Positioning and fixing method of civil engineering frame post and positioning metal fitting used therefor

Info

Publication number
JP2700306B2
JP2700306B2 JP7037596A JP3759695A JP2700306B2 JP 2700306 B2 JP2700306 B2 JP 2700306B2 JP 7037596 A JP7037596 A JP 7037596A JP 3759695 A JP3759695 A JP 3759695A JP 2700306 B2 JP2700306 B2 JP 2700306B2
Authority
JP
Japan
Prior art keywords
civil engineering
positioning
engineering frame
roadbed
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7037596A
Other languages
Japanese (ja)
Other versions
JPH08209619A (en
Inventor
重夫 原
重治 原
Original Assignee
重夫 原
重治 原
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 重夫 原, 重治 原 filed Critical 重夫 原
Priority to JP7037596A priority Critical patent/JP2700306B2/en
Publication of JPH08209619A publication Critical patent/JPH08209619A/en
Application granted granted Critical
Publication of JP2700306B2 publication Critical patent/JP2700306B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Road Paving Machines (AREA)
  • Road Repair (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、道路を舗装する場合
に、舗装個所を区画すべく路盤上に複数の土木用枠柱を
順次端部を突き合わせて長さ方向につないで連続的に配
置するとき、それら複数の土木用枠柱を位置決め固定す
る位置決め固定方法、およびその方法で用いる土木用枠
柱の位置決め金具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for pavement of a road, in which a plurality of civil engineering frames are successively arranged on a roadbed so as to divide the pavement portion by connecting their ends in the longitudinal direction. The present invention relates to a positioning and fixing method for positioning and fixing the plurality of civil engineering frame pillars, and a positioning bracket for the civil engineering frame pillar used in the method.

【0002】[0002]

【従来の技術】従来、たとえば車道を舗装するときは、
車道部分の地盤を掘ってそこに砕石や玉砕や砂利などの
路盤材を流し込み、図9に示すように路盤1を形成す
る。その後、図示するように、その路盤1上に複数の土
木用枠柱2を順次端部を突き合わせて長さ方向につない
で連続的に配置し、歩道3沿いのコンクリート溝材4と
の間に舗装個所イを区画する。そして、それら土木用枠
柱2の外側に適宜間隔をあけて複数本の杭5をあてが
い、路盤1中に打ち込んでそれらの枠柱2を動かないよ
うに位置決めしていた。それから、舗装個所イにアスフ
ァルトを敷き、ロードロ−ラやタイヤロ−ラなどを用い
て転圧することにより締め固め、作業終了後枠柱2およ
び杭5を撤去していた。
2. Description of the Related Art Conventionally, for example, when paving a road,
The roadbed material such as crushed stones, crushed stones and gravel is poured into the ground of the roadway portion, and the roadbed 1 is formed as shown in FIG. Thereafter, as shown in the figure, a plurality of civil engineering framework pillars 2 are successively arranged on the roadbed 1 by abutting the ends thereof in the longitudinal direction, and between the concrete pillars 4 along the sidewalk 3. Partition the pavement area a. Then, a plurality of piles 5 are applied to the outside of the civil engineering frame 2 at appropriate intervals, and are driven into the roadbed 1 to position the frame 2 so as not to move. Then, asphalt was laid on the pavement point a and compacted by rolling using a road roller or a tire roller. After the work was completed, the frame 2 and the pile 5 were removed.

【0003】[0003]

【発明が解決しようとする課題】ところが、このような
従来のやり方では、杭5を固い路盤1中に打ち込んだり
その路盤1中から引き抜いたりしなければならないか
ら、作業に手間がかかるとともに、杭5で路盤1を損傷
してその部分を補修しなければならない問題があった。
However, in such a conventional method, since the pile 5 must be driven into the solid subbase 1 or pulled out from the subbase 1, the work is troublesome, and the pile 5 is difficult to work. 5, there was a problem that the roadbed 1 was damaged and that part had to be repaired.

【0004】そこで、この発明の目的は、杭を打ち込ん
だり引き抜いたりする手間をなくして舗装作業を容易と
するとともに、路盤の損傷をなくして補修の面倒をなく
すことにある。
Accordingly, an object of the present invention is to eliminate the trouble of hammering and pulling out a pile, thereby facilitating pavement work, and at the same time, to eliminate damage to a roadbed and repair trouble.

【0005】[0005]

【課題を解決するための手段】そのため、請求項1に記
載の土木用枠柱の位置決め固定方法は、たとえば以下の
図示実施例に示すとおり、道路を舗装するとき、路盤1
0上に複数の土木用枠柱11を順次端部を突き合わせて
長さ方向につないで連続的に配置し、それら複数の土木
用枠柱11で舗装個所ロを区画し、その後、その隣り合
う2つの土木用枠柱11の端部に乗せてそれらの端部間
に位置決め金具14を掛け渡し、それから、その位置決
め金具14の固定釘挿通孔14bに固定釘15を挿入
し、先端を路盤10中に打ち込んでその固定釘15で位
置決め金具14を固定し、その位置決め金具14の頂部
14aで上から押さえ、側縁部14cで横ずれを規制
し、土木用枠柱11を位置決め固定してなる、ことを特
徴とする。
Therefore, a method of positioning and fixing a frame for civil engineering according to the first aspect of the present invention is, for example, as shown in the following illustrated embodiment, when paving a road, a roadbed 1
A plurality of civil engineering frame pillars 11 are sequentially arranged with their ends abutting each other and connected in the length direction, and a plurality of civil engineering frame pillars 11 are used to divide a pavement location B, and then adjacent to each other. Positioning brackets 14 are placed on the ends of the two civil engineering frame posts 11, and a positioning bracket 14 is extended between the ends. Then, a fixing nail 15 is inserted into a fixing nail insertion hole 14 b of the positioning bracket 14, and the tip is connected to the roadbed 10. The positioning metal fittings 14 are fixed to the positioning metal fittings 14, the positioning metal fittings 14 are fixed with the fixing nails 15, the tops 14a of the positioning metal fittings 14 are pressed down from above, the lateral edges 14c are used to restrict lateral displacement, and the civil engineering frame 11 is positioned and fixed. It is characterized by the following.

【0006】請求項2に記載の土木用枠柱の位置決め金
具は、たとえば以下の図示実施例に示すとおり、道路を
舗装する場合に、舗装個所口を区画すべく路盤10上に
複数の土木用枠柱11を順次端部を突き合わせて長さ方
向につないで連続的に配置するとき、その隣り合う2つ
の土木用枠柱11の端部に乗せてそれらの端部間に掛け
渡す頂部14aと、その頂部14aにあけて路盤10に
打ち込む固定釘15を挿通する固定釘挿通孔14bと、
前記頂部14aから下向きに折り曲げて形成し、隣り合
う2つの土木用枠柱11の端部が横ずれすることを規制
する側縁部14cと、を設けてなる、ことを特徴とす
る。
According to a second aspect of the present invention, in the case of paving a road, a plurality of civil engineering frame pillar positioning metal fittings are provided on a roadbed 10 to divide a pavement location as shown in the following embodiment. When the frame pillars 11 are successively arranged by connecting the ends in the longitudinal direction with their ends being sequentially joined to each other, the top part 14a is put on the ends of two adjacent civil engineering framework pillars 11 and bridged between the ends. At the top 14a and on the roadbed 10
A fixed nail insertion hole 14b through which a fixed nail 15 to be driven is inserted ;
A side edge portion 14c formed by bending downward from the top portion 14a and restricting lateral displacement of the ends of two adjacent civil engineering frame pillars 11 is provided.

【0007】請求項3に記載のものは、請求項2に記載
の土木用枠柱の位置決め金具において、たとえば以下の
図示実施例に示すとおり、前記固定釘挿通孔14bに固
定釘15を挿入して先端を路盤10中に打ち込んだと
き、その固定釘15の頭部15aが前記頂部14aの上
面より突出しないように、前記頂部14aの前記固定釘
挿通孔14b付近に、前記2つの土木用枠柱11の端部
間に入り込む凹状部分14dを形成してなる、ことを特
徴とする。
According to a third aspect of the present invention, there is provided the positioning bracket for civil engineering frame post according to the second aspect, wherein a fixing nail 15 is inserted into the fixing nail insertion hole 14b as shown in the following illustrated embodiment. The two civil engineering frames are located near the fixed nail insertion holes 14b of the top portion 14a so that the head 15a of the fixed nail 15 does not protrude from the upper surface of the top portion 14a when the tip is driven into the roadbed 10. It is characterized in that a concave portion 14d that enters between the ends of the pillar 11 is formed.

【0008】[0008]

【作用】そして、この発明では、道路を舗装するとき、
路盤10上に複数の土木用枠柱11を順次端部を突き合
わせて長さ方向につないで連続的に配置し、それら複数
の土木用枠柱11で舗装個所ロを区画し、その後、その
隣り合う2つの土木用枠柱11の端部に乗せてそれらの
端部間に位置決め金具14を掛け渡し、それから、その
位置決め金具14の固定釘挿通孔14bに固定釘15を
挿入し、先端を路盤10中に打ち込んでその固定釘15
で位置決め金具14を固定し、その位置決め金具14の
頂部14aで上から押さえ、側縁部14cで横ずれを規
制し、土木用枠柱11を位置決め固定する。
According to the present invention, when paving a road,
A plurality of civil engineering frame pillars 11 are successively arranged on the roadbed 10 by abutting ends thereof in the longitudinal direction, and a plurality of civil engineering frame pillars 11 are used to divide a pavement location b. A pair of civil engineering frame pillars 11 is placed on the ends of the pillars, and a positioning metal fitting 14 is extended between the ends. Then, a fixing nail 15 is inserted into a fixing nail insertion hole 14b of the positioning metal fitting 14, and the tip is mounted on the roadbed. 10 into the fixed nail 15
Then, the positioning fitting 14 is fixed, the top 14a of the positioning fitting 14 is pressed from above, the lateral edge is restricted by the side edge 14c, and the civil engineering frame 11 is positioned and fixed.

【0009】請求項3に記載のものでは、2つの土木用
枠柱11の端部間に位置決め金具14を掛け渡したと
き、その凹状部分14dがそれら2つの土木用枠柱11
の端部間に入り込み、固定釘挿通孔14bに固定釘15
を挿入して先端を路盤10中に打ち込んだとき、その固
定釘15の頭部15aは、位置決め金具14の頂部14
a上面より突出しない。
According to the third aspect of the present invention, when the positioning bracket 14 is hung between the ends of the two civil engineering frame posts 11, the concave portion 14d is formed by the concave portions 14d.
Of the fixing nail 15 into the fixing nail insertion hole 14b.
Is inserted into the roadbed 10 and the head 15a of the fixing nail 15 is attached to the top 14 of the positioning metal fitting 14.
a Does not protrude from the upper surface.

【0010】[0010]

【実施例】以下、図面を参照しつつ、この発明の実施例
につき説明する。この発明による土木用枠柱の位置決め
固定方法では、たとえば車道を舗装するとき、車道部分
の地盤を掘って砕石や玉砕や砂利などの路盤材を流し込
み、たとえば図8に示すように路盤10を形成する。
Embodiments of the present invention will be described below with reference to the drawings. In the method for positioning and fixing a civil engineering frame pillar according to the present invention, for example, when paving a roadway, a roadbed material such as crushed stone, crushed stone or gravel is poured by digging the ground of the roadway portion, and for example, a roadbed 10 is formed as shown in FIG. I do.

【0011】そして、その路盤10上に複数の枠柱11
を、若干の間隙sを設けて順次端部を突き合わせて長さ
方向につないで連続的に配置し、歩道12沿いのコンク
リート溝材13との間に舗装個所ロを区画する。
Then, a plurality of frame pillars 11 are mounted on the roadbed 10.
Are arranged continuously by connecting the ends in the longitudinal direction with a slight gap s provided therebetween, and a pavement point b is defined between the concrete groove 13 and the sidewalk 12.

【0012】その後、図7の(A)および(B)に示す
ように、隣り合う2つの土木用枠柱11の端部に乗せて
それらの端部間に位置決め金具14を掛け渡す。位置決
め金具14は、たとえば厚さ5mm程度の鉄板を用い、図
6に示すとおり、やや細長で平板状の頂部14aと、そ
の中央にあけた固定釘挿通孔14bと、頂部14aの両
側から下向きに折り曲げて形成した側縁部14cとを設
けて形成してなる。そして、図7の(A)および(B)
に示すごとく、固定釘挿通孔14bを間隙s上に位置
し、頂部14aの両端を各々枠柱11の端部上に乗せ、
両側縁部14cで枠柱11の端部を挾んでなる。
After that, as shown in FIGS. 7A and 7B, the positioning metal fittings 14 are placed over the ends of two adjacent civil engineering framework pillars 11 and extended between the ends. As shown in FIG. 6, the positioning metal fitting 14 is made of an iron plate having a thickness of, for example, about 5 mm, and has a slightly elongated flat plate-like top part 14a, a fixed nail insertion hole 14b formed at the center thereof, and a downward facing from both sides of the top part 14a. It is formed by providing a bent side edge portion 14c. Then, (A) and (B) of FIG.
As shown in the figure, the fixed nail insertion hole 14b is located on the gap s, and both ends of the top 14a are placed on the ends of the frame 11 respectively,
The ends of the frame 11 are sandwiched between the side edges 14c.

【0013】それから、図1の(A)および(B)に示
すように、固定釘挿通孔14bに上から固定釘15を挿
入して間隙sを通し、先端を路盤10中に打ち込み、そ
の固定釘15で位置決め金具14を固定する。そして、
これにより位置決め金具14の頂部14aで上から押さ
えるとともに、側縁部14cで横ずれを規制し、枠柱1
1を位置決め固定する。固定釘15としては、たとえば
コンクリート打ち込み用のものを使用する。
Then, as shown in FIGS. 1A and 1B, the fixing nail 15 is inserted from above into the fixing nail insertion hole 14b, passes through the gap s, and the tip is driven into the roadbed 10 to fix the same. The positioning fitting 14 is fixed with the nail 15. And
As a result, the top 14a of the positioning fitting 14 is pressed down from above, and the side edge 14c regulates the lateral displacement.
1 is positioned and fixed. As the fixed nail 15, for example, a nail for concrete driving is used.

【0014】しかる後、舗装個所ロにアスファルトを流
し込み、ロードロ−ラやタイヤロ−ラなどで押し固めて
舗装作業を終了する。作業終了後、間隙sに工具を入れ
て位置決め金具14を持ち上げ、路盤10から固定釘1
5を引き抜き、それらの位置決め金具14および固定釘
15を取り除いてから枠柱11を撤去する。
Thereafter, the asphalt is poured into the pavement area B, and the pavement work is completed by compacting the asphalt with a road roller or a tire roller. After completion of the work, the positioning metal fitting 14 is lifted by inserting a tool into the gap s, and
5, the positioning post 14 and the fixing nail 15 are removed, and then the frame 11 is removed.

【0015】舗装厚を厚くしたいときには、第1層目を
舗装した路盤上に再び複数の枠柱11を連続的に配置
し、同じく枠柱11の端部間に位置決め金具14を掛け
渡して固定釘15で固定し、同様に第2層目の舗装を行
う。必要に応じ、これを繰り返すことで所望厚さの舗装
を得ることができる。
When it is desired to increase the thickness of the pavement, a plurality of frame pillars 11 are continuously arranged again on the roadbed on which the first layer is paved, and the positioning brackets 14 are similarly stretched between the ends of the frame pillars 11 and fixed. It is fixed with nails 15 and the second layer is paved in the same manner. If necessary, this can be repeated to obtain a pavement having a desired thickness.

【0016】なお、道路がカーブしている等により、隣
り合う2つの枠柱11が一直線上にない場合には、図2
に示すように、枠柱11の側面と側縁部14cとの間に
余裕がある幅広の位置決め金具14を使用することによ
り、それで同様に枠柱11を位置決め固定することがで
きる。
When two adjacent frame pillars 11 are not on a straight line due to a curved road or the like, FIG.
As shown in FIG. 7, by using the wide positioning metal fitting 14 having a margin between the side surface of the frame 11 and the side edge portion 14c, the frame 11 can be similarly positioned and fixed.

【0017】また、上述した図示実施例では、頂部14
aの両側に側縁部14cを形成した。しかし、たとえば
図3に示すように、頂部14aの片側にだけ側縁部14
cを形成し、その側縁部14cを枠柱11の外側(舗装
個所ロと反対の側)に位置して該位置決め金具14を固
定するようにしてもよい。
In the illustrated embodiment described above, the top 14
The side edge part 14c was formed in both sides of a. However, for example, as shown in FIG.
c may be formed, and the side edge portion 14c may be located outside the frame pillar 11 (on the side opposite to the pavement location B) to fix the positioning metal fitting 14.

【0018】ところで、このように枠柱11で区画して
舗装を行うとき、従来、枠柱11上を走るセンサで枠柱
11の高さをはかり、その高さに合わせて舗装を行うこ
とがあった。しかし、上述した実施例においてこのよう
なやり方を行うと、位置決め金具14の頂部14a上面
より突出する固定釘15の頭部が邪魔になる。そこで、
このようなことを考慮し、たとえば図4に示すように、
位置決め金具14の頂部14aの固定釘挿通孔14b付
近に凹状部分14dを形成し、図5に示すとおり隣り合
う2つの枠柱11の端部間に掛け渡して固定釘挿通孔1
4bに固定釘15を挿入して先端を路盤10中に打ち込
んだとき、その凹状部分14dが2つの枠柱11の端部
間の間隙sに入り込み、固定釘15の頭部15aが頂部
14aの上面より突出しないようにしてもよい。
By the way, when pavement is performed by partitioning with the frame pillar 11 as described above, conventionally, the height of the frame pillar 11 is measured by a sensor running on the frame pillar 11, and paving is performed according to the height. there were. However, if such a method is performed in the above-described embodiment, the head of the fixing nail 15 protruding from the upper surface of the top 14a of the positioning fitting 14 becomes an obstacle. Therefore,
Considering this, for example, as shown in FIG.
A concave portion 14d is formed near the fixed nail insertion hole 14b on the top portion 14a of the positioning metal fitting 14, and the fixed nail insertion hole 1 is stretched between the ends of two adjacent frame pillars 11 as shown in FIG.
When the fixing nail 15 is inserted into the base 4b and the tip is driven into the roadbed 10, the concave portion 14d enters the gap s between the ends of the two frame pillars 11, and the head 15a of the fixing nail 15 is You may make it not protrude from an upper surface.

【0019】なお、図4に示す位置決め金具14では、
凹状部分14dの両側を除き側縁部14cを形成する形
状としてなる。そして、図5に示すように、それらの側
縁部14cで挾んで枠柱11の横ずれを規制する。
In the positioning bracket 14 shown in FIG.
Except for both sides of the concave portion 14d, the shape forms the side edge portion 14c. Then, as shown in FIG. 5, the lateral displacement of the frame post 11 is restricted by being sandwiched between the side edges 14c.

【0020】さて、上述した実施例では、位置決め金具
14の固定釘挿通孔14bに固定釘15を挿入して2つ
の土木用枠柱11の端部間の間隙sを通し、先端を路盤
10中に打ち込むようにした。しかし、この発明では、
土木用枠柱11の端部間の間隙sに固定釘15を通す場
合に限らず、一方の土木用枠柱11の端部に打ち込み、
その端部を貫通して先端を路盤10中に打ち込むように
してもよい。
In the above-described embodiment, the fixing nail 15 is inserted into the fixing nail insertion hole 14b of the positioning metal fitting 14, passes through the gap s between the ends of the two civil engineering frame posts 11, and the tip ends in the roadbed 10. I tried to hit. However, in the present invention,
Not only when the fixing nail 15 is passed through the gap s between the ends of the civil engineering frame post 11, but also,
The tip may be driven into the roadbed 10 through the end.

【0021】[0021]

【発明の効果】したがって、この発明によれば、道路を
舗装するとき、複数の土木用枠柱で舗装個所を区画し、
その隣り合う2つの土木用枠柱の端部間に位置決め金具
を掛け渡し、その固定釘挿通孔に挿入して固定釘で位置
決め金具を固定し、その位置決め金具の頂部で上から押
さえ、側縁部で横ずれを規制し、土木用枠柱を位置決め
固定するから、従来のように杭を打ち込んだり引き抜い
たりする手間をなくして舗装作業を容易とするととも
に、路盤の損傷を最小限に抑えて補修の面倒をなくすこ
とができる。
Therefore, according to the present invention, when paving a road, a pavement location is divided by a plurality of civil engineering frames,
A positioning bracket is hung between the ends of the two adjacent civil engineering frame pillars, inserted into the fixing nail insertion hole, and the positioning bracket is fixed with the fixing nail. The lateral displacement is regulated by the section, and the civil engineering frame pillar is positioned and fixed, so that the work of hammering in and pulling out the pile is eliminated, making paving work easier, and repairing with minimal damage to the roadbed Troublesomeness can be eliminated.

【0022】請求項3に記載のものによれば、2つの土
木用枠柱の端部間に位置決め金具を掛け渡したとき、そ
の凹状部分がそれら2つの土木用枠柱の端部間に入り込
み、固定釘挿通孔に固定釘を挿入して先端を路盤中に打
ち込んだとき、その固定釘の頭部は、位置決め金具の頂
部上面より突出しないこととなる。よって、従来と同様
に、枠柱上を走るセンサで枠柱の高さをはかり、その高
さに合わせて舗装を行うことができる。
According to the third aspect of the present invention, when the positioning bracket is hung between the ends of the two civil engineering frame pillars, the concave portion enters between the ends of the two civil engineering frame pillars. When the fixing nail is inserted into the fixing nail insertion hole and the tip is driven into the roadbed, the head of the fixing nail does not protrude from the upper surface of the top of the positioning metal fitting. Therefore, similarly to the related art, the height of the frame pillar can be measured by the sensor running on the frame pillar, and paving can be performed according to the height.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の一実施例である位置決め固定方法に
より、土木用枠柱を位置決め固定した状態を示すもの
で、(A)はその状態の平面図、(B)は正面図であ
る。
FIGS. 1A and 1B show a state in which a civil engineering frame pillar is positioned and fixed by a positioning and fixing method according to an embodiment of the present invention, wherein FIG. 1A is a plan view of that state, and FIG.

【図2】他の実施例である位置決め固定方法により、位
置決め固定した状態を示す平面図である。
FIG. 2 is a plan view showing a state where positioning and fixing are performed by a positioning and fixing method according to another embodiment.

【図3】この発明による位置決め固定方法で用いる位置
決め金具の斜視図である。
FIG. 3 is a perspective view of a positioning fitting used in the positioning and fixing method according to the present invention.

【図4】他の位置決め金具の斜視図である。FIG. 4 is a perspective view of another positioning fitting.

【図5】図4の位置決め金具を用いて土木用枠柱を位置
決め固定した状態を示す正面図である。
FIG. 5 is a front view showing a state where the civil engineering frame is positioned and fixed using the positioning metal fitting of FIG. 4;

【図6】図1の位置決め固定方法で用いる位置決め金具
の斜視図である。
FIG. 6 is a perspective view of a positioning fitting used in the positioning and fixing method of FIG. 1;

【図7】図1の位置決め固定方法で、隣り合う2つの枠
柱の端部間に位置決め金具を掛け渡した状態を示すもの
で、(A)はその状態の平面図、(B)は正面図であ
る。
FIGS. 7A and 7B show a state in which a positioning bracket is hung between the ends of two adjacent frame pillars in the positioning and fixing method of FIG. 1, wherein FIG. 7A is a plan view of the state and FIG. FIG.

【図8】図1の位置決め固定方法で枠柱を位置決め固定
するとき、舗装個所を枠柱で区画した状態を示す斜視図
である。
FIG. 8 is a perspective view showing a state where a pavement portion is divided by the frame pillar when the frame pillar is positioned and fixed by the positioning and fixing method of FIG. 1;

【図9】従来の位置決め固定方法で枠柱を位置決め固定
するとき、舗装個所を枠柱で区画した状態を示す斜視図
である。
FIG. 9 is a perspective view showing a state where a pavement portion is divided by the frame pillar when the frame pillar is positioned and fixed by the conventional positioning and fixing method.

【符号の説明】 10 路盤 11 土木用枠柱 14 位置決め金具 14a 頂部 14b 固定釘挿通孔 14c 側縁部 14d 凹状部分 15 固定釘 15a 頭部 ロ 舗装個所[Description of Signs] 10 Roadbed 11 Civil engineering frame pillar 14 Positioning bracket 14a Top 14b Fixed nail insertion hole 14c Side edge 14d Concave portion 15 Fixed nail 15a Head b Paving location

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 道路を舗装するとき、路盤上に複数の土
木用枠柱を順次端部を突き合わせて長さ方向につないで
連続的に配置し、それら複数の土木用枠柱で舗装個所を
区画し、 その後、その隣り合う2つの土木用枠柱の端部に乗せて
それらの端部間に位置決め金具を掛け渡し、 それから、その位置決め金具の固定釘挿通孔に固定釘を
挿入し、 先端を路盤中に打ち込んでその固定釘で位置決め金具を
固定し、その位置決め金具の頂部で上から押さえ、側縁
部で横ずれを規制し、土木用枠柱を位置決め固定してな
る、 土木用枠柱の位置決め固定方法。
1. When paving a road, a plurality of civil engineering frame pillars are sequentially arranged on the roadbed with their ends abutting each other in the longitudinal direction, and a plurality of civil engineering frame pillars are used to form a pavement location. After that, the positioning bracket is put on the ends of the two adjacent civil engineering frame pillars, and a positioning bracket is bridged between the ends. Then, a fixing nail is inserted into a fixing nail insertion hole of the positioning bracket. Into the roadbed, fix the positioning bracket with the fixing nail, hold down the top of the positioning bracket from above, restrict lateral displacement at the side edge, and position and fix the civil engineering frame post. Positioning and fixing method.
【請求項2】 道路を舗装する場合に、舗装個所を区画
すべく路盤上に複数の土木用枠柱を順次端部を突き合わ
せて長さ方向につないで連続的に配置するとき、その隣
り合う2つの土木用枠柱の端部に乗せてそれらの端部間
に掛け渡す頂部と、 その頂部にあけて路盤に打ち込む固定釘を挿通する固定
釘挿通孔と、 前記頂部から下向きに折り曲げて形成し、隣り合う2つ
の土木用枠柱の端部が横ずれすることを規制する側縁部
と、 を設けてなる、土木用枠柱の位置決め金具。
2. When pavement of a road, when a plurality of civil engineering frame pillars are successively arranged on the roadbed with their ends abutting one another in the length direction to divide a pavement portion, they are adjacent to each other. A top portion that is put on the ends of two civil engineering frame pillars and spans between the ends, a fixed nail insertion hole through which the fixed nails are inserted into the roadbed, and formed by bending downward from the tops And a side edge portion for restricting lateral displacement of ends of two adjacent civil engineering frame columns, and a positioning metal fitting for the civil engineering frame column.
【請求項3】 前記固定釘挿通孔に固定釘を挿入して先
端を路盤中に打ち込んだとき、その固定釘の頭部が前記
頂部の上面より突出しないように、前記頂部の前記固定
釘挿通孔付近に、前記2つの土木用枠柱の端部間に入り
込む凹状部分を形成してなる、請求項2に記載の土木用
枠柱の位置決め金具。
3. When the fixed nail is inserted into the fixed nail insertion hole and the tip is driven into the roadbed, the fixed nail is inserted through the top so that the head of the fixed nail does not protrude from the upper surface of the top. The positioning metal fitting for a civil engineering frame post according to claim 2, wherein a concave portion that enters between the ends of the two civil engineering frame posts is formed near the hole.
JP7037596A 1995-02-02 1995-02-02 Positioning and fixing method of civil engineering frame post and positioning metal fitting used therefor Expired - Lifetime JP2700306B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7037596A JP2700306B2 (en) 1995-02-02 1995-02-02 Positioning and fixing method of civil engineering frame post and positioning metal fitting used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7037596A JP2700306B2 (en) 1995-02-02 1995-02-02 Positioning and fixing method of civil engineering frame post and positioning metal fitting used therefor

Publications (2)

Publication Number Publication Date
JPH08209619A JPH08209619A (en) 1996-08-13
JP2700306B2 true JP2700306B2 (en) 1998-01-21

Family

ID=12501949

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7037596A Expired - Lifetime JP2700306B2 (en) 1995-02-02 1995-02-02 Positioning and fixing method of civil engineering frame post and positioning metal fitting used therefor

Country Status (1)

Country Link
JP (1) JP2700306B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200459661Y1 (en) * 2009-08-19 2012-04-04 박기홍 Walk road boundary instrument

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0757988B2 (en) * 1993-04-08 1995-06-21 忠義 菅原 Coupling device for concrete formwork

Also Published As

Publication number Publication date
JPH08209619A (en) 1996-08-13

Similar Documents

Publication Publication Date Title
JP2700306B2 (en) Positioning and fixing method of civil engineering frame post and positioning metal fitting used therefor
JP3857124B2 (en) Road surface lining construction method and lining board used therefor
US7021858B2 (en) Double joints pavement system
JP3343598B2 (en) Hanging wall type retaining wall method for lightweight embankment method
JP3406383B2 (en) Subgrade ground covering construction method
JP4399050B2 (en) Paving partition material
JPH0788645B2 (en) Pavement method for road joints
JP3120150B1 (en) Road lining method
JPS59114301A (en) Assembled walking road
KR200213124Y1 (en) Prefabricated steel flash board
JP4029058B2 (en) Construction method of approach part of multilevel intersection road
JPH0119045Y2 (en)
JP4058170B2 (en) Road crossing groove structure
JPH0643004U (en) Sidewalk version
JPS59192104A (en) Bow walking road block and production thereof
JPH0739923Y2 (en) Precast block pavement
JP3619515B2 (en) Split-bridge type traffic road and method for constructing split-bridge type traffic road
JP2606448B2 (en) Concrete overhang structure
JP2002129575A (en) Lining structure for slope face
JP3402851B2 (en) Boundary blocks on roads and construction methods
JP3095429U (en) Sidewalk boundary block with apron
EP0472803A1 (en) A method of arranging edgings as kerb elements for demarcation of roadway edges and the like
KR850002239Y1 (en) A prefab ricated form
JPH07116686B2 (en) Method and structure for assembling pillars and foundation of elevated road
JPH036642Y2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees