JPH0788645B2 - Pavement method for road joints - Google Patents

Pavement method for road joints

Info

Publication number
JPH0788645B2
JPH0788645B2 JP63082458A JP8245888A JPH0788645B2 JP H0788645 B2 JPH0788645 B2 JP H0788645B2 JP 63082458 A JP63082458 A JP 63082458A JP 8245888 A JP8245888 A JP 8245888A JP H0788645 B2 JPH0788645 B2 JP H0788645B2
Authority
JP
Japan
Prior art keywords
pavement
road
joint
holes
seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP63082458A
Other languages
Japanese (ja)
Other versions
JPH01256602A (en
Inventor
元之助 新井
Original Assignee
元之助 新井
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 元之助 新井 filed Critical 元之助 新井
Priority to JP63082458A priority Critical patent/JPH0788645B2/en
Publication of JPH01256602A publication Critical patent/JPH01256602A/en
Publication of JPH0788645B2 publication Critical patent/JPH0788645B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)
  • Sawing (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は道路継目部の舗装方法に関する。TECHNICAL FIELD The present invention relates to a method for paving road joints.

(従来の技術) 一般に、道路継目部には鋼製ないしはゴム製のジョイン
ト部材を設置することが多いが、舗装が遊間を跨いで連
続するようにして道路継目部を盲目地状態とすることも
なされている。
(Prior Art) Generally, a joint member made of steel or rubber is often installed at a road joint, but it is also possible to make the road joint a blind joint state so that the pavement is continuous across the play space. Has been done.

上記ジョイント部材を設置する場合は、遊間を存して相
対する道路端部にそれぞれ段下げ部を形成し、両段下げ
部の中央位置にジョイント部材を配置してその両側の段
下げ部にコンクリートを路面高さまで打設し、このコン
クリート部にジョイント部材を固定するという方法が一
般に採用されている。この場合、上記コンクリートによ
る継目部の舗装と橋面舗装との境界を波形にするという
提案は知られている(実公昭57−2484号公報参照)。こ
のような波形の境界をもって連なる2つの舗装は、いず
れか一方が摩耗して境界に段差を生じても、車両のタイ
ヤが段差を斜めに横切っていき易く、タイヤの急激な上
下動を防止することができるため、車両の走行性がよ
い。
When installing the above-mentioned joint member, a step-down portion is formed at each of the opposite road ends with a play space, and the joint members are arranged at the center positions of both step-down portions, and concrete is provided at the step-down portions on both sides of the joint member. Generally, a method of driving the concrete up to the height of the road surface and fixing the joint member to the concrete portion is adopted. In this case, it is known that the boundary between the concrete pavement and the bridge pavement is corrugated (see Japanese Utility Model Publication No. 57-2484). Even if one of the two pavements connected with such a wave boundary is worn and a step is generated at the boundary, the tire of the vehicle easily crosses the step obliquely, and a rapid up and down movement of the tire is prevented. Therefore, the running performance of the vehicle is good.

(発明が解決しようとする課題) 上述の波形の境界は、ジョイント部材を設置する場合に
限らず、盲目地において道路継目部の舗装とその両側の
橋面舗装との材質が異なる場合においても採用すること
が好ましいが、いずれにしても波形境界の形成が難しい
という問題がある。
(Problem to be Solved by the Invention) The above-mentioned corrugated boundary is not limited to the case where a joint member is installed, and is adopted even when the material of the road joint pavement and the bridge surface pavement on both sides of the road joint are different in a blind place. However, there is a problem that it is difficult to form the waveform boundary in any case.

すなわち、道路継目部におけるジョイント部材の設置あ
るいは盲目地の施工においては、先に道路継目部を跨い
で橋面舗装を連続して施し、後から橋面舗装の道路継目
部分を除去し、その除去した部分にジョイント部材の設
置あるいは盲目地の施工を行なう後付け工法が多く採用
されている。上記橋面舗装の道路継目部分を除去する際
に、橋面舗装を波形に切れば、上述の境界が波形になる
が、その際に通常用いられるコンクリートカッターは直
線状の目地切りを行なうものであるため、波形に目地切
りするのは実質上不可能である。
That is, when installing joint members at road joints or constructing blind joints, bridge surface pavement shall be continuously applied across the road joints first, and then the road joints of the bridge surface pavement shall be removed and removed. Many post-installation methods are used to install joint members or construct blind spots in these areas. When removing the road joint part of the bridge surface pavement, if the bridge surface pavement is cut into a corrugated shape, the above-mentioned boundary becomes a corrugated shape, but the concrete cutter usually used at that time is to cut straight joints. As a result, it is virtually impossible to make joints in the waveform.

結局、コンクリートカッターで直線状の目地切りを行な
って段下げ部を余分に幅広く形成した後、該段下げ部内
に波形の型枠を立設してその両側に舗装材を打設すると
いうような面倒な作業を行なう必要があるとともに、上
記舗装材の打設によって舗装の複数箇所に打ち継ぎがで
き、さらに、転圧を要する舗装材ではその打設範囲が極
めて狭いことから転圧が非常に難しく、十分な転圧が期
待できない。
After all, after making a straight joint with a concrete cutter to form an extra wide step-down part, a corrugated formwork is erected in the step-down part and pavement materials are placed on both sides of it. In addition to the need for troublesome work, the above pavement material can be cast into multiple locations on the pavement, and in the case of pavement material that requires rolling compaction, the placement range is extremely narrow, so rolling compaction is extremely difficult. Difficult and cannot expect sufficient compaction.

本発明の課題は、上述の波形の型枠を用いることなく2
つの舗装の境界を簡単に波形にすることができる道路継
目部の舗装方法を提供することにある。
It is an object of the present invention to use the above-mentioned corrugated form without using
It is an object of the present invention to provide a pavement method for road joints that can easily make the boundary between two pavements corrugated.

(課題を解決するための手段) 本発明は、先に施されている舗装に複数の孔を並べて設
け、この各孔を結べば、各孔の孔壁を波形状における凹
部(あるいは凸部)として利用することができる点に着
目してなされたものである。
(Means for Solving the Problems) In the present invention, a plurality of holes are provided side by side in a pavement previously applied, and when the holes are connected, the hole wall of each hole is a concave portion (or a convex portion) in a wave shape. It was made paying attention to the fact that it can be used as.

すなわち、本発明にかかる道路継目部の舗装方法は、 道路継目部の遊間を塞いだ状態で該遊間を介して相対す
る一方の道路から他方の道路にわたって上記遊間を跨い
で連続する第1舗装を施し、 次に、上記遊間両側の道路上において各々上記第1舗装
に複数の円形の孔を道路継目部の長手方向に並ぶように
開設し、 上記第1舗装における上記遊間両側の道路継目部の長手
方向に並設された上記孔より内側の部分を除去すること
により、上記遊間の両側に上記各孔の孔壁における上記
遊間側を向いた円弧状の部位が上記長手方向に連なって
なる側壁を有する段下げ部を形成し、 上記段下げ部に継目部用後打ち材を打設して継目部用の
第2舗装を形成することを特徴とする。
That is, the pavement method of the road seam portion according to the present invention is the first pavement that is continuous across the play space from one road facing the other road through the play space with the play space of the road seam portion blocked. Next, a plurality of circular holes are formed in the first pavement so as to be aligned in the longitudinal direction of the road joint on the roads on both sides of the play space. By removing the portions inside the holes arranged in parallel in the longitudinal direction, side walls on the opposite sides of the holes in which arc-shaped portions of the hole walls of the holes facing the clearance side are continuous in the longitudinal direction. And forming a second pavement for the seam portion by forming a step-down portion having a step and placing a post-casting material for the seam portion on the step-down portion.

(作用) 上記道路継目部の舗装方法においては、遊間の両側にお
いて第1舗装に複数の孔を道路継目部の長手方向に並ぶ
ように開設し、当該両側の孔より内側の舗装部分を除去
して段下げ部を形成するようにしたから、該段下げ部に
おいて、道路継目部に道路の伸縮を許容するジョイント
部材を設置してその背部に後打ち材を打設して第2舗装
を形成すること、あるいは第1舗装よりも伸縮性の高い
後打ち舗装材を、遊間を跨いで連続するように打設して
盲目地形式の第2舗装を形成することが可能である。
(Operation) In the above-described pavement method for road joints, a plurality of holes are formed in the first pavement on both sides of the free space so as to be aligned in the longitudinal direction of the road joint, and pavement portions inside the holes on both sides are removed. Since the step-down part is formed by forming the step-down part, a joint member that allows the expansion and contraction of the road is installed in the road-seam part, and the post-punch material is placed behind the joint member to form the second pavement. Alternatively, it is possible to form a second pavement of a blind ground type by placing a post-paving material having higher elasticity than the first pavement so as to be continuous across the play space.

そうして、上記段下げ部の側壁は、道路継目部の長手方
向に並設した各孔の孔壁の遊間側を向いた円弧状の部位
を利用して構成するから、各孔の孔壁の円弧状の部位を
上記長手方向と交差する方向に凹んだ凹部として上記側
壁に凹凸を形成することができる。そして、この凹凸を
有する側壁が第1舗装と段下げ部に施した第2舗装との
境界になるから、結局、この境界は凹凸を有するもの、
つまり波形となる。これにより、第1舗装及び第2舗装
のうちの一方が轍ぼりによって摩耗して上記境界部で段
差を生じても、車両のタイヤの上下動を少なくしてその
走行性を高めることができるものである。
Then, since the side wall of the step-down portion is configured by utilizing the arcuate portion facing the free space side of the hole wall of each hole juxtaposed in the longitudinal direction of the road joint, the hole wall of each hole is formed. Concavities and convexities can be formed on the side wall as concave portions in which the arc-shaped portions are concaved in the direction intersecting the longitudinal direction. Then, since the side wall having the unevenness serves as a boundary between the first pavement and the second pavement applied to the step-down portion, eventually, the boundary has unevenness,
That is, it becomes a waveform. Accordingly, even if one of the first pavement and the second pavement is worn due to rubbing and a step is formed at the boundary portion, the vertical movement of the tire of the vehicle can be reduced and the running performance thereof can be improved. Is.

(発明の効果) 従って、本発明によれば、第1舗装における遊間の両側
の各部位に道路継目部の長手方向に並ぶ複数の孔を形成
して、当該両側の孔よりも内側の舗装材を除去すること
により、上記遊間の両側に上記各孔の孔壁における上記
遊間側を向いた円弧状の部位が上記長手方向に連なって
なる側壁を有する段下げ部を形成し、該段下げ部に後打
ち材を打設して継目部用の第2舗装を形成するようにし
たから、ジョイント部材を設置する場合及び盲目地にす
る場合のいずれにおいても、波形型枠を用いることな
く、第1舗装と継目部用の第2舗装との境界を簡単に波
形に形成することができ、舗装回数を少なくして作業の
効率化を図り、舗装の打ち継ぎ部を減らすことができる
とともに、両舗装の境界に段差を生じても良好な車両走
行性を維持することができるようになる、という効果が
得られる。
(Effect of the invention) Therefore, according to the present invention, a plurality of holes aligned in the longitudinal direction of the road joint are formed in each part on both sides of the play in the first pavement, and the pavement material inside the holes on both sides is formed. Is removed to form step-down parts having side walls on both sides of the play, the arc-shaped portions of the hole walls of the holes facing the play-interval side being continuous in the longitudinal direction. Since the second pavement for the seam portion is formed by placing the post-casting material in the joint, it is possible to use the corrugated form without using the corrugated form in both cases of installing the joint member and making the joint blind. The boundary between the first pavement and the second pavement for the seam can be easily formed into a corrugated shape, the number of pavements can be reduced, work efficiency can be improved, and the jointing part of the pavement can be reduced. Good vehicle running performance even if there is a step on the boundary of the pavement The effect of being able to maintain is obtained.

(実施例) 以下、本発明の実施例を図面に基づいて説明する。(Example) Hereinafter, the Example of this invention is described based on drawing.

−実施例1− 本例は第1図乃至第4図に示されており、盲目地の施工
例である。第1図において、1は道路橋における道路端
部2,2による継目部の遊間である。本例の場合、橋脚
(橋台)に桁が架設され、床版3,3が打設され、遊間1
を跨ぐ覆板4が両床版3,3の上面に架設されて、第1舗
装(橋面舗装)5が上記遊間1を跨いで連続して施され
ている。また、この第1舗装5は、舗装材を打設してか
ら転圧がかけられている。
-Example 1-This example is shown in FIGS. 1 to 4 and is an example of construction of a blind joint. In FIG. 1, reference numeral 1 is a clearance between seams formed by road edges 2 and 2 in a road bridge. In the case of this example, a girder is erected on the bridge pier (abutment), the floor slabs 3, 3 are placed, and the free space 1
A cover plate 4 straddling the slab is erected on the upper surfaces of the two floor slabs 3, 3 and a first pavement (bridge surface pavement) 5 is continuously provided across the play space 1. Further, the first pavement 5 is subjected to rolling compaction after the pavement material is placed.

継目部の舗装に際しては、まず、遊間1から橋長方向へ
離隔した位置において、第1舗装5の上面に道路継目部
の長手方向へ延びる基準線6,6を描く(マーキング)。
そして、上記第1舗装5に対し、その上方から複数の孔
7をそれぞれの略中心が上記基準線6の位置にあって互
いに接するように穿設する。これにより、複数の孔7は
道路継目部の長手方向に並設された状態となる。
When paving the seam, first, at a position separated from the free space 1 in the bridge length direction, reference lines 6 and 6 extending in the longitudinal direction of the road seam are drawn on the upper surface of the first pavement 5 (marking).
Then, a plurality of holes 7 are formed in the first pavement 5 from above so that the centers of the holes 7 are at the positions of the reference line 6 and are in contact with each other. As a result, the plurality of holes 7 are arranged side by side in the longitudinal direction of the road joint.

上記穿孔にあたっては、例えば第2図に示すコアドリル
13を用いる。このコアドリル13は、基台14に立設した支
柱15と、この支柱15に支持筒16にて昇降可能に支持した
駆動装置17と、この駆動装置17の駆動軸18に結合した円
筒状のコアビット19とからなる。上記駆動装置17はコア
ビット19を回転させながら下降せしめるものである。す
なわち。このコアドリル13の場合、コアビット19の下端
を第1舗装5の上面に当接し、コアビット19を回転させ
ながら下降せしめることにより、第1舗装5を円切し、
しかる後、この円切りした部分をコアビット19とともに
上方へ抜き取り、上述の孔7を形成することになる。
For the drilling, for example, the core drill shown in FIG.
Use 13. The core drill 13 includes a column 15 standing on a base 14, a drive unit 17 supported on the column 15 by a support tube 16 so as to be able to move up and down, and a cylindrical core bit coupled to a drive shaft 18 of the drive unit 17. It consists of 19 and. The drive device 17 lowers the core bit 19 while rotating it. Ie. In the case of this core drill 13, the lower end of the core bit 19 is brought into contact with the upper surface of the first pavement 5 and the core bit 19 is rotated and lowered to cut the first pavement 5 into a circle.
After that, the cut portion is extracted upward together with the core bit 19 to form the hole 7 described above.

上述の如くして2本の基準線6,6においてそれぞれ複数
の孔7が穿設された後、第3図に示す如く、第1舗装5
の各孔7より遊間1側にある部分、つまり、2本の複数
の孔7による列の間にある部分を除去して段下げ部8を
形成する。この舗装の除去は、削岩機で舗装をはつるこ
とにより行なうことができ、上記基準線6,6の間にあっ
た舗装部分の除去により、段下げ部8の対向する側壁8
a,8aは、上記各孔7の孔壁の一部(遊間1側を向いた円
弧状の部位)で構成され、この孔壁部分が橋長方向へ凹
んだ凹凸状となる。
After the plurality of holes 7 are formed in each of the two reference lines 6 and 6 as described above, as shown in FIG.
The step lowering portion 8 is formed by removing the portion on the side of the play space 1 from each hole 7, that is, the portion between the rows of the plurality of two holes 7. This pavement can be removed by cutting the pavement with a rock drilling machine, and by removing the pavement portion between the reference lines 6 and 6, the side walls 8 of the step-down portion 8 facing each other can be removed.
The a and 8a are formed by a part of the hole wall of each hole 7 (a circular arc-shaped portion facing the free space 1 side), and the hole wall portion is concave and convex in the bridge length direction.

次に、遊間1の覆板4を除去し、第4図に示す如く段下
げ部(床版上面)8に遊間1のシール部材10を支持し、
この段下げ部8およびシール部材10の上に舗装材を打設
して第2舗装11を形成する。従って、上記段下げ部8の
対向する側壁8a,8aが第1舗装5と第2舗装11との境界
となり、この境界は上記側壁8aに対応して凹凸状、つま
り波形となる。この場合、第2舗装11は第1舗装5と同
じ舗装材で形成しても、異なる舗装材で形成してもよ
い。
Next, the cover plate 4 of the play gap 1 is removed, and the seal member 10 of the play gap 1 is supported on the step-down portion (the floor slab upper surface) 8 as shown in FIG.
A pavement material is cast on the step-down portion 8 and the seal member 10 to form the second pavement 11. Therefore, the side walls 8a, 8a facing each other of the step-down portion 8 serve as a boundary between the first pavement 5 and the second pavement 11, and this boundary has an uneven shape, that is, a corrugated shape corresponding to the side wall 8a. In this case, the second pavement 11 may be formed of the same pavement material as that of the first pavement 5 or a different pavement material.

−実施例2− 本例は第5図および第6図に示されている。Example 2-This example is shown in FIGS. 5 and 6.

すなわち、本例は実施例1とは異なる形状の波形境界を
得る方法である。まず、遊間1から橋長方向へ離隔した
位置において、第1舗装5に道路継目部の長手方向へ延
びる切れ目21をいれる。この切れ目21はコンクリートカ
ッターを用いて形成することができる。次に、上記第1
舗装5に対し、その上方から複数の孔7をそれぞれが上
記切れ目21で互いに結ばれるように道路継目部の長手方
向に間隔をおいて穿孔する。
That is, this example is a method of obtaining a waveform boundary having a shape different from that of the first embodiment. First, at a position separated from the play space 1 in the bridge length direction, the first pavement 5 is provided with a cut 21 extending in the longitudinal direction of the road joint. This cut 21 can be formed using a concrete cutter. Next, the first
From the upper side of the pavement 5, a plurality of holes 7 are drilled at intervals in the longitudinal direction of the road joint so that the holes 7 are connected to each other at the cuts 21.

そうして、上記第1舗装5の切れ目21と各孔7より遊間
1側にある部分を除去して段下げ部を形成し、実施例1
と同様にしてこの段下げ部に舗装材を打設し、第2舗装
22を形成する。従って、本例の場合、第1舗装5と第2
舗装22の境界は、上記切れ目21と各孔7の側壁とにより
形成された波形となる。
Then, the cut 21 of the first pavement 5 and the portion on the free space 1 side of each hole 7 are removed to form a step-down portion.
Pavement material is placed on this step-down section in the same manner as
Form 22. Therefore, in the case of this example, the first pavement 5 and the second pavement 5
The boundary of the pavement 22 has a corrugated shape formed by the cut 21 and the side wall of each hole 7.

なお、本例においては、切れ目21が各孔7の中心を通る
ようにしたが、中心からずれた位置を通るようにしても
よい。また、切れ目21は各孔7を穿設した後に各孔7を
結ぶようにいれてもよい。
In this example, the cut 21 is made to pass through the center of each hole 7, but it may be made to pass through a position deviated from the center. Further, the cut 21 may be formed so as to connect the holes 7 after forming the holes 7.

−実施例3− 本例は第7図乃至第9図に示し、道路継目部にジョイン
ト部材を設置する例である。
-Example 3-This example is shown in FIGS. 7 to 9 and is an example in which a joint member is installed at a road joint.

すなわち、第7図に示すように、まず、床版3,3に形成
された切欠箱抜き部(床版打設時に型枠を設けて形成す
る)25,25に遊間1の覆板6を設けて砕石27を詰め、第
1舗装5を実施例1と同様に連続して施し、基準線6,6
を引いて複数の孔7を穿設する。次に、第8図に示すよ
うに、第1舗装5の各孔7より遊間1側にある部分、砕
石27及び覆板26を除去し、段下げ部28を形成する。従っ
て、この段下げ部28は、孔7と切欠箱抜き部25とにより
上下2段の底面を有するとともに、側壁28aは上部のみ
が各孔7の孔壁の一部により凹凸状に形成されることに
なる。
That is, as shown in FIG. 7, first, the cover plate 6 of the play space 1 is attached to the notch box cutout portions (formed by forming a mold when placing the floor slab) 25, 25 formed in the floor slabs 3, 3. It is provided and packed with crushed stones 27, and the first pavement 5 is continuously applied in the same manner as in the first embodiment.
To draw a plurality of holes 7. Next, as shown in FIG. 8, the portion on the free space 1 side of each hole 7 of the first pavement 5, the crushed stone 27 and the cover plate 26 are removed to form a step-down portion 28. Therefore, this step-down portion 28 has a bottom surface of two upper and lower steps by the hole 7 and the notch box cutout portion 25, and only the upper portion of the side wall 28a is formed in an uneven shape by a part of the hole wall of each hole 7. It will be.

そうして、第9図に示すように、遊間1に対応する位置
にジョイント部材29を設け、その背部、つまり、上記段
下げ部28にセメントコンクリート等を打設して第2舗装
30を形成する。
Then, as shown in FIG. 9, a joint member 29 is provided at a position corresponding to the play space 1 and cement concrete or the like is placed on the back portion thereof, that is, the step lowering portion 28 to make a second pavement.
Forming 30.

本例のジョイント部材29は一対の波形板の間にシール材
を介装したものであるが、ラバートップジョイントなど
他の形式のジョイント部材を設置してもよい。また、第
1舗装5と第2舗装30の境界は実施例2の施工例に倣っ
て円弧と直線が交互に設けられたものにすることもでき
る。
The joint member 29 of this example has a seal member interposed between a pair of corrugated plates, but other types of joint members such as a rubber top joint may be installed. Further, the boundary between the first pavement 5 and the second pavement 30 may be one in which arcs and straight lines are alternately provided in accordance with the construction example of the second embodiment.

【図面の簡単な説明】[Brief description of drawings]

図面は本発明の実施例を示し、第1図乃至第4図は実施
例1に関するもので、第1図は穿孔の段階の道路継目部
を示す一部断面にした斜視図、第2図は穿孔手段を示す
一部断面にした正面図、第3図は舗装除去段階における
第1図と同様の図、第4図は施工完了状態を示す第1図
と同様の図、第5図は実施例2における穿孔段階の道路
継目部の平面図、第6図は同例の施工完了状態を示す道
路継目部の平面図、第7図乃至第9図は実施例3におけ
る第1図、第3図および第4図に対応する図である。 1……遊間、2……道路端部、3……床版、5……第1
舗装、7……孔、8,28……段下げ部、8a,28a……側壁、
11,22,30……第2舗装
The drawings show the embodiments of the present invention, and FIGS. 1 to 4 relate to the first embodiment. FIG. 1 is a partially sectional perspective view showing a road joint at the stage of drilling, and FIG. FIG. 3 is a view similar to FIG. 1 at the pavement removal stage, FIG. 4 is a view similar to FIG. 1 showing the completion of construction, and FIG. 6 is a plan view of the road joint at the drilling stage in Example 2, FIG. 6 is a plan view of the road joint showing the construction completion state of the same example, and FIGS. 7 to 9 are FIGS. It is a figure corresponding to a figure and FIG. 1 ... Yuma, 2 ... Road edge, 3 ... Floor slab, 5 ... First
Pavement, 7 ... hole, 8,28 ... step lowering part, 8a, 28a ... side wall,
11,22,30 …… Second pavement

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】道路継目部の遊間を塞いだ状態で該遊間を
介して相対する一方の道路から他方の道路にわたって上
記遊間を跨いだ連続する第1舗装を施し、 次に、上記遊間両側の道路上において各々上記第1舗装
に複数の円形の孔を道路継目部の長手方向に並ぶように
開設し、 上記第1舗装における上記遊間両側の道路継目部の長手
方向に並設された上記孔より内側の部分を除去すること
により、上記遊間の両側に上記各孔の孔壁における上記
遊間側を向いた円弧状の部位が上記長手方向に連なって
なる側壁を有する段下げ部を形成し、 上記段下げ部に継目部用後打ち材を打設して継目部用の
第2舗装を形成することを特徴とする道路継目部の舗装
方法。
1. A continuous first pavement is applied across the play space from one road facing the other road through the play space in a state where the play space of the road seam portion is closed, and then, on both sides of the play space. On the road, a plurality of circular holes are formed in the first pavement so as to be lined up in the longitudinal direction of the road joint, and the holes are juxtaposed in the longitudinal direction of the road joints on both sides of the play in the first pavement. By removing the inner portion, a step-down portion having a side wall in which arc-shaped portions of the hole walls of the holes facing the clearance side are continuous in the longitudinal direction on both sides of the clearance, A pavement method for a road seam, which comprises forming a second pavement for a seam by placing a post-casting material for the seam on the step-down portion.
JP63082458A 1988-04-04 1988-04-04 Pavement method for road joints Expired - Lifetime JPH0788645B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63082458A JPH0788645B2 (en) 1988-04-04 1988-04-04 Pavement method for road joints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63082458A JPH0788645B2 (en) 1988-04-04 1988-04-04 Pavement method for road joints

Publications (2)

Publication Number Publication Date
JPH01256602A JPH01256602A (en) 1989-10-13
JPH0788645B2 true JPH0788645B2 (en) 1995-09-27

Family

ID=13775068

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63082458A Expired - Lifetime JPH0788645B2 (en) 1988-04-04 1988-04-04 Pavement method for road joints

Country Status (1)

Country Link
JP (1) JPH0788645B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3829073B2 (en) * 2001-07-19 2006-10-04 新日本製鐵株式会社 Partial cutting device and partial cutting method for existing expansion joint
JP4646936B2 (en) * 2007-03-07 2011-03-09 元之助 新井 Road bridge joint pavement construction method
JP4524294B2 (en) * 2007-03-07 2010-08-11 元之助 新井 Road bridge joint pavement construction method
JP4646935B2 (en) * 2007-03-07 2011-03-09 元之助 新井 Road bridge joint pavement construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS572484U (en) * 1980-06-06 1982-01-07
JPS6043507A (en) * 1983-08-19 1985-03-08 西部瓦斯株式会社 Drive machine of paved road and open space

Also Published As

Publication number Publication date
JPH01256602A (en) 1989-10-13

Similar Documents

Publication Publication Date Title
JP4092662B2 (en) Bridge construction method
JP3859636B2 (en) Road pavement construction method
JPH0788645B2 (en) Pavement method for road joints
US7021858B2 (en) Double joints pavement system
JP3857124B2 (en) Road surface lining construction method and lining board used therefor
KR20060110138A (en) H pile use wall constitution structure and construction process
KR102309271B1 (en) Cutting machine capable of adjusting the blades interval for concrete pavement and cutting method using thereof
US2205810A (en) Construction joint
JPH11350409A (en) Joint structure for precast pc board pavement using pad board
JP5517057B2 (en) Gutter repair member and gutter repair method using gutter repair member
JP4939101B2 (en) Approach construction method
JP2700306B2 (en) Positioning and fixing method of civil engineering frame post and positioning metal fitting used therefor
JP2000145386A (en) Member and method for repairing batholith of existing mountain tunnel
AU671528B2 (en) Jointing element
JPS61176718A (en) Slope construction work for road shoulder
JP4029058B2 (en) Construction method of approach part of multilevel intersection road
JPH0643004U (en) Sidewalk version
JPH0439336Y2 (en)
JPH081071B2 (en) Basic construction method for unit housing
JPH0310162Y2 (en)
JPS5972325A (en) Pavement work for surrounding of manhole
JP3249636B2 (en) Foundation structure and construction method
JPH0739923Y2 (en) Precast block pavement
KR20030053638A (en) Construction method of corrugated steel plate structures
JP2023176944A (en) Method of removing existing joint device

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070927

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080927

Year of fee payment: 13

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080927

Year of fee payment: 13