなわち、掘削断面外周に沿っ
てパイプ(鋼管)を並列に挿入し、これらにコンクリー
ト等のグラウト材を充填してトンネル形状に合わせたル
ーフを形成する工法等が知られている。
Conventionally, as a tunnel protection method for reinforcing air and preventing leakage and spouting in the shield method, a pipe roof method, that is, pipes (steel pipes) are inserted in parallel along the outer periphery of the excavated section, There is known a construction method in which a grout material such as concrete is filled to form a roof having a tunnel shape.

【0006】[0006]

【発明が解決しようとする課題】ところが、このパイプ
ルーフ工法を含めて、従来のトンネルの防護工法による
と、トンネル内部(切羽)からパイプ挿入等の防護工を
施すため、 1回の施工距離が短くて施工能率が悪
く、 防護工が不連続となることから強度面でも不利
となり、 しかも、高度の施工技術を要求されるとい
う問題があった。
However, according to the conventional tunnel protection construction method including this pipe roof construction method, since the protection work such as pipe insertion is performed from inside the tunnel (face), the construction distance of one time is reduced. There was a problem in that it was short and construction efficiency was poor, and because protective work was discontinuous, it was also disadvantageous in terms of strength, and that it required advanced construction technology.

【0007】そこで本発明は、地盤の補強、シールド工
法における漏気や噴発の防止のための防護工を地表側か
ら連続して能率良く、施工することができるトンネルの
防護工法を提供するものである。
Therefore, the present invention provides a tunnel protection construction method capable of continuously and efficiently constructing protection work for reinforcement of the ground and prevention of air leaks and jets in the shield construction method from the ground surface side. Is.

【0008】[0008]

【課題を解決するための手段】請求項1の発明は、掘削
刃付きエンドレスチェーンがカッターポストの上下両端
部間に掛け渡されてなるチェーン式カッターを走行台車
に傾斜して取付けて掘 削機を構成し、 A.トンネルの建設予定線上において上記掘削機のカッ
ターを地表側から地中に斜めに建て込んだ状態で、同カ
ッターを回転させながら上記走行台車によって上記トン
ネル予定線と平行に移動させることにより地中に傾斜し
た連続溝を掘削する掘削作業、 B.上記連続溝に固化材を注入し固化させる固化作業 を、トンネルの予定線の中心に対して両側から行う こと
により、上記トンネル建設予定線上において地中に斜め
にクロスした第1及び第2の防護壁を造成するものであ
る。
The invention of claim 1 is excavation
Endless chains with blades are at the upper and lower ends of the cutter post.
Traveling cart with a chain-type cutter that is stretched between parts
It mounted inclined constitute excavation machine, A. On the planned construction line of the tunnel,
With the target installed diagonally in the ground from the surface side,
While rotating the machine, the ton
It will tilt into the ground by moving it parallel to the planned line.
Excavation work for excavating continuous continuous grooves, B. The first and second protections that diagonally cross into the ground on the planned tunnel construction line are performed by performing the solidification work by injecting the solidifying material into the continuous groove from both sides with respect to the center of the planned tunnel line. It is to create a wall.

【0009】請求項2の発明は、請求項1の工法におい
て、カッターを走行台車に対して水平軸を中心として起
伏自在に取付け、かつ、伸縮自在なバックステーによっ
て傾斜角度調整自在に支持するものである。
According to a second aspect of the present invention, in the construction method of the first aspect, the cutter is raised with respect to the traveling carriage about a horizontal axis.
The back stay is attached so that it can be folded up and down.
The tilt angle can be adjusted freely .

【0010】請求項3の発明は、請求項2の工法におい
て、バックステーを油圧シリンダによって伸縮自在に構
成したものである。
According to a third aspect of the present invention, in the construction method according to the second aspect, the back stay is configured to be extendable / contractible by a hydraulic cylinder.
It was made.

【0011】上記工法によると、建設されるトンネルを
屋根状に覆う状態で斜めにクロスした防護壁が連続して
造成され、この防護壁によりトンネル上の地盤が補強さ
れて地盤沈下が防止され、かつ、シールド工法によるト
ンネル掘削時の漏気や泥水の噴発が防止される。
According to the above-mentioned construction method , a diagonally crossed protection wall is formed continuously in a state of covering the tunnel to be constructed like a roof, and the ground on the tunnel is reinforced by the protection wall to prevent ground subsidence, Moreover, leakage of air and spout of mud during tunnel excavation by the shield method are prevented.

【0012】この工法によると、防護壁を地表側から簡
単にしかも連続して造成することができるため、施工能
率が良いとともに、強度面で有利となる。
According to this construction method, the protective wall can be easily and continuously formed from the ground surface side, so that the construction efficiency is good and the strength is advantageous.

【0013】この場合、カッターを回転させながら走行
台車を移動させることによって連続溝を掘削するため、
たとえばドリルによる穿孔作業を繰り返して連続溝を形
成する場合と比較して、連続溝を均一幅で遥かに能率良
く掘削することができる。
[0013] To excavate the continuous groove by this case, moving the traveling vehicle while rotating the mosquitoes Potter,
For example, as compared with the case where a continuous groove is formed by repeating a drilling operation, the continuous groove can be drilled with a uniform width and much more efficiently.

【0014】また、請求項の発明によると、トンネル
の外径寸法等に応じて連続溝、すなわち防護壁の傾斜角
度を任意に調整することができる。
According to the second aspect of the invention, the inclination angle of the continuous groove, that is, the protective wall can be arbitrarily adjusted according to the outer diameter dimension of the tunnel and the like.

【0015】この場合、請求項の発明によると、この
角度調整を油圧シリンダの伸縮作用によって簡単、迅速
に行うことができる。
In this case, according to the third aspect of the invention, this angle adjustment can be easily and quickly performed by the expansion and contraction action of the hydraulic cylinder.

【0016】[0016]

【発明の実施の形態】本発明の実施形態を図によって説
明する。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of the present invention will be described with reference to the drawings.

【0017】図1に、この実施形態にかかるトンネルの
防護工法に使用される掘削機の全体構成を示している。
FIG. 1 shows the entire construction of an excavator used in a tunnel protection method according to this embodiment.

【0018】この掘削機は、基本的には、自走可能な走
行台車(たとえばクローラクレーンのベースマシン)1
にチェーン式カッター2が取付けられて成り、油圧ショ
ベル等の適宜の手段によって掘削した穴内にこのカッタ
ー2を建て込んだ状態で、同カッター2を回転させなが
ら走行台車1とともに水平方向に移動させることによ
り、所定長さの連続溝Gを掘削する。
This excavator is basically a self-propelled traveling carriage (for example, a crawler crane base machine) 1
A chain type cutter 2 is attached to the, and while the cutter 2 is built in a hole excavated by an appropriate means such as a hydraulic excavator, the cutter 2 is rotated and moved horizontally along with the traveling carriage 1. Thus, the continuous groove G having a predetermined length is excavated.

【0019】カッター2は、図2に示すように、縦長の
箱形フレームであるカッターポスト3の上端部に設けら
れた駆動輪(スプロケット)4と、下端部に設けられた
遊動輪(プーリ)5との間にエンドレスチェーン6が掛
け渡され、このチェーン6の外周側に設けられた多数の
掘削刃7…によって溝Gを掘削するように構成されてい
る。
As shown in FIG. 2, the cutter 2 has a drive wheel (sprocket) 4 provided at the upper end of a cutter post 3 which is a vertically long box-shaped frame and an idle wheel (pulley) provided at the lower end. 5, an endless chain 6 is laid between the endless chains 6 and 5, and the groove G is excavated by a large number of excavating blades 7 provided on the outer peripheral side of the chain 6.

【0020】このカッター2は走行台車1に対し、次の
ように取付けられている。
The cutter 2 is attached to the traveling carriage 1 as follows.

【0021】図1に示すように、走行台車1にメインフ
レーム8が取付けられている。
As shown in FIG. 1, a main frame 8 is attached to the traveling carriage 1.

【0022】このメインフレーム8は、下端部が水平軸
9によって、また上端部が油圧シリンダからなる伸縮自
在なバックステー10によってそれぞれ走行台車1に支
持され、バックステー10の伸縮作用により水平軸9を
中心として起伏自在、すなわち、水平面に対する傾斜角
度θが調整自在となっている。
The main frame 8 is supported at its lower end by a horizontal shaft 9 and at its upper end by a retractable backstay 10 composed of a hydraulic cylinder. Can be raised and lowered about the center, that is, the inclination angle θ with respect to the horizontal plane can be adjusted.

【0023】このメインフレーム8の前面にリーダ1
1、カッター2(カッターポスト3)の上端にスライド
フレーム12がそれぞれ取付けられ、このスライドフレ
ーム12がリーダ11に昇降自在に取付けられている。
The reader 1 is provided on the front surface of the main frame 8.
1, a slide frame 12 is attached to the upper ends of the cutter 2 (cutter post 3), and the slide frame 12 is attached to the reader 11 so as to be movable up and down.

【0024】13はリーダ11とスライドフレーム12
との間に設けられた昇降用油圧シリンダで、同シリンダ
13の伸縮作用によってスライドフレーム12(カッタ
ー2)が昇降して掘削深度の調整が行われる。
Reference numeral 13 is a reader 11 and a slide frame 12.
With a lifting hydraulic cylinder provided between and, the slide frame 12 (cutter 2) is lifted and lowered by the expansion and contraction of the cylinder 13 to adjust the excavation depth.

【0025】こうして、走行台車1にカッター2が傾斜
して、かつ、この傾斜角度θが調整自在な状態で取付け
られて掘削機が構成されている。
In this way, the excavator is constructed by mounting the cutter 2 on the traveling carriage 1 in a tilted state and adjusting the tilt angle θ so as to be adjustable.

【0026】この工法によるときは、トンネル掘削に先
立ち、図5に示すようにトンネルTの建設予定線上にお
いて、地中に斜めにクロスする屋根状の防護壁W1,W
2を予定線沿いに造成する。
According to this construction method, prior to excavation of the tunnel, as shown in FIG. 5, on the planned construction line of the tunnel T, roof-like protective walls W1 and W diagonally crossing into the ground.
Build 2 along the planned line.

【0027】この防護壁W1,W2の施工手順は次の通
りである。
The procedure for constructing the protective walls W1 and W2 is as follows.

【0028】 図1に示すように、掘削機の走行台車
1を建設予定線と平行に走行移動可能に配置し、前記し
たようにカッター2を地中(予め適宜の手段で掘削した
斜め縦穴)に建て込んだ状態で、同カッター2を回転さ
せながら走行台車1を移動させることにより傾斜した第
1の連続溝G1を掘削する。
As shown in FIG. 1, the traveling carriage 1 of the excavator is arranged so as to be movable in parallel with the planned construction line, and the cutter 2 is underground (oblique vertical hole excavated by an appropriate means in advance) as described above. In the state of being built in, the traveling carriage 1 is moved while rotating the cutter 2 to excavate the inclined first continuous groove G1.

【0029】この連続溝G1の傾斜角度(カッター2の
傾斜角度θ)は、トンネルTの外径寸法等に応じて調整
される。
The inclination angle of the continuous groove G1 (the inclination angle θ of the cutter 2) is adjusted according to the outer diameter of the tunnel T and the like.

【0030】 この溝掘削後に、溝G1内に固化液
(セメントスラリー)を注入し、この固化液を原位置土
と撹拌・混合した後、固化させることにより、図3に示
すようにソイルセメント壁である第1の防護壁W1を造
成する。
After the excavation of the groove, a solidifying liquid (cement slurry) is injected into the groove G1, the solidifying liquid is stirred and mixed with the in-situ soil, and then solidified to thereby solidify the soil cement wall as shown in FIG. The first protection wall W1 is formed.

【0031】 この第1の防護壁W1の固化後、また
は固化前に、図4に示すように掘削機の位置をトンネル
建設予定線の中心に対して反対側に移し、傾斜した第2
の連続溝G2を第1の防護壁W1とクロスして掘削す
る。
After solidification of the first protection wall W1 or before solidification, as shown in FIG. 4, the position of the excavator is moved to the opposite side to the center of the planned tunnel construction line, and the second inclined wall is formed.
The continuous groove G2 of is crossed with the first protective wall W1 and excavated.

【0032】なお、第1の防護壁W1の固化後であって
も、カッター2によってこの防護壁W1を貫いて第2の
連続溝G2を掘削することは十分可能である。
Even after the first protective wall W1 is solidified, the cutter 2 can sufficiently excavate the second continuous groove G2 through the protective wall W1.

【0033】 第1の防護壁W1の造成時と同様に、
連続溝G2を掘削した後、溝内に固化液を注入し、原位
置土と撹拌・混合し、固化させることにより、図5に示
すように、第2の防護壁W2を第1の防護壁W1に対し
て斜めにクロスして造成する。
Similar to when the first protective wall W1 was created,
After excavating the continuous groove G2, the solidification liquid is injected into the groove, stirred and mixed with the in-situ soil, and solidified, whereby the second protection wall W2 is changed to the first protection wall as shown in FIG. Created by crossing diagonally with respect to W1.

【0034】こうして造成された防護壁W1,W2によ
り、トンネル上の地盤が補強されてトンネル建設後の地
盤沈下が防止され、かつ、シールド工法によるトンネル
掘削時の漏気や泥水の噴発が防止される。
The protection walls W1 and W2 thus constructed reinforce the ground on the tunnel to prevent ground subsidence after the tunnel construction, and also prevent leakage of air and muddy water during tunnel excavation by the shield construction method. To be done.

【0035】この工法によると、防護壁W1,W2を地
表側から連続して造成することができるため、従来のパ
イプルーフ工法のようにトンネル内からトンネル断面の
周囲にパイプを挿入する等の防護工を施す工法と比較し
て、施工能率が良く、かつ、強度面で有利となる。
According to this construction method, since the protection walls W1 and W2 can be continuously formed from the ground side, protection such as inserting a pipe from inside the tunnel to the periphery of the tunnel cross section as in the conventional pipe roof construction method. Compared with the construction method, the construction efficiency is good and the strength is advantageous.

【0036】ところで、上記実施形態では、連続溝を掘
削した後、固化液(セメントスラリー)を注入し、原位
置土と撹拌混合させてソイルセメント防護壁W1,W2
を造成するようにしたが、溝掘削後、コンクリートを注
入・固化させてコンクリート防護壁を造成してもよい。
[0036] In the above SL embodiment, after drilling a continuous groove, injecting the solidifying solution (cement slurry), by stirring and mixing the original position earth soil cement protective wall W1, W2
The concrete protective wall may be formed by pouring and solidifying concrete after excavating the trench.

【0037】さらに、上記実施形態では、第1の防護壁
W1を造成した後、第2の連続溝G2を掘削し、固化液
を注入・固化させて第2の防護壁W2を造成する手順を
とったが、第1および第2の連続溝G1,G2を相次い
で掘削し、これらに同時に固化材(たとえばコンクリー
ト)を注入し固化させて防護壁G1,G2を造成する手
順をとってもよい。
Furthermore, in the above embodiment, after the first protective wall W1 is formed, the second continuous groove G2 is excavated, and the solidification liquid is injected and solidified to form the second protective wall W2. However, the first and second continuous grooves G1 and G2 may be excavated one after another, and a solidifying material (for example, concrete) may be simultaneously injected into these to solidify them to form the protective walls G1 and G2.

【0038】一方、上記実施形態ではバックステー10
を油圧シリンダによって構成し、これを伸縮させて傾斜
角度を調整するようにしたが、このバックステー10を
単なる内筒と外筒とによって伸縮自在に構成し、クレー
ン等の他の吊り上げ機械の助けを借りて傾斜角度調整を
行うようにしてもよい。
On the other hand, in the above embodiment, the back stay 10 is used.
Was constructed by a hydraulic cylinder, and the tilt angle was adjusted by expanding and contracting it. However, this back stay 10 is constructed by a simple inner cylinder and an outer cylinder so that it can be expanded and contracted to assist other lifting machines such as cranes. Alternatively, the inclination angle may be adjusted.

【0039】あるいは、バックステー10を非伸縮式と
し、カッター2の傾斜角度を一定不変に構成してもよ
い。
Alternatively, the back stay 10 may be a non-expandable type, and the inclination angle of the cutter 2 may be constant.

【0040】[0040]

【発明の効果】上記のように本発明によるときは、掘削
機により、トンネルの建設予定線上に傾斜した連続溝を
クロスして掘削し、この連続溝に固化材を注入すること
により、トンネル上の地盤を補強して地盤沈下を防止
し、かつ、シールド工法によるトンネル掘削時の漏気や
泥水の噴発を防止する斜めにクロスした防護壁を造成す
るため、防護工を地表側から簡単にしかも連続して施す
ことができる。
As described above, according to the present invention, the excavator excavates a continuous groove that is inclined on the planned construction line of the tunnel, and the solidification material is injected into the continuous groove so that the solidified material is injected into the tunnel. Since the ground is reinforced to prevent ground subsidence and to create a diagonally crossed protection wall that prevents leakage and mud spray during tunnel excavation using the shield construction method, the protection work can be easily performed from the ground side. Moreover, it can be applied continuously.

【0041】このため、従来のパイプルーフ工法等と比
較して、防護工の施工能率を格段に向上させることがで
きるとともに、防護壁の連続性を確保して高強度の防護
壁を構築することができる。
Therefore, compared with the conventional pipe roof construction method and the like, the construction efficiency of the protective work can be remarkably improved, and the continuity of the protective wall can be secured to construct a high-strength protective wall. You can

【0042】この場合、カッターを回転させながら走行
台車を移動させることによって連続溝を掘削するため、
たとえばドリルによる穿孔作業を繰り返して連続溝を形
成する場合と比較して、連続溝を均一幅で遥かに能率良
く掘削巣することができる。
[0042] To excavate the continuous groove by this case, moving the traveling vehicle while rotating the mosquitoes Potter,
For example, compared with a case where a continuous groove is formed by repeating a drilling operation with a drill, the continuous groove can be excavated with a uniform width and much more efficiently.

【0043】また、請求項の発明によると、トンネル
の外径寸法等に応じて連続溝、すなわち防護壁の傾斜角
度を任意に調整することができる。
Further, according to the invention of claim 2 , the inclination angle of the continuous groove, that is, the protective wall can be arbitrarily adjusted according to the outer diameter dimension of the tunnel and the like.

【0044】この場合、請求項の発明によると、この
角度調整を油圧シリンダの伸縮作用によって簡単、迅速
に行うことができる。
In this case, according to the third aspect of the invention, this angle adjustment can be easily and quickly performed by the expansion and contraction action of the hydraulic cylinder.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施形態にかかる工法に使用される掘
削機の全体側面図である。
FIG. 1 is an overall side view of an excavator used in a construction method according to an embodiment of the present invention.

【図2】同掘削機におけるチェーン式カッターの正面図
である。
FIG. 2 is a front view of a chain type cutter of the excavator.

【図3】実施形態にかかる工法において第1の防護壁を
造成した段階を示す概略断面図である。
FIG. 3 is a schematic cross-sectional view showing a stage in which a first protective wall is created in the construction method according to the embodiment.

【図4】同工法において第2の防護壁を造成するための
第2の連続溝を掘削する段階を示す概略断面図である。
FIG. 4 is a schematic cross-sectional view showing a step of excavating a second continuous groove for forming a second protective wall in the same construction method.

【図5】施工完了状態の概略断面図である。FIG. 5 is a schematic cross-sectional view of a completed construction state.

【符号の説明】[Explanation of symbols]

1 走行台車 2 チェーン式カッター 3 カッターポスト 6 エンドレスチェーン 4 チェーンの駆動輪 5 チェーンの遊動輪 7 掘削刃 9 カッターの起伏支点となる水平軸 10 油圧シリンダから成るバックステー G 連続溝 G1 第1の連続溝 G2 第2の連続溝 W1 第1の防護壁 W2 第2の防護壁 T トンネル 1 traveling carriage 2 chain type cutter 3 cutter posts 6 Endless chain 4 Chain drive wheels 5 Chain idler 7 drilling blade 9 Horizontal axis that is the fulcrum of the cutter Backstay consisting of 10 hydraulic cylinders G continuous groove G1 First continuous groove G2 Second continuous groove W1 First protective wall W2 Second protective wall T tunnel

───────────────────────────────────────────────────── フロントページの続き (72)発明者 近藤 博明 兵庫県高砂市荒井町新浜2丁目3番1号 株式会社神戸製鋼所 高砂製作所内 (56)参考文献 特開 平4−30100(JP,A) 特開 昭60−141920(JP,A) 特公 昭46−26703(JP,B1) 特公 昭60−17903(JP,B2) (58)調査した分野(Int.Cl.7,DB名) E21D 9/04 E21D 9/00 E02D 3/12 101 E02F 5/06 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Hiroaki Kondo 2-3-1, Niihama, Arai-cho, Takasago-shi, Hyogo Kobe Steel Works, Takasago Works (56) Reference JP-A-4-30100 (JP, A) JP 60-141920 (JP, A) JP 46-26703 (JP, B1) JP 60-17903 (JP, B2) (58) Fields investigated (Int.Cl. 7 , DB name) E21D 9/04 E21D 9/00 E02D 3/12 101 E02F 5/06

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 掘削刃付きエンドレスチェーンがカッタ
ーポストの上下両端部間に掛け渡されてなるチェーン式
カッターを走行台車に傾斜して取付けて掘削機を構成
し、 A.トンネルの建設予定線上において上記掘削機のカッ
ターを地表側から地中に斜めに建て込んだ状態で、同カ
ッターを回転させながら上記走行台車によって上記トン
ネル予定線と平行に移動させることにより地中に傾斜し
た連続溝を掘削する掘削作業、 B.上記連続溝に固化材を注入し固化させる固化作業 を、トンネルの予定線の中心に対して両側から行う こと
により、上記トンネル建設予定線上において地中に斜め
にクロスした第1及び第2の防護壁を造成することを特
徴とするトンネルの防護工法。
1. An endless chain with a cutting blade is a cutter.
-Chain type that is hung between the upper and lower ends of the post
The excavator is constructed by mounting the cutter on the traveling carriage at an angle.
And, A. On the planned construction line of the tunnel,
With the target installed diagonally in the ground from the surface side,
While rotating the machine, the ton
It will tilt into the ground by moving it parallel to the planned line.
Excavation work for excavating continuous continuous grooves, B. The first and second protections that are diagonally crossed into the ground on the planned tunnel construction line are performed by performing the solidification work of injecting the solidifying material into the continuous groove and solidifying it from both sides with respect to the center of the planned tunnel line. A tunnel protection method characterized by creating walls.
【請求項2】 カッターを走行台車に対して水平軸を中
心として起伏自在に取付け、かつ、伸縮自在なバックス
テーによって傾斜角度調整自在に支持することを特徴と
する請求項1記載のトンネルの防護工法。
2. The cutter has a horizontal axis centered on the traveling carriage.
A backs that can be installed up and down freely as a heart, and also expandable
The method for protecting a tunnel according to claim 1 , wherein the support is supported by a tie so that the inclination angle can be adjusted .
【請求項3】 バックステーを油圧シリンダによって伸
縮自在に構成したことを特徴とする請求項2記載のトン
ネルの防護工法。
3. A back stay is extended by a hydraulic cylinder.
The tunnel protection method according to claim 2, wherein the tunnel protection method is configured to be contractible .
JP31276695A 1995-11-30 1995-11-30 Tunnel protection method Expired - Lifetime JP3440661B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31276695A JP3440661B2 (en) 1995-11-30 1995-11-30 Tunnel protection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31276695A JP3440661B2 (en) 1995-11-30 1995-11-30 Tunnel protection method

Publications (2)

Publication Number Publication Date
JPH09151691A JPH09151691A (en) 1997-06-10
JP3440661B2 true JP3440661B2 (en) 2003-08-25

Family

ID=18033169

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31276695A Expired - Lifetime JP3440661B2 (en) 1995-11-30 1995-11-30 Tunnel protection method

Country Status (1)

Country Link
JP (1) JP3440661B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112228081A (en) * 2020-10-24 2021-01-15 中铁一局集团有限公司 Method for reinforcing pile foundation of shield tunnel side-through high-speed rail viaduct
CN113029082B (en) * 2021-03-27 2022-09-06 宣鹏 Tunneling angle measuring device for tunnel construction

Also Published As

Publication number Publication date
JPH09151691A (en) 1997-06-10

Similar Documents

Publication Publication Date Title
JP3284047B2 (en) Construction method of underground diaphragm wall
US5257471A (en) Excavator for forming underground continuous wall
US5112161A (en) Method for excavating and constructing monolithic continuous straight or circular structural walls and a machine for realizing such a method
EP0563472B1 (en) Excavator and methods of use thereof
JPH07113214B2 (en) Excavation device for underground wall and construction method using the device
JPH07173835A (en) Excavator for underground continuous wall
JP3440661B2 (en) Tunnel protection method
JP2833482B2 (en) Steel lining structure of tunnel
JP2505976B2 (en) How to create an underground structure
JPH07127374A (en) Method for constructing tunnel
JP4080226B2 (en) Mobile jetty
JPH08319618A (en) Civil engineering work device, excavator, sheathing device and civil engineering work method
JP2878784B2 (en) Drilling rig for slope construction
JP2689370B2 (en) Underground continuous wall excavator and underground continuous wall construction method
JPH0442498B2 (en)
CN107059839A (en) A kind of construction method of armored concrete waveform sheet pile underground structure
JPH10121514A (en) Underground continuous wall forming machine
JPS61126229A (en) Continuous trench excavating method and excavator and excavator attachment employed said method
JP2000110158A (en) Retaining wall construction method using oblique wall
JP2024092472A (en) Method of entering an open shield machine into a vertical shaft in an open shield construction method and a vertical shaft of an open shield machine
JPH0768847B2 (en) Stirring machine
JP2004124656A (en) Underground curved cross section continuous wall trench excavator
JPH06129194A (en) Temporary timbering
JP2918457B2 (en) Slope construction method
JPS63161217A (en) Excavation work

Legal Events

Date Code Title Description
S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080620

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090620

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100620

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100620

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110620

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120620

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120620

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130620

Year of fee payment: 10

EXPY Cancellation because of completion of term