JP3107716B2 - Soil retaining wall - Google Patents

Soil retaining wall

Info

Publication number
JP3107716B2
JP3107716B2 JP06259406A JP25940694A JP3107716B2 JP 3107716 B2 JP3107716 B2 JP 3107716B2 JP 06259406 A JP06259406 A JP 06259406A JP 25940694 A JP25940694 A JP 25940694A JP 3107716 B2 JP3107716 B2 JP 3107716B2
Authority
JP
Japan
Prior art keywords
concrete
retaining wall
steel material
reinforcing steel
concrete plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP06259406A
Other languages
Japanese (ja)
Other versions
JPH0892981A (en
Inventor
欣二 新妻
久男 長谷
Original Assignee
ジオテック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ジオテック株式会社 filed Critical ジオテック株式会社
Priority to JP06259406A priority Critical patent/JP3107716B2/en
Publication of JPH0892981A publication Critical patent/JPH0892981A/en
Application granted granted Critical
Publication of JP3107716B2 publication Critical patent/JP3107716B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、傾斜地等で住宅を建設
する地盤等を造成する際に構築する土留擁壁に関し、特
に、比較的低く構築される擁壁を既成のコンクリート板
等を縦に並べた状態で設け、擁壁の盛土に隠れる部分
(山側)に柱部材を配置して、擁壁の谷側の露出面に段
部等が生じない状態で構築する土留擁壁に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a retaining wall for constructing a ground or the like for constructing a house on a slope or the like, and more particularly, to a relatively low retaining wall formed of an existing concrete plate or the like. The present invention relates to an earth retaining wall constructed by arranging a pillar member at a portion (mountain side) hidden by the embankment of the retaining wall so that a step portion does not occur on an exposed surface on a valley side of the retaining wall.

【0002】[0002]

【従来の技術】傾斜地に住宅等の建物を施工する際に
は、地盤の高いところを掘削して低いところに盛土する
ことにより、区画された部分に平らな地盤を構築するよ
うな工事を行っている。そして、前記区画された部分で
は、地盤の高い所を切り取り、低い端部に盛土を行うの
で、区画の谷側の端部での土の崩壊を防ぐために土留擁
壁を施工することが行われている。前述したような土留
擁壁としては、コンクリートブロックを積み重ねる状態
で所定の傾斜で構築することや、垂直なコンクリート壁
を構築すること等が行われる。
2. Description of the Related Art When constructing a building such as a house on a slope, a work is performed such that a high ground is excavated and buried in a low ground, thereby constructing a flat ground in a divided area. ing. And, in the sectioned section, since a high place of the ground is cut out and embankment is performed at a low end, construction of a retaining wall is performed to prevent collapse of soil at a valley side end of the section. ing. As the retaining wall as described above, a concrete block is constructed with a predetermined inclination in a state where the concrete blocks are stacked, or a vertical concrete wall is constructed.

【0003】例えば、前記土留擁壁をコンクリートで構
築する場合には、擁壁の基礎となる地盤を所定の深さに
掘削してから、基礎コンクリートを所定の高さと幅で、
土留擁壁の長さに対応させて打設し、その上に型枠を組
んでコンクリートを打設する工法を用いる。前述したよ
うにして、土留擁壁を構築した後で、前記擁壁の裏側に
施工する裏込めの石等を介して、土を盛ることにより、
盛土の支持と排水を良好な状態で行わせ得るようにして
いる。また、擁壁のコンクリートを垂直に打設すること
に代えて、比較的低い盛土の端部分に対しては、略L字
状の断面のPC板部材を用いた土留擁壁を構築すること
も行われており、そのような略L字状の土留擁壁は、施
工期間を短縮できる等の利点を発揮することが可能であ
る。
[0003] For example, when the retaining wall is constructed of concrete, the ground to be the foundation of the retaining wall is excavated to a predetermined depth, and then the foundation concrete is formed at a predetermined height and width.
Casting is performed according to the length of the retaining wall, and a concrete frame is put on it and cast concrete. As described above, after constructing the retaining wall, by embedding the soil through a back-filled stone or the like to be constructed on the back side of the retaining wall,
The embankment is supported and drained in good condition. Instead of vertically pouring the concrete of the retaining wall, it is also possible to construct a retaining wall using a PC plate member having a substantially L-shaped cross section for a relatively low end of the embankment. Such an approximately L-shaped retaining wall has been used and can exhibit advantages such as shortening of the construction period.

【0004】前述したような土留擁壁を施工する際に、
比較的軟弱な地盤に対しては、基礎コンクリートの下部
に杭を打設して、支持地盤を強化することが行われてい
る。前記杭部材としてコンクリート柱部材や鋼製の柱部
材を用い、杭打ち機等を用いて打ち込むことが行われて
いるが、ハンマー等の杭打ち機を用いる場合には、工事
の騒音の問題等が発生するという欠点がある。そこで、
施工現場での騒音の問題を解決するために、場所打ち杭
を施工することが行われており、前記場所打ち杭として
は、アースオーガー等の装置を用いて所定の径の孔を掘
削し、その掘削した土にセメントミルク等の凝固剤を混
入して良く攪拌し、凝固剤と土によりソイルセメントコ
ラムを構築するようにしている。そして、前述したよう
な場所打ち杭を擁壁の支持に用いる場合には、ソイルセ
メントコラムの径や強度等を、現場の土質に対応させて
施工することが可能であるから、土留擁壁に付与される
土圧等に対応させた支持部材を容易に構成することが可
能であるとされる。
When constructing the retaining wall as described above,
For relatively soft ground, piles are cast at the bottom of the foundation concrete to strengthen the supporting ground. A concrete pillar member or a steel pillar member is used as the pile member, and the pile member is driven using a pile driver. However, when a pile driver such as a hammer is used, there is a problem of construction noise and the like. There is a drawback that occurs. Therefore,
In order to solve the problem of noise at the construction site, it is performed to cast a cast-in-place pile, as the cast-in-place pile, excavating a hole of a predetermined diameter using an apparatus such as an earth auger, A coagulant such as cement milk is mixed into the excavated soil and agitated well to construct a soil cement column using the coagulant and the soil. When the cast-in-place pile is used to support the retaining wall as described above, the diameter and strength of the soil cement column can be set according to the soil quality at the site, so It is said that it is possible to easily configure a support member corresponding to the applied earth pressure or the like.

【0005】[0005]

【発明が解決しようとする課題】従来の土留擁壁の基礎
に構築する場所打ち杭は、擁壁の基礎と一体に接続する
ことにより、擁壁を支持するために用いられているもの
であり、基礎と一体に打設した擁壁を補強する役割を負
担する。しかし、前記擁壁の基礎は杭を用いない場合と
同様に、擁壁の重量を支持できるような大きな構造物と
して構築する必要がある。そして、前述したようにし
て、コンクリートを現場で打設して構築する土留擁壁
は、その擁壁自体の自立性により土圧に対抗できるよう
な強度を持たせているものであり、コンクリートの使用
量が多く、比較的大きな構造物として構築する必要があ
る。また、小規模の宅地の開発等においては、大量のコ
ンクリートを現場に搬入することや、擁壁の施工現場に
型枠を組んで、長期間の工事を行うことには多くの問題
がある。
The cast-in-place pile constructed on the foundation of the conventional retaining wall is used to support the retaining wall by being integrally connected to the foundation of the retaining wall. , And bear the role of reinforcing the retaining wall cast in one with the foundation. However, the foundation of the retaining wall needs to be constructed as a large structure capable of supporting the weight of the retaining wall, as in the case where no pile is used. And, as described above, the retaining wall constructed by casting concrete at the site has strength enough to withstand earth pressure due to the independence of the retaining wall itself. It needs to be constructed as a relatively large structure with a large amount of use. In the development of a small-scale residential land, etc., there are many problems in carrying a large amount of concrete to the site and performing a long-term construction by forming a formwork on the retaining wall construction site.

【0006】そして、場所打ち杭を軟弱な地盤に施工す
る場合には、その場所打ち杭を擁壁が倒れる方向に対抗
させて、十分な強度を有するものとして設計されること
がないという問題がある。さらに、従来の土留擁壁で
は、基礎の下部に施工した場所打ち杭と、基礎のコンク
リート、および、擁壁の3つの構成部材を一体化して、
土留擁壁の強度を増大させることや、各構成部材を低い
コストで構築すること等に関する考慮が払われてないと
いう問題がある。そこで、擁壁をPC板等の既成のコン
クリート部材で構成することも考えられているが、その
ような軽量のコンクリート板等で擁壁を構成する場合
に、土圧の大きさに対応させて、擁壁としての作用を十
分に発揮できるようにする技術手段を開発することが要
望されているのが現状である。
[0006] When the cast-in-place pile is constructed on soft ground, there is a problem that the cast-in-place pile is opposed to the direction in which the retaining wall falls and is not designed to have sufficient strength. is there. Furthermore, in the conventional retaining wall, the cast-in-place pile constructed under the foundation, the concrete of the foundation, and the three components of the retaining wall are integrated,
There is a problem in that no consideration is given to increasing the strength of the retaining wall, building each component at low cost, and the like. Therefore, it is considered that the retaining wall is made of an existing concrete member such as a PC board. However, when the retaining wall is made of such a lightweight concrete board or the like, it is necessary to correspond to the magnitude of the earth pressure. At present, it is desired to develop a technical means that can sufficiently exert the function as a retaining wall.

【0007】[0007]

【発明の目的】本発明は、前述したような従来の土留擁
壁の問題を解消するもので、PCコンクリート板等を用
いて比較的低い土留擁壁を施工するに際して、基礎の下
部に構築する場所打ち杭と、擁壁の支持部材との間に補
強鋼材を配置して基礎と擁壁とを一体に構築して、擁壁
の支持強度を増加させるとともに、擁壁の裏面に支持柱
部材を配置して、擁壁の露出部に凹凸が生じることをな
くし、容易に施工可能な土留擁壁を提供することを目的
としている。
An object of the present invention is to solve the above-mentioned problem of the conventional retaining wall, and to construct a relatively low retaining wall using a PC concrete plate or the like, to construct the retaining wall below the foundation. Reinforced steel is placed between the cast-in-place pile and the supporting member of the retaining wall to integrally build the foundation and the retaining wall to increase the supporting strength of the retaining wall and to provide a supporting column member on the back surface of the retaining wall. An object of the present invention is to provide an earth retaining wall which can be easily constructed by eliminating the unevenness in the exposed portion of the retaining wall by arranging the retaining wall.

【0008】[0008]

【課題を解決するための手段】本発明は、コンクリート
製等の擁壁を施工して盛土部分の端部を支持する土留擁
壁に関する。本発明の請求項1の発明は、擁壁の下部の
地盤に所定の間隔で垂直に施工する場所打ち杭と、前記
場所打ち杭を構成するソイルセメントの混合物が固化す
る前に所定の深さに打ち込んで、上端部を擁壁の高さよ
りも低い位置まで突出させ、ソイルセメントを固化させ
た場所打ち杭と一体に構築する補強鋼材と、前記補強鋼
材の谷側に配置する擁壁部材としてのコンクリート板部
材と、前記補強鋼材を囲むように配置する型枠部材とを
組み合わせ、前記補強鋼材と型枠部材の間、および、補
強鋼材と土留に使用するコンクリート板部材との間に、
コンクリートを充填する前の段階で相互に間隔を維持す
るための保持部材を取り付けるとともに、型枠部材の内
部空間にコンクリートを充填し、補強鋼材と一体に固化
させたコンクリートを介して、各保持部材に対する支持
の作用を発揮させるものとすることを特徴とする。
SUMMARY OF THE INVENTION The present invention relates to a retaining wall for retaining an end portion of a bank by constructing a retaining wall made of concrete or the like. The invention according to claim 1 of the present invention provides a cast-in-place pile which is constructed vertically at a predetermined interval on the ground under a retaining wall, and a predetermined depth before a mixture of a soil cement constituting the cast-in-place pile is solidified. Into, the upper end protrudes to a position lower than the height of the retaining wall, as a reinforcing steel material to be built integrally with the cast-in-place pile solidified with soil cement, and as a retaining wall member to be disposed on the valley side of the reinforcing steel material Combining a concrete plate member and a formwork member arranged so as to surround the reinforcing steel material, between the reinforcing steel material and the formwork member, and between the reinforcing steel material and a concrete plate member used for earth retaining,
At the stage before the concrete is filled, the holding members for maintaining the distance from each other are attached, and the interior space of the formwork member is filled with the concrete, and the respective holding members are solidified together with the reinforcing steel material through the concrete. Characterized in that it exerts a supporting effect on

【0009】請求項2の発明は、前記型枠部材とコンク
リート板部材で囲まれる空間部にコンクリートを充填し
て、型枠部材と補強鋼材を一体化した合成支柱に対し
て、土留に用いるコンクリート板部材に基部を固定した
アンカーロッドを埋め込み、前記アンカーロッドのコン
クリート埋め込み部に対して、ナットのような部材を固
定して設けることを特徴とする。請求項3の発明は、前
記補強鋼材としてH型鋼を用い、前記H型鋼のフランジ
に対して型枠部材とコンクリート板部材の固定保持部材
を位置決めすることを特徴とする。
A second aspect of the present invention is a concrete column which is filled with concrete in a space surrounded by the form member and the concrete plate member, and which is used as a concrete support for a composite pillar in which the form member and the reinforcing steel material are integrated. An anchor rod having a base fixed to a plate member is embedded, and a member such as a nut is fixedly provided in a concrete embedded portion of the anchor rod. The invention according to claim 3 is characterized in that an H-shaped steel is used as the reinforcing steel material, and a fixed holding member for a form member and a concrete plate member is positioned with respect to the flange of the H-shaped steel.

【0010】[0010]

【工法】本発明の土留擁壁を施工するに際しては、最初
に擁壁の施工現場の基礎に対応する位置に、ソイルセメ
ントコラムによる場所打ち杭を所定の間隔で施工し、そ
のソイルセメントが固化する前にH型鋼等の補強鋼材を
立て込み、その補強鋼材を擁壁の高さに応じて地面上に
突出させる。そして、前記場所打ち杭が補強鋼材と一体
化して固化した状態で、擁壁の下部に基礎を構築し、そ
の上に擁壁部材としてのPCコンクリート板を、補強鋼
材の谷側に1列に積み重ねるようにする。前記PCコン
クリート板を積み重ねて擁壁を構築する作業と同時に、
補強鋼材を囲むようにしてU字溝部材を積み重ね、PC
コンクリート板とU字溝部材とを補強鋼材としてのH型
鋼と一体に固定手段を用いて相互に固定し、H型鋼を囲
むようにして配置したU字溝部材の内部にコンクリート
を充填して固化させることにより合成支柱を構築する。
前述したようにして、PCコンクリート板と合成支柱を
一体化したものに対して、合成支柱側を埋める状態で盛
土を施工するが、PCコンクリート板と盛土の間には一
般の擁壁の場合と同様に、裏込めの砂利等を配置して水
抜きに対応させ、その擁壁の背後(山側の部分)に盛土
を施工し、宅地等を造成することができるようにする。
[Construction method] When constructing the retaining wall of the present invention, cast-in-place piles with a soil cement column are installed at predetermined intervals at positions corresponding to the foundation of the construction site of the retaining wall, and the soil cement is solidified. Before the reinforcement, a reinforcing steel material such as an H-shaped steel is erected, and the reinforcing steel material is projected on the ground according to the height of the retaining wall. Then, in a state where the cast-in-place pile is integrated with the reinforcing steel material and solidified, a foundation is constructed at the lower part of the retaining wall, and a PC concrete plate as a retaining wall member is placed thereon in a row on the valley side of the reinforcing steel material. Make them stack. At the same time as building the retaining wall by stacking the PC concrete boards,
Stack U-shaped groove members so as to surround the reinforcing steel
A concrete plate and a U-shaped groove member are fixed to each other integrally with an H-shaped steel as a reinforcing steel material using fixing means, and concrete is filled and solidified in a U-shaped groove member arranged so as to surround the H-shaped steel. To construct a composite support.
As described above, the embankment is constructed with the PC column and the composite column integrated with the composite column side. Similarly, backfill gravel and the like are arranged to allow for drainage, and embankment is constructed behind the retaining wall (mountain side portion) so that residential land and the like can be created.

【0011】本発明においては、土留擁壁としてのPC
コンクリート板を合成支柱を用いて支持させ、前記合成
支柱の中央部に埋設する補強鋼材としてH型鋼等を用い
ることができ、前記H型鋼のフランジに対して、型枠と
してのU字溝部材の固定部材を取り付けて、PCコンク
リート板と、U字溝部材で区画された部分にコンクリー
トを充填して、H型鋼と一体の合成支柱を構築すること
ができる。また、前記合成支柱の各構成部材の接続部材
としては、U字溝部材等を固定位置に配置可能であれ
ば、任意の固定手段を用いることができ、H型鋼に対し
てPCコンクリート板を取り付けるために、PCコンク
リート板に端部を埋め込んだ取付ボルト部材等を用いて
前記取付ボルト部材の突出端部にアンカーとしてのナッ
ト等の部材を取り付けておくことにより、取付ボルト部
材のコンクリートに対する引き抜き強度を増大させるこ
とができる。
In the present invention, a PC as a retaining wall is used.
A concrete plate is supported by using a composite support, and an H-shaped steel or the like can be used as a reinforcing steel material buried in the central portion of the composite support. For the flange of the H-shaped steel, a U-shaped groove member as a mold is used. By attaching the fixing member, concrete is filled in the section defined by the PC concrete plate and the U-shaped groove member, and a composite column integrally formed with the H-section steel can be constructed. Further, as a connecting member of each constituent member of the composite support, any fixing means can be used as long as a U-shaped groove member or the like can be arranged at a fixed position, and a PC concrete plate is attached to the H-section steel. For this purpose, by attaching a member such as a nut as an anchor to the protruding end of the mounting bolt member using a mounting bolt member or the like having an end embedded in a PC concrete plate, the pull-out strength of the mounting bolt member with respect to concrete Can be increased.

【0012】本発明においては、PCコンクリート板を
合成支柱に対して支持する手段を、合成支柱内に充填す
るコンクリートに取付ボルト部材等を挿入して構成する
ことが可能であり、PCコンクリート板の背後に加えら
れる土圧に対して、取付ボルト部材を介して合成支柱に
支持させることができる。そして、内部に埋設したH型
鋼を介して、前記合成支柱と場所打ち杭を一体に構築す
るので、擁壁を支持する合成支柱の強度を十分に大きく
設定することが可能である。さらに、擁壁に加えられる
土圧の大きさ等に対応させるためには、PCコンクリー
ト板の厚さや、合成支柱とPCコンクリート板を接続す
る取付ボルト部材の強度を適宜選定することが可能であ
るから、その擁壁の施工現場の状況に合わせて施工する
ことができる。
In the present invention, the means for supporting the PC concrete plate on the composite support can be constituted by inserting a mounting bolt member or the like into concrete filled in the composite support. In response to earth pressure applied behind, it can be supported by a composite support via a mounting bolt member. Since the composite strut and the cast-in-place pile are integrally formed via the H-shaped steel buried therein, the strength of the composite strut supporting the retaining wall can be set sufficiently high. Furthermore, in order to correspond to the magnitude of the earth pressure applied to the retaining wall, it is possible to appropriately select the thickness of the PC concrete plate and the strength of the mounting bolt member connecting the composite support and the PC concrete plate. Therefore, it can be constructed according to the situation of the construction site of the retaining wall.

【0013】[0013]

【実施例】図示される例にしたがって、本発明の土留擁
壁を説明する。図1ないし図5に示される例は、本発明
の擁壁の施工順序を示しているもので、擁壁の施工位置
に対応させて、図1に示すように、基礎地盤1から垂直
にソイルセメントコラム10を施工する。前記ソイルセ
メントコラムとしては、従来の場所打ち杭工法と同様
に、アースオーガー等により所定の径の孔を掘削しなが
ら、孔の中の土にセメントミルク等の凝固剤を混入して
ソイルセメントコラムを構築する。次いで、前記ソイル
セメントコラム10からアースオーガーを引き抜いた後
で、図2に示すようにして、補強鋼材としてのH型鋼1
5を立て込み、前記H型鋼15の突出高さを擁壁の高さ
よりも若干低い位置に固定し、H型鋼15の埋め込み部
がソイルセメントコラム10と一体化する状態で固化さ
せる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The retaining wall of the present invention will be described with reference to the illustrated example. The examples shown in FIGS. 1 to 5 show the construction sequence of the retaining wall of the present invention, and correspond to the construction position of the retaining wall, and as shown in FIG. The cement column 10 is installed. As the soil cement column, as in the conventional cast-in-place pile method, while excavating a hole of a predetermined diameter with an earth auger or the like, mixing a coagulant such as cement milk into the soil in the hole, the soil cement column. To build. Next, after pulling out the earth auger from the soil cement column 10, as shown in FIG.
The H-shaped steel 15 is fixed to a position slightly lower than the height of the retaining wall so that the embedded portion of the H-shaped steel 15 is solidified with the soil cement column 10.

【0014】前述したようにして、擁壁の施工地盤に対
して、PCコンクリート板の長さ等に対応する間隔でソ
イルセメントコラムとH型鋼とを施工した後で、擁壁の
下部に対応させて捨石基礎と捨コンクリートを打設して
基礎を構築する。その後で、図3に示すように、H型鋼
15を囲むようにして型枠部材を積み重ねるが、前記型
枠部材としては、例えば、コンクリート製のU字溝等の
既成の部材を用いることができる。そして、前記U字溝
部材20の開口部を擁壁部材としてのPCコンクリート
板に対応させて配置し、H型鋼とU字溝部材20の間を
接続部材を用いて相互に接続し、U字溝部材をH型鋼の
上部が隠れる高さに立ち上げるようにする。次いで、図
4に示すようにして、U字溝部材20の開口を塞ぐ状態
でPCコンクリート板25を積み上げる作業を行い、P
Cコンクリート板25をH型鋼とU字溝部材20に対し
て固定するとともに、PCコンクリート板25の間に隙
間が生じる場合には、モルタル等を用いて塞ぐことがで
きる。
As described above, the soil cement column and the H-shaped steel are applied to the ground of the retaining wall at intervals corresponding to the length of the PC concrete plate and the like, and then the lower part of the retaining wall is made to correspond to the lower part of the retaining wall. The foundation is constructed by casting rubble foundation and rubble concrete. Thereafter, as shown in FIG. 3, the form members are stacked so as to surround the H-shaped steel 15. As the form members, for example, an existing member such as a U-shaped groove made of concrete can be used. Then, the opening of the U-shaped groove member 20 is arranged so as to correspond to the PC concrete plate as the retaining wall member, and the H-shaped steel and the U-shaped groove member 20 are connected to each other by using a connecting member, and the U-shape is formed. The groove member is raised to a height at which the upper part of the H-section steel is hidden. Next, as shown in FIG. 4, the work of stacking the PC concrete boards 25 in a state where the opening of the U-shaped groove member 20 is closed is performed.
The C concrete plate 25 is fixed to the H-shaped steel and the U-shaped groove member 20, and when a gap is formed between the PC concrete plates 25, it can be closed with mortar or the like.

【0015】前述したようにして、H型鋼を囲む状態で
U字溝部材とPCコンクリート板を組み立ててから、U
字溝部材の内部の空間にコンクリートを流し込み、H型
鋼に対するU字溝部材とPCコンクリート板の接続部材
をコンクリートの中に埋め込むことにより固定し、U字
溝部材とH型鋼とを一体化した合成支柱11を構築す
る。その後で、図5に示すように、PCコンクリート板
の裏面側(山側)に裏込め6の砂利等を所定の幅で施工
しながら、土砂を投入して盛土5を施工し、PCコンク
リート板の高さに対応させた住宅地等を区画する地盤を
造成する。したがって、前記図5に示されるようにし
て、PCコンクリート板の山側に盛土を行うことによ
り、擁壁を支える合成支柱11は盛土の中に埋没される
状態となり、擁壁の表面側(谷側)では、面一のPCコ
ンクリート板の表面が露出するのみとなり、擁壁の表面
に凹凸等が形成されずに、美観上での問題が生じること
がなくなる。
As described above, after assembling the U-shaped groove member and the PC concrete plate so as to surround the H-section steel,
Concrete is poured into the space inside the U-shaped groove member, and the connection member between the U-shaped groove member and the PC concrete board for the H-shaped steel is fixed by embedding in concrete, and the U-shaped groove member and the H-shaped steel are integrated. The support 11 is constructed. Then, as shown in FIG. 5, while embedding the gravel of the backfill 6 at a predetermined width on the back surface side (mountain side) of the PC concrete plate, earth and sand are charged and the embankment 5 is constructed, and the PC concrete plate is constructed. Create the ground that divides residential areas, etc., corresponding to the height. Therefore, as shown in FIG. 5, when the embankment is laid on the mountain side of the PC concrete plate, the composite support 11 that supports the retaining wall is buried in the embankment, and the surface side of the retaining wall (the valley side). In the case of (2), only the surface of the flush PC concrete plate is exposed, and no irregularities are formed on the surface of the retaining wall.

【0016】前述したような構築方法を用いて土留擁壁
を構築することにより、H型鋼とU字溝部材により構成
した合成支柱11と、PCコンクリート板の関係は、図
6、7に示されるように形成される。図6に示される例
は、PCコンクリート板の正面側から見たものであり、
PCコンクリート板は高さ方向に積み上げられるととも
に、2つのPCコンクリート板の接続部を合成支柱11
の中央部に配置して、擁壁を構築するようにしている。
また、図7の側面図に示されるように、盛土5の層の谷
側にPCコンクリート板を配置し、PCコンクリート板
を合成支柱11により支持させ、土留擁壁としての作用
を発揮させるようにする。前述したように、PCコンク
リート板に付与される土圧を合成支柱11により支持さ
せるために、合成支柱11の中心部にH型鋼15を立設
して、コンクリート12により充填し、前記H型鋼15
の基部をソイルセメントコラム10の中に埋没させる状
態で、固化したソイルセメントコラムに対してH型鋼を
一体に構築し、H型鋼による合成支柱の強度を非常に大
きなものとして構成する。
By constructing the retaining wall using the above-described construction method, the relationship between the composite column 11 composed of the H-shaped steel and the U-shaped groove member and the PC concrete plate is shown in FIGS. It is formed as follows. The example shown in FIG. 6 is viewed from the front side of a PC concrete plate,
The PC concrete boards are stacked in the height direction, and the connecting portion between the two PC concrete boards is connected to the composite support 11.
It is located in the center of the building to build a retaining wall.
In addition, as shown in the side view of FIG. 7, a PC concrete plate is arranged on the valley side of the layer of the embankment 5, and the PC concrete plate is supported by the composite support 11 so as to exhibit the function as a retaining wall. I do. As described above, in order to support the earth pressure applied to the PC concrete plate by the composite support 11, the H-shaped steel 15 is erected at the center of the composite support 11 and filled with the concrete 12, and the H-shaped steel 15 is filled.
In a state in which the base is buried in the soil cement column 10, an H-shaped steel is integrally formed with the solidified soil cement column, and the strength of the composite support made of the H-shaped steel is extremely large.

【0017】さらに、PCコンクリート板の施工部分の
下部には、所定の厚さの捨石基礎2を構築してから、捨
コンクリートの層3を打設して基礎を構築することは、
従来の擁壁の場合と同様にされるが、前記捨コンクリー
トの層3をソイルセメントコラム10と一体に接続する
ことにより、基礎の強度を向上させることができる。ま
た、本発明においては、ソイルセメントコラムの上部を
接続する基礎のコンクリートに対して、ソイルセメント
コラムを相互に接続する状態で鉄筋等を配筋してから、
捨コンクリートの層3を打設する工法を用いる場合に
は、基礎の強度を大幅に向上させることが可能であると
ともに、擁壁自体が受ける土圧に対する支持強度を大き
くすることができる。前記ソイルセメントコラム10の
中に埋設する補強鋼材としては、本実施例に開示するよ
うに、H型鋼15を用いることの他に、廃棄するレール
や溝型鋼、I型鋼等の任意の鋼材を使用することができ
る。そして、前記補強鋼材の基礎に対応する部分に対し
て、横鉄筋を溶接等により接続してからコンクリートを
打設することによって、基礎の強度を向上させることも
可能になる。
Furthermore, it is necessary to construct a rubble foundation 2 having a predetermined thickness under the construction part of the PC concrete plate and then cast a rubble layer 3 to construct the foundation.
As in the case of the conventional retaining wall, the strength of the foundation can be improved by integrally connecting the discarded concrete layer 3 with the soil cement column 10. Further, in the present invention, for the concrete of the foundation connecting the upper part of the soil cement column, reinforcing bars and the like are arranged in a state where the soil cement column is connected to each other,
In the case of using the construction method in which the concrete layer 3 is cast, the strength of the foundation can be greatly improved, and the supporting strength against the earth pressure received by the retaining wall itself can be increased. As the reinforcing steel material embedded in the soil cement column 10, as described in this embodiment, in addition to using the H-shaped steel 15, any steel material such as a discarded rail, a grooved steel, and an I-shaped steel is used. can do. Then, by connecting the horizontal reinforcing bar to the portion corresponding to the foundation of the reinforcing steel material by welding or the like and then casting concrete, the strength of the foundation can be improved.

【0018】前述したようにして、擁壁の構築現場に合
成支柱を配置して、PCコンクリート板による土留擁壁
を構築する際には、例えば、図8に示すように、合成支
柱11、11a、11b……の配置間隔Lを、PCコン
クリート板25の長さに対応させて設ける。そして、P
Cコンクリート板の端部が合成支柱の中央部に位置する
状態で、合成支柱を介してPCコンクリート板の接続を
行い、土留擁壁により段状に区画した宅地の造成を行う
ことができる。また、前記PCコンクリート板の山側に
盛土を行って、宅地を造成することにより、合成支柱を
構成する金具部材や、補強鋼材等が全部コンクリートの
中に埋没された状態となる。さらに、前記合成支柱が地
表部に露出することがなく、またコンクリート中に埋没
される補強鋼材や接続部材等の金属部材が、地盤や盛土
等に接することがないので、前記金属部際が腐食したり
することを防止でき、擁壁の耐久性を向上させることが
可能になる。
As described above, when constructing a retaining wall made of PC concrete plate by arranging a composite support at a construction site of a retaining wall, as shown in FIG. 8, for example, as shown in FIG. , 11b... Are provided corresponding to the length of the PC concrete board 25. And P
In a state where the end of the C concrete plate is located at the center of the composite support, the PC concrete plate is connected via the composite support, and the residential land partitioned in steps by the retaining wall can be created. In addition, embankment is performed on the mountain side of the PC concrete plate to form a residential land, so that a metal member, a reinforcing steel material, and the like constituting the composite support are all buried in the concrete. Further, since the composite pillar is not exposed to the surface of the ground and metal members such as reinforcing steel materials and connection members buried in concrete do not come into contact with the ground or the embankment, corrosion of the metal portion is prevented. Can be prevented, and the durability of the retaining wall can be improved.

【0019】前述したように、U字溝部材によりH型鋼
を覆う状態で、H型鋼に対してU字溝部材とPCコンク
リート板とを相互に接続するために、図9に示すような
接続手段を構成することができる。前記図9に示される
例は、合成支柱の横断面図として示すものであり、2つ
のPCコンクリート板25、25aの接続部を合成支柱
11に対応させて配置し、H型鋼15をU字溝部材20
により覆う状態で配置する。また、PCコンクリート板
には所定の深さの孔28を設けて、接着剤29により取
付ボルト部材30の基部を固定し、前記取付ボルト部材
30の先端部をU字溝部材の空間内部に向けて大きく突
出させ、取付ボルト部材にナット31を介して取り付け
た固定板部材32を位置決めする。さらに、前記取付ボ
ルト部材30の突出側の先端部には、ナット等のアンカ
ー部材33を固定して、U字溝部材の空間部にコンクリ
ート12を充填した際に、前記アンカー部材33が取付
ボルト部材の引き抜きを阻止する部材として作用させ
る。
As described above, in order to connect the U-shaped groove member and the PC concrete board to the H-shaped steel in a state where the H-shaped steel is covered by the U-shaped groove member, connecting means as shown in FIG. 9 is used. Can be configured. The example shown in FIG. 9 is shown as a cross-sectional view of a composite column, in which a connection portion between two PC concrete plates 25, 25a is arranged corresponding to the composite column 11, and an H-shaped steel 15 is formed in a U-shaped groove. Member 20
It is arranged in a state of being covered by. Further, a hole 28 having a predetermined depth is provided in the PC concrete plate, the base of the mounting bolt member 30 is fixed with an adhesive 29, and the tip of the mounting bolt member 30 is directed toward the inside of the space of the U-shaped groove member. And the fixing plate member 32 attached to the mounting bolt member via the nut 31 is positioned. Furthermore, an anchor member 33 such as a nut is fixed to the tip of the mounting bolt member 30 on the protruding side, and when the space of the U-shaped groove member is filled with concrete 12, the anchor member 33 is It acts as a member that prevents the member from being pulled out.

【0020】前記合成支柱11において、U字溝部材2
0のフランジの先端部に近接する位置で、フランジを貫
通する止めボルト21を設け、前記止めボルト21を用
いてU字溝部材の内側にL型金具22を固定して配置す
る。そして、取付ボルト部材30に取り付けた固定板部
材32の一方の端部を前記L型金具22に係止させ、L
型金具の他方の端部をH型鋼15のフランジ17に係止
させて、H型鋼に対してU字溝部材と取付ボルト部材の
2つの部材を位置決めして固定させるようにする。な
お、前記図9に示す例においては、H型鋼15の谷側の
フランジ17に対して固定板部材32を位置決めする
が、前記H型鋼のフランジの両側端部に固定板部材を配
置し、ナット31をそれぞれ締め込んで、固定板部材3
2とフランジの間の位置決めを行うことにより、U字溝
部材20の開口側のフランジの端部をPCコンクリート
板に対して押圧し、コンクリートを充填する際に、モル
タルが漏れ出さないような処置を行うことができる。
In the composite column 11, the U-shaped groove member 2
A stop bolt 21 penetrating the flange is provided at a position close to the front end of the flange No. 0, and the L-shaped bracket 22 is fixedly arranged inside the U-shaped groove member using the stop bolt 21. Then, one end of the fixing plate member 32 attached to the attachment bolt member 30 is locked to the L-shaped bracket 22,
The other end of the mold is locked to the flange 17 of the H-shaped steel 15 so that the U-shaped groove member and the mounting bolt member are positioned and fixed to the H-shaped steel. In the example shown in FIG. 9, the fixed plate member 32 is positioned with respect to the flange 17 on the valley side of the H-shaped steel 15. 31 and tighten the fixing plate member 3
By positioning between the flange 2 and the flange, the end of the flange on the opening side of the U-shaped groove member 20 is pressed against the PC concrete plate so that the mortar does not leak when the concrete is filled. It can be performed.

【0021】また、前記U字溝部材とPCコンクリート
板の固定を行う際には、H型鋼のウェブ16に対して接
続金具等を溶接して取り付け、その金具と固定板部材と
を位置決めすることや、H型鋼の山側のフランジに対し
て固定手段を用いた取り付けを行う等の任意の手段を設
けることができる。そして、U字溝部材の内部に配置す
る接続手段としての金具部材は、U字溝部材の内部にコ
ンクリート12を充填して固化させることにより、固化
したコンクリートの内部に埋没される状態となり、外気
に露出して錆が生じたりすることがないので、合成支柱
の耐久性を良好に維持させることができるものとなる。
When fixing the U-shaped groove member and the PC concrete plate, a connection fitting or the like is attached to the H-shaped steel web 16 by welding, and the fitting and the fixing plate member are positioned. Alternatively, an arbitrary means such as attachment using a fixing means to the flange on the mountain side of the H-section steel can be provided. Then, the metal member as a connecting means disposed inside the U-shaped groove member is filled with the concrete 12 inside the U-shaped groove member and solidified, so that the metal member is buried in the solidified concrete. The rust does not occur due to the exposure of the composite support, and the durability of the composite support can be maintained satisfactorily.

【0022】図10に示す例は、前記擁壁の縦断面図と
して示すもので、上下に積み重ねるようにして配置する
PCコンクリート板25、25A……からは、山側に取
付ボルト部材30、30a……をそれぞれ突出させて配
置し、U字溝部材の内部に充填したコンクリートによ
り、アンカー部材33、33A……を介して一体に固着
させるようにする。また、上下に積み重ねるU字溝部材
20、20a……の、各々の接続部には隙間がほとんど
形成されないが、その隙間が大きい場合には、モルタル
等を充填して隙間を塞ぐような処理を行う。前記コンク
リート製の部材の接続部に、モルタル等を充填して隙間
を塞ぐことは、PCコンクリート板の場合と同様にして
行うもので、PCコンクリート板やU字溝部材の接続部
分には、隙間が形成されないような処理を積み上げ作業
と同時に行うようにする。さらに、前記上下のU字溝部
材20、20aを接続するために、U字溝部材のフラン
ジを貫通するボルト24、24aを用いて、接続金具2
3を固定することにより、上下のU字溝部材がズレを生
じたりすることがないように固定される。
The example shown in FIG. 10 is a longitudinal sectional view of the retaining wall. From the PC concrete plates 25, 25A,... Which are vertically stacked, mounting bolt members 30, 30a,. Are arranged so as to protrude, and are integrally fixed to each other via the anchor members 33, 33A,... With concrete filled in the inside of the U-shaped groove member. Moreover, although little gap is formed at each connection part of the U-shaped groove members 20, 20a stacked vertically, if the gap is large, processing such as filling with mortar or the like to close the gap is performed. Do. Filling the connection portion of the concrete member with mortar or the like to close the gap is performed in the same manner as in the case of the PC concrete plate, and the connection portion of the PC concrete plate or the U-shaped groove member has a gap. Is performed simultaneously with the stacking operation. Further, in order to connect the upper and lower U-shaped groove members 20 and 20a, the connection fitting 2 is formed using bolts 24 and 24a penetrating through the flange of the U-shaped groove member.
By fixing 3, the upper and lower U-shaped groove members are fixed so as not to be displaced.

【0023】前述したように、本発明の土留擁壁は宅地
等の造成に際して、PCコンクリート板等の既成のコン
クリート板を用い、簡単な構成で盛土や切り土の部分を
支持して擁壁により崩壊を防ぐとともに、容易に施工で
きるようなものとしている。また、本発明の土留擁壁
は、建物の基礎と土留の壁部材とを一体に構築する場合
にも用いることが可能である。例えば、図11に示すよ
うに、地下室を構築する場合、または、傾斜地に建物を
構築する場合に、切り土の部分をPCコンクリート板に
より支持し、合成支柱を用いて柱の基礎を構築するよう
にすることもできる。前記実施例では、建物の下部構造
物としての地下室や1階の部分に対応させて傾斜地等を
垂直に切る状態で掘削し、擁壁に対応させてソイルセメ
ントコラム10を打設し、ソイルセメントコラム10の
中にH型鋼15を埋め込むようにして一体に構築する。
そして、前記H型鋼15を囲むようにしてU字溝部材2
0を配置して、H型鋼とU字溝部材の間を位置決めして
固定し、前記H型鋼の谷側にPCコンクリート板25…
…を垂直に重ねて設け、U字溝部材の内部の空間にコン
クリートを充填して合成支柱11を構築する。
As described above, the soil retaining wall of the present invention uses an existing concrete plate, such as a PC concrete plate, when constructing a residential land or the like, and supports the embankment or cut soil with a simple structure and uses the retaining wall. It is designed to prevent collapse and facilitate construction. Further, the retaining wall of the present invention can also be used when the foundation of the building and the wall member of the retaining wall are integrally constructed. For example, as shown in FIG. 11, when a basement is constructed or a building is constructed on a sloping ground, the cut part is supported by a PC concrete plate, and the foundation of the pillar is constructed using a composite support. You can also In the above-described embodiment, a soil cement column 10 is excavated in a state where a slope or the like is cut vertically so as to correspond to a basement or a first floor portion as a lower structure of a building, and a soil cement column 10 is cast corresponding to a retaining wall. The H-shaped steel 15 is embedded in the column 10 so as to be integrally formed.
Then, the U-shaped groove member 2 is formed so as to surround the H-shaped steel 15.
0 is positioned and fixed between the H-shaped steel and the U-shaped groove member, and the PC concrete plate 25 is positioned on the valley side of the H-shaped steel.
Are vertically stacked, and concrete is filled in the space inside the U-shaped groove member to construct the composite support 11.

【0024】前述したようにして構築した合成支柱11
は、建物の1階の部屋または地下室44の天井の梁47
の高さまで延長して構築し、合成支柱11の上に直接建
物の根太46を配置し、上部構造物の柱45を立設でき
るようにする。また、PCコンクリート板25は地下室
等の壁として用いることができるものであり、その壁の
露出面に凹凸等が形成されないことから、壁面に対して
防水処理やその他の工事を行うことは容易になる。さら
に、地下室等の床に対しては、ベースコンクリート41
と床面のコンクリート40等を施工し、前記ベースコン
クリート41の基部をソイルセメントコラム10と一体
に接続して、基礎構造物を構成することができる。した
がって、前述したように、ソイルセメントコラム10と
一体に構築した柱部材と擁壁部材、および、基礎を構成
することにより、傾斜地に建設する建物に対しても、本
発明の土留擁壁を利用することができる。
The composite strut 11 constructed as described above
Is the beam 47 on the ceiling of the room or basement 44 on the first floor of the building.
, And the joist 46 of the building is arranged directly on the composite column 11 so that the column 45 of the superstructure can be erected. Further, the PC concrete plate 25 can be used as a wall of a basement or the like, and since there is no unevenness or the like on the exposed surface of the wall, it is easy to perform waterproofing treatment and other construction on the wall surface. Become. Furthermore, base concrete 41 is used for floors such as basements.
And concrete 40 on the floor surface and the like, and the base of the base concrete 41 is integrally connected to the soil cement column 10 to form a substructure. Therefore, as described above, by using the pillar member and the retaining wall member integrally formed with the soil cement column 10 and the foundation, the soil retaining wall of the present invention can be used for a building constructed on a slope. can do.

【0025】なお、前記図11に示される例において、
基礎の上に構築する建物が高いものである場合や、基礎
が負担する重量が大きい場合には、ソイルセメントコラ
ム10と合成支柱11の数を多くしたり、それ等の部材
の径を大きくして、基礎構造物の支持強度を増大させる
ことができる。また、本発明のソイルセメントコラム1
0と合成支柱11を組み合わせた支持構造物は、建物の
柱部材として構築することも可能である。そのために
は、U字溝部材の開口部を塞ぐ幅のコンクリート板部材
をU字溝部材に取り付けて、H型鋼を囲む状態で位置決
めして固定し、U字溝部材の内部にコンクリートを充填
することにより、単純な構成の柱部材を構成することが
可能になる。さらに、本発明の実施例で使用しているU
字溝部材は、それ自体が大きな強度を有する市販のU字
溝部材を使用する例の他に、無機質の薄い板材料を略U
字状に組み合わせて構成したもの等を用いることも可能
である。その他に、任意の材料を用いてU字型の枠部材
を構成して、内部にコンクリートを充填することによ
り、枠部材とコンクリートを一体に接着し、支持柱とし
て作用させるようにすることが可能である。
In the example shown in FIG.
If the building to be built on the foundation is tall or the foundation bears a large weight, increase the number of the soil cement columns 10 and the composite struts 11 or increase the diameter of those members. Thus, the supporting strength of the substructure can be increased. In addition, the soil cement column 1 of the present invention
The support structure combining the 0 and the composite support 11 can be constructed as a column member of a building. For this purpose, a concrete plate member having a width that closes the opening of the U-shaped groove member is attached to the U-shaped groove member, positioned and fixed so as to surround the H-shaped steel, and concrete is filled inside the U-shaped groove member. This makes it possible to form a column member having a simple configuration. Further, U used in the embodiment of the present invention
In addition to the example of using a commercially available U-shaped groove member which itself has a large strength, the U-shaped groove member is made of an inorganic thin plate material substantially U-shaped.
It is also possible to use a combination formed in a letter shape. In addition, by forming a U-shaped frame member using an arbitrary material and filling the inside with concrete, it is possible to integrally bond the frame member and concrete and to act as a support pillar. It is.

【0026】前述したようにして、H型鋼を囲むように
してU字溝部材とPCコンクリート板を積み重ねる作業
を行う場合に、最初にU字溝部材を積み重ねる状態で配
置し、後でPCコンクリート板を積み重ねて擁壁を構成
することができるが、その他に、地盤に立て込んだH型
鋼に対してU字溝部材とPCコンクリート板とを交互に
1段ずつ積み重ねて、構築する工法を用いることも可能
である。さらに、U字溝部材の内部空間にコンクリート
を充填する際にも、U字溝部材を積み重ねる途中で、コ
ンクリートの充填の作業を行うような工法を用いること
もできる。したがって、本発明の土留擁壁の施工に際し
ては、任意の施工段取りにより工事を行うことができる
ものであり、現場の状態や工事の規模等に応じて施工す
ることができる。
As described above, when the work of stacking the U-shaped groove member and the PC concrete plate so as to surround the H-shaped steel is performed, the U-shaped groove member is first arranged in a stacked state, and then the PC concrete plate is stacked. In addition, it is also possible to use a construction method in which a U-shaped groove member and a PC concrete plate are alternately stacked one by one on an H-shaped steel erected on the ground. is there. Further, when the concrete is filled in the internal space of the U-shaped groove member, a method of performing the work of filling the concrete while the U-shaped groove members are being stacked can be used. Therefore, when the retaining wall of the present invention is constructed, the construction can be performed by an arbitrary construction setup, and the construction can be performed according to the condition of the site, the scale of the construction, and the like.

【0027】[0027]

【発明の効果】本発明の土留擁壁は、前述したような構
成を有するものであるから、擁壁の補強を行うために、
ソイルセメントコラムと一体に構築したH型鋼等の補強
鋼材を用いるので、PCコンクリート板により構成する
擁壁の支持を容易に行うことができ、土留擁壁の構築作
業を容易に行うことができる。また、本発明において
は、H型鋼のフランジに対してU字溝部材の固定部材を
取り付けることが可能であり、合成支柱を構築する際の
作業工程を簡素化できる。さらに、H型鋼に対してPC
コンクリート板を取り付けるために、PCコンクリート
板に端部を埋め込んだ取付ボルト部材を用い、前記取付
ボルト部材の突出端部にアンカー部材としてのナット等
を取り付けてコンクリート中に埋設しておくことによ
り、取付ボルト部材のコンクリートに対する引き抜き強
度を増大させることができる。
Since the retaining wall of the present invention has the above-described configuration, it is necessary to reinforce the retaining wall.
Since a reinforcing steel material such as an H-shaped steel integrally formed with the soil cement column is used, the retaining wall formed of the PC concrete plate can be easily supported, and the construction of the retaining wall can be easily performed. Further, in the present invention, it is possible to attach the fixing member of the U-shaped groove member to the flange of the H-shaped steel, and it is possible to simplify the operation process when constructing the composite support. Furthermore, PC for H-section steel
In order to attach a concrete board, by using a mounting bolt member having an end embedded in a PC concrete board, a nut or the like as an anchor member is attached to a protruding end of the mounting bolt member and embedded in concrete, The pull-out strength of the mounting bolt member against concrete can be increased.

【0028】そして、本発明においては、合成支柱を構
成するコンクリートに挿入した取付ボルト部材により、
PCコンクリート板を合成支柱に対して支持する手段を
構成するので、PCコンクリート板の背後に加えられる
土圧に対して、取付ボルト部材を介して合成支柱が支持
することになるが、前記合成支柱が場所打ち杭と一体に
構築されていることから、合成支柱の強度を十分に大き
く設定することができる。前記効果に加えて、擁壁に加
えられる土圧の大きさ等に対応させるためには、PCコ
ンクリート板の厚さや、合成支柱とPCコンクリート板
を接続する取付ボルト部材の強度を適宜選定することが
可能であるから、その擁壁の施工現場の状況に合わせて
施工することができる。
And, in the present invention, the mounting bolt member inserted into the concrete constituting the composite strut,
Since the means for supporting the PC concrete plate with respect to the composite column is constituted, the composite column supports the earth pressure applied behind the PC concrete plate via the mounting bolt member. Is integrally formed with the cast-in-place pile, so that the strength of the composite strut can be set sufficiently large. In addition to the above effects, in order to correspond to the magnitude of the earth pressure applied to the retaining wall, etc., appropriately select the thickness of the PC concrete plate and the strength of the mounting bolt member connecting the composite support and the PC concrete plate. Therefore, the construction can be performed according to the situation of the construction site of the retaining wall.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 擁壁の構築現場にソイルセメントコラムを構
築する工程の説明図である。
FIG. 1 is an explanatory diagram of a process of constructing a soil cement column at a construction site of a retaining wall.

【図2】 ソイルセメントコラムにH型鋼を立て込む工
程の説明図である。
FIG. 2 is an explanatory view of a step of setting an H-section steel in a soil cement column.

【図3】 H型鋼に対してU字溝部材を立て込む工程の
説明図である。
FIG. 3 is an explanatory view of a step of setting a U-shaped groove member in an H-shaped steel.

【図4】 PCコンクリート板を構築する工程の説明図
である。
FIG. 4 is an explanatory diagram of a process of constructing a PC concrete board.

【図5】 擁壁の完成後に盛土を行う工程の説明図であ
る。
FIG. 5 is an explanatory diagram of a step of performing embankment after completion of a retaining wall.

【図6】 本発明の合成支柱とPCコンクリート板の構
成を正面から見た説明図である。
FIG. 6 is an explanatory view of the configuration of the composite column and the PC concrete plate of the present invention as viewed from the front.

【図7】 図6の合成支柱とPCコンクリート板の構成
を示す縦断面図である。
FIG. 7 is a longitudinal sectional view showing a configuration of a composite support column and a PC concrete board of FIG. 6;

【図8】 本発明の工法により構築する土留擁壁の平面
図である。
FIG. 8 is a plan view of a retaining wall constructed by the method of the present invention.

【図9】 H型鋼とU字溝部材およびPCコンクリート
板の取り付け関係を示す断面図である。
FIG. 9 is a cross-sectional view showing an attachment relationship between an H-shaped steel, a U-shaped groove member, and a PC concrete plate.

【図10】 PCコンクリート板とU字溝部材の取り付
け関係を示す説明図である。
FIG. 10 is an explanatory view showing an attachment relationship between a PC concrete board and a U-shaped groove member.

【図11】 本発明の別の実施例の説明図である。FIG. 11 is an explanatory view of another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 基礎地盤、 5 盛土、 10 ソイルセメ
ントコラム、11 合成支柱、 15 H型鋼、
20 U字溝部材、23 接続金具、 25 P
Cコンクリート板、30 取付ボルト部材、 33
アンカー部材、41 ベースコンクリート、 44
地下室、45 上部構造物の柱。
1 foundation ground, 5 embankment, 10 soil cement column, 11 synthetic column, 15 H-section steel,
20 U-shaped groove member, 23 connection fitting, 25 P
C concrete board, 30 mounting bolt members, 33
Anchor member, 41 Base concrete, 44
Basement, 45 Pillars of superstructure.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02D 29/02 306 E02D 29/02 308 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 7 , DB name) E02D 29/02 306 E02D 29/02 308

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 コンクリート製等の擁壁を施工して盛土
部分の端部を支持する土留擁壁において、 擁壁の下部の地盤に所定の間隔で垂直に施工する場所打
ち杭と、 前記場所打ち杭を構成するソイルセメントの混合物が固
化する前に所定の深さに打ち込んで、上端部を擁壁の高
さよりも低い位置まで突出させ、ソイルセメントを固化
させた場所打ち杭と一体に構築する補強鋼材と、 前記補強鋼材の谷側に配置する擁壁部材としてのコンク
リート板部材と、 前記補強鋼材を囲むように配置する型枠部材とを組み合
わせ、 前記補強鋼材と型枠部材の間、および、補強鋼材と土留
に使用するコンクリート板部材との間に、コンクリート
を充填する前の段階で相互に間隔を維持するための保持
部材を取り付けるとともに、 型枠部材の内部空間にコンクリートを充填し、補強鋼材
と一体に固化させたコンクリートを介して、各保持部材
に対する支持の作用を発揮させるものとすることを特徴
とする土留擁壁。
1. A cast-in-place pile that is constructed vertically on a ground under a retaining wall at predetermined intervals on a retaining wall that supports an end of an embankment portion by constructing a retaining wall made of concrete or the like; Before the soil cement mixture that makes up the pile is solidified, it is driven into a predetermined depth and the upper end protrudes to a position lower than the height of the retaining wall, and is integrated with the cast-in-place pile that solidifies the soil cement. A reinforcing steel material, a concrete plate member as a retaining wall member arranged on the valley side of the reinforcing steel material, and a formwork member arranged so as to surround the reinforcing steel material, between the reinforcing steel material and the formwork member, In addition, between the reinforcing steel material and the concrete plate member used for the earth retaining, a holding member for maintaining the space between them before the concrete is filled, and a concrete space inside the formwork member A retaining wall, characterized in that the retaining wall has a function of supporting each holding member through concrete that is filled with a rib and solidified integrally with a reinforcing steel material.
【請求項2】 前記型枠部材とコンクリート板部材で囲
まれる空間部にコンクリートを充填して、型枠部材と補
強鋼材を一体化した合成支柱に対して、土留に用いるコ
ンクリート板部材に基部を固定したアンカーロッドを埋
め込み、 前記アンカーロッドのコンクリート埋め込み部に対し
て、ナットのような部材を固定して設けることを特徴と
する請求項1に記載の土留擁壁。
2. A concrete column is filled with concrete in a space surrounded by the form member and the concrete plate member, and a base of the concrete plate member used for soil retaining is provided for a composite column in which the form member and the reinforcing steel material are integrated. The retaining wall according to claim 1, wherein a fixed anchor rod is embedded, and a member such as a nut is fixedly provided in a concrete embedded portion of the anchor rod.
【請求項3】 前記補強鋼材としてH型鋼を用い、前記
H型鋼のフランジに対して型枠部材とコンクリート板部
材の固定保持部材を位置決めすることを特徴とする請求
項1または2に記載の土留擁壁。
3. The earth retaining device according to claim 1, wherein an H-shaped steel is used as the reinforcing steel material, and a fixed holding member for a form member and a concrete plate member is positioned with respect to the flange of the H-shaped steel. Retaining wall.
JP06259406A 1994-09-29 1994-09-29 Soil retaining wall Expired - Fee Related JP3107716B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06259406A JP3107716B2 (en) 1994-09-29 1994-09-29 Soil retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06259406A JP3107716B2 (en) 1994-09-29 1994-09-29 Soil retaining wall

Publications (2)

Publication Number Publication Date
JPH0892981A JPH0892981A (en) 1996-04-09
JP3107716B2 true JP3107716B2 (en) 2000-11-13

Family

ID=17333680

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06259406A Expired - Fee Related JP3107716B2 (en) 1994-09-29 1994-09-29 Soil retaining wall

Country Status (1)

Country Link
JP (1) JP3107716B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000328586A (en) * 1999-05-24 2000-11-28 Modern Material:Kk Retaining wall
JP2011236721A (en) * 2010-05-12 2011-11-24 Iritech Co Ltd Retaining wall panel for creating slope for road or building land and method for constructing the same
JP6207318B2 (en) * 2013-09-24 2017-10-04 日特建設株式会社 Retaining wall
JP6790609B2 (en) * 2016-09-01 2020-11-25 株式会社大林組 How to build a seismic isolated building
KR101954113B1 (en) * 2017-02-13 2019-05-17 손익달 Retaining wall structure and construction method thereof
JP6416367B1 (en) * 2017-12-12 2018-10-31 株式会社トラバース Retaining wall panel, manufacturing method thereof, and retaining wall
JP6385554B1 (en) * 2017-12-25 2018-09-05 株式会社トラバース Self-supporting retaining wall
JP6328359B1 (en) * 2018-01-10 2018-05-23 株式会社トラバース Retaining wall construction method
CN108643225A (en) * 2018-07-25 2018-10-12 中铁七局集团第工程有限公司 A kind of peg board retaining wall with steel reinforced concrete rib

Also Published As

Publication number Publication date
JPH0892981A (en) 1996-04-09

Similar Documents

Publication Publication Date Title
US5551810A (en) Retaining wall with an outer face and method of forming the same
JP3107716B2 (en) Soil retaining wall
KR20190022132A (en) Top-down method using precast-concrete colum
US5356242A (en) System and method for adjustably connecting wall facing panels to the soldier beams of a tie-back or anchored wall
JP3760304B2 (en) Building foundation construction method
JP2000265574A (en) High floor type steel frame footing beam method
US10829924B2 (en) Composite wall and methods of constructing a composite wall
JP2000144769A (en) Method of landslide protection work for preparing housing lot
JP3390081B2 (en) How to build an underground parking
JP3185129B2 (en) Column-integrated column base fixed foundation structure and its construction method
JP4612422B2 (en) Construction method of structure and foundation structure used for it
JP2860490B2 (en) Building Steel Foundation
JP4332651B2 (en) Foundation reinforcement device and foundation construction method
JP3178390B2 (en) Building seismic isolation foundation
KR100673475B1 (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
KR100722198B1 (en) Strut system of temporary retaining wall and subgrade external wall construction method utilizing the same
KR200428941Y1 (en) Strut system of temporary retaining wall
JPS63280153A (en) Underground inverted lining method
KR102583537B1 (en) Top-down construction method for uneven-slope site
JP2004285613A (en) Construction method for building foundation
JPH04366229A (en) Temporary corresponding standard used for method of reverse driving construction
JPH02164933A (en) Architecture foundation construction method
JPH02248527A (en) Constructing foundation structure
KR200405652Y1 (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it
JP3567387B2 (en) How to build an underground skeleton

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080908

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090908

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090908

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100908

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees