JP2733537B2 JP1086488A JP8648889A JP2733537B2 JP 2733537 B2 JP2733537 B2 JP 2733537B2 JP 1086488 A JP1086488 A JP 1086488A JP 8648889 A JP8648889 A JP 8648889A JP 2733537 B2 JP2733537 B2 JP 2733537B2
Authority
JP
Japan
Prior art keywords
pile
hole
soil
filled
connecting means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1086488A
Other languages
Japanese (ja)
Other versions
JPH02266027A (en
Inventor
哲男 山口
博史 吉塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIOTOTSUPU KK
NAKAYAMA SEIKOSHO KK
Original Assignee
JIOTOTSUPU KK
NAKAYAMA SEIKOSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIOTOTSUPU KK, NAKAYAMA SEIKOSHO KK filed Critical JIOTOTSUPU KK
Priority to JP1086488A priority Critical patent/JP2733537B2/en
Publication of JPH02266027A publication Critical patent/JPH02266027A/en
Application granted granted Critical
Publication of JP2733537B2 publication Critical patent/JP2733537B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、軽量で短い杭を使用するプレハブ建物、プ
レハブ畜舎等の軽量建物の基礎部分の構造に関するもの
であり、特に、軽量建物の杭と上部構造体との連結構造
に関する。
Description: TECHNICAL FIELD The present invention relates to a structure of a foundation portion of a lightweight building such as a prefabricated building or a prefabricated barn using a lightweight and short pile, and in particular, a pile of a lightweight building. And a connection structure between the upper structure and the upper structure.

[従来の技術] 従来軽量建物の基礎において、地盤に杭を埋設するに
は地盤に孔を穿孔し、この孔に杭を差し込んで、ソイル
を埋め戻していた。そして、埋設する杭は下部の径が上
部の径と同じ大きさとなっていた。そして、杭の上部は
単に基礎などに埋設していただけであった。
[Prior Art] Conventionally, on a foundation of a light-weight building, a hole is drilled in the ground to bury a pile in the ground, and a pile is inserted into the hole to backfill the soil. The pile to be buried had the lower diameter equal to the upper diameter. The upper part of the pile was simply buried in the foundation.

[発明が解決しようとする課題] ところが、このように下部の径が上部の径と同じ大き
さの杭を用いた場合、支持力を得るには長い杭を用いて
大きな支持力を得る必要があり、このため軽量建物にお
いても地盤に長さの長い孔を掘って杭を埋入する必要が
あった。
[Problems to be Solved by the Invention] However, when a pile having a lower diameter equal to that of an upper diameter is used as described above, it is necessary to obtain a large supporting force by using a long pile in order to obtain a supporting force. Therefore, even in a light-weight building, it was necessary to dig a long hole in the ground and insert a pile.

また、従来にあっては、杭を孔に埋入すると、杭の上
端のレベルがその都度異なるので、上端のレベル出しを
して所定のレベルになるように切断する手間が必要であ
った。
Further, conventionally, when a pile is buried in a hole, the level at the upper end of the pile is different each time, so that it is necessary to set the upper end and cut it to a predetermined level.

また、従来にあっては、杭の上に基礎を構成する場
合、基礎と杭との連結手段と基礎の内部の配筋とが別部
分であって、施工が面倒で、しかも部材点数が増してコ
スト高になるという問題があった。
Also, conventionally, when a foundation is constructed on a pile, the connecting means between the foundation and the pile and the reinforcement inside the foundation are separate parts, which makes the construction troublesome and increases the number of members. There was a problem that cost was high.

本発明は、上記の点に鑑みて発明したものであって、
その目的とするところは、プレハブ建物、プレハブ畜舎
などの軽量建物の基礎を形成するに当たり、軽量で長さ
の短い杭を使用しても十分な支持力が得られ、また上部
構造体との連結が確実にできる杭と上部構造体との連結
構造を提供するにある。
The present invention has been made in view of the above points,
The purpose is to form a foundation for a light-weight building such as a prefabricated building or a prefabricated barn. The object of the present invention is to provide a connection structure between a pile and a superstructure, which can be surely provided.

また、別の目的としては、杭の上部に働く水平力に対
して強固な杭と上部構造体との連結構造を提供するにあ
る。
Another object is to provide a connection structure between the pile and the upper structure that is strong against horizontal force acting on the upper part of the pile.

また、別の目的としては、杭の上端のレベル調整が簡
単にできる杭と上部構造体との連結構造を提供するにあ
る。
Another object of the present invention is to provide a connection structure between a pile and an upper structure that can easily adjust the level of the upper end of the pile.

また、別の目的としては、連結手段がそのまま基礎の
縦筋として兼用できる杭と上部構造体との連結構造を提
供するにある。
Another object of the present invention is to provide a connection structure between a pile and an upper structure in which connection means can be used as a vertical streak of a foundation as it is.

[課題を解決するための手段] 上記の従来例の問題点を解決するために本発明の杭と
上部構造体との連結構造は、地盤1に形成された土壌硬
化剤または土壌硬化剤と土砂とが混合された充填物2が
充填された孔3に下部に拡大部4を有し且つ上部に上部
構造体5との連結手段6を設けた杭7を挿入すると共に
連結手段6に上部構造体5を連結する構造とした。
[Means for Solving the Problems] In order to solve the above-mentioned problems of the conventional example, the connection structure between the pile and the upper structure according to the present invention comprises a soil hardener formed on the ground 1 or a soil hardener and soil and sand. And a stake 7 having an enlarged portion 4 in the lower part of the hole 3 filled with the filling material 2 and a connecting means 6 for connecting the upper structure 5 to the upper structure 5 in the upper part. The body 5 was connected.

また、地盤1に形成された土壌硬化剤または土壌硬化
剤と土砂とが混合された硬化前の状態がウエットな充填
物2が充填された孔3に下部に拡大部4を有し且つ上部
に上部構造体5との連結手段6を設けた杭7を挿入し、
上記孔3の上部にドライな上部充填物33を充填してもよ
い。
In addition, the hole 3 filled with the wet hardening material 2 in a state before hardening in which the soil hardening agent or the soil hardening agent and the earth and sand formed on the ground 1 are mixed has an enlarged portion 4 at the lower portion and an upper portion at the upper portion. The stake 7 provided with the connecting means 6 to the upper structure 5 is inserted,
The upper part of the hole 3 may be filled with a dry top filler 33.

また、連結手段6に上下寸法調整部8を設けてもよ
い。
Further, the connecting means 6 may be provided with a vertical dimension adjusting section 8.

更に、連結手段6が基礎9の縦筋10となるようにして
もよい。
Further, the connecting means 6 may be the vertical streak 10 of the foundation 9.

[作用] すなわち、本発明にあっては、ソイルセメント2が充
填された孔3内に下部に拡大部4を有する杭7を挿入し
たので、拡大部4により支持力が増すと共に、下部に拡
大部4を有する杭7がソイルセメント2と一体化してい
っそう支持力を増すようになっている。また。上部に設
けた連結手段6を利用して上部構造体5と簡単に連結で
きるようになっている。
[Operation] In other words, in the present invention, since the pile 7 having the enlarged portion 4 at the lower portion is inserted into the hole 3 filled with the soil cement 2, the supporting force is increased by the enlarged portion 4 and the enlarged portion is enlarged at the lower portion. The pile 7 having the portion 4 is integrated with the soil cement 2 to further increase the supporting force. Also. The connection with the upper structure 5 can be easily performed by using the connection means 6 provided on the upper part.

また、地盤1に形成された土壌硬化剤または土壌硬化
剤と土砂とが混合された硬化前の状態がウエットな充填
物2が充填された孔3に下部に拡大部4を有し且つ上部
に上部構造体5との連結手段6を設けた杭7を挿入して
あるので、下部に拡大部6を有する杭7を挿入するに当
たり、ウエットな充填物であるため拡大部6を有する杭
7を簡単に挿入することができる。そして、上記孔3の
上部にドライな上部充填物33を充填することで、ドライ
な充填物を突き固めることで、杭7の上部に働く水平力
に対して強固になった。
In addition, the hole 3 filled with the wet hardening material 2 in a state before hardening in which the soil hardening agent or the soil hardening agent and the earth and sand formed on the ground 1 are mixed has an enlarged portion 4 at the lower portion and an upper portion at the upper portion. Since the pile 7 provided with the connecting means 6 for connecting to the upper structure 5 is inserted, the pile 7 having the enlarged portion 6 is inserted in the lower portion. Can be easily inserted. Then, by filling the upper portion of the hole 3 with the dry upper filler 33, the dry filler was squeezed, whereby the pile 3 became stronger against the horizontal force acting on the upper portion of the pile 7.

また、連結手段6に上下寸法調整部8を設けておく
と、杭7の上端の連結手段6の位置調整を簡単に行って
上部構造体5と正確な位置で連結できる。
Further, if the connecting means 6 is provided with the vertical dimension adjusting portion 8, the position of the connecting means 6 at the upper end of the pile 7 can be easily adjusted to connect the upper structure 5 at an accurate position.

また、連結手段6が基礎9の縦筋10となるようにする
と、連結手段6が縦筋10を兼用し、作業の簡略化及び部
材の低減が可能となるものである。
Further, when the connecting means 6 is used as the vertical streaks 10 of the foundation 9, the connecting means 6 also serves as the vertical streaks 10, thereby simplifying the work and reducing the number of members.

[実施例] 以下本発明を添付図面の実施例に基づいて詳述する。EXAMPLES The present invention will be described below in detail based on examples of the accompanying drawings.

第1図、第2図には本発明の一実施例が示してある。
地盤1にソイルセメント2が充填された孔3を穿孔す
る。この場合、第2図に示すような装置を用いる。第2
図に示す装置は、両面リーダー11の片側に上下移動自在
にスパイラルオーガーのようなオーガー13を設け、他の
片側に上下移動自在にモノケン14が設けて構成してあ
る。第2図中15はクレーンブームであってリーダー11の
上部が取り付けてあり、リーダー11の下部は固定ピン16
により地盤1に支持されてある。またリーダー11の下部
には回動自在に振れ止め部材17が設けてあり、更に、リ
ーダー11には水準器18が設けてある。図中19はオーガー
13を回動するための油圧減速器である。そして、上記の
ような構成の装置を杭芯にオーガー13を合わせて設置し
て固定する。そして、水準器18により鉛直度を確認する
(第2図(a)参照)。次に、第2図(b)に示すよう
にオーガー13で掘削して土砂を排出し、孔3内に土壌硬
化剤または土壌硬化剤と土砂との混合物よりなる充填物
2を充填する。この場合、土壌硬化剤としては例えばセ
メントミルクがあり、このセメントミルクの固化剤を投
入撹拌してソイルセメントを形成して孔3の下部に充填
するのである。つまり、この実施例では孔3内にはソイ
ルセメントよりなる充填物2が充填されることになる。
ここで、土壌硬化剤としては、セメントミルクにのみ限
定されるものではなく、他の土壌硬化剤を用いることが
できが、土壌硬化剤としてはウエットなものを用い、孔
3内に充填される充填物2が硬化前はウエットな状態と
なるようにする。次に、オーガー13を引き上げた後、リ
ーダー11を回転してモノケン14を杭芯に配置する。そし
て、下部に拡大部4を有し且つ上部に上部構造体5との
連結手段6を有する杭7を建て込んで下部に充填物2が
充填された孔3に挿入し、杭芯、杭頭高さを確認し、モ
ノケン14で杭7を軽打する(第2図(c)参照)。次
に、杭芯、杭頭高さを確認し、排出土砂を直接、または
排出土砂とセメントなどの土砂硬化剤とを混合したも
の、あるいは砕石、砂利、砂等の上部充填材33を孔3の
上部に投入後、突き固めるものである(第2図(d)参
照)。この場合、上部充填材33はドライなものが用いら
れる。
1 and 2 show an embodiment of the present invention.
A hole 3 filled with soil cement 2 is drilled in the ground 1. In this case, an apparatus as shown in FIG. 2 is used. Second
The apparatus shown in the figure is configured such that an auger 13 such as a spiral auger is provided on one side of a double-sided reader 11 so as to be vertically movable, and a monoken 14 is provided on the other side so as to be vertically movable. In FIG. 2, reference numeral 15 denotes a crane boom, on which the upper part of the leader 11 is attached, and
Is supported by the ground 1. A lower part of the leader 11 is provided with a swing-stop member 17 so as to be freely rotatable, and the reader 11 is further provided with a level 18. 19 in the figure is auger
13 is a hydraulic speed reducer for rotating 13. Then, the device having the above configuration is installed and fixed with the auger 13 aligned with the pile core. Then, the verticality is checked by the level 18 (see FIG. 2A). Next, as shown in FIG. 2 (b), the earth and sand are excavated by the auger 13 and the hole 3 is filled with the filling 2 made of a soil hardener or a mixture of the soil hardener and the earth and sand. In this case, as a soil hardening agent, for example, there is cement milk, and a solidifying agent of the cement milk is charged and stirred to form a soil cement, and the soil cement is filled in the lower part of the hole 3. That is, in this embodiment, the hole 3 is filled with the filler 2 made of soil cement.
Here, the soil hardening agent is not limited to cement milk, and other soil hardening agents can be used. However, a wet soil hardening agent is used and is filled in the hole 3. The filler 2 is made to be in a wet state before curing. Next, after raising the auger 13, the leader 11 is rotated to place the monoken 14 on the pile core. Then, a pile 7 having an enlarged portion 4 at a lower portion and a connecting means 6 for connecting to an upper structure 5 at an upper portion is erected and inserted into a hole 3 filled with a filler 2 at a lower portion. After confirming the height, the pile 7 is lightly hit with the monoken 14 (see FIG. 2 (c)). Next, the pile core and the height of the pile head are checked, and the discharged earth or sand is directly mixed, or a mixture of the discharged earth and sand with a hardening agent such as cement, or an upper filler 33 such as crushed stone, gravel, sand, or the like is inserted into the hole 3. After being thrown into the upper part of the table, it is compacted (see FIG. 2 (d)). In this case, a dry filler is used as the upper filler 33.

ここで、杭7の具体的構成を第1図に示す実施例に基
づいて説明すると、杭7は下部鋼管20の下部に下部鋼管
20と一体的に拡大部4となるコンクリート製の沓部を形
成し、この下部鋼管20に上部鋼管21の下部を嵌合してボ
ルト22、ナット23により結合し、上部鋼管21の上部に連
結手段6となる金属製の板材28を上下位置調整自在に取
り付けて構成してある。上下位置調整をするための上下
寸法調整部8は上部鋼管21の上部に連結手段6である金
属製の板材28の下面に垂設した金属製の垂下筒24とを螺
合することで構成してある。第1図の実施例では上部鋼
管21の上部に雌ねじ部25が設けてあり、垂下筒24に雄ね
じ部26が設けてあって、両者を深浅自在に螺合してあ
る。上部鋼管21として長さの異なるものを使用すること
で、杭7の長さを異なる長さにすることができ、杭7の
施工時のレベル調整は上下寸法調整部8により行うもの
である。図中27は下部鋼管20内のコンクリート部分内に
埋入したスリーブであって、ボルト22はこのスリーブ27
内を挿通されるものである。そして、上記のように連結
手段6のレベル調整をした後、連結手段6である板材28
の上に上部構造体5である柱29の下部の連結プレート30
を重ねてボルト31、ナット32により連結するものであ
る。そして、必要に応じて埋め戻し材33の上位置にコン
クリート37を打設して上部鋼管21、垂下筒24、連結手段
6、柱29の下部を埋設することで一体化してもよい。
Here, the concrete configuration of the pile 7 will be described based on the embodiment shown in FIG.
A concrete shoe portion which becomes the enlarged portion 4 is formed integrally with the lower steel pipe 20. The lower portion of the upper steel pipe 21 is fitted to the lower steel pipe 20 and connected by bolts 22 and nuts 23, and connected to the upper portion of the upper steel pipe 21. A metal plate member 28 serving as the means 6 is mounted so as to be vertically adjustable. The vertical dimension adjusting section 8 for adjusting the vertical position is formed by screwing a metal hanging cylinder 24, which is provided on the lower surface of a metal plate 28 serving as the connecting means 6, on the upper part of the upper steel pipe 21. It is. In the embodiment shown in FIG. 1, a female screw part 25 is provided on the upper part of the upper steel pipe 21, and a male screw part 26 is provided on the hanging cylinder 24, and these are screwed together so as to be able to be deep and shallow. By using different lengths of the upper steel pipe 21, the length of the pile 7 can be made different, and the level adjustment at the time of construction of the pile 7 is performed by the upper and lower dimension adjusting unit 8. In the figure, reference numeral 27 denotes a sleeve embedded in a concrete portion in the lower steel pipe 20.
It is inserted through the inside. Then, after adjusting the level of the connecting means 6 as described above, the plate material 28 serving as the connecting means 6 is adjusted.
The connecting plate 30 below the pillar 29 which is the upper structure 5
Are overlapped and connected by bolts 31 and nuts 32. Then, if necessary, concrete 37 may be cast at a position above the backfill material 33, and the upper steel pipe 21, the hanging cylinder 24, the connecting means 6, and the lower part of the column 29 may be buried to be integrated.

第3図には本発明の他の実施例が示してあり、この実
施例では、連結手段6が基礎9の縦筋10を兼用している
実施例が示してある。すなわち、鋼管34の下部に金属製
の板材よりなる拡大部4を熔接により一体化し、この鋼
管34内にコンクリート35を充填すると共にコンクリート
35内に連結手段6となる鉄筋の下部を埋入して杭7が構
成してある。そして、地盤1に土壌硬化剤または土壌硬
化剤と土砂とが混合されたソイルセメントのような充填
物2が充填された孔3を穿孔し、この充填物2が充填さ
れた孔3に充填物が未硬化のウエットな状態の時に上記
の構成の孔7を挿入し、その後、孔3の上部にドライな
上部充填物33を投入して埋め戻した後に突き固める。こ
の場合、鋼管34の上部が上部充填物33よりも上方な突出
するようにしておく。その後、連結手段6である上方に
突出する鉄筋を後で構成する基礎9の縦筋10として兼用
するため、この鉄筋に横筋36を結合して基礎9の配筋を
し、その後、コンクリートを打設して上部構造体5とな
る基礎9を形成することで連結手段6である縦筋10を介
して上部構造体5と杭7とを一体に連結するのである。
ここで、基礎9の下部には鋼管34の上部が埋設され、よ
り強固に一体化されるものである。
FIG. 3 shows another embodiment of the present invention. In this embodiment, the connecting means 6 also serves as the vertical stripe 10 of the foundation 9. That is, the enlarged portion 4 made of a metal plate is integrated with the lower part of the steel pipe 34 by welding, and the steel pipe 34 is filled with concrete 35 and concrete.
A pile 7 is formed by embedding a lower part of a reinforcing bar serving as a connecting means 6 in 35. Then, a hole 3 filled with a filler 2 such as soil cement or a soil cement mixed with soil hardener and earth and sand is drilled in the ground 1, and the hole 3 filled with the filler 2 is filled with the filler. The hole 7 having the above-mentioned structure is inserted when the material is in an uncured and wet state, and thereafter, a dry top filler 33 is charged into the upper part of the hole 3 and backfilled. In this case, the upper part of the steel pipe 34 is made to protrude above the upper filler 33. Thereafter, in order to use the reinforcing bar projecting upward as the connecting means 6 also as the vertical bar 10 of the foundation 9 to be formed later, a horizontal bar 36 is connected to this reinforcing bar to arrange the base 9, and then the concrete is struck. The upper structure 5 and the pile 7 are integrally connected via the vertical bar 10 which is the connection means 6 by forming the foundation 9 serving as the upper structure 5.
Here, the upper part of the steel pipe 34 is buried in the lower part of the foundation 9 so as to be more firmly integrated.

[発明の効果] 本発明にあっては、叙述のように地盤に形成された土
壌硬化剤または土壌硬化剤と土砂とが混合された充填物
が充填された孔に下部に拡大部を有し且つ上部に上部構
造体との連結手段を設けた杭を挿入すると共に連結手段
に上部構造体を連結するので、拡大部により支持力が増
すと共に、下部に拡大部を有する杭が土壌硬化剤または
土壌硬化接と土砂との混合物と一体化していっそう支持
力を増すものであって、この結果、杭を短くできるもの
である。また、上部に設けた連結手段を利用して上部構
造体と簡単に連結できるものである。
[Effects of the Invention] In the present invention, as described above, a hole filled with a soil hardener formed on the ground or a mixture of soil hardener and soil and sand is provided with an enlarged portion at a lower portion. And since the pile provided with the connection means with the upper structure in the upper part is inserted and the upper structure is connected to the connection means, the supporting force is increased by the enlarged part, and the pile having the enlarged part in the lower part is a soil hardening agent or It is integrated with the mixture of soil hardening and earth and sand to further increase the bearing capacity, and as a result, the pile can be shortened. Further, it can be easily connected to the upper structure using the connecting means provided on the upper part.

また、地盤に形成された孔に土壌硬化剤または土壌硬
化剤と土砂とが混合された硬化前の状態がウエットな充
填物が充填されているので、下部に拡大部を有する杭を
簡単に充填物が充填された孔内に挿入できて作業が簡略
化され、しかも、孔の上部にドライな充填物を充填して
あるので、ドライな上部充填物を付き固めることで、土
壌硬化剤を硬化した後は地盤が締め固まって杭上部に働
く水平力に対して強固になるものである。ちなみに、プ
レハブ建物、プレハブ畜舎等の軽量建物の基礎にあって
は、杭の上部の周囲を強化改良するものは無かったが、
本発明によればプレハブ建物、プレハブ畜舎等の軽量建
物の基礎において、杭の上部の周囲を強化改良できて、
このことによっても杭を軽量で短くできるものである。
In addition, since the hole formed in the ground is filled with a soil hardener or a soil hardener and a mixture of soil and sand, which is wet before hardening, it is easy to fill a pile with an enlarged part at the bottom The work can be simplified because it can be inserted into the hole filled with material, and the top of the hole is filled with dry filling material. After that, the ground is compacted and becomes strong against the horizontal force acting on the pile top. By the way, in the foundation of lightweight buildings such as prefabricated buildings and prefabricated barns, there was nothing to strengthen and improve the periphery of the upper part of the pile,
According to the present invention, in the foundation of a lightweight building such as a prefabricated building, a prefabricated barn, the periphery of the upper part of the pile can be strengthened and improved,
This also makes the pile lighter and shorter.

また、連結手段に上下寸法調整部を設けておくこと
で、杭の上端の連結手段の位置調整を簡単に行って上部
構造体と正確な位置で連結できるものであり、従来のよ
うに杭の上部を切断したりする必要がないものである。
In addition, by providing the vertical dimension adjusting section in the connecting means, it is possible to easily adjust the position of the connecting means at the upper end of the pile and to connect with the upper structure at an accurate position. It is not necessary to cut off the upper part.

また、連結手段が基礎の縦筋となるようにすると、連
結手段が基礎の縦筋を兼用し、作業の簡略化及び部材の
低減が可能となるものである。
Further, when the connecting means serves as the vertical streaks of the foundation, the connecting means also serves as the vertical streaks of the foundation, so that the work can be simplified and the number of members can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明の断面図、第2図(a)(b)(c)
(d)は杭の施工順序を示す説明図、第3図は本発明の
他の実施例の断面図であって、1は地盤、2は充填物、
3は孔、4は拡大部、5は上部構造体、6は連結手段、
7は杭、8は上下寸法調整部、9は基礎、10は縦筋、33
は上部充填物である。
FIG. 1 is a sectional view of the present invention, and FIGS. 2 (a), 2 (b) and 2 (c).
(D) is an explanatory view showing the construction order of piles, FIG. 3 is a cross-sectional view of another embodiment of the present invention, 1 is ground, 2 is a filler,
3 is a hole, 4 is an enlarged portion, 5 is an upper structure, 6 is a connecting means,
7 is a pile, 8 is a vertical dimension adjustment part, 9 is a foundation, 10 is a vertical line, 33
Is the top filling.

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】地盤に形成された土壌硬化剤または土壌硬
化剤と土砂とが混合された充填物が充填された孔に下部
に拡大部を有し且つ上部に上部構造体との連結手段を設
けた杭を挿入すると共に連結手段に上部構造体を連結す
ることを特徴とする杭と上部構造体との連結構造。
A hole filled with a soil hardening agent formed on the ground or a filler obtained by mixing a soil hardening agent and earth and sand has an enlarged portion at a lower portion, and a connecting means for connecting to an upper structure at an upper portion. A connection structure between a pile and an upper structure, wherein the provided structure is inserted and the upper structure is connected to a connecting means.
【請求項2】地盤に形成された土壌硬化剤または土壌硬
化剤と土砂とが混合された硬化前の状態がウエットな充
填物が充填された孔に下部に拡大部を有し且つ上部に上
部構造体との連結手段を設けた杭を挿入し、上記孔の上
部にドライな上部充填物を充填して成ることを特徴とす
る請求項1記載の杭と上部構造体との連結構造。
2. A hole in which a soil hardening agent formed on the ground or a mixture of soil hardening agent and earth and sand before hardening is filled with a wet filler has an enlarged portion at a lower portion and an upper portion at an upper portion. 2. The connection structure between a pile and an upper structure according to claim 1, wherein a pile provided with a connection means for the structure is inserted, and the upper portion of the hole is filled with a dry upper filler.
【請求項3】連結手段が上下寸法調整部を備えているこ
とを特徴とする請求項1または請求項2記載の杭と上部
構造体との連結構造。
3. A connection structure between a pile and an upper structure according to claim 1, wherein the connection means includes a vertical dimension adjusting portion.
【請求項4】連結手段が基礎の縦筋であることを特徴と
する請求項1または請求項2記載の杭と上部構造体との
連結構造。
4. A connection structure between a pile and an upper structure according to claim 1, wherein the connection means is a vertical streak of a foundation.
JP1086488A 1989-04-05 1989-04-05 Connection structure between pile and superstructure Expired - Lifetime JP2733537B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1086488A JP2733537B2 (en) 1989-04-05 1989-04-05 Connection structure between pile and superstructure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1086488A JP2733537B2 (en) 1989-04-05 1989-04-05 Connection structure between pile and superstructure

Publications (2)

Publication Number Publication Date
JPH02266027A JPH02266027A (en) 1990-10-30
JP2733537B2 true JP2733537B2 (en) 1998-03-30

Family

ID=13888371

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1086488A Expired - Lifetime JP2733537B2 (en) 1989-04-05 1989-04-05 Connection structure between pile and superstructure

Country Status (1)

Country Link
JP (1) JP2733537B2 (en)

Also Published As

Publication number Publication date
JPH02266027A (en) 1990-10-30

Similar Documents

Publication Publication Date Title
US5039256A (en) Pinned foundation system
CN106988303B (en) A kind of pile foundation and its construction method
CN109972630A (en) A kind of foundation pit enclosure structure and its construction method of the assembly of PC component
CN110777836A (en) Reinforced concrete plate-anchor rod composite foundation and using method thereof
JPS5985028A (en) Steel pipe pile and laying work thereof
JP3107716B2 (en) Soil retaining wall
JP4029191B2 (en) Subsidence suppression structure, construction method of settlement suppression structure
JP3486602B2 (en) Pier foundation method and pier foundation structure
JP3129676B2 (en) Piling columns in building structures using piles as pillars
JP2733537B2 (en) Connection structure between pile and superstructure
JP6867664B1 (en) Foundation structure of structure, foundation construction method, and support pipe material used for foundation
CN212983885U (en) Foundation pit structure
CN211447000U (en) Foundation pit backfill area construction elevator foundation
JP4154492B2 (en) Pile head connection structure of ready-made piles
JP3236541B2 (en) Joint method between knotted pile and steel pipe pile
CN111535334B (en) Construction method of double-core expanded pile anchor foundation pit supporting structure
JP2908764B2 (en) Repair method around concrete structures
CN217325334U (en) Construction method pile system with prestressed anchorage
JP2003041580A (en) Soil improving pile body and foundation structure for house using the same
JPH073813A (en) Construction of building foundation
JPH02164933A (en) Architecture foundation construction method
JPH10331155A (en) Soil cement embedding pile
JPH04366229A (en) Temporary corresponding standard used for method of reverse driving construction
JP2810602B2 (en) Foundation construction method
JPS62276119A (en) Composite piling work

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080627

Year of fee payment: 12